Sei sulla pagina 1di 11

Microwave LOS Survey Guide

MicrowaveLOSSurveyGuide

Microwave LOS Survey Guide


MicrowaveLOSSurveyGuide
BeforeOn
Site/Study
Map/Google
earth
th

Summaryand
TSSR

ViewOnSite
andtracking

LOS??

Analys data
withpathloss

Prepare Before the LOS Survey


SiteInformationthatwillbesurvey
1. DataCoordinate(Longitudeand
latitude)atNearendandfarend
Alternative
DegreeMinuteSecond
Decimal
InputdatatoGPS(bymanualorby
mapsource)
2. SiteAddress
3. Permitletter(AccesstoSite)
4. SiteownerandPICownerofsitewith
NoTelp
5. TowerProposedifNewSiteand
Tower Proposed if New Site and
TowerExisting
6. MaketerraindataNominal/Map
studywithMapTopo,Googleearth,
G
GoogleMap,Pathloss
l M P hl
terraindata.
i d
7. TopologyNetworkExisting(mapinfo,
Pathloss,Googleearth)

Map Study/ Google earth

SiteInformationthatwillbesurvey
1.MaketerraindataNominal/Map
studywithMapTopo,Googleearth,
y
p p ,
g
,
GoogleMap,Pathloss terraindata.

By map Study, Google Earth,


Pathloss
LOS or Not ??

Tool for LOS Survey


1. GPS(GlobalPositioningSystem)
1
GPS (Gl b l P iti i S t )
MarkingactualCoordinate
Tracking
Getdataazimuth/Bearingfromlink
g
GetAltitude/elevationdata
2.Compass(Azimuth)
3.Altimeter(HeightfromGroundlevel)
4 Inclinometer (calculated of angle)
4.Inclinometer(calculatedofangle)
6.SafetyBelt
7.Binocular
8.DigitalCamera
9.Mirror
9.Etc

At Site Near End


1. MarkingCoordinate,CrosscheckcoordinateSite
Situation photograph
Situationphotograph
2. CompareCoordinatewithNominalcoordinate&
updatetoGPS
3. Makesurefromwhere,wedoLOSSurvey
FornewSiteBuilt:
CoordinateandAddressfromSitac /RNP
ForNewSiteSharing:
Coordinate owner and Address
Coordinate,ownerandAddress.
3. TakephotopanoramicfromPole/Tower
proposed.0,30,60,90,120,150,180,210,240,
270,300,330.
4. MakedrawinglayoutSiteandTower
5. ViewtoFarendcandidatewithBinocularand
take Photograph.
takePhotograph.
6. MakeanalysisLOSornotbaseonViewtoFar
end

On tracking
O
ac g to
o Far
a end
e d
1. WithGPSandLaptop,weTrack
Route to FE.
RoutetoFE.
2. Recorddataelevation(ASL=Above
SeaLevel)withAltimeterorGPS.
3. RecorddataBuildingandThreeat
Li
LineofSightNearendtoFE
f Si h N
d FE
4. MarkingCoordinatethat
probabilitybeObstacle

At Site Far End


1. MarkingCoordinate,Crosscheckcoordinate
g
SiteSituationphotograph
2. CompareCoordinatewithNominal
coordinate&updatetoGPS
3 Makesurefromwhere,wedoLOSSurvey
3.
Make sure from where we do LOS Survey
FornewSiteBuilt:
CoordinateandAddressfromSitac /RNP
ForNewSiteSharing:
Coordinate,ownerandAddress.
3. TakephotopanoramicfromPole/Tower
proposed 0 30 60 90 120 150 180 210
proposed.0,30,60,90,120,150,180,210,
240,270,300,330.
4. ViewtoFarendcandidatewithBinocularand
takePhotograph.
5. MakedrawinglayoutSiteandTower
6. MakeanalysisLOSornotbaseonViewto
Nearend

After LOS Survey


1. InputdataelevationtoPathloss
2. MakeanalysisaboutLinkLOSorNotbaseon
AntennaHeightonTowerProposed
g
p
Towerproposed
BuildingHeight
Terraindata
BuildingorObstacle
B ildi
Ob t l
3.MakeSummaryLOSsurvey
4.MakeTSSR

Thanks you

Potrebbero piacerti anche