General Items
Item No.

Code No.
A100

Description

Unit

Qty.

Rate

CONTRACTUAL REQUIREMENTS
Bond

A111

Performance Bond.

sum

A112

Design Guarantee Bond [for roof structure (to be


designed by the Contractor).

sum

A2

Insurances
A121

Insurance of the Works.

sum

A122

Public Liability Insurance.

sum

A123

SOCSO/Workmen Compensation Insurance.

sum

Statutory Obligations
A131

CIDB Levy.

sum

A140

Stamp duty.

sum

A200

ENGINEER/SO/PD'S REQUIREMENTS
Facilities for the Engineer/SO/PD's representative.
Rate shall be deemed to include the provision of water
supply, electricity, and communication facilities.

C2

A211

Establishment and removal of [transportable type cabin]


office [with a floor area of 70 m2].

sum

A212

Maintenance of office.

mth

A213

Establishment and removal of [purpose built]


laboratories [with a floor area of 60 m2 as shown in
Drawing No CA(AR)/16/03/A08/014/PT.

sum

A214

Maintenance of laboratories.

mth

A1,A3

A1,A3

Equipment for Use by the Engineer/SO/PD's


Representative
A221

Establishment and removal of office equipment [with


type and quantity as per Specification.() Equipment to
be reverted to the Contractor after completion].

sum

A1,A5,A6

Class A: General Items Page BQA1 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

CLASS A
General Items
Item No.

Code No.
Description
A222 Maintenance of office equipment.

Unit
mth

Qty.

Rate

Page Total carried to Summary of Class A

Class A: General Items Page BQA2 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

CLASS A
General Items
Item No.

Code No.

Description

Unit

Qty.
A1,A5,A6

A223

Establishment and removal of laboratory equipment


[with type and quantity as per Specification clause.()
Equipment to be reverted to the Contractor after
completion].

sum

A224

Maintenance of laboratory equipment.

mth

A225

Surveying equipment [with type and quantity as per the


Specification clause () Equipment to be reverted to
the Contractor after completion].

sum

A226

Maintenance of survey equipment.

mth

Rate

A5,A6

Services for the Engineer/SO/PD's Representative

A231.1

Provision of transport vehicle [Type A as per


Specification clause (). Vehicle to be reverted to the
Contractor after completion].

sum

A6

A231.2

Provision of transport vehicle [Type B as per


Specificationclause (). Vehicle to be reverted to the
Contractor after completion].

sum

A6

A232.1

Maintenance of vehicle [Type A].

mth

A232.2

Maintenance of vehicle [Type B].

mth

A233

Provision of mobile phones [and to be reverted to the


Contractor after completion].

sum

A234

Maintenance of mobile phones.

mth

A235

Provision of camera [and to be reverted to the


Contractor after completion].

sum

A6

A6

Attendance for Engineer/SO/PD's Representative


A241

[2 Nos.] Drivers for [Type A and Type B vehicle].

man-mth

A7

A242

[2 Nos.] Survey assistants.

man-mth

A7

A243

[2 Nos.] Laboratory assistants.

man-mth

A7

A244

[4 Nos.] General labours.

man-mth

A7

A245

[2 Nos.] Security guards.

man-mth

A7

Class A: General Items Page BQA3 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

CLASS A
General Items
Item No.

Code No.

Description

Unit

Qty.

Rate

Page Total carried to Summary of Class A

Class A: General Items Page BQA4 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

CLASS A
General Items
Item No.

Code No.

Description

Unit

Qty.

Rate

Submission of Documents
A251

Project execution plan [as per Specification.

sum

A252

Drawings [as per Specification.

sum

A253

Method statement [as per Specification.

sum

A254

Work programme [in Microsoft Project on a Gantt Chart


format].

sum

A8

mth

A9

Miscellaneous
A261

Progress report [ in five sets]. Rate to include progress


photographs.

A262

Project signboard.

nr

A263

As built drawings.

sum

A264

Video recording [as per Specification.

sum

A265

Temporary fencing and hoarding.

sum

A300

PROJECT REQUIREMENTS

A310

Survey and setting out [by licensed surveyor].

sum

A10

Quality Assurance/Quality Control (QA/QC)


QA/QC Plan [as per Specification clause ()

sum

Testing of materials; [concrete test cubes; samples and


method of testing as per Specification.

sum

A323

Testing of work [for cold water plumbing system as per


Specification clause ().

sum

A324

Factory acceptance test [for hydrostatic testing of


butterfly valves] for three (3) person of the S.O.
representatives.

sum

Testing and commissioning [of plant for a duration of


three (3) months].

sum

A321
A322

A325

A11

Operation and Maintenance of Plant


A331

Operation and Maintenance Manual.

A12

A13
sum
Class A: General Items Page BQA5 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

CLASS A
General Items
Item No.

Code No.
Description
A332 Training of operating personnel [for a period of 10
weeks].

Unit
sum

Qty.
A14

Rate

Page Total carried to Summary of Class A

Class A: General Items Page BQA6 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

CLASS A
General Items
Item No.

Code No.

Description

Unit

A333

Provision of manpower [for a period of 12 months].

sum

A334

Provision of chemicals and consumable [for a period of


12 months].

sum

A335

Utility cost [for a period of 12 months].

sum

Qty.

Rate

Maintenance of Road
A341

Routine maintenance for existing road as per


Specification clause ().

sum

A342

Periodic maintenanceas for existing road per


Specification ().

sum

A343

Routine maintenance for temporary road diversion as


per Specification clause ().

sum

A344

Periodic maintenance for temporary road diversion as


per Specification clause ().

sum

A350

Clearance of site upon completion.

sum

A400

AUTHORITIES' REQUIREMENTS
Occupational Safety and Health Requirements

A411

Health and safety plan.

sum

A412

Occupational safety and health officer [for duration of


the contract period].

A413

Personnel protective equipment as per Specification


clause ()

sum

A414

Health and safety report in five sets. Rate to include tool


box meeting.

mth

A415

Training of health and safety as per Specification clause


()

sum

A416

Safety signages.

sum

A420

Permits and fees [to KTMB for pipe jacking work


across railway tracks at Alor Star.

sum

A430

Deposit [to JKR for pipelaying work along road verge


from Jitra to Alor Star.

sum

man-mth

A15

A16

Class A: General Items Page BQA7 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

CLASS A
General Items
Item No.

Code No.

Description

Unit

Qty.

Rate

Page Total carried to Summary of Class A

Class A: General Items Page BQA8 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

CLASS A
General Items
Item No.

Code No.
A500

Description

Unit

Qty.

Rate

CONTRACTOR'S REQUIREMENTS
Facilities
Item shall be deemed to include the provision of water
supply, electricity, and sanitary facilities and their
continuing operation and/or maintenance.

C7

A511.1

Set up offices and remove upon completion; fixed


charge.

sum

A511.2

Maintain office for duration of contract period; timerelated charge.

sum

A512.1

Provision of office equipment and remove upon


completion; fixed charge.

sum

A512.2

Maintain office equipment for duration of contract


period; time-related charge.

sum

A513.1

Set up laboratories and remove upon completion; fixed


charge.

sum

A513.2

Maintain laboratories for duration of contract period;


time-related charge.

sum

A514.1

Provision of laboratories equipment and remove upon


completion [with type and quantity as per Specification
clause ()].

sum

A514.2

Maintain laboratories equipment for duration of contract


period; time-related charge.

sum

A515.1

Set up stores and remove upon completion; fixed


charge.

sum

A515.2

Maintain store for duration of contract period; timerelated charge.

sum

A516.1

Set up workshops and remove upon completion; fixed


charge.

sum

A516.2

Maintain workshop for duration of contract period;


time-related charge.

sum

A517.1

Set up workmen accomodation and remove upon


completion; fixed charge.

sum

A517.2

Maintain workmen accomodation for duration of


contract period; time-related charge.

sum

A17

Class A: General Items Page BQA9 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

CLASS A
General Items
Item No.

Code No.
Description
A518.1 Provision of transport.
A518.2

Unit
sum

Maintain transport for duration of contract period; timerelated charge.

Qty.

Rate

sum

Page Total carried to Summary of Class A

Class A: General Items Page BQA10 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

CLASS A
General Items
Item No.

Code No.

Description

Unit

Qty.

Rate

Temporary Work
A521.1

Construct temporary access roads to site; fixed charge.

sum

A521.2

Maintain temporary access roads for duration of contract


period; time-related charge.

sum

A522.1

Construct temporary bridges and remove upon


completion over Sg. Udang; fixed charge.

sum

A522.2

Maintain temporary bridges for duration of contract


period; time-related charge.

sum

A523.1

Construct cofferdams for [water intake] and remove


upon completion; fixed charge.

sum

A523.2

Maintain cofferdam for duration of construction; timerelated charge.

sum

A524.1

Install pumping and dewatering at [pumphouse] and


remove upon completion; fixed charge.

sum

A524.2

Operation and maintenance of pumping and dewatering


for duration of construction; time-related charge.

sum

A525.1

Construct river diversion for [water intake] and reinstate


to its original alignment upon completion; fixed charge.

sum

A525.2

Maintain river diversion for duration of construction;


time-related charge.

sum

A526.1

Construct temporary jetty at Sg. Udang and remove


upon completion; fixed charge.

sum

A526.2

Maintain temporary jetty for duration of contract period;


time-related charge.

sum

A527.1

Construct temporary staging over Sg. Udang and


remove upon completion; fixed charge.

sum

A527.2

Maintain temporary staging for duration of construction;


time-related charge.

sum

Site Management
A531

Site agent for the duration of conract period; timerelated charge.

sum

Class A: General Items Page BQA11 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

CLASS A
General Items
Item No.

Code No.
Description
A532 QA/QC officer for the duration of contract period.

Unit
man-mth

Qty.

Rate

Page Total carried to Summary of Class A

Class A: General Items Page BQA12 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

CLASS A
General Items
Item No.

Code No.

Description

Unit

Qty.

A540

Mobilisation and demobilisation. [Rate to include


remobilisation for testing and commissioning of the
plant after the completion of the pipelaying work under
Package (2)].

sum

A18

A600

DESIGN AND BUILT ELEMENT

A610

Preliminary engineering studies.

sum

A620

Design survey.

sum

A630

Utilities survey.

sum

A640

Site investigation.

sum

A650

Design fees.

sum

Rate

Independent Checkers
A661

Structural.

sum

A662

Geotechnical.

sum

A663

Road safety.

sum

A670

Supervision fees.

sum

A700

PROVISIONAL/PRIME COST SUMS


Provisional Sums

A711.1

Provisional Sum of [RM: Two hundred thousands only


for TNB contribution].

sum

A19

A711.2

Provisional Sum of [RM: Five hundred thousands only


for piling work].

sum

A19

A711.3

Provisional Sum of [RM: Three hundred thousands only


for staff quarters to be procured by the Employer].

sum

A19

A711.4

Attendance [for Item A711.3].

sum

A711.5

Profit for [Item A711.3].

Prime Cost Items


A721

Prime Cost Sum of [RM: One million only for


reinforced soil wall].

sum

A19

Class A: General Items Page BQA13 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

CLASS A
General Items
Item No.

Code No.

Description

A722

Attendance.

A723

Profit.

Unit

Qty.

sum

A20

A20

Rate

Page Total carried to Summary of Class A

Class A: General Items Page BQA14 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

CLASS A
General Items
Item No.

Code No.

Description

Unit

Qty.

Rate

Summary of Class A: General Items


Page BQA1
Page BQA2
Page BQA3
Page BQA4
Page BQA5
Page BQA6
Page BQA7

Class A: General Items Page BQA15 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

CLASS A
General Items
Item No.

Code No.

Description

Unit

Qty.

Rate

Total of Class A carried to Grand Summary

Class A: General Items Page BQA16 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA17 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA18 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA19 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA20 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA21 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA22 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA23 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA24 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA25 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA26 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA27 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA28 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA29 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA30 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA31 of BQA32

CQ501-CIVIL ENGINEERING MEASUREMENT

MOHAMAD ASYRAF BIN MAD AMIN


03DUB10F1048

Amount (RM)

Class A: General Items Page BQA32 of BQA32

Potrebbero piacerti anche