JOB SAFETY PLAN (JSP)

COMPANY: MAJEES TECHNICL SERVICES LLC


DATE:
ACTIVITY: Concreting activity for
upgradation AP & LP flare system
area.

TASK DESCRIPTION: Concreting activity for


upgradation AP & LP flare system area.

WORK LOCATION:
TASK
Mobilization of
personnel &
equipment

HAZARD
H2S and LEL
Personnel
being Run over
or struck by
moving
vehicles
Lack of site
HSSE
knowledge

CONTROL
H2S and LEL Gas detection
within 15m perimeter from the
live area
All personnel will receive the
MTS - HSE Induction
Ensure
all
material/tools/
equipment / plant is visually
inspected before use to ensure
all safe guards are working
All personnel working in close
proximity to moving vehicles
shall wear high visibility vests
Correct PPE to be worn at all
times
Un-authorized
entry
of
personnel to worksite must be
restricted. Barriers and safety
signs to be used.
Thorough visual inspection of
the area and ground conditions
to be carried out before work
starts
No personnel to stand behind
reversing

ACTION
PARTY
Permit holder

*( )

General

Working without
work permit.
In-experienced
Improper
planning &
communication
Short cutting of
activities
Over confident
Absent minded
Extreme high
Temperature &
humidity
Working without
PPE, Toolbox
talk.
Improper
planning of work
and tools.
Fire hazard.

Adequate Work Permit should


be available prior to the
commencement of the job and
shall be displayed at work
place.
Conduct Tool Box talks, JSP &
Adequate
PPEs.
Strict
supervision has to be ensured.
Proper planning to be done,
Usage of home tools to be
avoided.
Use
barrier
cream
from
sunlight and use coverall (full
suit).
The
supervisor
to
communicate with all parties
Ensure welfare facilities

PCC activity

Improper
Storage of
cement bags more than 1.5m
height

Ensure proper storage of


cement
bags
to
avoid
strenuous
efforts
while
handling
Maintain right posture while
handling.
Comply
with
MSDS
requirements
Trained
(manual
material
handling
&
storage)
&
experienced workers to be
deployed in the work.
Periodic rest breaks / stretchouts / crew rotation.
Use rubber shoes / gumboots,
hand gloves, goggles, suitable
dust mask, coverall and
helmet, while handling
cement.

Exposure to
cement,
admixtures &
other harmful
chemicals (also
refer HEMP for
Handling & Use
of Chemicals
and Other
Hazardous

Ensure personnel involved in


handling cement & other
substances are aware of the
properties
&
precautions,
required (as in MSDS / SHOC
card).
Store
in
separate
well
ventilated areas storage areas
away from other material (not
in general stores).

Permit holder

Substances)

Identification
details
of
chemicals shall be available on
the packages.
Display MSDS / SHOC cards
near point of storage / use and
educate personnel on its
contents.
Wash hands thoroughly before
taking food or smoking.
Do not eat, drink or smoke in
work area.
Provide
necessary
warning
signs in storage / handling
areas.
Use appropriate PPE (chemical
mono-goggles, PVC gloves,
suitable respirators, coverall,
rubber shoes / gumboots, etc.)
for handling.
Store
in
separate
well
ventilated areas storage areas
away from other material (not
in general stores).
Display MSDS / SHOC cards
near point of storage / use and
educate personnel on its
contents.
Provide sacks in the floor to
collect mixture spilt on floor.
Do not wash out to drains.
Provide necessary warning
signs in storage / handling
areas.

Improper
handling of
cement bags /
pans & other
loads

Training in Safe Manual


handling practice
Use the strength of legs /
knees and not of the back
while handling rebar.
Be sure of the path in which
the load to be carried and the
obstacles involved.
Carry load with back straight,
head erect, chin in, arms close
to the body and with watchful
steps.
Check the weight to be
handled and ask for
assistance (preferably a
person of similar height &
physique) if it is unsafe to be
handled alone.
Avoid changing positions /
adjusting the load while
walking.
Avoid throwing cement bags.
Period rest / job rotation.
Use appropriate PPE (chemical
mono-goggles, PVC gloves,
suitable respirators, coverall,
rubber shoes / gumboots, etc.)
for handling

Congested work
area

Ensure adequacy of resources


required and plan the work
area
properly
to
avoid
congestion
and
conflicting
activities in the vicinity
Establish clearly maintained
walkways and for movement of
personnel, wherever possible.
Proper storage of materials.
Maintain good housekeeping in
worksites.
Prompt collection & disposal of
wastes, spills, accumulations,
etc.

Unsafe handling /
use of hand tools

Training on correct manual


handling practices lift the
weight with load on the knees
and not on the back.
Ask for assistance if it is
unsafe to be handled alone.
Periodic rest / stretch-outs / job
rotation.

Permit holder

Use appropriate PPE (chemical


mono-goggles, PVC gloves,
suitable respirators, coverall,
rubber shoes / gumboots, etc.)
for handling.
Ingress of water
from the sides
while concreting

Wind up and
House Keeping

Trip Slip ,
Manual
Handling

Remove
the
accumulated
water from the concrete area
prior to commencement of
concreting.
Provide shoring the side walls
to avoid cave in.
Use appropriate PPE (chemical
mono-goggles, PVC gloves,
suitable respirators, coverall,
rubber shoes / gumboots,
etc.).
Access clear from unwanted materials.

Permit holder

Work supervisor on site is to confirm () that all controls are in place prior to start
the job

Permit Applicant:

Responsible Supervisor:

Signature:

Signature:

Date:

Date: