Sei sulla pagina 1di 56

FPSO Pioneiro de Libra

Specification Code:
Total No. of
Pages (incl. One

DOCUMENT COVER SHEET

2
1
0
A
REV.
NO.:

07-Oct-2015
10-Sep-2015
30-Apr-2015
27-Feb-2015
DATE
dd-Mmm-yyyy

Re-Issued for Construction


Issued for Construction
Issued for Design
Issued for Review
ISSUE PURPOSE

1 of 56

Cover Sheet)

AT
AT
AT
TSK

CKT
CKT
CKT
CKT / AT

CHT
CHT
CHT
CHT

WRITTEN BY

CHECKED BY

APPROVED BY

Revision History
JURONG SHIPYARD PTE LTD
(A subsidiary of SembCorp Marine Ltd)
SINGAPORE
ENG.DEPARTMENT D353 SECTION
Document Title:

Project
Title:

FPSO Pioneiro de Libra


22-0508

Job No.:

TOPSIDES PIPING
CONSTRUCTION STANDARD

OOGTK Document No.:

OOGTK SFI:

OOGTK02-04-L-07-SA001009-001
Technip Document No.:

407

5982-0000-STC-1390-00001
JSPL SFI No.: 101
JSPL Document No.:
0508-TP-101-101-01-11-01

Class:

ABS-I

Scale

Rev. No.:

OOGTK Doc.
Status Code

N.A

This document and the information contained within comprise proprietary information owned solely by Jurong
Shipyard Pte Ltd. This document is provided subject to the provision that the information herein will not be
disclosed or reproduced unless specifically authorised in writing by Jurong Shipyard Pte Ltd nor will be used in any
way detrimental to or in competition with interest of Jurong Shipyard Pte Ltd. This documents, reproductions
previously authorised in writing and associated in writing and associated information shall be returned when they
have served their intended purposes, or on demand.

FPSO Pioneiro de Libra


Technip Doc No.:

5982-0000-STC-1390-00001

Rev. No.:

Date:

07-Oct-2015

Page 2 of 56

Contents
DEFINITIONS, ABBREVIATIONS AND ACRONYMS ......................................................................3
HOLDS LIST ......................................................................................................................................3
MAIN CHANGES IN THIS ISSUE .....................................................................................................3
1.

INTRODUCTION ......................................................................................................................4

SCOPE .....................................................................................................................................5

GENERAL NOTES ...................................................................................................................5

ABBREVIATIONS ....................................................................................................................5

LIST OF STANDARDS ............................................................................................................6

___________________________________________________________________________________________________________________________
TECHNIP GEOPRODUCTION (M) SDN BHD (79917-X)
2ND Floor, Wisma Technip, 241 Jalan Tun Razak,
50400 Kuala Lumpur,
Malaysia

FPSO Pioneiro de Libra


Technip Doc No.:

5982-0000-STC-1390-00001

Rev. No.:

Date:

07-Oct-2015

Page 3 of 56

DEFINITIONS, ABBREVIATIONS AND ACRONYMS:


Owner:
Company:
Contractor:
Subcontractor:
DM:
DCC:
ENG:
EWT:
FPSO:
JSPL:
OOG/TK
Party:
Partys:
TP:

Field Owner Representative Petrobras;


Odebrecht/Teekay Joint Venture;
Jurong Shipyard Pte Ltd;
Technip;
Delta Marine Hull Conversion Designer;
Document Control Centre;
General Engineering (include meetings related to ONE Area);
Extended Well Testing;
Floating Production, Storage and Offloading vessel;
Jurong Shipyard P L (JSPL);
Odebrecht/Teekay Joint Venture;
Either one of JSPL or TP;
Both JSPL and TP collectively;
Technip

HOLDS LIST:
Hold

Section

Description

1
2
3
4

MAIN CHANGES IN THIS ISSUE:


Section

Main Changes In This Issue

___________________________________________________________________________________________________________________________
TECHNIP GEOPRODUCTION (M) SDN BHD (79917-X)
2ND Floor, Wisma Technip, 241 Jalan Tun Razak,
50400 Kuala Lumpur,
Malaysia

FPSO Pioneiro de Libra


Technip Doc No.:

1.

5982-0000-STC-1390-00001

Rev. No.:

Date:

07-Oct-2015

Page 4 of 56

INTRODUCTION

The Libra Oil field is a large ultra-deep-water oil prospect located in the Santos Basin, about 230
km off the coast of Rio de Janeiro at a water depth of up to 2,500 m.
Production rights were awarded to a consortium led by Petrobras. In January 2014, Petrobras
issued an ITT for the supply of an Extended Well Test (EWT) to support the Libra development for
data acquisition.
Teekay and Odebrecht Oil & Gas have been awarded intend to bid for the supply of the EWT and
have engaged TP to support them in the development of the Topside Design. Genesis have
performed a Concept study.
The process plant on the EWT FPSO shall be capable of handling a maximum of 8000 Sm3/D of
liquids and 4,000,000 Sm3/D of gas.
The FPSO hull shall be a converted tanker that will be refurbished and modified in accordance
with an accepted Flag Administration.

___________________________________________________________________________________________________________________________
TECHNIP GEOPRODUCTION (M) SDN BHD (79917-X)
2ND Floor, Wisma Technip, 241 Jalan Tun Razak,
50400 Kuala Lumpur,
Malaysia

FPSO Pioneiro de Libra


Technip Doc No.:

5982-0000-STC-1390-00001

Rev. No.:

Date:

07-Oct-2015

Page 5 of 56

SCOPE

This document covers all Topsides Piping Construction Standards to be used for FPSO LIBRA EWT
Detailed Design.
This document does not supersede the requirements of the Project Specifications as defined in the
Contract. For the avoidance of doubt in the case of conflict between this document and the requirements
of the Project Specifications, then the Project Specifications shall govern.

GENERAL NOTES

3.1 All materials of construction shall be in accordance Topsides Piping Material Specification document
no. OOGTK02-04-L-07-SA-001002-001.
3.2 The standards shall be read in conjunction with the following documents:
OOGTK02-04-I-87-XX-000004-001
OOGTK02-04-I-87-XX-000003-001

Instrument Hook Up Typical /Standard.


Instrument Hook-up drawings.

3.3 Branches in size range of DN20 to DN50 where a valve is mounted shall be assessed for bracing
back to the parent pipe. Bracing design shall be in accordance with Topsides Pipe Supports
Construction Standard document no. OOGTK02-04-L-07-SA-001010-001.
3.4 For pipe grounding detail, refer to OOGTK02-03-L-07-SA-000002-001 (JSPL Piping Construction
Standard).

ABBREVIATIONS
BE
BW
CE
CJ
FB
FF
GALV
NPTF
NPTM
PE
RB
RF
RTJ
SCH
SE
SMLS
SW
TE
WN

Beveled End
Butt Weld
Capillary Ends (Female Solder Cup)
Compact Flange End
Full Bore
Flat Face
Galvanized
National Pipe Thread Female
National Pipe Thread Male
Plain End
Reduced Bore
Raised Face
Ring Type Joint
Schedule
Socket End
Seamless
Socket Weld
Threaded End
Welding Neck

___________________________________________________________________________________________________________________________
TECHNIP GEOPRODUCTION (M) SDN BHD (79917-X)
2ND Floor, Wisma Technip, 241 Jalan Tun Razak,
50400 Kuala Lumpur,
Malaysia

FPSO Pioneiro de Libra


Technip Doc No.:

5982-0000-STC-1390-00001

Rev. No.:

Date:

Page 6 of 56

07-Oct-2015

LIST OF STANDARDS

PIPING CONSTRUCTION STANDARD


ITEM NO.
STC-1390-

DRAWING TITLE

0100-001
to
0100-006

Process Vent On Piping (PV)


Typical Arrangements

0101-001
to
0101-006

Process Drain On Piping (PD)


Typical Arrangements

0102-001
to
0102-0106

Hydrotest Vent On Piping (VT)


Typical Arrangements

0103-001
to
0103-006

Hydrotest Drain On Piping (DT)


Typical Arrangements

0104-001
to
0104-004

Thermowell On Piping (TW)


Typical Arrangements

0105-001
to
0105-007

Pressure Gauges & Transmitters (PI/PT)


Typical Arrangements

0106-001
to
0106-004

Pressure Instrument on Piping (PIF/PT)


Typical Arrangements

Rev

Date

Rev

Date

27-FEB-15

07-OCT-15

30-APR-15

10-SEP-15
2

07-OCT-15

07-OCT-15

07-OCT-15

07-OCT-15

07-OCT-15

07-OCT-15

27-FEB-15

30-APR-15

10-SEP-15

27-FEB-15

30-APR-15

10-SEP-15

27-FEB-15

30-APR-15

10-SEP-15

27-FEB-15

30-APR-15

10-SEP-15

27-FEB-15

30-APR-15

10-SEP-15

27-FEB-15

30-APR-15

10-SEP-15

___________________________________________________________________________________________________________________________
TECHNIP GEOPRODUCTION (M) SDN BHD (79917-X)
2ND Floor, Wisma Technip, 241 Jalan Tun Razak,
50400 Kuala Lumpur,
Malaysia

FPSO Pioneiro de Libra


Technip Doc No.:

5982-0000-STC-1390-00001

Rev. No.:

Date:

Page 7 of 56

07-Oct-2015

PIPING CONSTRUCTION STANDARD


ITEM NO.
STC-1390-

DRAWING TITLE

0107-001
to
0107-002

Chemical Injection (CI)


Typical Arrangements

0108-001
to
0108-002

Sample Connections (SC)


Typical Arrangements

0109-001

General Piping Standards


Orifice Instrument Connections

0109-002

0110-001

0110-002

General Piping Standards


Orifice Instrument Connections

General Piping Standards


Bird Screen Installation
General Piping Standards
Utility Station Arrangement

0110-003

General Piping Standards


Inserted 45 deg Branch Connection

0110-004

General Piping Standards


Inserted 45 deg Branch Connection

Rev

Date

Rev

Date

27-FEB-15

07-OCT-15

30-APR-15

10-SEP-15

27-FEB-15

07-OCT-15

30-APR-15

10-SEP-15

27-FEB-15

07-OCT-15

30-APR-15

10-SEP-15
2

07-OCT-15

27-FEB-15

30-APR-15

10-SEP-15

30-APR-15

10-SEP-15

07-OCT-15

30-APR-15

10-SEP-15

07-OCT-15

10-SEP-15

07-OCT-15

10-SEP-15

07-OCT-15

___________________________________________________________________________________________________________________________
TECHNIP GEOPRODUCTION (M) SDN BHD (79917-X)
2ND Floor, Wisma Technip, 241 Jalan Tun Razak,
50400 Kuala Lumpur,
Malaysia