FOUNDATION CALCULATION SHEET

TITLE

DESCRIPTION

PROJECT/JOB NO.

MSH155

PROJECT/JOB NAME

RAFT FOUNDATION

CLIENT NAME

PT. xxx

SITE NAME

DMT SPLIT COMBAT GENBA

DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME

MNR-62M

LOAD COMBINATION GROUP NAME

REV

DATE

Copyright (c) GS E&C. All Rights Reserved

DESCRIPTION

PREP'D

CHK'D

APPR'D

APPR'D

7/25/2016

Calculation Sheet
of
Foundation

CONTENTS
1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
4.2 CHECK OF OVERTURNING MOMENT
4.3 CHECK OF CONTACT PRESSURE

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved

Project Na. : RAFT FOUNDATION


Project No. : MSH155
Page 2

7/25/2016

Calculation Sheet
of
Foundation

Project Na. : RAFT FOUNDATION

Project No. : MSH155


Page 3

1. GENERAL
1.1 CODE & STANDARD
Items

Description

Design Code

American Concrete Institute (ACI 318) [SI]

Horizontal Force for Wind

UNIFORM BUILDING CODE (UBC-1997)

Horizontal Force for Seismic

UNIFORM BUILDING CODE [UBC-1997]

Unit System

Input : SI,

Output : SI,

Calculation Unit : SI

1.2 MATERIALS & UNIT WEIGHT


Items

Value
2

Concrete (f'c : compressive strength)

18.600 N/mm

Lean Concrete (Lf'c : compressive strength)

15.000 N/mm2

Reinforcement (D10 ~ D16 , yield strength)

294.000 N/mm2

Reinforcement (D19 ~ , yield strength)

392.000 N/mm2

Rs (Soil unit weight)

14.700 kN/m3

Rc (Concrete unit weight)

24.000 kN/m3

Es (Steel Modulus of Elasticity)

196.130 kN/mm2

Ec (Concrete Modulus of Elasticity)

24.615 kN/mm2

- Soil Capacity
Items
Soil Name

Value
Unit-01

Footing List

F3

Qa (Soil Bearing Capacity)

220.66 kN/m2

Buoyancy

Not Consider

WL (Water Label from the EL = 0)

10000 mm

FD (Frost Depth from the EL = 0)

0 mm

Internal Friction Angle

30

Passive Soil Pressure

Not Consider

Cu (Undrained cohesion)

Clay , 0 kN/m2

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items

Description

Allowable Increase of Soil (Wind)

33.33 %

Allowable Increase of Soil (Seismic)

33.33 %

Allowable Increase of Soil (Test)

20 %

Safety factor against overturning for OVM1(FO1)

1.5

Safety factor against overturning for OVM2(FO2)

1.5

Safety factor against sliding for the SL1(FS1)

1.5

Safety factor against sliding for the SL2(FS2)

1.5

Copyright (c) GS E&C. All Rights Reserved

7/25/2016

Calculation Sheet
of
Foundation
Friction factor (m)

0.35

1.4 LOAD COMBINATION


Index

Load Case Name

Load Case Description

SW

SELF WEIGHT

TR1

TOWER REACTION 1

TR2

TOWER REACTION 2

TR3

TOWER REACTION 3

TR4

TOWER REACTION 4

Comb . ID

Load Combination for stability

1.0 SW + 1.0 TR1

1.0 SW + 1.0 TR2

1.0 SW + 1.0 TR3

1.0 SW + 1.0 TR4

Comb . ID

Load Combination for Reinforcement

1.0 SW + 1.0 TR1

1.0 SW + 1.0 TR2

1.0 SW + 1.0 TR3

1.0 SW + 1.0 TR4

Copyright (c) GS E&C. All Rights Reserved

Project Na. : RAFT FOUNDATION

Project No. : MSH155


Page 4

7/25/2016

Page 5

2. DRAWING

REFERENCE DWGS
A01

NO.

DWG NO.

DWG TITLE

NOTES
* OUTPUT UNIT : mm

01
RAFT FOUNDATION PROJECT

FOUNDATION LOCATION PLAN


SST-62M
2
SQUAD CHECK

PROCESS PIPING VESSELS STRUCT.

ELEC.

INST.

F3

SCALE

AS SHOWN

JOB NO.

MSH115

MICROFILM NO.

7/25/2016

Page 6

2.2 DETAIL SKETCH

OUTPUT UNIT : mm

7/25/2016

Page 7

REFERENCE DWGS
NO.

CL FOOTING

DWG NO.

DWG TITLE

8200
1803.5

1803.5

1803.5

4593

NOTES
* OUTPUT UNIT : mm

4593

8200

RAFT FOUNDATION PROJECT

1803.5

FOUNDATION DETAIL FOR


F3
SQUAD CHECK

CL FOOTING

FOUNDATION PLAN

PROCESS PIPING VESSELS STRUCT.

SCALE
REV. DATE

DESCRIPTION

DRWNCHKDAPPD APPD APPD

AS SHOWN

JOB NO.

MSH115

ELEC.

INST.

MICROFILM NO.

7/25/2016

Page 8

REFERENCE DWGS
NO.

DWG NO.

DWG TITLE

CL FOOTING
BOTTOM

50
TYP.

TOP

NOTES

D16@200

D16@200

* OUTPUT UNIT : mm

RAFT FOUNDATION PROJECT

FOUNDATION DETAIL FOR


F3

D16@200
SQUAD CHECK

D16@200

REINFORCEMENT PLAN

PROCESS PIPING VESSELS STRUCT.

SCALE
REV. DATE

DESCRIPTION

DRWNCHKDAPPD APPD APPD

AS SHOWN

JOB NO.

MSH115

ELEC.

INST.

MICROFILM NO.

7/25/2016

Page 9

400

800

LEAN CONC. 50 THK


CRUSHED STONE 100 THK

ELEVATION S1 - X

OUTPUT UNIT : mm

7/25/2016

Page 10

Item No.

2
650

650

D10

650

650

50
TYP.

D10

D10
@150

D16

75

1500

100

50

24-D16

100
1500

D16

D10
@150

100

1500

100
D10
@150
75

1500

D16

50

24-D16

50

24-D16

50

24-D16

D10

D16

D10
@150

D10

50
TYP.

650

50
TYP.

650

650

50
TYP.

75

650

75

F3

7/25/2016
Project Na. : RAFT FOUNDATION

Calculation Sheet
of
Foundation

Project No. : MSH155


Page 11

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
( mm ) Ft. Name

8200

650 650

8200

650 650

650 650

Ft. Type

MAT

Area

67.240 m2

Ft. Thickness

400.00 mm

Ft. Volume

26.896 m3

Ft. Weight

645.504 kN

Soil Height

800.00 mm

Soil Volume

52.440 m3

Soil Weight

770.868 kN

Buoyancy

Not Consider

Self Weight (except Pr.SW)

1416.372 kN

800
1500

650 650

F3

400

The Origin coordinate


The Center of gravity (0,0) mm

Section Data
( mm )

Ft.Name

Direction

Soil Volume

F3

All Direct

Sec.Name

Section Area
2

S1

Ft. Volume

67.240 m

Pier Wt

26.896 m

52.440 m

60.840 kN

Ft. Weight

Soil Weight

Total Weight

645.504 kN

770.868 kN

1477.212 kN

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
Unit( Length : mm , Weight : kN , Area : m2 )

Ft.Name
F3

Pr.Name

Shape

Pl

Pw

Rectangle

650.000

650.000

1500.000

0.423

15.210

Rectangle

650.000

650.000

1500.000

0.423

Rectangle

650.000

650.000

1500.000

0.423

Rectangle

650.000

650.000

1500.000

0.423

Copyright (c) GS E&C. All Rights Reserved

Ph

Area

Weight

Off X

Off Y

2296.500

2296.500

15.210

2296.500

-2296.500

15.210

-2296.500

2296.500

15.210

-2296.500

-2296.500

7/25/2016
Project Na. : RAFT FOUNDATION

Calculation Sheet
of
Foundation

Project No. : MSH155


Page 12

3.3 LOAD CASE


Fz
Fy

Mz

Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are
based on the right hand rule.

My
Fx
Mx

Index

Load Case Name

Load Case Description

SW

SELF WEIGHT

TR1

TOWER REACTION 1

TR2

TOWER REACTION 2

TR3

TOWER REACTION 3

TR4

TOWER REACTION 4

Unit( kN , kN-m )

Ft.Name

Pr.Name

Load Case

F3
3

Fx

Fy

Fz

Mx

My

-15.21

-32.74

-31.95

-623.89

-0.36

0.34

-12.6

-10.73

-23.37

0.26

-0.22

-11.33

-13.55

-28.85

0.23

-0.28

-29.92

-30.68

571.67

-0.29

0.31

-15.21

-12.6

-10.73

-23.37

0.26

-0.22

-11.33

-13.55

-28.85

0.23

-0.28

-29.92

-30.68

571.67

-0.29

0.31

-32.74

-31.95

-623.89

-0.36

0.34

-15.21

-11.33

-13.55

-28.85

0.23

-0.28

-29.92

-30.68

571.67

-0.29

0.31

-32.74

-31.95

-623.89

-0.36

0.34

-12.6

-10.73

-23.37

0.26

-0.22

-15.21

-29.92

-30.68

571.67

-0.29

0.31

-32.74

-31.95

-623.89

-0.36

0.34

-12.6

-10.73

-23.37

0.26

-0.22

-11.33

-13.55

-28.85

0.23

-0.28

0.000

0.000

-1416.372

0.000

0.000

Footing SW

Copyright (c) GS E&C. All Rights Reserved

7/25/2016

Calculation Sheet
of
Foundation

Project Na. : RAFT FOUNDATION


Project No. : MSH155
Page 13

3.4 LOAD COMBINATION


In Pier Top
without Self Weight

In Footing Bottom
with Pier Self Weight,
But without Footing Self Weight,

In Footing Bottom Center


with Pier & Footing Self Weight & Soil Weight,
Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.4.1 Load Combination in Pier Top (Without SW)


Ft.Name

S Fx

S Fy

S Fz

S Mx

S My

-32.742

-31.946

-623.888

-0.356

0.343

-12.596

-10.730

-23.366

0.263

-0.219

-11.328

-13.548

-28.850

0.226

-0.281

-29.923

-30.678

571.672

-0.294

0.307

-32.742

-31.946

-623.888

-0.356

0.343

-12.596

-10.730

-23.366

0.263

-0.219

-11.328

-13.548

-28.850

0.226

-0.281

-29.923

-30.678

571.672

-0.294

0.307

-12.596

-10.730

-23.366

0.263

-0.219

-11.328

-13.548

-28.850

0.226

-0.281

-29.923

-30.678

571.672

-0.294

0.307

-32.742

-31.946

-623.888

-0.356

0.343

-12.596

-10.730

-23.366

0.263

-0.219

-11.328

-13.548

-28.850

0.226

-0.281

-29.923

-30.678

571.672

-0.294

0.307

-32.742

-31.946

-623.888

-0.356

0.343

-11.328

-13.548

-28.850

0.226

-0.281

-29.923

-30.678

571.672

-0.294

0.307

-32.742

-31.946

-623.888

-0.356

0.343

-12.596

-10.730

-23.366

0.263

-0.219

-11.328

-13.548

-28.850

0.226

-0.281

-29.923

-30.678

571.672

-0.294

0.307

-32.742

-31.946

-623.888

-0.356

0.343

-12.596

-10.730

-23.366

0.263

-0.219

-29.923

-30.678

571.672

-0.294

0.307

-32.742

-31.946

-623.888

-0.356

0.343

-12.596

-10.730

-23.366

0.263

-0.219

-11.328

-13.548

-28.850

0.226

-0.281

-29.923

-30.678

571.672

-0.294

0.307

-32.742

-31.946

-623.888

-0.356

0.343

-12.596

-10.730

-23.366

0.263

-0.219

-11.328

-13.548

-28.850

0.226

-0.281

Pr.Name L.Comb.

F3

Unit( kN , kN-m )

Copyright (c) GS E&C. All Rights Reserved

7/25/2016
Project Na. : RAFT FOUNDATION

Calculation Sheet
of
Foundation

Project No. : MSH155


Page 14

3.4.2 F3
Ft.Name

Unit( kN , kN-m )

S Fx

S Fy

S Fz

S Mx

S My

-32.742

-31.946

-639.098

60.341

-61.867

-12.596

-10.730

-38.576

20.650

-24.151

-11.328

-13.548

-44.060

25.967

-21.804

-29.923

-30.678

556.462

57.994

-56.547

-32.742

-31.946

-639.098

47.563

-48.770

-12.596

-10.730

-38.576

16.358

-19.113

-11.328

-13.548

-44.060

20.548

-17.273

-29.923

-30.678

556.462

45.723

-44.578

-12.596

-10.730

-38.576

20.650

-24.151

-11.328

-13.548

-44.060

25.967

-21.804

-29.923

-30.678

556.462

57.994

-56.547

-32.742

-31.946

-639.098

60.341

-61.867

-12.596

-10.730

-38.576

16.358

-19.113

-11.328

-13.548

-44.060

20.548

-17.273

-29.923

-30.678

556.462

45.723

-44.578

-32.742

-31.946

-639.098

47.563

-48.770

-11.328

-13.548

-44.060

25.967

-21.804

-29.923

-30.678

556.462

57.994

-56.547

-32.742

-31.946

-639.098

60.341

-61.867

-12.596

-10.730

-38.576

20.650

-24.151

-11.328

-13.548

-44.060

20.548

-17.273

-29.923

-30.678

556.462

45.723

-44.578

-32.742

-31.946

-639.098

47.563

-48.770

-12.596

-10.730

-38.576

16.358

-19.113

-29.923

-30.678

556.462

57.994

-56.547

-32.742

-31.946

-639.098

60.341

-61.867

-12.596

-10.730

-38.576

20.650

-24.151

-11.328

-13.548

-44.060

25.967

-21.804

-29.923

-30.678

556.462

45.723

-44.578

-32.742

-31.946

-639.098

47.563

-48.770

-12.596

-10.730

-38.576

16.358

-19.113

-11.328

-13.548

-44.060

20.548

-17.273

Pr.Name L.Comb.

F3

3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
- C.G. of Load is coordinate from left bottom. Unit : mm

Ft.Name

F3

L.Comb.

S Fx

S Fy

Unit( kN , kN-m )

SFz

S Mx

-86.589

-86.902

-1581.644

-86.589

-86.902

-1581.644

-86.589

-86.902

-1581.644

-86.589

-86.902

-1581.644

2923.150

Copyright (c) GS E&C. All Rights Reserved

-2593.245

S My

C.G. of Loads

2568.640

5828.0 , 5843.9

2923.150

-164.369

4100.0 , 2356.1

-2593.245

-2897.379

2372.0 , 5843.9

-164.369

4100.0 , 2356.1

7/25/2016

Calculation Sheet
of
Foundation

Project Na. : RAFT FOUNDATION


Project No. : MSH155
Page 15

Load Combination of Ultimate Condition


- C.G. of Load is coordinate from left bottom. Unit : mm

Ft.Name

F3

Sec.Nam L.Comb.

S1

S Fx

Unit( kN , kN-m )

S Fy

S Fz

S Mx

S My

C.G. of Loads

-86.589

-86.902

-1581.644

-2628.005

2603.276

5828.0 , 5843.9

-86.589

-86.902

-1581.644

2888.390

-129.734

4100.0 , 2356.1

-86.589

-86.902

-1581.644

-2628.006

-2862.743

2372.0 , 5843.9

-86.589

-86.902

-1581.644

2888.390

-129.733

4100.0 , 2356.1

Copyright (c) GS E&C. All Rights Reserved

7/25/2016

Calculation Sheet
of
Foundation

Project Na. : RAFT FOUNDATION

Project No. : MSH155


Page 16

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
mSFz + P.F
> Fs -> OK (Bi-Axial)
2
2
SFx + SFy
P.F = Passive Force (apply only in case checked passive force, mark by P )
Formula :

Unit ( kN )

Ft.Name

Dir.

L.Comb.

( mSFz + P.F ) / S Fx + SFy

Fs(i)

Result

F3

Bi-Axial

0.35 1581.64 / 122.68 = 4.51

1.5

OK

4.2 CHECK OF OVERTURNING MOMENT


Formula : (SMry / SMoy or SMrx / SMox) > OVM(i) -> OK

Ft.Name
F3

Dir.

L.Comb.

Unit ( kN-m )

S Mry / S Moy = OVM or S Mrx / S Mox = OVM

OVM(i)

Result

-6484.74 / -164.37 = 39.45

1.5

OK

-6484.74 / -2923.15 = 2.22

1.5

OK

4.3 CHECK OF CONTACT PRESSURE


4.3.1 Contact Pressure Formula
'Handbook CONCRETE ENGINEERING' Second Edition edited by Mark Fintel

SFz SMy X(i) SMx Y(i)


Af
Iy
Ix
if q1 or q2 < 0 , than q1 and q2 will be recalculated
by following formula
L
q(x) width(x) X dx
Px = 0 L
q(x) width(x) dx
0
P = L0 q(x) width(x) dx
q1,q2 =

4.3.2 Input Data


2

Ft.Name

Af (m )

Fl (m )

Fw (m )

Ix (m )

Iy (m )

F3

67.240

8.200

8.200

376.7682

376.7682

Copyright (c) GS E&C. All Rights Reserved

7/25/2016
Project Na. : RAFT FOUNDATION

Calculation Sheet
of
Foundation

Project No. : MSH155


Page 17

4.3.3 Pressure Check


- Qa = Soil bearing capacity
- Uc = Uplift Allowable capacity
- XY-Direction (Bi-Axial)

Unit( kN , kN-m , kN/m2 )

Ft.Name

L.Comb.

q1

q2

ci

cj

Qmax

Qa

Cont.A.R

Result

F3

0.000

105.763

4.878

11.579

105.8

294.2(gross)

64.39 %

OK

Copyright (c) GS E&C. All Rights Reserved

7/25/2016

Calculation Sheet
of
Foundation

Project Na. : RAFT FOUNDATION

Project No. : MSH155


Page 18

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
SQ = SFz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width

5.1.1 Data

Unit( mm , kN , kN-m )

Ft.Name Sec.Nam

Dir.

S1

L.Comb.

Fl or Fw

Sl or Sw

S Fz

SM

SQ

8200.00

8200.00

1581.644

2603.28

165.272

8200.00

8200.00

1581.644

-129.73

165.272

8200.00

8200.00

1581.644

-2862.74

165.272

8200.00

8200.00

1581.644

-129.73

165.272

8200.00

8200.00

1581.644

-2628.005

165.272

8200.00

8200.00

1581.644

2888.390

165.272

8200.00

8200.00

1581.644

-2628.006

165.272

8200.00

8200.00

1581.644

2888.390

165.272

F3

S1

5.1.2 Design Parameters


Yield Strength - D10 ~ D16 : fy1 , D19 ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
f_clb : Clear Cover for bottom of footing reinforcement
Loc. : Location of Critical Point from left side of footing
Unit(N/mm2,mm)

f(Flexure)

f(Shear)

f'c

fy1

fy2

f_cl

f_clt

f_clb

0.8

0.75

18.60

294.00

392.00

50.0

50.0

50.0

Copyright (c) GS E&C. All Rights Reserved

7/25/2016
Project Na. : RAFT FOUNDATION

Calculation Sheet
of
Foundation

Project No. : MSH155


Page 19

5.2 REQUIRED REINFORCEMENT


5.2.1 Reinforcement Formula
- Shrinkage and temperature reinforcement
As = fac b h , fac = 0.002
---- USD99 CODE 5.7.2(1)
- Required Reinforcement by Analysis
As As2
- At every section of flexural members where tensile reinforcement is required
As As5
As As4
- The requirements of Eq (6.3.2) need not be applied, if every section As provided is
at least one -third greater than that required by analysis
As2 = r.req b d
As3 = 1.333 r.req b d
1.4
As4 =
bd
fy
0.25 fck
As5 =
bd
fy
Asmax = 0.75 rb b d
fck
0.003 Es
rb = 0.85 b 1 f
0.003 Es + fy
y
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!
Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu
0.85 fck
2Rn
Rn =
, r.req =
1- 12 , f = 0.8
fy
0.85fck
fbd

5.2.2 Check of Footing Reinforcement


Footing Name : F3
GroupType : Mat_Foundation
- X direction (Unit Width)

Sec.Name
S1

L.Comb.

d (mm)

As (mm )

5 - D16 @ 200

2.129

1.000

342.050

992.783

botom

5 - D16 @ 200

6.072

1.000

342.050

992.783

L.Comb.

Mu (kN-m)

Rn

r.Req

top

34.077

0.364

0.0013

bottom

42.302

0.452

0.0016

L.Comb.

As1(mm )

As2(mm )

As3(mm )

As4(mm )

As5(mm )

Asmax(mm )

top

400.000

428.572

571.286

1628.810

1254.408

7819.142

bottom

400.000

533.555

711.228

1628.810

1254.408

7819.142

Sec.Name
S1

Width b (m)

top

Sec.Name
S1

Loc. (m)

Sec.Name
S1

Using Bar (mm)

L.Comb.

Using As(mm )

Select As(mm )

Result

top

992.783

571.286

OK

bottom

992.783

711.228

OK

Copyright (c) GS E&C. All Rights Reserved

7/25/2016
Project Na. : RAFT FOUNDATION

Calculation Sheet
of
Foundation

Project No. : MSH155


Page 20

- Y direction (Unit Width)

Sec.Name
S1

L.Comb.

d (mm)

As (mm )

5 - D16 @ 200

2.129

1.000

326.150

992.783

botom

5 - D16 @ 200

6.072

1.000

326.150

992.783

Mu (kN-m)

Rn

r.Req

top

34.151

0.401

0.0014

bottom

42.722

0.502

0.0017

L.Comb.

L.Comb.

As1(mm )

As2(mm )

As3(mm )

As4(mm )

As5(mm )

Asmax(mm )

top

400.000

450.992

601.172

1553.095

1196.097

7455.673

bottom

400.000

566.060

754.558

1553.095

1196.097

7455.673

Sec.Name
S1

Width b (m)

top

Sec.Name
S1

Loc. (m)

Sec.Name
S1

Using Bar (mm)

L.Comb.

Using As(mm )

Select As(mm )

Result

top

992.783

601.172

OK

bottom

992.783

754.558

OK

Copyright (c) GS E&C. All Rights Reserved

7/25/2016
Project Na. : RAFT FOUNDATION

Calculation Sheet
of
Foundation

Project No. : MSH155


Page 21

5.3 ONE WAY SHEAR FORCE


5.3.1 One-Way Shear Formula
- f Vc = 0.75 1/6 fck B'w d
- Vu <= f Vc , then OK!!

5.3.2 Check of One-Way Shear


Footing Name : F3

GroupType : Mat_Foundation

PileType : False

Unit : mm
8200

1137

8200

1137

- X direction One-Way Shear (Unit Width)

Sec.Name L.Comb.
S1

Loc. (mm)

d (mm)

Bw (mm)

fVc (kN)

Vu (kN)

Result

1137

342

1000

184.398

35.122

OK

Loc. (mm)

d (mm)

Bw (mm)

fVc (kN)

Vu (kN)

Result

1137

326.1

1000

175.826

35.51

OK

- Y direction One-Way Shear (Unit Width)

Sec.Name L.Comb.
S1

Copyright (c) GS E&C. All Rights Reserved

7/25/2016

Project Na. : RAFT FOUNDATION

Calculation Sheet
of
Foundation

Project No. : MSH155


Page 22

5.4 TWO WAY SHEAR FORCE


5.4.1 Two-Way Shear Formula
Vu = SFz Shade Ratio
f Vc1 = 0.75 1/6 (1 + 2/ b c) fck bo d
f Vc2 = 0.75 1/6 (1 + as d / 2 bo) fck bo d
f Vc3 = 0.75 1/3 fck bo d
f Vc = Min(f Vc1 , f Vc2 , f Vc3)
Vu f Vc , then OK
where
b c = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

5.4.2 Check of Two-WayShear


Ft.Name
Pr.Name

8200

8200

0.985
2195.184 kN

8 f Vc2

1993.194 kN

Pl

650 mm f Vc3

1463.456 kN

Pw

650 mm f Vc

1463.456 kN

L.Comb.

bo / d
b c / as

Copyright (c) GS E&C. All Rights Reserved

2 Ratio Shade

984163.000 mm2

Rectangle f Vc1

Shape
3

F3 Punching Area

3968.2 / 342.05 mm Vu
1 / 40 Result

629.744 kN

OK

7/25/2016
Project Na. : RAFT FOUNDATION

Calculation Sheet
of
Foundation

Project No. : MSH155


Page 1

SUMMARY REPORT FOR FOUNDATION DESIGN


Project Information
Project Name

RAFT FOUNDATION

Structure Name

SST-62M

1. CHECK OF STABILITY
1.1 Check of Sliding Force (Bi-Axial)

Ft.Name

F3

# L/C

Fs

Allowable

Result

4.512

1.5

OK

4.512

1.5

OK

4.512

1.5

OK

4.512

1.5

OK

1.2 Check of Overturning Moment

Ft.Name

F3

# L/C

X - OVM

Y - OVM

Allowable

Result

2.52

2.5

1.5

OK / OK

39.45

2.22

1.5

OK / OK

2.24

2.5

1.5

OK / OK

39.45

2.22

1.5

OK / OK

1.3 Check of Bearing Pressure (Bi-Axial)

Ft.Name

F3

# L/C

Qu(kN/m )

Allowable

Result

96.64

294.21

OK

59.06

294.21

OK

105.76

294.21

OK

59.06

294.21

OK

2. DESIGN OF FOOTING
2.1 Check of Reinforcement
Ft.Name

Sec.Nam

S1 (X)

F3

S1 (Y)

(Unit : mm2)

# L/C

Req.As top / bottom

Used.As top / bottom

Result

571.29 / 711.23

992.78 / 992.78

OK / OK

400.00 / 400.00

992.78 / 992.78

OK / OK

400.00 / 578.11

992.78 / 992.78

OK / OK

400.00 / 400.00

992.78 / 992.78

OK / OK

601.17 / 754.56

992.78 / 992.78

OK / OK

403.25 / 613.87

992.78 / 992.78

OK / OK

601.17 / 754.56

992.78 / 992.78

OK / OK

403.25 / 613.87

992.78 / 992.78

OK / OK

Copyright (c) GS E&C. All Rights Reserved

7/25/2016

Calculation Sheet
of
Foundation

Project Na. : RAFT FOUNDATION


Project No. : MSH155
Page 2

2.2 Check of One Way Shear


Ft.Name

Sec.Nam

S1 (X)

F3

S1 (Y)

(Unit : kN)

# L/C

fVc

Vu

Result

184.40

30.56

OK

184.40

7.09

OK

184.40

35.12

OK

184.40

7.09

OK

175.83

30.87

OK

175.83

35.51

OK

175.83

30.87

OK

175.83

35.51

OK

2.3 Check of Two Way Shear


Ft.Name

F3

(Unit : kN)

# L/C

Ct. Pr.Name

fVc

Vu

Result

1463.456

629.744

OK

1463.456

629.744

OK

1463.456

629.744

OK

1463.456

629.744

OK

Copyright (c) GS E&C. All Rights Reserved

7/25/2016

COLUMN CALCULATION SHEET

TITLE

DESCRIPTION

PROJECT/JOB NO.

MSH155

PROJECT/JOB NAME

RAFT FOUNDATION

CLIENT NAME

PT. XX

SITE NAME

DMT SPLIT COMBAT GENBA

DOCUMENT NO.
REFERENCE NO.

MNR-62M

STRUCTURE NAME
GROUP NAME
LOADCOMBINATION GROUP NAME
REV

DATE

Copyright (c) GS E&C. All Rights Reserved

DESCRIPTION

PREP'D

CHK'D

APPR'D

APPR'D

7/25/2016

Calculation Sheet
of
Pier

CONTENTS
1. INPUT DATA
1.1 GENERAL
1.2 PIER DATA
1.3 LOADING DATA

2. CANTIL BEAM DESIGN


2.1 FORMULA
2.2 CANTIL BEAM DESIGN

3. ONE-WAY SHEAR
3.1 FORMULA
3.2 ONE-WAY SHEAR

Copyright (c) GS E&C. All Rights Reserved

Project Na. : RAFT FOUNDATION


Project No. : MSH155
Page 1

7/25/2016
Project Na. : RAFT FOUNDATION

Calculation Sheet
of
Pier

Project No. : MSH155


Page 2

1. INPUT DATA
1.1 General
Design Code

American Concrete Institute (ACI 318) [SI]

Input Unit

SI

f Bending

f Axial

0.8

f'c
18.6 N/mm

f Sprial reinf.
0.8

fy (D10 ~ D16)
2

Output Unit

294 N/mm

SI

f Tied reinf.

0.7

fy (D19 ~)
2

392 N/mm

f Shear

0.65

Ec

0.75

Es
2

24.61 kN/mm

196.13 kN/mm

Steel Db

Cover

JIS G3112 (D)

50 mm

1.2 Pier Data


50

650

650

50

650

650

50

650

650

650

650

50

Pier Name

Ver Bar

D16, 7 7 EA

Pier Shape

Rectangle

Tie Bar

D10 @ 150 mm

Width

650 mm

f'c

18.6 N/mm2

Length

650 mm

fy

294 N/mm2

Height

1500 mm

Using As

4765.35 mm2

dx

582.52 mm

dy

582.52 mm

Pier Name

Ver Bar

D16, 7 7 EA

Pier Shape

Rectangle

Tie Bar

D10 @ 150 mm

Width

650 mm

f'c

18.6 N/mm2

Length

650 mm

fy

294 N/mm2

Height

1500 mm

Using As

4765.35 mm2

dx

582.52 mm

dy

582.52 mm

Pier Name

Ver Bar

D16, 7 7 EA

Pier Shape

Rectangle

Tie Bar

D10 @ 150 mm

Width

650 mm

f'c

18.6 N/mm2

Length

650 mm

fy

294 N/mm2

Height

1500 mm

Using As

4765.35 mm2

dx

582.52 mm

dy

582.52 mm

Pier Name

Ver Bar

D16, 7 7 EA

Pier Shape

Rectangle

Tie Bar

D10 @ 150 mm

Width

650 mm

f'c

18.6 N/mm2

Length

650 mm

fy

294 N/mm2

Height

1500 mm

Using As

4765.35 mm2

dx

582.52 mm

dy

582.52 mm

Copyright (c) GS E&C. All Rights Reserved

7/25/2016
Project Na. : RAFT FOUNDATION

Calculation Sheet
of
Pier

Project No. : MSH155


Page 3

1.3 Loading Data


1.3.1 Load Case
Pier Name

Unit( kN , kN-m )

Name

Fx

Fy

Fz

Mx

My

SW

-15.21

TR1

-32.742

-31.946

-623.888

-0.356

0.343

TR2

-12.596

-10.73

-23.366

0.263

-0.219

TR3

-11.328

-13.548

-28.85

0.226

-0.281

TR4

-29.923

-30.678

571.672

-0.294

0.307

SW

-15.21

TR1

-12.596

-10.73

-23.366

0.263

-0.219

TR2

-11.328

-13.548

-28.85

0.226

-0.281

TR3

-29.923

-30.678

571.672

-0.294

0.307

TR4

-32.742

-31.946

-623.888

-0.356

0.343

SW

-15.21

TR1

-11.328

-13.548

-28.85

0.226

-0.281

TR2

-29.923

-30.678

571.672

-0.294

0.307

TR3

-32.742

-31.946

-623.888

-0.356

0.343

TR4

-12.596

-10.73

-23.366

0.263

-0.219

SW

-15.21

TR1

-29.923

-30.678

571.672

-0.294

0.307

TR2

-32.742

-31.946

-623.888

-0.356

0.343

TR3

-12.596

-10.73

-23.366

0.263

-0.219

TR4

-11.328

-13.548

-28.85

0.226

-0.281

1.3.2 Load Combination List


Comb . ID

Load Combination for Reinforcement

1.0 SW + 1.0 TR1

1.0 SW + 1.0 TR2

1.0 SW + 1.0 TR3

1.0 SW + 1.0 TR4

1.3.3 In Pier Top


P. Name

Unit( kN , kN-m )

LC#

S Fx

S Fy

S Fz

S Mx

S My

-32.742

-31.946

-623.888

-0.356

0.343

-12.596

-10.73

-23.366

0.263

-0.219

-11.328

-13.548

-28.85

0.226

-0.281

-29.923

-30.678

571.672

-0.294

0.307

-12.596

-10.73

-23.366

0.263

-0.219

-11.328

-13.548

-28.85

0.226

-0.281

-29.923

-30.678

571.672

-0.294

0.307

-32.742

-31.946

-623.888

-0.356

0.343

-11.328

-13.548

-28.85

0.226

-0.281

-29.923

-30.678

571.672

-0.294

0.307

-32.742

-31.946

-623.888

-0.356

0.343

Copyright (c) GS E&C. All Rights Reserved

7/25/2016
Project Na. : RAFT FOUNDATION

Calculation Sheet
of
Pier

Project No. : MSH155


Page 4

-12.596

-10.73

-23.366

0.263

-0.219

-29.923

-30.678

571.672

-0.294

0.307

-32.742

-31.946

-623.888

-0.356

0.343

-12.596

-10.73

-23.366

0.263

-0.219

-11.328

-13.548

-28.85

0.226

-0.281

1.3.4 In Pier Bottom


P. Name

Unit( kN , kN-m )

LC#

S Fx

S Fy

S Fz

S Mx

S My

-32.742

-31.946

-639.098

34.785

-35.673

-12.596

-10.73

-38.576

12.066

-14.075

-11.328

-13.548

-44.06

15.129

-12.742

-29.923

-30.678

556.462

33.452

-32.608

-12.596

-10.73

-38.576

12.066

-14.075

-11.328

-13.548

-44.06

15.129

-12.742

-29.923

-30.678

556.462

33.452

-32.608

-32.742

-31.946

-639.098

34.785

-35.673

-11.328

-13.548

-44.06

15.129

-12.742

-29.923

-30.678

556.462

33.452

-32.608

-32.742

-31.946

-639.098

34.785

-35.673

-12.596

-10.73

-38.576

12.066

-14.075

-29.923

-30.678

556.462

33.452

-32.608

-32.742

-31.946

-639.098

34.785

-35.673

-12.596

-10.73

-38.576

12.066

-14.075

-11.328

-13.548

-44.06

15.129

-12.742

Copyright (c) GS E&C. All Rights Reserved

7/25/2016
Project Na. : RAFT FOUNDATION

Calculation Sheet
of
Pier

Project No. : MSH155


Page 5

2. CANTIL BEAM DESIGN


2.1 FORMULA
- Shrinkage and temperature reinforcement
As = fac b h , fac = 0.002
---- USD99 CODE 5.7.2(1)
- Required Reinforcement by Analysis
As As2
- At every section of flexural members where tensile reinforcement is required
As As5
As As4
- The requirements of Eq (6.3.2) need not be applied, if every section As provided is
at least one -third greater than that required by analysis
As2 = r.req b d
As3 = 1.333 r.req b d
1.4
As4 =
bd
fy
0.25 fck
As5 =
bd
fy
Asmax = 0.75 rb b d
fck
0.003 Es
rb = 0.85 b 1 f
0.003 Es + fy
y
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!
Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu
0.85 fck
2Rn
Rn =
, r.req =
1- 12 , f = 0.8
fy
0.85fck
fbd

2.2 CANTIL BEAM DESIGN

Unit( mm )

P.Name

bx

by

dx

dy

650

650

582.52

582.52

650

650

582.52

582.52

650

650

582.52

582.52

650

650

582.52

582.52

Unit(mm2)

P.Name

Pier As

temp. As (As1)

Using As (All)

Result

4765.35

845

4765.35

OK

4765.35

845

4765.35

OK

4765.35

845

4765.35

OK

4765.35

845

4765.35

OK

Unit(mm2)

P.Name

Dir

LC#

UsingAs

As2

As3

As4

As5

AsSelect

Result

1389.9

262.06

349.32

1803.04

1388.59

349.32

OK

1389.9

102.99

137.28

1803.04

1388.59

137.28

OK

Copyright (c) GS E&C. All Rights Reserved

7/25/2016

Calculation Sheet
of
Pier
X

Project Na. : RAFT FOUNDATION


Project No. : MSH155
Page 6

1389.9

93.21

124.25

1803.04

1388.59

124.25

OK

1389.9

239.41

319.13

1803.04

1388.59

319.13

OK

1389.9

255.49

340.57

1803.04

1388.59

340.57

OK

1389.9

88.26

117.65

1803.04

1388.59

117.65

OK

1389.9

110.72

147.59

1803.04

1388.59

147.59

OK

1389.9

245.64

327.44

1803.04

1388.59

327.44

OK

1389.9

102.99

137.28

1803.04

1388.59

137.28

OK

1389.9

93.21

124.25

1803.04

1388.59

124.25

OK

1389.9

239.41

319.13

1803.04

1388.59

319.13

OK

1389.9

262.06

349.32

1803.04

1388.59

349.32

OK

1389.9

88.26

117.65

1803.04

1388.59

117.65

OK

1389.9

110.72

147.59

1803.04

1388.59

147.59

OK

1389.9

245.64

327.44

1803.04

1388.59

327.44

OK

1389.9

255.49

340.57

1803.04

1388.59

340.57

OK

1389.9

93.21

124.25

1803.04

1388.59

124.25

OK

1389.9

239.41

319.13

1803.04

1388.59

319.13

OK

1389.9

262.06

349.32

1803.04

1388.59

349.32

OK

1389.9

102.99

137.28

1803.04

1388.59

137.28

OK

1389.9

110.72

147.59

1803.04

1388.59

147.59

OK

1389.9

245.64

327.44

1803.04

1388.59

327.44

OK

1389.9

255.49

340.57

1803.04

1388.59

340.57

OK

1389.9

88.26

117.65

1803.04

1388.59

117.65

OK

1389.9

239.41

319.13

1803.04

1388.59

319.13

OK

1389.9

262.06

349.32

1803.04

1388.59

349.32

OK

1389.9

102.99

137.28

1803.04

1388.59

137.28

OK

1389.9

93.21

124.25

1803.04

1388.59

124.25

OK

1389.9

245.64

327.44

1803.04

1388.59

327.44

OK

1389.9

255.49

340.57

1803.04

1388.59

340.57

OK

1389.9

88.26

117.65

1803.04

1388.59

117.65

OK

1389.9

110.72

147.59

1803.04

1388.59

147.59

OK

3. ONE-WAY SHEAR
3.1 FORMULA
- Vc = 1/6 fck Bw d
Av fy d
- Vs =
s
- Vu <= f Vc + f Vs , f = 0.75
- When, Value of f Vs shall not exceed f 2/3

Copyright (c) GS E&C. All Rights Reserved

fck Bw d (Vs max)

7/25/2016

Calculation Sheet
of
Pier

Project Na. : RAFT FOUNDATION


Project No. : MSH155
Page 7

3.2 ONE-WAY SHEAR


P. Name

Dir.

Unit(kN)

LC#

fVc

fVs

fVs max

Vu

Result

204.531

244.323

818.123

32.742

OK

204.531

244.323

818.123

12.596

OK

204.531

244.323

818.123

11.328

OK

204.531

244.323

818.123

29.923

OK

204.531

244.323

818.123

31.946

OK

204.531

244.323

818.123

10.73

OK

204.531

244.323

818.123

13.548

OK

204.531

244.323

818.123

30.678

OK

204.531

244.323

818.123

12.596

OK

204.531

244.323

818.123

11.328

OK

204.531

244.323

818.123

29.923

OK

204.531

244.323

818.123

32.742

OK

204.531

244.323

818.123

10.73

OK

204.531

244.323

818.123

13.548

OK

204.531

244.323

818.123

30.678

OK

204.531

244.323

818.123

31.946

OK

204.531

244.323

818.123

11.328

OK

204.531

244.323

818.123

29.923

OK

204.531

244.323

818.123

32.742

OK

204.531

244.323

818.123

12.596

OK

204.531

244.323

818.123

13.548

OK

204.531

244.323

818.123

30.678

OK

204.531

244.323

818.123

31.946

OK

204.531

244.323

818.123

10.73

OK

204.531

244.323

818.123

29.923

OK

204.531

244.323

818.123

32.742

OK

204.531

244.323

818.123

12.596

OK

204.531

244.323

818.123

11.328

OK

204.531

244.323

818.123

30.678

OK

204.531

244.323

818.123

31.946

OK

204.531

244.323

818.123

10.73

OK

204.531

244.323

818.123

13.548

OK