UPDATE DRAWING LIST & MATERIAL


No.

Local

All

Item

Piping marking

Description

In Charge

Will be marking by tape instead of


Production
paint

Next Action

Status

Issue color code and order


material

Target date

Technical spec

Remark

W41

Confirm by Bruno

W14

Sent to Trung design

W20

Comment by Owner.
See REX from S82/83

W20

Confirm by Bruno

pending
2

Supperstructure

Bronze bell

To be fitted forward bulkhead of


block4, fr47

Design

Update drawing

IP
3

Galley

Side door

To be added S.steel cover between


Design
interious door & watertight door

Update drawing and material

pending
4

All

Sink

Missing typhon for almost sink

Design

Update drawing and material

pending
5

New Office

AC

Missing air conditioning

Project/ Design To be confirmed by Bruno

W14

pending
6

2 men cabin

Access holes

To be made amaflex and cover by


Production
Aluminium facing

Update drawing and material

W20

Confirm by Bruno

W20

Confirm by Bruno

IP
7

Switch board room Water coming

Water coming switch board room


from washing machine

Design

Updated drawing with


additional non-return valve

pending

Updated date:
UPDATE DRAWING LIST & MATERIAL
No.

Local

Bothruster room

Item

S.Steel cabinet

Description

In Charge

To be fit 5pcs in bowthruster room Design

Next Action

Status

Update drawing and material

Target date

W15

Technical spec

Remark

Not inTS

Sent to Trung & Huong


design
Shelves to be moved
from Schottel room to
bow thruster room

Done
9

All room

Composite door

Not watertigh, hinges bad quality Design

Update drawing

W20

Comment by Owner

W16

Comment by Owner.
Sam-341 inform
production to use
Junction box IP67 from
stock

pending
10

ER

Electric junction box

All electric junction box below


floor must be water tight

Design

Update drawing and material

Not inTS

Done
11

ER

Electric cabinet

Electric cabinet touching with GE Design/


exhaust pipe ladding
Production

Check again concerning


drawing

W15

Comment by Owner

pending

12

All

Brass valve

To be added insulation kit when


Production
connect brass valve with steel pipe

Update drawing and material

W16

Not inTS

Confirm by Bruno

pending
13

ER, Technical room Ladder

Ladder for fresh water tank SBT


Design
and Lub.Oil tank touching piping

Update drawing

W14

Sent to Trung design

W14

Informed Arturo in
drawing meeting

Done
14

Bridge deck

FIFI pipe

Support for FIFI pipe of monitor


must be movable

Design/
Production

Update drawing

Done

Updated date:
UPDATE DRAWING LIST & MATERIAL
No.

15

Local

Item

Nav. Bridge deck Funnel outside

Description

In Charge

Vibriation to be solved with more


Design
support

Next Action

Status

Update drawing

Target date

Technical spec

Remark

W17

Confirm by Bruno
As-built SEAS88/89

W17

Trial comment

W17

Comment by Owner
As-built SEAS88/89

pending
17

AC room

Insulation arround door

To be added Steel cover on


insulation of step

Design

Update drawing

pending
18

ER

Hydraulic

To be removed 2 valve at hydraulic


Design
tank

Update drawing & material

pending
19

Lobby

Grating on floor

Grating for lobby with full area to


Design
be done

Update drawing & material

W17

Not inTS

Sent information to
Trung & Huong design
As-built SEAS88/89

IP
20

Technical room

PVC pipe

To be cover PVC pipe at door


access in technical room

Production

Confirm by Bruno

pending
21

FW tank

Glass level gauge

Cover for level gauge of FW tank


for next vessel to avoid broken
Production
glass tube

Update drawing & material

W18

pending
22

Deck

Winch gear

To be protected with movable


cover

Production

Confirm by Bruno

pending

Updated date:
UPDATE DRAWING LIST & MATERIAL
No.

Local

23

Stair

Item

Wooden handrail

Description

All wooden hand rail on top stair


to ensure strong

In Charge

Design

Next Action

Status

Update drawing & material

Target date

Technical spec

Remark

W20

Sent information to
Huong design

W15

Sent information to
Thuan design

pending
24

Stair

Wheel house stair

To be removed bracket at top of


wheel house stair

Design

Update drawing

pending
25

All room

Interious door

So many ACC door missing grille Design

Sent information to
Huong design

Update drawing

done
26

2 men cabin

Ladder

Connecting bolt for removable


ladder inside cement, to be move
up 170mm

Design

Sent information to
Trung design

Update drawing

done
27

ER

Ventilation box

Very low, to be move up

Design

Informed Arturo in
drawing meeting

Update drawing

done
28

Deck

Mooring rope

To be remove thimble at the end

Design

Sent information to
Trung & Trang design

Update DA

Done
29

Funnel

Insulation

Adding insulation for silencer of


exhaust pipe

Design

Update drawing

W15

Not inTS

Done on Seas88, 89

pending

Updated date:
UPDATE DRAWING LIST & MATERIAL
No.

Local

30

Schottel room

Item

Discharge valve

Description

To be added drip tray for all


discharge valve

In Charge

Design

Next Action

Status

Target date

Technical spec

Remark

Await Bruno confirm

pending
31

Wheel house

Wheel house cabinet

To be added ventilation grid on


door

Design

Already done on
Seas88, 89

Update drawing

pending

32

Wheel house

Console

Shelves are too small to store the


blinders (modified on previous
vessels by Boluda)

Design

To be done in the cabins


as well

To be modified drawing

pending

33

Wheel house

Guardrail

SS guardrail in wheelhouse (door)


Design
too low

comment from French


flag

To be modified drawing

Done
34

All cabin

Desk above heater

Grids to be added on desks in


Design
cabin above the eaters

To be modified drawing

confirmed by Bruno

pending

6.Apr.2016
Picture

6.Apr.2016
Picture

6.Apr.2016
Picture

6.Apr.2016
Picture

6.Apr.2016
Picture