WEEK

INTRODUCTION OF
DESIGN 2
WORKSHOP
BRIEFING
ORGANIZATION
BRIEFING
MATERIAL
SURVEYING/
MATERIAL COSTING
MATERIAL BUYING
MATERIAL CUTTING
IMPACT OF
ATTENUATOR
FABRICATION
FIREWALL
FABRICATION
FLOOR
FABRICATION
BODYWORK
FABRICATION
FULL PART
ASSEMBLY
OTHER PART
ASSEMBLY
PROGRESS
PRESENTATION
FINAL INSPECTION
AND
MODIFICATION
OPERATE AND TEST
DRIVE
REPORT WRITING

10

11

12

13

14

ALL
FAIZ
AFIQAH
FITR
I
ALIF
F

PROJECT SCHEDULE
WEEK 6-7
PROCESS OF FIREWALL
FABRICATION
- FABRICARE FIREWALL WITH
CHASSIS
- ATTACHED SEATBELT AT
THE FIREWALL
PERSON IN CHARGE: FITRI ADAM

WEEK 5-6
PROCESS OF FABRICATION OF
IMPACT OF THE ATTENUATOR
- ATTACHED 3 DIFFERENT
DIMENSION OF
ATTENUATOR TOGETHER
- ATTACHED THE
ATTENUATOR AT THE
FRONT PLATE OF THE
CAR
PERSON IN CHARGE: FAIZ

WEEK 8-9
PROCESS OF FLOOR FABRICATION
-

WEEK 10-12
PROCESS OF BODY FABRICATION
PERSON IN CHARGE: ALL OF THE
GROUP MEMBERS

ATTACHED THE FLOOR


WITH THE CHASSIS
ATTACHED SEAT ON THE
FLOOR

PERSON IN CHARGE: ALIFF