Sei sulla pagina 1di 50

SUMMARY OF DCP TEST

NO.

POINT

9.61

1.41

31.29

1.69

28.46

40.74

3
4

STATION

10+840

AVERAGE

18.86

NO.

Penurunan Sendiri Tanpa


ukulan

Cm

POINT 1

POINT 2

POINT 3

18

POINT 4

POINT 5

POINT 6

Berat Hammer

8.0

Submitted by Contractor
PT. Halla

Supervision Consultant
CECI Engineering Consultan's

Lee Kyo IL

Ir. Yuliansyah

Quality Control Manager

Site Engineer

SUMMARY OF DCP TEST

SPESIFIKASI

MIN 6%
SNI
6 < 18.86

Cm
1
1
18
0
1
4

Kg

Supervision Consultant
CECI Engineering Consultan's

Ir. Yuliansyah
Site Engineer

REGIONAL ROADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN

DYNAMIC CONE PENETROMETER


Name of Package

Existing ( Simanggaris - Border )

Province

East Kalimantan

Contractor

PT.HALLA

Contract No.

34 - RCP 04

Location

STA. 10 + 840 (A1) (Bridge Cassion) (Back Fill)

Material classification
Pavement conditions

:
:

No

Number of Blows

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

0
1

22
23
24
25
26
27
28
29
30
31
32

1
1
1
1
1
1
1
1
1
1
1

Cumulative
Penetration (mm)

0
230
730
750
760
770
780
805
830
845
870
900
925

Hamm
Ham

Penetration Between
Reading (mm)

Penetration per
Blow (mm)

0
230
500
20
10
10
10
25
25
15
25
30
25

0
230
730
750
760
770
780
805
830
845
870
900
925

Hammer Factor

0
1
1
1
1
1
1
1
1
1
1
1
1

DCP Index
(mm/blows)

0
230
500
20
10
10
10
25
25
15
25
30
25

33
34
35

Submitted by Contractor

Submitted by Contractor

PT. HALLA

PT. HALLA

Muttakin, A.Md

Lee Kyo IL

Material Engineer

Quality Control Manager

OADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN
ASTM D 6951 - 03
Place

STA 10 + 840

Point No.

Date of tested

24-Aug-15

Tested by

Approved by

Hammer weight :
Hammer faktor :

CBR

(%)

0
0.7
0.4
10.0
20.0
20.0
20.0
8.0
8.0
14.0
8.0
6.0
8.0

4.6 kg
2

Average

10.22

12.50

7.33

8.0 kg
1

Remarks

Supervision Consultant
CECI Engineering Consultan's

Supardi, A.Md
Quality Engineer

REGIONAL ROADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN

DYNAMIC CONE PENETROMETER


Name of Package

Existing ( Simanggaris - Border )

Province

East Kalimantan

Contractor

PT.HALLA

Contract No.

34 - RCP 04

Location

STA. 10 + 840 (A1) (Bridge Cassion) (Back Fill)

Number of Blows

Cumulative
Penetration (mm)

1
1
1
1

230.0
730.0
750.0
760.0

0.7
0.4
10.0
20.0

1
1
1
1

780.0
805.0
830.0
845.0

20.0
8.0
8.0
14.0

770.0

20.0

870.0

8.0

AVERAGE

CBR

(%) Number of Blows

10.22

Cumulative
Penetration (mm)

CBR

AVERAGE

AVERAGE

AVERAGE

AVERAGE

AVERAGE

(%)

11.60

AVERAGE CBR (%)


0
0
100
200
300

DEPTH (mm)

400
500
600
700
800
900
1000

10

20

30

40

50

60

800
900
1000

Field CBR (%)

Submitted by Contractor

Submitted by Contractor

PT. HALLA

PT. HALLA

Muttakin, A.Md

Lee Kyo IL

Material Engineer

Quality Control Manager

OADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN
ASTM D 6951 - 03
Place

STA 10 + 840

Point No.

Date of tested

24-Aug-15

Tested by

Approved by

Number of Blows

Cumulative
Penetration (mm)

1
1

900.0
925.0

CBR

(%)

6.0
8.0

AVERAGE

7.00

AVERAGE

AVERAGE

VERAGE CBR (%)


20

30

9.61
40

50

60

70

80

90

100

Field CBR (%)

Supervision Consultant
CECI Engineering Consultan's

Supardi, A.Md
Quality Engineer

REGIONAL ROADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN

DYNAMIC CONE PENETROMETER


Name of Package

Existing ( Simanggaris - Border )

Province

East Kalimantan

Contractor

PT.HALLA

Contract No.

34 - RCP 04

Location

STA. 10 + 840 (A1) (Bridge Cassion) (Back Fill)

Material classification
Pavement conditions

:
:

No

Number of Blows

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

0
1

22
23
24
25
26
27
28
29
30
31
32

1
1
1
1
1
1

Cumulative
Penetration (mm)

0
165
380
500
630
720
810
945

Hamm
Ham

Penetration Between
Reading (mm)

Penetration per
Blow (mm)

0
165
215
120
130
90
90
135

0
165
380
500
630
720
810
945

Hammer Factor

0
1
1
1
1
1
1
1

DCP Index
(mm/blows)

0
165
215
120
130
90
90
135

33
34
35

Submitted by Contractor

Submitted by Contractor

PT. HALLA

PT. HALLA

Muttakin, A.Md

Lee Kyo IL

Material Engineer

Quality Control Manager

OADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN
ASTM D 6951 - 03
Place

STA 10 + 840

Point No.

Date of tested

24-Aug-15

Tested by

Approved by

Hammer weight :
Hammer faktor :

CBR

(%)

0
1.0
0.7
1.4
1.3
1.9
1.9
1.2

4.6 kg
2

Average

1.26
1.55

8.0 kg
1

Remarks

Supervision Consultant
CECI Engineering Consultan's

Supardi, A.Md
Quality Engineer

REGIONAL ROADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN

DYNAMIC CONE PENETROMETER


Name of Package

Existing ( Simanggaris - Border )

Province

East Kalimantan

Contractor

PT.HALLA

Contract No.

34 - RCP 04

Location

STA. 10 + 840 (A1) (Bridge Cassion) (Back Fill)

Number of Blows

Cumulative
Penetration (mm)

1
1
1
1

165.0
380.0
500.0
630.0

1.0
0.7
1.4
1.3

720.0

1.9

AVERAGE

CBR

(%) Number of Blows

1
1

1.26

Cumulative
Penetration (mm)

CBR

810.0
945.0

1.9
1.2

AVERAGE

AVERAGE

AVERAGE

AVERAGE

AVERAGE

(%)

1.55

AVERAGE CBR (%)


0
0
100
200
300

DEPTH (mm)

400
500
600
700
800
900
1000

10

20

30

40

50

60

800
900
1000

Field CBR (%)

Submitted by Contractor

Submitted by Contractor

PT. HALLA

PT. HALLA

Muttakin, A.Md

Lee Kyo IL

Material Engineer

Quality Control Manager

OADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN
ASTM D 6951 - 03
Place

STA 10 + 840

Point No.

Date of tested

24-Aug-15

Tested by

Approved by

Number of Blows

Cumulative
Penetration (mm)

CBR

(%)

AVERAGE

AVERAGE

AVERAGE

VERAGE CBR (%)


20

30

1.41
40

50

60

70

80

90

100

Field CBR (%)

Supervision Consultant
CECI Engineering Consultan's

Supardi, A.Md
Quality Engineer

REGIONAL ROADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN

DYNAMIC CONE PENETROMETER


Name of Package

Existing ( Simanggaris - Border )

Province

East Kalimantan

Contractor

PT.HALLA

Contract No.

34 - RCP 04

Location

STA. 10 + 840 (A1) (Bridge Cassion) (Back Fill)

Material classification
Pavement conditions

:
:

No

Number of Blows

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

0
1

22
23
24
25
26
27
28
29
30
31
32

1
1
1
1
1
1
1
1
1
1

Cumulative
Penetration (mm)

0
85
140
155
160
165
170
175
180
190
200
210

Hamm
Ham

Penetration Between
Reading (mm)

Penetration per
Blow (mm)

0
85
55
15
5
5
5
5
5
10
10
10

0
85
140
155
160
165
170
175
180
190
200
210

Hammer Factor

0
1
1
1
1
1
1
1
1
1
1
1

DCP Index
(mm/blows)

0
85
55
15
5
5
5
5
5
10
10
10

33
34
35

Submitted by Contractor

Submitted by Contractor

PT. HALLA

PT. HALLA

Muttakin, A.Md

Lee Kyo IL

Material Engineer

Quality Control Manager

OADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN
ASTM D 6951 - 03
Place

STA 10 + 840

Point No.

Date of tested

24-Aug-15

Tested by

Approved by

Hammer weight :
Hammer faktor :

CBR

(%)

0
2.0
3.3
14.0
50.0
50.0
50.0
50.0
50.0
20.0
20.0
20.0

4.6 kg
2

Average

23.86

38.00
20.00

8.0 kg
1

Remarks

Supervision Consultant
CECI Engineering Consultan's

Supardi, A.Md
Quality Engineer

REGIONAL ROADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN

DYNAMIC CONE PENETROMETER


Name of Package

Existing ( Simanggaris - Border )

Province

East Kalimantan

Contractor

PT.HALLA

Contract No.

34 - RCP 04

Location

STA. 10 + 840 (A1) (Bridge Cassion) (Back Fill)

Number of Blows

Cumulative
Penetration (mm)

1
1
1
1

85.0
140.0
155.0
160.0

2.0
3.3
14.0
50.0

1
1
1
1

170.0
175.0
180.0
190.0

50.0
50.0
50.0
20.0

165.0

50.0

200.0

20.0

AVERAGE

CBR

(%) Number of Blows

23.86

Cumulative
Penetration (mm)

CBR

AVERAGE

AVERAGE

AVERAGE

AVERAGE

AVERAGE

(%)

50.00

AVERAGE CBR (%)


0
0
100
200
300

DEPTH (mm)

400
500
600
700
800
900
1000

10

20

30

40

50

60

800
900
1000

Field CBR (%)

Submitted by Contractor

Submitted by Contractor

PT. HALLA

PT. HALLA

Muttakin, A.Md

Lee Kyo IL

Material Engineer

Quality Control Manager

OADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN
ASTM D 6951 - 03
Place

STA 10 + 840

Point No.

Date of tested

24-Aug-15

Tested by

Approved by

Number of Blows

Cumulative
Penetration (mm)

210.0

CBR

(%)

20.0

AVERAGE

20.00

AVERAGE

AVERAGE

VERAGE CBR (%)


20

30

31.29
40

50

60

70

80

90

100

Field CBR (%)

Supervision Consultant
CECI Engineering Consultan's

Supardi, A.Md
Quality Engineer

REGIONAL ROADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN

DYNAMIC CONE PENETROMETER


Name of Package

Existing ( Simanggaris - Border )

Province

East Kalimantan

Contractor

PT.HALLA

Contract No.

34 - RCP 04

Location

STA. 10 + 840 (A1) (Bridge Cassion) (Back Fill)

Material classification
Pavement conditions

:
:

No

Number of Blows

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

0
1

22
23
24
25
26
27
28
29
30
31
32

1
1
1
1
1

Cumulative
Penetration (mm)

0
115
215
270
315
820
960

Hamm
Ham

Penetration Between
Reading (mm)

Penetration per
Blow (mm)

0
115
100
55
45
505
140

0
115
215
270
315
820
960

Hammer Factor

0
1
1
1
1
1
1

DCP Index
(mm/blows)

0
115
100
55
45
505
140

33
34
35

Submitted by Contractor

Submitted by Contractor

PT. HALLA

PT. HALLA

Muttakin, A.Md

Lee Kyo IL

Material Engineer

Quality Control Manager

OADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN
ASTM D 6951 - 03
Place

STA 10 + 840

Point No.

Date of tested

24-Aug-15

Tested by

Approved by

Hammer weight :
Hammer faktor :

CBR

(%)

0
1.4
1.7
3.3
4.1
0.4
1.2

4.6 kg
2

Average

2.18
1.2

8.0 kg
1

Remarks

Supervision Consultant
CECI Engineering Consultan's

Supardi, A.Md
Quality Engineer

REGIONAL ROADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN

DYNAMIC CONE PENETROMETER


Name of Package

Existing ( Simanggaris - Border )

Province

East Kalimantan

Contractor

PT.HALLA

Contract No.

34 - RCP 04

Location

STA. 10 + 840 (A1) (Bridge Cassion) (Back Fill)

Number of Blows

Cumulative
Penetration (mm)

1
1
1
1

115.0
215.0
270.0
315.0

1.4
1.7
3.3
4.1

820.0

0.4

AVERAGE

CBR

(%) Number of Blows

2.18

Cumulative
Penetration (mm)

CBR

960.0

1.2

AVERAGE

AVERAGE

AVERAGE

AVERAGE

AVERAGE

(%)

1.20

AVERAGE CBR (%)


0
0
100
200
300

DEPTH (mm)

400
500
600
700
800
900
1000

10

20

30

40

50

60

800
900
1000

Field CBR (%)

Submitted by Contractor

Submitted by Contractor

PT. HALLA

PT. HALLA

Muttakin, A.Md

Lee Kyo IL

Material Engineer

Quality Control Manager

OADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN
ASTM D 6951 - 03
Place

STA 10 + 840

Point No.

Date of tested

24-Aug-15

Tested by

Approved by

Number of Blows

Cumulative
Penetration (mm)

CBR

(%)

AVERAGE

AVERAGE

AVERAGE

VERAGE CBR (%)


20

30

1.69
40

50

60

70

80

90

100

Field CBR (%)

Supervision Consultant
CECI Engineering Consultan's

Supardi, A.Md
Quality Engineer

REGIONAL ROADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN

DYNAMIC CONE PENETROMETER


Name of Package

Existing ( Simanggaris - Border )

Province

East Kalimantan

Contractor

PT.HALLA

Contract No.

34 - RCP 04

Location

STA. 10 + 840 (A1) (Bridge Cassion) (Back Fill)

Material classification
Pavement conditions

:
:

No

Number of Blows

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

0
1

22
23
24
25
26
27
28
29
30
31
32

1
1
1
1

Cumulative
Penetration (mm)

0
190
300
310
320
320

Hamm
Ham

Penetration Between
Reading (mm)

Penetration per
Blow (mm)

0
190
110
10
10
0

0
190
300
310
320
320

Hammer Factor

0
1
1
1
1
1

DCP Index
(mm/blows)

0
190
110
10
10
0

33
34
35

Submitted by Contractor

Submitted by Contractor

PT. HALLA

PT. HALLA

Muttakin, A.Md

Lee Kyo IL

Material Engineer

Quality Control Manager

OADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN
ASTM D 6951 - 03
Place

STA 10 + 840

Point No.

Date of tested

24-Aug-15

Tested by

Approved by

Hammer weight :
Hammer faktor :

CBR

(%)

0
0.8
1.5
20.0
20.0
100.0

4.6 kg
2

Average

28.46

8.0 kg
1

Remarks

Supervision Consultant
CECI Engineering Consultan's

Supardi, A.Md
Quality Engineer

REGIONAL ROADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN

DYNAMIC CONE PENETROMETER


Name of Package

Existing ( Simanggaris - Border )

Province

East Kalimantan

Contractor

PT.HALLA

Contract No.

34 - RCP 04

Location

STA. 10 + 840 (A1) (Bridge Cassion) (Back Fill)

Number of Blows

Cumulative
Penetration (mm)

1
1
1
1

190.0
300.0
310.0
320.0

0.8
1.5
20.0
20.0

320.0

100.0

AVERAGE

CBR

(%) Number of Blows

28.46

Cumulative
Penetration (mm)

CBR

(%)

AVERAGE

AVERAGE

AVERAGE

AVERAGE

AVERAGE
AVERAGE CBR (%)
0
0
100
200
300

DEPTH (mm)

400
500
600
700
800
900
1000

10

20

30

40

50

60

800
900
1000

Field CBR (%)

Submitted by Contractor

Submitted by Contractor

PT. HALLA

PT. HALLA

Muttakin, A.Md

Lee Kyo IL

Material Engineer

Quality Control Manager

OADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN
ASTM D 6951 - 03
Place

STA 10 + 840

Point No.

Date of tested

24-Aug-15

Tested by

Approved by

Number of Blows

Cumulative
Penetration (mm)

CBR

(%)

AVERAGE

AVERAGE

AVERAGE

VERAGE CBR (%)


20

30

28.46
40

50

60

70

80

90

100

Field CBR (%)

Supervision Consultant
CECI Engineering Consultan's

Supardi, A.Md
Quality Engineer

REGIONAL ROADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN

DYNAMIC CONE PENETROMETER


Name of Package

Existing ( Simanggaris - Border )

Province

East Kalimantan

Contractor

PT.HALLA

Contract No.

34 - RCP 04

Location

STA. 10 + 840 (A1) (Bridge Cassion) (Back Fill)

Material classification
Pavement conditions

:
:

No

Number of Blows

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

0
1

22
23
24
25
26
27
28
29
30
31
32

1
1
1
1

Cumulative
Penetration (mm)

0
50
55
60
65
70

Hamm
Ham

Penetration Between
Reading (mm)

Penetration per
Blow (mm)

0
50
5
5
5
5

0
50
55
60
65
70

Hammer Factor

0
1
1
1
1
1

DCP Index
(mm/blows)

0
50
5
5
5
5

33
34
35

Submitted by Contractor

Submitted by Contractor

PT. HALLA

PT. HALLA

Muttakin, A.Md

Lee Kyo IL

Material Engineer

Quality Control Manager

OADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN
ASTM D 6951 - 03
Place

STA 10 + 840

Point No.

Date of tested

24-Aug-15

Tested by

Approved by

Hammer weight :
Hammer faktor :

CBR

(%)

0
3.7
50.0
50.0
50.0
50.0

4.6 kg
2

Average

40.74

8.0 kg
1

Remarks

Supervision Consultant
CECI Engineering Consultan's

Supardi, A.Md
Quality Engineer

REGIONAL ROADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN

DYNAMIC CONE PENETROMETER


Name of Package

Existing ( Simanggaris - Border )

Province

East Kalimantan

Contractor

PT.HALLA

Contract No.

34 - RCP 04

Location

STA. 10 + 840 (A1) (Bridge Cassion) (Back Fill)

Number of Blows

Cumulative
Penetration (mm)

1
1
1
1

50.0
55.0
60.0
65.0

3.7
50.0
50.0
50.0

70.0

50.0

AVERAGE

CBR

(%) Number of Blows

40.74

Cumulative
Penetration (mm)

CBR

(%)

AVERAGE

AVERAGE

AVERAGE

AVERAGE

AVERAGE
AVERAGE CBR (%)
0
0
100
200
300

DEPTH (mm)

400
500
600
700
800
900
1000

10

20

30

40

50

60

800
900
1000

Field CBR (%)

Submitted by Contractor

Submitted by Contractor

PT. HALLA

PT. HALLA

Muttakin, A.Md

Lee Kyo IL

Material Engineer

Quality Control Manager

OADS DEVELOPMENT PROJECT (RRDP)


EAST KALIMANTAN
ASTM D 6951 - 03
Place

STA 10 + 840

Point No.

Date of tested

24-Aug-15

Tested by

Approved by

Number of Blows

Cumulative
Penetration (mm)

CBR

(%)

AVERAGE

AVERAGE

AVERAGE

VERAGE CBR (%)


20

30

40.74
40

50

60

70

80

90

100

Field CBR (%)

Supervision Consultant
CECI Engineering Consultan's

Supardi, A.Md
Quality Engineer

Potrebbero piacerti anche