Abstract

This report is a summer internship report submitted in partial fulfilment of the requirements
for the degree of Bachelor of Technology in Civil Engineering as per norms of Krukshetra
University, Kurukshetra. The author visited the site for construction of culvert structure, at
Madan Bhandari Highway Project, Kathmandu in his training period and attained technical
knowledge during the course, after which he was able to compile this report. The report
consists of brief study and description of materials, equipment and procedures used at site for
construction of a culvert. Author put his best to elaborate the actual site conditions, and
problem faced at site and the tactics used to deal with them .The main objective of this report
is to present a systematic text on the execution of construction of a culvert based on the
Nepali Standard codes.
The report also covers the fundamental aspects of practical requirement such as safety,
feasibility and economy at site. In this report the objective was to introduce, wherever
necessary, material which embodies the most recent methodologies. Chapter 1 discusses
introduction to organization profile, management structure, products, plants, capacity,
turnover, market share, problem definition (objectives, deliverables etc ) and the main
conclusions. Chapter 2 deals with materials and equipment used at site, literature view.
Chapter 3 contains description of the process plant/site where practical training was
undertaken including block diagrams for showing process scheme, major operations and
process equipment, stream compositions, site conditions governing the process control.
Chapter 4 discusses summary of the project with main findings and conclusions, the method
of adoption of the proposed solution by the organization and expected benefits (technical and
financial) Chapter 5 presents the results obtained after the tests performed on site proceeding
with their conclusion. In spite of every care taken, it is possible that some errors might have
been left unnoticed. The author sincerely welcomes the constructive criticism for improving
the report.

CERTIFICATE

It is certified that the work contained in this training report titled Construction of Culvert at
Kathmandu-Gotikhel highway project, Kathmandu. " is the original work done by Sudip
Ghimire (2213851) and has not been submitted anywhere.

Date

Head of department of

civil
Place

Shurti Kant Sharma


SDDIET

ACKNOWLEDGMENT

I take immense pleasure in thanking Prof, Shruti Kant Sharma, HOD, SDDIET, Barwala, for
having permitted me to carry out this training. I wish to express my deep sense of gratitude to
my teachers, Mr. Ravi Rana, Mr. Karamjeet Chahal, Mr. Amir Iqbal Bhat, civil department,
for their able encouragement and useful suggestions, which helped me in completing the
training work, in time.
I would also like to thank Mr. Sundar Shyam Ghimire and Mr. Neetin Thakuri for all their
valuable assistance during training. Words are inadequate in offering my thanks to the Project
team of Metro Construction company for their guidance and co-operation carrying out the
training work.
Finally, yet importantly, I would like to express my heartfelt thanks to my beloved parents for
their blessings, my friends/classmates for their help and wishes for the successful completion
of this training.

Sudip Ghimire
2213851
Btech civil, 7th sem
SDDIET, BARWALA

Potrebbero piacerti anche