Sei sulla pagina 1di 2

Status of Submittals to MoE

NO.
1

FTP
Date
27-Oct-11

Trans. #

TBC Documents
Reference No.
HPP-TBC-G-55-GEN-2001

ENKA Documents
Reference No.
0-740078-00-G-00101-2

Item

Monthly Report, Feb 2012


Rev.
2

Qty.

Size

Description of Item

A0

Power Plant Plot Plan

For Approval

Trans. date
Soft copy
Hard Copy
27-Nov-2011
28-Nov-2011

Approval
14 days
12-Dec-2011

GE
*

Issue Reason

Comments
Date
9/12/2011

MOE
#

Date

Status
* RNC
# RC
* RNC

28-Oct-11

HPP-TBC-C-55-GEN-2002

0-740078-00-G-00103-2

A0

Power Plant Orientation Concept Plan

For Approval

27-Nov-2011

28-Nov-2011

12-Dec-2011

9/12/2011

* RNC

3-Nov-11

HPP-TBC-C-55-GEN-2003

0-740078-00-G-00104-1

A0

Construction Camp & Storage Area Plot Plan

For Approval

27-Nov-2011

28-Nov-2011

12-Dec-2011

9/12/2011

* RNC

10-Nov-11

HPP-TBC-G-08-GEN-2004

4-740078-00-G-04104-0

A4

Engineering Documentation Standard

For Approval

27-Nov-2011

28-Nov-2011

12-Dec-2011

9/12/2011

27-Oct-11

HPP-TBC-C-52-GEN-2005

0-740078-00-C-10102-2

A0

Bore Hole& Electrical Resistivity Test Location Plan

For Approval

27-Nov-2011

28-Nov-2011

12-Dec-2011

9/12/2011

27-Oct-11

HPP-TBC-C-52-GEN-2006

4-740078-00-C-10104-2

A4

Soil Investigation Technical Specification

For Approval

27-Nov-2011

28-Nov-2011

12-Dec-2011

9/12/2011

29-Nov-11

#2

HPP-TBC-G-00-GEN-2027

4-740078-00-G-041 02-0

A4

Painting & Coating Schedule For Steel Structure Piping And Equipment Engineering Specification

For Approval

1-Dec-11

7-Dec-11

21-Dec-2011

Accepted For Information

8
9
10
11
12
13

29-Nov-11
29-Nov-11
29-Nov-11
29-Nov-11
29-Nov-11
29-Nov-11

#3

1
2
3
4
5
6

HPP-TBC-E-68-GRS-2009
HPP-TBC-E-00-MVS-2018
HPP-TBC-E-00-MVS-2019
HPP-TBC-E-00-GEN-2026
HPP-TBC-E-00-GRS-2020
HPP-TBC-E-00-GRS-2021

A
A
A
A
A
A

1-740078-K5-E-052
4-740078-K1-E-054
4-740078-K1-E-054
4-740078-K4-E-054
4-740078-K5-E-054
4-740078-K5-E-054

02-0
19-0
20-0
35-0
38-0
39-0

0
0
0
0
0
0

1
1
1
1
1
1

A1
A4
A4
A4
A4
A4

Lightning Protection System Installation Drawings -Typical


MV Power Supply Cables Specification
MV Cable Termination Specification
Cable Trays and Accessories Specification
Grounding Specification
Lightning Protection Specification

For
For
For
For
For
For

1-Dec-2011
1-Dec-2011
1-Dec-2011
1-Dec-2011
1-Dec-2011
1-Dec-2011

5-Dec-2011
5-Dec-2011
5-Dec-2011
5-Dec-2011
5-Dec-2011
5-Dec-2011

19-Dec-2011
19-Dec-2011
19-Dec-2011
19-Dec-2011
19-Dec-2011
19-Dec-2011

*
*
*
Accept for Information
Accept for Information
Accept for Information

16/12/2011
9/12/2011
9/12/2011
17/12/2011
19/12/2011
16/12/2011

* RCN, Approved
* RCN, Approved
Approved
Approved
Approved
Approved

14
15

5-Dec-11
5-Dec-11

#4

1
2

HPP-TBC-E-00-HVS-2015
HPP-TBC-E-64-GEN-2011

A
A

4-740078-J3-E-05415-0
4-740078-K4-E-05204-0

0
0

1
1

A4
A4

H.V. CABLES SPECIFICATION


CABLE TRAYS and CONDUITS ARRANGEMENT INTALLATION DRAWINGS TYPICAL

For Approval
For Approval

15-Dec-11
15-Dec-11

12/18/2011
12/18/2011

1-Jan-2012
1-Jan-2012

*
*

20/12/2011
19/12/2011

* RNC
* RNC

16

13-Dec-11

#5

HPP-TBC-M-69-GEN-2031

740078-00-G-04103

A4

Thermal Insulation of Piping and Equipment Specification

For Approval

15-Dec-11

12/18/2011

1-Jan-2012

Accept for information

15/12/2011

17
18

25-Nov-11
25-Nov-11

#6

1
2

HPP-TBC-I-01-GEN-2023
HPP-TBC-I-51-DCS-2024

A
A

4-740078-00-I-75001-0
3-740078-L0-I-75401-0

0
0

1
1

A4
A3

Design Criteria of BOP Instrument and Control System


GTG & BOP DCS Architecture

For Approval
For Approval

16-Dec-11
16-Dec-11

12/18/2011
12/18/2011

1-Jan-2012
1-Jan-2012

Reviwed Comment as noted


Reviwed Comment as noted

21/12/2011
21/12/2011

19
20

15-Dec-11
15-Dec-11

#7

1
2

HPP-TBC-C-01-GEN-2028
HPP-TBC-C-01-GEN-2029

Structural Design - Codes and Standards


Structure Material Specification

For Approval
For Approval

12/18/2011
12/18/2011

1-Jan-2012
1-Jan-2012

Reviwed Comment as noted


Reviwed No Comment

19-21/12/2011
19-21/12/2011

21

16-Dec-11

HPP-TBC-E-00-HVS-2016

4-740078-J3-E-05416-0

A4

HV Cable Termination Specification

For Approval

12/19/2011

2-Jan-2012

Accepted for informatiom

19/12/2011

22

16-Dec-11

HPP-TBC-E-00-LVS-2040

4-740078-K2-E-05424-0

A4

LV Power & Installation Cables Specification

For Approval

12/19/2011

2-Jan-2012

Accepted for informatiom

19/12/2011

23

16-Dec-11

HPP-TBC-E-00-LVS-2044

4-740078-K2-E-05428-0

A4

LV Cable Termination Specification

For Approval

12/19/2011

2-Jan-2012

Accepted for informatiom

19/12/2011

24

16-Dec-11

HPP-TBC-E-00-GEN-2045

4-740078-K2-E-05429-0

A4

Cabling Accessories Specification

For Approval

12/19/2011

2-Jan-2012

Accepted for informatiom

19/12/2011

25

16-Dec-11

HPP-TBC-E-00-GEN-2030

4-740078-K4-E-05436-0

A4

Conduits and Accessories Specification

For Approval

12/19/2011

2-Jan-2012

Accepted for informatiom

19/12/2011

26

16-Dec-11

HPP-TBC-E-00-GEN-2036

4-740078-K4-E-05437-0

A4

Erection Material for Electrical Equipment and Cable Ways

For Approval

12/19/2011

2-Jan-2012

Accepted for informatiom

19/12/2011

27

16-Dec-11

HPP-TBC-E-00-LVS-2041

4-740078-K2-E-05425-0

A4

LV Control Cables Specification

For Approval

12/19/2011

2-Jan-2012

Accepted for informatiom

19/12/2011

28
29
30
31

21-Dec-11
21-Dec-11
21-Dec-11
21-Dec-11

#9

1
2
3
4

HPP-TBC-M-51-LDS-2032
HPP-TBC-M-51-LDS-2033
HPP-TBC-M-51-HFS-2034
HPP-TBC-M-51-HFS-2035

A
A
A
A

3-740078-F1-G-01101-0
3-740078-F2-G-01102-0
3-740078-E1-G-01201-0
3-740078-E3-G-01202-0

0
0
0
0

1
1
1
1

A3
A3
A3
A3

LDO Unloading and Storage System Flow Diagram


LDO Forwarding System Flow Diagram
HFO Unloading and Storage System Flow Diagram
Treated HFO Storage and Forwarding System Flow Diagram

FOR
FOR
FOR
FOR

APPROVAL
APPROVAL
APPROVAL
APPROVAL

12/28/2011
12/28/2011
12/28/2011
12/28/2011

11-Jan-2012
11-Jan-2012
11-Jan-2012
11-Jan-2012

*
*
*
*

19/1/2012
19/1/2012
18/1/2012
19/1/2012

32
33
34
35
36
37
38
39
40
41

21-Dec-11
21-Dec-11
21-Dec-11
21-Dec-11
21-Dec-11
21-Dec-11
21-Dec-11
21-Dec-11
21-Dec-11
21-Dec-11

#10

1
2
3
4
5
6
7
8
9
10

HPP-TBC-C-71-ADB-2054
HPP-TBC-C-71-ADB-2055
HPP-TBC-C-71-ADB-2056
HPP-TBC-C-71-ADB-2057
HPP-TBC-C-71-ADB-2058
HPP-TBC-C-71-ADB-2059
HPP-TBC-C-71-ADB-2060
HPP-TBC-C-71-ADB-2061
HPP-TBC-C-71-CNT-2062
HPP-TBC-C-71-CNT-2063

A
A
A
A
A
A
A
A
A

0-740078-P1-C-18001-0
0-740078-P1-C-18002-0
0-740078-P1-C-18003-0
0-740078-P1-C-18004-0
0-740078-P1-C-18005-0
0-740078-P1-C-18006-0
0-740078-P1-C-18007-0
0-740078-P1-C-18008-0
1-740078-P2-C-18201-0
0-740078-P2-C-18202-0

0
0
0
0
0
0
0
0
0

1
1
1
1
1
1
1
1
1

A0
A0
A0
A0
A0
A0
A0
A1
A0

Administration Building Architecture Projects - Ground Floor Plan


Administration Building Architecture Projects - First Floor Plan
Administration Building Architecture Projects - Roof Plan
Administration Building Architecture Projects - Sections 1/3
Administration Building Architecture Projects - Sections 2/3
Administration Building Architecture Projects - Sections 3/3
Administration Building Architecture Projects - Views 1/2
Administration Building Architecture Projects - Views 2/2
Canteen Building Architecture Projects - Ground Floor Plan
Canteen Building Architecture Projects - Roof Plan

FOR
FOR
FOR
FOR
FOR
FOR
FOR
FOR
FOR
FOR

APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL

12/26/2011
12/26/2011
12/26/2011
12/26/2011
12/26/2011
12/26/2011
12/26/2011
12/26/2011
12/26/2011
12/26/2011

12/28/2011
12/28/2011
12/28/2011
12/28/2011
12/28/2011
12/28/2011
12/28/2011
12/28/2011
12/28/2011
12/28/2011

*
*
*
*
*
*
*
*
*
*

3/1/2012
3/1/2012
3/1/2012
3/1/2012
3/1/2012
3/1/2012
3/1/2012
3/1/2012
3/1/2012
3/1/2012

*
*
*
*
*
*
*
*
*
*

RNC
RNC
RNC
RNC
RNC
RNC
RNC
RNC
RNC
RNC

42
43
44
45
46
47

21-Dec-11
21-Dec-11
21-Dec-11
21-Dec-11
21-Dec-11
21-Dec-11

1
2
3
4
5
6

HPP-TBC-C-71-CNT-2064
HPP-TBC-C-71-CNT-2065
HPP-TBC-C-71-CNT-2066
HPP-TBC-C-71-SNB-2067
HPP-TBC-C-71-SNB-2068
HPP-TBC-C-71-SNB-2069

A
A
A
A
A
A

0-740078-P2-C-18203-0
0-740078-P2-C-18204-0
0-740078-P2-C-18205-0
0-740078-P7-C-18401-0
0-740078-P7-C-18402-0
0-740078-P7-C-18403-0

0
0
0
0
0
0

1
1
1
1
1
1

A0
A0
A0
A0
A0
A0

Canteen Building Architecture Projects - Sections 1/2


Canteen Building Architecture Projects - Sections 2/2
Canteen Building Architecture Projects - Views
Single Rooms Building Architecture Projects, Gr. Floor
Single Rooms Building Architecture Projects ,1st Floor
Single Rooms Building Architecture Projects - Roof

FOR
FOR
FOR
FOR
FOR
FOR

APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL

12/28/2011
12/28/2011
12/28/2011
12/28/2011
12/28/2011
12/28/2011

12/29/2011
12/29/2011
12/29/2011
12/29/2011
12/29/2011
12/29/2011

1/12/2012
1/12/2012
1/12/2012
1/12/2012
1/12/2012
1/12/2012

*
*
*
*
*
*

3/1/2012
3/1/2012
3/1/2012
3/1/2012
3/1/2012
3/1/2012

*
*
*
*
*
*

RNC
RNC
RNC
RNC
RNC
RNC

48

21-Dec-11

HPP-TBC-C-71-SNB-2070

0-740078-P7-C-18404-0

A0

Single Rooms Building Architecture Projects - Sec. 1/2

FOR APPROVAL

12/28/2011

12/29/2011

1/12/2012

3/1/2012

* RNC

49

21-Dec-11

HPP-TBC-C-71-SNB-2071

0-740078-P7-C-18405-0

A0

Single Rooms Building Architecture Projects - Sec. 2/2

FOR APPROVAL

12/28/2011

12/29/2011

1/12/2012

3/1/2012

* RNC

50

21-Dec-11

HPP-TBC-C-71-SNB-2072

0-740078-P7-C-18406-0

A0

Single Rooms Building Architecture Projects - Views

FOR APPROVAL

12/28/2011

12/29/2011

1/12/2012

3/1/2012

* RNC

51

27-Dec-11

HPP-TBC-C-71-GTH-2075

0-740078-P6-C-15001-0

A0

Gate House Architecture Projects Plans & Sections

FOR APPROVAL

8.1.2012

17/1/2012

31/1/2012

18/1/2012

23-Jan-12

* RNC
#Comment

HPP-TBC-C-71-GTH-2076

1-740078-P6-C-15002-0

A1

Gate House Architecture Projects Views

FOR APPROVAL

8.1.2012

17/1.2012

31/1/2012

18/1/2012

24-Jan-12

* RNC,
#Nocomment

HPP-TBC-M-51-FGS-2073

1-740078-B0-G-01001-0

A1

Process Flow Diagram Fuel Gas Supply System

FOR APPROVAL

8.1.2012

HPP-TBC-M-51-FGS-2074

1-740078-B1-G-01002-0

A1

Process Flow Diagram Fuel Gas Station Packag

FOR APPROVAL

8.1.2012

17/1/2012
17/1.2012

31/1/2012
31/1/2012

17/1/2012
17/1/2012
17/1/2012
17/1/2012
17/1/2012
17/1/2012
17/1/2012

31/1/2012
31/1/2012
31/1/2012
31/1/2012
31/1/2012
31/1/2012
31/1/2012

Information
Information
Information
Information
Information
Information
Information

29/1/2012
29/1/2012
29/1/2012
29/1/2012
29/1/2012
29/1/2012
29/1/2012

31/1/2012
31/1/2012
31/1/2012
31/1/2012

*
*
*
*

23/1/2012
23/1/2012
23/1/2012
23/1/2012

*
*
*
*

31/1/2012

23/1/2012

* RCN

31/1/2012

Accept for information

26/1/2012

23/1/2012

#1

#8

#11

4-740078-00-C-11001-0
4-740078-00-C-11002-0

Approval
Approval
Approval
Approval
Approval
Approval

11-Jan-2012
11-Jan-2012
11-Jan-2012
11-Jan-2012
11-Jan-2012

* RNC
#

* RNC #RC
* RNC

Approved

Approved

Approved

Approved
Approved

* RCN, We confirm GE
review

# 12
52

27-Dec-11

53

22-Dec-11

54

22-Dec-11

55

27-Dec-11

HPP-TBC-E-64-GEN-2012

4-740078-K4-E-05205-0

A4

Buildings and Cubicles Cable Sealing Installation Drawings Typical

FOR APPROVAL

12/1/2012

56

27-Dec-11

HPP-TBC-E-00-LVS-2042

4-740078-K2-E-05426-0

A4

Local Control Stations Specification

FOR APPROVAL

12/1/2012

57

27-Dec-11

HPP-TBC-E-00-GEN-2043

4-740078-K2-E-05427-0

A4

Cable Labeling Specification

FOR APPROVAL

12/1/2012

58

27-Dec-11

HPP-TBC-E-00-LVS-2046

4-740078-K2-E-05430-0

A4

Service Socket Stations Specification

FOR APPROVAL

12/12012

59

27-Dec-11

HPP-TBC-E-00-GEN-2048

4-740078-K2-E-05432-0

A4

Cable Glands Specification

FOR APPROVAL

12/1/2012

60

27-Dec-11

HPP-TBC-E-00-LVS-2049

1-740078-K2-E-05433-0

A1

LV Power and Auxiliary Control Cables Armor Earthing Connection Specification

FOR APPROVAL

12/1/2012

61

27-Dec-11

HPP-TBC-E-00-CSS-2050

4-740078-K3-E-05434-0

A4

Communication and Security Systems Cable Specification

FOR APPROVAL

12/1/2012

62

28-Dec-11

HPP-TBC-C-01-GEN-2007

4-740078-00-C-10001-0

A4

Design Criteria for Civil Works

FOR APPROVAL

11/1/2012

63

28-Dec-11

HPP-TBC-C-01-GEN-2077

0-740078-00-C-10002-0

A0

General Notes on Civil and Structural Works

FOR APPROVAL

11/1/2012

64

28-Dec-11

HPP-TBC-C-51-GEN-2078

1-740078-00-C-10003-0

A1

Typical Details for Civil and Structural Works

FOR APPROVAL

11/1/2012

65

28-Dec-11

HPP-TBC-C-51-GEN-2079

0-740078-00-C-10004-0

A0

Standard Details Reinforcement

FOR APPROVAL

11/1/2012

17/1/2012
17/1/2012
17/1/2012
17/1/2012

66

28-Dec-11

#16

HPP-TBC-I-00-PWB-2080

4-740078-A0-I-76201-0

A4

Technical Specification of Continuous Emission Monitoring System

FOR APPROVAL

11/1/2012

17/1/2012

67

1-Jan-12

#17

HPP-TBC-E-00-CSS-2050

4-740078-K3-E-05434-1

A4

FOR APPROVAL

16/1/2012

HPP-TBC-I-01-GEN-2023

4-740078-00-I-75001-1

A4

FOR APPROVAL

17/1/2012

17/1/2012

31/1/2012

HPP-TBC-C-71-FBB-2082

0-740078-P5-C-18301-0

A0

FOR APPROVAL

28/1/2012

29-Jan-12

12-Feb-2012

HPP-TBC-C-71-FBB-2083

0-740078-P5-C-18302-0

A0

Fire Brigade Building Architecture Projects Sections

FOR APPROVAL

28/1/2012

12-Feb-2012

HPP-TBC-C-71-FBB-2084

0-740078-P5-C-18303-0

A0

Fire Brigade Building Architecture Projects Views

29-Jan-12
29-Jan-12

68

69

# 13

#14

#15

#18

3-Jan-12

70

3-Jan-12

71

3-Jan-12

#19

Communication and Security Systems Cable Specification

Design Criteria of BOP Instrument and Control System

Fire Brigade Building Architecture Projects Plans & Sections

28/1/2012

17/1/2012

12-Feb-2012

Accept
Accept
Accept
Accept
Accept
Accept
Accept

For
For
For
For
For
For
For

RNC
RNC
RNC
RNC

* RNC

72

4-Jan-12

HPP-TBC-C-51-GEN-2085

0-740078-00-C-10005-0

A0

Standard Details Steel Structures

FOR APPROVAL

28/1/2012

30-Jan-12

13-Feb-2012

73

4-Jan-12

HPP-TBC-C-51-GEN-2086

1-740078-00-C-10010-0

A1

Standard Details Typical Architectural Sheet 1 of 3

FOR APPROVAL

28/1/2012

30-Jan-12

13-Feb-2012

74

4-Jan-12

HPP-TBC-C-51-GEN-2087

1-740078-00-C-10011-0

A1

Standard Details Typical Architectural Sheet 2 of 3

FOR APPROVAL

28/1/2012

30-Jan-12

13-Feb-2012

75

4-Jan-12

HPP-TBC-C-51-GEN-2088

1-740078-00-C-10012-0

A1

Standard Details Typical Architectural Sheet 3 of 3

FOR APPROVAL

28/1/2012

30-Jan-12

13-Feb-2012

76

11-Jan-12

#21

HPP-TBC-M-02-FGS-2089

4-740078-B0-M-22001-0

A4

Fuel Gas Supply System Sizing Calculation

FOR Approval

28/1/2012

29-Jan-12

12-Feb-2012

#RNC
*RCN

78

13-Jan-12

#22

HPP-TBC-M-02-LDS-2081

4-740078-F0-M-22101-0

A4

LDO Supply System System Sizing Calculation

FOR Approval

28/1/2012

29-Jan-12

12-Feb-2012

#*RNC

79

13-Jan-12

#23

HPP-TBC-M-02-HFS-2090

4-740078-E0-M-22201-0

A4

HFO Supply System Sizing Calculation

FOR APPROVAL

28/1/2012

29-Jan-12

12-Feb-2012

#*RNC

80

16-Dec-11

HPP-TBC-E-51-GEN-2022

0-740078-K0-E-06010-1

A0

General Single Line Diagram (HV MV & LV)

FOR APPROVAL

29/1/2012

81

17-Jan-12

HPP-TBC-E-51-MVS-2093

1-740078-K1-E-06111-0

A1

MV Main Distribution Panel 1 Single Line Diagram

FOR APPROVAL

29/1/2012

82

17-Jan-12

HPP-TBC-E-51-MVS-2094

1-740078-K1-E-06112-0

A1

MV Main Distribution Panel 2 Single Line Diagram

FOR APPROVAL

29/1/2012

83

17-Jan-12

HPP-TBC-E-52-MVS-2095

1-740078-K0-E-06261-0

A1

Protection and Metering Single Line Diagram(Unit 21-22-23-24)

FOR APPROVAL

29/1/2012

84

17-Jan-12

HPP-TBC-E-61-MVS-2096

3-740078-K0-E-06265-0

A3

Phasing Diagram Vector Group Coordination

FOR APPROVAL

29/1/2012

85

17-Jan-12

HPP-TBC-E-08-MVS-2099

4-740078-K1-E-06720-0

A4

MV Switchgear Incoming and Bus Coupler Operation Description

FOR APPROVAL

29/1/2012

86

17-Jan-12

HPP-TBC-E-08-LVS-2098

4-740078-K2-E-06725-0

A4

LV Switchgear Incoming and Bus Coupler Operation Description

FOR APPROVAL

29/1/2012

87

17-Jan-12

HPP-TBC-E-08-LVS-2097

4-740078-K2-E-06730-0

A4

0,4 kV Emergency Supply System Operation Description

FOR APPROVAL

29/1/2012

1-Feb-12
1-Feb-12
1-Feb-12
1-Feb-12
1-Feb-12
1-Feb-12
1-Feb-12
1-Feb-12

88

19-Jan-12

HPP-TBC-I-51-DCS-2024

3-740078-L0-I-75401-1

A3

GTG & BOP DCS Architecture

FOR APPROVAL

29/1/2012

1-Feb-12

15-Feb-2012

89

20-Jan-12

HPP-TBC-M-00-FGS-2101

4-740078-B1-M-20001-0

A4

Fuel Gas Station Package Engineering Specification

FOR APPROVAL

29/1/2012

31-Jan-12

14-Feb-2012

#RNC

90

20-Jan-12

HPP-TBC-M-00HFS-2091

A4

HFO Treatment Package Engineering Specification

FOR APPROVAL

29/1/2012

31-Jan-12

14-Feb-2012

91

20-Jan-12

HPP-TBC-E-00-LVS-2100

4-740078-K2-E-054 13-0

A4

LV Motor Specification

For Approval

29/1/2012

24-Jan-12

HPP-TBC-E-68-GRS-2008

4-740078-K5-E-052 01-0

A4

Grounding System Specification & Installation Drawings

For Approval

29/1/2012

93

24-Jan-12

HPP-TBC-E-00-HVS-2013

4-740078-J1-E-054 11-0

A4

Step-Up Transformers Specification

For Approval

29/1/2012

94

24-Jan-12

HPP-TBC-E-00-HVS-2014

4-740078-J1-E-054 12-0

A4

Unit Auxiliary Transformers Specification

For Approval

29/1/2012

95

24-Jan-12

HPP-TBC-E-00-MVS-2037

4-740078-J2-E-054 14-0

A4

Isolated Phase Bus-Duct Specification

For Approval

29/1/2012

96

24-Jan-12

HPP-TBC-E-00-MVS-2017

4-740078-K1-E-054 17-0

A4

Distribution Transformers Specification

For Approval

29/1/2012

97

24-Jan-12

HPP-TBC-E-63-HVS-2092

0-740078-J3-E-082 00-0

A0

H.V. Cable Route Layout, Sections & Details

For Approval

29/1/2012

1-Feb-12
1-Feb-12
1-Feb-12
1-Feb-12
1-Feb-12
1-Feb-12
1-Feb-12

15-Feb-2012

92

98

26-Jan-12

#28

HPP-TBC-M-00-GEN-2103

4-740078-00-P-40001-0

A4

Piping Materials - BOP / Engineering Specification

For Approval

29/1/2012

1-Feb-12

15-Feb-2012

99

27-Jan-12

#29

HPP-TBC-E-00-LVS-2042

4-740078-K2-E-05426-1

A4

FOR APPROVAL

29/1/2012

1-Feb-12

15-Feb-2012

100

15-Dec-11

#30

HPP-TBC-G-00GEN-2025

4-740078-00-G04101-1

A4

Basic Design Data

FOR APPROVAL

7/2/2012

8-Feb-12

22-Feb-2012

*RCN

HPP-TBC-G-51-GEN-0001

A4

Quality Assurance Plan

HPP-TBC-G-51-GEN-0002

A4

Site Quality Control

FOR APPROVAL

7/2/2012

2/9/2012

23-Feb-12

HPP-TBC-G-51-GEN-0003

A4

Environment Health and safety Plan

*
*
*

*AFI
*AFI
*AFI

HPP-TBC-G-07-GEN-0006

A4

Project Baseline S-Curve

HPP-TBC-G-07-GEN-0007

A4

Project level 2 Baseline Schedule

FOR APPROVAL

20-2-2012

2/23/2012

8-Mar-12

HPP-TBC-G-07-GEN-0008

A4

Project level 3 Baseline Schedule

*
*
*

* RNC
* RCN
* RCN

HPP-TBC-G-05-GEN-0009

FOR APPROVAL

23-2-2012

26-Feb-12

11-Mar-12

*RCN

#20

#24

#25

#26

#27

101
102

#31

103

104
105

#32

106

107

#33

4-740078-E2-M-20202-0

Local Control Stations Specification

WBS Weights Breakdown

15-Feb-2012

15-Feb-2012

15-Feb-2012

15-Feb-2012

15-Feb-2012

*RCN

# * RCN

#RNC

15-Feb-2012
15-Feb-2012
15-Feb-2012
15-Feb-2012
15-Feb-2012

RR
RCN
Noted
REJ
RNC
RNR

Key
Revise & Resubmit
Reviewed Comments
Reject
Reviewed No Comments
Reviewed Not Required

Potrebbero piacerti anche