1 Site management
3.1.1 Introduction
Management is a very important process in any kind of work. Site management is the
process of interrelation of major functions such as planning, organizing, controlling, and leading.
Those things are directed in the achievement of objectives and goals of the project.
Normally the construction works are carried out with given designs and specified
materials, so it is important to have proper management at the construction site to carry out
works in an economical manner. To have proper management study of all aspects of the work,
the method of carrying out successive operations and selection of general arrangement of site are
considered as important points.
Responsible for all section of the administration, Technical and other parts.
Coordinates between head office and site and between the client and contractor.
He should give instruction to the Site Managers, Engineer, Asst. Engineers and officers as
it required by the site conditions.
Store control
Site security
Welfare of officers
Cash disburse
Quality control especially with regards to line levels, plumb and basic methodology of
executing work
Security services should be carefully checked on daily basis and report promptly all
shortcomings to project manager.
Keep well assistance with storekeepers to find out requirement to store daily.
All the copies of attendance sheet and any other documents pertaining to employees from
be carefully packed and dispatched to need office at the end of every month.
Every personal accident looks after the purpose of employee and he should take action.
Shop drawings
Bills of quantities
Specifications
Method Statement
Weather records
Daily diary
Stores inventory.
Minutes of meetings.
Staff attendance.
The calculation for the quantities should be done accurately & methodically & in the format
given as ;
Those measurements will later come useful in checking or preparing labour sub contracts,
ordering materials or in site material recocilation work as well.
Any discrepancies found with respect to the B.O.Q can be easily checked.
When governing the factors delay the work , the contractor should maintain the records of
rainfall, poor supply of materials, work stoppages & poor financial situations which causes to
the delay of work. By forwarding these records to the client & consultant will be able to
Suspension of work
Variations
Additional or varied work may have the effect of increasing the time necessary for
completion of the contract. This could apply not only to increases in actual work to be executed
but also to changes of material which may require longer periods for ordering the effect on the
program should be discussed with the contractor and extension granted so warranted.
Special circumstances
Such circumstances might include excessively adverse weather, labour unrest or strikes
of general extent ,difficulty in obtaining permits etc late delivery of material so far occurs
from unforeseen able reasons or control of material supplied by the employer. In such case
engineer should assess the effect on the contractors program. So then the extension can be
considered.
There is a site meeting at every day after the tea break organized by the site engineer to
discuss the site problems and difficulties. All the site engineering staff, sub contractors, one
person from staff should participate to this meeting. Therefore, site engineer can discuss and
solve all the problems encountered. At the end of meeting all the sub contractors, labor
supervisors are instructed with regarding the future work and the labor strength required.
There is a site meeting at every day at about 5.30 p.m. organized by the project manager
to discuss the site problems and difficulties. Project manager, two site managers & senior
engineers participated this meeting.
In once a week there is a site meeting at the site to discuss the site progress. This meeting
is held among the project manager, site engineer, consultant engineer and their representatives
and the client. The function of this meeting is,
To ensure that the contractor and other team members have a proper understanding of the
projects requirements, have an opportunity to check construction design and production details
and to request clarification of information.
To discuss problems such as delays and how it effects for timing of the project.
To ensure that the subcontractors agree on the action necessary to meet their obligation