Report No. SNO-Q-BPK-RFI-956
Date
15-Sep-15
Page
of
Gentlemen,
We would like to have your presence for inspection according to the following schedules.
Place/Area
CPP 1
09.00 WITA
Inspection Item
Remarks
Piping
Civil
Instrument
Pipeline
Structural
Electrical
H-4011
Mechanical
COMMEN:
Performed By
Involvement
Party
Signature
Name
Sign Date
Job Title
Approved By
TSC
Reviewed By
JOB PMTS
TPI
(If applicable)
Sub-Contracto
Report No. SNO-Q-BPK-RFI-957
Date
14-Sep-15
Page
of
Gentlemen,
We would like to have your presence for inspection according to the following schedules.
Place/Area
CPP 1
15.00 WITA
Inspection Item
Remarks
Piping
Civil
Instrument
Pipeline
Structural
Electrical
E-4015
Mechanical
COMMEN:
Performed By
Involvement
Party
Signature
Name
Sign Date
Job Title
Approved By
TSC
Reviewed By
JOB PMTS
TPI
(If applicable)
INSPECTION REPORT
Senoro Gas Development Project
Sub-Contractor
9608/SU2573
Report No.
JOB Pertamina Medco E & P Tomori Sulawesi Date
TRIPATRA-SAMSUNG CONSORTIUM
Page
Project Title
Job No
Client
Main Contractor
SNO-Q-BPK-IR-010
15-Sep-15
of
WEST
EAST
Involvement Party
Performed By
Signature
Name
Sign Date
Job Title
Approved By
TSC
Reviewed By
JOB PMTS
TPI
(If applicable)
INSPECTION REPORT
Project Title
Job No
Client
Main Contractor
MATERIAL USED
Green Light K 26 LI
Atlas TR 85 AT
Blue Ca
Red Cast 1
Involvement Party
Performed By
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0003 Rev.0
Approved By
TSC
Reviewed B
JOB PMTS
PECTION REPORT
Sub-Contractor
Report No.
Date
Page
SNO-Q-BPK-IR-008
MATERIAL USED
06-May-15
of
Reviewed By
JOB PMTS
TPI
(If applicable)
INSPECTION REPORT
Project Title
Job No
Client
Main Contractor
Involvement Party
Performed By
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0003 Rev.0
Approved By
TSC
Reviewed B
JOB PMTS
PECTION REPORT
Sub-Contractor
Report No.
Date
Page
SNO-Q-BPK-IR-009
06-May-15
of
Reviewed By
JOB PMTS
TPI