Sei sulla pagina 1di 80

A

REQUEST FOR INSPECTION


Project Title
Job No
Client
Main Contractor
(Client Name:

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
Tripatra-Samsung Consortium

Sub-Contr
Report No
Date
Page

Attn. Mr. Sri Adi. W


Project Manager

Gentlemen,

We would like to have your presence for inspection according to the following sch

Date and time

Place/Area

2-Jan-15

CPP Area

08.00 WITA

Inspection Item
Top of Padding
PK 3002

Piping

Civil

Instrument

Pipeline

Structural

Electrical

COMMENT
:

Involvement
Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0001 Rev.0

Performed By

Approved By
TSC

Reviewed By
JOB PMTS

FOR INSPECTION
Sub-Contracto
Report No. SNO-Q-BPK-RFI-028
Date
31-Dec-14
Page
of

tion according to the following schedules.

Inspection Item

Remarks

Mechanical

Reviewed By
JOB PMTS

TPI

(If applicable)

REQUEST FOR INSPECTION


Project Title
Job No
Client
Main Contractor
(Client Name:

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
Tripatra-Samsung Consortium

Sub-Contr
Report No
Date
Page

Attn. Mr. Sri Adi. W


Project Manager

Gentlemen,

We would like to have your presence for inspection according to the following sch

Date and time


26-Dec-14
08.00 WITA

Place/Area
CPP 2

Inspection Item
Top of Padding
PK 2228

Piping

Civil

Instrument

Pipeline

Structural

Electrical

COMMENT
:

Involvement
Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0001 Rev.0

Performed By

Approved By
TSC

Reviewed By
JOB PMTS

FOR INSPECTION
Sub-Contracto
Report No. SNO-Q-BPK-RFI-028
Date
25-Dec-14
Page
of

tion according to the following schedules.

Inspection Item

Remarks

Mechanical

Reviewed By
JOB PMTS

TPI

(If applicable)

REQUEST FOR INSPECTION


Project Title
Job No
Client
Main Contractor
(Client Name:

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
Tripatra-Samsung Consortium

Sub-Contr
Report No
Date
Page

Attn. Mr. Sri Adi. W


QC Manager

Gentlemen,

We would like to have your presence for inspection according to the following sch

Date and time


9-Jan-15
08.30 WITA

Place/Area
CPP 1

Inspection Item
Top of Padding
PK 6059

Piping

Civil

Instrument

Pipeline

Structural

Electrical

COMMENT
:

Involvement
Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0001 Rev.0

Performed By

Approved By
TSC

Reviewed By
JOB PMTS

FOR INSPECTION
Sub-Contracto
Report No. SNO-Q-BPK-RFI-052
Date
08-Jan-15
Page
of

tion according to the following schedules.

Inspection Item

Remarks

Mechanical

Reviewed By
JOB PMTS

TPI

(If applicable)

REQUEST FOR INSPECTION


Project Title
Job No
Client
Main Contractor
(Client Name:

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
Tripatra-Samsung Consortium

Sub-Contr
Report No
Date
Page

Attn. Mr. Sri Adi. W


QC Manager

Gentlemen,

We would like to have your presence for inspection according to the following sch

Date and time


9-Jan-15
08.30 WITA

Place/Area
CPP 1

Inspection Item
Top of Padding
PK 4001

Piping

Civil

Instrument

Pipeline

Structural

Electrical

COMMENT
:

Involvement
Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0001 Rev.0

Performed By

Approved By
TSC

Reviewed By
JOB PMTS

FOR INSPECTION
Sub-Contracto
Report No. SNO-Q-BPK-RFI-052
Date
08-Jan-15
Page
of

tion according to the following schedules.

Inspection Item

Remarks

Mechanical

Reviewed By
JOB PMTS

TPI

(If applicable)

PADDING INSPECTION REPOR


Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Equipment Tag Number

SNO-PK-2228

Reference Drawing

Equipment Name

Antifoam Injection Package

Revision

Manufacturer

Elevation (mm)
DesignActualDeviation
+1
1 1354
151
2 1353 380
150
0
150
+1
3 1354 3
151
4 1352
149
-1
5 1353
150
0
6 1353
150
0
BM
:
2800 + 1003 = 3803
150
Elev Dsg :
Elev Ground : 2300
Target El: 3803 - (2300+150) = 1353
Note :
FS
: Number on Elevation Ruler
HI
: High Instrument
Design
: Foundation Design (Civil dwg)

No

FS

Actual

HI

: Actual Dimension of Foundation

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

25-Dec-14
of

: SNO-C-EF-10-268
:

SNO-Q-BPK-PIR-001

Rev 0

Reviewed By
JOB PMTS

TPI (If applicable)

PADDING INSPECTION REPOR


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Equipment Tag Number

SNO-PK-9025

Equipment Name

Effluent Waste Water Treatment PackagRevision

Manufacturer

WHASUNG

Reference Drawing

BM
:
Elev Ds:
Target :
No

FS

1
2
3
4
5
6
7
8
9
10

799
799.5
800
799
800
799
798.5
798.5
798.5
799

Note
FS
HI
Design
Actual

HI

99
9

Elevation (mm)
DesignActualDeviation
200
0
199.5
0.5
199
1
200
0
200
199
1
200
0
200.5
0.5
200.5
0.5
200.5
0.5
200
0

:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation

100 + 899 =
999
200

999 - 200 =

1
1
0
9

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

SNO-Q-BPK-PIR-001

25-Dec-14
of

: SNO-C-EF-10-268
:

Rev 0

100 + 899 =
999

999 - 200 = 799

1
0

6
8

Reviewed By
JOB PMTS

TPI (If applicable)

PADDING INSPECTION REPOR


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Equipment Tag Number

SNO-P-9035

Reference Drawing

Equipment Name

NaOCL Storage Tank

Revision

Manufacturer

BM
:
Elev Ds:
Target :
No

FS

1
2
3
4
5
6
7
8

798
799
798
798
798
798
798
799

Note
FS
HI
Design
Actual

HI

99
7

Elevation (mm)
DesignActualDeviation
199
-1
198
-2
199
-1
199
-1
200
199
-1
199
-1
199
-1
198
-2

:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation

120 + 877 =
997
200

997 - 200 =

1
8

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

SNO-Q-BPK-PIR-003B

25-Dec-14
of

: SNO-C-EF-80-037
:

Rev 2

120 + 877 =
997

997 - 200 = 797

5
7

Reviewed By
JOB PMTS

TPI (If applicable)

PADDING INSPECTION REPOR


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Equipment Tag Number

SNO-P-9045

Reference Drawing

Equipment Name

Emulsion Breaker Storage Tank

Revision

Manufacturer

BM
:
Elev Ds:
Target :
No

FS

1
2
3
4
5
6
7
8

799
798
798
798
799
797
797
798

Note
FS
HI
Design
Actual

HI

99
7

Elevation (mm)
DesignActualDeviation
198
-2
199
-1
199
-1
199
-1
200
198
-2
200
0
200
0
199
-1

:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation

120 + 877 =
997
200

997 - 200 =

1
8

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

SNO-Q-BPK-PIR-003C

25-Dec-14
of

: SNO-C-EF-80-037
:

Rev 2

120 + 877 =
997

997 - 200 = 797

5
7

Reviewed By
JOB PMTS

TPI (If applicable)

PADDING INSPECTION REPOR


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Equipment Tag Number

SNO-PK-9025

Reference Drawing

Equipment Name

Treated Pump

Revision

Manufacturer

HI
:
Elev Ds:
Target :
No

FS

1
2
3
4
5
6
7
8
9
10

798
798
798
797
798
797
798
798
798
799

Note
FS
HI
Design
Actual

HI

99
7

Elevation (mm)
DesignActualDeviation
199
-1
199
-1
199
-1
200
0
200
199
-1
200
0
199
-1
199
-1
199
-1
197
-2

:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation

120 + 877 =
997
200

997 - 200 =

N
10
9

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

SNO-Q-BPK-PIR-003A

25-Dec-14
of

: SNO-C-EF-80-037
:

Rev 2

120 + 877 =
997

997 - 200 = 797

10

5
8

Reviewed By
JOB PMTS

TPI (If applicable)

PADDING INSPECTION REPOR


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Equipment Tag Number

SNO-T-9025C

Reference Drawing

Equipment Name

Oil Basin

Revision

Manufacturer

HI
:
Elev Ds:
Target :
No

FS

HI

1
2
3
4
5
6

697
699
699
698
698
697

99
7

Note
FS
HI
Design
Actual

Elevation (mm)
DesignActualDeviation
300
0
298
-2
298
-2
300
297
-3
297
-3
300
0

:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation

120 + 877 =
997
300

997 - 300 =

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

SNO-Q-BPK-PIR-003D

25-Dec-14
of

: SNO-C-EF-80-037
:

Rev 2

120 + 877 =
997

997 - 300 = 697

1
2

Reviewed By
JOB PMTS

TPI (If applicable)

PADDING INSPECTION REPOR


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Equipment Tag Number

SNO-T-9025A

Reference Drawing

Equipment Name

CPI Separator

Revision

Manufacturer

HI
:
Elev Ds:
Target :
No

FS

HI

1
2
3
4
5
6
7
8

697
697
670
698
698
698
698
699

99
7

Elevation (mm)
DesignActualDeviation
300
0
300
0
299.5
-0.5
300
300
0
300
0
300
0
300
0
300
0

120 + 877 =
997
300

997 - 300 =

1
5

Note
FS
HI
Design
Actual

:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

SNO-Q-BPK-PIR-001

25-Dec-14
of

: SNO-C-EF-80-037
:

Rev 2

120 + 877 =
997

997 - 300 = 697

Reviewed By
JOB PMTS

TPI (If applicable)

PADDING INSPECTION REPOR


Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Equipment Tag Number

CT 4019

Reference Drawing

Equipment Name

Cooling Tower

Revision

Manufacturer

HI
:
Elev Ds:
Target :
No

FS

1
2
3
4
5
6

814
814
814
814
815
813

Elevation (mm)
DesignActualDeviation
300
0
300
0
111
300
300
0
4
300
0
299
-1
+
301

498 + 616 =
1114
300

1114 - 300 =

HI

Note
FS
HI
Design
Actual

:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

SNO-Q-BPK-PIR-001

25-Dec-14
of

: SNO-C-EF-10-268
:

Rev 0

498 + 616 =
1114

1114 - 300 = 814

Reviewed By
JOB PMTS

TPI (If applicable)

PADDING INSPECTION REPOR


Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Equipment Tag Number

CT 4019

Reference Drawing

Equipment Name

Cooling Tower

Revision

Manufacturer

HI
:
Elev Ds:
Target :
No

FS

1
2
3
4
5
6

814
814
814
814
815
813

Elevation (mm)
DesignActualDeviation
300
0
300
0
111
300
300
0
4
300
0
299
-1
+
301

2674 - 665 =
150

1114 - 300 =

HI

Note
FS
HI
Design
Actual

:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

SNO-Q-BPK-PIR-001

25-Dec-14
of

: SNO-C-EF-10-268
:

Rev 0

2674 - 665 =

1114 - 300 = 814

Reviewed By
JOB PMTS

TPI (If applicable)

PADDING INSPECTION REPOR


Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Equipment Tag Number

PK 3002

Reference Drawing

Equipment Name

Antifoam Injection Package

Revision

Manufacturer

HI
:
Elev Ds:
Target :
No

FS

1
2
3
4
5
6
7
8

889
889
889
889
889
889
889
889

Note
FS
HI

Elevation (mm)
DesignActualDeviation
150
0
150
0
150
0
150
103
9
150
0
150
0
150
0
150
0
150
0

3339 - 2300
1039
150

1039 - 150 =

HI

:
: Number on Elevation Ruler
: High Instrument

Design
Actual

: Foundation Design (Civil dwg)


: Actual Dimension of Foundation

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

SNO-Q-BPK-PIR-006

31-Dec-14
of

: SNO-C-EF-10-268
:

Rev 0

3339 - 2300 =
1039
1039 - 150 = 889

4
6

Reviewed By
JOB PMTS

TPI (If applicable)

PADDING INSPECTION REPOR


Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Equipment Tag Number

PK 3002

Reference Drawing

Equipment Name

Antifoam Injection Package

Revision

Manufacturer

No
1
2
3
4
5
6
7
8

Elevation (mm)
DesignActualDeviation
150
0
149
-1
148
-2
150
373
1
149
-1
149
-1
149
-1
148
-2
149
-1

FS

HI

1281
1280
1279
1280
1280
1280
1279
1280

Note
FS
HI
Design
Actual

BM
:
2674
BS
1057
HI
:
2674 + 105
150
3731
Elev Ds:
Elev Ground : 2300
Target :
3731 - (230

:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

31-Dec-14
of

: SNO-C-EF-10-269
:

BM

SNO-Q-BPK-PIR-006

Rev 0

2674
1057
2674 + 1057 =
3731

Elev Ground : 2300


3731 - (2300+150) = 1281

4
6

Reviewed By
JOB PMTS

TPI (If applicable)

PADDING INSPECTION REPOR


Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Equipment Tag Number

BK 9050

Reference Drawin

Equipment Name

Emergensi Diesel Generator

Revision

Manufacturer

No

Elevation (mm)
DesignActualDeviation
350
0
350
0
350
0
349
-1
349
-1
348
-2
350
128
349
-1
2
348
-2
348
-2
348
-2
349
-1
349
-1
350
0
350
0
+1
351
349
-1
350
0
350
0

FS

932
932
932
933
933
934
933
934
934
934
933
933
932
932
931
933
932
932
Note
FS
HI
Design

HI

1
2
3
4
5
7
8
9
10
11
12
13
14
15
16
17
18
19

Actual

:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation

20
21
22
23
24

933
933
932
932
933

1282

350

349
349
350
350
349

-1
-1
0
0
-1

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

31-Dec-14
of

: SNO-C-EF-10-268
:

-1
-1
0
0
-1

SNO-Q-BPK-PR-005

Rev 0

HI 334: + 948 =
350
Elev1282
D:
Target: 1282 - 350 = 932

24

23

22

21

20

19

18
17
16
15

14

13

1
0
1
1
1
2

15

Reviewed By
JOB PMTS

14

13

TPI (If applicable)

PADDING INSPECTION REPOR


Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Equipment Tag Number

PK 9050

Reference Drawin

Equipment Name

Emergensi Diesel Generator

Revision

Manufacturer

No

Elevation (mm)
DesignActualDeviation
349
-1
349
-1
+2
352
349
-1
350
0
350
0
350
122
350
0
8
350
0
349
-1
350
0
+1
351
349
-1
348
-2
349
-1
+2
352
350
0
349
-1
350
0

FS

877
877
880
877
878
878
878
878
877
878
879
877
876
877
880
878
877
878
Note
FS
HI
Design

HI

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Actual

:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation

19
20
21
22
23
24

878
877
877
878
878
878

1228

350

350
349
349
350
350
350

BM = 0334
BS = 0894
HI = 0334 + 0894 = 1228
Elev Design = 350
Target El = 1228 - 350 = 878

0
-1
-1
0
0
0

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

31-Dec-14
of

: SNO-C-EF-10-199
:

0
-1
-1
0
0
0

SNO-Q-BPK-PR-005

Rev 3

24

23

22

21

20

19

18
17
16
15

14

13

1
0
1
1
1
2

15

Reviewed By
JOB PMTS

14

13

TPI (If applicable)

PADDING INSPECTION REPOR


Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Equipment Tag Number

SNO-PK-6059

Reference Drawing

Equipment Name

Antifoam Injection Package

Revision

Manufacturer

WHASUNG

BM
BS
HI
:
Elev Ds:
Target :
No
1
2
3
4
5
6
7
8

Elevation (mm)
DesignActualDeviation
2448
-2
2449
-1
-1
2450 2449
380
3
2448
-2
2448
-2
2449
-1
2449
-1
2448
-2

FS

Actual

3112
691

3112 + 691
150 + 230
3803
2450 - 2450
3803

HI

1351
1352
1352
1351
1351
1352
1352
1351

Note
FS
HI
Design

:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

08-Jan-15
of

: SNO-C-EF-10-229
:

BM

SNO-Q-BPK-PIR-009

Rev 1

3112
691
3112 + 691 =
150 + 2300 =
3803
2450 - 2450 = 1353
3803

4
7

Reviewed By
JOB PMTS

TPI (If applicable)

PADDING INSPECTION REPOR


Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Equipment Tag Number

SNO-PK-4001

Reference Drawing

Equipment Name

Thermal Oxidizer Package

Revision

Manufacturer

ANGUIL

No

FS

1
2
3
4
5
6
7
8
9
10
11
12

768
768
768
768
768
769
768
768
768
769
768
768

Note
FS
HI

Elevation (mm)
DesignActualDeviation
2450
0
2450
0
2450
0
2450
0
2450
321
2450
0
8
+1
2451
2450
0
2450
0
2450
0
2451
+1
2450
0
2450
0
HI

:
: Number on Elevation Ruler
: High Instrument

2406

BM
:
BS
:
HI
:
Elev Ds:
Target :

812
2406 + 812
2300 + 150
3218 - 2450

12
1
1
1
0

Design
Actual

: Foundation Design (Civil dwg)


: Actual Dimension of Foundation

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

SNO-Q-BPK-PIR-010 A

08-Jan-15
of

: SNO-C-EF-10-053
:

Rev 0

2406 + 812 = 3218


2300 + 150 = 2450
3218 - 2450 = 768

2
3

12

4
5
6

9
8

Reviewed By
JOB PMTS

TPI (If applicable)

PADDING INSPECTION REPOR


Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Equipment Tag Number

SNO-PK-4001

Reference Drawing

Equipment Name

Thermal Oxidizer Package

Revision

Manufacturer

ANGUIL

No

FS

1
2
3
4
5
6

768
768
768
769
768
768

Elevation (mm)
DesignActualDeviation
2450
0
2450
0
2450
321
2450
0
8
+
2451
1
2450
0
2450
0
HI

2406
BM
:
BS
: 812
HI
: 2406 + 8
Elev Dsg: 2300 + 1
Target E: 3218 - 24

1
2
3

Note
FS
HI
Design
Actual

:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation

Remarks :

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0

Performed By

Approved By
TSC

Revie
JOB

SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing

SNO-Q-BPK-PIR-10 B

08-Jan-15
of

: SNO-C-EF-10-053
:

Rev 0

2406

812
2406 + 812 = 3218
2300 + 150 = 2450
3218 - 2450 = 768

Reviewed By
JOB PMTS

TPI (If applicable)

Potrebbero piacerti anche