TOTAL (kVA)
Pioneer Camp
Refurbish Camp
TOTAL (kVA)
TOTAL (kW)
1677.4
1341.9
363.4
Available space
(Note 3)
Qtt
(Unit)
Remark
Length
(mm)
Width (mm)
450
45000
22000
2 X 24 hours
290.8
969.4
775.5
63.8
51.0
2646.8
2117.5
427.2
341.8
6089.6
4859.7
1096.3
877.0
1697.2
853.1
1051.4
841.1
Power Generation 2
Early Camp
Company Camp
630.8
504.7
4.6
3.7
Contractor Camp
1973.2
1578.5
360.0
288.0
Subcontractor 1 Camp
4534.5
3627.6
1008.6
806.9
Subcontractor 2 Camp
4426.5
3541.2
1011.5
809.2
19351.7
14964.7
4532.5
3626.0
13
1280
67300
20000
2 X 24 hours
1148.0
918.0
1148.0
918.0
450
VTA
VTA
2 X 24 hours
Total
3
TOTAL (kW)
Power Generation 1
Total
minimum load
Power Generation 3
BOF Satelite Office
RO Water Location
Passenger Terminal
6.9
5.5
0.0
0.0
6.4
VTA
VTA
2 X 24 hours
2.3
1.8
0.0
0.0
6.4
VTA
VTA
2 X 24 hours
Power Generation 4
Low Voltage Generators , 400 V, 50 Hz
820.4
656.3
789.4
631.5
450
VTA
VTA
2 X 24 hours
Warehouse, Waste
Management, Rest Shed
Note
Note
Note
Note
1
2
3
4
:
:
:
:
Design Load is at MV switch gear terminal. Vendor to consider looses (LV / MV transformer, MV switch gear, LV switch gear, etc) to define required Genset rating.
Vendor to advise the optimize quantity and Genset rating based on design load and market availability. The total quantity shall consider spare unit (N+1)
Vendor to ensure available space is sufficient for designed power plan (including genset, Diesel day Tank, Control and switch gear building, transformer
Vendor to consider simultan loading and unloading for diesel fuel storage system for determining day tank capacity and quantity. Day tank shall be above ground installation
Unit Price
(IDR)
Material
Installation
Total Price
(IDR)