Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
MECHANICAL REFRIGERATION
GAS PROCESSING UNIT
Recover Hydrocarbons from Natural Gas Streams
Increase Profitability / Meet Pipeline Specifications / Reduce Flared Waste
Electric driven
equipment for improved
availability
& efficiency
TRANSPORTATION
All equipment mounted on structural steel skid bases:
GRU-1 & 2
2 skids
GRU-3
3 skids
GRU-10
4 skids
Skid width
8' 6"
Process skid length
32' 6" 35' 6" (based on unit selected)
Refrigeration skid length
26' 34' (based on unit selected)
Weights of skids
27,000 to 40,000 lbs/skid
INSTALLATION
Bolt skids together hot oil skids can be separated
No foundations required can set on leveled, prepared base
Piping connections in convenient locations on skid
Single electrical service connection
Electrical connections between skids terminate at junction boxes near edge of skid
GRU-2
INFORMATION
For inquiries on BFX Mechanical Refrigeration Products, please contact:
Jim Stephanick Sales
972.523.2894 cell
jstephanick@bfxco.com