WUR D-QAC-PG-WP-
WORK PROCEDURE
( HYDROTEST )
Date:
Nov 24, 2010
Issued by
QA/QC DEPT.
Revision:
Page:
1 OF 7
SUMIGITA-INWHA CONSORTIUM
Project Title
CONSTRUCTION SERVICE WUR D LT PROJECT
Contract No. 8967 XK
2/11/2010
STATUS
DATE
DESCRIPTION
JAY
BDK
PREPARED
NOV
CHK'D
SIC
CHEK'D
APPV'D
TF
CPI
DOCUMENT NO. :
WUR D-QAC-PG-WPDATE REVISION:
QA/QC
Page
-2-
TABLE OF CONTENT
1. Table Of Content
1
2. Scope ........
2
3. Code, Standards & References .
2
4. Responsibility ....
3
5. Pressure Tests ......
5
6. QA Record.....
6
REV
DOCUMENT NO. :
WUR D-QAC-PG-WPDATE REVISION:
Issued By :
QA/QC
Page
-3-
1. SCOPE
This Procedure describes the general requirements and procedure for
field pressure testing of above ground or underground pressure piping
system which has been fabricated, installed and connected equipment
and integral components For Contruction service WUR D contract no
8967 XK CPI project SLS Operation Unit.
Followings piping system need not be field pressure tested.
a. Any package unit previously tested by the manufacturer in
accordance with applicable codes.
b. Instrument piping lead lines between the root valve at the process
or utility line and the connected instrument, and control piping used
to connect air or hydraulically operated control apparatus.
c. The lines and system which are open to the atmosphere, such as
vents or drains downstream of the last shutoff valve.
2. TYPES OF EQUIPEMNT USED
a. Bottom Chart
b. Pressure Gauge
c. Temperature Gauge
d. Pressure Pump
3. CODES, STANDARDS AND REFERENCES
Unless otherwise specifically indicated in writing, all works shall be
performed in accordance with the requirements of below code and
standards and those of the latest editions at the time of call for tender
of the documents listed hereafter:
a) ANSI/ASME B31.3 : Process Piping Code
b) ANSI/ASME B31.4 : Pipeline Transportation System Code
c) PP-SC-GG-001
d) PP-PI-PP-001
e) Client Specifications.
REV
DOCUMENT NO. :
WUR D-QAC-PG-WP-
DATE REVISION:
QA/QC
Page
-4-
4. RESPONSIBILITIES
3.1.
engineer
Gen.
Superintendent
shall
also
be
QA/QC Engineer:
a) Quality Control Engineer shall be responsible for inspecting
the pressure test and recording it with actual data on the
pressure test record.
5. PRESURE TEST
4.1.
General Requirements
a) After installation of piping (complete/partial), all lines shall be
hydrostatically
or
pneumatically
test
as
required
by
REV
DOCUMENT NO. :
WUR D-QAC-PG-WPDATE REVISION:
Issued By :
QA/QC
f)
Page
-5-
4.2.
Hydrostatic Testing
a) Test Medium
Water shall normally be used as the test medium unless
otherwise specified by the owner. Test water shall be clean
and shall be of such quality as to minimize corrosion the
materials in the piping system.
b) Test Pressure
The hydrostatic test pressure at any point in the piping
system shall not be less than 1.5 times of design pressure,
but shall not exceed the maximum allowable test pressure of
any non isolated components or as specified in the drawing.
REV
DOCUMENT NO. :
WUR D-QAC-PG-WPDATE REVISION:
QA/QC
Page
-6-
c) Hydrostatic Test.
Fill the test water into the piping system and ensure
proper venting.
REV
DOCUMENT NO. :
WUR D-QAC-PG-WPDATE REVISION:
QA/QC
Page
-7-
d) Retest
If there are found any leakage during the pressure test shall
be retested to the specified pressure after repaired have
been made. Any lines changed after they have been tested
shall be retested.
e) Bolt shall not be tightened while systems are being tested
which are pressured above 2.1bar (30psig)
6. TEST COMPLETION
a) In the event that repairs or additions are made following the pressure
test, the affected piping shall be retested at the pressures originally
specified for the test. Retesting of minor repairs or additions may be
waived subject to client approval.
b) After completion of testing, all temporary blanks and blinds shall be
removed, all operating blinks returned to proper position and all lines
and piping components shall be completely drained. Valves, orifice
plates, expansion joints and short pieces of piping which have been
removed shall be reinstalled with proper gasket in place. All valves that
were closed during hydrostatic test shall be opened to insure draining
REV
DOCUMENT NO. :
WUR D-QAC-PG-WPDATE REVISION:
Issued By :
QA/QC
Page
-8-
the bonnet cavity. Lines which are being drained after testing shall have
all vents open. Piping system downstream of check valves should be
inspected to insure complete drainage.
c) After lines have been drained, temporary supports shall be removed.
d) Flange joints where the test blind has been removed shall not be
retested. Special length bolting and flat non-asbestos gaskets shall be
removed and replaced with line class bolts and gaskets after completion
of hydrostatic test.
e) Instruments which were removed or blocked out for test shall be
reinstalled and blocks placed in the normal operating position after test.
7. QA RECORD
7.1 Pressure Test Package
Test packages shall consist of:
a) Cover
b) Exception lists for leak test
c) Field Installation check list for piping
d) P & ID
e) Arrangement Drawings
f)
ISO Drawings
j)
Calibration Records.
Others
Date of Test.
Ambient Temperature
REV
DOCUMENT NO. :
WUR D-QAC-PG-WPDATE REVISION:
Issued By :
QA/QC
Temperature
-
Test Medium.
Test Pressure.
Page
-9-
Test Medium
REV