Sei sulla pagina 1di 19

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345


1. RELAY DATA
RATINGS:
Current

1/5 A

Model No.

P345311K3N0360K

Voltage

100-120VAC

S. No.

965449T

Frequency

60Hz

Software Ref.

360K

2. CHECKS
S. No. on module, case and cover are identical
Relay case connected to a local earth bar

3. WATCHDOG RELAY CHECK


Check status of watchdog contacts as below
Contact Status

Terminals

Remarks

Relay De- energized

Relay Energized

M11-M12

Closed

Open

OK

M13-M14

Open

Closed

OK

4. FIELD VOLTAGE
Measure the field voltage across M7 (+) and M9 (-) .49.19VDC.
(Check that the voltage is about 48V DC)
Repeat the test for terminals M8 (+) and M10 (-) 49.21VDC..

INSTRUMENT NAME: CMC-256


SERIAL NO: CD749G
CALIBRATION DATE: 07-03-13

ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

1 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

2 of 16

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345


5. MECHANICAL CHECKS AND VISUAL INSPECTION:
Result
Ok (Y/N)
Y

Sl.no

General checks

1.

Inspect for no physical damage.

2.

Verify the wiring connection as per approved drawing.

3.

Relay case connected to a local earth bar.

4.

Confirm ring type lugs are used for CT/VT and DC circuits.

5.

Power up the relay circuit and check relay is healthy.


Send the relay setting configuration file to relay through Front RS232
communication Port.
Relay Test ID on front label and the serial number in the display
match.

6.
7.

Y
Y

6. OPTO-COUPLER STATUS
This is to verify the healthiness of the DC Opto inputs.
- Apply a rated voltage at each spare binary input and verify the status of the input at Front panel.
- Opto Inputs status can be monitored using front LCD System Data .

Scroll down System Data to Opto input status , using the


correlates to under test.

Key. Use

key to identify which bit

Note: Only spare inputs shall be checked with external voltage initiation and other inputs shall be checked
during respective functional test.
OPTO Input No.

Terminal

OPTO 01
OPTO 02
OPTO 03
OPTO 04
OPTO 05
OPTO 06
OPTO 07
OPTO 08
OPTO 09
OPTO 010
OPTO 011
OPTO 012
OPTO 013
OPTO 014
OPTO 015
OPTO 016

E1-E2
E3-E4
E5-E6
E7-E8
E9-E10
E11-E12
E13-E14
E15-E16
G1-G2
G3-G4
G5-G6
G7-G8
G9-G10
G11-G12
G13-G14
G15-G16
ALSTOM Grid

Configuration
CB OPEN
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE

Result
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

3 of 16

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345


7. LED CHECK
Check the operation of all LEDs on the relay front panel
LED No.

Allocation

Result

LED 01

REVERSE POWER

LED 02

FIELD FAILURE

LED 03

NPS THERMAL

LED 04

GEN. DIFFERENTIAL

LED 05

ROTOR EARTH FAULT

LED 06

100% STATOR EARTH FAULT

LED 07

UNDER VOLTAGE

LED 08

OVER VOLTAGE

OK
OK
OK
OK
OK
OK
OK
OK

Function Keys LEDS check:


LED No.

Allocation

FN LED 01

UNDER FREQUENCY

FN LED 02

CBF TRIP

FN LED 03

VOLTAGE BALANCE

FN LED 04

Vdep OVER CURRENT

FN LED 05

OVER FLUX(V/Hz)

FN LED 06

DEAD MACHINE
52G CB OPEN
SPARE
52G CB CLOSE
ANY START

FN LED 07
FN LED 08
FN LED 09
FN LED 10

Result

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

8. OUTPUT RELAY CHECKS


This is to verify the healthiness of the Control output relay healthiness.
Operate each Spare output through Commissioning Test on front LCD, Check continuity of the contact that
closes.
-

Scroll
to Commissioning Test , use
to test mode.
Change Test Mode to Contact Blocked. Under Test pattern identify the output to close. Apply Test
using the Contact test option.
Reset the output relays by setting cell [COMMISSIONING TESTS, Contact Test] to Remove Test.

Note: Only spare outputs shall be checked using above procedure and other Outputs shall be checked
during respective functional test.
ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345

Output Relay No.

Terminal

Configuration(IEC NO.S)

RL 1
RL 2
RL 3
RL 4
RL 5
RL 6
RL 7
RL 8
RL 9
RL 10
RL 11
RL 12
RL 13
RL 14
RL 15
RL 16
RL 17
RL 18
RL 19
RL 20
RL 21
RL 22
RL 23
RL 24
RL 25
RL 26
RL 27
RL 28
RL 29
RL 30
RL 31
RL 32

L1-L12
L3-L4
L5-L6
L7-L8
L9-L10
L11-L12
L13-L14-L15
L16-L17-L18
K1-K2
K3-K4
K5-K6
K7-K8
K9-K10
K11-K12
K13-K14-K15
K16-K17-K18
J1-J2
J3-J4
J5-J6
J7-J8
J9-J10
J11-J12
J13-J14-J15
J16-J17-J18
H1-H2
H3-H4
H5-H6
H7-H8
H9-H10
H11-H12
H13-H14-H15
H16-H17-H18

60
27
87G,64S
59,81,32,64R & 46
51-27 & 40
40
46
87G
51-27
81
64S
59
64R
81
64B
32
CBF
CBF
CBF
CBF
CBF
CBF
60
59
27
81
51-27
46
40
32
GENERAL ALARM
ANY TRIP

ALSTOM Grid

Result

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

4 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

5 of 16

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345


9. MEASUREMENT CHECK
Note:
- This test is intended to verify the CT/VT inputs and CT Ratio, VT Ratio setting in the local relay.
- During the injection on one phase, the LCD will show that the angle of that phase changing randomly but
angle measurement is not required.
When inject 3ph current, the LCD will display correct angles.
VTR:

14.4kV/120V

//

CTR:

2000/1 A

APPLIED & MEASURED CURRENT:


, Current Applied: 1.0 A,
Tolerance +5%
Applied
Ph-Current

Expected Current

Measured Current

Result
Ok (Y/N)

IA-1

2000 A

2005 A

IB-1

2000 A

2005 A

IC-1

2000 A

2005 A

IA-2

2000 A

2006 A

IB-2

2000 A

2005 A

IC-2

2000 A

2005 A

IN-1

IN-2

2000 A

2004 A

2006 A

APPLIED & MEASURED VOLTAGE:


Voltage Applied: V ( Ph-N) AC, Tolerance +5%
Applied
Ph-Voltage

Result
Ok (Y/N)

Measured Values (Applicable only for 230kV)


PHASE AN MAG<ANG

AN

8.335kV, 0deg

BN

CN

ABCN

AB

PHASE BN MAG<ANG

PHASE CN MAG<ANG

8.334kV, -120deg
14.44kV

BC

8.334kV, 120deg
Y

CA

14.44kV

Y
Y

10. DIFFERENTIAL PROTECTION (87G):


Biased differential protection
In a biased differential relay, the through current is used to increase the setting of the differential element.
For heavy through faults, it is unlikely that the CT outputs at each zone end will be identical, due to the
effects of CT saturation. In this case a differential current can be produced. However, the biasing will
increase the relay setting, such that the differential spill current is insufficient to operate the relay.
ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

6 of 16

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345


The through current is calculated as the average of the scalar sum of the current entering and leaving the
zone of protection. This calculated through current is then used to apply a percentage bias to increase the
differential setting. The percentage bias can be varied to give the operating characteristic shown in Figure
2.

10.1 Differential Protection Settings:


Item

Description

Setting

IS1

100mA

IS2

1.0 A

K1

0%

K2

150%

ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345

10.2 Pickup Test Setting (ISI):


Expected: I I Diff I > [IS1/(1-0.5K1)]
PHASE
Pick Up - Amps

IA-1

IB-1

IC-1

Expected Value

100 mA

100 mA

100 mA

100.0 mA

IA-2

IB-2

IC-2

Expected Value

100 mA

100mA

100 mA

100.0mA

PHASE
Pick Up - Amps

10.3 Bias Characteristic Test:


BIAS = (1 + 2)/2
DIFF > K2.BIAS (K2 K1) s2 + s1 +/- 20%

where BIAS > s2

PHASE

I1

I2

IRESTRAIN

Expected IDIFF

Measured IDIFF

1.0

1.411

1.205

0.408

0.413

2.0

8.416

5.231

6.446

6.447

3.0

1.22

2.11

1.77

1.78

10.4 Operating Time Test With DT Characteristic:


Operating Time at I = 1A
T = 0 Sec
Phase
A
B
Operating Time
21.2 mSec
18.6 mSec

C
20.7 mSec

Expected Value
< 40 m Sec

11. 100% STATOR EAERTH FAULT PROTECTION


Enabled Element: VN 3RD HARMONIC -VN3H< 1V

Characteristic: DT
Delay Time: 1 sec

11.1 PICKUP TEST

Phase

Measured Pick-up

Measured Drop-off

VN3H<

1.0

1.06

ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

7 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345

11.2 DEFINITE TIME CHARACTERISTICS


CURRENT SETTING: VN3H< 1V

TIME SETTING: 1 sec

APPLIED VOLTAGE

Measured Time (Sec)

0.5 V

1.03 sec

12. UNDER FREQUENCY PROTECTION (81U):


12.1 Under Frequency Protection:
Item

Description

Setting

F<1 Status

Enabled

F<1 Setting

56 Hz

F<1 Time Delay

5.0 sec

F<2 Status

Enabled

F<2 Setting

58 Hz

F<2 Time Delay

30.0 sec

12.2 First Stage Under Frequency Pickup Check:


Frequency Setting (Hz)
56 Hz

Operated Frequency (Hz)


56.0 Hz

12.3 First Stage Under Frequency Operating Time Check:


Injected Frequency (Hz)
54 Hz

Measured Operating Time (S)


5.06 Sec

12.4 Second Stage Under Frequency Pickup Check:


Frequency Setting (Hz)
58 Hz

Operated Frequency (Hz)


58.0 Hz

12.5 Second Stage Under Frequency Operating Time Check:


ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

8 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345


Injected Frequency (Hz)
57 Hz

Measured Operating Time (S)


30.09 Sec

12.6 OVER FREQUENCY PROTECTION (81U):


12.7 Over Frequency Protection:
Item

Description

Setting

F>1 Status

Enabled

F>1 Setting

62.4 Hz

F>1 Time Delay

2.0 sec

F>2 Status

Disabled

12.8 First Stage Over Frequency Pickup Check:


Frequency Setting (Hz)
62.4 Hz

Operated Frequency (Hz)


62.40 Hz

12.9 First Stage Over Frequency Operating Time Check:


Injected Frequency (Hz)
66 Hz

Measured Operating Time (S)


2.05 Sec

13. OVERVOLTAGE/ UNDERVOLTAGE PROTECTION (59/27):


13.1 Overvoltage Protection:
Item

Description

1
2
3
4
5

Setting

V> Measurement Mode


V> Operate Mode
V>1 Function
V>1 Voltage Set
V>1 Time Delay

Phase-Phase
Any Phase
DT
127 V
2.00 Sec

13.1.1 Stage-I Overvoltage Pickup Check:


Phase Reference

Voltage Setting

Operated Voltage

AB

127

127.1

ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

9 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345


BC
CA

127
127

127.1
127.1

13.1.2 Stage-I Operating Time Check:


Phase Reference

Applied Voltage (V)

AB
BC
CA

127
127
127

Measured Operating Time

2.033 sec
2.034 sec
2.031 sec

13.2 Undervoltage Protection:


Item

Description

1
2
3
4
5
6

Setting

V< Measurement Mode


V< Operate Mode
V<1 Function
V<1 Voltage Set
V<1 Time Delay
V<1 Pole Dead Inh

Phase-Phase
Any Phase
DT
102 V
2.00 Sec
Enabled

13.2.1 Stage-I Under Voltage Pickup Check:


Phase Reference
Voltage Setting (V)

AB
BC
CA
13.2.2 Stage-I Operating Time Check:
Phase Reference

Operated Voltage

102
102
102

102.0 V
101.9 V
101.9 V

Applied Voltage (V)

Measured Operating Time

101
101
101

2.027 sec
2.028 sec
2.026 sec

AB
BC
CA

14. REVERSE POWER PROTECTION (32R):


14.1 Reverse Power Protection:

ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

10 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345


Ite
m
1
2
3
4
5

Description

Setting

Power 1 Function
-P>1 Setting
Power 1 Time Delay
Power 1 DO Timer
P1 Pole dead

Enabled
11.0 W
1.5 sec
0.0 sec
Enabled

14.1.1 Reverse Power Pickup Check:


-P>1 Setting
11 W

Applied Voltage (V)


69.20 V

Applied Current
(A)
53 mA

Calculated
Pick
-up Power
11.01 W

Measured
Power
10.99 W

Note: The current should be 180 degree phase displaced from the reference voltage phases.
14.1.2 Reverse power Operating Time Check:
Applied Power in (W)
20

Measured Operating Time (S)


1.53 sec

15. THERMAL NEGATIVE PHASE SEQUENCE PROTECTION (46T):


15.1 Negative Phase Sequence Settings:

ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

11 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345


Ite
m
1
2
3
4
5

Description

Setting

I2>1 Alarm
I2>1 Current Set
I2>1 Time Delay
I2>2 Trip

Enabled
40 mA
5 Sec
Enabled

I2>2 Current Set

70 mA

I2>2 k Set
6

3.8 sec
I2>2 kRESET

3.8 sec
I2>2 tMAX

8
9

500 sec
I2>2 tMIN

6.0 sec

15.1.1 Thermal NPS Alarm Function Check:


I2>1 Alarm
set (mA)
40 mA

Pickup
Value (mA)
41 mA

I2>1 Alarm
set (sec)
5 sec

I2>1 Alarm
(sec)
5.059sec

15.1.3 Thermal NPS Tripping Function Check:


Note: The negative phase sequence thermal characteristic is given as

Injected I2 Current (A)


140mA

Expected Operating Time


223.09 Sec

Measured Operating Time


223.1 sec

16. LOSS OF EXCITATION PROTECTION (40)


16.1 Alarm Function Checks:
ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

12 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

13 of 16

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345


Ite
m

Description

Setting

FFail Alm Status

Enabled

FFail Alm Angle


2

15.00 deg

FFail Alm time delay

5 sec

Alarm observed when the injected fault Impedance above 9.5<-30 deg after 5.04 Sec.
16.2 Field Failure 1:
Ite
Description
m
FFail 1 Status
1
2
3
4
5

Enabled

FFail 1 Xb1

240.0 Ohm

FFail Time Delay


FFail DO Timer
FFail 1 Xa1

Total Impedance
(Xa1+Xb1)
15+240

Setting

2.0 Sec
0 Sec
15 Ohm

Applied Voltage (V)

Applied Current (A)

Calculated Operated
Impedance

100 V, 0 deg

1A , 270deg

100 Ohm

Operating Time Check

Applied Impedance

Measured Operating Time

50 Ohm(50V,0deg,1A, 90deg)

2.035 sec

Field Excitation Failure Impedance Characteristics:


1.)Applythefollowingvoltageandcurrent:Va=100V0,Ia=0.25A+90.Theappliedimpedanceisat
positionAofthepolardiagraminFigure8.
2) Increasethecurrentuntiltherelayoperates.Thisshouldoccuratroughly0.40A(100V/(220+15))andindicates
thatwearenowattheouteredgeofthecirclepointB(Xa1+Xb1).
3) Increasethecurrentto0.5A.Therelayshouldbeoperatingstronglyastherelayimpedanceisnowatpoint
C.
ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

14 of 16

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345


4) Rotatethephaseangleofthecurrentanticlockwiseuntiltherelaydropsoff310anditispossibletoresetit.
Slowlyrotatethecurrentphaseangleclockwiseuntiltherelayjustoperatesagainat295.Recordthephase
anglebetweenthecurrentandvoltage(1onthepolardiagram). 15
5) Withoutchangingthemagnitudeofthecurrentandvoltage,rotatethecurrentphaseangleclockwise,passing
throughtheoperatingarea,untilonceagainitispossibletoresettherelayat225.Slowlyrotatethecurrent
phaseangleanticlockwiseuntiltherelayagainjustoperatesat240.Measurethenewangle,2onthepolar
diagram.
Therelaycharacteristicangleisthemeanofthetwomeasuredanglesandshouldbe
roughly0.

17. SYSTEM BACKUP PROTECTION:


17.1 Voltage Restrained Settings:

ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345


Ite
m
1
2
3
4
5
6
7
9

Description

Setting

Backup Function
Vector Rotation
V Dep OC Char
V Dep OC I> set
V Dep OC Delay
V Dep OC tRESET
V Dep OC V<1 Set
V Dep OC k Set

17.2 Pickup Test:


Ite
Condition
m
1
Vs > V<1
2
Vs < V<1

Volt Controlled
None
DT
0.800 A
1.50 sec
0.0 sec
36.0 V
0.10

Pick Up(I>)

tI> sec

0.810 A
0.080 A

1.522 sec
1.526 sec

Remarks

18. GENERATOR ROTOR EARTH FAULT PROTECTION:


18.1 Rotor Earth Fault Settings:
Ite
Description
m
1
Injection Frequency
0.25 Hz
2
CL I/P Select
CL1
3
64R R<1 Alarm
Enabled
4
64R R<1 Alarm Set
40.0 k
5
64R R<1 Alarm Delay
10.0 sec
6
64R R<2 Trip
Enabled
7
64R R<2 Trip Set
5.0 k
8
64R R<2 Trip Dly
1.0 sec

Setting

18.2 Calibration:
R Compensation = 110
18.4 Perform Timing Tests:

5.
6.

Element

Applied Resistance

Expected Time

Measured Time

64R R< 1 Alarm

10.00k

10.0 sec

10.01 sec

Element

Applied Resistance

Expected Time

Measured Time

64R R<2 Trip

1.0 k

1.0 sec

1.023 sec

ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

15 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345

19. VTS FUNCTION TEST:

19.1 Loss of one or two phases test:


Fixed setting V2=10V
-Apply 3 Phase rated voltage (Ur V) with balanced angles.
-Apply 3 Phase rated current (Ir A) with balanced angles.
-for the phase under test start decrease the voltage on one phase and / or two phases
till you get Internal fuse fail (fuse fail without time lag).
- For time test inject voltage more than V2.and stop Omicron BO. VTF alarm
Fixed setting: V2 = 10 volt, I2> inhibit less than setting= 50 mA
I>
Inhibit less than setting= 1.25 A

Phase

Pick up

Drop Off

One phase
Two phase

38.2 V
39.2 V

41.2 V
41.2 V

Set Time

Measured Time

(sec)

(Sec)
5.017
5.017

5.0

19.2 Loss of all 3 phase voltages under load condition test(detect 3p):
Fixed Setting: a- for fuse fail pick up; V1=10 volts.
b- for fuse fail reset; V1=30 volts.
Pick up
measurement
voltage(v)
10 V

Reset measurement
voltage(v)
30 V

20. Breaker Fail protection


20.1 CBF Pick-up Current Test
Current
Settings
100mA

R-Phase
Drop
Pick up
out
101 mA
99 mA

Y-Phase
Pick up

Drop out

101 mA

99mA

ALSTOM Grid

B-Phase
Drop
Pick up
out
101 mA 99 mA

N
Pick up

Drop out

101 mA

99 mA

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

16 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345


20.2 CBF Time Test

Pick-up current set for phase and N: 0.1A , Current injected for phase and N : 0.2 A
CBF start initiated through operation of other protection.

Stage 1
Delay Set
in Sec
Delay Mesured in Sec
R
Y
B
N
0.150
0.170
0.171
0.170
0.170

21. VOLTS/HERTZ PROTECTION :


21.1 Over fluxing Settings
Item
Description
1
V/Hz Status
2
V/Hz Alarm Set

Setting
Enabled
2.10

V/Hz Alarm Delay

10 sec

V/Hz>1 Status

Enabled

V/Hz>1 Trip Function

DT

V/Hz>1 Trip Set

2.2

V/Hz>1 Trip Delay

2 sec

21.2 Volts/Hertz Alarm Check:


ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

17 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345


V/Hz Alarm Set
2.1

Hz
60

Volts
124.8V

Alarm Delay
10 sec

Measured Time
10.4

Hz
60

Volts
131.28

Trip Delay
2 sec

Measured Time
2.3 ec

21.3 Volts/Hertz Alarm Timing Test :


V/Hz Alarm Set
2.1

21.4 Volts/Hertz Trip Check :


V/Hz Alarm Set
2.2
21.5

Volts/Hertz Trip Timing Test :


V/Hz Trip Set
2.2

22.DEAD MACHINE PROTECTION :


22.1 DEAD Machine Settings
Item
Description
1
Dead Mach Status
2
Dead Mach I>

22.2

Setting
Enabled
80.0 mA

Dead Mach V<

70 V

Dead Mach tPU

0 Sec

Dead Mach tDO

500 msec

Dead Mach Trip Timing Test :


Dead
Set
80 mA

Mach

PU

D.O

80mA

76mA

Delay
Set
time
1 sec

Measured Time
31.4 m sec

FINAL CHECKS

ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

18 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

19 of 16

Generator Protection Relays Site Test Report


Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date
Name of Bay

16-10-2012
PP Name
NAJRAAN P/P
GENERAT.N3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345


Item

Description

Result

All test equipment, leads, shorts and test block removed safely?

OK

Disturbed customer wiring re-checked?

OK

All commissioning tests disabled?

OK

Circuit breaker operations counter reset?

OK

Current counters reset?

OK

Event records reset?

OK

Fault records reset?

OK

Disturbance records reset?

OK

Alarms reset?

OK

10

LEDs reset?

OK

11

Secondary front cover replaced? (If applicable)

OK

Remarks:
..
..
..
..
..
..

ALSTOM Grid

Najran Power Plant SEC-SOA

Signature
Name
Date

LAKSHMANAN PAULRAJ
16-10-12

ENGR. MOHAMMED A. ALMAKRAMI


16-10-12

Potrebbero piacerti anche