1.
PLANT DETAILS
TESTING OBJECTIVE
TO PREVENT THE GENERATOR ,ITS TRANSFORMER AND ITS AUX
FROM FAULTS.
3.PROPOSAL
TRIPPING OF EQUIPMENTS ARE CARRIED OUT IN THREE CLASSES
DEPENDING UPON THEIR SEVERITY IN SPREADING&DAMAGING AND
OCCURRENCE PERIOD/DURATION.
CLASS A TRIPS
TRIPPING OF GENERATOR AND TURBINE ARE TO BE SIMULTANEOUSLY
CARRIED OUT WHEN THIS TYPE OF FAULT OCCURS.
CLASS B TRIPS
TRIPPING OF TURBINE SHOULD BE AT FIRST AND GENERATOR MUST
BE SUBSEQUENTLY TRIPPED ON REVERSE POWER PROTECTION WHEN
THIS TYPE OF FAULT OCCURS.
CLASS C TRIPS
TRIPPING OF GENERATOR ONLY REQUIRED WHEN THIS TYPE OF FAULT
OCCURS.
4.SERVICES REQUIRED
220 V DC SUPPLY,240 V 1 PHASE 50 Hz AC SUPPLY, GENERATOR
SYSTEM AND GENERATOR & UNIT TRANSFORMER .
5.0 SAFETY PRECAUTIONS
I)
FIRE EXTINGUISHER SYSTEMS READINESS
II) PROTECTION PANEL CHARGED CAUTION BOARD TO BE FIT
III) MEN & MATERIALS TO BE KEPT AWAY FROM PROTECTION PANEL
IV) IN CASE OF POWER SUPPLY FAILURE,EMERGENCY PROTECTION
OF EQUIPMENTS MUST BE ENSURED.
6. EMERGENCY PROCEDURE