Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Personas
11
h dia
9.6
Dia de Obra
hh
hhacum
metrado
metrado acum
Rendim diario
Rendim Acum
Rendim Presupuestado
32
105.60
3,379.20
101.94
4,000.64
1.04
0.84
33
105.60
3,484.80
135.21
4,135.85
0.78
0.84
34
105.60
3,590.40
142.43
4,278.28
0.74
0.84
35
105.60
3,696.00
120.50
4,398.78
0.88
0.84
1.00
1.00
1.00
1.00
Operario
Formacin de Oficial
Cuadrilla
Peon
Total
LAST DAY
Amotiguador
Amotiguador
36
105.60
3,801.60
101.94
4,500.72
1.04
0.84
37
105.60
3,907.20
135.21
4,635.93
0.78
0.84
38
105.60
4,012.80
142.43
4,778.36
0.74
0.84
39
105.60
4,118.40
120.50
4,898.86
0.88
0.84
40
105.60
4,224.00
101.94
5,000.80
1.04
0.84
41
105.60
4,329.60
5,000.80
0.87
42
105.60
4,435.20
5,000.80
0.89
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.16
0.13
0.11
776.80
671.20
565.60
9,710.00
7,047.60
5,938.80
12.5
10.5
10.5
6.00
Dif Rend
0.00
Dif HH
5.00
Dif Soles
11.00
Amotiguador
Amotiguador
43
105.60
4,540.80
5,000.80
0.91
44
105.60
4,646.40
5,000.80
0.93
1.00
1.00
0.09
0.07
460.00
354.40
HH
4,830.00
3,721.20
S/.
10.5
10.5
18
11
5
7
12
13.66666667 13.5333
hh/m2
jornada
rendimiento
8 hrs
16 m3/dia
CONC
SEMANA 29
LUNES
MARTES
MIRCOLES
6/25/2012
6/26/2012
6/27/2012
22.50
25.00
25.00
1672.50
1697.50
1722.50
45.00
23.50
41.00
Metrado Acumulado
2256.73
2280.23
2321.23
Rend Presupuestado
0.72
0.72
0.72
Rend Diario
0.50
1.06
0.61
Rend Acumulado
0.74
0.74
0.74
1.00
0.80
0.60
0.40
0.20
0.00
LUNES
MARTES
MIRCOLES
JUEVES
0.00
LUNES
MARTES
MIRCOLES
JUEVES
SEMANA 30
JUEVES
VIERNES
SBADO
LUNES
MARTES
MIRCOLES
6/28/2012
6/29/2012
6/30/2012
7/2/2012
7/3/2012
7/4/2012
25.00
22.50
13.00
20.00
22.50
8.00
1747.50
1770.00
1783.00
1803.00
1825.50
1833.50
45.50
45.50
16.50
36.00
40.00
9.00
2366.73
2412.23
2428.73
2464.73
2504.73
2513.73
0.72
0.72
0.72
0.72
0.72
0.72
0.55
0.49
0.79
0.56
0.56
0.89
0.74
0.73
0.73
0.73
0.73
0.73
REND. Pres.
REND. Diario
REND. Acum.
MIRCOLES
JUEVES
VIERNES
SBADO
LUNES
MARTES
MIRCOLES
JUEVES
VIERNES
MIRCOLES
JUEVES
VIERNES
SBADO
LUNES
MARTES
MIRCOLES
JUEVES
VIERNES
AS
SEMANA 30
JUEVES
VIERNES
SBADO
7/5/2012
7/6/2012
7/7/2012
22.00
25.00
15.00
1855.50
1880.50
1895.50
33.00
40.00
18.50
2546.73
2586.73
2605.23
0.72
0.72
0.72
0.67
0.63
0.81
0.73
0.73
0.73
REND. Pres.
REND. Diario
REND. Acum.
JUEVES
VIERNES
SBADO
JUEVES
VIERNES
SBADO
operario
peon
chofer de cisterna
ayudante p/ motobomba de cisterna (peon)
operador de rodillo
ayudante de operador de rodillo
operador de motoniveladora
ayudante de operador de motoniveladora
10% de capataz
Ru
1000
1000
1000
1000
Nhombres
Rend. MO/Equipo N
o equipos
de h*H/Ru
H
6.93
0.15
1
1
0.06 HH/m2
0.001 HH/m2
0.01 HH/m2
0.01 HH/m2
Productividad
Ru/N Horas*H
18.04 m2/HH
833.3 m2/HH
125 m2/HH
125 m2/HH
Velocidad de
Produccion
Ru/N de horas
125
125
125
125
m2/H
m2/H
m2/H
m2/H