Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
: 21287929
Feature
: 11.1.1.8.1
: EBS R12.X
Solution:
Steps: ODI Changes
1 Follow the step of 1 Create Custom Folder and Enable version control in
Instructions_How_to_Make_Change_on_ODI_Mappings.doc, create
CUSTOM_SDE_ORAR12XX_Adaptor folder, copy task folder
SDE_ORA_PERSISTEDSTAGE_GLLINKAGEINFORMATION_AEEXTRACT from
SDE_ORAR12XX_Adaptor and enable version control.
2 Open the yellow temp interface
SDE_ORA_PersistedStage_GLLinkageInformation_AEExtract.W_ORA_GL_LINKAGE_AE_
PS_SQ_XLA_AE_LINES as shown in the screenshot below.
3 Now go to Quick-Edit tab. Then go to Select Dataset dropdown and select Manage
Datasets option. Configure the datasets as below.
4 After creating the datasets, go to Mapping tab - >Select dataset 2 tab. This dataset
tab will not have any mapping in that dataset. Customer need to manually create the
mapping exactly similar to the one already present in dataset 1 dataset.
5 After creating the mapping for dataset 2, go to Quick-Edit and select dataset 1 and
then open the filter section and select the filter as shown below:
NEW:
RUN_FULL_INCREMENTAL("#IS_INCREMENTAL",AELINE.CREATION_DATE >=
TO_DATE_VAR('#INITIAL_EXTRACT_DATE'),AELINE.LAST_UPDATE_DATE>=TO_DATE_VAR('#LAST_EXTRACT_DATE')
)
7 Now select dataset 2 and open the same as shown above and copy the below:
NEW:
RUN_FULL_INCREMENTAL("#IS_INCREMENTAL",AELINE.CREATION_DATE >=
TO_DATE_VAR('#INITIAL_EXTRACT_DATE') AND 1=2,AELINE.LAST_UPDATE_DATE <
TO_DATE_VAR('#LAST_EXTRACT_DATE') AND AEH.LAST_UPDATE_DATE>=TO_DATE_VAR('#LAST_EXTRACT_DATE')
)
10. Save the change and following the step of 3 Delete the old scenario and create new
scenario in Instructions_How_to_Make_Change_on_ODI_Mappings.doc to create
new scenario for SDE_ORA_PERSISTEDSTAGE_GLLINKAGEINFORMATION_AEEXTRACT in
CUSTOM_SDE_ORAR12XX_Adaptor folder.
Steps: Data Fix
This change is for improving performance and no data fix is involved.