Supply & Pouring of RCC mix ration 1:2:4,


20mm HBG metal for Columns, Beams,
Lintel and Roof Slabs as per standard
specification excluding the deform steel.
Columns

1x39

0.75

0.45

4.5

59.23

2x1
1x9
1x4
1x1

20.79
17.56
29.27
29.27

0.6
0.45
0.45
17.56

0.05
1.21
1
0.15

1.25
86.05
52.69
77.10
1.69
278.00

Lintel & Roof Beam


Cut-Lintel Beam
Side Sun shade
Cross Beam
Straight Beam
Roof Slab
Lum sum R.C.C. Work
Total Quantity
2

Supply & Fabrication of deform steel in


position including cutting, bending &
tying etc. Complete in position.
Column 2.5%, Beam 2% & Slab 1%

39689.00

Supply & Installation of Brick work in


cement mortar mix ratio 1:6 w/ country
burnt bricks.
Side Wall Left & Right
Corridor Wall Left & Right
Front & Back Wall
Middle Wall 1-6
Com. Bed Room Front Wall
Room Toilet Wall
Com. Room Toilet Wall
Parapet All Around
Lum Sum Brick work

1x2
1x2
1x2
2x6
1x1
2x7
1x2
1x1

27.82
24.61
17.56
7.88
17.56
3.91
5.53
80

3.35
3.35
3.35
3.35
3.35
3.35
3.35
0.75

0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23

42.87
37.92
27.06
72.86
13.53
42.18
8.52
13.80
2.97

Sr. No.

Description of Work

Nos

All Measures are in Meters


Length
Breadth
Depth

Total
Quantity

Deduction For Openings


As per Item No 4+5+6+7+8+9
3.15+33.60+28.35+12.33+16.44+4.86=98.73

1x1

98.73

0.23

Total Brick Work

22.71
239.00

Supply & Installation of Main Door in Teak


Wood w/ Key Lock and Hinges.
Size 1.8mx2.1m.

1x1

1.5

2.1

3.15

Supply & Installation of Room Doors in


Country Wood w/ Key Lock and Hinges.
Size 1mx2.1m

1x16

2.1

33.60

Supply & Installation of Bath room Doors


in PVC w/ Lock and Hinges.
Size 0.75mx2.1m.

1x18

0.75

2.1

28.35

Supply & Installation of Windows in


Country Wood w/ three partition, Grill &
Glass shutters w/ Wood Frame
Size 1.5mx1.37m.

1x6

1.5

1.37

12.33

Supply & Installation of Windows in


Country Wood w/ two partition, Grill &
Glass shutters w/ Wood Frame
Size 1mx1.37m.

1x12

1.37

16.44

Supply & Installation of Bath room Vent


Windows in Country Wood w/ Glass
inserts Size .45mx.6m

1x18

0.45

0.6

4.86

Lum Sum for Wood Work


Total Quantity

4.27
103.00

Sr. No.
10

Description of Work

Nos

All Measures are in Meters


Length
Breadth
Depth

Supply & plastering in cement mortar mix


ratio 1:3 and 10mm thick on bottom of roof
slab, sun shade and beams.
BedRoom Ceiling Area Plastering
BedRoom Dressing Ceiling Area Plastering
Bath room Ceiling Area Plastering
Com. Room Ceiling Area Plastering
Corridor Ceiling Area Plastering
Beam Sides
Sun shade Bottom & edges

1x14
1x14
1x18
1x1
1x1
2x6
2x1

5.43
1.37
1.77
13.11
1.8
11.64
20.54

3.28
2
1.8
3.31
24.03
0.85
0.7

Lum Sum for Ceiling Plaster Work


Total Quantity
11

Total
Quantity

249.35
38.36
57.35
43.39
43.25
118.73
28.76
23.81
603.00

Supply & Plastering in Cement mortar mix


ratio 1:4 and 12mm thick over the brick
work & column surface.
Side Wall Left & Right both side
Corridor Wall Left & Right both side
Front & Back Wall both side
Middle Wall 1-6 both side]
Com. Bed Room Front Wall both side
Room Toilet Wall both side
Com. Room Toilet Wall both side
Parapet Both Side
Main Door Still & soffits
Door Still & soffits D1
Door Still & soffits D2
Window Still & soffits W1
Window Still & soffits W2
Ventilator V
Lum Sum for Brick Work Plaster

1x2
1x2
1x2
2x6
1x1
2x7
1x2
1x1
1x1
1x16
1x18
1x6
1x12
1x18

27.82
24.61
17.56
7.88
17.56
3.91
5.53
80
5.2
5.2
5.2
5.74
4.74
2.1

3.35
3.35
3.35
3.35
3.35
3.35
3.35
0.85
0.13
0.13
0.13
0.13
0.13
0.13

372.79
329.77
235.30
105.59
117.65
366.76
74.10
136.00
0.68
10.82
12.17
4.48
7.39
4.91
89.00

Sr. No.

Description of Work

Nos

All Measures are in Meters


Length
Breadth
Depth

Total
Quantity

Deduction for Openings


As per Item No 4+5+6+7+8+9
3.15+33.60+28.35+12.33+16.44+4.86=98.73

1x2

98.73

0.23

Total Quantity
12

1822.00

Supply & Laying of Granite slab on the rough


plastering floor finishing in cement mortar mix
ratio 1:4.
Bed Room Floor Area
Bed Room Dressing Floor Area
Com. Room Floor Area
Corridor Floor Area
Skirting Area 10%

1x14
1x14
1x1
1x1

5.43
1.37
13.11
1.8

3.28
2
3.31
24.03

Lum Sum for Granite Floor Work

13

45.42

20.15

Total Quantity
Supply & Laying of Bath rooms Ceramic Tiles
on Floor & Wall (7 Feet Height) in cement
mortar mix ratio 1:4.
Bed Room Toilet Wall
Com. Room Toilet Wall

249.35
38.36
43.39
43.25
37.50

432.00

2x7
1x2

7.14
6.62

2.1
2.1

Lum Sum for Wall Tile Work

209.92
55.61
13.30

Deduction for Openings


As per Item No 6+9
28.35+4.86=33.21
Bed Room Toilet Floor
Com. Room Toilet Floor

33.21

2x7
2x2

1.77
1.77

1.8
1.54

44.60
10.90

Sr. No.

Description of Work

Nos

All Measures are in Meters


Length
Breadth
Depth

Lum Sum for Floor Tile Work


Total Quantity
14

304.00

Supply & White washing two coats over a


primary coat with Fine white Emulsion Paint
with approved Brand.
As per item No. 10

15

603

603.00

1822

1822.00

Supply & Color washing two coats over a


primary coat with approved color and Brand
Emulsion Paint.
As per item No. 11

16

Total
Quantity
2.88

Supply & Installation of Water Supply PVC &


CPVC Pipes and Drainage PVC Pipes for Bath
Rooms. Complete in Position.

18

18.00

17

Supply & Installation of Bath Mixer Fitting w/


Shower.

2x9

18.00

18

Supply & Installation of Angle Valves.

(6x18)-4

104.00

19

Supply & Installation of Shut-off Valves w/


Hose

18

18.00

20

Supply & Installation of Master Control Valve


for each Bath room.

18

18.00

21

Supply & Installation of Western Closet with


Slim Tank Parry Ware Make.

16

16.00

22

Supply & Installation of Indian Closet with Slim


Tank Parry Ware Make.

2.00

Sr. No.

Description of Work

Nos

All Measures are in Meters


Length
Breadth
Depth

Total
Quantity

23

Supply & Installation of Wash Basin w/ Tap


Parry Ware Make. ( Cold Water Only)

32

24

Supply & Installation of Rain water down fall


pipe fittings.

LS

LS

25

Supply & Installation of Swear Drain pipe


fittings.

LS

LS

32.00

26

27

Supply & Installation of Electrical wiring


running between switch board and end point
within same room. Including PVC conduits,
Wires, Switch, Switch Boards & Socket
Supply & Installation of Electrical wiring
running between Main circuit breaker to
switch board in each room. Including PVC
conduits, 2.5mm Wires & Termination

Points

178.00

568

568.00

28

Supply & Installation of Panel Board w/ Main


Breaker and 24 Circuit Breakers

2.00

29

Supply & Installation of Florescent Light w/


fittings

43

43.00

36

36.00

33

33.00

18

18.00

18

18.00

30
Supply & Installation of CFL Light w/ fittings
31
Supply & Installation of Ceiling Fan w/ fittings
32
Supply & Installation of Night Lamp w/ shade
33
Supply & Installation of Exhaust Fan w/ fittings
34

Supply & Installation of Door Switch

15

15.00

35

Supply & Installation of Electrical wiring for


Water Heater in each Bath room. Including
PVC conduits, 4mm Wires, Power Socket &
Termination

18

18.00

Sr. No.

Description of Work

Nos

All Measures are in Meters


Length
Breadth
Depth

Total
Quantity

36

Power Cable for EB Meter Board to Main Panel


Board by 4+1 50mm2 Copper Cable

500

500.00

37

Other Unforeseen Items

LS

LS

Potrebbero piacerti anche