Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
MINISTRY OF DEFENCE
MANAKIKARAN NIDESHALAYA
RAKSHA UTPADAN TATHA POORTI VIBHAG
RAKSHA MANTRALAYA, 'H' BLOCK, DHQ PO
NEW DELHI - 110 011
DIRECTORATE OF STANDARDISATION
DEPARTMENT OF PRODUCTION & SUPPLIES
MINISTRY OF DEFENCE, 'H'- BLOCK, DHQ PO
NEW DELHI - 110 011
JSS 50102
MARCH 1985
RAKSHA MANTRALAYA
MINISTRY OF DEFENCE
ON
JSS 50102
MARCH 1985
MANAKIKARAN NIDESHALAYA
RAKSHA UTPADAN TATHA POORTI VIBHAG
RAKSHA MANTRALAYA, 'H' BLOCK, DHQ PO
NEW DELHI - 110 011
DIRECTORATE OF STANDARDISATION
DEPARTMENT OF PRODUCTION & SUPPLIES
MINISTRY OF DEFENCE, 'H'- BLOCK, DHQ PO
NEW DELHI - 110 011
JSS 50102
MARCH 1985
LIST OF MEMBERS ASSOCIATED WITH REAFFIRMATION FO THIS
STANDARD
This reaffirmation of Joint Services Specification on has been approved by Maj Gen AR
Nambiar, chairman, Electronic Standardisation Sub Committee in the meeting held on
24 Aug 2000/ by circulation
2.
Sl
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11
12.
13.
14.
15.
16
17.
18.
19.
20.
21.
22.
23.
24
25.
26.
27.
28.
29.
30.
31.
32.
ii
Organisation
LCSO, Bangalore
SSPL, New Delhi
CQA (L), Bangalore
DSC Bangalore
LRDE, Bangalore
LRDE, Bangalore
BEL, Bangalore
STQC, DOE, New Delhi
DEAL, Dehradun
JCES, New Delhi
CQA (AVL), Avadi
D of L&I, DRDO
DGL (Air HQ)
OS (L), AHQ
CRI, C/O BE (GAD)
DGAQA, New Delhi
ITI Bangalore
ITI, Bangalore
ECIL, Delhi
ECIL, Hyderabad
DQAN, New Delhi
DOS (L), NHQ
HQ TGEME, Delhi Cantt
DSC Dehradun
Secretary, LSSC
Dte of Signals, AHQ
WE Dte (WE-7), AHQ
DLRL, Hyderbad
HAL, Hyderbad
Dte of Rocket and Missile
CQA (EW), Secundrabad
CQA (S), Secundrabad
JSS 50102
MARCH 1985
RECORD OF AMENDMENTS
Amendment
No.
Date
Amendment
pertains to :
Sl. No./Para No./
Column No.
Authority
Amended by
Name & Appointment
(IN BLOCK LETTERS)
iii
Signature
&
Date
JSS 50102
MARCH 1985
CONTENTS
Srl.
No.
0.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
PAGE NO
FOREWORD
SECTION - 1: GENERAL INFORMATION
SCOPE
RELATED SPECIFICATIONS AND DOCUMENTS
DEFINITIONS.
SECTION -2 : PROCEDURE FOR THE QUALIFICATION
APPROVAL OF COMPONENTS INCLUDING
APPROVAL OF TEST LABORATIES
INTRODUCTION.
QUALIFICATION APPROVAL OF COMPONENTS
POST QUALIFICATION APPROVAL ACTIVITES
APPROVAL OF TEST LABORATORY
INTRODUCTION.
TERMS OF COTRACT.
BATCH ACCEPTANCES TESTS
APPENDIX A LCSO QUALIFICATION APPROVAL
CERTIFICATE
APPENDIX B LCSO LIMITED APPROVAL
CERTIFICATE
APPENDIX C APPLICATION FOR QUALIFICATION
APPROVAL
APPENDIX D CAPACITY REPORT, PART I
APPENDIX E QUALIFICATION APPROVAL TEST
REPORT
APPENDIX F INFORMATION ON FAILURE OF
APPROVED COMPONENTS
APPENDIX G DETAILS TO BE SUBMITTED BY THE
TEST LABORATORY FOR APPROVAL BY LSSC FOR
QUALIFICATION APPROVAL TESTING
APPENDIX H LCSO APPROVAL OF TEST
LABORATORY CERTIFICATE
iv
1
2
2
3
5
5
10
13
16
16
17
19
21
24
26
28
30
34
38
JSS 50102
MARCH 1985
0. FOREWORD
0.1
This specification has been prepared by the Electronic Components
Standardisation Organisation (LCSO) on behalf of lectronicStandardisation Sub
Committee (LSSC) on the authority of Standardisation
Committee, Ministry of Defence.
0.2
This specification approved by the Ministry of Defence and is mandatory for use
by the Ministry of Defence and is mandatory for use of components in service electronic
equipment.
0.3
Enquiries regarding this speification in relation to any contractual conditions
should be addressed to the Inspection authority named in the tender or contract. Other
enquiries will be answered on behalf of the Director of Standrdisation by:
The Officer-in-Charge,
Electronic Components Standardisation Organisation,
Electronics and Radar Development Establishment,
Ministry of Defence
PO Box No-5108
BANGALORE-560001
Telephone - 24597
0.4
JSS 50102
MARCH 1985
SECTION 1
GENERAL INFORMATION
1.
SCOPE
1.1
This specification provides the procedure for Qualification Approval and
Acceptance of standard 1 electronic component. This should be read in conjunction with
relevant component specifications. This specification is divided into the following three
sections:
Section 1 - General Information
Section 2 - Procedure for the Qualification Approval of components including
approval of test laboratories
Section 3 - Procedure for Batch Acceptance.
2.
2.1
Revision No.1
Reaffirmed 2000
2.2
JSS 50102
MARCH 1985
2.3
Other Specifications
IS 10673: 1983
for inspection
by attributes for Re-affirmed 1991
1
2.4
Reference to a document, in any tender or contract for supply of a component
means the edition for the document current on the date of such tender or contract.
However, in the case of BS 6001, the issue quoted above shall apply unless otherwise
stated
3.
DEFINATIONS
3.0
3.1
Approval authority- Reference to the Approval authority for electronic components
shall mean the Electronic components Standardisation Organisation (L C S O) on behalf of
Electronics Standardisation Sub-committee (L S S C).
3.2
Batch Acceptance Tests- Tests to be applied to approved standard components
before they con be accepted against a contract or order
3.3
Capacity assessment -Examination of the declarations of the manufacturer and
his facilities to asses that he has to manufacturing facilities and quality assurance
organisation essential to produce components in bulk with the quality required by the
relevant joint services specifications
3.4
3.5
JSS 50102
MARCH 1985
3.6
3.7
3.8
JSS 50102
MARCH 1985
SECTION 2
PROCEDURE FOR THE QULIFICATION APROVAL OF
COMPNENTS INCLUDING APPROVAL OF TEST LABORATORIES
4.
INTRODUCTION
4.1
4.2
5.
5.1
5.2
5.2.1
5.2.2
Only such components which apparently conform to styles covered in the
relevant JSS will be taken
up for Qualification Approval testing.
5.2.3
JSS 50102
MARCH 1985
5.2.4
The concerned LCSO shall be satisfied with the performance evaluation of the
component
and
the
capacity assessment of the manufacturer.
5.2.5
The approval accorded is valid only for a period of three year. For maintenance of
Qualification on Approval (MQA) the procedure for Qualification Approval has
to be repeated. Such approval shall
be from the data of expiry of previous approval, provided the samples for MQA
are submitted well in advance
5.2.6
5.2.7 The manufacturer shall intimate to LCSO at least six months in advance if the
production of the approved
Component was likely to be discontinued for certain valid reasons.
5.3
5.3.1
5.3.2
After the receipt of the application and the samples, LCSO shall check these for
physical conformance to the
Relevant JSS standard. If the samples are found satisfactory, action shall be
initiated for the capacity assessment (See 5.3.3). The specimens shall be
forwarded to the test laboratory, either while the capacity assessment is in
progress or after obtaining satisfactory capacity assessment report, at the
discretion of the
Approval authority (See 5.3.5).
5.3.3
Capacity Assessment- The Secretary of the concerned LCSO panel shall forward
to the manufacturer the
6
JSS 50102
MARCH 1985
Capacity Report Part 1 as per Appendix D. The completed form shall be
submitted by the manufacturer to
LCSO and to nay agency nominated by LCSO. On receipt of this completed form
the manufacturer, LCSO or the agency shall nominate an officer who shall visit
the firm to verify the following:
5.3.3.1 The correctness of the statement made in the capacity report form submitted by
the manufacturer.
5.3.3.2 The major stages of production processes.
5.3.3.3 The reason for not replacing the imported piece parts and materials by equivalent
indigenous items, wherever available
5.3.3.4 The production facilities including:
a) Method of inward goods inspection.
b) Facilities to maintain the tolerances.
c) Ability to control critical processes of production, which would affect the
quality of the product.
5.3.3.5 Adequacies of the inspection facilities including:
a) Availability of test instruments and equipment to conduct the tests for stage
inspection and final
Inspection in the production process.
b) Arrangements to calibrate test instruments and equipment.
c) Necessary infrastructure to carry out the required tests and provide feed-back
information for quality
control.
5.3.4
JSS 50102
MARCH 1985
as the validity of the Qualification Approval is maintained without break, it shall
not be necessary for the manufacturer to submit the details in part I of the
capacity assessment report.
5.3.5
The panel Secretary and/ or the chairman of the panel shall periodically visit
the test laboratory to check the
conduct of and progress on the tests.
5.3.5.2
The test laboratory shall consult the Secretary of the concerned LCSO panel in
case failures are observed
during testing testing in order to decide on either suspension of the total tests
or call for replacement of
samples (if the failure are not major) to continue the tests. When testing is
suspended, the samples shall
be collected form test laboratory and the firm advised to collect the failed
samples form LCSO, for
analysis of the defects and submission of improved samples, along with
details of failure analysis done
and improvements affected.
5.3.5.3
The test laboratory shall submit the test results to LCSO in the format as given
at Appendix E. The test
Results are required to be submitted, even if the testing is discontinued before
completion. All test reports shall be classified confidential and the results shall
be intimated to the concerned manufacturer only through
LCSO. The Secretary of LCSO panel shall scrutinize the test results and inform
the manufacturer the details
of failure, if any. In case, the test results have been found satisfactory, he shall
inform that the approval certificate will be issued after the test results and the
capacity report are considered by the LCSO panel.
5.3.5.4 The Secretary of the concerned LCSO panel shall intimate the test results and
capacity report to the panel
8
JSS 50102
MARCH 1985
panel for consideration either by circulation or during the panel meeting. The
LCSO panel shall examine if the capacity report is satisfactory and consider the
test report to decide whether the component:
a) Has met the complete requirements of JSS and Qualification Approval
could be granted: or
b) Has not met the complete requirements of JSS and/ or certain tests could
not be conducted due to the lack of test facilities and Limited Approval
(See 3.6) could be granted: or
c) Has failed to meet the requirements of JSS.
No Limited Approval shall be granted if the limitation is on a
NOTE
primary characteristic of the
Component. For example, leakage in a hermetically sealed meter.
5.3.5.5
The LCSO shall prepare the required certificate (See3.5) and after obtaining
the necessary signatures
LCSO shall dispatch the certificate to the manufacturer.
ii)
JSS 50102
MARCH 1985
5.4
5.4.1
6.
6.1
6.2
ACTION by LCSO
6.2.1
Publish the List of approve components-JSG 50102 every five years and
issue amendments
periodically.
6.2.2
6.2.3
JSS 50102
MARCH 1985
6.2.4
6.2.5
6.2.6
In case, where the validity period of qualification Approval has expired, but the
tests for maintenance of
Qualification Approval are not completed, then the validity period shall be
extended by the Secretary of the LCSO panel with the concurrence of the panel
Chairmain.In such cases care shall be exercised to ascertain that the samples
under test have reasonable chances of satisfactory performance. However, the
extension accorded shall not exceed twelve months under any circumstances.
Such extension shall be intimated by LCSO to the major Defence electronic
equipment manufactures
6.3
Action by Manufacturer
6.3.1
Inform LCSO, the following details in respect of each order they received for
approve components:
a) Address of indentor.
b) Details of indent number, date, nomenclatures quantity etc.
c) Proposed date (S) of supply.
11
JSS 50102
MARCH 1985
NOTE - This information will enable LCSO to asses the user requirements of an
approved component. Obtain
The user opinion on the maintenance of quality and co-ordinate the
effects for failure analysis. It
May be appreciated that non-submision of the required information by
component manufacturer
Would lead LCSO to presume that the item for which Qualification
Approval was accorded, is not
Required consider further approval.
6.3.2
Take prompt action to investigate and intimate the LCSO the reasons for any
rejection of his components
Reported either by the indentor or by LCSO.Such investigation should identify
the defects in one or more of the following:
a) The quality of raw materials
b) The variables in the production process
c) Calibration of test instruments used
d) The worng implementation of the laid down inspection procedure
6.3.3
In components specification, if certain special parameters and their tests have not
been adequately covered,
Bring such cases to the notice of LCSO with relevant details. This will enable
LCSO to examine the feasibility of incorporating in the specification such
parameter and the required methods of testing.
6.3.4
6.3.5
Make efforts to improve the product in respect of the parameters for which
limitation, if any was observed.
this will avoid recurrence of the same limitation during the maintenance of
Qualification Approval.
6.3.6
Submit the required number of samples as per relevant JSS at least one year
before the date of expiry
12
JSS 50102
MARCH 1985
indicated in the earlier approval certificate. Test results obtained against payment
testing or tests for which sample have been given through LCSO shall not be
considered against Qualification Approval tests.
6.4
Action by User
6.4.1
6.4.2
Users must conduct the Batch Acceptance tests and approval by LCSO does NOT
eliminate the need for the
same. The procedure of these tests are given in Section 3 of this document and the
tests are in the relevant JSS
for each typeof component.
6.4.3
6.4.4
6.4.5
7.
7.1
The decision of LCSO panel to grant the qualification Approval and the
failure report by LCSO to
the manufacturer are based on the test results given by the approved test
laboratories. Hence the accuracy of the result from the test laboratories have to be
ensured by frequents surveillance of facilities and their methods of conducting
13
JSS 50102
MARCH 1985
test. The test laboratories shall make efforts to update the test facilities required for
testing of components covered by new JSS prepared after the date of the test
laboratory approval. The issue of test laboratory approval certificate and its
withdrawal shall be published in JSG 50102
7.2
Condition of Approval - The approval of test laboratory shall be accorded under
the following conditions.
7.2.1
Expect for the test laboratories in the Defence establishments, the approval shall
be valid only for a period
of five years. Extension of approval beyond this period shall be considered on
specific application for further approval. To maintain the continuity of approval,
application shall be submitted at least one year before the expiry of earlier
approval.
7.2.2
7.2.3
7.2.4
7.2.5
7.2.6
7.2.7
The senior most officer of the test laboratory shall also sigh the
Qualification Approval certificate to be issued by LCSO in confirmation
of test results.
14
7.2.8
JSS 50102
MARCH 1985
Test laboratory shall arrange to conduct the complete tests as required by
JSS. Where test facilities
are either not available or inadequate/ LCSO shall arrange the conduct of
such tests in outer laboratories.
7.2.9
All tests results shall be treated as confidential and all communication on
matters pertaining to testing
shall be to the LCSO only. Special care shall be taken to avoid divulging
of test results on components
of one manufacturer to any other. They shall also not have any discussion
or communication with the
manufacturer on the product forwarded by LCSO for testing.
7.2.9
7.2.10
7.3
7.4.2
7.4.3
7.4.4
7.4.5
JSS 50102
MARCH 1985
SECTION 3
PROCEDURE FOR BATCH ACCEPTANCE
8.
INTRODUCTION
8.1
This section specified the conditions and procedure for acceptance of approved
components. This should be
Read in conjunction with relevant component specification, which specifies the
tests to be carried out, inspection levels and AQL/LTPD.
9.
TERMS OF CONTRACT
9.1
The contract for the supply of a component shall indicate the applicable
specification, the style Reference(s), the inspection agency who will conduct the
tests on behalf of the indentor, and the place (mutually agreed to between
indentor and the supplier) where such inspection is to be conducted.
16
JSS 50102
MARCH 1985
f) The indentor shall cancel the order if the Qualification approval for
the component was not current at the time of the supplies against
the contract.
10.
10.1
These tests are also included in the relevant Joint Services specification.
All the tests specified for
Qualification Approval are not required for Batch Acceptance.
10.2
10.3
When greater assurance of quality is desired for large orders, all the tests
specified under Qualification
Approval may be repeated. When the duration of storage had an adverse
effect on the characteristics of a component, for example, electrolytic
capacitors, crystal units, switches etc. such components, if proposed to be
used after a considerable period of storage shall be subjected to minimum
tests of critical parameters at the discretion of the Inspection Authority
before using them in the equipment.
10.4
The Batch Acceptance tests shall consist of 100 percent Acceptance tests
and Sampling tests.
10.4.1
17
JSS 50102
MARCH 1985
(a) Group A tests - These are non-destructive tests to check the basic
physical and electrical
parameters of the component. For
example, in case of connectors, measurements to ensure
physical Interchangeability, contact resistance insulation resistance etc.
(b) Group 'B' Tests - These consist of tests of destructive or special nature
and include life and environmental tests. These tests are so chosen as to
enable dompletion of this group of tests
within 15 days.
All Groups A and Group 'B'Acceptance sampling test resultes shall be recorded
and maintained by the
inspection agency. The sample size and acceptance
criteria shall be seen from the tables given in BS: 6001
and shall depend on the following details.
(a)
Lot size:
(b)
Inspection Level:
(c)
18
JSS 50102
MARCH 1985
(a) In case of lot rejection failures observed in the Acceptance tests shall be
intimated to LCSO in Part 1
of Appendix 'F'.
(b) The inspection records shall be maintained for at least five years.
(c) Components which have subjected to destructive tests of Group 'B' or
have failed in Batch
Acceptance tests shall under no circumstance be included in the
accepted batch.
Earlier Approval
AppendixA
Number Year
(Clause 3.5)
Number
......
.......
Date of Issue
......
.......
Date of Expiry
......
.......
19
JSS 50102
MARCH 1985
GOVERNMENT OF INDIA
MINISTRY OF DEFENCE
LCSO QUALIFICATION APPROVAL
(Under the provisions of JSS 50102)
Grant of this Approval confirms the competence of
M/s............................................................................................
to manufacture the component (s) described below :
1. Component
2. Manufacatur's Code
4. Style Reference
5. Range
Temperature
Damp heat
Air pressure (low)
Acceleration (Steady State)
Impact (Shock)
Vibration
:
:
:
:
:
:
7. Special features
Officer-in = Charge
Chairman LSCO panel
Test laboratory
Officer -in Charge
Electronic Components Standardisation
Organisation
for Electronic Standardisation Sub-Committer
Place
Date
:
:
20
JSS 50102
MARCH 1985
This approval does not obviate the need Batch Acceptance test
Earlier Approval
AppendixB
Number Year
(Clause 3.6)
Number
......
.......
Date of Issue
......
.......
Date of Expiry
......
.......
21
JSS 50102
MARCH 1985
GOVERNMENT OF INDIA
MINISTRY OF DEFENCE
LCSO QUALIFICATION APPROVAL
(Under the provisions of JSS 50102)
Grant of this Approval confirms the competence of
M/s............................................................................................
to manufacture the component (s) described below the limitation (s) as in serial
number B :
1. Component
2. Manufactures Code
4. Style Reference
5. Range
:
:
:
:
:
7. Special features
8. Limitations
Officer -in-Charge
Test Laboratory
Chairman LSCO Panel
Officer-in-Charge
Electronic Components Standardisation Organisation
for Electronics Standadisation Sub-Committee
Place
Date
:
:
22
JSS 50102
MARCH 1985
This approval does not obviate the need for Batch Acceptance tests.
23
JSS 50102
MARCH 1985
AppendixC
Sub-clause 5.3
ELECTROINC COMPONENTS STANDARDISATION ORGANISATION
APPLICATION FOR QUALIFICATION APPROVAL
1.
2.
Manufacturer's Name
Place of manufacture and
telephone number
Registered address and
telephone number
Distributor's name and address
Component
Manufacturer's type or code numbers
List of purchased piece parts
and address of sources
List of enclosed general
assembly drawing numbers
Relevant JSS number and date
JSS style(s) to which component is
produced and the range covered
Details of samples submitted
for testing
Certificate number of any
earlier LSCO approval
Changes, if any, made to the component
since the previous LSCO approval
Details of any supplies made to users
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
:
:
:
:
:
:
:
:
:
:
:
:
:
:
Date
:
Designation
JSS 50102
MARCH 1985
the management. Application signed by the local sales representative
will not be acceptable.
NOTE - 2 : Incomplete information can be a cause for delay.
25
JSS 50102
MARCH 1985
AppendixD
(Sub-clause 5.3.3.)
ELECTRONIC COMPONENTS STANDARDISATION ORGANISATION
CAPACITY REPORT
PART I
1.
2.
3.
4.
5.
______________________________________________________________
Srl. Description
Capacity
_________________________________
No. Of the product Licensed Installed Utilised
__________________________________________________________
6.
7.
:
8.
JSS 50102
MARCH 1985
Procurement
Manpower employed
(a) Administrative staff
:
(b) Technical staff
:
10. Financial standing (supported
:
by latest balance sheet)
9.
Station :
Signature
Date :
Designation
Seal of the firm
NOTE -1 : Details at Srl. No 7 for each product is to be given on separate sheets
along with process flow chart.
NOTE - 2 : Part 2 of capacity assessment form will be a questionnaire prepared by
LCSO for reference of
27
JSS 50102
MARCH 1985
AppendixE
(Sub Clause 5.3.5.3)
ELECTRONIC COMPONENTS STANDARDISATION ORGANISATION
QUALIFICATION APPROVAL TEST REPORT
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
(b)
Reasons(s)
________________________________________________________________
(c)
________________________________________________________________
JSS Clause
Title of
Specimen
Mature of
Number
Test
Number
failure
28
JSS 50102
MARCH 1985
________________________________________________________________
____________________________________________________
(d)
_____________________________________________________
Group No.
Specimen No.
_____________________________________________________
JSS Clause
Title of
Specification
Test
Test
Requirement
Results
Remarks
Number
_____________________________________________________
_____________________________________________________________
(e)
Remarks
_____________________________________________________________
12.
_____________________________________________________________
Date :
Signature
Seal :
Test Laboratory
29
JSS 50102
MARCH 1985
AppencixF
(Sub Clause 6.4.4)
ELECTRICAL COMPONENTS STANDARDISATION ORGANISATION
INFORMATION ON FAILURE OF APPROVED COMPONENTS
PART 1 - OBSERVED DURING ACCEPTANCE TESTING
1.
2.
3.
4.
5.
6.
:
:
:
:
:
:
:
:
Sample size
7.
AQL
Failure data
Specimen
cause
number
:
:
No. of specimens failed
Details of
Probable
Details of
test during
which failure
occurred 2/
failure
of failure
______________________________________________________
_______________
1/
For example, single sampling plan for normal insepetion, double sampling plan
for tightened inspection.
2/
Indicate brief the exact stage (100 percent, Group 'A' or 'B') at which the failure
occurred giving reference to
the test clause of the specification
30
JSS 50102
MARCH 1985
Appendix F (Cont)
8.
Date
Signature
Seal
:
Origanisation
(Reporting
31
JSS 50102
MARCH 1985
Appendix F (Contd)
ELECTRONIC COMPONENTS STANDARDISATION ORGANISATION
INFORMATION ON FAILURE OF APPROVED COMPONENTS
PART II - OBSERVED DURING USE IN EQUIPMENT
1.
2.
3.
4.
5.
6.
7.
8.
9.
:
:
:
:
:
Serial
:
:
:
:
External to component
under observation 2/
:
:
1/
In case where the failure immediately follows a period of transport, storage, or
stand by, the relevant
conditions should be stated
2/
Excessive mains voltage or fluctuations, overloads, interruptions etc. Details of
conditions immediately
before the failure are useful.
32
JSS 50102
MARCH 1985
Unknow
Unconfirmed
10.
11.
Signature
(Reporting Unit)
Date
Seal
:
:
:
:
:
Signature
(Reporting Unit)
Date :
Seal :
NOTE 1 - Separate forms shall be used for each component.
NOTE 2 - The completed form in duplicate shall be forwarded by the unit to the
equipment Inspection Agency
for scruting and comments
NOTE 3 - The Inspection Agency shall complete details at Srl. No 12 to 16 and
forward one copy to LSCO.
33
JSS 50102
MARCH 1985
AppendixG
(clause 7.3)
ELECTRONIC COMPONENTS STANDARDISATION ORGANISATION
DETAILS TO BE SUPPLIED BY THE TEST LABORATORY
FOR APPROVAL BY THE ELECTRONICS STANDARDISATION
SUB-COMMITIEE FOR QUALIFICATION APPROVAL TESTS
(To be forwarded to LSCO in triplicate)
1.
2.
3.
4.
5.
6.
7.
Signature
(Test
Laboratory)
Date :
Seal :
34
JSS 50102
MARCH 1985
Annexure 1 to Appendix 'G'
ELECTRONIC COMPONENTS STANDARDISATION ORGANISATION
DETAILS OFFACILITIES FOR ENVIRONMENTAL TESTING
NAME OF ORGANISATION :
Srl. JSS
No. 50101
Test &
Procedure
(clause
number)
1
2
Equipment
Calibration
I
Performance
make &
arrangement
model
Range Accuracy
number
Operational
characterstics
3
4
5
6
7
Date :
Signature
(Test Laboratory)
Seal
35
Remark
JSS 50102
MARCH 1985
Annexure 1 to Appendix 'G'
ELECTRONIC COMPONENTS STANDARDISATION ORGANISATION
DETAILS OFFACILITIES FOR ENVIRONMENTAL TESTING
NAME OF ORGANISATION :
Srl. Equipment
No. make
&model
number
Operational
characterRange
stics
Accuracy JSS
Number
Test
clause
number
Date :
Signature
(Test Laboratory)
Seal
Remark
Performance
Used For
36
JSS 50102
MARCH 1985
Annexture 3 to Appendix 'G'
ELECTRONIC COMPONENTS STANDARDISATION ORGANISATION
FUNCTIONAL SET UP TEST LABORATORY
A block diagram showing the functional set up of the Test Labortoryshall be
given as an Annexture.This shall
Indicate the relationship between various technical groups for their interaction.
Under each group, the test
facilities, in brief and the grade of technical personnel employed shall be shown.
37
JSS 50102
MARCH 1985
AppendixH
(Clause 7.3)
Earlier Approval
Number Year
Number
:
.......
Date of Issue :
.......
Date of Expiry :
GOVERNMENT OF INDIA
MINISTRY OF DEFENCE
(Under the Provisions of JSS 50102)
Grant of this Approval confirms the competence of
.
.
for the Qualification Approval testing of the following components to the relevant
Joint Services Specification.
.
..
Officer-in-Charge
Chairman
ELECTRONIC COMPONENTS
STANDARDISATION
STANDARDISATION ORGANISATION
SUB-COMMITTEE
38
ELECTRONICS