Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
positive)
Prestressing
Moment
Live load
Total
Dead
Position Primary Parasitic
Load
Sagging Hogging Sagging Hogging
Support
4,046.8 4,487.5
-8,694.6 1,308.9 -4,901.6 1,148.6 -5,061.8
1/4
point
-7,025.1 4,487.5
2,617.7 3,298.9 -2,497.5 3,379.0 -2,417.4
Midspan 13,021.9 4,487.5
6,397.4 5,489.2 -1,789.7 3,352.3 -3,926.6
Position
Support
1/4
point
Midspan
Primary Moments
-13,596.2
5,916.6
11,886.6
Combined
7.4
15.4
11.7
10.2
9.5
11.2
Notes
Close range of compressive stresses at top and bottom fibres may point to low eccentricity
used in the bridge
Constant parasitic moments may also indicate constant eccentricity or small variations in
tendon eccentricity
High eccentricity of 650mm yields higher disproportionately lower top fibre stresses than
those revealed by the designers report
Trial and Error evaluation reveals P =53000kN and e=200mm to achieve stresses comparable
to those in report findings
+
459.73 104
188.21 107
188.21 107 188.21 107
= 10.211/2
Extreme bottom fibre stress
=
+
+
459.73 104
957.22 106
957.22 106 957.22 106
= 11.235/2