CIKARANG DRY PORT

Integrated PORT & LOGISTICS Facilities

www.cikarangdryport.com

Ver. Oct 2013

Background
 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor
Toll Road Bekasi-Cikampek, a significant contribution to the nation and
effective to build facilities for export and import.
 Alignment with Government of Indonesia, ie. CATS (Customs Advance Trade System),
KPPT (Kawasan Pelayanan Pabean Terpadu) initiatives to streamline inefficiencies in
the current logistics landscape and to relieve congestion in Jakarta
 To participate in a profitable business through provision of integrated logistics
services in a growing market : Improve competitiveness , Requirement on
Integrated Logistics System (Fast and efficient distribution system, Achieve zero inventory,
Deliver security system (24/7), Fast container handling clearance system, Efficient warehousing
service management system; Delivery of goods (Timely, not costly, accountable, predictable,
No congestion)

KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

Bringing Port to Industrial Neighborhood


HUB
(Tj. Priok Port)

SPOKE
(Cikarang Dry Port)
Distance = 50 kms

JBBK1
JBBK2

MM2100
Hyu
EJIP

Lippo
BIEE

KIIC

KIM
SC
KBI

Port Code: IDJBK


Surrounded by 12 Industrial Estate and
More than 3000 manufacturer company

KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

KIKC

Concept

Integrated Port-Services, Logistics Services &


Bonded Zone as One-Stop-Services
Bringing Port, Customs, and Quarantine
Services to Industrial Estate and Industrial Zone
Supported by Real Time Monitoring System
Security and Safety comply to International
Standard
KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

Concept
EXISTING

TAN J U N G P R I O K

Customs
CY

Quarantine

INDUSTRIES

Forw arder MT Depot Shipping Line Trucks

SEA PORT

KPPT-Cikarang Dry Port


TANJUNG PRIOK

Integrated / One Stop Services

Customs
CY

Quarantine

Carrier

MT Depot

Logistics
Forw arder

INDUSTRIES

CY

Trucks

Cikarang Dry Port

Systematically connected

KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

SEA PORT

Sea Port & Dry Port Connectivity

at Sea Port

KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

Government Approval
Ministry of Transportation
Location Permit by Minister of Transportation, No:KP.131 Year 2004,
Construction Permit by Directorate General of Sea Transportation,
No:PU60/3/8/DJPL.06,19 June 2006
Operation Permit by Minister of Transportation, No. 527, Year 2009
International Port Code, ID JBK, 2010
Ministry of Finance, cq. Customs
Permit for Temporary Storage Area (TPS), as implementation of Customs
Advance Trade System (CATS), KM-07/WBC.08/2010
Kawasan Pelayanan Pabean Terpadu (KPPT), KEP-706/KM.4/2010
Manifest Sarana Pengangkut melalui KPPT Cikarang Dry Port, Perdirjen No
5/BC/2011
Ministry of Agriculture, cq. Quarantine
Place of Entering Point for Import and Export of Animal and Plantation
Product, Ministry of Agriculture Regulation No. 94/Permentan/OT.140/12/2011
The National Agency of Drug and Food Control (BPOM)
Online Services at e-BPOM (web base, http:// http://e-bpom.pom.go.id) for
permitting import-export with International Port Code IDJBK.
KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

Operational Scheme
Flow Chart

CY- CDP
(IDJBK)

CY-TjPriok
(IDJKT)

Shipper /
Consignee

Import Process
Multimodal B/L
B/L @ CDP
Place of Delivery
Non Multimodal B/L
B/L @ Tj Priok

By Carrier

CIF/CNF
@IDJKT

CIF/CNF
@IDJBK

By CDP using BC 1.2


as requested by consignee
& approved by Customs

By Consignee / Forwarder

By Consignee / Forwarder

Export Process
Multimodal B/L
BL @ CDP
Place of Receipt

By Carrier

KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

On Truck/Train
On Board
@IDJBK

By Shipper / Forwarder

Value Proposition
(Source: World Bank Study, 2011)

CERTAINTY

Predicted Lead time


and Cost using
Multimodal B/L
Export : Closing Time
and transfer
responsibility at CDP
Import : Avoid
Overbrengen

TRACEABILITY

Transfer of
responsibility at CDP
Reduced risk
Managed bonded
transportation with
Electronic Seal for
better security &
monitoring

PROFITABILITY

Better planning,
inventory reduction
and increasing
productivity
Streamlined process,
time & cost
Storage & demurrage
start counting at CDP
(Multimodal B/L)

KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

10

Terminal Cost Comparison

Penalty

Penalty

More details please visit www.cikarangdryport.com

KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

11

AREA MASTERPLAN
200 Ha
Port / Terminal
( 70 Ha)

Logistics Park
(130 Ha)
Quarantine

TPP
Kawasan Industri
KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

12

Bird Eye View


Port Code:IDJBK
Total Area 200 Ha
Logistics
Park:
130 ha
Warehouse
TPP

Railway
Domestics
Internasional

Port :
70 Ha
Customs
Quarantine
CY
Reefer
CFS
Empty Depo

KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

13

Facility Development

Rail
Emplacement
Container Yard
& Reefer Plug

Container Yard
CFS
Gate
Domestic CY

Office
Empty Container &
Truck Pool
Bonded
Warehouse

Empty Container

Logistics Park
Access Road

Legend :
Already built
= 21 Ha
Under construction = 15 Ha
KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

14

Facilities
Starting Operation since 18 Aug 2010
(24 / 7)

KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

Main Office & Administration

Weight Bridge

Empty Container Depot

16

Export Import Operation (day)

Export Import Operation (night)

17
Activity at Gate CDP

Logistics Park (upcoming)

KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

18

Tracking
www.cikarangdryport.com
Import

Export

KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

Strategic Partnership with Other Stakeholders


Shipping Liners
(14)

Terminal
Operators
(4)

JICT
PT Mustika
Alam Lestari

Land
Transporter
(3)

Logistics Service
Provider
(20+)

Industry
Customers
(70+)

KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

21

Customers Testimony
Cikarang Dry Port prove the commitment
on night delivery to meet factory operation
PT. Kraft Indonesia | Buyer

Avoid OverbrengenMavoid high cost


PT. Cargill Indonesia | Supply Chain

Customs response (PEB/NPE) is fast


PT. Yamaha Music Manufacturing Asia | Logistics

Customs very cooperative and supportive !


PT. Damco Indonesia | Dispatcher

Increase truck feeder efficiency by


returning empty container near factory
PT. SGL Indonesia | Operation

Managed delivery to factory


PT. Tekpak Indonesia.
KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

22

Infrastructure Development
Railway

CDP

Exit toll
km 24

1
3
2

Exit toll
Km 29
Exit toll
km 31

Legend :
New Toll Road (km 29,2 and 34,7)
New Industrial Estate Connecting Road
Existing Industrial Est Connecting Road
KPPT-Cikarang
Dry Port
Integrated PORT & LOGISTICS Facilities
Jababeka Existing
road

4
Exit toll
km 34.7

23

Access Road (Toll Road Km 29 to CDP)

KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

24

Access Road (Toll Road Km 29 to CDP)

KPPT-Cikarang Dry Port Integrated Logistics Facilities and Services

25

Contact Us

End of Presentation
THANK YOU

For further information:


PT. Cikarang Inland Port
Jl. Dry Port Raya, Kota Jababeka, Cikarang, Bekasi17530, West Java, Indonesia
Phone(62-21) 2908 2908; Fax (62-21)2908 2503
Website : www.cikarangdryport.com
E-mail : marketing@cikarangdryport.com
Cikarang Dry Port
KPPT-Cikarang Dry Port Integrated PORT & LOGISTICS Facilities

@CikarangDryPort

27

Potrebbero piacerti anche