Fill only the yellow cells !

1. Circulate pumps to blender


2. Pressure test to
3. Open well
4. Pump
Pump rate
5. Step down with linear gel
Volume
6. Reset counters
Pump rate
7. Pump Job
Flush Top Perfs
8. Wait until closure

600 bar
4.3 m3 linear gel
1.5 m3/min
11 m3
3 m3/min

1250

Tubing depth

1283

Top perforations

15 m x linked gel
3

4.3 m3 linear gel

1303

Bottom perforations
Plug back depth

1310

Total; Volume Pumped

47.2 m

Casing volumes
OD inches Wall mm
5

Minifrac Calculation
Under Flush
Casing
Tubing
BH (plug back depth)
Tubing Depth
TOP Perforations
BOT Perforations

Hole Fill
Step up
Step down
Minfrac Volume
Flush Top Perf.
Total Pumped

0.018346
0.002585
1310
1250
1283
1303
4
10
11
18
4
47.2

[m3/m] or m2
[m3/m] or m2

[m]
[m]
[m]
[m]
[m3]
[m3]
[m3]
[m3]
[m3]
[m3]

7.70

OD mm

Area, m2

127.00

0.009777

5 1/4
7.70
5 1/2
6.99
5 3/4
7.70
6 3/4
7.70
6 5/8
7.70
7
10.36
8 5/8
7.70
9 5/8
13.9
Tubing volumes
OD inches Wall mm
2 7/8
7.82
3 1/2
6.70
2 3/8
9.52

133.35
139.70
146.05
171.45
168.28
177.80
219.08
244.48

0.010921
0.012407
0.013399
0.019116
0.018346
0.019369
0.032565
0.036854

OD mm
73.03
88.90
60.33

Area, m2
0.002585
0.004475
0.001338

Vol. with proppant

m3

0.367

ALWAYS COMPARE CA
VOLUMES WITH A
HANDBOOK!!!

Fill only the yellow cells !


WGA-20
3.6 kg
3600
1000
3.6
1000
0.0036
0.72
OC APS
0.25 kg
250
1000
0.25
1000
0.00025
0.05
DRB-HT
0.25 kg
250
1000
0.25
1000
0.00025
0.05

OC CL20
g
l
g/1l
ml
g /ml
g/200 ml

0.5 l

0
1000
0
1000
0
0

ml/1l
l
ml/1l
ml
ml /ml
ml/200 ml

OC CS-11
g
l
g/1l
ml
g /ml
g/200 ml

3 l

3000
1000
3
1000
0.003
0.6

ml/1l
l
ml/1l
ml
ml /ml
ml/200 ml

OC DE11
g
l
g/1l
ml
g /ml
g/200 ml

2 l

2000
1000
2
1000
0.002
0.4

ml/1l
l
ml/1l
ml
ml /ml
ml/200 ml

0
1000
0
1000
0
0

ml/1l
l
ml/1l
ml
ml /ml
ml/200 ml

0 l

0
1000
0
1000
0
0

ml/1l
l
ml/1l
ml
ml /ml
ml/200 ml

0 l

0
1000
0
1000
0
0

ml/1l
l
ml/1l
ml
g /ml
g/200 ml

CMHPG
0 kg

500
1000
0.5
1000
0.0005
0.1

OC TEA
g
l
g/1l

0 l

g /ml
g/200 ml
OC TS11

0 kg

0 kg

0
1000
0
1000
0
0

g
l
g/1l

0
1000
0
1000
0
0

g
l
g/1l

g /ml
g/200 ml

g /ml
g/200 ml

1. Circulate pumps to blender


Fill only the yellow cells !
2. Open well
3. Put the whole quantity of necessary sand in the blender's tab and mix with gel
4. Pump in the well that quantity of sand followed by liniar gel to displace

5. Total gel pumped


Pump rate
Bulk density proppant
Abs. density proppant

10.7 m3 gel
1 m3/min
1610 kg/m3
2650 kg/m3

Calculation
Casing
Tubing

0.036888
0.004327

[m3/m] or m2

BH (plug back depth1)


Tubing Depth

2814
2450

[m]
[m]

BOT Perforations

2500

[m]

Volume of S.Plug

11.58
18648

Tubing volume
Flush

10.6
10.6

[m3]
kg
[m3]
[m3]
[m3]
[m3]

Total Flush

10.7

[m3]

30
0.1

m
m3

Mass of proppant

injection line length


injection line volume

12.653886 20372.76

2450

Tubing depth

2500

Bottom perforations (plug back d

2814

BH (plug back depth1)

[m3/m] or m2

Casing volumes
OD inches Wall mm
5
7.70
5 1/4
7.70
5 1/2
7.70
5 3/4
7.70
6 3/4
7.70
6 5/8
7.70
9 5/8
13.85
Tubing volumes
OD inches Wall mm
2 7/8
7.72
3 1/2
7.33

OD mm
127.00
133.35
139.70

Area, m2
0.009777
0.010921
0.012129

146.05
171.45
168.28
244.48

0.013399
0.019116
0.018346
0.036888

OD mm
73.03
88.90

Area, m2
0.002603
0.004327