Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
SCHOOL:
SCHOOL ADDRESS:
(Please Check
appropriate box)
SCHOOL HEAD:
PTA PRESIDENT:
Elementary ) Secondary
CONTACT NUMBER:
CONTACT NUMBER:
New
Constructio
n
Replaced
Repaired
Repainted
Other
s
1. Roofs/rain gutter
2. Walls/Ceilings
3. School Building Directory
4. Windows and Doors
5. Chairs/Desks Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds/Landscaping
9. School Signs/signages
10.Electrical
11.Fire extinguisher (suspended outside)
12. School free from any sharp objects
13.Prepare directory of identified
classroom for evacuation
14.Drainage
15.Signages for on-going
construction/condemn
ed buildings
16.Exit plan/signage of high story building
17 Post directory of emergency contact
18. Establish early warning devices in case of emergency
Total
G. ISSUES AND CONCERN (Describe briefly problems encountered and how resolved)
I.
J. EVIDENCES / ATTACHMENTS
a. Photos (before, during and after)
b. Photocopy of all completed BE Forms:
1. Form 01
3. Form 03
5. Form 05
2. Form 02
4. Form 04
6. Form 06
Prepared by:
Date:
__________________________________
_____________
______________
Name of School Head with Signature
and
Designation
Submit this Report to Division Office on or before June 19, 2015 (Two (2) folders)
the improvement
Manpower Needed
(Indicate quantity
and nature of
labor
services needed)
________________
Date of Inspection
Noted:
_____________________________
TIC/Head Teacher/Principal
2. Resource Mobilization
3. Implementation
4. Monitorin
g
and
Evaluatio
n
5. Reporting
Prepared by:
_________________________
Signature over Printed Name
_________________
Date Prepared
Noted by:
______________________________
TIC/Head Teacher/Principal
BE Form 03
RESOURCE MOBILIZATION FORM
(TO BE ACCOMPLISHED BY THE Resource Mobilization Committee)
BRIGADA ESKWELA
Instruction: using the completed BE For, 01: Physical Facilities Needs Assessments Form as basis, summarize the resource (materials and manpower)
needed and list down the potential source or partners to be tapped. Add additional sheet if needed. The Status and Remarks columns should be updated
regularly to determine progress in acquiring resources needed.
Materials Needed
Quantity
Labor
Skills/Volunteers
Quantity
Needed
Prepared by:
Strategies/Plan of
Key
Action
Persons/Organizations
to
be Tapped
Strategies/Plan of
Key
Action
Persons/Organizations
to
be Tapped
Noted:
Person Responsible
Status
Remarks
Person Responsible
Status
Remarks
______________________________________
Resource Mobilization Committee Chairperson
_______________________________
TIC/Head Teacher/Principal
BRIGADA ESKWELA
Date: _____________________
Instructions: Volunteers themselves should personally fill in the details required by this form under the supervision of any of the committee members. For
the last column, Indicate if masonry, carpentry, plumbing, painting, electrical, gardening/landscaping, ordinary labor, or others.
SIGNATUR TOTAL NUMBER
E
OF
TIME
NAME
Noted:
__________________________
_____________________
IN
OUT
HOURS SERVED
NATURE OF
VOLUNTEER
SERVICE
RENDERED
School Head
Date
BE Form 05
BRIGADA ESKWELA
RECORDS OF DONATIONS
RECEIVED
(To be accomplished by the Documentation Committee)
NAME OF DONOR
ITEMS OR MATERIALS
QUANTIT DATE
Y
RECEIVED
Prepared by:
_____________________________________
Committee on Documentation Chair/Member
Noted:
_____________________________________
School Head
ASSUMED COST OF
ITEMS
PER UNIT
TOTAL
BE Form 06
DAILY ACCOMPLISHEMENT REPORT
(To be accomplished by the Program Implementation
Committee)
Day
1
BRIGADA
ESKWELA
Date
Instruction: list down all the activities that needs to be undertaken for each of the Brigada Eskwela week. At the end of each day, please mark the
appropriate column that corresponds to status of each activity. Cite reason for non-completion.
STATUS
Activities
Prepared by:
_________________________________________
Program Implementation Committee Chair/Member
Noted by:
_________________________________________
Completed
REMARKS/RECOMMENDATIONS
School Head