Name of the work:

Formation & Gravelling Road from -------- to ------------ in


Budharaopet (V) of Khanapur Mandal

Grant: SDF Proposal

Amount of Estimate Rs. 5.00 Lakhs

The above said has been proposed for administrative sanction under SDF
Grant for an amount of Rs. 5.00 Lakhs.
Hence the detailed Estimate is prepared with the following provisions
1

Construction of embankment with approved material obtained from borrow pits with a lift
upto 1.5m transporting to site, spreading, grading to required slope and compacting to
OMC meet requirement of Tables 300.1 and 300.2 with a lead upto 1000m as per
Technical Specification Clause 301.5 MORD / 305 MORTH (Carted earth).

Construction of Granular Sub-base / Shoulders by provinding well graded material of 100%


Gravel having Soaked CBR not less than 15% and plasticity index < 6 with vibratory roller
of 8-10 T capacity to achieve the desired density, complete as per IRC technical
specification clause 402(3)(iii) of MORD.

Collection and filling of Gravel for shoulders including watering and tamping, cost and
conveyance of all materials and labour charges etc., complete.
Add LS for other U/S item of works etc., complete.

Hence the Detailed Estimate is prepared with SSR - 2015-16 and submitted
in favour of early administrative sanction.

Asst. Executive Engineer


MPP-Khanapur

Dy. Executive Engineer


PR SD-Narsampet-II

m borrow pits with a lift


e and compacting to
1000m as per

graded material of 100%


< 6 with vibratory roller
IRC technical

d tamping, cost and

5-16 and submitted

e Engineer
rsampet-II

DETAILED AND ABSTRACT ESTIMATE


(Proposed Estimate)
Name of the work : Formation & Gravelling road from this house to that house
at Budharaopet(V), of Khanapur mandal
Grant : SDF proposal

Amount of Estimate: Rs

Measurements
Qty
L
B
D
2
3
4
5
6
7
1 Construction of embankment with approved material
obtained from borrow pits with a lift upto 1.5m
transporting to site , spreading , grading to required
slope and compacting to OMC meet requirement of
Tables 300.1 and 300.2 with a lead upto 1000m as per
technical specification Clause 301.5 MORD / 305 MORTH
including all over heads and contractor's profit but
excluding seignorage charges , VAT (Carted earth).

S.NoDescription of itemNo's
1

1200

4.00

0.225

Rate
8

1080.00

163.14

720.00

417.97

2 Construction of Granular Sub-base / Shoulders by


providing well Graded material of 100% Gravel
having soaked CBR not less than 15% and Plasticity
index <6 and stacking at site to the departmental
guage for pre measurements and mixing them and
spreading the same with grader in uniform layers of
loose thickness of not more than 225mm thick
including mixing by mix in place method with
rotavator to OMC amd compacting with vibratory
roller of 8-10 T capacity to achieve the desired
density , complete as per IRC technical specification
clause 402(3) (iii) of MORD for finished item of work
etc., complete.

1200

4.00

0.15

3 Construction and filling of Gravel for shoulders


including watering and tamping cost and conveyance
of all materials and labour charges etc., complete.

5.00 Lacs.

1200

0.25

0.1

60.00

317.55

4 Add 0.5% QC charges


5 Add LS for other U/S item of works etc., complete.
Total Rs

Asst. Executive Engineer


MPP- Khanapur

Dy. Executive Engineer


PR-SD Narsampet-1

stimate: Rs

5.00 Lacs.
Per

Amount

10

1.00 /cum 176191.200

1.00 /cum

300938.40

1.00 /cum

e Engineer
sampet-1

19053.00
496182.60
2480.91
1336.49