Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Engine
e
ring
Design
er o
Siraga
f solut
ions
Engi
1936
1966
Siraga Engineering - p. 2
2003
1990
2002
2006
2008
2010
A recognition as well as
a commitment to continuous
improvement : Siraga
Engineering obtains ISO
9001:2000 certification.
2011-2012
2013
2014
Siraga Engineering - p. 3
excelle
nce
g Director
ga Engineerin
z - Sira
Laurent Gerne
With Siraga, as a partner, you are the heart of our concern. That is why we
take special care to meet your needs and requirements. Thus, you are the best
judge of the quality of our services and equipment.
You
values
Sa
fety
Qua
Siraga Engineering - p. 4
Our
lity
phil
Our ph
i
l
osophy
Differe
nce thr
ough
l project is
Any industria
ing
venture fac
d
a
n
a
m
u
ah
llenges.
technical cha
confidence !
n
o
d
e
s
a
b
ip
A partnersh
t
n
e
m
n
o
r
i
Env
Ethi
cs
Siraga Engineering - p. 5
Acti
Area o
f Activi
ty
Siraga Engineering - p. 6
< 1,000,000 $
a
rg
e
L
d
e
M
ll
iu
Project sizes
> 6,000,000 $
Siraga Engineering - p. 7
E
nginee
Type o
f servi
ring
ces a
nd com
petenc
es area
s
Engi
Siraga
Conceptual Studies
We work in close cooperation with our clients to
define tailor-made solutions at the early stages of the
project
Feasibility studies
At the beginning of your project, we can develop
preliminary studies and propose a rough budget in order
to help you take the decision to invest.
Siraga Engineering - p. 8
Construction supervision
We ensure the on-site installation supervision and
commissioning of equipment
Project Management
Whatever the nature of the project to realize, we develop
a suitable project team and we manage all stakeholder
expectations.
Customer
needs
Customer
requirements
Consultancy /
Feasability Studies
Tender
Documents
Bidding
phase
Project
execution
Plant under
operation
Bid
Preparation
Project
Execution
Technical
Assistance
Siraga Engineering - p. 9
Y
X Energ
LPG st
ies
orage
plant e
xte
nsion
Or y
Tanzan
ia - OR
Amount:
Period:
Situation:
Customer:
Dar Es Salam,
TANZANIA
ORYX Energies
2014
2015
Small scale project
(< 1,000,000 USD)
(One year)
Description
Full turn-key extension and renovation contract to supply, erect and start up:
LPG tanks (4x100m3)
LPG pumping stations (2 LPG pumps)
2 loading/unloading bays with metering system
LPG network extension with piping, fittings and accessories
Extension of fire-fighting network with firewater pumps, piping, fittings and accessories
Compressed air network extension with piping, fittings and accessories
Instrumentation, switchboards, automatic control systems, gas and fire detection
Siraga Engineering - p. 10
Siraga Engineering - p. 11
A
E
N
E
New L
R
G
PG bot
Y
tling fi
lling
facility
Pum
Benin PUM
Amount:
Period:
Situation:
Customer:
Cotonou,
BENIN
PUMA ENERGY
2011
2012
Medium scale project
(from 1,000,000$ to
6,000,000 $)
(One year)
Description
Studies, Supply, Installation Supervision and start-up of the LPG network, air
network, electric network and gas & flame detection system and fire-fighting
network of an LPG filling station.
Filling lines: one line B13 complete with carousel and equipped with 10 scales
(including maintenance)
LPG network, LPG pumping plant, LPG unloading stations
Complete fire fighting network (pumps, gas & flame detection system, etc.)
Air network
Electric network, low voltage switchboard, emergency generator
Siraga Engineering - p. 12
Siraga Engineering - p. 13
FTAL
Naft
Full tur
nrenova
tion of key extensio
na
an LPG
bottlin nd
g plant
Algria
- NA
Amount:
Period:
Situation:
Customer:
Bejaia,
ALGERIA
NAFTAL
2009
2012
Large scale project
(> 6,000,000 $)
(Three years)
Description
Full turn-key extension and renovation contract to design, supply, erect and start up:
LPG filling hall :
- 2x 1200 bottles/hour Butane B13 lines and 1x 120 bottles/hour Butane B3 line
- 1x 480 bottles/hour Propane P35 line & 2 maintenance lines
Siraga Engineering - p. 14
Siraga Engineering - p. 15