EXPANSION OF 53 KV NETWORK =
IN AL AIN REGION Ses
CONTRACT NO. A
ns
[Ms LARSEN & TOUBRO LTD, ECC DIVISION
P.O. fox 30805,
Abu Dhabi, UAL.
Ata, Projet Manager
Document Transmittal Ref, :DTS-1266 | Comment Sheet Ref, + 5-126
Suberission Dae 16062015. | Date rorzots
Reecip Date 17.06.2015 | Previous Status =
[amber of Working
Days with OLP 20 days
" DOC /DRWG Title oe
tem spNo, | Rev Status | et | Comment
S3/TTRV Al Mohayer Primary SS |p 595 on
1 | Fire-fighting Pipe Trench & Duct | MIOPSOEM-| 9 | AEN
Bank Design Caleulations|
STATUS: AP = Approved
[AEN = Approved Except as Noted
NA = Not Approved
FIO. = Fos laformaion Only or Not Subject o Approval
RET = Drawing retired with this DISCOM YeuNo
COMMENT:
1+ Base slab thickness for fire pipe trench is considered inthe design calculations as 250,
rm thick. Henoe base slab’s thickness shall be inereased rom 225 mm to 250 mm in
the structural drawings via DTS-1159 in compliance wih structural ealulations,
2+ RC walls thickness fr fire pipe trench is considered in the design eleulations as 250,
1mm thick. Hence walls thickness shall be iereasd from 225 mm ¥ 250 men in the
structural drawings via DTS-1159 in compliance wit structural calcalations.
3+ Design ealeulations output for fre pipe trench base slab are T12 @ 12S mm CIC for
bottom and top reinforcement. Hence reinforcement detls fr ire tench base slab
via DTS-159 shall be revised in compliance with structural calculations.
‘+ Design calculations output for fire pipe tench RC walls are T12 @ 100 mm CAC for
both wall faces’ reinforcement. Hence reinforcement details for fire trench walls via
DIS-1159 shall be revised in compliance with structural calculations
‘aman ne it yh pn a mag to po ob ee
‘ions prscom ase CZ iS Page Lot?EXPANSION OF 33 KV NETWORK
ALAIN REGION
720 for
CONTRACT NO. A~ 10825
forcement details for pre-ast cover slab via
5+ Design calculations output for fre trench pre-cast cover slab are 6 nos
bottom and top reinforeement. Hence
DTS-1159 shall be revised in compliance with structural calculations
Signed
For OLPLIC For AADC
Ce: AADC Projects Delivery Division Manager OLP Site Office
‘Sc Wai oman pl a ioe em Tes in eo Crt ae
set Ny enon at en pact
Page 02
{10325 DISCOM 1266