Sei sulla pagina 1di 2
EXPANSION OF 53 KV NETWORK = IN AL AIN REGION Ses CONTRACT NO. A ns [Ms LARSEN & TOUBRO LTD, ECC DIVISION P.O. fox 30805, Abu Dhabi, UAL. Ata, Projet Manager Document Transmittal Ref, :DTS-1266 | Comment Sheet Ref, + 5-126 Suberission Dae 16062015. | Date rorzots Reecip Date 17.06.2015 | Previous Status = [amber of Working Days with OLP 20 days " DOC /DRWG Title oe tem spNo, | Rev Status | et | Comment S3/TTRV Al Mohayer Primary SS |p 595 on 1 | Fire-fighting Pipe Trench & Duct | MIOPSOEM-| 9 | AEN Bank Design Caleulations| STATUS: AP = Approved [AEN = Approved Except as Noted NA = Not Approved FIO. = Fos laformaion Only or Not Subject o Approval RET = Drawing retired with this DISCOM YeuNo COMMENT: 1+ Base slab thickness for fire pipe trench is considered inthe design calculations as 250, rm thick. Henoe base slab’s thickness shall be inereased rom 225 mm to 250 mm in the structural drawings via DTS-1159 in compliance wih structural ealulations, 2+ RC walls thickness fr fire pipe trench is considered in the design eleulations as 250, 1mm thick. Hence walls thickness shall be iereasd from 225 mm ¥ 250 men in the structural drawings via DTS-1159 in compliance wit structural calcalations. 3+ Design ealeulations output for fre pipe trench base slab are T12 @ 12S mm CIC for bottom and top reinforcement. Hence reinforcement detls fr ire tench base slab via DTS-159 shall be revised in compliance with structural calculations. ‘+ Design calculations output for fire pipe tench RC walls are T12 @ 100 mm CAC for both wall faces’ reinforcement. Hence reinforcement details for fire trench walls via DIS-1159 shall be revised in compliance with structural calculations ‘aman ne it yh pn a mag to po ob ee ‘ions prscom ase CZ iS Page Lot? EXPANSION OF 33 KV NETWORK ALAIN REGION 720 for CONTRACT NO. A~ 10825 forcement details for pre-ast cover slab via 5+ Design calculations output for fre trench pre-cast cover slab are 6 nos bottom and top reinforeement. Hence DTS-1159 shall be revised in compliance with structural calculations Signed For OLPLIC For AADC Ce: AADC Projects Delivery Division Manager OLP Site Office ‘Sc Wai oman pl a ioe em Tes in eo Crt ae set Ny enon at en pact Page 02 {10325 DISCOM 1266

Potrebbero piacerti anche