Sei sulla pagina 1di 82

SEM

DIA

RESUMEN DE TRABAJOS DE
MANTENIMEINTOS PROGRAMADOS
MES DE DICIEMBRE
AREA

GRUPO

SISTEMA

EQUIPO

TIPO OT

MOTIVO

TIPO MANT

HORARIO EJECUTADO
Inicial

BOP

GEN ERADOR DE
EMERGENCIA

INSPEC CION Y AJUSTE D E L AS C ON EXIONES ELC TRICAS DEL SISTEMA D E C ON TROL Y


SISTEMA DE POTENCIA; C OMPR OBAR EL FUN CION AMIEN TO D E LOS VEN TILAD OR ES;
AJU STE DE BORN AS Y MEDICION D E TENSION DE BATERIAS

PR

PREV

BOP

PCI

ESPUMOGENO

INSPECCIONAR LAS VLVULAS DE CONTROL (SI ESTN ENCLAVADAS)

PR

PREV

SEMANA N 48

Thu 3

I&C

SEMANA N 48

Thu 3

MEC

SEMANA N 48

Thu 3

ELEC

ELECT

SEMANA N 48

Thu 3

I&C

EJECU TADO
SI /NO

TIEMPO TOTAL

Final

09:00:00 a.m.

08:00:00 a.m.

12:00:00 p.m.

03:00:00 a.m. SI

10:00:00 a.m.

02:00:00 a.m. SI

TG1

C ALEFAC CIN EN FR IAMIENTO Y


VEN TIL ACIN

TERMOSTATO

INSPECCION DE TERMOSTATO Y CALIBRACION DE SER REQUERIDO

PR

PREV

12:00:00 p.m.

01:30:00 a.m. SI

BOP

AIRE COMPRIMIDO

COMPRESORES 1 Y 2

LIMPIEZA SUPERFICIAL, FILTROS EXTERIORES Y PURGADO MANUAL

PR

PREV

11:00:00 a.m.

02:00:00 a.m. SI

SEMANA N 48

Thu 3

MEC

TG1

C ALEFAC CIN EN FR IAMIENTO Y


VEN TIL ACIN

AIRE ACONDICIONADO

INSPECCION Y LIMPIEZA DE FILTROS DE AIRE ACONDICIONADOS

PR

PREV

SEMANA N 48

Thu 3

I&C

TG1

CEMS

CEMS

VER IFICACIN Y/O CALIBRAC IN CON GASES PATR N D E L A MEDIDA DE SO2 , C O2 , O2 Y


N OX.

PR

PREV

02:00:00 p.m.

03:00:00 p.m.

01:00:00 a.m. SI

SEMANA N 48

Thu 3

I&C

TG1

CEMS

CEMS

VERIFICACION Y AJUSTE MANUAL DE CERO DEL OPACMETRO SI SE NECESARIO.

SEMANA N 48

Thu 3

MEC

BOP

GENER ADOR DE
EMER GEN CIA

10:30:00 a.m.

09:00:00 a.m.

NO SE REALIZO Quedando pendiente de reprogramar

PR

PREV

03:00:00 p.m.

04:00:00 p.m.

01:00:00 a.m. SI

MOTOR Y GENERADOR

L IMPIAR POLVO O H UMEDAD EN EL INTERIOR DEL CONTENED OR ; INSPECC ION VISU AL


D EL SISTEMA D E ESC APE, ANCL AJES. C OMPR OBAR EL NIVEL DE ACEITE DE LU BRICACIN PR
EN EL MOTOR ; COMPROBAR EL NIVEL DEL REFRIGER ANTE D EL MOTOR; R EVISAR L OS
TESTIGOS DE FILTROS D E ADMISIN

PREV

02:30:00 p.m.

05:30:00 p.m.

03:00:00 a.m. SI

SEMANA N 48

Fri 4

MEC

BOP

PCI

BOMBA DIESEL

VER IFICACION AJU STE PER NOS D E ANC LAJE DE BOMBA; IN SPECCION DE INTERRU PTOR
FLOTAD OR D EL TANQUE COMBUSTIBL E; INSPEC CION D E MAN GU ERAS Y CONEC TORES
FLEXIBLES; LU BRICAR CAL ENTAD OR D E ACEITE; DR ENAJE DE FILTROS

PR

PREV

08:00:00 a.m.

10:00:00 a.m.

02:00:00 a.m. SI

SEMANA N 48

Thu 3

ELEC

ELECT

BOP

GEN ERADOR DE
EMERGENCIA

INSPEC CIN VISUA L D EL ESTADO GENER AL DEL AL TERN ADOR; C OMPR OBAR L AS
R ESISTEN CIAS D E C ALDEO; INSPEC CION AR AQUEL LAS PAR TES QUE PUDIERAN SU FR IR
D ESGASTE O C ON TAMIN ACIN EXTER NA; INSPEC CION AR LA EN TR ADA Y SALIDA DE AIRE

PR

PREV

01:00:00 p.m.

04:00:00 p.m.

03:00:00 a.m. SI

SEMANA N 48

Fri 4

ELEC

ELECT

MEDIA TENSION

IN TER RUPTOR DE
GEN ERACION

INSPECCION DE ARMARIO DEL MANDO DEL INTERRUPTOR

PR

PREV

09:00:00 a.m.

01:30:00 p.m.

04:30:00 a.m. SI

SEMANA N 48

Thu 3

I&C

TG1

CEMS

CEMS

C OMPR OBAR L OS EL EMENTOS DEL FILTRO DE PARTCUL AS Y CIDOS. C AMBIAR LOS SI SE


PR
OBSERVA H UMEDAD O SUCIEDAD .

PREV

04:00:00 p.m.

04:30:00 p.m.

12:30:00 a.m. SI

SEMANA N 48

Fri 4

MEC

BOP

PCI

VALVULAS

R EALIZAR L A VER IFICACIN DE AJU STE DE LOS PERNOS DE LA ESTR UCTUR A Y BRIDAS
D E L A VLVUL A, SI H AY DESGASTE R EMPLAZO

PR

PREV

10:00:00 a.m.

12:30:00 p.m.

02:30:00 a.m. SI

SEMANA N 48

Fri 4

MEC

TG1

L UBRICAC ION;
VALVULAS Y TUBERIAS
L UBRICAC ION, AGUA Y AIRE

INSPEC CION Y AJUSTE D E ACC ESOR IOS, C OL GAD OR ES Y ABRAZADERAS SUELTAS; TOMA
PR
D E VIBRAC IN

PREV

01:00:00 p.m.

03:30:00 p.m.

02:30:00 a.m. SI

SEMANA N 48

Fri 4

ELEC

ELECT

PCI

R EVISAR L A TENSION Y CORR IEN TE EN LAS BATER IAS;INSPECC IN DE L AS C ON EXIONES


BATERIAS DE BOMA DIESEL EN TANQUES DE ESPUMA; VER IFICAR NIVEL DE ELEC TR OL ITOS E INSPECC ION Y LIMPIEZA PR
GENER AL

SEMANA N 48

Fri 4

MEC

BOP

AGUA BRUTA Y PR E
TRATAD A

BOMBA DE DESCAR GA DE
AGU A / BOMBA D E AGUA
FILTRADA

INSPECCION DE MOTOR, REVISION DE FUGAS Y TOMA DE TEMPERATURA


VER IFICACION DE PRESIN DE DESCAR GA; IN SPECCION Y VERIFIC ACION DE RUIDO
INU SUAL O EXC ESIVO; TOMA DE VIBRACIONES Y AJUSTE D E EJE

PR

PREV

01:00:00 p.m.

03:00:00 p.m.

02:00:00 a.m. SI

PREV

03:40:00 p.m.

05:00:00 p.m.

01:20:00 a.m. SI

SEMANA N 48

Fri 4

MEC

TG1

SISTEMA DE EN VO DE
C OMBU STIBL E L QUIDO

BOMBAS CENTRIFUGAS

PR

PREV

05:00:00 p.m.

06:00:00 p.m.

01:00:00 a.m. SI

SEMANA N 48

Fri 4

ELEC

ELECT

PTA

BOMBAS DE ALTA PR ESION INSPECCION DE VALVULAS ELECTRICAS


OSMOSIS

PR

PREV

03:00:00 p.m.

05:00:00 p.m.

02:00:00 a.m. SI

05:30:00 p.m.

01:00:00 a.m. SI

SEMANA N 48

Thu 3

I&C

TG1

CEMS

CEMS

COMPROBAR LA CAPACIDAD DE ASPIRACIN DE LA BOMBA DE MUESTREO.

PR

PREV

SEMANA N 48

Fri 4

I&C

TG1

AIRE COMPRIMIDO

COMPRESORES 1 Y 2

L IMPIEZA EXTERNA DEL PANEL DE CONTROL; INSP ECCIN DE VLVU LAS SOLENOIDES DE
C OMPR ESOR , FILTROS Y TANQUE DE ALMACEN AMIEN TO; INSPEC CION AR
PR
FUN CION AMIEN TO CORREC TO DE LOS ACU MULAD OR ES D E A AGUA D E D RENAJE DE LOS
FILTR OS; IN SPECCIN DE VLVULAS DE ALIVIO

PREV

SEMANA N 48

Mon 30

I&C

BOP

PTA

EDI

R EVISIN D E CONEXION ES EN PANEL ES D E C ON TR OL Y FUER ZA D EL SISTEMA ED I Y


PANEL CONTROL Y FUER ZA EN SAL DE LA PTA

PREV

PR

04:30:00 p.m.

NO SE REALIZO Quedando pendiente de reprogramar

NO SE REALIZO Quedando pendiente de reprogramar

SEMANA N 48

Tue 1

I&C

BOP

ELECTRICO

P10, P20, PM1

D ESCARGA D E D ATOS DE MEDIDORES DE ENER GA PARA EL EN VIO AL C OES POR


OPERAC IONES .

PR

PREV

09:00:00 a.m.

05:00:00 p.m.

08:00:00 a.m. SI

SEMANA N 48

Wed 2

I&C

BOP

GENER ADOR DE
EMER GEN CIA

GDE

REVISIN DE ALARMAS AVTIVAS EN CONTROLADOR GPC

PR

PREV

09:00:00 a.m.

05:00:00 p.m.

08:00:00 a.m. SI

SEMANA N 48

Mon 30

MEC

TG1

WATER INJECTION

FILTRO D EL WATER
IN JECTION

C AMBIO DE POSIC ION DE FILTRO AL FILTRO REDU NDAN TE , EN EL SKID DE WATER


INJEC TION ,POR D IFEREN CIAL D E PR ESION ELEVADO

PR

PREV

09:00:00 a.m.

10:00:00 a.m.

01:00:00 a.m. SI

SEMANA N 49

Mon 7

ELEC

ELECT

AIRE COMPRIMIDO

SECADORES

C OMPR UEBE EL ESTADO DE LOS C ON DUC TOS Y CABL ES D E ALIMENTACIN EL ECTRICA,


VER IFICACIN Y /O AJUSTE DE BOR NES DE CONEXION ADO

PR

PREV

09:00:00 a.m.

12:00:00 p.m.

03:00:00 a.m. SI

SEMANA N 49

Mon 7

I&C

BOP

AIRE COMPRIMIDO

COMPRESSOR

INSPEC CION Y LIMPIEZA EXTER NA D EL PANEL DE CONTR OL , VLVUL AS SOLEN OIDES,


FILTR OS Y TANQUE DE AL MACENAMIENTO, INSPECC IONAR FUN CION AMIEN TO CORREC TO PR
D E L OS ACUMU LADORES D E A AGUA D E D RENAJE DE LOS FILTROS y VLVUL AS D E ALIVIO

PREV

01:00:00 p.m.

02:00:00 p.m.

01:00:00 a.m. SI

SEMANA N 49

Mon 7

I&C

TG1

C ALEFAC CIN EN FR IAMIENTO Y


VEN TIL ACIN

TERMOSTATO

INSPECCION DE TERMOSTATO Y CALIBRACION DE SER REQUERIDO

PR

PREV

02:00:00 p.m.

03:00:00 p.m.

01:00:00 a.m. SI

SEMANA N 49

Mon 7

MEC

BOP

AIRE COMPRIMIDO

COMPRESORES 1 Y 2

L IMPIEZA SUP ERFIC IAL , FILTROS EXTER IORES Y PU RGADO MAN UAL, INSPECC ION DE
MOTOR

PR

PREV

08:00:00 a.m.

12:00:00 p.m.

04:00:00 a.m. SI

SEMANA N 49

Mon 7

ELEC

ELECT

BOP

GEN ERADOR DE
EMERGENCIA

INSPEC CION Y AJUSTE D E L AS C ON EXIONES ELC TRICAS DEL SISTEMA D E C ON TROL Y


SISTEMA DE POTENCIA, C OMPR OBAR EL FUN CION AMIEN TO D E LOS VEN TILAD OR ES

PR

PREV

08:30:00 a.m.

01:30:00 p.m.

05:00:00 a.m. SI

SEMANA N 49

Mon 7

MEC

BOP

PCI

BOMBA DIESEL

R EVISAR PU RIFICAD OR D E AIRE, MANGUERAS DE REFRIGERANTE, VALVUL A SOLENOIDE


D E AGUA D E EN FR IAMIENTO, SISTEMA DE ESCAPE, TANQUE DE COMBUSTIBLE,
C ALENTADOR DE AGUA D E L A CH AQU ETA, C ARCASA, VERIFIC AR LA AUSEN CIA DE
PR
H UMEDAD Y AC UMUL ACION D E POLVO EN EL INTERIOR DE LA C ARCASA Y ALRE DEDOR,
AU SENCIA D E OBJETOS QUE PUED AN OBSTACUL IZAR LAS PARTES MOVILES DEL MOTOR.

PREV

01:00:00 p.m.

04:30:00 p.m.

03:30:00 a.m. SI

SEMANA N 49

Mon 7

MEC

BOP

PCI

BOMBA DIESEL

INSPEC CION D E TAMIZ, FILTR O, O CAN AL D E SED IMEN TOS O COMBINAC IN DE ESTOS,
INSPEC CION D E TUBO DE VENTILACIN DEL CRTER, IN SPECCION DE FILTRO D E AGUA ,
VER IFICAR AISL AMIENTO

PR

PREV

04:30:00 p.m.

05:30:00 p.m.

01:00:00 a.m. SI

SEMANA N 49

Tue 8

I&C

BOP

PCI

BOMBA DIESEL

C OMPR OBAR EL VOLTAJE, MEDIR CORRIENTE DE CONSUMO Y REGISTR AR LOS VALORE S


TOMADOS, VERIFIC AR CARGADOR Y RGIMEN D E C ARGA DE BATERIAS, VERIFIC ACIN
PR
Y/O AJUSTE DE CONEXIONES DE (MANGUERAS, TU BIN G, CONEXION ES EL ECTRICAS
R APID AS EN E L MOTOR .

PREV

01:30:00 p.m.

02:30:00 p.m.

01:00:00 a.m. SI

VALVUL AS D E BL OQU EO
MOTORIZAD AS

L IMPIEZA SUP ERFIC IAL DE VLVUL A, INSPECC IN DE NO PRECEN CIA DE ALAR MAS EN
D IPL AY LOCAL

IN TER RUPTOR DE
GEN ERACION
BOMA DIESEL

INSPECCION DE ARMARIO DEL MANDO DEL INTERRUPTOR

PR

PREV

03:30:00 p.m.

05:30:00 p.m.

VERIFICAR CAJA DE BORNES AJUSTES

PR

PREV

08:30:00 a.m.

03:30:00 p.m.

SEMANA N 49

Tue 8

I&C

BOP

GASOIL

PR

PREV

02:30:00 p.m.

03:30:00 p.m.

SEMANA N 49

Tue 8

ELEC

ELECT

MEDIA TENSION

SEMANA N 49

Tue 8

ELEC

ELECT

PCI

SEMANA N 49

Tue 8

MEC

BOP

GENER ADOR DE
EMER GEN CIA

MOTOR Y GENERADOR

VER IFICAR QUE LAS REJILL AS Y CONDU CTOS DE AIR E EN L A SAL A NO ESTN SU CIAS,
C OMPR OBAR EL ESTADO D E L OS FILTROS DE AIRE DE DEL MOTOR, VERIFICA R EL ESTADO
PR
D E L IMPIEZA DEL FILTR O PRIMARIO D E GASOIL EL IMINAN DO C UALQUIER TIPO DE
SED IMEN TO QU E SE PUD IE RA EN CON TRAR.

PREV

09:00:00 a.m.

11:00:00 a.m.

SEMANA N 49

Tue 8

MEC

BOP

GENER ADOR DE
EMER GEN CIA

MOTOR Y GENERADOR

C OMPR OBAR QUE TOD OS LOS DISPOSITIVOS MECN IC OS DE SEGURIDAD ESTN EN


PER FEC TO ESTADO, C OMPR OBAR IND IC ADORES DE RESTRICC ION DE FILTROS,
C OMPR OBAR L A NO EXIS TEN CIA DE POLVO O H UMEDAD EN EL INTERIOR D EL
C ON TEN EDOR

PREV

11:30:00 a.m.

01:00:00 p.m.

PR

SEMANA N 49

Tue 8

MEC

BOP

GASOIL

FILTRO DE CESTA

LIMPIEZA DE FILTRO DE CESTA

PR

PREV

SEMANA N 49

Tue 8

MEC

BOP

GASOIL

BOMBA DESCAR GA
COMBUSTIBL E

INSPECCION DE MOTOR Y ACOPLES, MEDIDA DE TEMPERATUA DE RODAMIENTOS

PR

PREV

SEMANA N 49

Wed 9

I&C

BOP

GASOIL

IN DICADOR DE PRESIN DE R EALIZAR L A INSPEC CIN D EL ESTADO D EL IND ICADOR Y C ON DICION ES D EL EQUIPO,
BOMBAS
VER IFICAR PERD ID AS

PR

PREV

SEMANA N 49

Wed 9

I&C

BOP

GASOIL

TR ANSMISOR ES
IN DICADOR DE NIVEL

PR

PREV

SEMANA N 49

Wed 9

ELEC

ELECT

PCI

R EVISAR L A TENSION Y CORR IEN TE EN LAS BATER IAS;INSPECC IN DE L AS C ON EXIONES


BATERIAS DE BOMA DIESEL EN TANQUES DE ESPUMA; VER IFICAR NIVEL DE ELEC TR OL ITOS E INSPECC ION Y LIMPIEZA PR
GENER AL

PREV

LIMPIEZA SUPERFICIAL DE INSTRUMENTO

01:00:00 p.m.

02:30:00 p.m.
09:00:00 a.m.

01:00:00 a.m. SI
02:00:00 a.m. SI
07:00:00 a.m. SI

02:00:00 a.m. SI

01:30:00 a.m. SI

06:30:00 p.m.

05:30:00 a.m. SI

03:00:00 a.m. SI

02:00:00 p.m.

05:00:00 a.m. SI

03:30:00 p.m.

07:30:00 a.m. SI

SEMANA N 49

Wed 9

ELEC

ELECT

PCI

SISTEMA DE ESPUMA

INSPECCIN DE LAS CONEXIONES ELECTRICAS Y AJUSTE DE BORNAS

PR

PREV

SEMANA N 49

Wed 9

I&C

BOP

GASOIL

TR ANS. IND IC ADORES DE


TEMPER ATUR A

LIMPIEZA SUPERFICIAL DE INSTRUMENTO

PR

PREV

08:00:00 a.m.
-

SEMANA N 49

Wed 9

MEC

BOP

DRENAJES GASOIL

BOMBAS

INSPECCION Y LIMPIEZA DE MOTOR, TOMA DE VIBRACIONES

PR

PREV

PARCIALMEN TE Se rea lizo l a insp eccio n de mo to r y aco ple s , la


toma de te mpera tu ras No se rea lizo p or ina ctivida d de l os
motore s, no estabn e n fu nci ona nmie nto y tamp oco se p udo
po nerl os en ma rcha po rque trab aja rian e n vacio

05:30:00 p.m.

NO SE REALIZO

NO SE REALIZO

SEMANA N 49

Wed 9

MEC

BOP

DRENAJES PTA

BOMBAS

INSPECCION Y LIMPIEZA DE MOTOR, TOMA DE VIBRACIONES

PR

PREV

SEMANA N 49

Wed 9

MEC

BOP

DRENAJES TG1

BOMBAS

INSPECCION Y LIMPIEZA DE MOTOR, TOMA DE VIBRACIONES

PR

PREV

PARCIALMEN TE El an ali sis vibra cion al ,No se re ali zo p or


in activid ad de l os motore s, no e sta bn en fu ncio nan mien to y
tampo co se pu do po nerl os en ma rcha po rque trab aja rian e n
vaci o SE REAL IZO L IMP IEZA E INSPECC ION DE MOTOR
PARCIALMEN TE El an ali sis vibra cion al No se re al izo po r
in activid ad de l os motore s, no e sta bn en fu ncio nan mien to y
tampo co se pu do po nerl os en ma rcha po rque trab aja rian e n
vaci o SE REAL IZO L IMP IEZA E INSPECC ION DE MOTOR
PARCIALMEN TE El an ali sis vibra cion al No se re al izo po r
in activid ad de l os motore s, no e sta bn en fu ncio nan mien to y
tampo co se pu do po nerl os en ma rcha po rque trab aja rian e n
vaci o SE R EALIZO LIMPIEZA E INSPEC CION D E MOTOR

SEMANA N 49

Thu 10

ELEC

ELECT

BT

TR ANSFOR MADORES
SECOS

L IMPIEZA EXTERIOR DEL TR ANSFOR MADOR, R EVISION D EL PANEL D E C ON TR OL Y


MED IC ION DEL TRANS FORMADOR

PR

PREV

SEMANA N 49

Thu 10

ELEC

ELECT

ATOMIZACION DE AIRE

TR ANSFOR MADORES
SECOS

INSPEC CION Y LIMPIEZA DE PAN EL D E C ON TR OL D E TRANSFORMADORES SEC OS DE


C OMPR ESOR ES D E ATOMIZAC ION DE AIR E

PR

PREV

SEMANA N 49

Thu 10

MEC

TG1

CCW

MOTOR

ANLISIS DE VIBRACIONES, ANLISIS TERMO GRAFICO

PR

PREV

08:30:00 a.m.

11:30:00 a.m.

PARCIALMEN TE Se Re ali zo ana lisi s termo grafi co,que dan do


03:00:00 a.m. pe ndi ente l a to ma de vib racio nes po r fa lla e n el transd uctor de l
eq uip o de vib racio nes

SEMANA N 49

Thu 10

MEC

TG1

CCW

BOMBAS

R EVISIN DE FUGA S POR SELL O MECN IC O, VERIFICAC IN DE ESTAD O DE TUBERAS Y


VL VU LAS, ANL ISIS DE VIBRACIONES

PR

PREV

01:30:00 p.m.

03:30:00 p.m.

meca nico s ,veri fi cacio n de l estado d e las tub eria s qu eda ndo
02:00:00 a.m. pe
ndi ente l a to ma d evib racio nes po r fa lla e n el transd uctor de l

SEMANA N 49

Thu 10

MEC

TG1

CCW

IN TER CAMBIADORES DE
CALOR EN MODUL OS
AUXILIARES

INSPEC CION Y REVISION D E FUGAS EN COSTU RAS Y JU NTAS, INSP ECCION Y REVISION D E
C OR ROSIN Y EROSIN EN ALETAS Y TUBOS, INSPEC CION Y REVISION D E PIEZAS,
PR
POSIBLES DA OS

PREV

SEMANA N 49

Thu 10

I&C

BOP

GASOIL

PREV

NO SE REALIZO
NO SE REALIZO

PARCIALMEN TE Se rea lizo l a revisi on d efu gas po r se llo s


eq uip o de vib racio nes

EDIDOR DE FL UJO
CORIOL IS

R EALIZAR L A INSPEC CIN D EL ESTADO D E TRAN SMISORES, CONDICIONES DEL EQUIPO,


TUBER A S FLEXIBLES Y R GIDAS DE CONEXIN EL CTRICA, LIMPIEZA SU PERFIC IAL D E
INSTRU MENTO

SEMANA N 49

Thu 10

I&C

BOP

GASOIL

IN DICADOR DE PRESION
DIFER ENCIAL

L IMPIEZA SUP ERFIC IAL DE INSTRUMEN TO, R EALIZAR L A INSPEC CIN D EL ESTADO D EL
IND IC ADOR Y COND IC IONES D EL EQUIPO,

SEMANA N 49

Fri 11

MEC

TG1

SISTEMA DE ACEITE
L UBRICAN TE

VENTIL ADOR ELIMIN ADOR L IMPIEZA DE ALOJAMIENTO DE VENTILADOR, IN SPECCION Y AJUSTE DE PERNOS DE
DE ROCO
MONTAJE, VERIFIC ACION D E R UIDO POR VIBRAC IN EXCESIVA Y TOMA DE VIBR ACION ES

SEMANA N 49

Fri 11

I&C

BOP

AGUA DESMINERALIZADA

SEMANA N 49

Fri 11

ELEC

TG1

SEMANA N 49

Wed 9

I&C

BOP

PR

08:00:00 a.m.

03:30:00 p.m.

01:30:00 p.m.

No se realizo per se ejecuto el lunes 14

07:30:00 a.m. SI

PR

PREV

PR

PREV

TANQUE DE AGUA DEMI

INSPEC CIN Y LIMPIEZA EXTER NA D E VALVULAS D E BL OQUEO, VLVU LAS DE CONTROL E


PR
ISNTRU MENTOS (PI, PDT, L TC, PDIS, ATC, LI); REVISIN DE CABLES, CONEXION ES
FIFTING, TUBERIAS POR PRESENC IA DE COROCIN

PREV

08:00:00 a.m.

12:30:00 p.m.

04:30:00 a.m. SI

ARRANQUE ESTATICO

TR ANSFOR MADOR DE
AISL AMIEN TO

R EVISION DEL PANEL DE CONTROL CABLEAD O INTERNO, SISTEMA DE R ADIADORES DE


R EFR IGERAC ION QU E TRABAJE N ADE CUADA ME NTE, REVISION D E C ON ECTOR ES A
TIERRA, TER MIN ALES Y CABL E EN BU EN ESTADO, VER IFICAR EL INDICAD OR D E N IVEL DE PR
AC EITE

PREV

01:00:00 p.m.

04:30:00 p.m.

03:30:00 a.m. SI

SISTEMA GASOIL

VALVULA MOTORIZADA

VL VU LA MOTOR IZADA DE IN GR ESO DE COMBUSTIBLE A TANQUE 01 APARECE CON


AN OMAL A ELC TR IC A

PR

PREV

08:00:00 a.m.

01:30:00 p.m.

05:30:00 a.m. SI

03:30:00 p.m.

02:00:00 a.m. SI

No se realizo per se ejecuto el lunes 14

SEMANA N 50

Mon 14

I&C

BOP

AGUA BRUTA Y PR E
TRATAD A

FILTROS D E C ARBON
ACTIVO

VER IFICAR AJUSTE DE FIFTING Y LIMPIEZA SUPERFICIAL DE LOS INSTRU MENTOS;


MONITOR EAR LOS PARAMETROS DE OPER ACIN DE LOS INSTRU MENTOS AT CON LOS
AN ALISADORES PORTATIL

PR

PREV

08:30:00 a.m.

02:30:00 p.m.

06:00:00 a.m. SI

SEMANA N 50

Mon 14

I&C

BOP

AGUA BRUTA Y PR E
TRATAD A

BOMBA DE DESCAR GA DE
AGU A

VER IFICACIN DE LOS PARMETROS DE OPERACIN DE LOS INSTRU MENTOS Y E QU IPOS;


C ON TASTAR C ON SAL A DE CONTROL PAR AMETR OS D E OPERAC IN; IN SPECCIN Y
PR
L IMPIEZA EXTERNA DE VAL VU LAS DE BLOQU EO, VLVULAS D E C ON TR OL E
ISNTRU MENTOS (PI, PTC, FQIT, PDIS, ATC, CV)

PREV

03:30:00 p.m.

05:00:00 p.m.

01:30:00 a.m. SI

SEMANA N 50

Mon 14

MEC

TG1 / BOP

TODOS

EQUIPOS ROTATIVOS

LUBRICACION DE EQUIPOS ROTATIVOS DE PLANTA

PR

PREV

08:00:00 a.m.

10:30:00 a.m.

02:30:00 a.m. AVANC E AL 50 % SE C ON TINU O EL DIA 1 5 Y EL SE R EALIZO


EL MARTES 1 5 EL 50% R ESTANTE

SEMANA N 50

Mon 14

MEC

TG1

SISTEMA DE ACEITE
L UBRICAN TE

BOMBAS DE ACEITE
LUBR IC ANTE

INSPECCION Y VERIFICACION DE RUIDO EXCESIVO

PR

PREV

10:30:00 a.m.

12:30:00 p.m.

,SE R EALIZO LA IN STALACION DE UN SEL LO MEC ANICO EN


02:00:00 a.m. EL MANHOLE D EL TAN QU E D E AGUA DEMI ,AVISO
N 100 001 62

SEMANA N 50

Mon 14

MEC

TG1

SISTEMA DE ACEITE
L UBRICAN TE

IN TER CAMBIADORES DE
CALOR

INSPEC CION Y AJUSTE D E FUGAS; INSPEC CION Y VERFICACION DE AGUA CONTAMINADA

PR

PREV

12:30:00 p.m.

03:00:00 p.m.

,SE R EALIZO LA CORRECC ION DE L A FUGA EN EN LA


02:30:00 a.m. VALVU LA D E E NTRADA DE AGUA AFILTROS CARTUC HO
ATEN DIENDO EL ,AVISO N 10 000 161

SEMANA N 50

Mon 14

MEC

TG1

SISTEMA DE ACEITE
L UBRICAN TE

ELIMINADOR DE ROCO

INSPEC CION Y VERFICACION DE FU GAS DE VAPOR D E ACEITE; INSPECC ION Y LIMPIEZA


D E FILTR O; IN SPECCION DE CONDICIN DEL LEC HO D E FIBRA D EL ELEMENTO D E FILTRO

PR

PREV

03:30:00 p.m.

05:00:00 p.m.

01:30:00 a.m. SE REALIZO EL MIERCOLES 16

SEMANA N 50

Tue 15

ELE

ELECT

MT

INTERRUPTORES 6.6 KV

C OMPR OBAR EL FUN CION AMIEN TO DE LA R ESISTENC IA DE CALEFACCION EN LAS


C ELDAS Y EL TERMOSTATO ESTE AJUSTAD O A SU VALOR.

PR

PREV

08:30:00 a.m.

10:30:00 a.m.

02:00:00 a.m. SI

INTERRUPTORES 6.6 KV

C OMPR OBAR QUE L OS INTERRU PTORES DE ALIMETACIONES DE CONTROL Y FUERZA


ESTAN CERR ADOS

SEMANA N 50

Tue 15

ELE

ELECT

MT

PR

PREV

10:30:00 a.m.

12:30:00 p.m.

02:00:00 a.m. SI

SEMANA N 50

Tue 15

ELE

ELECT

MT

INTERRUPTORES 6.6 KV

VERIFICACION DE LOS ANALIZADORES DE REDES ( MEDIDORES ) EN FUNCIONAMIENTO

PR

PREV

01:30:00 p.m.

03:30:00 p.m.

02:00:00 a.m. SI

SEMANA N 50

Tue 15

ELE

ELECT

MT

INTERRUPTORES 6.6 KV

REVISION DE LOS RELES DE PROTECCION MULTILIN 350 OPERATIVOS

PR

PREV

03:30:00 p.m.

04:30:00 p.m.

01:00:00 a.m. SI

SEMANA N 50

Tue 15

ELE

ELECT

MT

BARRA DE FASE AISLADA

MONITOR EO EN EL PAN EL DE SIN CRONIZACION MAR K VI EN EL PEECC; VERIFICAR


ESTADO D E R ESISITENC IAS ( CALD EOS )

PR

PREV

04:30:00 p.m.

05:30:00 p.m.

01:00:00 a.m. SI

SEMANA N 50

Tue 15

MEC

TG1

HIDRAULICO

VLVULAS DE DESCARGA

TOMA DE VIBRACIN Y REVICION DE FUGAS

PR

PREV

08:00:00 a.m.

10:30:00 a.m.

02:30:00 a.m. SI

SEMANA N 50

Tue 15

MEC

TG1

HIDRAULICO

FILTROS D E ACEITE
LUBR IC ANTE

INSPECCION DE COSTURAS Y JUNTAS

PR

PREV

10:30:00 a.m.

12:30:00 p.m.

02:00:00 a.m. SI

SEMANA N 50

Tue 15

MEC

TG1

HIDRAULICO

FILTROS D E ACEITE
HIDRU LICO /ELEVACIN

INSPECCION DE COSTURAS Y JUNTAS

PR

PREV

12:30:00 p.m.

03:00:00 p.m.

02:30:00 a.m. SI

SEMANA N 50

Tue 15

MEC

TG1

SISTEMA DE ACEITE D E
EL EVAC IN Y ACEITE
H ID RUL IC O

BOMBA DE SUMINISTR O
HIDRU LICO

INSPECCION, TOMA DE VIBRACIONES; AJUSTE EN EL EJE Y LAS BRIDAS DE MONTAJE

PR

PREV

03:30:00 p.m.

05:00:00 p.m.

01:30:00 a.m. SI

SEMANA N 50

Wed 16

I&C

BOP

AGUA BRUTA Y PR E
TRATAD A

C ON TASTAR C ON SAL A DE CONTROL PAR AMETR OS D E OPERAC IN; IN SPECCIN Y


BOMBA DE AGUA FILTRADA L IMPIEZA EXTERNA DE VAL VU LAS DE BLOQU EO, VLVULAS D E C ON TR OL E
ISNTRU MENTOS (PI, PTC, FQIT, PDIS, ATC, CV)

PR

PREV

08:30:00 a.m.

02:30:00 p.m.

06:00:00 a.m. SI

SEMANA N 50

Wed 16

I&C

BOP

AGUA BRUTA Y PR E
TRATAD A

TANQUE DE AGU A BRU TA 1 / C ON TASTAR C ON SAL A DE CONTROL PAR AMETR OS D E OPERAC IN; IN SPECCIN Y
L IMPIEZA EXTERNA DE VAL VU LAS DE BLOQU EO, VLVULAS D E C ON TR OL E
2
ISNTRU MENTOS (PI, PTC, FQIT, LTC , PDIS, ATC, LI); R EVISIN DE CABLES, CONEXION ES

PR

PREV

03:30:00 p.m.

05:00:00 p.m.

01:30:00 a.m. SI

10:30:00 a.m.

02:00:00 a.m. SI

12:30:00 p.m.

02:00:00 a.m. SI

VER IFICACIN DE LOS PARMETROS DE OPERACIN DE LOS INSTRU MENTOS Y E QU IPOS;

FIFTING, TUBERIAS POR PRESENC IA DE CORROCIN


SEMANA N 50

Wed 16

ELE

TG1

MT

SECCIONADOR DE
AISL AMIEN TO

R EVISAR EL ESTADO D E L OS PUL SADORES E IN DICADORES (LED ) D E SE ALIZAC ION;


L IMPIEZA DEL PANEL DE CONTROL; COMPROBAR QU E L AS PUERTAS DEL ARMAR IO DEL
INTERR UPTOR ESTEN CE RRADA S

PR

PREV

SEMANA N 50

Wed 16

ELE

ELECT

PCI

BOMA DIESEL

INSPEC CION , L IMPIEZA Y C OMPR OBAC ION DE VOLTAJE AD ECUAD O PARA EL EQUIPO EN
TABLERO

PR

PREV

SEMANA N 50

Wed 16

ELE

ELECT

PCI

BATERIAS DE BOMA DIESEL INSPECCION, LIMPIEZA, VERIFICAR NIVEL DE ELECTROLITOS; AJUSTE DE TERMINALES

PR

PREV

PR

PREV

01:30:00 p.m.

03:30:00 p.m.

02:00:00 a.m. SI

PR

PREV

08:00:00 a.m.

12:30:00 p.m.

04:30:00 a.m. SI

SEMANA N 50

Wed 16

ELE

ELECT

PCI

BOMBA ELECTRICA

INSPEC CION , L IMPIEZA Y C OMPR OBAC ION DE VOLTAJE AD ECUAD O PARA EL EQUIPO EN
TABLERO

SEMANA N 50

Wed 16

MEC

BOP

AGUA BRUTA Y PR E
TRATAD A

BOMBA DE DESCAR GA DE
AGU A

INSPEC CION D E MOTOR ; INSPECC ION VISUAL DE FUGAS; CH EQU EAR TEMPER ATUR A DE
MOTOR

08:30:00 a.m.

10:30:00 a.m.

NO SE REALIZO SE REPROGRAMO PARA LA SEMANA 51

SEMANA N 50

Wed 16

MEC

BOP

AGUA BRUTA Y PR E
TRATAD A

SIST.DE BOMBEO Y
RECIRC ULAC ION

INSPECCION DE MOTOR

PR

PREV

12:30:00 p.m.

03:30:00 p.m.

03:00:00 a.m. SI

SEMANA N 50

Wed 16

ELE

ELECT

PCI

BOMBA YOCKEY

INSPECCION DE CAJA DE BORNES, AJUSTES Y LIMPIEZA DE CONTACTOS

PR

PREV

03:30:00 p.m.

04:30:00 p.m.

01:00:00 a.m. SI

SEMANA N 50

Wed 16

MEC

BOP

AGUA BRUTA Y PR E
TRATAD A

BOMBAS DOSIFICAD OR AS
DE HIPOC LORITO

C OMPR OBAR L A ESTAN QU EID AD DE TODA LA U NIDAD DE TRANSPORTE, EN ESPEC IAL D EL


ORIFIC IO DE FU GAS ; COMPROBAR LA INTEGRIDAD DE LAS CONEXIONES ELC TR IC AS;
C OMPR OBAR L A INTEGRIDAD DE LA CARC ASA; COMPRU EBAR QU E L OS TOR NILLOS DEL PR
C ABEZAL D OSIFIC ADOR ESTN BIEN APRETAD OS; COMPRUEBE EL TUBO D E PR ESIN Y
EL TUBO DE BYPASS NO TENGAN DOBLE CES.

PREV

05:30:00 p.m.

02:00:00 a.m. SI

SEMANA N 50

Thu 17

I&C

ELECT

GENER ADOR DE
EMER GEN CIA

PLC

INSPEC CION D E C ABLEAD O ENTRE EL PCL Y OTROS EQUIPOS, C OMPR OBAN DO QUE NO
ESTN SU ELTOS O HACIEND O UN MAL C ON TACTO.

PR

PREV

02:30:00 p.m.

06:00:00 a.m. SI

SEMANA N 50

Thu 17

I&C

BOP

PTA

PANEL DE CONTROL

REVISAR LOS CONTROLADORE ESTEN FUNCIONANDO CORRETAMENTE SIN ALARMAS.

PR

PREV

SEMANA N 50

Thu 17

ELE

ELECT

TG1

TR ANSFOR MADOR DE
EXITACION

VER IFICACION DE LOS MEDIDORES DE DEVANADOS Y ACEITE SE ENCU ENTREN


OPERATIVOS; R EVIS ION DEL PANEL DE CONTROL CABLEAD O INTERNO; R EVISION DEL
SISTEMA DE R ADIADORES DE REFRIGER ACION QUE TRABAJEN CORR ECTAMEN TE;
PR
R EVISION DE LOS CONECTORES A TIERRA,TERMINAL ES Y CABLE EN BU EN ESTADO;
VER IFICACION DE LA VALVUL AS D E L LENAD O Y VACIADO DE ACEITE; VERIFICAC ION DE EL
IND IC ADOR DE NIVEL DE AC EITE SE ENC UENTRE EN FUNC IONA MIEN TO

PREV

03:30:00 p.m.

08:30:00 a.m.

NO SE REALIZO

NO SE REALIZO SE REPROGRAMO PARA LA SEMANA 51

SEMANA N 50

SEMANA N 50

Thu 17

MEC

BOP

AGUA DESMINERALIZADA

BOMBA D E AGUA
DESMINERAL IZADA

INSP COPLES Y E STOPAS; VERIFIC AJUSTE PERNOS DE AN CLAJE DE BBA; INSP Y L IMP
FILTR O DE AGU A EN Y

PR

PREV

08:00:00 a.m.

12:30:00 p.m.

04:30:00 a.m. SI

Thu 17

MEC

BOP

AGUA DESMINERALIZADA

TANQUE DE AGUA DEMI

REVISIN DE CONEXIONES MECNICAS POR FUGAS.

PR

PREV

12:30:00 p.m.

03:30:00 p.m.

03:00:00 a.m. SI

PREV

03:30:00 p.m.

05:30:00 p.m.

02:00:00 a.m. SI

SEMANA N 50

Thu 17

MEC

BOP

AGUA DESMINERALIZADA

SEMANA N 50

VALVULAS

INSPECCION DE VALVULAS ( VERIFICAR FUGAS ).

PR

PANEL C ON TR A INCEN DIO


LCI

NORMALIZACIN DE SISTEMA CONTRA INCENDIO EN CONTENEDOR LCI

PR

PREV

SEMANA N 51

Mon 21

ELECT

ELECT

PCI

BOMA DIESEL

INSPEC CION , L IMPIEZA Y C OMPR OBAC ION DE VOLTAJE AD ECUAD O PARA EL EQUIPO EN
TABLERO

PR

PREV

08:30:00 a.m.

01:30:00 p.m.

05:00:00 a.m. si

SEMANA N 51

Mon 21

ELECT

ELECT

TG1

IN TER RUPTOR DE
GEN ERACION

INSPECCION DE ARMARIO DEL MANDO DEL INTERRUPTOR

PR

PREV

01:30:00 p.m.

04:30:00 p.m.

03:00:00 a.m. si

SEMANA N 51

Wed 16

Mon 21

I&C

I&C

TG1

BOP

C OMPARTIMIEN TO L CI TUR BIN A

SISTEMA DE BOMBEO

INSPEC CIN Y LIMPIEZA EXTER NA D E VALVULAS D E BL OQUEO /L IMPIEZA EXTERNA DE


BOMBA DE POZO CAMOTE INSTRU MENTOS (PRESIN, FL UJO Y NIVEL)/REVISAR LOS EQUIPOS IN TER NOS D E L OS
PANEL ES EL ECTRICOS Y DE CONTROL.

PR

PREV

08:30:00 a.m.

11:30:00 a.m.

03:00:00 a.m. si

NO SE REALIZO

SEMANA N 51

Mon 21

I&C

BOP

PCI

BOMBA JOCKEY

C OMPR OBAR EL VOLTAJE, MEDIR CORRIENTE DE CONSUMO Y REGISTR AR LOS VALORE S


PR
TOMADOS.

PREV

11:30:00 a.m.

03:30:00 p.m.

04:00:00 a.m. si

SEMANA N 51

Mon 21

I&C

TG1

PCI

BOMBA ELECTRICA

C OMPR OBAR EL VOLTAJE, MEDIR CORRIENTE DE CONSUMO Y REGISTR AR LOS VALORE S


PR
TOMADOS.

PREV

03:30:00 p.m.

05:30:00 p.m.

02:00:00 a.m. si

08:30:00 a.m.

11:30:00 a.m.

03:00:00 a.m. si

PCI

SISTEMA DE ESPUMA

INSPEC CION AR LAS CAMAR AS D E EXPANSIN DE ESPUMA ,INSPECC IONAR L AS TUBER IAS PR
,APLICAC IN D E ANITIZICE SI LO NECEC ITARA, INSPEC ION DE SOPORTES

PREV

HVAC

FILTROS DE AIRE

VERIFICACION Y LIMPIEZA DE LOS FILTROS DEL AIRE

PREV

Tue 22

I&C

TG1

PTA

BACKWASH WATER /
FILTRO D E AREN A

VERIFICAR AJUSTE DE FIFTING Y LIMPIEZA SUPERFICIAL DE LOS INSTRUMENTOS

PR

PREV

08:30:00 a.m.

11:30:00 a.m.

03:00:00 a.m. si

Tue 22

I&C

TG1

PTA

FILTROS D E CARTUCHO

VERIFICAR AJUSTE DE FIFTING Y LIMPIEZA SUPERFICIAL DE LOS INSTRUMENTOS/

PR

PREV

11:30:00 a.m.

03:30:00 p.m.

04:00:00 a.m. si

SEMANA N 51

Mon 21

MEC

BOP

SEMANA N 51

Mon 21

MEC

TG1

SEMANA N 51
SEMANA N 51
SEMANA N 51

Tue 22

SEMANA N 51

Mon 21

MEC

BOP

SEMANA N 51

Tue 22

MEC

I&C

TG1

TG1

SEMANA N 51

Tue 22

ELECT

ELECT

SEMANA N 51

Tue 22

ELECT

ELECT

SEMANA N 51

SEMANA N 51

PI, FIT, PIS, FI, TI, AT, TIT,


PTA(OSMOSIS INVER SA I Y II) PH, VALVULAS DE
VERIFICAR AJUSTE DE FIFTING Y LIMPIEZA SUPERFICIAL DE LOS INSTRUMENTOS/
BLOQU EO, SOL ENOID ES
HVAC
FILTROS DE AIRE PLASMA VERIFICACION Y LIMPIEZA DE LOS FILTROS DEL AIRE
FILTROS D E AIRE
ATOMIZACION
INSPECCION Y LIMPIEZA DE FILTRO
COMPRIMID O
IN TER RUPTOR DE
TG1
REVISAR EL ESTADO DE LOS PULSADORES E INDICADORES (LED) DE SEALIZACION
GEN ERACION
IN TER RUPTOR DE
TG1
LIMPIEZA DEL PANEL DE CONTROL
GEN ERACION

PR

NO SE R EALIZO ,S E ATEND IO EL AVIS O 10 000 191 ,GOTEO DE


ACEITE D E L A L IN EA DEL SISTEMA HIDRAU LICO EN BERING
02 D EL GEN ERADOR

PREV

PR

PREV

PR

PREV

03:30:00 p.m.

05:30:00 p.m.

02:00:00 a.m. si

08:30:00 a.m.

11:30:00 a.m.

03:00:00 a.m. si

No se realizo

PR

PREV

08:30:00 a.m.

01:30:00 p.m.

05:00:00 a.m. si

PR

PREV

01:30:00 p.m.

04:30:00 p.m.

03:00:00 a.m. si

Wed 23

I&C

TG1

Tue 22

MEC

TG1

ATOMIZACION

PREENFRIADOR DE AIR E
DE ATOMIZAD O

TG1

SISTEMA DE AIRE DE
EN FR IMEINTO Y SELL ADO

FILTROS D E AIRE
COMPOR IMIDO

INSPECCION Y AJUSTE DE ACCESORIOS, COLGADORES Y ABRAZADERAS

PR

PREV

03:30:00 p.m.

05:30:00 p.m.

02:00:00 a.m. si

ELECT

PCI

BOMA DIESEL

INSPEC CION , L IMPIEZA Y C OMPR OBAC ION DE VOLTAJE AD ECUAD O PARA EL EQUIPO EN
TABLERO

PR

PREV

08:30:00 a.m.

01:30:00 p.m.

05:00:00 a.m. si

SISTEMA DE AIRE DE
EN FR IMEINTO Y SELL ADO

PR

PREV

SEMANA N 51

Tue 22

MEC

SEMANA N 51

Wed 16

ELECT

SEMANA N 51

Wed 23

MEC

TG1

PI, FIT, PIS, FI, TI, AT, TIT,


PH, VALVULAS DE
BLOQU EO, SOL ENOID ES

PR

PTA(SISTEMA D E
C ON SERVACION D E
MEN BRANAS)

VERIFICAR AJUSTE DE FIFTING Y LIMPIEZA SUPERFICIAL DE LOS INSTRUMENTOS

INSPECCION Y REVISION DE RENDIMIENTO

PR

PREV

03:30:00 p.m.

05:30:00 p.m.

02:00:00 a.m. si

PR

PREV

12:00:00 p.m.

03:30:00 p.m.

03:30:00 a.m. si

NO SE R EALIZO DEVIDO A QU E L AS VIBRAC IONES E TOMAN


CON LA TU RBINA EN GENER ACION Y A MAXIMA C ARGA.

TUBERAS

TOMA DE VIBRACIONES

SEMANA N 51

Wed 23

MEC

TG1

SISTEMA DE AIRE DE
EN FR IMEINTO Y SELL ADO

VLVULA DE PURGA D EL
COMPRESOR

INSPECCION Y AJUSTE

PR

PREV

08:00:00 a.m.

08:30:00 a.m.

12:30:00 a.m. si

SEMANA N 51

Wed 23

MEC

TG1

SISTEMA DE C OMBU STIBLE


L IQUIDO

BOMBAS DE COMPUSTIBLE INSPECCIONAR DE SELLO DEL EJE DE FILTRACIN


LIQU ID O

PR

PREV

08:30:00 a.m.

09:00:00 a.m.

12:30:00 a.m. si

SEMANA N 51

Wed 23

MEC

TG1

SISTEMA DE C OMBU STIBLE


L IQUIDO

DIVISOR DE FLUJO

INSPECCION Y AJUSTE DE FUGAS, RUIDO ANORMAL

PR

PREV

09:30:00 a.m.

11:00:00 a.m.

01:30:00 a.m. si

SEMANA N 51

Wed 23

MEC

TG1

SISTEMA DE C OMBU STIBLE


L IQUIDO

VLVULA DEL SELECTOR


DE LA BOQUILLA DE
COMBUSTIBL E

VERIFICACION DE OPERACIN DEL VSTAGO

PR

PREV

11:00:00 a.m.

11:30:00 a.m.

12:30:00 a.m. si

VLVULA DEL SELECTOR


DE LA BOQUILLA DE
COMBUSTIBL E

SEMANA N 51

Wed 23

MEC

TG1

SISTEMA DE C OMBU STIBLE


L IQUIDO

INSPECCION Y AJUSTE FUGAS EN LAS CONEXIONES

PR

PREV

02:00:00 p.m.

04:00:00 p.m.

02:00:00 a.m. si

SEMANA N 51

Thu 24

MEC

BOP

COMBUSTIBLE GASOIL

SISTEMA D E
TR ANSFERENC IA

INSPEC CION D E MOTOR ,INSPECC ION DE C OPL ES /REVISE SI LOS SELL OS DEL EJE
MEC NICO PR ESENTAN FUGA EXC ESIVA Y REEMPLC ELOS DE SER NECESAR IO

PR

PREV

08:30:00 a.m.

11:30:00 a.m.

03:00:00 a.m. si

SEMANA N 51

Thu 24

MEC

BOP

COMBUSTIBLE GASOIL

SISTEMA D E
TR ANSFERENC IA

COMPRUEBE QUE LA CIMENTACION Y LOS PERNOS DE SUJECION ESTEN AJUSTADOS

PR

PREV

12:00:00 p.m.

03:30:00 p.m.

03:30:00 a.m. si

SEMANA N 51

Thu 24

MEC

BOP

COMBUSTIBLE GASOIL

SISTEMA D E
TR ANSFERENC IA

COMPRUEBE LA ALINEACION DEL EJE

PR

PREV

03:30:00 p.m.

05:30:00 p.m.

02:00:00 a.m. si

SEMANA N 51

Thu 24

ELECT

ELECT

INTERR UPTOR AUTOMATICO

IN TER RUPTOR
AUTOMATICO

INSPEC CION AR LOS MOTOR ES DE AC CION AMIEN TO D EL SECCIONADOR


,VERIFIC AR EL AISLAMIENTO Y SECCIONADORES (P-A-T) PR UEBAS DE COMPROBACION

PR

PREV

01:30:00 p.m.

04:30:00 p.m.

03:00:00 a.m. si

SEMANA N 51

Thu 24

I&C

TG1

DRENAJES DE PLANTA

TG1

VER IFICAR LOS NIVELES DE LOS TANQUE SEPAR ADORES /LINPIEZA GEN ERAL DE LOS
EQUIPOS E INSTRU MENTOS.

PR

PREV

08:30:00 a.m.

11:30:00 a.m.

03:00:00 a.m. si

SEMANA N 51

Thu 24

I&C

TG1

DRENAJES DE PLANTA

PTA

VER IFICAR LOS NIVELES DE LOS TANQUE SEPAR ADORES /LINPIEZA GEN ERAL DE LOS
EQUIPOS E INSTRU MENTOS.

PR

PREV

11:30:00 a.m.

03:30:00 p.m.

04:00:00 a.m. si

PR

PREV

03:30:00 p.m.

05:30:00 p.m.

02:00:00 a.m. si

PR

PREV

SEMANA N 51

Thu 24

I&C

TG1

DRENAJES DE PLANTA

GASOIL

VER IFICAR LOS NIVELES DE LOS TANQUE SEPAR ADORES /LINPIEZA GEN ERAL DE LOS
EQUIPOS E INSTRU MENTOS.

SEMANA N 52

Mon 28

MEC

TG1

ENTRADA DE AIRE

PUERTA BY PASS

VERIFICACION DE SELLO APROPIADO

No se realizo

SEMANA N 52

Mon 28

MEC

TG1

COOLING WATER

BOMBAS

CAMBIO DE AQCEITE POR HORAS DE FUNCIONAMIENTO

PR

PREV

07:30:00 a.m.

11:30:00 a.m.

04:00:00 a.m. si

SEMANA N 52

Mon 28

ELECT

ELECT

MT

BARRA DE FASE AISLADA

MONITOR EO EN EL PAN EL DE SIN CRONIZACION MAR K VI EN EL PEECC; VERIFICAR


ESTADO D E R ESISITENC IAS ( CALD EOS )

PR

PREV

08:30:00 a.m.

11:30:00 a.m.

03:00:00 a.m. si

SEMANA N 52

Mon 28

ELECT

TG1

MT

SECCIONADOR DE
AISL AMIEN TO

R EVISAR EL ESTADO D E L OS PUL SADORES E IN DICADORES (LED ) D E SE ALIZAC ION;


L IMPIEZA DEL PANEL DE CONTROL; COMPROBAR QU E L AS PUERTAS DEL ARMAR IO DEL
INTERR UPTOR ESTEN CE RRADA S

PR

PREV

01:30:00 p.m.

04:30:00 p.m.

03:00:00 a.m. si

TANQUE DIESEL

VALVULAS

SEMANA N 52

Mon 28

I&C

BOP

PRUEBAS OPERATIVAS DE VALVULA MOTORIZADA 01EGD20AA351

PR

PREV

08:30:00 a.m.

11:30:00 a.m.

03:00:00 a.m. si

SEMANA N 52

Mon 28

I&C

TG1

PI, FIT, PIS, FI, TI, AT, TIT,


PTA(OSMOSIS INVER SA I Y II) PH, VALVULAS DE
BLOQU EO, SOL ENOID ES

VERIFICAR AJUSTE DE FIFTING Y LIMPIEZA SUPERFICIAL DE LOS INSTRUMENTOS/

PR

PREV

01:30:00 p.m.

04:30:00 p.m.

03:00:00 a.m. si

TG1

SISTEMAS DE CALOR DE
PU RGA DE ENTRA DA

INSPEC CION D E FUGA, VIBR ACIN , SOPOR TES ROTOS, AC CESORIOS SUEL TOS,
C OL GAD OR ES, ABRAZADER AS

SEMANA N 52

Mon 28

MEC

SEMANA N 52

Tue 29

MEC

TG1

SEMANA N 52

Tue 29

MEC

BOP

TUBERAS

PR

PREV

01:30:00 p.m.

05:00:00 p.m.

03:30:00 a.m. si

VIRADOR

VIRADOR

CAMBIO DE ACEITE POR HORAS DE FUNCIONAMIENTO

PR

PREV

07:30:00 a.m.

11:30:00 a.m.

04:00:00 a.m. si

PTA/BAC KWASH WATER /


PU MPS

VALVULAS

INSPECCION DE VALVULAS

PR

PREV

11:30:00 a.m.

01:30:00 p.m.

02:00:00 a.m. si

SEMANA N 52

Tue 29

MEC

BOP

PTA /AIR BLOWERS

SOPLANTES

R EVISAR FILTR OS
VER IFICAR FIL TRO DE ASPIRAC ION

PR

PREV

01:30:00 p.m.

02:30:00 p.m.

01:00:00 a.m. si

SEMANA N 52

Tue 29

MEC

BOP

PTA/OSMOSIS INVERS A I y II BOMBAS DE ALTA PRESION INSPECCION DE VALVULAS

PR

PREV

02:30:00 p.m.

03:00:00 p.m.

12:30:00 a.m. si

SEMANA N 52

Tue 29

ELECT

ELECT

TG1

TR ANSFOR MADOR DE
EXITACION

VER IFICACION DE LOS MEDIDORES DE DEVANADOS Y ACEITE SE ENCU ENTREN


OPERATIVOS; R EVIS ION DEL PANEL DE CONTROL CABLEAD O INTERNO; R EVISION DEL
SISTEMA DE R ADIADORES DE REFRIGER ACION QUE TRABAJEN CORR ECTAMEN TE;
PR
R EVISION DE LOS CONECTORES A TIERRA,TERMINAL ES Y CABLE EN BU EN ESTADO;
VER IFICACION DE LA VALVUL AS D E L LENAD O Y VACIADO DE ACEITE; VERIFICAC ION DE EL
IND IC ADOR DE NIVEL DE AC EITE SE ENC UENTRE EN FUNC IONA MIEN TO

PREV

08:30:00 a.m.

11:30:00 a.m.

03:00:00 a.m. si

SEMANA N 52

Tue 29

ELECT

ELECT

TG1

SELECTOR DE MANDO
REMOTO

VERIFICAR EL ESTADO DEL SELECTOR DE MANDO SE ENCUENTRE OPERATIVO

PREV

01:30:00 p.m.

04:30:00 p.m.

03:00:00 a.m. si

PR

SEMANA N 52

Tue 29

I&C

TG1

VIRADOR

88TG1

ATENCIO DE AVISO N 10000134 ,GOTEO D EACEITE EN SENSOR DE PROXIMIDAD

PR

PREV

08:30:00 a.m.

11:30:00 a.m.

03:00:00 a.m. si

SEMANA N 52

Tue 29

I&C

BOP

PTA

PANEL DE CONTROL

REVISAR LOS CONTROLADORES ESTEN FUNCIONANDO CORRETAMENTE SIN ALARMAS.

PR

PREV

01:30:00 p.m.

04:30:00 p.m.

03:00:00 a.m. si

SEMANA N 52

Tue 29

MEC

TG1

SISTEMA DE AIRE DE
EN TR ADA (TUR BINA)

PUERTA BYPASS

VERIFICAR SELLO APROPIADO

PR

PREV

SEMANA N 52

Tue 29

MEC

TG1

SISTEMAS DE CALOR DE
PU RGA DE ENTRA DA

AISL AMIEN TO DE LAS


TU BERAS

INSPECCION DE DAADO O FALTANTE EN AISLAMIENTO

PR

PREV

03:00:00 p.m.

04:00:00 p.m.

01:00:00 a.m. si

SEMANA N 52

Tue 29

MEC

BOP

WATER TREATMENT PL ANT


(PTA)

SOPLANTES

VERIFICCAR RUIDO

PR

PREV

04:30:00 p.m.

05:30:00 p.m.

01:00:00 a.m. si

No se realizo

SEMANA N 52

Wed 30

MEC

BOP

PTA

BOMBAS DE HIPOCLORITO INSPECCION VER POSIBLES FILTRACIONES

PR

PREV

07:30:00 a.m.

11:30:00 a.m.

04:00:00 a.m. si

SEMANA N 52

Wed 30

MEC

BOP

PTA

BOMBAS DE SOD A
CAUSTICA

INSPECCION DE VALVULAS VER POSIBLES FILTRACIONES

PR

PREV

11:30:00 a.m.

01:30:00 p.m.

02:00:00 a.m. si

SEMANA N 52

Wed 30

ELECT

ELECT

AIRE COMPRIMIDO, BARR A


FASE AISLAD A, PTA

TABLEROS ELECTRICOS

INSPECCION, LIMPIEZA Y AJUSTE DE BIRNAS DE TABLEROS ELECTRICOS

PR

PREV

08:30:00 a.m.

11:30:00 a.m.

03:00:00 a.m. si

SEMANA N 52

Wed 30

ELECT

ELECT

ELE

BATERAS (SALA PEEC C MOD ULO REDU NDAN TE)

INSPECCION Y LIMPIEZA , Y VERIFICACION DE NIVEL DE ELECTROLITOS

PR

PREV

01:30:00 p.m.

04:30:00 p.m.

03:00:00 a.m. si

SEMANA N 52

Wed 30

ELECT

ELECT

SAI

BATERAS

INSPECCION Y LIMPIEZA , Y VERIFICACION DE NIVEL DE ELECTROLITOS

PR

PREV

04:30:00 p.m.

05:30:00 p.m.

01:00:00 a.m. si

SEMANA N 52

Wed 30

I&C

TG1

PTA(SISTEMA D E
C ON SERVACION D E
MEN BRANAS)

PI, FIT, PIS, FI, TI, AT, TIT,


PH, VALVULAS DE
BLOQU EO, SOL ENOID ES

PR

PREV

08:30:00 a.m.

11:30:00 a.m.

03:00:00 a.m. si

VERIFICAR AJUSTE DE FIFTING Y LIMPIEZA SUPERFICIAL DE LOS INSTRUMENTOS

SEMANA N 52

Wed 30

I&C

TG1

DRENAJES DE PLANTA

TG1

VER IFICAR LOS NIVELES DE LOS TANQUE SEPAR ADORES /LINPIEZA GEN ERAL DE LOS
EQUIPOS E INSTRU MENTOS.

PR

PREV

01:30:00 p.m.

04:30:00 p.m.

03:00:00 a.m. si

SEMANA N 52

Wed 30

MEC

TG1

SISTEMA DE AIRE DE
EN TR ADA (TUR BINA)

PANTALLAS DE
ENTRADA/ELIMINADORES
DE ROCO

INSPECCION Y VERIFICACION DE OBSTRUCCIONES

PR

PREV

01:30:00 p.m.

02:30:00 p.m.

01:00:00 a.m. si

SEMANA N 52

Wed 30

MEC

TG1

COMBUSTIBLE GASOIL

BOMBA DE
TR ANSFERENC IA DE
COMBUSTIBL E

INSPECCION DE BOMBA DE REFRIGERANTE

PR

PREV

02:30:00 p.m.

03:00:00 p.m.

12:30:00 a.m. si

TANQUES DE AGUA BRUTA REVISION DE CONEXIONES MECANICAS POR FUGA

PR

PREV

07:30:00 a.m.

11:30:00 a.m.

04:00:00 a.m. si

BOMBA DE POZO CAMOTE VERIFICACION DE PERDIDAS DE AGUA . EN CONEXXIONES UNIONES BRIDAS.

PR

PREV

11:30:00 a.m.

01:30:00 p.m.

02:00:00 a.m. si

SEMANA N 52

Thu 31

MEC

BOP

AGUA BRUTA Y PR E
TRATAD A

SEMANA N 52

Thu 31

MEC

BOP

POZO CAMOTE

SEMANA N 52

Thu 31

I&C

TG1

DRENAJES DE PLANTA

PTA

VER IFICAR LOS NIVELES DE LOS TANQUE SEPAR ADORES /LINPIEZA GEN ERAL DE LOS
EQUIPOS E INSTRU MENTOS.

PR

PREV

08:30:00 a.m.

11:30:00 a.m.

03:00:00 a.m. si

SEMANA N 52

Thu 31

I&C

TG1

DRENAJES DE PLANTA

GASOIL

VER IFICAR LOS NIVELES DE LOS TANQUE SEPAR ADORES /LINPIEZA GEN ERAL DE LOS
EQUIPOS E INSTRU MENTOS.

PR

PREV

01:30:00 p.m.

04:30:00 p.m.

03:00:00 a.m. si

SEMANA N 52

Thu 31

MEC

TG1

SISTEMA DE C ON TR OL DE
L ABE GU A DE ENTRADA
(IGV) Y LABE DEL ESTATOR IGV Y VSV
VARIABLE (VSV)

INSPECCION Y AJUSTE DEL SISTEMA

PR

PREV

01:30:00 p.m.

02:30:00 p.m.

01:00:00 a.m. si

SEMANA N 52

Thu 31

MEC

BOP

WATER TREATMENT PL ANT


(PTA)

VERIFICCAR RUIDO

PR

PREV

02:30:00 p.m.

03:00:00 p.m.

12:30:00 a.m. si

SOPLANTES

MANTENIMIENTOS PR
ITEM DIA

AREA

GRUPO

SISTEMA

16-May-16

ELEC

ELEC

ELECTRICO

16-May-16

ELEC

ELEC

ELECTRICO

16-May-16

ELEC

ELEC

ELECTRICO

16-May-16

ELEC

ELEC

ELECTRICO

16-May-16

ELEC

ELEC

ELECTRICO

17-May-16

ELEC

ELEC

ELECTRICO

17-May-16

ELEC

ELEC

ELECTRICO

17-May-16

ELEC

ELEC

ELECTRICO

17-May-16

ELEC

ELEC

ELECTRICO

10

17-May-16

ELEC

ELEC

ELECTRICO

11

17-May-16

ELEC

ELEC

ELECTRICO

13

17-May-16 ELEC

ELEC

ELECTRICO

14

17-May-16 ELEC

ELEC

ELECTRICO

15

17-May-16 ELEC

ELEC

ELECTRICO

16

17-May-16 ELEC

ELEC

ELECTRICO

17
18

18-May-16
18-May-16

ELEC
ELEC

ELEC
ELEC

ELECTRICO
ELECTRICO

19

18-May-16

ELEC

ELEC

ELECTRICO

20

18-May-16

ELEC

ELEC

ELECTRICO

21

18-May-16

ELEC

ELEC

ELECTRICO

22

18-May-16

ELEC

ELEC

ELECTRICO

23

19-May-16

ELEC

TG1

TG1

24

20-May-16

ELEC

TG1

TG1

MANTENIMIENTOS PROGRAMADOS SEMANA 020

- PLANTA CENTRAL TERMICA RECKA

SUB SISTEMA

KKS

EQUIPO

TRAFO PRINCIPAL

01BBA10

TRAFO PRINCIPAL

TRAFO PRINCIPAL

01BBA10

TRAFO PRINCIPAL

TRAFO PRINCIPAL

01BBA10

TRAFO PRINCIPAL

BARRA DE FASE AISLADA

01BBA50

TRAFO PRINCIPAL

AT

L2167

LINEA DE TRASMISION

AT

L2167

LINEA DE TRASMISION

TRAFO PRINCIPAL

01BBA10

TRAFO PRINCIPAL

MT

01BBA10GS011

INTERRUPTOR PRINCIPAL DE
GABINETES

MT

01BBA10GS012

CELDA DE PROTECCION

MT

01BBA10GS031

CELDA DEL TRANSFORMADOR


DE AISLAMIENTO 01BPT10

MT

01BBA10GS041

CELDA DEL TRANSFORMADOR


DE EXCITACIN 01MKC20

MT

01BBT10

TRANSFORMADOR AUXILIAR

MT

01BBT10GH002

CAMBIADOR DE TOMAS

MT

01BBT10GH001

PANEL DE CONTROL

CAJA DE RESISTENCIA PARA


NEUTRO
LINEA DE TRASMISION
TRAFO PRINCIPAL

MT

01BBU10

AT
TRAFO PRINCIPAL

L2167
01BBA10

MT

01BBA10GS054

CELDA DEL TRANSFORMADOR


DE SERVICIOS 1 - 01BFT10

MT

01BBA10GS061

CELDA DEL TRANSFORMADOR


DE SERVICIOS 2 - 01BFT20

MT

01BBA10GS071

CELDA DEL TRANSFORMADOR


01BBT20

MT

01BBA10GS072

CELDA DEL TRANSFORMADOR


01BBT30

COMPARTIMIENTO DE TURBINA

23HT- 3A,3B

HEATER

AA/LF

JB-77F

JUNCTION BOX

CENTRAL TERMICA RECKA


DESCRIPCION

INSPECCION SENSORES DE TEMPERATURA DEL TRAFO PRINCIPAL


CAMBIO DE SILICA GEL EN EL TRAFO PRINCIPAL
PRUEBAS ELECTRICAS A TRAFO PRINCIPAL
DESCONEXION DE LA JUNTA DE LA BARRA DE FASE AISLADA
MANTENIMIENTO DE LA LINEA L2167
MANTENIMIENTO DE LA LINEA L2167
PRUEBAS ELECTRICAS A TRAFO PRINCIPAL
LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR
VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN T60 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS Y EL TERMOSTATO ESTE
AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN CERRADOS.
INSPECCION Y LIMPIEZA DE BUS BAR (COMPARTIMIENTO DE BARRA PRINCIPAL DE LAS CELDAS)

LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR


VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN 350 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS Y EL TERMOSTATO ESTE
AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN CERRADOS.

LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR


VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN 350 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS Y EL TERMOSTATO ESTE
AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN CERRADOS.

LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR


VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN 350 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS Y EL TERMOSTATO ESTE
AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN CERRADOS.

REVISAR EL PANEL DE CONTROL QUE LOS INDICADORES LED FUNCIONEN CORRECTAMENTE


VERIFICACION Y AJUSTES DE BORNES
REVISION DEL SISTEMA DE RADIADORES DE REFRIGERACION QUE TRABAJEN ADECUADAMENTE
VERIFICACION DE LOS CONECTORES A TIERRA Y TERMINAL EN BUEN ESTADO.
TANQUE DE EXPANSION DE ACEITE REVISAR QUE NO PRESENTE ANOMALIAS
RELE BUCHOLZ VERIFICAR QUE NO TENGA FUGAS Y TRABAJE CORRECTAMENTE
VALVULA SOBRE PRESION REVISAR QUE NO PRESENTE DERRAMES O FUGAS
VERIFICAR EL ESTADO DEL DESECANTE SILICA GEL

CAMBIADOR DE TOMAS COMPROBAR EL FUNCIONAMIENTO Y SU POSICIONN ACTUAL


MEDIDOR DE TEMPERATURA DE DEVANADOS Y ACEITE QUE SE ENCUENTREN OPERATIVOS.
CHEQUEO QUE LOS CABLES SE ENCUENTREN EN SUS BORNERAS Y AJUSTADOS
VERIFICAR EL SISTEMA DE ILUMINACION
VERIFICAR EL SISTEMA DE CALEFACCION
VERIFICAR EL ESTADO DE LOS CONVERTIDORES DE TEMPERATURA
VERIFICAR LAS SEALES ANALOGICAS AL DCS Y SALA DE CONTROL

REVISION Y LIMPIEZA DE (GROUND RESISTOR)


VERIFICAR EL OHMIAJE DE LA RESISTENCIA NEUTRO
MANTENIMIENTO DE LA LINEA L2167
PRUEBAS ELECTRICAS A TRAFO PRINCIPAL
LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR
VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN 350 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS Y EL TERMOSTATO ESTE
AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN CERRADOS.
LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR
VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN 350 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS Y EL TERMOSTATO ESTE
AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN CERRADOS.

LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR


VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN 350 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS Y EL TERMOSTATO ESTE
AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN CERRADOS.
LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR
VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN 350 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS Y EL TERMOSTATO ESTE
AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN CERRADOS.
MONTAJE, INSTALACION, PRUEBAS DE FUNCIONAMIENTO DEL EQUIPO
DESMONTAJE, DESCONEXIONADO, DE CAJA EN MAL ESTADO.
MONTAJE, INSTALACION, CABLEADO DE CAJA NUEVA

H-H
ESTIMADAS

5.00
4.00
4.00
2.00
5.00
8.00
8.00

2.00

2.00

2.00

2.00

4.00

2.00

2.00

2.00
4.00
4.00

2.00

2.00

2.00

2.00

8
8

ITEM

DIA

AREA

GRUPO

SISTEMA

1
2
3
4
5
6
7

16-May-16
16-May-16
16-May-16
16-May-16
16-May-16
17-May-16
17-May-16

ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC

ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC

ELECTRICO
ELECTRICO
ELECTRICO
ELECTRICO
ELECTRICO
ELECTRICO
ELECTRICO

17-May-16

ELEC

ELEC

ELECTRICO

17-May-16

ELEC

ELEC

ELECTRICO

10

17-May-16

ELEC

ELEC

ELECTRICO

11

17-May-16

ELEC

ELEC

ELECTRICO

12

17-May-16

ELEC

ELEC

ELECTRICO

13

14

15
16

17-May-16

ELEC

ELEC

ELECTRICO

17

18-May-16

ELEC

ELEC

ELECTRICO

18

18-May-16

ELEC

ELEC

ELECTRICO

19

18-May-16

ELEC

ELEC

ELECTRICO

20

18-May-16

ELEC

ELEC

ELECTRICO

21

18-May-16

ELEC

ELEC

ELECTRICO

MANTENIMIENTOS EJECUTADOS SEMANA -020 - PLANTA CENTRAL TE


EQUIPO

TRAFO PRINCIPAL
TRAFO PRINCIPAL
TRAFO PRINCIPAL
TRAFO PRINCIPAL
LINEA DE TRASMISION
LINEA DE TRASMISION
TRAFO PRINCIPAL

INTERRUPTOR PRINCIPAL DE GABINETES

CELDA DE PROTECCION

CELDA DEL TRANSFORMADOR DE AISLAMIENTO


01BPT10

CELDA DEL TRANSFORMADOR DE EXCITACIN


01MKC20

TRANSFORMADOR AUXILIAR

CAMBIADOR DE TOMAS

PANEL DE CONTROL

CAJA DE RESISTENCIA PARA NEUTRO


LINEA DE TRASMISION

TRAFO PRINCIPAL

CELDA DEL TRANSFORMADOR DE SERVICIOS 1 01BFT10

CELDA DEL TRANSFORMADOR DE SERVICIOS 2 01BFT20

CELDA DEL TRANSFORMADOR 01BBT20

CELDA DEL TRANSFORMADOR 01BBT30

TADOS SEMANA -020 - PLANTA CENTRAL TERMICA RECKA


MOTIVO

INSPECCION SENSORES DE TEMPERATURA DEL TRAFO PRINCIPAL


CAMBIO DE SILICA GEL EN EL TRAFO PRINCIPAL
PRUEBAS ELECTRICAS A TRAFO PRINCIPAL
DESCONEXION DE LA JUNTA DE LA BARRA DE FASE AISLADA
MANTENIMIENTO DE LA LINEA L2167
MANTENIMIENTO DE LA LINEA L2167
PRUEBAS ELECTRICAS A TRAFO PRINCIPAL
LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR
VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN T60 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS
Y EL TERMOSTATO ESTE AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA
ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN
CERRADOS.
INSPECCION Y LIMPIEZA DE BUS BAR (COMPARTIMIENTO DE BARRA PRINCIPAL DE LAS
CELDAS)

LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR


VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN 350 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS
Y EL TERMOSTATO ESTE AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA
ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN
CERRADOS.

LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR


VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN 350 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS
Y EL TERMOSTATO ESTE AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA
ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN
CERRADOS.
LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR
VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN 350 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS
Y EL TERMOSTATO ESTE AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA
ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN
CERRADOS.

REVISAR EL PANEL DE CONTROL QUE LOS INDICADORES LED FUNCIONEN


CORRECTAMENTE
VERIFICACION Y AJUSTES DE BORNES
REVISION DEL SISTEMA DE RADIADORES DE REFRIGERACION QUE TRABAJEN
ADECUADAMENTE
VERIFICACION DE LOS CONECTORES A TIERRA Y TERMINAL EN BUEN ESTADO.
TANQUE DE EXPANSION DE ACEITE REVISAR QUE NO PRESENTE ANOMALIAS
RELE BUCHOLZ VERIFICAR QUE NO TENGA FUGAS Y TRABAJE CORRECTAMENTE
VALVULA SOBRE PRESION REVISAR QUE NO PRESENTE DERRAMES O FUGAS
VERIFICAR EL ESTADO DEL DESECANTE SILICA GEL
CAMBIADOR DE TOMAS COMPROBAR EL FUNCIONAMIENTO Y SU POSICIONN ACTUAL
MEDIDOR DE TEMPERATURA DE DEVANADOS Y ACEITE QUE SE ENCUENTREN
OPERATIVOS.
CHEQUEO QUE LOS CABLES SE ENCUENTREN EN SUS BORNERAS Y AJUSTADOS
VERIFICAR EL SISTEMA DE ILUMINACION
VERIFICAR EL SISTEMA DE CALEFACCION
VERIFICAR EL ESTADO DE LOS CONVERTIDORES DE TEMPERATURA
VERIFICAR LAS SEALES ANALOGICAS AL DCS Y SALA DE CONTROL
REVISION Y LIMPIEZA DE (GROUND RESISTOR)
VERIFICAR EL OHMIAJE DE LA RESISTENCIA NEUTRO
MANTENIMIENTO DE LA LINEA L2167

PRUEBAS ELECTRICAS A TRAFO PRINCIPAL


LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR
VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN 350 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS
Y EL TERMOSTATO ESTE AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA
ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN
CERRADOS.
LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR
VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN 350 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS
Y EL TERMOSTATO ESTE AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA
ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN
CERRADOS.
LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR
VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN 350 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS
Y EL TERMOSTATO ESTE AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA
ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN
CERRADOS.

LIMPIEZA DE CUBICULOS EXTERIOR E INTERIOR


VERIFICAR LOS INTERRUPTORES DE LA SALA DE 6.6 KV Y SU POSICION
VERIFICACION DE LOS INDICADORES LED EN BUEN ESTADO
REVISION DE LOS PULSADORES EN FUNCIONAMIENTO CORRECTO
VERIFICACION DE SELECTORES QUE ACTUEN EN MODO LOCAL Y REMOTO
REVISION DEL RELE DE PROTECCION MULTILIN 350 ESTE OPERATIVO
INSPECCION DE CABINAS EN POSICION DE EXTRAIDO PRUEBAS O DESCARGO
VERIFICAR LA TENSION Y LECTURA EN ACOMETIDA DE 6.6 KV
COMPROBAR EL FUNCIONAMIENTO DE LA RESISTENCIA DE CALEFACCION EN LAS CELDAS
Y EL TERMOSTATO ESTE AJUSTADO A SU VALOR
COMPROBAR QUE LOS INTERRUPTORES DE ALIMETACIONESDE CONTROL Y FUERZA
ESTAN CERRADOS
COMPROBAR QUE TODOS LOS INTERRUPTORES AUTOMATICOS DE CALDEO ESTEN
CERRADOS.

HORARIO

H-H
REALES

14:00
14:00
15:00
13:00
13:00
8:00
8:00

17:00
17:30
17:30
15:00
17:30
17:30
17:30

3.00
3.50
2.50
2.00
4.50
9.50
9.50

10:00

13:00

3.00

14:00

16:00

2.00

N PTW

4072025
4072024
4072023
4072022
4072021
4072021
4072023

4072124
4072125

4072125

16:00

17:30

1.50

4072126

17:30

19:00

1.50

4072127

11:00

14:00

3.00

4072026

14:00

15:30

1.50

4072026

15:30

17:00

1.50

4072026

17:00

18:30

1.50

4072026

8:00

12:00

4.00

4072021

8:00

12:30

4.50

4072023

8:00

9:00

1.00

4072128

9:00

10:00

1.00

4072129

10:00

11:00

1.00

4072130

11:00

12:00

1.00

4072131

ITEM

DIA

AREA

GRUPO

MANTENIMIENTOS NO EJECUTADOS SEMANA


SISTEMA

MANTENIMIENTOS NO EJECUTADOS SEMANA 020 - PLANTA CENTRAL TERM


EQUIPO

NA 020 - PLANTA CENTRAL TERMICA RECKA


DESCRIPCION

MOTIVO

ITEM

DIA

EMPRESA

SISTEMA

MANTENIMIENTOS DE GARANTIA SEMANA 020- PLANTA


EQUIPO

MANTENIMIENTOS DE GARANTIA SEMANA 020- PLANTA CENTRAL TERMICA RECKA


DESCRIPCION

AL TERMICA RECKA
OBSERVACIONES

HORARIO

H-H
ESTIMADAS

N PTW

ITEM

DIA

AREA

GRUPO

SISTEMA

20-May-16

ELEC

TG1

TG1

21-May-16

ELEC

TG1

TG1

MANTENIMIENTOS CORRECTIVO SEMANA 020 - PLANTA


EQUIPO

HEATER

GENERADOR

ANTENIMIENTOS CORRECTIVO SEMANA 020 - PLANTA CENTRAL TERMICA RECKA


DESCRIPCION

MONTAJE, INSTALACION, PRUEBAS DE FUNCIONAMIENTO DEL EQUIPO

INSTALACION DE PORTA ESCOBILLA Y CARBON EN EL SISTEMA DE EXCITACIN

AL TERMICA RECKA
OBSERVACIONES

HORARIO

EL PERSONAL DE MANTENIMIENTO DE CTR AYUDO EN LA


INSTALACION DE LOS EQUIPOS, SE REALIZARON LAS PRUEBAS
CORRESPONDIENTES Y SE DEJARON OPERATIVOS.

10:00

14:00

SE INSTALO PORTA ESCOBILLA Y CARBON QUE FALTABA EN EL


SISTEMA DE EXCITACIN.

8:00

9:30

H-H
REALES

N PTW

4.00

4072111

1.50

4072400

MANTENIMIENTOS POR SERVICIOS EXTERNOS SEMANA 020- P


ITEM

DIA

1 16-May-16
2 16-May-16
3 16-May-16

UBICACIN

EMPRESA

TRANSFORMADOR PRINCIPAL
DELCROSA
TRANSFORMADOR PRINCIPAL
DELCROSA
SUBESTACION REQUE-SUBESTACION
LUAL
RECKA

TERNOS SEMANA 020- PLANTA CENTRAL TERMICA RECKA


DESCRIPCION

PTW

DESCONEXION DE LA JUNTA DE LA BARRA DE FASE AISLADA


PRUEBAS ELECTRICAS A TRAFO PRINCIPAL

4072022
4072023

MANTENIMIENTO DE LA LINEA L2167

4072021

GRAFICA DE MANTENIMIENTOS SEMANA 0


SEMANA - 19
PROG
23
0
0
23
86.00

ELEC
MEC
I&C
MANTTO
HH

EJEC
18
0
0
18
62.50

NO EJEC
5
0
0
5
-

CORREC
2
0
0
2
5.50

GARANTIA
0
0
0.00

SERV
2
2

MANTTO - SEM 19
23

18

5
2

MANTTO - SEM 019

NO EJEC; 5; 22%

EJEC; 18; 78%

EJEC

NO EJEC

NIMIENTOS SEMANA 020 - PLANTA CENTRAL TERMICA RECKA

MANTTO - SEM 019


23
18

5
2
2

ELEC

0MEC
0

I&C

MANTTO - SEM 019

Hor
86.00
62.50

5.50

0.00

- SEM 019

0
MEC

I&C

- SEM 019

Horas hombre

0.00

ITEM

1
2
3
4
5
6
7
8
9
10
11
12

13

14

15
16

17
18
19
20

DIA

AREA

GRUPO

21
22
23

24

25

26

27
28
29
30
31
32
33
34

35

36

37

38

39
40

MANTENIMIENTOS PROG
SISTEMA

MANTENIMIENTOS PROGRAMADOS SEMANA 21- PLANTA CENTRAL TER


SUB SISTEMA

KKS

21- PLANTA CENTRAL TERMICA RECKA


EQUIPO

A
MOTIVO

H-H
ESTIMADAS

Potrebbero piacerti anche