Sei sulla pagina 1di 2

Employer

Employers Stamp

LRT Employers Representative

ENGINEER EMPLOYERS REPRESENTATIVE


(To be Nominated)

Contractor

Sub-Contractor;

Project

Approval Stamp

LUSAIL DEVELOPMENT
LUSAIL LIGHT RAIL TRANSIT
SYSTEM

QUG Monthly Report: MARINA 02


Month of July 2016

PMO
Date
L

R
Project

Preparation
Q

Sub Group

Technical Approval

This document is
uncontrolled once
downloaded or printed

Management Approval

WBS

0
Doc Type

Discipline

Location

Issuer
Code

Doc
Number

Rev

QUG Monthly Report


Month of July 2016

TABLE OF CONTENT
1. Monthly Activities and Manpower Report.
2. Electrical Shop Drawing Log.
3. Material Approval Log.
4. Work Method Statement Log.
5. Material Receiving Inspection Log.
6. Inspection and Testing Request.
7. Progress Report.
8. Installation highlighted drawings.
9. 3 Months look ahead
10.
11.

Photographic Report.

HSE Reports.

Potrebbero piacerti anche