Sei sulla pagina 1di 53

1

General info

Zone

CER

City

Site ID

Site Name

Site
Address

Cluster

10

11

12

15

16

General info

Survey
Date of
Subcontra Engineer Survey(da Longitude Latitude GreenField
ctor
name / Tel. y/month/y (WGS 84) (WGS 84 ) /RoofTop
no.
ear)

Site
Access
Status

17

18

19

20

21

22

23

BTS model & Configuration

Current
Target
Site Type
Configura
(2G, 3G,
tion
2G&3G)

2G (900)
Original
Vendor

2G (900)
Cabinet
type
(brand)

2G (900)
Type

2G (1800)
Original
Vendor

2G (1800)
Cabinet
type
(brand)

24

25

26

27

28

29

Existing
Quantity
of BBU
boards (if
Huawei 3G
Cabinet)

No. of RF
boards (if
Huawei 3G
Cabinet)

30

BTS model & Configuration

2G (1800)
Type

3G
Original
Vendor

3G
Cabinet
type
(brand)

3G Type

Site
Model
Before
Swap

31

32

33

34

35

36

37

Transport method of Equipment

Final BTS
Existing
Existing
Hardware
Crane
Crane Can Building
Tx Power
Transmissi Transmissi
Type
Needed Or
access
Stairs
type
on Cabinet on type
After
Not
near site ? width(MM)
(2G)
(2G)
(2G)
Swap

38

39

40

41

42

43

44

Transmission

number of
used 2G
E1

Cable
Length
(2G)

Existing
Existing
E1 Cable
Tx Power number of
Transmissi Transmissi
Connector
type
used 3G
on Cabinet on type
type (2G)
(3G)
E1
(3G)
(3G)

45

46

number of
IP
ethernet
E1 Cable
free ports
Connector on BSC MW
type (3G) direction
(on IDU)

47

48

Ethernet
Ethernet
Swith
Swith Type
exsist ?

49

Cable
Length
(3G)

50

DDF has
free
ports ?

51

Original
Antenna
Model (2G
900) +
Type
number

52

Original
Antenna
Model
(3G) +
Type
number

53

Original
Antenna
Model (2G
1800) +
Type
number

54

Antenna
height
(2G)

55

56

Antenna
Antenna
height
height
(2G 1800),
(3G), if
if
Separate
Separate

57

Antenna
no. of
Ports
(2G)

58

Antenna
no. of
Ports
(2G 1800)

59

60

61

62

63

64

65

Antenna Sectror 1

Antenna
Antenna
Antenna
Antenna
no. of
support 2
support 1
Support
Ports
length(MM
length(MM
has free
(3G), if
) for 3G,if
) for 2G
space ?
Separate
Separate

Civil work
needed if
new
Sector will
be added

Antenna
Azimuth

Tilt Elec
2G

66

Tilt Elec
2G 1800

67

Tilt Elec
3G

68

69

70

71

72

Tilt
Tilt
Tilt
Mechanica
Mechanica
TMA type /
Mechanica
l
Combiner
l
serial
l
(2G 1800),
type
(3G), if
number
(2G)
if
Separate
Separate

73

74

75

76

Original
G900 RCU
G1800
U2100
Antenna
type /
RCU type / RCU type / Model (2G
serial
serial
serial
900) +
number
number
number
Type
number

77

Original
Antenna
Model
(3G) +
Type
number

78

Original
Antenna
Model (2G
1800) +
Type
number

79

Antenna
height
(2G)

80

81

82

83

84

85

86

Antenna S

Antenna
Antenna
height
height
(2G 1800),
(3G), if
if
Separate
Separate

Antenna
no. of
Ports
(2G)

Antenna
no. of
Ports
(2G 1800)

Antenna
Antenna
Antenna
no. of
support 2
support 1
Ports
length(MM
length(MM
(3G), if
) for 3G,if
) for 2G
Separate
Separate

87

88

89

90

91

92

93

Antenna Sectror 2

Antenna
Support
has free
space ?

Civil work
needed if
new
Sector will
be added

Antenna
Azimuth

Tilt Elec
2G

Tilt Elec
2G 1800

Tilt Elec
3G

Tilt
Mechanica
l
(2G)

94

95

96

97

98

99

100

Tilt
Tilt
Mechanica
G900 RCU
G1800
U2100
Mechanica
TMA type /
l
Combiner
type /
RCU type / RCU type /
l
serial
(2G 1800),
type
serial
serial
serial
(3G), if
number
if
number
number
number
Separate
Separate

101

Original
Antenna
Model (2G
900) +
Type
number

102

Original
Antenna
Model
(3G) +
Type
number

103

Original
Antenna
Model (2G
1800) +
Type
number

104

Antenna
height
(2G)

105

106

Antenna
Antenna
height
height
(2G 1800),
(3G), if
if
Separate
Separate

107

Antenna
no. of
Ports
(2G)

108

109

110

111

112

113

114

Antenna Sectror 3

Antenna
no. of
Ports
(2G 1800)

Antenna
Antenna
Antenna
Antenna
no. of
support 2
support 1
Support
Ports
length(MM
length(MM
has free
(3G), if
) for 3G,if
) for 2G
space ?
Separate
Separate

Civil work
needed if
new
Sector will
be added

Antenna
Azimuth

115

116

117

118

119

120

121

Tilt Elec
2G 900

Tilt Elec
2G 1800

Tilt Elec
3G

Tilt
Tilt
Tilt
Mechanica
Mechanica
Mechanica
l
Combiner
l
l
(2G 1800),
type
(3G), if
(2G)
if
Separate
Separate

122

123

124

125

126

127

Existing Antenna's

128

New Antenna / TMA

Antenna
status/Ch
quantity
G900 RCU
G1800
U2100
Total
ange
TMA type /
of antenna
type /
RCU type / RCU type / quantity
existing
serial
for each
serial
serial
serial
of existing
Antenna
number
sector(S1/
number
number
number
sector
or Not /
S2/S3)
number
needed

129

130

131

132

133

134

135

New Antenna / TMA

Target
Antenna

Change
TMA or
not

Feeder

feeder
Type 2G
900

feeder
Type 2G
1800

feeder
Type3G
2100

no. of
Feeders
(2G 900)

feeder
length
(2G 900)
(S1/S2/S3)

136

Feeder

137

138

139

140

141

142

Jumper-Feeder Connector

2G 900
if Feeder
Feeder
feeder
feeder
feeder
no. of
no. of
can't be Connector
length
length
Staus
Feeders
Feeders
re-used, to Jumper
(2G 1800)
(3G 2100) (can be
(2G 1800)
(3G 2100)
whats the
inside
(S1/S2/S3)
(S1/S2/S3) re-used ?)
reason ?
Shelter
type

143

144

Jumper-Feeder Connector (2G 900)

145

146

147

148

149

Jumper-Feeder Connector (2G 1800)

Feeder
Length
2G 1800
Connector from new
Feeder
Number of to Jumper
BTS to
Number of
Connector
2G 900
inside
existing
2G 1800
to Jumper
Jumpers
Shelter
feeder
Jumpers
inside
needed need to be connextio
needed
Shelter
changed ? n point
type
(2G 900)
2G 900

Feeder
Connector
to Jumper
inside
Shelter
need to be
changed ?
(2G 1800)

Length
from new
BTS to
existing
feeder
connextio
n point
2G 1800

150

151

152

Jumper-Feeder Connector (3G 2100)

3G 2100
Feeder
Number of
Connector
3G 2100
to Jumper
Jumpers
inside
needed
Shelter
type

153

154

155

156

Lighting Arrester

Feeder
Length
Connector from new
to Jumper
BTS to
Lighting
inside
existing
Arrester
Shelter
feeder
Existance
need to be connextio
changed ? n point
(3G 2100)
3G

Lighting
Arrester
Location

AC resource

AC type

157

158

159

160

161

162

163

AC resource

Output AC
Output AC
Main input
breaker in Main input rectefire
breaker in
AC
(2)3G
AC
Module
2G TGBT
breaker/
TGBT
breaker/ type/Capa
(number/c
phase
(number/c
phase
city
apacity)
apacity)

2G Rectifier

existing
rectefire
Module
number

extend
rectefire
Module
number

164

165

166

167

168

169

170

2G Rectifier

Output DC Output DC
Rectifier
breakers breakers
Screen
not used
used
Load
(number/c (number/c
reading(A)
apacity)
apacity)

Expand
modules
Re-use Main input
Battery
needed or existing
AC
Capacity
not/ if yes Rectifier breaker/
(2G)
say the
or Not
phase
qty.

171

172

173

174

175

176

177

3G Rectifier

rectefire
Module
type/Capa
city

existing
rectefire
Module
number

Output DC Output DC
extend
Rectifier
breakers breakers
rectefire
Screen
not used
used
Module
Load
(number/c (number/c
number reading(A)
apacity)
apacity)

Battery
Capacity
(3G)

178

179

180

181

182

183

184

185

Power Cable length

Expand
modules
Re-use
needed or existing
not/ if yes Rectifier
say the
or Not
qty.

DC cable
AC cable AC cable DC cable DC cable
new BTS
(from
(from 2G (from 3G (from new (from new
to
reusing
TGBT to
TGBT to Rectifier Rectifier
Groundin
Rectifier
new
new
to new
to new
g bar
to BTS)
Rectifier) Rectifier)
BTS)
battery)

186

187

188

189

190

191

192

193

Civil work
Additional
I beam
cable tray
Existing
new
existing
(length) & No. of
Concrete
I beam
indoor/ou
power
length /
USED
specify
Foundatio existing
tdoor
system to
distance
indoor or holes on
n Needed enough or
cable tray
Groundin
between
outdoor,
Feeder
Or Not
not ?
g bar
I-Beam
if
window
length(M)
(MM)
needed(M
)

No. of
FREE
holes on
Feeder
window

194

195

196

197

198

199

200

201

Civil work
Feeder
Feeder
window
Air
Fire
window
holes
condition, dection,
holes
enough or
is
is
enough or not , if
working working
not , if
adding
normal ? normal ?
adding 3G (2G 1800)
& 3G

TGBT

Air
Recloser condition
capacity

Ground
bar free
hole
number

202

203

204

Other
Comments
equipment

ADSL/tran
Comment
smission
s
and so on

site environment
VSWR secotr 1
[900 A: x at y (m) ;
900 B: x at y (m);
2100A: x at y (m) ;
2100 B: x at y (m);
1800 A: x at y (m) ;
1800 B: x at y (m)];

VSWR secotr 2
[900 A: x at y (m) ;
900 B: x at y (m);
2100A: x at y (m) ;
2100 B: x at y (m);
1800 A: x at y (m) ;
1800 B: x at y (m)];

205

ment

206

207

208

209

MicroWave Existing data (for Hub Sites)


VSWR secotr 3
[900 A: x at y (m) ;
900 B: x at y (m);
2100A: x at y (m) ;
2100 B: x at y (m);
1800 A: x at y (m) ;
1800 B: x at y (m)];

Total No.
IDU1
ODU1 dish
IDU2
ODU2 dish
of existing
direction diameter direction diameter
MicroWave

210

211

r Hub Sites)

IDU3direct ODU3 dish


ion
diameter

Technical Site Survey Report


S-RAN
0
Site name

Site type

0
0

DR/City

Survey date

External view of the site

PARTICIPANTS
Name

Comapny

Contact

Huawei Technologies Co., Ltd.

Project
Huawei Technologies Co., Ltd.

S-RAN

REV :

Page:

Summary

1.
2.
3.
4.

GENERAL INFORMATION
3
BTS MODEL AND CONFIGURATION
4
TRANSMISSION
5
TRANSMISSION PHOTOS.. 6

7
5. ANTENNAS SUBSYSTEM
8
6. ANTENNA CONNEXION TO THE BTS (FEEDER, JUMPER, CONNECTOR).
9
7. POWER SYSTEM
8. POWER SYSTEM PHOTOS 10
11
9. RECTIFIERS
12
10. RECTIFIERS AND BATTERIES PHOTOS.
13
11. CIVIL WORK and VSWR
14
12. SKETCH LAYOUT
15
13. ANTENNA ANNEXE1 (PANORAMIC & ANTENNA'S PHOTOS)..
16
14. ANTENNA ANNEXE2 (COMBINERS & TMA & RCU PHOTOS)...
17
15. OTHER PHOTOS.........
16. BTS and rectifier screen photos..
18
19
17. LAYOUT (path of cable tray tower with Antennas)
20
18. EQUIPMENT SUMMARY.

Rev.

Remarks

0.

Date

SITE ID

Name

Site Name:

1
2
3

Huawei Technologies Co., Ltd.

Projet S-RAN

REV :

Page:

Technical site survey Report

Site information
Site survey date
DR
City/Zone
Site name
Site ID
Site Address
Longitude
Latitude
Site Type
GreenField/RoofTop
Site Access
Cluster
Review date
TSSR status

0
0
0
0
0
0
0
0
0
0
0
0

Transport method of Equipment


Crane Needed Or Not
Crane Can access near site ?
Building Stairs width(MM)

0
0

Customer
Contact Name
Contact Telephone
Contact Fax
Contact E-mail
Signature

Huawei Surveyor
0
00 00 00

A.Essarghini@iam.ma

Contact Name
Contact Telephone
Contact Fax
Contact E-mail
Signature

0
+
evan.lihui@huawei.com

Other participants
Name
Name

0
0

Company

Phone n:

Company

Phone n:

Name

Company

Phone n:

Name

Company

Phone n:

Site name

Site ID

Rev:

Projet S-RAN
Huawei Technologies Co., Ltd.

+
+

Page
3

2.BTS MODEL AND CONFIGURATION


Site name

Target Configuration

Actual configuration
Current Site Type (2G, 3G, 2G&3G)

2G (900) Original Vendor

2G (900) Cabinet type (brand)

2G (900) Type

2G (1800) Original Vendor

2G (1800) Cabinet type (brand)

2G (1800) Type

3G Original Vendor

3G Cabinet type (brand)

3G Type

Existing Quantity of BBU boards (if Huawei 3G Cabinet)

No. of RF boards (if Huawei 3G Cabinet)

No. And type of WBBP


Total of CE (WBBP b2: 128; WBBP b3: 256; WBBP b4: 384)
Site Model Before Swap

Final BTS Hardware Type After Swap

2G (900) Existing BTS Cabinet

Rev.

Remarks

3G (2100) Existing BTS Cabinet

Date

SITE ID

Name

Site Name:

0.

1
2
3

Huawei Technologies Co., Ltd.

Projet S-RAN

REV :

Page:

3.TRANSMISSION

TRANSMISSION

Site name

Existing Transmission Cabinet (2G)

Existing Transmission type (2G)

Tx Power type (2G)

number of used 2G E1

Cable Length (2G)

E1 Cable Connector type (2G)

Existing Transmission Cabinet (3G)

Existing Transmission type (3G)

Tx Power type (3G)

number of used 3G E1

E1 Cable Connector type (3G)

number of IP ethernet free ports on BSC MW direction (on IDU)

Ethernet Swith exsist ?

Ethernet Swith Type

Cable Length (3G)

DDF has free ports ?

MicroWave Existing data (for Hub Sites)

Rev.

Total No. of existing


MicroWave

IDU1 direction

ODU1 dish
diameter

IDU2 direction

ODU2 dish
diameter

IDU3direction

ODU3 dish
diameter

Remarks

Date

SITE ID

Name

Site Name:

0.

1
2
3

Huawei Technologies Co., Ltd.

Projet S-RAN

REV :

Page:

3.TRANSMISSION photos
DDF PICTURE

E1 Connector Photo

ODF/IP Ethernet Switch

ODF/IP Port Photo

Microwave dishes

No Microwave in this site

Rev.

Remarks

Date

SITE ID

Name

Site Name:

0.

1
2
3

Huawei Technologies Co., Ltd.

Projet S-RAN

REV :

Page:

5.ANTENNAS SUBSYSTEM
Antenna
support
(m)

Ports
number

HBA( m)

Technologi
Azimut ()
e

Ant1

Antenna Type

Anten. Vendor

Tilt Elec
2G(900)

Tilt Elec
2G(1800)

Tilt Elec
3G

Tilt Mc

HMA (m)

Building
height (m)

Sector1
Ant2
Ant1
Sector2
Ant2
Ant1
Sector3
Ant2

Existing Antenna's

New Antenna / TMA

Total quantity of
existing sector

quantity of antenna
for each
sector(S1/S2/S3

Antenna
status/Change
existing Antenna or
Not / number needed

Target Antenna

Change TMA or not

AZIMUTH PHOTOS

Combiner,TMA, RCU systems

Sector1

G1800 RCU type / serial


number and status

Combiner type

TMA type / serial numbe and


status

G900 RCU type / serial


number and status

U2100 RCU type / serial


number and status

0.00E+00

0.00E+00

0.00E+00

0.00E+00

0.00E+00

0.00E+00

0.00E+00

0.00E+00

0.00E+00

0.00E+00

0.00E+00

0.00E+00

Status
Sector2
Status
Sector3
Status

Rev.

Remarks

Date

SITE ID

Name

Site Name:

0.

1
2
3

Huawei Technologies Co., Ltd.

Projet S-RAN

REV :

Page:

6.ANTENNA CONNEXION TO THE BTS (FEEDER, JUMPER, CONNECTOR)


FEEDERS

feeder Type 2G
900

feeder Type
2G 1800

feeder
Type3G 2100

no. of
feeder length
no. of
feeder length
no. of
feeder length feeder Staus
Feeders (2G
(2G 900)
Feeders (2G
(2G 1800)
Feeders (3G
(3G 2100)
(can be re900)
(S1/S2/S3)
1800
(S1/S2/S3)
2100)
(S1/S2/S3)
used ?)
0

if Feeder can't
be re-used,
whats the
reason ?

JUMPERS
Jumper-Feeder Connector (2G 900)
2G 900 Feeder Connector to Jumper
inside Shelter type

Number of 2G 900 Jumpers needed

Feeder Connector to Jumper inside


Shelter need to be changed ?
(2G 900)

Existing Jumper length


and status

Length from new BTS to existing


feeder connextion point 2G 900
0

Jumper-Feeder Connector (2G 1800)


2G 1800 Feeder Connector to Jumper
inside Shelter type

Number of 2G 1800 Jumpers needed

Feeder Connector to Jumper inside


Shelter need to be changed ?
(2G 1800)

Existing Jumper length


and status

Length from new BTS to existing


feeder connextion point 2G 1800

Jumper-Feeder Connector (3G 2100)


3G 2100 Feeder Connector to Jumper
inside Shelter type

Number of 3G 2100 Jumpers needed

Feeder Connector to Jumper inside


Shelter need to be changed ?
(3G 2100)

Existing Jumper length


and status

Length from new BTS to existing


feeder connextion point 3G

LIGHTNING ARRESTOR
Lighting Arrester Existance

Lighting Arrester Location

Jumper to feeder connection (Showing clear photo for connector type: male/female)

2G

Feeder Lightning Arrestor Connection

3G

Feeder routing to Site

near the feeder window

Rev.

Remarks

Between the BTS & the tower

Date

On the tower

SITE ID

Name

Site Name:

0.

Huawei Technologies Co., Ltd.

Projet S-RAN

REV :

Page:

7.POWER SYSTEM
AC resource
AC type

Main input AC breaker/ phase

Output AC breaker in 2G TGBT


(number/capacity)

Output AC breaker in (2)3G TGBT


(number/capacity)

POWER CABLE LENGHTS


DC cable (from
reusing Rectifier to
BTS)

new BTS to
Grounding bar

AC cable (from 2G
TGBT to new
Rectifier

AC cable (from 3G DC cable (from new DC cable (from new


new power system to
TGBT to new
Rectifier to new
Rectifier to new
Grounding bar
Rectifier)
BTS
battery)
0

AC Grid Breaker Main input

Rev.

Remarks

Date

SITE ID

Name

Site Name:

0.

Huawei Technologies Co., Ltd.

Projet S-RAN

REV :

Page:

8.POWER SYSTEM photos

2G TGBT

3G TGBT

Rev.

Remarks

Date

SITE ID

Name

Site Name:

0.

Huawei Technologies Co., Ltd.

Projet S-RAN

REV :

Page:

10

9.RECTIFIERS
RECTIFIERS
2G Rectifier
Main input AC
breaker/ phase

rectefire Module existing rectefire extend rectefire Rectifier Screen


type/Capacity Module number Module number Load reading(A)

Output DC
Output DC
breakers not
Expand modules
breakers used
Battery
used
needed or not/ if
(number/capacit Capacity (2G)
(number/capacit
yes say the qty.
y)
y)

Re-use
existing
Rectifier or
Not

3G Rectifier
Main input AC
breaker/ phase

rectefire Module existing rectefire extend rectefire Rectifier Screen


type/Capacity Module number Module number Load reading(A)

Output DC
Output DC
breakers not
Expand modules
breakers used
Battery
used
needed or not/ if
(number/capacit Capacity (3G)
(number/capacit
yes say the qty.
y)
y)
0

Re-use
existing
Rectifier or
Not

2G DC rectifier cabinet overview and label

2G DC Output Breaker

3G DC rectifier cabinet overview and label

3G DC Output Breaker

Rev.

Remarks

Date

SITE ID

Name

Site Name:

0.

REV :
Huawei Technologies Co., Ltd.

Projet S-RAN

Page:

11

10.RECTIFIERS and batteries photos

Battery (2G)

Battery (3G)

Rev.

Remarks

Date

SITE ID

Name

Site Name:

0.

REV :
Huawei Technologies Co., Ltd.

Projet S-RAN

Page:

12

11. CIVIL WORK and VSWR

Concrete Foundation Needed Or Not

0.00E+00

I beam existing enough or not ?

I beam existing length / distance between I-Beam (MM)

Existing indoor/outdoor cable tray length(M)

0.00E+00

Additional cable tray (length) & specify indoor or outdoor, if needed(M)

No. of USED holes on Feeder window

0.00E+00

No. of FREE holes on Feeder window

Feeder window holes enough or not , if adding 3G

0.00E+00

Feeder window holes enough or not , if adding (2G 1800) & 3G

0.00E+00

Existing Feeder window status


Air condition, is working normal ?

0.00E+00

Fire dection, is working normal ?

TGBT

Recloser

Air condition capacity

Ground bar free hole number

Other equipment

Rev.

Comments

site environment

site environment

site environment

ADSL/transmission and so on

Comments

VSWR sector1
[900 A: x at y (m) ;
900 B: x at y (m);
2100A: x at y (m) ;
2100 B: x at y (m);
1800 A: x at y (m) ;
1800 B: x at y (m)];

VSWR sector2
[900 A: x at y (m) ;
900 B: x at y (m);
2100A: x at y (m) ;
2100 B: x at y (m);
1800 A: x at y (m) ;
1800 B: x at y (m)];

VSWR sector3
[900 A: x at y (m) ;
900 B: x at y (m);
2100A: x at y (m) ;
2100 B: x at y (m);
1800 A: x at y (m) ;
1800 B: x at y (m)];

Remarks

Date

SITE ID

Name

Site Name:

0.

REV :
Huawei Technologies Co., Ltd.

Projet S-RAN

Page:

13

12. SKETCH LAYOUT


Layout of shelter showing Positions for all equipments and all wall mounting equipments,
In Case of Outdoor Site: Show Positions for all equipments and all wall mounting equipments, Concrete base/I-Beem and its different cable trays.

Layout of shelter showing Positions for all equipments and all wall mounting equipments, proposed location to install our new equipments to be marked by RED color in the
layout.
In Case of Outdoor Site: Show Positions for all equipments and all wall mounting equipments, Concrete base/I-Beem and its different cable trays proposed location to install
our new equipments to be marked by RED color in the layout..

Rev.

Remarks

Date

SITE ID

Name

Site Name:

0.

Huawei Technologies Co., Ltd.

Projet S-RAN

REV :

Page:

14

13.PANORAMIC PHOTOS
0

20

40

60

80

100

120

140

160

180

200

220

240

260

280

300

320

340

ANTENNA'S PHOTOS

Rev.

Sector1

Sector2

Sector3

ANTENNA LABEL

ANTENNA LABEL

ANTENNA LABEL

Remarks

Date

SITE ID

Name

Site Name:

0.

REV :
Huawei Technologies Co., Ltd.

Projet S-RAN

Page:

15

14.ANTENNA DOWNTILT
Antenna 1

Mech Tilt

2G(900)Elec Tilt

2G(1800)Elec Ti

3G(2100)Elec Til

Antenna 2

Mech Tilt

2G(900)Elec Tilt

2G(1800)Elec Ti

3G(2100)Elec Til

Antenna 3

Mech Tilt

2G(900)Elec Tilt

2G(1800)Elec Ti

3G(2100)Elec Til

1.RCU/ TMA/ Combiner Serial number


TMA

U2100 RCU

G900 RCU

G1800 RCU

Combiner

TMA

U2100 RCU

G900 RCU

G1800 RCU

Combiner

TMA

U2100 RCU

G900 RCU

G1800 RCU

SECTOR3

SECTOR2

SECTOR1

Combiner

Rev.

Remarks

Date

SITE ID

Name

Site Name:

0.

Huawei Technologies Co., Ltd.

Projet S-RAN

REV :

Page:

16

15. OTHER PHOTOS


LOCATION OF THE NEW CABINET

Site Access
Site Building (Showing clearly the
building with tower)

Building entrance

View for Crane access to the Street (if


need Crane)

Building Stairs Width

External view of the equipment room

No need of the crane

Cable ladder and feeder routing to site


Internal view of the equipment room

Upper side walls (show cable ladders)

Air Conditioner

Fire Detection

Combiner near BTS

Combiner near BTS Label

Feeder Window Photo (from inside


Shelter)

Feeder Window Photo (from outside


Shelter)

Ground Bar near BTS

Environment
Alarm

I-Beam photo

Combiner & Spliter

Rev.

Remarks

Power Spliter

Date

Power Spliter Label

Other equipment 3

SITE ID

Name

Site Name:

0.

REV :
Huawei Technologies Co., Ltd.

Projet S-RAN

Page:

17

16. OTHER PHOTOS


2G (900) Existing BTS Cabinet
hole Cabinet

Upper part of cabient

hole Cabinet

Upper part of cabient

No 1800 on the site

No 1800 on the site

hole Cabinet

Upper part of cabient

Lower part of cabinet

2G (900) Existing RFU boards (showing


the label of 900 on the boards)

Middle part of cabinet

Lower part of cabinet

2G (900) Existing RFU boards (showing


the label of 900 on the boards)

No 1800 on the site

No 1800 on the site

No 1800 on the site

Lower part of cabinet

2G (900) Existing RFU boards (showing


the label of 900 on the boards)

Middle part of cabinet

2G (1800) Existing BTS Cabinet

3G (2100) Existing BTS Cabinet


Middle part of cabinet

Rectefier Screen Load reading (2G)

Rectefier Screen Load reading (3G)

No screen

Rev.

Remarks

Date

SITE ID

Name

Site Name:

0.

REV :
Huawei Technologies Co., Ltd.

Projet S-RAN

Page:

18

17. Layout (path of cable tray tower with Antennas).


General layout for the site showing:
Shelter position and paths of cable tray to tower/pole with antennas(Azimuth,HBA,..)

Rev.

Remarks

Date

SITE ID

Name

Site Name:

0.

REV :
Huawei Technologies Co., Ltd.

Projet S-RAN

Page:

19

General Information

18. Equipments summary:

Site name

Site configuration

Site Model before swap

Final BTS Hardware Type After Swap

Antenna

Antenna System

RCU
TMA
Combiner
Feeder
Existing Jumper status
Total jumper length needed on site
TGBT
RECTIFIER
Batteries
Air conditioner
Fire detection
I-Beam

Environment

Foundation
Feeder window
Cable tray
Antenna Support
DC cable (from reusing Rectifier to BTS)

new BTS to Grounding bar

AC cable (from 2G TGBT to new Rectifier)

AC cable (from 3G TGBT to new Rectifier)

DC cable (from new Rectifier to new BTS)

DC cable (from new Rectifier to new battery)

new power system to Grounding bar(section)

Grounding cables status

Ok

Anomalies while the Audit


No anomalies discovered while the audit

Rev.

Remarks

Date

SITE ID

Name

Site Name:

0.

REV :
Huawei Technologies Co., Ltd.

Projet S-RAN

Page:

20

Site

TetouanAssafae
Tanger DarTounsi
TangerDarTounsi
ZaouiaSidiKacenColline
TangerMghora
TangerImmMrabet
TangerAouama
TangerBranesFadila
TangerBranesFadila
TangerBranesFadila
TangerBranesFadila
TangerBranesFadila
TangerBranesFadila
TangerBranesFadila
TangerBranesFadila
TangerBranesFadila
TangerRmilat
Tanger Residence Ghorfa
Tanger Ziaten

Tanger CCL
HtelCesar
Tanger Bahraouine
Tanger Bouhoute
TangerHay El Amal

Action

Responsabilit

Matriel dlest rcuprer


Jumpers 3G tiqueter
non branch
les batteries sont gonfls par la haute temprature
Problme chemin de cble Huawei mal install
PMU dfectueux
Deux PSU de la BTS Huawei non active (manque des phases)
Prise de masse de feeders 2G et 3G non branchs la terre.
La barre de la mise la terre non installe.
Les cbles DC de la BTS Huawei non tiquets.
Les feeders 2G et 3G non tiquets.
La dtection dincendie non allume.

Huawei
Huawei
Huawei
Huawei
Huawei
Huawei
Huawei
Huawei+NSN
Huawei+NSN
Huawei
Huawei+NSN
Huawei+NSN

Les RET 2G non installs.


Le software de la BTS 3G ncessite upgrade.
Manque dun PSU du RED de la BTS Huawei.
Risque dinfiltration de la pluie par le window.
2eme Secteur problme overshooting necessite un DownTilt.
Manque tiquetage des feeders cot antennes
Configured Capacity Limit Exceeding Licensed Limit

Huawei+NSN
Huawei
Huawei
Huawei+NSN
Huawei
Huawei
Huawei

Couverture du premier secteur est trs rduite : ncessite une rehausse


du support d'antenne suite aux obstacles (shelter, habitations voisines ).
Feeder 3G endommag (courbure aigue)
VSWR sur le secteur1 3G (2,04 24m) infiltration deau dans le feeder:
changer
Manque tiquetage des Feeders cot antennes 2G/3G
Etiquetage des feeders ct antenne faire

Huawei
Huawei
Huawei/DRT
Huawei
Huawei

Potrebbero piacerti anche