It is in this sense that the Government decided recruiting private partners to achieve five (05) photovoltaic solar
power plants with a combined capacity of 80 megawatts in Burkina Faso.
Climatic studies: solar radiation, temperature, wind, altitude, precipitation, humidity, pollution
Technical Studies
The studies on equipment location: topographical, geological and geotechnical civil engineering details
studies;
All modules are certified to IEC 61730 and 61215 standards ED.2 or equivalent. They must match the
Electrical Protection Class II and the CE or equivalent guidelines .
6.3 Electrical Specifications
The power unit crest modules will not be less than 245 Wp . The tolerance on the peak power guaranteed by the
manufacturer will be a maximum of +/- 3% .
The module junction box is waterproof ( IP65) and contain bypass diodes ( by-pass) necessary to prevent
damage to cells due to differential sunshine the module surface .
The temperature coefficient compared to the value of the power PMPP should be less than -0.46 % / C , to
ensure good performance of high temperature modules.
the temperature inside technical rooms will not exceed that permitted by the UPS while avoiding the waste of
energy in all outdoor temperature assumptions.
The partner will present a study that justifies the temperature inside technical rooms will not exceed that
permitted by the UPS while avoiding the waste of energy in all outdoor temperature assumptions.
Special filters will be installed on local openings to prevent the entry of dust or small animals that could
damage equipment
The construction of equipment rooms will allow easy access to equipment for their replacement or maintenance.
If liquid processors are available , an oil recovery tank will be installed in each power transformer. The storage
capacity of the tank is at least equal to the maximum amount of transformer oil. The pit will include an oil recovery
device at the bottom by gravity.
10.4 Protections / accessories
Local techniques should incorporate all the auxiliary elements necessary for their proper functioning, i.e :
- The protection and connection boxes;
- BT network for auxiliary power ;
- The network of ground equipment on the premises;
- Inside and outside lighting installation ( normal and emergency ) premises ;
- Tooling and handling equipment;
- Safety equipment ( insulated gloves , insulating stool , placard describing the first aid) ;
- Filters ;
- Air conditioning equipment and / or forced ventilation
10.5 Documentation
The partner will describe the proposed technical premises. They are either prefabricated buildings where
equipment and also all connections are already installed or built premises on the site.
- The applicant must indicate the total amount of the project ( total contract value ) and the total amount of the
proposed specifying the identity finance contract (name, contact person to contact , ...) of the financing structure
and other partners involved ;
- Annual turnover means the candidate during the last three years must be equal to at least fifteen (15) million;
- Capital contribution by the applicant: the amount of credit available must be at least two (02) million for a batch
of 10 MW , three (03 ) million for a batch of 15 MW , five (05 ) million for a batch of 30 MW
13.2 Technical and professional capacity of candidate
The candidate must have completed and completed at least two (02) photovoltaic solar power projects on the
ground with a minimum cumulative total power of twenty (20) MW connected to the grid which at least one of
equal or greater power to 5 MWp. This work should have been be made in the ten ( 10) years and should be of a
similar nature and complexity.
i.
ii.
iii.
iv.
v.
This criterion aims to assess the real capacity of achievement in the field of photovoltaic power .
To assess the relevance of the reference made, the candidate shall indicate :[1] The applicant must provide copies of final acceptance certificates (or provisional ) signed by the project
managers / project owners for projects in question;
[2] The public authority reserves the right to verify the information provided by the bidder.
Roofing projects will not be considered.
The sum of several lower power projects to a minimum threshold may be presented as a single reference,
whatever the standardization of these projects.
The applicant must indicate the technical elements of the work, including for each performed photovoltaic plant :
- the total power of each;
-type ( trade name) technology and unit power modules used ;
-type of inverter used ;
-types of structures and anchors .
The candidate must have been responsible for the operation and maintenance of at least one (01) photovoltaic
plant floor 5 MWp minimum power during the five (5 ) years ( these references will be indicated ) .
13.3 Technical and financial proposal of the candidate
- The proposed technology for each component of (or of ) plant ( s) ;
- The civil engineering for the various infrastructures of (or of ) plant ( s) ;
- The characteristics of proposed connection ;
- The precise planning of each stage of realization (development, construction, commissioning )
- Daily producible ;
- The annual producible ;
- The total cost of the investment and without VAT ;
- The selling price per kWh net cost of connection ( output transformer 33kV ) ;
- The procedures for revision of the kWh selling price ;
- Duration of the power purchase agreement;
- The availability of financing and financial partners;
- The period of mobilization of financing and evidence relating thereto;
- The main contractors and their role in the project ;
- Operating personnel ( qualification and number)
- Management and environmental protection .
NB : The proposed energy storage ( partial or progressive ) is envisaged