LEVEL 1 - RISK REGISTER

Project Name:

Example Project

DIST- EA

Risk Identification
Status

ID #

Type

Category

Active

160

Threat

Design

Active

Active

Active

Active

Active

Active

Active

161

162

163

164

165

166

167

Threat

Threat

Threat

Threat

Threat

Threat

Threat

Title
Survey File

Environmental Challenge to EIR

R/W

Construction

Design

Delay of R/W Acquisition

Buried Objects

Supplemental EIR

Environmental Nesting birds

R/W

Construction

Additional R/W

Hazardous Materials

08-1234

Project
Manager

Risk Rating
Risk Statement

Current status/assumptions

Inaccuracies or incomplete information


in the survey file could lead to rework of
the design.

Priority
Rating

Rationale for Rating

Risk Response
Strategy

Response Actions

Risk Owner

Updated

Mitigate

Verify that the survey file is accurate and


complete

Sam Owner

10/12/2012

Mitigate

Address concerns of stakeholders and


public during environmental process

EIR Person

11/23/2012

R/W Person

11/23/2012

Medium

Potential lawsuits may challenge the


environmental report, delaying the start
of construction or threatening loss of
funding.

PM Person

Low

Due to the large number of parcels and


businesses, may have to use the
condemnation process to acquire R/W,
which could delay start of construction
by up to one year, increasing
construction costs and extend the time
for COS.

Accept

High

Unanticipated buried man-made objects


uncovered during construction require
removal and disposal resulting in
additional costs.

Accept

Include a Supplemental Work item to


cover this risk.

PM

11/24/2012

Avoid

Monitor design changes against ED to


avoid reassessment of ED unless the
opportunity outweighs the threat

Design Manager

11/24/2012

PM/RE

11/24/2012

Medium

A design change that is outside of the


parameters contemplated in the
Environmental Document triggers a
supplemental EIR which causes a delay
due to the public comment period.

Low

Nesting birds, protected from


harassment under the Migratory Bird
Treaty Act, may delay construction
during the nesting season.

Mitigate

Schedule contract work to avoid the


nesting season or remove nesting habitat
before starting work.

Mitigate

Re-sequence the work to enable R/W


Certification

R/W Person

11/24/2012

Accept

Ensure storage space will be available

PM

11/24/2012

Low

Due to the complex nature of the


staging, additional right of way or
construction easements may be
required to complete the work as
contemplated, resulting in additional
cost to the project.

Low

Hazardous materials encountered


during construction will require an onsite storage area and potential
additional costs to dispose

Medium

Level 1 Risk Register

Project Name:

LEVEL 2 - RISK REGISTER

Example Project

DIST- EA

08-1234

Project
Manager

Risk Identification
Status
Active

Active

Active

Active

Active

Active

Active

Active

ID #
160

161

162

163

164

165

166

167

Type
Threat

Threat

Threat

Threat

Threat

Threat

Threat

Threat

Category
Design

Title

Probability

Cost Impact

3-Moderate

2 -Low

Potential lawsuits may challenge the


environmental report, delaying the start
of construction or threatening loss of
funding.

1-Very Low

Delay of R/W Acquisition

Due to the large number of parcels and


businesses, may have to use the
condemnation process to acquire R/W,
which could delay start of construction
by up to one year, increasing
construction costs and extend the time
for COS.

3-Moderate

Buried Objects

Unanticipated buried man-made objects


uncovered during construction require
removal and disposal resulting in
additional costs.

3-Moderate

A design change that is outside of the


parameters contemplated in the
Environmental Document triggers a
supplemental EIR which causes a delay
due to the public comment period.

3-Moderate

Environmental Challenge to EIR

R/W

Construction

Design

Supplemental EIR

Construction

Risk Statement

Current status/assumptions

Cost Score

Time Impact

4 -Moderate

8 -High

4 -Moderate

8 -High

4 -Moderate

3-Moderate

8 -High

Hazardous Materials

Hazardous materials encountered


during construction will require an onsite storage area and potential
additional costs to dispose

8 -High

2 -Low

Level 2 Risk Register

Verify that the survey file is accurate and


complete

Sam Owner

10/12/2012

Mitigate

Address concerns of stakeholders and


public during environmental process

EIR Person

11/23/2012

R/W Person

11/23/2012

Accept

Include a Supplemental Work item to


cover this risk.

PM

11/24/2012

Avoid

Monitor design changes against ED to


avoid reassessment of ED unless the
opportunity outweighs the threat

Design Manager

11/24/2012

PM/RE

11/24/2012

Mitigate

Schedule contract work to avoid the


nesting season or remove nesting habitat
before starting work.

Mitigate

Re-sequence the work to enable R/W


Certification

R/W Person

11/24/2012

Accept

Ensure storage space will be available

PM

11/24/2012

24
1 -Very Low

Mitigate

16

24
2-Low

Updated

24
8 -High

8 -High

Risk Owner

12

12

Additional R/W

Response Actions

24

12

2 -Low

Strategy

Accept

4 -Moderate

4 -Moderate

Rationale

12

Due to the complex nature of the


staging, additional right of way or
construction easements may be
required to complete the work as
contemplated, resulting in additional
cost to the project.

Time Score

12

2-Low

Risk Response

4 -Moderate
6

Nesting birds, protected from


harassment under the Migratory Bird
Treaty Act, may delay construction
during the nesting season.

Environmental Nesting birds

R/W

Risk Assessment

Inaccuracies or incomplete information


in the survey file could lead to rework of
the design.

Survey File

PM Person

LEVEL 3 - RISK REGISTER

Project Name:

Example Project

Project
Manager

08-1234

DIST- EA

PM Person

Risk Assessment
Risk Identification
Status

ID #

Active

160

Active

161

Category
Design

162

R/W

Active

163

Construction

164

Active

165

Design

166

R/W

Active

167

Construction

Probability
Current status/assumptions

Low

Cost Impact ($)

High

Low

40

60

100,000

Potential lawsuits may challenge the


environmental report, delaying the start
of construction or threatening loss of
funding.

10

Delay of R/W Acquisition

Due to the large number of parcels and


businesses, may have to use the
condemnation process to acquire R/W,
which could delay start of construction
by up to one year, increasing
construction costs and extend the time
for COS.

40

60

Buried Objects

Unanticipated buried man-made objects


uncovered during construction require
removal and disposal resulting in
additional costs.

20

Supplemental EIR

A design change that is outside of the


parameters contemplated in the
Environmental Document triggers a
supplemental EIR which causes a delay
due to the public comment period.

Survey File

Most likely

Time Impact (days)


High

Probable

Low

Most likely

High

Risk Response

Rationale
Probable

Strategy

Risk Owner

Updated

Mitigate

Verify that the survey file is accurate and


complete

Sam Owner

10/12/2012

Address concerns of stakeholders and


public during environmental process

EIR Person

11/23/2012

R/W Person

11/23/2012

PM

11/24/2012

300,000 $

100,000

500,000 $

800,000 $

1,200,000 $

42,000

60

150

Mitigate

500,000 $

750,000 $

2,000,000 $

542,000

180

365

136

Accept

40

200,000

400,000 $

90,000

10

30

100,000 $

200,000 $

400,000 $

47,000

60

Nesting birds, protected from


harassment under the Migratory Bird
Treaty Act, may delay construction
during the nesting season.

20

150,000

300,000 $

23,000

30

Additional R/W

Due to the complex nature of the


staging, additional right of way or
construction easements may be
required to complete the work as
contemplated, resulting in additional
cost to the project.

40

60

500,000 $

750,000 $

1,000,000 $

Hazardous Materials

Hazardous materials encountered


during construction will require an onsite storage area and potential
additional costs to dispose

20

40

100,000

300,000 $

Environmental Nesting birds

Active

Risk Statement
Inaccuracies or incomplete information
in the survey file could lead to rework of
the design.

Environmental Challenge to EIR

Active

Active

Title

Level 3 Risk Register

Response Actions

Accept

Include a Supplemental Work item to


cover this risk.

Avoid

Monitor design changes against ED to


avoid reassessment of ED unless the
opportunity outweighs the threat

Mitigate

Schedule contract work to avoid the


nesting season or remove nesting habitat
before starting work.

375,000

Mitigate

60,000

Accept

Design Manager 11/24/2012

PM/RE

11/24/2012

Re-sequence the work to enable R/W


Certification

R/W Person

11/24/2012

Ensure storage space will be available

PM

11/24/2012

Rating -->

Very Low

Impact Definitions
Low
Moderate

High

Cost Impact of
Threat
(CO + COS)

Insignificant
cost increase

<5% cost
increase

5-10% cost
increase

10-20% cost
increase

Cost Impact of
Opportunity (CO
+ COS)

Insignificant
cost reduction

<1% cost
decrease

1-3% cost
decrease

3-5% cost
decrease

Schedule Impact
of Threat

Insignificant
slippage

<1 month
slippage

1-3 months
slippage

3-6 months
slippage

Schedule Impact
of Opportunity
Probability

Insignificant
<1 month
1-2 months
2-3 months
improvement improvement improvement improvement
19%

1019%

2039%

4059%

Risk Matrix
Probability Rating

5 Very High
4 High
3 Moderate
2 Low
1 Very Low
1
Very Low

2
Low

4
Moderate

Impact Rating

Low Risk
Moderate Risk
High Risk

Rating

Very High
>20% cost
increase
>5% cost
decrease
>6 months
slippage

>3 months
improvement
6099%

8
High

16
Very High