Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
COMPRESSOR
Submitted in partial fulfillment of the requirements for the award of
Bachelor of Engineering Degree in
Mechanical Engineering
by
ARUN PRASATH.S (Reg. No. 3145521)
BHARATH.P.R
SATHYABAMA UNIVERSITY
JEPPIAAR NAGAR, RAJIV GANDHI SALAI,
CHENNAI 600119. TAMILNADU.
APRIL 2014
SATHYABAMA UNIVERSITY
(Established under Section 3 of UGC Act, 1956)
Internal Guide
MR.S.P.VENKATESAN
Internal Examiner
(Name in capital letters
with signature)
External Examiner
(Name in capital letters
with signature)
DECLARATION
We ARUN PRASATH.S (Reg.No. 3145521) and BHARATH.P.R (Reg.No. 3145538) hereby
declare
that
the
Project
Report
entitled
DESIGN
FOR
ENERGY
SAVING
IN
1.
2.
DATE
PLACE
:
:
ACKNOWLEDGEMENT
My deep sense of gratitude goes to our beloved chancellor Col. Dr. JEPPIAAR, M.A.,
B.L., Ph.D who provided all facilities and necessary encouragement during the course study.
I extended my gratitude and sincere thanks to our honorable directors Dr. Marie Johnson,
B.E., M.B.A., M.Phil., Ph.D & Dr. Mariazeena Johnson, B.E., M.B.A., M.Phil., Ph.D for their
support.
I would like to express our sincere thanks to our beloved Vice Chancellor Dr. B. Sheela
Rani, M.S. (By Research), Ph.D & Registrar Dr.S.S.Rau., Ph.D for their support.
I dedicate my sincere thanks to our bellowed Registrar Dr.S.S.Rau., Ph.D and Controller
of Examinations Dr.K.V.Narayanan., Ph.D who provide all facilities and necessary
encouragement during the course study.
I would like to express the sense of gratitude towards our Head of the Department Dr. S.
Krishnamoorthy M.E. Ph.D for completion of this project. I extend my thanks to all my
lecturers.
I dedicate whole hearted thanks to my guide , Mr.S.P.Venkatesan, M.E.,(Ph.D.,)
Assistant Professor, Sathyabama University for the commendable inspiring guidance, valuable
advice, encouragement and motivation given to succeed in our endeavors.
ABSTRACT
Air leak testing machine plays a vital role in detecting the leaks in the rims. The rim
is clamped between the two cavities, of which one is stationary through which air supplied
and the other cavity is movable which is positioned by the pneumatic clamp cylinder. Leak
is detected by measuring the amount of air flow from one cavity to other cavity through the
rim.
Booster plays a major role for supplying the pressurized air at the desired pressure
to the clamping cylinder. It boosts up the pressure of the air being supplied from the reservoir
and supplies to the clamp cylinder. In most of the cases there is a greater chance of booster
failure because of the repeated usage, high volume of air consumption by the clamp cylinder
and more pressure requirement, due to which the breakdown of the air leak testing machine
increases.
There is a growing emergency for reducing the breakdown in air leak testing machine
to
avoid much downtime, by eliminating the frequent booster failure or improving the
rim. So it is
project
is
about
finding
and
implementing
new
method
for
the
elimination of much downtime and spare cost in rim-air leak testing machine in such a way
that the sufficient clamping of rim is ensured. A systematic approach has been followed
for finding the new method for solving the above problem.
Hydraulic system has been founded as a new system for eliminating much
breakdown in air leak testing machine. Also this system is implemented in air leak testing
machine and a comparative study is made between the earlier pneumatic and newer hydraulic
system based on the cost.