Project Name: Starbucks SM Iloilo

Project Location: SM Iloilo Expansion


Construction Duration: August 10 2016 (50Days)
Date: August 5 2016

A . Z. Coronel Builder Haus


Block 6 Lot 15 North Lane Street
Greymarville Subdivision, Pamplona
Las Pinas, Metro Manila
June

Tasks

1
1.1
1.2

Number of Days
General Requirements
Mobilization
Permits
Building Permit

W T F S S M T W T F
###
###
###
###
###
###
###
###
### 1
1

S S
2 3

M
4

T
5

Tel.874-33-82
BARCHART as of August 5 2016
July
W T
6 7

F
8

S S M T W T F S S M T W T F S S M T W T F S S M
9 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### 1

August
T
2

W T
3 4

F
5

S S
6 7

M
8

Percentage
T W Accomplishment
9 ###

9 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
100%

10%

Occupancy Permit
2

Site Work
Hauling

85%

Demolition

100%

Concrete
Concrete Topping

100%

Masonry Works
100mm CHB walls, including plastering

100%

150mm CHB walls, including plastering

100%

50mm CHB walls (incl. plastering)

100%

Metals
Steel Framing for Restroom Lavatory

100%

Stainless Steel Water Heater Platform

100%

Stainless Steel Strip for Walk-Off Mat

100

6
6.1

Others
Wood
Rough Carpentry

100%

6.2

Finish Carpentry

95%

Cleaning Closet

100%

Manager's Area Cabinet Shelves

100%

POS/ Barista/ Condiment Bar


Metal Frames for Artwork
7

Thermal Protection
Waterproofing

100%

9
9.1

Doors and Windows


Solid Core Wood Door for Workroom

100%

Solid Core Wood Door for Restroom

100%

PVC Door for Utility Cabinet


Glass Panels and Glass Doors
Finishes
Floor Finishes
Tiles

100%

100%

Engineered Wood
Walk-Off Mat
9.2

Wall Finishes
Tiles

100%

6" Basetile

100%

Backbar Tiles

100%

Painting Works

9.3

Others
Ceiling Finishes
Slab soffit Finish
Acoustic Ceiling Tiles

10

Specialties
Laminated Partition for Urinal
Built-in Furniture

95%

98%
95%

95%

Community Table

95%

Merchandise Shelf

95%

Banquette Seat
Others
Permit Frame

90

Lavatory Cover

90

Signage
11

Electrical Works

12

Plumbing Works

13

Mechanical Works

14

Fire Protection Works

15

Owner-Supplied Items

Delivery of Casework
Installation of Casework

Delivery of Furniture
Dilivery of Equipment

90

Positioning of Furniture

Mid-Way Punchout
Testing and Commissioning
Final Punch Out
Secondary Punchout
Turnover

Overall Accomplishment

90%