SGD SAIPEM CAMP ACCOMODATION AND BUILDING FACILITIES

JOB SAFETY ANALYSIS


PROJECT OPERATIONAL CAMP

JSA NO. 003

Date 10/01/2013

Activity: Electrical works

Steps

Scaffoldings.

Page 1 of 2

Hazards

Fall of materials.
Fall of personnel.
Collapse of scaffolding.
Improper access and
egress.

Control Measures to be Enforced

All scaffolding materials should be inspected and


approved.
Inspection of all scaffolding structure should be
carried out after each deconstruction of all
scaffoldings by a qualified scaffolding inspector.
Obtain scaffold construction permit prior to start
the work.
Ensure the area is barricaded to prevent any
unauthorized personnel entry.
All scaffoldings shall be erected by qualified and
competent personnel under the supervision of a
scaffolding supervisor.
Inspection of scaffolding shall be done by a
qualified scaffolding inspector.
No one else is permitted to alter any scaffolding
without the approval of scaffolding inspector.
Scaffoldings must be fitted with toe boards to
prevent the fall of materials and tools. All tools and
materials shall be properly secured in the scaff
platform.
All personnel entering in the scaffolding must be
physically fit for the job and shall not be afraid of
heights.
Personnel must wear full safety harnesses while
working at heights. 100% tieoff shall be
maintained while working at heights.
Weekly Inspections should be carried out.
Scaff tag should be available on all scaffoldings.

Remarks / Actions

SGD SAIPEM CAMP ACCOMODATION AND BUILDING FACILITIES


JSA NO. 003

JOB SAFETY ANALYSIS


PROJECT OPERATIONAL CAMP

Page 2 of 2
Date 10/01/2013

Activity: Electrical works

Working at
Heights.

Fall from height.


Unsafe working
platforms and working
conditions.
Unsafe access / egress.
Hit by the structure.

Supervisor / Operators.
Any person working above 2m height shall be
considered as working at height.
Ensure all personnel assigned to work at height are
not afraid of height and medically fit for height
works.
Work shall not be allowed to be carried out
standing over wooden boxes; empty barrels and
other make shift arrangements.
In case of any practical difficulties to provide
proper working platform, safety harness with fall
arrestors (self inertia reels) shall be installed and
used.
Temporary edge protection with top hand rails at a
height of 1.1mand mid rail at a height of 0.55 m
and with toe board shall be installed in all around
the openings in floor slabs.
For small openings floor covers shall be provided
with adequate strength.
Stop work at height in high wind velocity.
Home made ladders not to be used; Ladders with
broken rug not to be used; Placement of ladder to be
in proper securing position.

Name
Approved By:

Sheikh Ismail

Signature

Date