Locational Based Marginal Pricing .

NYISO
Market Operations

the cornerstone
of the NYISO
Market Operation

LBMP

Objectives to Understand:
Basics of Locational Based
Marginal Pricing (LBMP)
LBMP and Impact of Congestion
LBMP Specifics

LBMP Energy Market


(Load)

Bid
s
s
r
e
f
f
O

Load Serving Entities (LSEs) provide bids to


purchase energy.
Power Suppliers/Generators (Gen) provide offers
to sell energy.

LBMP Energy Market


(Load)

Bid
s
s
r
e
f
f
O

Energy Sales and Purchases are


scheduled directly through the NYISO
Price of energy is based on the Market
Clearing Price or Locational Based
Marginal Pricing (LBMP).

Locational Based Marginal Pricing .


1. A methodology where the price of Energy at
each location in the NYS Transmission System
is equivalent to the cost to supply the next
increment of Load at that location.
2. NYISO takes into account:
Generation Offer Prices
Physical aspects of the NYS Transmission
System
Lets simplify the definition and use the following:

The cost to serve the next MW of Load


at a specific location in the grid

Before we start lets review the


following definitions..

Definitions - Simplified
Energy - A quantity of electricity that is bid,
produced, purchased, consumed, sold, or
transmitted over a period of time, and
measured or calculated in megawatt hours.
Load - Energy demands on the power grid.
Load Serving Entity (LSE) - An entity that
supplies Energy to retail customers.

Generator or Power Supplier - A facility


capable of supplying Electric Energy

Definitions - Simplified
Bus - A common connection of two or
more electric circuits within a station.
Transmission Line - Conductors for
transmitting electric power
Transmission Constraint - Limits on the
ability of the Transmission Grid to transmit
energy. Recognition of Transmission
Constraints is necessary to maintain
reliable operation of the Transmission
System.
Zone - Geographical areas reflecting the
Transmission Owners traditional service
territories and External Control Areas

Next we are going to define and demonstrate .

Marginal Pricing
the cost to serve the next MW of load

Using Economic Dispatch

Economic Dispatch:
1. Determine the least costly way of producing
electric energy to meet the load
2. The price of producing an additional MW in a
specific location in the grid is called the
Locational Based Marginal Price (LBMP).
3. The LBMP will be the same at all buses when:

Transmission limits are not reached


Transmission Limits are not exceeded
Losses are zero (Losses to be addressed later)

West

2 Zones

2 Zones (Geographical Area):


West and East
Buffalo-Albany Line

Buffalo

Gen#1
MW

$/MWh

East
2 Buses, Buffalo &
Albany, connected by
a Transmission Line

Albany
Note the arrows,
Generators
supply energy

Gen#2
MW

$/MWh

Transmission Line

Load A
MW of
Load

Load B
Note the arrows,
Load withdraws
energy

MW of
Load

The Generator MW capacity is displayed in black .

Gen#1
MW of Capacity

Offer
Price

$/MWh

When the Generator is selected to meet the load,


the number of MW selected is shown in blue .

Gen#1
MW of Capacity

MW selected to $/MWh
meet Load

Assumptions:

Simple 2 Bus, 2 Zone Examples

No Transmission Limits

No Transmission Losses - These


will be discussed later

West

East
Buffalo

Gen#1
100 MW

$25

Albany

Gen#2
100 MW

$45

Load A

Load B

10 MW

20 MW

Step 1:

Determine the Total Load

West

East
Buffalo

Gen#1
100 MW

Albany

Gen#2

$25

100 MW

$45

Load A

Load B

10 MW

20 MW

Total Load is 30 MW

West

Total Load
30 MW

Buffalo

Gen#1
100 MW

$25

East

Albany

Gen#2
100 MW

$45

Load A

Load B

10 MW

20 MW

Step 2:

Select the most economic Generation

West

Total Load
30 MW

Buffalo

Gen#1
100 MW

$25

East

Albany

Gen#2
100 MW

$45

Load A

Load B

10 MW

20 MW

Gen #1 is the cheapest and


can provide up to 100 MW

West

Total Load
30MW

Buffalo

Gen#1
100 MW

$25

East

Albany

Gen#2
100 MW

$45

Load A

Load B

10 MW

20 MW

Step 3:

Select the MW Gen#1 can provide to


meet the load

West

Total Load
30MW

Buffalo
Gen#1
100 MW

30 MW

$25

East

Albany

Gen#2
100 MW

$45

Load A

Load B

10 MW

20 MW

Gen #1 can provide up to 100 MW


Gen #1 provides 30 MW to meet the Load

West

Total Load
30MW

Buffalo
Gen#1
100 MW

30 MW

$25

East

Albany

Gen#2
100 MW

$45

Load A

Load B

10 MW

20 MW

Step 4:

Determine if all of the Load is met.

West

Total Load
30MW

Buffalo
Gen#1
100 MW

30 MW

$25

East

Albany

Gen#2
100 MW

$45

Load A

Load B

10 MW

20 MW
Total Load is 30 MW
Gen #1 provides 30 MW
Total Load is met

West

Total Load
30MW

Buffalo
Gen#1
100 MW

30 MW

$25

East

Albany

Gen#2
100 MW

$45

Load A

Load B

10 MW

20 MW

Step 5: Determine the MWs that are transmitted


over the Buffalo/Albany Line

Total Load
30MW

West

Buffalo
Gen#1
100 MW

30 MW

$25
10 MW

Load A
10 MW

East

Albany

Gen#2
20 MW

100 MW

$45

20 MW

Load B
20 MW

20 MWs are transmitted over the Buffalo/Albany Line

West

Total Load
30MW

Buffalo
Gen#1
100 MW

30 MW

$25

East

Albany

Gen#2
100 MW

$45

Load A

Load B

10 MW

20 MW

Step 6:

Determining the LBMP ..

West

Total Load
30MW

Buffalo
Gen#1
100 MW

$25

30 MW

East

Albany

Gen#2
100 MW

$45

Load A

Load B

10 MW

20 MW

Determine the cost to serve the


next MW of load.

West
Gen#1
100 MW

$25

30 MW

Buffalo

Albany

East
Gen#2
100 MW

$45

Load A

Load B

10 MW

20 MW

Lets see which generator would be selected if


the Total Load changed to 31MW .

Total Load
31MW

West

Buffalo
Gen#1
100 MW

31 MW

$25
11 MW

Load A
11 MW

East

Albany

Gen#2
20 MW

100 MW

$45

20 MW

Load B
20 MW

If the load in the West increased by 1 MW


Gen #1 will be dispatched to provide an
additional MW at $25/MW

Total Load
31MW

West

Buffalo
Gen#1
100 MW

31 MW

$25
10 MW

Load A
10 MW

East

Albany

Gen#2
21 MW

100 MW

$45

21 MW

Load B
21 MW

If the load in the East increased by 1 MW


Gen #1 will be dispatched to provide an
additional MW at $25/MW

West

Total Load
31MW

Buffalo
Gen#1
100 MW

East

Albany

Gen#2

$25

100 MW

30 MW

$45

Load A

Load B

10 MW

20 MW

Regardless where the load increased Gen #1 will be


dispatched to provide an additional MW at $25/MW

LBMP = $25/MW

West

Total Load
30MW

Buffalo
Gen#1
100 MW

$25

30 MW

East

Albany

Gen#2
100 MW

$45

Load A

Load B

10 MW

20 MW

Generator #1 can provide the next MW of load at


$25/MW
LBMP = $25/MW for the West Zone and the East Zone

Total Load
30MW

West

Buffalo
Gen#1
100 MW

$25

30 MW

East

Albany

Gen#2
100 MW

$45

Load A

Load B

10 MW

20 MW

LBMP (West) =
$25/MWh

LBMP (East) =
$25/MWh

Total Load
30MW

West

Buffalo
Gen#1
100 MW

$25

30 MW

East

Albany

Gen#2
100 MW

$45

Load A

Load B

10 MW

20 MW

Determine the Total Load.

West + East =
10 MW + 20MW =

Select the Most Economic


Generation to meet the Load.

Total Load = 30 MW
Generator #1
$25 < $45

Determine the Cost of serving


the Next MW of Load.

Generator #1 can
serve the next MW

30 MW

$25/MWh

Example 2
LBMP with No Congestion

Assumptions:

Simple 2 Bus, 2 Zone Examples

No Transmission Constraints

No Transmission Losses (to be discussed


later)

West

East
Buffalo

Gen#1
100 MW

Albany

Gen#2

$25

100 MW

$45

Load A

Load B

60 MW

90 MW
What is the Total Load?
1. 60 MW
2. 100 MW
3. 150 MW
4. 90 MW

West

East
Buffalo

Gen#1
100 MW

$25

Albany

Gen#2
100 MW

$45

Load A

Load B

60 MW

90 MW

Total Load is 150 MW

West

Total Load
150 MW

Buffalo

Gen#1
100 MW

$25

East

Albany

Gen#2
100 MW

$45

Load A

Load B

60 MW

90 MW

Select the generator that is the most economic (cheapest):


1. Gen #1
2. Gen #2
3. Load A
4. Load B

West

Total Load
150 MW

Buffalo

Gen#1
100 MW

$25

East

Albany

Gen#2
100 MW

$45

Load A

Load B

60 MW

90 MW

Gen #1 is the cheapest and


can provide up to 100 MW

West
Gen#1
100 MW

$25

100 MW

Total Load
150 MW

Buffalo

Albany

East
Gen#2
100 MW

$45

Load A

Load B

60 MW

90 MW

If Gen #1 is selected for 100 MW how many MW will


cross the Buffalo/Albany Line?
1. 40 MW
2. 60 MW
3. 100 MW
4. 90 MW

West
Gen#1
100 MW

Total Load
150 MW

Buffalo

Albany

Gen#2

$25

100 MW

100 MW
60 MW

East

40 MW

100 MW

$45

Load A

Load B

60 MW

90 MW

If Gen #1 provides 100 MW (Full Capacity);


60 MW to meet Load A
40 MW will go across the Buffalo/Albany Line

West
Gen#1
100 MW

Total Load
150 MW

Buffalo

Albany

Gen#2

$25

100 MW

100 MW
60 MW

Load A
60 MW

East

40 MW

100 MW

$45

40 MW

Load B
90 MW

Continuing with the same example:


40 MW cross the Buffalo/Albany Line to Load B
Load B is 90 MW.
Still need to serve 50 MW Load in the East

West
Gen#1
100 MW

Total Load
150 MW

Buffalo

Albany

$25

100 MW

100 MW
60 MW

Load A
60 MW

40 MW

East

50 MW

Gen#2
100 MW

$45

50 MW

90 MW

Load B
90 MW

Gen #2 can provide the 50 MW to meet


the remaining 50 MW Load in East .
Total Load of 150 MW is met

West

Total Load
150 MW

Buffalo
Gen#1
100 MW

100 MW

$25

East

Albany
Gen#2
100 MW

50 MW

$45

Load A

Load B

60 MW

90 MW

Lets see which generator would be selected if


the Total Load changed to 151MW .

West
Gen#1
100 MW

Total Load
151 MW

Buffalo

Albany

$25

100 MW

100 MW
61 MW

Load A
61 MW

39 MW

East

Gen#2
100 MW
51 MW

$45

51 MW

90 MW

Load B
90 MW

If the load in the West increased by 1 MW


Gen #2 would be dispatched to provide an
additional MW at $45/MW

West
Gen#1
100 MW

Total Load
151 MW

Buffalo

Albany

$25

100 MW

100 MW
60 MW

Load A
60 MW

40 MW

East

Gen#2
100 MW
51 MW

$45

51 MW

91 MW

Load B
91 MW

If the load in the East increased by 1 MW


Gen #2 would be dispatched to provide
an additional MW at $45/MW

West
Gen#1
100 MW

$25

100 MW

Load A
60 MW

Total Load
150 MW

Buffalo

Albany

East
Gen#2
100 MW

$45

50 MW

Load B
90 MW

Regardless of where the load increased Gen #2


would have to provide an additional MW at $45/MW
LBMP = $45/MW

West
Gen#1
100 MW

Total Load
150 MW

Buffalo

Albany

East
Gen#2
100 MW

$25

$45

50 MW

100 MW

Load A

Load B

60 MW

90 MW

Determine the Total Load.

West + East =
60 MW + 90 MW =

Select the Most Economic


Generation to meet the Load.

Total Load = 150 MW


$25 for first 100 MW
$45 for next 50 MW

Determine the Cost of serving


the Next MW of Load.

Generator #2 can
serve the next MW

150 MW

Generator #2

$45/MWh

West
Gen#1
100 MW

Total Load
150 MW

Buffalo

$25

100 MW

Load A
60 MW

LBMP (West) =
$45/MWh

Albany

East
Gen#2
100 MW

$45

50 MW

Load B
90 MW

LBMP (East) =
$45/MWh

West
Gen#1
100 MW

$25

100 MW

Load A
60 MW

Total Load
150 MW

Buffalo

Albany

East
Gen#2
100 MW

$45

50 MW

Load B
90 MW

Total Load = 150 MW


Generator #2 is the Marginal Unit
Generator that would serve the next MW of load.

The last two examples showed the Marginal Pricing of LBMP and the
process of Economic Dispatch
All of these examples had no Transmission Constraints on the
Transmission Lines resulting in equal LBMPs for both buses.
In the real world transmission limits exist! Now we are going to add
Transmission Limits to the remaining examples.

Marginal Pricing
the cost to serve the next MW of load

Using Economic Dispatch


Transmission Constraints

To maintain an efficient and reliable Transmission


System we need to ensure Transmission System Limits
are not exceeded.

Example 3
LBMP with
Transmission Limits
And No Congestion

Assumptions:

Simple 2 Bus, 2 Zone Examples

Transmission Constraint of 50 MW

No Transmission Losses

West

East
Buffalo

Albany

Gen #1 $25
100 MW

Gen #2 $30
100 MW

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

What is the Total Load?


1. 80 MW
2. 140 MW
3. 200 MW
4. 220 MW

West

Total Load
220 MW

Buffalo

East

Albany

Gen #1 $25
100 MW

Gen #2 $30
100 MW

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

Total Load is 220 MW

West

Total Load
220 MW

Buffalo

East

Albany

Gen #1 $25
100 MW

Gen #2 $30
100 MW

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

Select the generator that is the most economic (cheapest):


1. Gen #1
2. Gen #2
3. Gen #3
4. Gen #4

Total Load
220 MW

West

Buffalo
Gen #1
100 MW

East

Albany

$25

??? MW

Gen #2 $30
100 MW

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

Total Load

220 MW

Gen #1

??? MW

Gen #1 is the most economic at $25/MWh.


Can Gen #1 provide its full capacity to
serve Load?
Yes
No

Total Load
220 MW

West

Buffalo
Gen #1
100 MW

East

Albany

$25

100 MW

Gen #2 $30
100 MW

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

Total Load

220 MW

Gen #1

100 MW

Remaining
Load

120 MW

Gen #1 is selected for 100 MW


Still need to select generation to meet
the remaining Load of 120MW.

Total Load
220 MW

West

Buffalo
Gen #1
100 MW

East

Albany

$25

100 MW

Gen #2 $30
100 MW

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

Total Load

220 MW

Gen #1

100 MW

Remaining
Load

120 MW

Select the next generator that is the most


economic (cheapest)
1. Gen #2
2. Gen #3
3. Gen #4

Total Load
220 MW

West

Buffalo
Gen #1
100 MW

$25

East

Albany
Gen #2
100 MW

$30

100 MW

??? MW

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

Total Load

220 MW

Gen #1

100 MW

Gen #2

??? MW

Gen #2 is the most economic at $30/MWh.


Can Gen #2 provide its full capacity to
serve load?
Yes
No

Total Load
220 MW

West

Buffalo
Gen #1
100 MW

$25

East

Albany
Gen #2
100 MW

$30

100 MW

100 MW

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

Total Load

220 MW

Gen #1

100 MW

Gen #2

100 MW

Remaining
Load

20 MW

Gen #2 is selected for 100 MW


Still need to select generation to
meet the remaining Load of 20MW.

Total Load
220 MW

West

Buffalo
Gen #1
100 MW

$25

East

Albany
Gen #2
100 MW

$30

100 MW

100 MW

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

Total Load

220 MW

Gen #1

100 MW

Gen #2

100 MW

Remaining
Load

20 MW

Select the next generator that is


the most economic
1. Gen #3
2. Gen #4

Total Load
220 MW

West

Buffalo
Gen #1
100 MW

Gen #4
100 MW

Albany
Gen #2
100 MW

$25

100 MW
$40

??? MW

East

$30

100 MW
Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

Total Load

220 MW

Gen #1

100 MW

Gen #2

100 MW

Gen #4

??? MW

Gen #4 is the most economic at $40/MWh.


Can Gen #4 provide its full capacity to
serve load?
Yes
No

Total Load
220 MW

West

Buffalo
Gen #1
100 MW

Albany
Gen #2
100 MW

$25

$30

100 MW

100 MW
Gen #4
100 MW

East

Gen #3 $50
100 MW

$40

20 MW
Load A

Load B

80 MW

140 MW

Total Load

220 MW

Gen #1

100 MW

Gen #2

100 MW

Gen #4

20 MW

To meet the remaining load of


20 MW, Gen #4 is selected for
20 MW.
Total Load of 220 MW is met

West

Total Load
220 MW

Buffalo
Gen #1
100 MW

$25

Albany
Gen #2
100 MW

$30

100 MW

100 MW
Gen #4
100 MW

East

$40

20 MW

Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

Based on the Generators/MWs selected, how many


MW will cross the Buffalo/Albany Line?
1. 40 MW
2. 60 MW
3. 100 MW
4. 90 MW

Total Load
220 MW

West

Buffalo
Gen #1
100 MW

East

Albany
Gen #2
100 MW

$25

100 MW

100 MW

Gen #4
100 MW

20 MW

40 MW

100 MW

20 MW
80 MW

80 MW

100 MW
Gen #3 $50
100 MW

$40

Load A

$30

140 MW

Load B
140 MW

100 MW (Gen #1) + 20 MW (Gen #4) - 80 MW (Load A) = 40 MW


40 MW will cross the Buffalo/Albany Line.
The Transmission Limit is not reached or exceeded.

Total Load
220 MW

West

Buffalo
Gen #1
100 MW

$25

Albany
Gen #2
100 MW

$30

100 MW

100 MW
Gen #4
100 MW

East

$40

20 MW

Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

Total Load

220 MW

Gen #1

100 MW

Gen #2

100 MW

Gen #4

20 MW

What is the LBMP?


1. $25
2. $30
3. $35
4. $40
5. $45
6. $50

Total Load
220 MW

West

Buffalo
Gen #1
100 MW

$25

Albany
Gen #2
100 MW

$30

100 MW

100 MW
Gen #4
100 MW

East

$40

20 MW

Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

LBMP (West) =
$40/MWh

LBMP (East) =
$40/MWh

Generator #4 can provide the next MW of Load at $40/MW


regardless if the load increases in the West or in the East.

Total Load
220 MW

West

Buffalo
Gen #1
100 MW

$25

Albany
Gen #2
100 MW

$30

100 MW

100 MW
Gen #4
100 MW

East

$40

20 MW

Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

Total Load

220 MW

Gen #1

100 MW

Gen #2

100 MW

Gen #4

20 MW

Which generator is the Marginal Unit?


Gen #1
Gen #2
Gen #3
Gen #4

Total Load
220 MW

West

Buffalo
Gen #1
100 MW

$25

Albany
Gen #2
100 MW

$30

100 MW

100 MW
Gen #4
100 MW

East

$40

20 MW

Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

Total Load

220 MW

Gen #1

100 MW

Gen #2

100 MW

Gen #4

20 MW

Gen #4 is the Marginal Unit.


The generator that would
serve the next MW of load.

Total Load
220 MW

West

Buffalo
Gen #1
100 MW

$25

Albany
Gen #2
100 MW

$30

100 MW

100 MW
Gen #4
100 MW

East

$40

20 MW

Gen #3 $50
100 MW

Load A

Load B

80 MW

140 MW

Determine the Total Load.

West + East =
80 MW + 140 MW =

Select the Most Economic


Generation to meet the Load.

Total Load = 220 MW


$25 for first 100 MW
$30 for next 100 MW
$40 for next 20 MW

Determine the Cost of serving Generator #4 can


the Next MW of Load.
serve the next MW

220 MW

Generator #4

$40/MWh

Total Load
220 MW

West

Buffalo
Gen #1
100 MW

East

Albany
Gen #2
100 MW

$25

100 MW

100 MW

Gen #4
100 MW

20 MW

40 MW

100 MW

20 MW
80 MW
LBMP (West) =
$40/MWh

80 MW

100 MW
Gen #3 $50
100 MW

$40

Load A

$30

140 MW

Load B
140 MW

LBMP (East) =
$40/MWh

In this example 40 MW is transmitted over the Buffalo/Albany


Line. The Transmission Limit of 50 MW is not exceeded. When
Transmission Limits are not reached or exceeded the LBMP for
West and East are the same.

Congestion occurs when the Power flow


reaches the Transmission Limit.

NY Bulk Power System is:


Tightly Interconnected
Operationally Complex

Congestion .
A Characteristic of Transmission System
Occurs when the Transmission Limit is
reached

When Transmission Limits are reached Generators from a


different bus are dispatched to meet the load.
When there is congestion LBMPs can differ between buses.

Locational-Based
at a specific location in the grid

Lets address the Locational Based aspect of


LBMP and see when the LBMP at the buses
would be different.

Example 4
LBMP with Congestion

Assumptions:

Simple 2 Bus, 2 Zone Examples

Transmission Constraint of 50 MW

No Transmission Losses

West

East
Buffalo

Gen#1
100 MW

Albany

Gen#2

$25

100 MW

$45

Load A

Load B

10 MW

60 MW
What is the Total Load?
1. 10 MW
2. 70 MW
3. 60 MW
4. 100 MW

Total Load

West

70 MW

Buffalo

Gen#1
100 MW

East

Albany

Gen#2

$25

100 MW

$45

Load A

Load B

10 MW

60 MW

Total Load is 70 MW

Total Load

West

70 MW

Buffalo

Gen#1
100 MW

$25

East

Albany

Gen#2
100 MW

$45

Load A

Load B

10 MW

60 MW

Select the generator that is the most economic (cheapest):


1. Gen #1
2. Gen #2
3. Load A
4. Load B

Total Load

West

70 MW

Buffalo

Gen#1
100 MW

$25

East

Albany

Gen#2
100 MW

$45

Load A

Load B

10 MW

60 MW

Gen #1 is the cheapest and


can provide up to 100 MW

Total Load

West
Gen#1
100 MW

$25

70 MW

Buffalo

Albany

East
Gen#2
100 MW

$45

Load A

Load B

10 MW

60 MW

What is the transmission limit for the Buffalo/Albany Line?


1. 10 MW
2. 60 MW
3. 50 MW
4. 100 MW

Total Load

West
Gen#1
100 MW

$25

70 MW

Buffalo

Albany

East
Gen#2
100 MW

$45

Load A

Load B

10 MW

60 MW

The transmission limit for the Buffalo/Albany Line is 50 MW.

Total Load

West
Gen#1
100 MW

70 MW

Buffalo

Albany

Gen#2

$25

70 MW

East
100 MW

$45

?? MW

Load A

Load B

10 MW

60 MW

If Gen #1 is selected to serve 70 MW of Load how many MW will have


to cross the Buffalo/Albany Line?
1. 10 MW
2. 60 MW
3. 50 MW
4. 100 MW

Total Load

West
Gen#1
100 MW

70 MW

Buffalo

$25

70 MW

Albany

East
Gen#2

60 MW

100 MW

$45

70 MW
10 MW

Load A

Load B

10 MW

60 MW

If Gen #1 is selected for 70 MW,


60 MW will cross the Buffalo/Albany Line.

Total Load

West
Gen#1
100 MW

70 MW

Buffalo

$25

70 MW

Albany

Limit
Exceeded

60 MW

East
Gen#2
100 MW

$45

70 MW
10 MW

Load A

Load B

10 MW

60 MW

60 MW exceeds the 50 MW Transmission Limit


across the Buffalo/Albany Line

Total Load

West
Gen#1
100 MW

$25

?? MW

70 MW

Buffalo

Albany

East
Gen#2
100 MW

$45

Load A

Load B

10 MW

60 MW

Without exceeding the Buffalo/Albany Transmission Line Limit,


Gen #1 is selected for:
1. 70 MW
2. 10 MW
3. 50 MW
4. 60 MW

Total Load

West
Gen#1
100 MW

70 MW

Buffalo

$25

60 MW

Albany

East
Gen#2

50 MW

100 MW

$45

60 MW
10 MW

Load A

Load B

10 MW

60 MW

Gen #1 provides 60 MW.


10 MW to meet Load A.
50 MW will cross the Buffalo/Albany Line.

Total Load

West

Buffalo

Gen#1
100 MW

$25

60 MW

70 MW
Congestion
At Limit

50 MW

East

Albany

Gen#2
100 MW

$45

60 MW
10 MW

Load A

Load B

10 MW

60 MW

50 MW crosses the Buffalo/Albany Line.


50 MW is the Transmission Limit.
Congestion occurs when Power flow reaches
the Transmission Limit.

Total Load

West

70 MW

Albany

Buffalo

Gen#1
100 MW

Congestion
At Limit

$25

60 MW

East

50 MW

Gen#2
100 MW

$45

60 MW
10 MW

Load A
10 MW

50 MW

Load B
60 MW

Gen #1 provides 60 MW.


Still need to meet the remaining
Load of 10 MW in the East

Total Load

West

Buffalo

Gen#1
100 MW

$25

60 MW
60 MW
10 MW

Load A
10 MW

70 MW
Congestion
At Limit

50 MW

East

Albany

Gen#2
100 MW

$45

10 MW
10 MW
60 MW

Load B
60 MW

Gen #2 can serve the next 10 MW.


The Total Load of 70 MW is now met.

Total Load

West

70 MW

Buffalo
Gen#1
100 MW

60 MW

$25

East

Albany
Gen#2
100 MW

10 MW

$45

Load A

Load B

10 MW

60 MW

To determine the LBMP lets see which


generator would be selected if the Total Load
changed to 71MW .

Total Load

West

Buffalo

Gen#1
100 MW

$25

61 MW
61 MW
11 MW

Load A
11MW

71 MW
Congestion
At Limit

50 MW

East

Albany

Gen#2
100 MW

$45

10 MW
10 MW
60 MW

Load B
60 MW

If the load in the West increased by 1 MW


Gen #1 will be selected to serve the next MW
of Load in the West at $25/MW

Total Load

West

Buffalo

Gen#1
100 MW

$25

60 MW
60 MW
10 MW

Load A
10 MW

71 MW
Congestion
At Limit

50 MW

East

Albany

Gen#2
100 MW

$45

11 MW
11 MW
61 MW

Load B
61 MW

If the load in the East increased by 1 MW


Gen #2 will be selected to serve the next
MW of Load in the East at $45/MW

Total Load

West

Buffalo

Gen#1
100 MW

$25

60 MW

70 MW

East

Albany

Gen#2
100 MW

$45

10 MW

Load A

Load B

10 MW

60 MW

Congestion creates a Locational Based


Marginal Pricing resulting in different
LBMPs for the West and the East ...

Total Load

West

Buffalo

Gen#1
100 MW

$25

60 MW

70 MW

East

Albany

Gen#2
100 MW

$45

10 MW

Load A

Load B

10 MW

60 MW

LBMP (West) =
$25/MWh

LBMP (East) =
$45/MWh

Total Load

70 MW

West

Buffalo
Gen#1
100 MW

60 MW

East

Albany
Gen#2
100 MW

$25

10 MW

$45

Load A

Load B

10 MW

60 MW

LBMP (West) =
$25/MWh

Determine the Total Load.


Select the Most Economic
Generation to meet the Load.

LBMP (East) =
$45/MWh

West + East =
10 MW + 60 MW =

70 MW

Total Load = 70 MW
Meet Load without exceeding Transmission Limits

West

$25 for 60 MW

Gen #1

East

$45 for 10 MW

Gen #2

Determine the Cost of serving


the Next MW of Load.

West

$25/MWh

East

$45/MWh

Example 5
LBMP with Congestion

Assumptions:

Simple 2 Bus, 2 Zone Examples

Transmission Constraint of 150 MW

No Transmission Losses

West

East
Buffalo

Albany

Gen #1 $25
100 MW

Gen #2
50 MW

$30

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

20 MW

250 MW

What is the Total Load?


1. 200 MW
2. 270 MW
3. 200 MW
4. 220 MW

West

Total Load
270 MW

Buffalo
Gen #1 $25
100 MW

East

Albany
Gen #2
50 MW

$30

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

20 MW

250 MW

Select the generator that is the most economic (cheapest):


1. Gen #1
2. Gen #2
3. Gen #3
4. Gen #4

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

$25

??? MW

East

Albany
Gen #2
50 MW

$30

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

20 MW

250 MW

Total Load
Gen #1

270 MW
?? MW

Gen #1 is the most economic at $25/MWh.


Can Gen #1 provide its full capacity to
serve load?
Yes
No

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

$25

100 MW

East

Albany
Gen #2
50 MW

$30

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

20 MW

250 MW

Total Load

270 MW

Gen #1

100 MW

Remaining
Load

170 MW

Gen #1 is selected for 100 MW


Still need to select generation to meet the
remaining load of 170 MW.

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

$25

100 MW

East

Albany
Gen #2
50 MW

$30

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

20 MW

250 MW

Total Load

270 MW

Gen #1

100 MW

Remaining
Load

170 MW

Select the next generator that is the most


economic (cheapest)
1. Gen #2
2. Gen #3
3. Gen #4

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

$25

East

Albany
Gen #2
50 MW

$30

100 MW

??? MW

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

20 MW

250 MW

Total Load

270 MW

Gen #1

100 MW

Gen #2

??? MW

Gen #2 is the most economic at $30/MWh.


Can Gen #2 provide its full capacity to
serve load?
Yes
No

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

$25

100 MW

East

Albany
Gen #2
50 MW

$30

50 MW

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

20 MW

250 MW

Total Load

270 MW

Gen #1

100 MW

Gen #2

50 MW

Remaining
Load

120 MW

Gen #2 is selected for 50 MW


Still need to select generation to
meet the remaining load of 120 MW.

West

Total Load
270 MW

Buffalo
Gen #1
100 MW

$25

100 MW

East

Albany
Gen #2
50 MW

$30

50 MW

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

20 MW

250 MW

Total Load

270 MW

Gen #1

100 MW

Gen #2

50 MW

Remaining
Load

120 MW

Select the next generator that is


the most economic
1. Gen #3
2. Gen #4

West

Total Load
270 MW

Buffalo
Gen #1
100 MW

$25

100 MW

East

Albany
Gen #2
50 MW

$30

50 MW

Gen #4 $40
100 MW

Gen #3 $50
100 MW

Load A

Load B

20 MW

250 MW

Total
Load

270 MW

Gen #1

100 MW

Gen #2

50 MW

Gen #4

?? MW

Before we determine the amount of


MW of load Gen #4 can serve, lets take
a look at the:
Flow of MW
Impact of the Transmission Limit.

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

$25

100 MW
Gen #4
100 MW

100 MW

$40

100 MW
20 MW

Albany
Gen #2
50 MW

?? MW
100 MW

Load A

East

20 MW

50 MW

$30

50 MW
Gen #3 $50
100 MW
Load B
250 MW

If Gen #4 is selected for 100 MW how many MW will


cross the Buffalo/Albany Line?
1. 100 MW
2. 200 MW
3. 180 MW
4. 50 MW

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

$25

100 MW
Gen #4
100 MW

East

Albany
Gen #2
50 MW

180 MW
50 MW

100 MW
100 MW

100 MW
20 MW

50 MW
Gen #3 $50
100 MW

$40

Load A

$30

20 MW

20 MW

Limit
Exceeded

Load B
250 MW

100 MW (Gen #1) + 100 MW (Gen #2) 20 MW (Load A) = 180 MW


If Gen #4 were selected for 100 MW,
180 MW would have to cross the Buffalo/Albany Line.
This would exceed the 150 MW Transmission Line Limit.

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

Gen #4
100 MW

100 MW
??? MW

$40

?? MW
Load A
20 MW

Albany
Gen #2
50 MW

$25

100 MW

East

20 MW

$30

50 MW
Gen #3 $50
100 MW
Load B
250 MW

How many MWs can Gen #4 provide without exceeding the


Buffalo/Albany Transmission Line Limit?
1. 100 MW
2. 50 MW
3. 70 MW
4. 0 MW

Total Load
240 MW

West

Buffalo
Gen #1
100 MW

Albany
Gen #2
50 MW

$25

100 MW
Gen #4
100 MW

East

100 MW

150 MW

50 MW

70 MW

70 MW
20 MW

50 MW
Gen #3 $50
100 MW

$40

Load A

$30

200 MW

20 MW

Load B
250 MW

100 MW (Gen #1) + 70 MW (Gen #2) 20 MW (Load A) = 150 MW


Gen #4 is selected for 70 MW

Total Load
240 MW

West

Buffalo
Gen #1
100 MW

$25

100 MW

100 MW
70 MW

#4

Gen
100 MW

East

Albany

Congestion
At
150Limit
MW

Gen #2
50 MW
50 MW

Gen #3 $50
100 MW

70 MW
20 MW

20 MW

50 MW

150 MW

$40

Load A

$30

200 MW

Load B
250 MW

Congestion occurs when Transmission Constraints are Reached

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

$25

100 MW
Gen #4
100 MW

$40

70 MW

East

Albany

Congestion
At Limit

Gen #2
50 MW

$30

50 MW
Gen #3 $50
100 MW

Load A

Load B

20 MW

250 MW

Total Load

270 MW

Gen #1

100 MW

Gen #2

50 MW

Gen #4

70 MW

Remaining
Load

50 MW

Still need to meet the


remaining load of 50 MW .

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

$25

East

Albany
Gen #2
50 MW

100 MW

50 MW

Gen #4
100 MW

Gen #3
100 MW

$40

70 MW

$30

$50

??? MW

Load A

Load B

20 MW

250 MW

Total Load

270 MW

Gen #1

100 MW

Gen #2

50 MW

Gen #4

70 MW

Remaining
Load

50 MW

How many MWs will Gen #3 have to


provide to meet the remaining load?
1. 100 MW
2. 50 MW
3. 80 MW
4. 70 MW

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

$25

East

Albany
Gen #2
50 MW

100 MW

50 MW

Gen #4
100 MW

Gen #3
100 MW

$40

70 MW

$30

$50

50 MW

Load A

Load B

20 MW

250 MW

Total Load

270 MW

Gen #1

100 MW

Gen #2

50 MW

Gen #4

70 MW

Gen #3

50 MW

Gen #3 will have to provide 50 MW to


serve the remaining load.

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

Albany
Gen #2
50 MW

$25
150 MW

100 MW
Gen #4
100 MW

East

100 MW

50 MW
50 MW

70 MW

50 MW

$40

20 MW

Gen #3
100 MW

$50

50 MW

70 MW
Load A

$30

250 MW

20 MW

Congestion
At Limit

Load B
250 MW

Total Load is met.


There is Congestion across the Buffalo/Albany Line.

West

Total Load
270 MW

Buffalo
Gen #1
100 MW

$25

East

Albany
Gen #2
50 MW

100 MW

50 MW

Gen #4
100 MW

Gen #3
100 MW

$40

70 MW

$30

$50

50 MW

Load A

Load B

20 MW

250 MW

To determine the LBMP lets see which


generator would be selected if the Total Load
changed to 271MW .

West

Total Load
271 MW

Buffalo
Gen #1
100 MW

East

Albany
Gen #2
50 MW

$25

100 MW

50 MW

Gen #4
100 MW

Gen #3
100 MW

$40

70 MW

$30

$50

50 MW

Load A

Load B

21 MW

250 MW

If Load A (West) increases by one MW .

West

Total Load
271 MW

Buffalo
Gen #1
100 MW

East

Albany

$25

Gen #2
50 MW

100 MW

50 MW

Gen #4
100 MW

Gen #3
100 MW

$40

70 MW

$30

$50

50 MW

Load A

Load B

21 MW

250 MW

Gen #4 still has capacity to serve 30 MW

Total Load
271 MW

West

Buffalo
Gen #1
100 MW

Albany
Gen #2
50 MW

$25
150 MW

100 MW
Gen #4
100 MW

East

100 MW
71 MW

$40

50 MW
50 MW
50 MW

Gen #3
100 MW

$50

50 MW

71 MW
Load A

$30

21 MW

250 MW

21 MW

If Load A (West) increases by one MW


Gen #4 provides the additional MW
Gen #4 provides a total of 71 MW
without exceeding the Transmission Limit

Load B
250 MW

Total Load
271 MW

West

Buffalo
Gen #1
100 MW

Albany
Gen #2
50 MW

$25
150 MW

100 MW
Gen #4
100 MW

East

100 MW
71 MW

$40

50 MW
50 MW
50 MW

21 MW

Gen #3
100 MW

$50

50 MW

71 MW
Load A

$30

21 MW

250 MW

Load B
250 MW

Gen #4 can serve the next MW of load in the West at .


1. $25/MWh
2. $30/MWh
3. $40/MWh
4. $50/MWh

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

Albany
Gen #2
50 MW

$25
150 MW

100 MW
Gen #4
100 MW

East

100 MW
70 MW

$40

50 MW
50 MW
50 MW

20 MW

Gen #3
100 MW

$50

50 MW

70 MW
Load A

$30

20 MW

250 MW

Load B
250 MW

Gen #4 can serve the next MW of load in the West at $40/MWh

The LBMP for the WEST is $40/MWh

West

Total Load
271 MW

Buffalo
Gen #1
100 MW

East

Albany
Gen #2
50 MW

$25

100 MW

50 MW

Gen #4
100 MW

Gen #3
100 MW

$40

70 MW

$30

$50

50 MW

Load A

Load B

20 MW

251 MW

If Load B (East) increases by one MW .

Total Load
271 MW

West

Buffalo
Gen #1
100 MW

Albany
Gen #2
50 MW

$25

100 MW
Gen #4
100 MW

East

100 MW

50 MW

150 MW
50 MW

70 MW

51 MW

$40

20 MW

Gen #3
100 MW

$50

51 MW

70 MW
Load A

$30

20 MW

Congestion
At Limit

251 MW

Load B
251 MW

The system is at Transmission Constraints - Congestion


Transmission Limits cannot be exceeded. Gen #4 cannot serve the
next MW of load in the East without exceeding the Transmission Limit.

Gen #3 will have to serve the next MW of load in the East.

Total Load
271 MW

West

Buffalo
Gen #1
100 MW

Albany
Gen #2
50 MW

$25
150 MW

100 MW
Gen #4
100 MW

East

100 MW
70 MW

50 MW
50 MW
51 MW Gen #3

100 MW

$40

20 MW

$50

51 MW

70 MW
Load A

$30

20 MW

251 MW

Load B
251 MW

Gen #3 can serve the next MW of load in the East at .


1. $25/MWh
2. $30/MWh
3. $40/MWh
4. $50/MWh

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

Albany
Gen #2
50 MW

$25
150 MW

100 MW
Gen #4
100 MW

East

100 MW
70 MW

$40

50 MW
50 MW
50 MW

20 MW

Gen #3
100 MW

$50

50 MW

70 MW
Load A

$30

20 MW

250 MW

Load B
250 MW

Gen #3 can serve the next MW of load in the East at $50/MWh

The LBMP for the East is $50/MWh

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

$25

100 MW
Gen #4
100 MW

$40

70 MW

East

Albany

Congestion
At Limit

Gen #2
50 MW

$30

50 MW
Gen #3
100 MW

$50

50 MW

Load A

Load B

20 MW

250 MW

LBMP (West) =
$40/MWh

LBMP (East) =
$50/MWh

When transmission limits are reached there


is congestion, resulting in unequal LBMPs in
the West and East.

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

$25

100 MW
Gen #4
100 MW

$40

70 MW

Albany

Congestion
At Limit

Gen #2
50 MW

$30

50 MW
Gen #3
100 MW

$50

50 MW

Load A

Load B

20 MW

250 MW

LBMP (West) =
$40/MWh

East

LBMP (East) =
$50/MWh

The Cost of Congestion is the difference


between the West & East LBMPs
Congestion for this example is equal to

[$50/MWh-$40/MWh=$10/MWh]

West

Total Load
270 MW

Buffalo
Gen #1
100 MW

$25

East

Albany
Gen #2
50 MW

100 MW

50 MW

Gen #4
100 MW

Gen #3
100 MW

$40

$30

$50

50 MW

70 MW
Load A

Load B

20 MW

250 MW

Total Load

270 MW

Gen #1

100 MW

Gen #2

50 MW

Gen #4

70 MW

Gen #3

50 MW

Which generator is the Marginal Unit in


the West?
Gen #1
Gen #2
Gen #3
Gen #4

West

Total Load
270 MW

Buffalo
Gen #1
100 MW

$25

East

Albany
Gen #2
50 MW

100 MW

50 MW

Gen #4
100 MW

Gen #3
100 MW

$40

$30

$50

50 MW

70 MW
Load A

Load B

20 MW

250 MW

Total Load

270 MW

Gen #1

100 MW

Gen #2

50 MW

Gen #4

70 MW

Gen #3

50 MW

Which generator is the Marginal Unit in


the East?
Gen #1
Gen #2
Gen #3
Gen #4

Total Load
270 MW

West

Buffalo
Gen #1
100 MW

East

Albany
Gen #2
50 MW

$25

100 MW

50 MW

Gen #4
100 MW

Gen #3
100 MW

$40

$30

$50

50 MW

70 MW
Load A

Load B

20 MW

250 MW

Determine the Total Load.

West + East =
20 MW + 250 MW =

Select the Most Economic


Generation to meet the Load.

Total Load = 270 MW


$25 for first 100 MW
$30 for next 50 MW

270 MW
Meet Load without
exceeding
Transmission
Limits ..

West

$40 for next 70 MW

Gen #4

East

$50 for next 50 MW

Gen #3

Determine the Cost of serving


the Next MW of Load.

West

$40/MWh

East

$50/MWh

Example 6
LBMP with Congestion

Assumptions:

Simple 2 Bus, 2 Zone Examples

Transmission Constraint of 150 MW

No Transmission Losses

West

East
Buffalo

Gen #1
100MW

Albany

$55

Gen #4
$75
100 MW

Gen #2
$50
100 MW

Gen #5
50 MW

$45

Gen #3
$40
100 MW

Gen #6
50 MW

$60

Load A
40 MW

Load B
270 MW

What is the Total Load?


1. 230 MW
2. 310 MW
3. 150 MW
4. 320 MW

West

Total Load
310 MW

Buffalo
Gen #1
100MW

$55

East

Albany
Gen #4
100 MW $75

Gen #2
100 MW $50

Gen #5
50 MW

$45

Gen #3
100 MW $40

Gen #6
50 MW

$60

Load A
40 MW

Load B
270 MW

Select the generator that is the most economic (cheapest):


Gen #1
Gen #2
Gen #3
Gen #4
Gen #5
Gen #6

Total Load
310 MW

West

Buffalo
Gen #1
100MW

$55

Gen #2
$50
100 MW
Gen #3
100 MW

?? MW

$40

Load A
40 MW
Gen #3 is selected for:
150 MW
50 MW
100 MW
40 MW

East

Albany
Gen #4
$75
100 MW
Gen #5
50 MW

$45

Gen #6
50 MW

$60

Load B
270 MW

Total Load
310 MW

West

Buffalo
Gen #1
100MW

$55

Gen #2
100 MW $50
Gen #3
100 MW

100 MW

$40

Load A
40 MW

East

Albany
Gen #4
100 MW $75
Gen #5
50 MW

$45

Gen #6
50 MW

$60

Load B
270 MW

Total Load

310 MW

Gen #3

100 MW

Remaining
Load

210 MW

Gen #3 is selected for 100 MW


Still need to select generation to meet
the remaining load of 210 MW.

Total Load
310 MW

West

Buffalo
Gen #1
100MW

$55

Gen #2
100 MW $50
Gen #3
100 MW

$40

100 MW
Load A
40 MW
Total Load

310 MW

Gen #3

100 MW

Remaining
Load

210 MW

East

Albany
Gen #4
100 MW $75
Gen #5
50 MW

$45

Gen #6
50 MW

$60

Load B
270 MW
Select the next generator that is the most
economic (cheapest)
Gen #1
Gen #2
Gen #4
Gen #5
Gen #6

Total Load
310 MW

West

Buffalo
Gen #1
100MW

$55

Gen #2
100 MW $50
Gen #3
100 MW

$40

100 MW
Load A
40 MW
Gen #5 is selected for:
1. 150 MW
2. 50 MW
3. 100 MW
4. 40 MW

East

Albany
Gen #4
100 MW $75
Gen #5
50 MW

$45

?? MW
Gen #6
50 MW

$60

Load B
270 MW

West

Total Load
310 MW

Buffalo
Gen #1
100MW

$55

Gen #2
100 MW $50
#3

Gen
100 MW

$40

100 MW
Load A
40 MW
Total Load

310 MW

Gen #3

100 MW

Gen #5

50 MW

Remaining
Load

160 MW

East

Albany
Gen #4
100 MW $75
Gen #5
50 MW

$45

50 MW
Gen #6
50 MW

$60

Load B
270 MW
Gen #5 is selected for 50 MW
Still need to select generation to
meet the remaining load of 160 MW.

Total Load
310 MW

West

Buffalo
Gen #1
100MW

$55

Gen #2
100 MW $50
Gen #3
100 MW

100 MW

$40

Load A
40 MW

Albany
Gen #4
100 MW $75
Gen #5
50 MW

50 MW
Gen #6
50 MW

$45

$60

Load B
270 MW

Total Load

310 MW

Gen #3

100 MW

Gen #5

50 MW

Remaining
Load

East

160 MW

Select the next generator that is the most


economic (cheapest)
Gen #1
Gen #2
Gen #4
Gen #6

West

Total Load
310 MW

Buffalo
Gen #1
100MW
Gen #2
100 MW

100 MW
Gen #3
100 MW

100 MW

$55

$50

East

Albany
Gen #4
100 MW $75
Gen #5
50 MW

50 MW
$40

Load A
40 MW

Gen #6
50 MW

$45

$60

Load B
270 MW

Lets see what happens if Gen #2


is selected for 100 MW..

Total Load
310 MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

100 MW
Gen #3
100 MW

100 MW

East

Albany
Gen #4
100 MW $75

$55
100MW

Gen #5
50 MW

$50
100MW

Gen #6
50 MW

$40

Load A
40 MW

50 MW

$45

$60

40MW

Load B
270 MW

If Gen #2 is selected for 100 MW how many MW will


cross the Buffalo/Albany Line?
1. 200 MW
2. 160 MW
3. 150 MW
4. 140 MW

Total Load
310 MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

100 MW
Gen #3
100 MW

100 MW

Albany

Limit
Exceeded

$55

East
Gen #4
100 MW $75

100MW

160 MW

$50
100MW

50 MW
Gen #6
50 MW

$40

Load A
40 MW

Gen #5
50 MW

$45

$60

40MW

Load B
270 MW

If Gen #2 is selected for 100 MW ... 200 MW are provided by


Generators in the West. Subtracting the West Load of 40 MW
from the 200 MW generated leaves 160 MW to cross the
Buffalo/Albany Line.

This will exceed the transmission limit of 150 MW.

West

Total Load
310 MW

Buffalo
Gen #1
100MW
Gen #2
100 MW

??? MW
Gen #3
100 MW

100 MW

$55

$50

East

Albany
Gen #4
100 MW $75
Gen #5
50 MW

50 MW
$40

Load A
40 MW

Gen #6
50 MW

$45

$60

Load B
270 MW

Without exceeding the Buffalo/Albany Transmission Line Limit,


Gen #2 is selected for:
1. 70 MW
2. 50 MW
3. 90 MW
4. 150 MW

Total Load
310 MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

90 MW
Gen #3
100 MW

90MW

$50
100MW

150MW

Gen #4
100 MW $75
Gen #5
50 MW

$45

50 MW
Gen #6
50 MW

$40

100 MW

Albany

Congestion
At Limit

$55

East

$60

40MW

Load A
40 MW

Load B
270 MW

Total Load

310 MW

Gen #3

100 MW

Gen #5

50 MW

Gen #2

90 MW

Remaining Load

70 MW

Gen #2 is selected for 90 MW. 190


MW is generated in the West.
Subtracting the West Load of 40
MW leaves 150 MW to cross the
Buffalo/Albany Line.

West

Total Load
310 MW

Buffalo
Gen #1
100MW
Gen #2
100 MW

90 MW

Albany
Gen #4
100 MW $75

$55

Gen #5
50 MW

$50

$45

50 MW

#3

Gen
100 MW

East

Gen #6
50 MW

$40

100 MW
Load A
40 MW

$60

Load B
270 MW

Total Load

310 MW

Gen #3

100 MW

Gen #5

50 MW

Gen #2

90 MW

Remaining Load

70 MW

Can Generation from the West


continue to be selected to meet the
remaining load in the East?
Yes
No

Total Load
310 MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

90MW

$50

90 MW
Gen #3
100 MW

100MW

150MW

Gen #4
100 MW $75
Gen #5
50 MW

$45

50 MW
Gen #6
50 MW

$40

100 MW

Albany

Congestion
At Limit

$55

East

$60

40MW

Load A
40 MW

Load B
270 MW

Total Load

310 MW

Gen #3

100 MW

Gen #5

50 MW

Gen #2

90 MW

Remaining Load

70 MW

Any further generation from the West


would increase the MW crossing the
Buffalo/Albany Line. Generation from
the West cannot be selected to meet
the remaining load in the East since
the Buffalo-Albany Transmission Line
is at the Limit.

Total Load
310 MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

90 MW
Gen #3
100 MW

East

Albany
Gen #4
100 MW $75

$55
90MW

150MW

Gen #5
50 MW

$50
100MW

50MW

100 MW

50 MW
Gen #6
50 MW

$40
40MW

Load A
40 MW

$45

$60

200MW

Load B
270 MW

Total Load

310 MW

Gen #3

100 MW

Gen #5

50 MW

Gen #2

90 MW

Remaining Load

70 MW

Still need to select generation to


meet the remaining load of 70 MW
in the East .

West

Total Load
310 MW

Buffalo
Gen #1
100MW

Albany

$55
150MW

Gen #2
100 MW

Gen #4
100 MW $75
Gen #5
50 MW

$50

90 MW
Gen #3
100 MW

East

$45

50 MW
Gen #6
50 MW

$40

100 MW
Load A
40 MW

$60

Load B
270 MW

Total Load

310 MW

Gen #3

100 MW

Gen #5

50 MW

Gen #2

90 MW

Remaining Load

70 MW

Select the next generator that is the


most economic (cheapest) without
exceeding the transmission limits:
Gen #1
Gen #4
Gen #5
Gen #6

West

Total Load
310 MW

Buffalo
Gen #1
100MW

Albany

$55
150MW

Gen #2
100 MW

Gen #4
100 MW $75
Gen #5
50 MW

$50

90 MW
Gen #3
100 MW

East

$45

50 MW
Gen #6
50 MW

$40

100 MW

?? MW

Load A
40 MW

$60

Load B
270 MW

Total Load

310 MW

Gen #3

100 MW

Gen #5

50 MW

Gen #2

90 MW

Gen #6

?? MW

Remaining Load

70 MW

Gen #6 is selected for:


70 MW
50 MW
30 MW
40 MW

Total Load
310 MW

West

Buffalo
Gen #1
100MW

Albany

$55
150MW

Gen #2
100 MW

$50

$45

50 MW
Gen #6
50 MW

$40

100 MW

50 MW

Load A
40 MW
Total Load

Gen #4
100 MW $75
Gen #5
50 MW

90 MW
Gen #3
100 MW

East

$60

Load B
270 MW
310 MW

Gen #3

100 MW

Gen #5

50 MW

Gen #2

90 MW

Gen #6

50 MW

Remaining Load

20 MW

Gen #6 is selected for 50 MW.


Still need to select generation
to meet the remaining load of
20 MW in the East.

Total Load
310 MW

West

Buffalo
Gen #1
100MW

Albany
Gen #4
100 MW

$55
150MW

Gen #2
100 MW

$50

$75

$45

50 MW
Gen #6
50 MW

$40

100 MW

50 MW

Load A
40 MW
Total Load

20 MW
Gen #5
50 MW

90 MW
Gen #3
100 MW

East

$60

Load B
270 MW
310 MW

Gen #3

100 MW

Gen #5

50 MW

Gen #2

90 MW

Gen #6

50 MW

Remaining Load

20 MW

Gen #4 can serve the


remaining load of 20 MW.
Total load is met.

Total Load
310 MW

West

Buffalo
Gen #1
100MW

Albany
Gen #4
100 MW

$55
?? MW

Gen #2
100 MW

$50

$75

$45

50 MW
Gen #6
50 MW

$40

100 MW

50 MW

Load A
40 MW
Total Load

20 MW
Gen #5
50 MW

90 MW
Gen #3
100 MW

East

310 MW

Gen #3

100 MW

Gen #5

50 MW

Gen #2

90 MW

Gen #6

50 MW

Gen #4

20 MW

$60

Load B
270 MW
Based on the Generators and MWs
selected, how many MWs will cross
the Buffalo/Albany Line?
1. 100 MW
2. 150 MW
3. 180 MW
4. 160 MW

Total Load
310 MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

East

Albany
Gen #4
100 MW

$55
90MW

150MW

20 MW
20MW

$50

90 MW
Gen #3
100 MW

100MW

$40

100 MW
Load A
40 MW
Total Load

50MW

40MW

50MW
270MW

Gen #5
50 MW

100 MW

Gen #5

50 MW

Gen #2

90 MW

Gen #6

50 MW

Gen #4

20 MW

$45

50 MW
Gen #6
50 MW

50 MW

$60

Load B
270 MW

310 MW

Gen #3

$75

150 MW will cross the


Buffalo/Albany Line.
Transmission Limit is not
exceeded.

West

Total Load
310 MW

Buffalo
Gen #1
100MW
Gen #2
100 MW

$55

Albany
Gen #4
100 MW

20 MW
$50

90 MW
Gen #3
100 MW

East

Gen #5
50 MW

$75

$45

50 MW
$40

100 MW
Load A
40 MW

Gen #6
50 MW

$60

50 MW
Load B
270 MW

To determine the LBMP lets see which


generator would be selected if the Total Load
changed to 311MW .

West

Total Load
311 MW

Buffalo
Gen #1
100MW
Gen #2
100 MW

$55

Albany
Gen #4
100 MW

$75

20 MW
$50

90 MW
Gen #3
100 MW

East

Gen #5
50 MW

$45

50 MW
$40

100 MW

Gen #6
50 MW

50 MW

Load A
41 MW
If Load in the West increases by one MW .

$60

Load B
270 MW

West

Total Load
311 MW

Buffalo
Gen #1
100MW
Gen #2
100 MW

$55

Albany
Gen #4
100 MW

$75

20 MW
$50

90 MW
Gen #3
100 MW

East

Gen #5
50 MW

$45

50 MW
$40

100 MW
Load A

41 MW

Gen #6
50 MW

$60

50 MW
Load B
270 MW

Which generator (most economic) can serve the next MW


of Load in the West, without exceeding transmission
limits?
Gen #1
Gen #2
Gen #3
Gen #4
Gen #5
Gen #6

Total Load
311 MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

91 MW
Gen #3
100 MW

East

Albany
Gen #4
100 MW

$55
91MW

150MW

20 MW
20MW

$50
100MW

50MW

$40

100 MW
Load A
41 MW

41MW

50MW
270MW

$75

Gen #5
50 MW

$45

50 MW
Gen #6
50 MW

50 MW

$60

Load B
270 MW

If Load in the West increases by one MW


Gen #2 can serve the next MW of load in the West without
exceeding the Transmission Limit

Total Load
311 MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

East

Albany
Gen #4
100 MW

$55
91MW

150MW

20 MW
20MW

$50

91 MW
Gen #3
100 MW

100MW

50MW

$40

100 MW
Load A
41 MW

41MW

$75

50MW
270MW

Gen #5
50 MW

$45

50 MW
Gen #6
50 MW

$60

50 MW
Load B
270 MW

Gen #2 can serve the next MW of load in the West at .


1. $25/MWh
2. $30/MWh
3. $40/MWh
4. $50/MWh

Total Load
310 MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

East

Albany
Gen #4
100 MW

$55
90MW

150MW

20 MW
20MW

$50

90 MW
Gen #3
100 MW

100MW

50MW

$40

100 MW
Load A
40 MW

41MW

$75

50MW
270MW

Gen #5
50 MW

$45

50 MW
Gen #6
50 MW

$60

50 MW
Load B
270 MW

Gen #2 can serve the next MW of load in the West at $50/MWh

The LBMP for the WEST is $50/MWh

West

Total Load
311 MW

Buffalo
Gen #1
100MW
Gen #2
100 MW

90 MW
Gen #3
100 MW

$55

East

Albany
Gen #4
100 MW

20 MW
$50

Gen #5
50 MW

$75

$45

50 MW
$40

100 MW

Gen #6
50 MW

50 MW

Load A
40 MW
If Load in the East increases by one MW .

$60

Load B
271 MW

West

Total Load
311 MW

Buffalo
Gen #1
100MW
Gen #2
100 MW

90 MW

$55

East

Albany
Gen #4
100 MW

20 MW
$50

$45

50 MW

#3

Gen
100 MW

Gen #5
50 MW

$75

$40

100 MW
Load A
40 MW
Which generator (most economic) can provide the
additional MW of Load in the East?
East
Gen #1
Gen #2
Gen #3
Gen #4
Gen #5
Gen #6

Gen #6
50 MW

50 MW

$60

Load B

271 MW

Total Load
311MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

90 MW
Gen #3
100 MW

East

Albany
Gen #4
100 MW

$55
90MW

150MW

21 MW
21MW

$50
100MW

50MW

$40

100 MW
Load A
40 MW

40MW

50MW
271MW

Gen #5
50 MW

$75

$45

50 MW
Gen #6
50 MW

50 MW

$60

Load B
271 MW

If Load in the East increases by one MW


Gen #4 can serve the next MW of load in the East without
exceeding the Transmission Limit

Total Load
311 MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

90 MW
Gen #3
100 MW

East

Albany
Gen #4
100 MW

$55
90 MW

150MW

21 MW
21MW

$50
100MW

50 MW

$40

100 MW
Load A
40 MW

40MW

50MW
271MW

Gen #5
50 MW

$75

$45

50 MW
Gen #6
50 MW

50 MW

$60

Load B
271 MW

Gen #4 can serve the next MW of load in the East at


1. $75/MWh
2. $45/MWh
3. $50/MWh
4. $60/MWh

Total Load
310MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

90 MW
Gen #3
100 MW

East

Albany
Gen #4
100 MW

$55
90 MW

150MW

20 MW
20 MW

$50
100MW

50 MW

$40

100 MW
Load A
40 MW

40MW

50MW
271MW

Gen #5
50 MW

$75

$45

50 MW
Gen #6
50 MW

50 MW

$60

Load B
270 MW

Gen #4 can serve the next MW of load in the East at $75/MWh

The LBMP for the EAST is $75/MWh

Total Load
310 MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

$55

100 MW

Albany
Gen #4
100 MW

20 MW
$50

90 MW
Gen #3
100 MW

East

Gen #5
50 MW

$75

$45

50 MW
$40

Load A
40 MW

LBMP (West) =
$50/MWh

Gen #6
50 MW

50 MW

$60

Load B
270 MW

LBMP (East) =
$75/MWh

Total Load
310 MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

$55

$50

Gen #4
100 MW
Gen #5
50 MW

$75

$45

50 MW

#3

100 MW

Albany
20 MW

90 MW
Gen
100 MW

East

$40

Load A
40 MW

LBMP (West) =
$50/MWh

Gen #6
50 MW

50 MW

$60

Load B
270 MW

LBMP (East) =
$75/MWh

Ignoring losses what is the cost of Congestion?


1. $50/MWh
2. $40/MWh
3. $25/MWh
4. $75/MWh

Total Load
310 MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

$55

$50

Gen #4
100 MW
Gen #5
50 MW

$75

$45

50 MW

#3

100 MW

Albany
20 MW

90 MW
Gen
100 MW

East

$40

Load A
40 MW

LBMP (West) =
$50/MWh

Gen #6
50 MW

50 MW

$60

Load B
270 MW

LBMP (East) =
$75/MWh

Ignoring losses, the cost of Congestion is


the difference between the LBMPs

[$75/MWh - $50/MWh = $25/MWh]


$25/MWh is the Cost of Congestion

West

Total Load
310 MW

Buffalo
Gen #1
100MW
Gen #2
100 MW

$55

Albany
Gen #4
100 MW

$75

20 MW
$50

90 MW
Gen #3
100 MW

East

Gen #5
50 MW

$45

50 MW
$40

100 MW
Load A
40 MW

Gen #6
50 MW

$60

50 MW
Load B
270 MW

Which generator is the Marginal Unit for the West?


West
Gen #1
Gen #2
Gen #3
Gen #4
Gen #5
Gen #6

West

Total Load
310 MW

Buffalo
Gen #1
100MW
Gen #2
100 MW

90 MW

$55

100 MW

Albany
Gen #4
100 MW

20 MW
$50

Gen #5
50 MW

$75

$45

50 MW

#3

Gen
100 MW

East

$40

Load A
40 MW

Gen #6
50 MW

50 MW

$60

Load B
270 MW

Which generator is the Marginal Unit for the East?


East
Gen #1
Gen #2
Gen #3
Gen #4
Gen #5
Gen #6

Total Load
310 MW

West

Buffalo
Gen #1
100MW
Gen #2
100 MW

Albany
Gen #4
100 MW

$55

20 MW
Gen #5
50 MW

$50

90 MW
Gen #3
100 MW

100 MW

East
$75

$45

50 MW
Gen #6
50 MW

$40

50 MW

Load A
40 MW

$60

Load B
270 MW

Determine the Total Load.

West + East =
40 MW + 270 MW =

Select the Most Economic


Generation to meet the Load.

Total Load = 310 MW


$40 for first 100 MW
$45 for next 50 MW

West
East
Determine the Cost of serving the
Next MW of Load.

310 MW
Meet Load without
exceeding
Transmission
Limits ..

$50 for next 90 MW

Gen #2

$60 for next 50 MW

Gen #6

$75 for next 20 MW

Gen #4

West

$50/MWh

East

$75/MWh

Recognize:
To maintain an efficient and reliable
Transmission System a departure from
economic dispatch may be necessary to
ensure Transmission Limits are not
exceeded.
Congestion occurs when the transmission
limit is reached
Congestion results in unequal LBMPs at
different locations.

The previous examples show how the LBMP consists of


the cost of Energy as well as Congestion when
Transmission Limits are reached.
LBMP consists of three components .

(1) Energy

LBMP
Locational
Based
Marginal
Pricing

(2) Congestion

(3) Losses

(1) Energy:
Selecting the generation that is the most
economic (cheapest) to meet the Load
1.

The price of producing an additional MW of Load is called the


marginal price.
price

2.

The Energy component of LBMP is called marginal cost of


energy.

3.

The Energy component is the same for all buses.

4.

LBMP will be the same when:

5.

Transmission Limits are not reached


Transmission Limits are not exceeded
Losses are zero

Energy costs are usually positive.

(2) Congestion:
Ensuring transmission limits are not exceeded.
1.

Generation schedules may cause one or more


transmission lines, or other transmission equipment, to
carry more power than their rating allows.

2.

To maintain an efficient and reliable Transmission System


a departure from economic dispatch may be necessary to
ensure Transmission Limits are not exceeded.

3.

Congestion results in unequal LBMPs at different


locations.

4.

Congestion is one of the components of LBMP called the


marginal cost of congestion.

5.

The congestion component is zero when:

6.

Transmission Limits are not reached


Transmission Limits are not exceeded

Congestion can be zero, negative or positive.

(3) Losses:
Accounting for the Generation lost.

Transmission losses are one of the


components of LBMP called the marginal
cost of losses
Transmission losses is the power lost as
dissipated heat when power flows in
transmission lines and transformers.
Losses can be zero, negative or positive.

(3) Losses:
Accounting for the Generation lost.

Example determining the marginal cost of losses:


losses
Need 100 MW to be delivered
There is a 2% Loss of Generation or 2 MW
To deliver 100 MW need 102 MW Total
Generation to account for losses
102 MW
Generated

2 MW Lost
At $20/MW

Losses: (2 MW) x ($20/MW) = $40


Cost of losses is ($40)/100 MW = $0.40/MW
See Day Ahead Scheduling Manual, Attachment A

100 MW
delivered.

Generators are Paid the LBMP


(where they inject power) at the
Generator Bus.

The New York


Control Area
(NYCA) has over
400 Generator
Buses.

Load is charged based


on the Zone where the
Load is located

Zonal LBMP is a
Load Weighted
Average for the
Zone.

NYCA Zones
A West
B Genesee
C Central
D North
E Mohawk Valley
F Capital
G Hudson Valley
H Millwood
I

Dunwoodie

J New York City


K Long Island

4 External Zones
Hydro Quebec

PJM

ISO New England

IMO

NYCA Zones:
11 Internal
4 External

Locational Based Marginal Pricing .


1. A pricing methodology for the cost of Energy at
each location in the NYS Transmission System.
2. LBMP is equal to the cost to serve the next MW
of Load at a specific location in the grid.
3. Taking into account:
Generation Offer Prices
Physical aspects of the NY Transmission
System including Congestion and Losses

For More Information refer to


NYISO Web Site:
Market Participants User's Guide (MPUG)
Technical Bulletins regarding LBMP:
6, 7, 20, 28, 30, 37, 45, 52, 56, 62, 69, 86, 89

NYISO Market Training Online Resources

Market Participants User's Guide (MPUG)

Technical Bulletins Regarding LBMP:


6, 7, 20, 28, 30, 37, 45, 52, 56, 62, 69, 86, 89

Market Training Online Resources

Locational Based Marginal Pricing .


Generator Bus
Zone

Energy

Congestion

LBMP

Losses

the cornerstone
of the NYISO
Market Operation