Sei sulla pagina 1di 6

QCS 2014

Section 05: Concrete


Part
01: General

Page 1

GENERAL------------------------------------------------------------------------------------------------------------ 2

1.1
1.1.1
1.1.2
1.1.3
1.1.4

INTRODUCTION --------------------------------------------------------------------------------------------------- 2
Scope ----------------------------------------------------------------------------------------------------------------- 2
References----------------------------------------------------------------------------------------------------------- 2
Definitions ------------------------------------------------------------------------------------------------------------ 3
Approved Products ------------------------------------------------------------------------------------------------ 4

1.2
1.2.1
1.2.2
1.2.3
1.2.4

IMPLEMENTATION ----------------------------------------------------------------------------------------------- 4
Approved Installers ------------------------------------------------------------------------------------------------ 4
Field Quality Control ----------------------------------------------------------------------------------------------- 4
Rejected materials ------------------------------------------------------------------------------------------------- 5
Records --------------------------------------------------------------------------------------------------------------- 5

at

ar
C

on
st
ru

ct

io

Sp

ec

ifi

ca

tio

ns

20

14

QCS 2014

Section 05: Concrete


Part
01: General

Page 2

GENERAL

1.1

INTRODUCTION

1.1.1

Scope

This Section includes the requirements for concrete work for pipelines, roadworks, runways,
structures, water retaining structures, foundations and bases for structures and equipment.

This Part includes relevant standards, definitions, abbreviations, and requirements for testing
facilities, rejected materials, and record keeping.

Related Sections are as follows:


Aggregates
Cementitious Materials
Water
Admixtures
Property Requirements
Concrete Plants
Transportation and Placing of Concrete
Formwork
Curing
Reinforcement
Construction Joints
Inspection and Testing of Hardened Concrete
Protective Coatings to Concrete
Hot Weather Concrete
Miscellaneous
Precast Concrete
Prestressed Concrete
Water Retaining Structures

Section 1,
Section 2,
Section 4,
Section 6,
Section 8,
Section 9,

General
Quality Assurance and Quality Control
Foundations and Retaining Structures
Roadworks
Drainage Works
Mechanical and Electrical Equipment

at

ar
C

on
st
ru

ct

io

Sp

ec

ifi

ca

tio

This Section:
Part 2,
Part 3,
Part 4,
Part 5,
Part 6,
Part 7,
Part 8,
Part 9,
Part 10,
Part 11,
Part 12,
Part 13,
Part 14,
Part 15,
Part 16,
Part 17,
Part 18,
Part 19,

ns

20

14

1.1.2

References

The following standards are referred to in this Part:


ASTM C31 ..................Standard Practice for Making and Curing Concrete Test Specimens in
the Field
ASTM C39 ..................Standard Test Method for Compressive Strength of Cylindrical
Concrete Specimens
ASTM C143 ................Standard Test Method for Slump of Hydraulic-Cement C Concrete
ASTM C1064 ..............Standard Test Method for Temperature of Freshly Mixed HydraulicCement Concrete

QCS 2014

Section 05: Concrete


Part
01: General

Page 3

BS 6100, ....................Glossary of Building and civil engineering terms


BS EN 932-1 ..............Tests for general properties of aggregates. Methods for sampling
BS EN 932-2 ..............Tests for general properties of aggregates. Methods for reducing
laboratory samples
BS EN 12350-1 ..........Method of sampling fresh concrete in site
BS EN 12350-2 ..........Testing fresh concrete. Slump-test
BS EN 12390-1 ..........Shape, dimensions and other requirements for specimens and moulds
GSO ISO 1920-1 ........Testing of concrete Part 1: Sampling of fresh concrete

20

GSO ISO 1920-2 ........Testing of concrete Part 2: Properties of fresh concrete

14

BS EN 12390-2 .......... Making and curing specimens for strength tests

Definitions

Definitions used in this Section.

tio

1.1.3

ns

GSO ISO 1920-3 ........Testing of concrete Part 3: Making and curing test specimens

ct

io

Sp

ec

ifi

degree Celsius
calorie
centimetre
day
Characteristic compressive strength of concrete determined by testing cylinders
Compressive strength of concrete determined by testing cylinders
Characteristic compressive strength of concrete determined by testing cubes
Compressive strength of concrete determined by testing cubes
Mean compressive strength of concrete
Mean compressive strength of concrete at the age of (j) days
ground granulated blast furnace slag
guaranteed ultimate tensile strength
hour
kilogram
kilojoule
kilonewton
litre
metre
square metre
cubic metre
milligram
minute
millimetre
square millimetre
months
mega Pascal
kilo Pascal
moderate sulphate resisting Portland cement
ordinary Portland cement
pulverised fuel ash
polyvinylchloride
second
silica fume
sulphate resisting Portland cement

at

ar
C

on
st
ru

C
cal
cm
d
fck,cyl
fc,cyl
fck,cube
fc,cube
fcm
fcm,j
GGBS
GUTS
h
kg
kJ
kN
l
m
2
m
3
m
mg
min
mm
2
mm
months
MPa
kPa
MSRPC
OPC
PFA
PVC
s
SF
SRPC

ca

The following are terms and abbreviations used:

QCS 2014

ton
ppm

1000 kg
part per million

micron

10

10 meter

Page 4

-6
-6

Reference to a technical society, institution, association or governmental authority is made in


accordance with the following abbreviations.

io

Sp

ec

ifi

ca

tio

ns

20

14

American Association of State Highway and Transportation Officials


American Concrete Institute
American Society for Testing and Materials
American Welding Society
British Standard
British Standard Code of Practice
British Standards Institution
Cement and Concrete Association
Construction Industry Research and Information Association
Concrete Reinforcing Steel Institute
Concrete Society
Deutsches Institut fur Normung e.V.
Euro Norm
Federal Highway Authority
GCC Standardization Organization
Institution of Civil Engineers
International Organization for Standardization
Prestressed Concrete Institute
Qatar Construction Specifications
Qatar Standards
United Kingdom Department for Transport

on
st
ru

AASHTO
ACI
ASTM
AWS
BS
BSCP
BSI
C & CA
CIRIA
CRSI
CS
DIN
EN
FHWA
GSO
ICE
ISO
PCI
QCS
QS
UK DfT
Products

ct

Section 05: Concrete


Part
01: General

Approved Products

The contract specific documentation may identify approved products and approved or
prequalified manufacturers and suppliers of products used in concrete work.

1.2

ar
C

1.1.4

Approved Installers

at

1.2.1

IMPLEMENTATION

The contract specific documentation may identify approved or prequalified providers of


concrete construction services.

1.2.2

Field Quality Control

The Contractor shall carry out the test procedures required by this Section and any other
tests and test procedures as directed by the Engineer from time to time. The test procedures
shall be carried out using the facilities of an approved independent testing laboratory.

Supply, storage, sampling and testing of all materials shall be the responsibility of the
Contractor, unless the Contract specifies otherwise.

QCS 2014

Section 05: Concrete


Part
01: General

Page 5

The Engineer may also require the Contractor to take samples of materials and deliver them
to the Central Materials Laboratory for additional tests to be carried out by the Employer.
Sampling procedures shall be in accordance with BS EN 932 or relevant ASTM Standards,
and sample sizes shall conform to the requirements shown in Table 1.1.

The minimum equipment required for testing on Site is given in Table 1.2. This equipment
shall be maintained on Site at all times during concreting operations together with the
necessary scoops, buckets, sample containers, and other items required for sampling. The
cube curing tank shall be located in an air-conditioned area as stated in part 06.

1.2.3

Rejected materials

Any material rejected by the Engineer, in particular cement which has deteriorated or
aggregates which have segregated or become contaminated, shall be immediately removed
from the Site.

1.2.4

Records

The Contractor shall maintain on the Site full records of all work carried out accurately
related to the location of the work on site, which shall include:
the time and date when all concrete was poured, formwork removed and when

ifi

(a)

ca

tio

ns

20

14

all cubes and other tests

(c)

daily maximum and minimum temperatures.

Sp

(b)

One copy of all test results shall be sent to the Engineer immediately upon completion of the
tests

ec

formwork props were fully removed

on
st
ru

ct

io

Table 1.1
Sampling Procedure and
Minimum Sample Sizes for Central Materials Laboratory
Material

Aggregate

at

ar
C

Cement

Reinforcement
Water

Test

Min. Sample

Full range of tests

Composite sample of 7 kg
taken from at least 12 bags

Full range of tests

200 kg

Sieve analysis
Chemical analysis
Soundness test
Water absorption
Particle density
Flakiness index
Fines content
LA Abrasion value

50 kg

Tensile test

500 mm

Bend test

300 mm

Full range of tests

5 litres

QCS 2014

Section 05: Concrete


Part
01: General

Page 6

Table 1.2
Minimum Testing Equipment for Each Site*

ns

tio

ca

ifi

ec

io

Cube curing
BS EN
12390-2
or
GSO ISO 1920-3
or ASTM C39

Hessian or sacking, impervious sheet


Maximum/minimum thermometer
Waterproof marking crayon/paint or
equivalent
Curing tank (in air conditioned room)
Supply of packing materials for sending
cubes to commercial laboratory
Concrete thermometer

Sp

Cube making
BS EN 12390-1
and
BS EN 12350-1:2000
or
GSO ISO 1920-1
and
GSO ISO 1920-3
or ASTM C31 and C39

Slump cone with base plate


Compacting rod, circular cross-section
and round ends
Remixing container, 300 mm ruler,
moist cloth
Scoop and shovel
Timer
100 or 150 mm cubical or cylindrical
1
moulds
Compacting rod or bar Set of tools for
assembling and stripping moulds
Remixing container
Trowel, Scoop, Shovel and Mallet
Mould release agent in closed
container with brush

Slump test BS EN
12350-2
or
GSO ISO 1920-2
or
ASTM C143

6
1
1
1

lot
1
1
1
Lot
1

on
st
ru

ct

ASTM C1064

Minimum Number
Required
1
1
1
1
1

14

Equipment to be Provided

20

Test

at

ar
C

1 - The use of 100 mm cube and cylinder moulds are permitted when the nominal maximum aggregate
size is not greater than 20mm

END OF PART