Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
The production line is highly sophisticated; having multi cutting torches, auto welders shear
cutting machines, etc., which greatly lessen the time of fabrication of built up components. Roll
forming machines for producing Z&C members and sheeting, having standard dimension, enhances
the production capacity of secondary members. Using standard accessories highly enhances the
speed of production and erection. Typically, buildings are delivered in just a few weeks after the
drawings are approved. Anchor bolts and foundation are cast in parallel with manufacture of the
building.
Design: Pre-engineered metal and steel buildings are primarily formed of standard sections and
connections, the design time is lessened to a great extent. Specialized computer evaluation and
design programs optimize material require. Drafting is also computerized using standard details
that lessen project custom details. The low weight flexible frames provide higher resistance to
seismic forces.
Foundations: Pre-engineered buildings are about 30% lighter than the traditional steel structures.
Hence, the foundations are of simple design, simple to construct and lighter weights.
Savings in Cost: As a result of the systems approach, there is an exceptional saving in design,
manufacturing as well as the cost of site erection. The structural elements are shaped to follow the
stress diagram of the member, thus lessening weight, cost and load to foundations. The secondary
members and cladding nest together thus lessening transportation cost. The overall price per
square meter might be lessened as much as 30% lower than traditional steel.
Flexibility of Expansion: By adding additional bays, buildings can be easily expanded in length.
Also, expansion in width and height is possible by pre-designing for future expansion.
Low Maintenance: Buildings are supplied with high quality paint systems for cladding and steel to
suit ambient conditions at site, which results in long durability and low maintenance costs.
The increasing popularity of PEB systems in the industrial sector and the
development of infrastructure have propelled the Indian pre-engineered
steel buildings market to experience robust growth.
In 2011, the structural steel buildings market in India was around 5 to 5.5
million, of which around 9.5 to 10% accounted for the PEB market in India.
Its expected that the market in terms of volumes will reach 9,00,000 MT by
2016, at CAGR of 11.2%.
In the next 10 years the scope for pre-engineered metal & steel buildings is
immense, with the beginning and speedy progress of the Metro rail system.
PEB systems are extremely advantageous over the conventional buildings and are
really useful in case of the low rise buildings.
Pre-engineered buildings are usually low rise buildings; however, the maximum
eave heights can go up to 25 to 30 meters. Such buildings are perfect for offices,
houses, showrooms, shop fronts etc.
SALES
OMD/PMG/CSD
DESIGN
DETAILING
PURCHASE
PRODUCTION
SHIPMENT
ERECTION