Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
DESIGNSECTION
FUNCTIONALSPECIFICATION
FOR
SHELL&TUBEHEATEXCHANGER
SPECNo.
5702F
RevNo.
Discipline
0
Mechanical.
Page1of18
FUNCTIONALSPECIFICATION
FOR
SHELL&TUBEHEATEXCHANGER
PREPARED/
REVISEDBY
REVIWEDBY
APPROVED
BY
TOTAL
PAGES
DATE
REVNo.
0
FORMATNo.
Ref.PROCEDURENo.
ISSUENo.
REV.No.
REV.DATE:
ODS/SOF/004A
ODS/SOP/008TO015
OFFSHORE
01
FUNCTIONAL
01
15/10/2003
SPECNo.
SPECIFICATION
DESIGN
SECTION
5702F
FOR
SHELL&TUBEHEAT
EXCHANGER
Rev.No.
Discipline
Page
CONTENTS
SECTION
1. INTRODUCTION
2. STANDARDSANDCODES
3. SCOPEOFSUPPLY
4. ENVIRONMENTALDESIGNCRITERIA
5. BASICDESIGN
6. INSPECTION&TESTING
7. SPAREPARTSANDTOOLS
8. CONTRACTORDATAREQUIREMENT
9. PAINTINGANDPREPARATIONFORSHIPMENT
10. WARRANTY
FORMATNo.
Ref.PROCEDURENo.
ODS/SOF/004B
ODS/SOP/008TO015
OFFSHORE
ISSUENo.
REV.No.
01
01
REV.DATE:
15/10/2003
SPECNo.
DESIGN
SECTION
FUNCTIONAL
5702F
FOR
SHELL&TUBEHEATEXCHANGER
SPECIFICATION
Rev.No.
Discipline
Page
11
INTRODUCTION
1.1
SCOPE
Thisspecificationoutlinestheminimumrequirementsgoverningthethermal
andmechanicaldesign,manufacture,testing,packaging,guaranteesandsupply
ofShell&TubeHeatExchangertobeinstalledonoffshoreplatform.
1.2
CONTRACTORSRESPONSIBILITY
TheContractorshallberesponsiblefordesign,manufacture,supply,inspection
and testing of the Shell and Tube Heat Exchanger in accordance with this
specification,codes/standardsandattachedfunctionalSpecificationlistedin
section2.0
1.3
PROVENEQUIPMENT
Thesuppliershallhavedesigned,manufactured,testedandsuppliedtwo(2)
ShellandTubeHeatExchangersetsofsimilartype,designandofequalor
higherratingfromtheproposedmanufacturingplant.Contractorshallprovide
evidenceofsatisfactoryoperationofatleast2yearsormoreforoneofsuch
unitwhenoperatinginsimilarserviceconditionsinoffshoreareas.
12
APPLICABLECODES,STANDARDSANDREGULATIONS
Asaminimumallequipmentsuppliedaspartofthispackageshallbedesigned,
manufactured,testedanddeliveredinaccordancewiththerelevantsectionsof
thenational/internationalcodes,standardsandregulationslistedbelow.
ASMESectionVIIIDivI
APIRP500
:BoilerandPressureVesselCode
:ClassificationofareasforElecricalinstallationsat
DrillingRigsandProductionPlatformonLandand
onMarineFixedorMobilePlatforms.
TEMA
:TubularexchangerManufacturesAssociationClass
R
API660
:HeatExchangerForGeneralRefineryService
APIRP500
:HazardousAreaClassification
ASMESectionII
FORMATNo.
:Materialspecification
Ref.PROCEDURENo.
ODS/SOF/004B
ISSUENo.
ODS/SOP/008TO015
OFFSHORE
DESIGN
SECTION
01
REV.No.
REV.DATE:
01
15/10/2003
SPECNo.
FUNCTIONALSPECIFICATION
FOR
SHELL&TUBEHEATEXCHANGER
5702F
Rev.No.
Discipline
Page
Mechanical
4of18
ASMESectionIX
ASMEB16.5
:Weldingandbrazingqualification
:SteelpipeFlangesandFlangedfittings
ASMEB16.11
:ForgedSteelfittings,socketweldingandthreaded
ASMEB31.3
:PetroleumRefineryPiping
ASMEB16.20
:RingjointGasketsandGroovesforSteelPipeFlanges
ASTMA150
:CarbonFerriteAlloy&AusteniticAlloySteeltubes
WRC107
:Localstressesinsphericalandcylindricalshellsdueto
externalloading
:SupplementtoWRC107
WRC297
NACEMR0175/ISO15156:SulphideStressCracking
MaterialofOilFieldEquipment
Resistant Metallic
:Welding
SpecificationNo.2004A
:PipingDesign
SpecificationNo.2004B
:PipingFabricationandInstallation
SpecificationNo.5100 :PackagedEquipment
SpecificationNo.3503 :InstrumentationforPackagedEquipment
13
SCOPEOFSUPPLY
3.1
General
The scope of supply shall sets forth the minimum acceptance standards
governingthethermalandmechanicaldesign,manufacture,supplyofmaterial,
fabrication, inspection, guarantee, testing and delivery of Shell and Tube
Exchangers.
FORMATNo.
Ref.PROCEDURENo.
ODS/SOF/004B
ODS/SOP/008TO015
OFFSHORE
ISSUENo.
REV.No.
01
FUNCTIONAL
SPECIFICATION
01
SPECNo.
DESIGN
SECTION
REV.DATE:
15/10/2003
5702F
FOR
SHELL&TUBEHEATEXCHANGER
Rev.No.
Discipline
Page
3.2
Scopeofsupply
Thecontractorshallsupplyshellandtubetypeheatexchangerasperprocess
parameters given elsewhere in Bid Package. Also for details on the gas
composition,refertheprocessdesigncriteria.ThescopeofsupplyforShell&
TubeHeatExchangershallinclude,butnotlimitedtothefollowing:
1 Completethermalandmechanicaldesign
2 Heatexchangerpackage
3 ThirdpartyDesignVerificationandCodeInspection,ifapplicable
4 Support structure with lifting lugsnecessary arrangements for handling,
supports,alignment,laddersandplatformsetc.
5 Earthingbosses
6 Accessoriesandinstrumentationwithinthepackagelimits(tobeconfirmed
duringdetailedengineering)
7 Sparepartsnecessaryforstartup,commissioningandoneyearsoperation
8 Twosetsofspecialtools,ifany,requiredformaintenance.
14
ENVIRONMENTALDESIGNCRITERIAANDUTILITIES
4.1
ClimaticandProcessConditions
TheclimaticandotherconditionsunderwhichtheEquipmentwilloperateare
detailedinSection3.1VolIIunderGeneraldesignCriteriaandProcessDesign
Criteria.Theequipmentwillbeoperatedonanoffshoreplatform.
TheContractorisresponsibleforensuringthatallequipmentandcomponents
providedaresuitablefortheutilityandenvironmentalconditionsasspecified
duringtheentiredesignlife.
4.2
AvailabilityandReliability
Equipmentshallbedesignedandconstructedforcontinuousoperation,outdoor
andforaminimumservicelifeasindicatedelsewhereinthebid.
Ref.PROCEDURENo.
ODS/SOF/004B
ODS/SOP/008TO015
OFFSHORE
ISSUENo.
REV.No.
01
FUNCTIONAL
SPECIFICATION
01
SPECNo.
DESIGN
SECTION
REV.DATE:
15/10/2003
5702F
FOR
SHELL&TUBEHEATEXCHANGER
Rev.No.
Discipline
Page
forestimatingsuchdelaysisprovidedbythePurchase.Inthecaseoffailure
modeswhichmakeasignificantcontributiontotheoverallunavailability,the
suppliermayberequiredtodemonstratethathisassumedrepairtimescanbe
achieved.
4.3
AreaClassification
ElectricalandinstrumentationwillberatedfortheapplicableHazardousArea
classificationaccordingtoAPIRP500definitions.
15
BASICDESIGN
5.1
General
ThedesignoftheheatexchangershallbeinaccordancewithAPI660,TEMA
ClassRandASMEVIII.Aprocessguaranteeshallbeprovided,confirming
thattheheatexchangerwillprovidethemaximumspecifiedheattransferrate
betweentheprocessstreamswithintheheatexchanger.
ThehotgasshallpasspreferablythroughtheShellandcoolingwatershallpass
throughtheTube.ThevendorshallcompletelyfillupthedatasheetasperAPI
660 and submit it for review and approval. For process parameters, refer
processdesigncriteria.
Where cladding is specified on the Data Sheet, the relevant sections of
specificationforPressureVesselshallbemet.
For instrumentation and controls, refer spec no. 3503 Instrumentation for
packagedequipment.
Heatconservationandpersonnelprotectionforshellandheatexchangermust
be considered and meet the requirements of specification for Insulation No
2006givenelsewhereinBidPackage.
Flow induced vibrations must be considered and the Contractors shall be
responsibleforsubmittingproposedmethodsofeliminatingvibrationdamage,
whichshallbesubstantiatedbycalculations.
TheContractorshallprovidewiththeiroffer:
Ref.PROCEDURENo.
ODS/SOF/004B
ODS/SOP/008TO015
OFFSHORE
ISSUENo.
REV.No.
01
FUNCTIONAL
SPECIFICATION
DESIGN
SECTION
01
SPECNo.
REV.DATE:
15/10/2003
5702F
FOR
SHELL&TUBEHEATEXCHANGER
Rev.No.
Discipline
Page
5.2
DESIGNLIFE
Theprocessfacilitiesdesignlifeis25years.Equipmentshallbedesignedand
constructedforaminimumservicelifeof25yearsandforanuninterrupted
periodofoperationof5years.
5.3
THERMALANDMECHANICALDESIGNDETAILS
Forfixedtubesheetexchangers,thedifferentialbetweentheaverageshellmetal
temperature and the average metal temperature of any tube pass shall not
0
exceed28 C.
Theheatexchangershallhaveasurfaceareaatleast10%greaterthanthat
requiredforthemaximumthermaldutyspecified.
Shellsideandtubesidevelocitiesshallnotfallintothelaminarortransition
flowrange(i.e.Reynoldssnumbershallbegreaterthan4000).
For,bundlesprovidedwithbafflearrangementshallbedesignedtoeliminate,
as far as practical, dead fluid spaces and shortcircuiting between adjacent
passeswithinthelimitationsoftheallowablepressuredrop.
It is preferred that bellows type expansion joints not be used in exchanger
shells.Facilitiesshallbeprovidedandtheexchangercomponentsarrangedto
facilitatehighpressurewatercleaning.
Shellandtubeheatexchangerswithbonnettypechannelsshallbeprovided
withfulldiametertubesheetandcollarbolts.
Allchannels,channelcoversandbonnetsshallbeprovidedwithsuitablelifting
lugsattachedbyfullpenetrationwelds.
TheHeatExchangershallbesuitableforoperationinoutdoorconditions,ina
corrosivesaltladenoffshoreenvironmentwith100%relativehumidity.
5.4
FOULINGFACTOR:
Minimumfoulingfactorforaspecificstreamshallbethefactorslistedinthe
TEMAStandards.
Theflowofcorrosiveorfoulingfluidsshallbethroughthetubesideofheat
exchangers.Tubebundlesshallberemovabletofacilitatecleaning.Spacefor
removalodtubebundlesarealsotobeconsidered.
FORMATNo.
Ref.PROCEDURENo.
ODS/SOF/004B
ODS/SOP/008TO015
OFFSHORE
ISSUENo.
REV.No.
01
FUNCTIONAL
SPECIFICATION
DESIGN
SECTION
01
REV.DATE:
15/10/2003
SPECNo.
5702F
FOR
SHELL&TUBEHEATEXCHANGER
Rev.No.
Discipline
Page
Notwithstandingtheabove,theexchangershallbesodesignedsothat the
preventionoffoulingisaprimeconsideration,particularlywherethecooling
medium is processed water. Design shall take into consideration exchanger
configuration and fluid velocity as factors contributing to fouling of heat
exchanger. Design shall also make provision for ease of draining and the
cleaningoffouledtubebundles.
5.5
NOZZLELOADING:
TheContractorshallgivedetailsonthegeneraldrawingstheresultantforces
andmomentsthatcanbeaccommodatedonnozzles.Theseshallcomplywith
ASMESectinVIIIDivI.
TheContractorshallconsidertheradialforceactingtogetherwiththemoment
actingeitherinlongitudinalorcircumferentialdirection.Thecontractorshall
ensurethattheaboveloadingwillnotinduceunacceptablestresslevelsinthe
heatexchangershell,headorchannel,incompliancewithASMESectionVIII
DivI.
NozzlesshallconformtotheFunctionalspecificationforpressurevesselswith
regard to specification, fabrication, reinforcement, testing and special
requirementsforcladopenings.Nozzlesshallbeflangedandnotbesmaller
thanDN50mm.
5.6
STACKEDUNITS
Stackedunitsshallbeassembledandmountedintheshoptoensureacorrect
fit.Stackedunitsshallbetestedinthefullyassembledcondition.
Matingflangesofstackedexchangersshallnotbeoutofparallelbymorethan
1mmmeasuredacrossthegasketface.
Interconnectingnozzlesofstackedunitsshallbefittedwithspiralgasketsthat
containacompressionlimitingring.
Matingflangesofstackedexchangersshallnotbeoutofparallelbymorethan
1mmmeasuredacrossthegasketface.
Asinglepack(persaddle/support)ofshims,10mmtotalthickness,shallbe
suppliedwithallstackedheatexchangers.
5.7
TUBEBUNDLE
Tube diameters and wall thickness shall conform to the TEMA preferred
values,exceptthatforexoticmaterialse.g.titanium,thewallthicknessshallbe
subjecttoagreementwiththeCompany.
FORMATNo.
Ref.PROCEDURENo.
ODS/SOF/004B
ODS/SOP/008TO015
OFFSHORE
ISSUENo.
REV.No.
01
FUNCTIONAL
SPECIFICATION
01
SPECNo.
DESIGN
SECTION
REV.DATE:
15/10/2003
5702F
FOR
SHELL&TUBEHEATEXCHANGER
Rev.No.
Discipline
Page
Thewallthicknessofintegralfinnedtubesshallbemeasuredfromthebottom
ofthegroove.
Straighttubelengthshallnotexceed6100mm
Utubesshallhaveaminimumbendradius1.5timesthetubeoutsidediameter.
Allpipesandtubesusedinthecoolershallbeseamless.AllUtubesshallbe
formedfromacontinuouslengthoftubing,freeofgirthwelds
Tubes,wheretheextremefibrestrainexceeds5percent,shallbeheattreated.
Theproposedprocedureforheattreatmentshallbesubmittedtocompanyfor
approval.
Tierodmaximumcentersshallbe350mm.Theminimumnumberoftirerods
shallbeinaccordancewithTEMArequirementsandtheroddiametershallbe
atleast12mm.Tierodsshallbelocatedallaroundthebundleperipheryexcept
forthoseactingassupportsforimpingementplates
Impingement plates shall be 10 mm (min) thickness and be rectangular in
shape, the size to be based on nozzle diameter plus 50 mm. An additional
impingementplateshallbeprovidedforrotatablebundles.
Bafflesealingstripsshallbethesamematerialandthicknessasthebaffleand
shallextendfromedgeofbaffletofirsttube.
Bundlerunnersshallbefittedtoallremovablebundles.Pullingeyesshallbe
fittedtothefixedtubesheetofallremovablebundles.
Thebafflecutshallbedefinedtosuitthethermaldesignrequirementsandshall
beVnotchedtopandbottomforventsanddrain.
5.8
SHELL
TheheatexchangershallbecodecertifiedtomeettherequirementsofASME
SectionVIII,Division1.
Themaximumshelldiametershallbelimitedto1500mm.
Framed heads shall be semiellipsoidal with 2:1 ratio unless otherwise
specified.Coldformedheadsshallnotbeused.
Allheadsshallbenormalizedafterforming.
FORMATNo.
Ref.PROCEDURENo.
ODS/SOF/004B
ODS/SOP/008TO015
OFFSHORE
ISSUENo.
REV.No.
01
FUNCTIONAL
SPECIFICATION
DESIGN
SECTION
01
SPECNo.
REV.DATE:
15/10/2003
5702F
FOR
SHELL&TUBEHEATEXCHANGER
Rev.No.
Discipline
Page
5.9
SUPPORTS
Heat exchanger shall be supported on a subbase that will be designed to
facilitateweldingtotheplatformdeckorstructure.
Supportsaddlesshallbedesignedtowithstandahorizontalforceparalleltothe
axisoftheheatexchangerofnotlessthan1.5timesthebundleweight.
Dynamicloadingsshallbeconsideredinthedesignofexchangers,including
supportsaddles.
TheContractorshallprovideintheirdesignmeansofaccommodatingthermal
expansionandcontraction.Supportshallaccommodatethermalexpansionby
preferablyusinganoncorrodingslottedholeslidingarrangement.
All external attachments, including the complete supports and saddle plate,
shallbesealedagainstcorrosionbycontinuouswelding.TwoinchNPTvent
holesshallbeprovidedineachexternalpad.
Eachheatexchangershallbeprovidedwithtwoearthingbosses,weldedtothe
heatexchangersupportsaddles.
5.10
FLOATINGHEAD
The design of the floating head assembly shall be as indicated in ASME
SectionVIII,Div.1.
Theuseofspacerringisnotpermitted.
Thecrossoverareabetweenpassesshallbeequalto1.3timeshetotaltubearea
ineachpass.
Thefloatingheadboltingshallbereadilyaccessiblewhentheshellcoversare
removed.
Theminimumpermittedboltdiashallnotbelessthan20mm.
Where100%radiographyofexchangershellsand/orchannelsaretobecarried
out,thefloatingheadcovershallbeattachedtotheflangebybuttweldingonly.
100%Radiographyofweldjointshallbedone.
5.11
WELDING
Welding shall be in accordance relevant codes and specifications as
follows:PipingASMEB31.3
1 Vessel/ExchangersASMESectionVIIIDiv.1andASMESectionIX
2 AWSD1.1forstructuralwelding
FORMATNo.
Ref.PROCEDURENo.
ODS/SOF/004B
ODS/SOP/008TO015
OFFSHORE
ISSUENo.
REV.No.
01
FUNCTIONAL
SPECIFICATION
01
SPECNo.
DESIGN
SECTION
REV.DATE:
15/10/2003
5702F
FOR
SHELL&TUBEHEATEXCHANGER
Rev.No.
Discipline
Page
ONGCSpec.No.2009FforWelding
Thecontractorshallsubmitproposedweldprocedure,welddetailsandwelding
qualifications,forthecompanysreviewandapprovalpriortocommencingany
productionwelding.
AweldPlanshallbepreparedforeachitem,whichshallincludeanoutline
drawingidentifyingallweldsrelatingtoeachweldingprocedure.
Notwithstandingtherequirementsoftheapplicablecode,productiontestplates
shallbeconductedonlongitudinalshellseamsandheadseams(ifany)where
runofftabsshallbeused.Thisshallapplytoheatexchangerswithadesign
0
temperaturebelow0 Candthicknessgreaterthan25mm.Oneproductiontest
plateshallbeprovidedperexchangerforeachweldprocedure.Productiontest
platesshallbesubjecttofullmechanicaltestinginaccordancewithASME
SectionIX.
Backingstripsshallnotbeused.
Heatexchangershellsshallcontainonelongitudinalweldonly.
Weldingprocedureshallbeconfinedtomanualmetallicarc,submergedarcand
TungstenInertGasunlessotherwiseapprovedbythecompany.Backingstrips
shallnotbeused.
Contractorshallensuretheadequacyofalignmentbetweenadjacentwelds.Due
accountshallbetakenofdifferentialstressesresultingfromheattreatment.
5.12
MATERIAL
All materials shall be suitable for process fluids and for the environment
conditionsspecifiedelsewhereinbid.
All materials and parts included in the construction of the specified Heat
Exchangersshallbenew,unusedandofthehighestgrade,beingfreefromall
defectsorimperfectionslikelytoaffecttheirperformance.
Nonpressurepartweldedtopressurepartshallbeofboilerquality.All
forgingsshallbe100%ultrasonicallytestedasperASTMA388.
5.13
FORMATNo.
Ref.PROCEDURENo.
ODS/SOF/004B
ODS/SOP/008TO015
OFFSHORE
ISSUENo.
REV.No.
01
FUNCTIONAL
SPECIFICATION
01
REV.DATE:
15/10/2003
SPECNo.
DESIGN
SECTION
5702F
FOR
SHELL&TUBEHEATEXCHANGER
Rev.No.
Discipline
Page
Bolts and nuts shall be furnished by the Contractor for all cover plates,
manholes,blindflangesandboltedattachmentssuppliedwithheatexchangers.
Boltandnutsshallbenew.
Heat exchanger flanges shall be equipped with alloy steel stud bolting of
appropriate grade. Stud bolts shall have full continuous thread and be long
enoughtoextendoneandthreethreadlengthsoutsideeachnut.
FlangeboltingofDN36MMandaboveshallbesubjecttobolttensioning
FLANGES
Flanges material shall be of similar specification to the associated heat
exchangerpart,includingimpactproperties.
Girthflangesshallbeofintegraltaperedhubtype.
Jackscrewshallbeprovidedforallgirthflanges
GASKETS
GasketsshallbefurnishedbytheContractorforallboltedattachmentsi.e.cover
plates,manwaysandblindflangessuppliedwithheatexchangers.Gasketshallbe
inaccordancewithONGCSpecificationNo.2004AforPipingMaterial.
IMPACTTESTREQUIREMENTS
TherequirementsforCharpyVnotchImpactTestingshallbeinaccordance
withpressurevesselcode.
16
INSPECTION,TESTINGANDCERTIFICATION
6.1
General
InspectionandtestingshallbecarriedoutattheManufacturersworkandshall
be witnessed by the Companys authorized representatives and/or certifying
agency,ifrequired.
TheresponsibilityforinspectionrestswithContractor.However,theCompanyand
theirauthorizedrepresentativereservetherighttoinspecttheheatexchangeratany
timeduringfabricationtoensurethatmaterialsandworkmanshipareinaccordance
withthisspecification,relevantcodesandstandards.
Contractorshallprovideaprojectedshopschedulewithappropriatefabrication
stages at the time drawings are submitted for approval, they highlight the
inspectionactivityschedule.
FORMATNo.
Ref.PROCEDURENo.
ODS/SOF/004B
ODS/SOP/008TO015
OFFSHORE
ISSUENo.
REV.No.
01
FUNCTIONAL
SPECIFICATION
DESIGN
SECTION
01
SPECNo.
REV.DATE:
15/10/2003
5702F
FOR
SHELL&TUBEHEATEXCHANGER
Rev.No.
Discipline
Page
6.2
NonDestructiveExamination
The non destructive examination shall comply with the requirements of
functionalspecificationforUnfiredPressureVessels5601.
Clad tube sheets shall be ultrasonically tested, procedure and defect levels
beingagreedwiththecompanypriortoawardofcontract.
6.3
TESTING
Aftercompletionofassembly,theequipmentshallbehydrotestedatmaximum
allowable test pressure of the equipment for at least the minimum duration as
specifiedinthecode.Testingshallbedonebypressurizingeachsideseparately.
HydrostatictestshallbecarriedoutinthepresenceoftheCompanysappointed
Inspector.
Wherenecessary,testringsforconfinedtubesheetsandtestingrigsforfloating
tubesheetsshallbesuppliedforcompletionofadequateshoptesting.Allsuch
equipment, including studs and nuts where necessary, shall become the
propertyofthecompanyandisclearlymarkedbystampingwiththeequipment
tagnumber.
Testringsshallbedesignedtothehigherofthetwotestpressures,withan
allowabledesignstressof90%oftheyieldstressatthetesttemperature.
6.4
NAMEPLATE
Eachcompleteshellandtubeheatexchangershallbeprovidedwithatype316
stainlesssteelnameplatesecurelyattachedtotheshell,andlocatedonasurface,
thatitisclearlyvisibleafterinstallation.Nameplateshallberivetedtoabracket
weldedontotheexchanger.
Followinginformationshallbeaddedtothenameplate:
1 Exchangesurface(Shell/Tube)m2
2 TestPressure(Shell/Tube)kg/cm2
SPAREPARTS
TheContractorshallprovidepartsforinitialstartupandcommissioning.A
recommendedpartslistalongwithpriceforoneyearsoperationshallalsobe
submitted.Listshallincludepartnumber,partdescription,serialnumberand
deliveryleadtime.
FORMATNo.
Ref.PROCEDURENo.
ODS/SOF/004B
ODS/SOP/008TO015
OFFSHORE
ISSUENo.
REV.No.
01
FUNCTIONAL
SPECIFICATION
01
SPECNo.
DESIGN
SECTION
REV.DATE:
15/10/2003
5702F
FOR
SHELL&TUBEHEATEXCHANGER
Rev.No.
Discipline
Page
AllsparepartsfurnishedbyContractorshallbewrappedandpackagedsothat
theywillbepreservedinoriginalasnewconditionundernormalconditionsof
storage. Spare parts shall be properly tagged and coded so that later
identificationastointendedequipmentusagewillbefacilitated.
Theyshallbepackagedseparately,clearlymarkedasSparePartsandshipped
atthetimeastheequipment.Packagelistshallbefurnishedsothattheparts
canbehandledwithoutuncratingifrequired.
Thefollowingshallbesuppliedasaminimum:
10%approx.sparestudboltsandnutsforeachjointsize,oraminimumof4,
exceptforboltssubjecttohydraulictensioning,whereacompletesetshallbe
included.
Twosparesetsofgasketsforallblankedconnections,girthflangesandfloating
headconnections.
18
CONTRACTORDATAREQUIREMENT
8.1
WITHPROPOSAL
Equipmentspecifications,catalogues,datasheets,deviationscheduleandother
relevantdatashallbefurnished,asperattachedVendorDataRequirement
sheet,tofacilitatetheCompanyinevaluatingequipmentselection.
8.2
AFTERORDERPLACEMENT
Drawing and Data shall be furnished for companys review/approval as
outlinedintheattachedDatatobefurnishedbyVendorsheetandshallbe
submittedasapartofEquipmentDataBook.
FORMATNo.
Ref.PROCEDURENo.
ODS/SOF/004B
ODS/SOP/008TO015
OFFSHORE
ISSUENo.
01
FUNCTIONAL
SPECIFICATION
DESIGN
SECTION
REV.No.
REV.DATE:
01
15/10/2003
SPECNo.
5702F
FOR
SHELL&TUBEHEAT
EXCHANGER
Rev.No.
Discipline
Page
SPECIALNOTESONVENDORDATAREQUIREMENT
FORVENDORTOCOMPLY
FORMATNo.
Ref.PROCEDURENo.
ODS/SOF/004B
ODS/SOP/008TO015
OFFSHORE
DESIGN
SECTION
ISSUENo.
REV.No.
01
REV.DATE:
01
FUNCTIONALSPECIFICATION
FOR
SHELL&TUBEHEAT
EXCHANGER
15/10/2003
SPECNo.
5702F
Rev.No.
Discipline
0
Mechanical
Page16of18
DATATOBEFURNISHEDBYVENDOR
Sl.
No.
Description
I
1.
2.
3.
4.
4.
II
Filledindatasheets
TechnicalLiterature/Catalogue
Outlineofskidwithweight
Generalarrangementdrawing.
Crosssectionaldrawingswithpartlist and
materialofconstruction
Utilityrequirements
Thermal designcalculations including
computeroutputifapplicable.
Oneyearpricedspareslist
Commissioningspares
Maintenanceclearancediagram
Assembly drawings
with
material
specificationsshowingallthemainwelds,
nozzles,manholes,internalsetc.
MaterialTestcertificates
Welding procedure and qualification
records.
Radiographictestreports.
Installation,Operating
& Maintenance
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
WithProposal AfterOrderPlacement
ForCompany
Evaluation
III
X
X
X
X
X
ForCompany
Approval
/
Review
IV
X
X
X
X
With Eqpt.
DataBook
V
X
X
X
X
X
X
X
X
X
X
X
X
X
X
*
*
X
X
*
X
15.
16.
17.
16.
17.
18.
19.
Manual
Heattreatmentcharts
DeviationList
X
ReferenceListofPreviousInstallations
X
OthersasperONGCSpec.1060
SparePartCatalogue
X=DataRequired
*=RequirementatInspectionstage
FORMATNo.
Ref.PROCEDURENo.
ODS/SOF/004B
ISSUENo.
ODS/SOP/008TO015
OFFSHORE
X
X
X
X
X
REV.No.
01
FUNCTIONAL
SPECIFICATION
*
*
01
REV.DATE:
15/10/2003
SPECNo.
DESIGN
SECTION
5702F
FOR
SHELL&TUBEHEATEXCHANGER
Rev.No.
Discipline
Page
19
PAINTING&PREPERATIONFORSHIPMENT
9.1
PaintingandProtectiveCoating
Painting, protective coatings and the procedures used for preparation of
surfaces shall comply with ONGC Specification No.2005 for Protective
Coatinggivenelsewhereinbidpackage.
Where painting is specified, the entire heat exchanger shall be painted.
Nozzlesshallbepaintedontheflangeedgesinsideboltholes,anduptothe
gasket surface. Fireproofed or insulated surfaces shall be shot blasted and
givenonecoatofprimeronly.
TheContractorshallstencilinaprominentpositionin50mmhighcharacter
thedryliftingweightoftheheatexchangerandforstressrelievedand/orclad
vesselsthewordsNOWELDINGPERMITED
9.2
PreparationforShipment
Afterfinalhydrostatictest,theshellandtubeheatexchangershallbedriedand
cleanedthoroughlyofallgrease,loosescale,rust,fluxandweldspatter,both
internallyandexternally.
Allmachinedsurfacesandthreadconnectionsshallbeprotectedbycoating
withrustpreventive.
Flangedopeningsshallbeprotectedwithsteelplatecoversattachedbyproper
boltingorstrappingandsealedwithplasticcompound.
Screwedconnectionsshallbeprotectedwiththreadedforgedsteelplug.
Thecontractorshallberesponsibleforloadingandheatexchangerstoprevent
anydamageduringshipment.
Whenshippedloose,allinstruments,valvespartsetc.ofashellandtubeheat
exchangershallbetaggedwithitemnumbertofacilitateinstallationinthe
field.Tagsandwireshallbestainlesssteel.
10
WARRANTY
Vendorshallhavefinalandtotalresponsibilityforthedesignandperformance
ofallequipmentfurnishedbyhim.Vendorshallwarrantthattheequipment
furnishedbyhimandtheperformanceofthesaidequipmentisinaccordance
withthisspecificationandgeneralcodes.
FORMATNo.
Ref.PROCEDURENo.
ODS/SOF/004B
ODS/SOP/008TO015
OFFSHORE
ISSUENo.
REV.No.
01
FUNCTIONAL
SPECIFICATION
DESIGN
SECTION
REV.DATE:
01
15/10/2003
SPECNo.
5702F
FOR
SHELL&TUBEHEATEXCHANGER
Rev.No.
Discipline
Page
Vendorshallwarrantandguaranteethatallthematerialsandequipments
incorporatedintheentireequipmentunderhisScopeshallbenew,andall
workshallbeofgoodquality.
Vendorshallalsoberesponsibleforallsystemanddetaileddesigning,the
aspectsofwhichmaynothavebeencoveredinthisspecificationasregardsthe
workmanship,performanceetc.,oftheequipmentsuppliedbyhim.
Vendorshall,uponnoticefromCompany,makegoodathisownexpense
alldefectsfoundduringthewarrantyperiodexpeditiously.
Vendorshall,ifrequired,supplytheservicesofanexperiencedengineerto
supervisethecorrectionofanydefectsfoundduringthewarrantyperiod.
Vendorshallalsowarrantandguaranteeallwork,materialsandequipment
furnishedbyanySubVendorandwhichisincorporatedinthePackage.
THERMALANDMECHANICALGUARANTEES.
The thermal and mechanical design of heat exchangers shall be the
responsibilityofthecontractor.
Thermaldesignsshallbecompletedusinganapprovedsoftwarepackagesuch
asHTRI,HTFSorequivalent.Designshallbeapprovedbythecompanyprior
tothecommencementofanyfabrication.
ContractorshallprovideboththethermalandMechanicalguaranteeforthe
equipment and shall be based on the process and mechanical conditions
detailedindesigncriteria.
FORMATNo.
Ref.PROCEDURENo.
ODS/SOF/004B
ODS/SOP/008TO015
ISSUENo.
01
REV.No.
01
REV.DATE:
15/10/2003