PROJECT PROFILE
DISCLAIMER
This document has been prepared for information purposes only. It may be used only for t specifiedpurposes only and for
application of various permits and approvals or as approved.
EXECUTIVE SUMMARY
120MWp MURCIA
A. FIT SOLAR PROJECT
The documents enclosed are for a Solar Project to be built under the FiT
scheme. PSAC has embarked on developing this project by committing
significant resources and time to identify and secure key project specifics to
ensure project viability prior to applying for the various government permits
and approvals.
This project has been underdevelopment for the last 6 months with the
proper site selection and technical evaluation and local stakeholders
engagement and relationship building being developed to ensure project
viability. The initial findings are very positive and we are formally applying for
a Service Contract, which will be developed very quickly into a major
Philippine power project.
This approach allows all the stakeholders, DOE, NGCP, Landowners, LGUs,
etc. to have better comfort and visibility that our Service Contract will
crystalize into a real project and not remain in development for years.
The entire project will be completed in 2 phases:
a) Phase I of 60MW by February 2016 and
b) Phase II of 60MW by February 2017
B. PROPONENT
PH Solar Advance Corp (PSAC)is a wholly owned Filipino corporation and
was set up to fully focus on developing the Philippine Solar market. The
founder Ms.Maricel Montfort, a highly successful native of Cadiz and currently
residing in Bacolod and Manila, she is a long-standing citizen who has had
extensive working experience abroad and has returned back to the
Philippines to take an active part in improving the lives of the local Filipinos
through various infrastructure projects. Ms. Montfort is currently active with
several large infrastructure and social developments throughout the
Philippines.
These include medical facilities, orphanages, watertreatment/purification projects and land & property investments.Being a very
successful business lady, she is able to fully fund the professional and proper
development of these projects.
C. LOCATION
PSAC has identified Murcia City as a suitable site for the
Solar project. Murcia has a stable climate with adequate
sunlight throughout the year and minimal risk of heavy
typhoons or flooding. Land is plentiful and the local
government agencies are supportive of such an initiative.
Murcia currently has no power generation facilities and all
power is supplied from NGCP. It is an initiative that is
Irradiation Studies
Flood studies
Topographical surveys
Soil studies
Connection routing and
Plant layout design
The site has ideal road access and is relatively flat with little flood risk.
The lands will not inconvenience any inhabitants. The landlords have
committed to ensure the site will be problem free and we will engage their
local individuals where possible.
d) The lands identified are outside the CARP jurisdiction and we have
obtained proper legal advice as well as advise from the local LGUs on the
proper procedure to ensure that the site is Solar ready. This has already
been factored in our evaluation.
e) The land titles have also been checked for any risk of foreclosure or
encumbrances being attached.
f) PSAC has also ensured that there are no sensitive or endangered trees on
the site and will not need any special approval or process.
They will conduct our Grid Impact Study and Facility Study.
Others :
We have assembled a team of dedicated individuals with unique
skillsets to play key functions in this Solar Plant development. Among
them are: