Sei sulla pagina 1di 9

Sr No

10

11

12

Compliance Statement
Particulars
MODEL
Offered Model No/Detail

Requirement in Brief
The bidders scope of work for supply of Transformer Oil Test Kit(Online DGA System) is as follows:
Complete supply of six no. online DGA system. The DGA unit will be installed and commissioned on 3-phase transformer of 148/144 M
27MVA, 220/66kV. Necessary hardware/software for remote monitoring from control room to be supplied & commissioned with the sys

Technical Parameters
The system shall meet the following technical parameters:
1. Detection & Measurement of gases- H2, CO, C2H2, C2H4 with 100% sensitivity to H2 & C2H2
2. Accuracy(minimum)- (+/-) 10%
3. Oil temperature range of sensor- 10 DegC to 100 Deg C
4. Sensor attachment degree of protection- Minimum IP55
5. Minimum detection sensitivity to C2H2- 2ppm.
6. Sampling frequency minimum one sample per day. However in alarm range (can be made user settable)- it can be programmed up to m
day.
7. Validation of on line DGA system, testing and commissioning. (For validation of data, party should validate the data of supplied units
parameter within specified accuracy from Indian
government approved lab like CPRI, ERDA etc). Party has to clearly quantify in their offer the deviations due to transportation and samp

Technical Requirements
1. The system offered shall be suitable for online monitoring of dissolved gases in oil filled (Napthanic / Paraffanic based oil) power tran
least measure dissolved gases such as H2, CO,C2H2, and C2H4 with 100% sensitivity to H2 & C2H2.
2. The system to be supplied shall be installed at the location as decided by owner. The supplied system shall replace the existing TCG sy
Make) by the bidder. Bidder shall provide necessary adopter /fittings for this purpose. The attachment shall be provided with oil samplin
collection for manual off-line DGA by owner.
3. All software, hardware, PC, laptop for monitoring from respective control room and engineer hall(within a distance of 500 mtr.) shall
bidder. One PC system (for all six oil test kits) with operating system windows 7 or above is to be supplied & installed in the control roo
all six oil test kits) with operating system windows 7 or above is to be supplied for monitoring of equipment at site. Communication cab
DGA
system is to be supplied & laid by the bidder.
4. Two numbers potential free alarm contacts for high gas concentration (User programmable) shall be wired up to transformer marshalli
used by owner for facia alarm in control room and DDCMIS.
5. The software for remote monitoring in owner's control room and engineer hall shall facilitate real time data logging & also historical d
Installation and cable connection drawing shall be furnished for approval.
6. The system must have remote monitoring and networking capability to monitor dissolve gasses of transformer & also this networking
so as to accommodate future installation in same network.
7. Must provide password protected access for parameter settings, however parameter view can have free access to all PC Connected wit
trending.
8. Power supply for the DGA system either three phase or single phase as required shall be provided by NTPC at one point only in the ca
cabling between DGA system and common Marshalling box of transformer shall also be provided by NTPC. However termination of po
in the DGA system cabinet shall be done by the bidder.

SPARES
The suppliers shall give a list of spares and consumables, if any, for operation of the system for a period of three years. Cost of spares sh
separately.

WARRANTY/ DEFECT LIABILITY


The supplied system shall have Warranty for a period of twelve months after successful commissioning and handing over of the system a
warranty period all service & spares support shall be provided.

DOCUMENTATION/ MANUALS
1. The kit should be supplied with all detailed manuals and drawings, describing hardware of kit maintenance and trouble shooting. One
manuals are to be supplied with the kit. Soft copy of the Manual in CD media is also to be supplied with the kit.
2. Backup copy of the software will be supplied in CD media.
3. Installation and cable connection drawing shall be furnished for approval.

ENVIRONMENT
A. Temperature : 0 to 50 Deg C
B. Humidity : 85% non condensing

CALIBRATION CERTIFICATE
Calibration certificate from OEM/ reputed laboratories shall be submitted. Date of calibration shall not be older than one month from th
Supply of kit.

TRAINING & SUPPORT SERVICE


1. Successful Bidder will have to inspection/commissioning of the supplied system and will install/integrate and commission the system
software at site up to the satisfaction of NTPC.
2. Bidder will have to provide training to concern NTPC Engineers & technicians free of cost for safe operation and maintenance of the
handing over the instrument by the representative of original system supplier at site.
3. Bidder will have to submit the documentary evidence of having established mechanism for prompt services as and when required by N

PAYMENTS TERMS
A. 90 % Payment of equipment(on line DGA)shall be released after successful commissioning, data validation & certification by NTPC
B. 10% of equipment(on line DGA) shall be released after successful
completion of defect liability period else Successful bidder may submit PBG of 10% of the order value which shall be valid till defect lia

PERFORMANCE CERTIFICATION
A. The equipment offered by the bidder must be proven by design and service. The offered model of the ON LINE DGA equipment mus
satisfactory operation for a period of twelve month as on the date of
bid opening date. vendor shall submit proof of satisfactory operation of
the offered equipment along with the offer.
General Requirements1.Bidder has to be either manufacturer or authorized representative of manufacturer. In case of authorized representative, certificate from
authorization is to be enclosed with the offer.
2.Bidder shall confirm that there is no deviation between Unpriced commercial bid/ BOQ submitted with technical bid and commercial b
deviation the bid shall not be considered and rejected.
3.No deviation shall be acceptable in payment terms else offer shall be rejected without further consideration.
4.The specification mentioned above is the tentative; however, vendor may submit the offer for advanced and proven instrument and sof
5.Bids are to be submitted in two parts i.e. technical bid & commercial bid
6.Complete un-priced commercial offer along with un -priced BOQ is to be attached with technical bid
7.Vendor must fill up the attached technical compliance data sheet & submit the supporting catalogs along with the technical BID, witho
liable to be rejected.
Remarks: Both the items shall be evaluated collectively for the award of PO and both items shall be awarded to same vendor.

A.Eberle Comments
HC05

Compliance Confirmed

Compliance Confirmed

Compliance Confirmed

Compliance Confirmed

Compliance Confirmed

Compliance Confirmed

Compliance Confirmed

Compliance Confirmed

Compliance Confirmed

Compliance Confirmed

Documents has been attached

Potrebbero piacerti anche