The objective of the Transmission Planning was to develop Transmission Expansion Plan
based on the load forecast and generation supply scenario developed as part of the Power
System Master Plan for the state of Bihar. The purpose of this report was to present a
comprehensive summary of the process, assumptions, methodology, transmission network
expansion plan and investment required to ensure the transmission system which would be
capable transmitting the planned generation to meet the forecast loads up to FY 2018. The
results of the load forecast, generation and transmission plan will be used to develop the
distribution plan
The proposed transmission system was evaluated for the load and generation conditions for
FY 2018 and FY 2014. The following system conditions were studied for FY 2018 and FY
2014.
The system studies were carried out for the above scenarios and analyzed the transmission
system required in FY 2014 and FY 2018.
The planning studies do not include a detailed evaluation of the stability and protection
system requirement for transmission lines and substations.
The transmission investment plan was prepared based on the transmission network
expansion plan developed and was based on load flow studies.
4.1
Key Issues
It is important to review the key issues before undertaking the development of long - term
transmission generation plan. This helps the utility to formulate strategies and help to
develop policies for attaining the stated goals.
4.1.1
Central Electricity Authority (CEA) has been responsible for development of load forecast,
generation plan, transmission plan in the country and the states neither had the capacity nor
the opportunity to develop their own plans before reforms were initiated in the country.
However, BSEB had carried out Long-Term Transmission Plan up to FY 2021 with the help
of M/s Power Research and Development Consultants Private Limited (PRDCL). These
plans were developed during June 2009 and were based on the CEA 17th EPS Forecast.
The present system studies are carried out based on the load forecast and generation plan
as developed under the Power System Master Plan project funded by ADB. The
transmission plan took into account the transmission projects already in the pipe line and
committed projects of the BSEB Transmission Power System. .
4.1.2
Suppressed Demand
Presently, the state of Bihar is experiencing huge shortage of power in terms of energy and
capacity. The gap between supply and demand has been estimated at 16.4% of energy and
27.6% of capacity in year 2008-09.
4-1
020328-40RP-0400-00
Final Report
4.1.3
The projects either under construction or about to commence construction are termed as
committed units. In order to bridge the gap between supply and demand, the BSEB, in
consultation with Government of Bihar, has signed a number of MoUs with many central and
private sector power developers. The committed / planned capacity additions in the state are
about 20,600 MW and inter-state imports planned is about 3,490 MW. Apart from these, the
state hydro power corporation of Bihar has planned a total capacity of about 244 MW which
will be commissioned in 11th plan and 12th plan periods. The evacuation plans for the
various generating plants discussed in the other sections.
4.2
The methodology used for Transmission Planning for FY 2018 and FY 2014 was as follows:
For 2018 Study
Model forecast loads by circle from the load forecast developed as part of Power
System Master plan
Allocate the circle wise demand to existing and future 220/33KV and 132/33KV
substations
Schedule reinforcement required for existing 220kV and 132kV substations and
schedule new substations as necessary.
Develop the transmission system required to meet the study criteria based on the
load flow study.
Model forecast loads by circle from the developed load forecast as part of Power
System Master plan
Allocate the circle wise demand to existing and future 220/33KV and 132/33KV
substations
Modify imports and exports based on the availability various interstate projects
outside the state.
The total reinforcements were identified keeping in mind the 2018 scenario and for
2014 the projects were phased in and transmission projects not scheduled for FY
2014 or not required were removed from the system.
Validate the transmission system for satisfactory operation for FY 2014 for the
scenarios considered under the study.
4-2
020328-40RP-0400-00
Final Report
4.2.1
First the existing circle wise co-incident demand based on the existing substation
loads was calculated.
Allocate system demand for study year to all circles proportionally based on existing
circle wise coincident demand duly taking certain percentage of transmission system
losses.
The new substations are planned in the vicinity of existing overloaded substations
and the load is allocated accordingly so that the substations load is not more than
their capacity.
4.2.2
Generation Scheduling
The generation scheduling is carried out considering the existing and future projects get
commissioned as per the generation plan and expected interstate power exchanges. The
generation scheduling is carried out as follows:
Estimate the generation capacity required to meet the forecast loads after
considering certain percentage of initial transmission losses assumption
Estimate the availability of each generating unit for the load scenario (System Peak
and Light Load) under consideration and compute the generation capacity available
to the grid considering station auxiliary consumption and spinning reserve required
from the unit.
The generation is scheduled on the priority basis where the must run units are
despatched first.
Schedule expected hydro generation from the existing and future hydro station for
the load scenario under consideration based on the historical availability
Schedule the generation from peaking stations from Gas Turbines for peak load
scenario based on the system peak requirement
Schedule thermal generation from the BSEB stations and shared generation from
central sector and IPPs within the state
Reschedule few thermal plants generation in such a way that the total scheduled
generation from the state, PVT/IPP and interstate exchanges should be equal to
estimated generation requirement.
The details of the generation plan are discussed in the generation planning report.
4-3
020328-40RP-0400-00
Final Report
4.2.3
The transmission system analysis is carried out using Load Flow and AC contingency
modules of Power System Analysis Framework (PSAF) V3.10 simulation tool developed by
CYME International. The transmission network database was developed using PSAF to
simulate the power flow scenarios to analyse the 2018 and 2014 transmission system.
4.3
This section presents all key assumptions and criteria used in development of transmission
expansion plan. All the developed scenarios meet the uniform requirement in terms of
performance as; a uniform planning criteria was adopted for the study.
The various parameters are discussed as below:
4.3.1
The study horizon period for development of Transmission Plan is 2008-09 to 2017-18,
inclusive, a 10 year period.
4.3.2
Average load forecast scenario was used to develop the base case Transmission Plan for
FY 2018 and 2014.
4.3.3
Load Flow simulations were carried out for the horizon period and included the simulation
and studies for the intermediate year as follows:
4.3.4
Scenarios
The light load and peak load simulation were carried out to estimate the reinforcements and
reactive compensation required during peak and light load condition.
The historical system load of Bihar power system shows that the Peak Load Scenario
occurs during October whereas the Light Load Scenario occurs during April. The historical
data shows that the light load is about 57% of the annual system peak load.
All loads are assumed to have power factor of 0.9, which is a reasonable assumption
considering that in most of the national grid code, 0.9 pf has to be maintained between
transmission and distribution utilities.
4-4
020328-40RP-0400-00
Final Report
4.3.5
Study Criteria
The study criteria used for the simulation for FY 2014 and FY 2018 are based on the CEA
criteria and the key parameters are discussed in the following sections:
4.3.5.1
Under normal and N-1 contingency operation, no element of transmission should be loaded
beyond its thermal limit. The maximum number of transformers in a substation was limited to
three numbers though few existing substations had more than three transformers.
As 132/33 kV transformers are mostly radial, so a special methodology was developed to
limit the loading of the radial feeders. The loading limit of 132kV transformers was reduced
from their thermal limit; this was done considering the reliability requirement in the event of
outage of a single transformer. In the case of substation having single transformer the
substation was loaded up to 50% assuming that under contingency conditions such as
outage of transformer the load will be met by the neighbouring substations. Similarly
minimum loading criteria used for the substations having more than one transformer was
limited to 50%. Based on the above the maximum loading limit of the transformers is shown
in the Table 1 below:
Table 4-1
Sl.No
80%
75%
67%
50%
50%
The maximum substation capacity adopted for each type of substation used in the planning
studies was based on CEA criteria and outlined as follows:
Table 4-2
Sl.No
Substation Reinforcement
Type of Substation
Transformer Size
(MVA)
Substation
Capacity (MVA)
765/400kV
1500
3500
400/220kV
315
1000
220/132kV
100
320
132/33kV
50
150
The loading limit of transmission lines are derived based on Thermal Limit and Permissible
Loading Limit Curves. These curves were developed using St Clair method to determine the
line loading limits as a function of line lengths. The permissible loading limit curve is a plot
of length of line on X-Axis and loading limit in terms of % Surge Impedance Loading (SIL) on
Y-Axis. The permissible line loading limit depends on many factors such as voltage
regulation, stability and current carrying capacity of the line. The permissible line loading
curve is derived assuming a voltage regulation of 5% and phase angle difference of 30 deg
Developing the PSMP for Bihar
4-5
020328-40RP-0400-00
Final Report
between the two ends of the line. For the lines whose permissible line loading as determined
from the curve is higher than the thermal loading limit, the permissible loading limit is
restricted to thermal loading limit only. The permissible thermal loading limit curve is plotted
as follows:
Figure 4-1
Based on the above the loading limit of transmission lines for various voltages was derived
as follows:
Table 4-3
Description
Quad
Bersimis
Quad
Moose
AAAC 560
Sq.mm
Zebra
Panther
Voltage (kV)
765
400
400
220
220
132
Thermal Limit at
45 deg C ambient
temp (Amps) and
& 75 degC
conductor
temperature
2788
2380
1190
808
546
366
Thermal Limit
(MVA)
3694
1649
824
308
208
84
SIL (MVA)
2316
615
515
132
132
48
Line length
(<=100km)
2316
1649
824
308
208
84
4-6
020328-40RP-0400-00
Final Report
Description
Quad
Bersimis
Quad
Moose
Twin
Moose
AAAC 560
Sq.mm
Zebra
Panther
2316
1076
824
231
208
Line length
(>200km
and<=300km)
846
708
4.3.6
Voltage Limits
4.3.7
Voltage Limits
Bus Voltage
Voltage Limits
(%)
Voltage Limits
(kV)
765kv
+/-4.8
728kV to 800kV
400kV
+/-5%
380kV to 420kV
220kV
+/-10%
198kV to 245kV
132kV
+/-10%
122kV to 145kV
Contingency Criteria
The transmission planning is based on a deterministic approach using the single line
contingency criteria (N-1). This is the most common approach used worldwide, and it
requires the system to be able to operate satisfactorily with one element out of service (line
or transformer), and also to survive the transition state from the normal operating state to
contingency state without any operator intervention
4.3.8
Transmission projects
The starting point of the transmission system expansion planning is the modelling of the
following transmission projects:
4.3.9
Reactive Compensation
The reactive compensation was required to support the active power transfer from
generating station to loads.
The reactive power requirement in the system is partly met by the line charging from the
lines loading below surge impedance loading and partly from the generating stations.
Under the lightly loaded transmission lines generate more reactive power than they
consume which increases the line voltages. Under these conditions it is very important to
ensure that the generators which are in electrical vicinity to such lines absorb reactive power
generated but are within limits of the absorption capacity of the generators. In all cases
4-7
020328-40RP-0400-00
Final Report
including peak and light load conditions it was ensured that the limits of the reactive power
absorption or generation were respected at all times. Further under light load conditions in
order to limit the voltages within the prescribed limits, inductive compensation is required
normally for the 400kV system. The inductive compensation required will depend up on the
actual load and the power factor. For the system studied a power factor of 0.9 was assumed
and it should be noted that considerably more reactors will be required if the global power
factor of the load was increased from 0.9 to 0.95
For the planning studies, the reactor was added in step of 50, 63 and 100MVAr (these are
the sizes normally used in the Transmission Companies in India)
For peak load conditions, to meet the load reactive demand and maintain the system
voltages within acceptable limits during normal and contingency operation, it was necessary
to install substation capacitors. From the system studies it could be inferred that the
capacitive compensation was required at different buses to maintain the voltage within
limits. It should be noted that the present transmission plan presents the indicative value of
the capacitive requirement and the study does not consider the detail exercise for optimal
location of reactors and identifying optimal sizes, which are part of a detailed reactive power
management studies.
The capacitor requirements are planned for the capacities in multiple of 10MVAr. The ideal
location for capacitors should be next to the load but for transmission planning purposed the
location of such capacitors was taken at 132kV and 33kV buses.
4.4
Load Forecast
The section presents brief description of the load forecast study and the results of the load
forecast as presented in the Report on Load Forecast as part of the Power System Master
Plan. The summary of the study are as follows:
The various categories considered for forecasting the load are:
Domestic
Non-Domestic
Public Lighting
LT-Industry
HT-Industry
Railway Traction
Irrigation
Approach
Trend/Adjusted Trend
Categories
Non-Domestic, Public Lighting, LT-Industry, HT-Industry, Railway Traction
and Public water works
Domestic
End Use
Irrigation
4-8
020328-40RP-0400-00
Final Report
The horizon period for the forecast is from FY 2009 to FY 2018. Two load forecast scenarios
were developed. These scenarios are as follows:
4.4.1
The summary of results for the above two forecasts are presented in the following table:
Average Load Growth Scenario
Annual Energy
Requirement
(MU)
Annual Peak
Demand (MW)
Annual Peak
Demand (MW)
2009
12,110
2,048
12,571
2,126
2010
13,355
2,310
14,701
2,543
2011
14,742
2,617
17,101
3,036
2012
16,311
2,956
19,863
3,599
2013
18,327
3,286
22,935
4,113
2014
20,551
3,647
26,512
4,705
2015
22,766
3,998
30,400
5,339
2016
25,255
4,390
35,040
6,092
2017
28,204
4,854
41,091
7,072
2018
31,592
5,383
48,381
8,243
4-9
020328-40RP-0400-00
Final Report
4.4.2
The unconstrained load forecast represents the total Bihar state demand including
transmission and distribution losses, net of generating station auxiliaries. The circle wise coincident demand forecast is developed based on the methodology discussed in the previous
section.
The substation load demand forecast is developed assuming typical percentage of
transmission losses. The system coincident peak demand after deduction of transmission
losses works out to 3515 MW and 5271 MW respectively for FY 2014 and FY 2018. The
above demand forecast for loads is the starting point and are assigned in the load flow
database. Subsequently, while carrying out the load flow studies (which calculates the
actual transmission losses), the substation loads are adjusted globally to match the forecast
demand.
The system peak demand met by BSEB for FY 2010 in the month of October-2009. The
peak demand met was 1,506 MW. The coincident demand for all substations during system
peak demand was not available. Hence, the coincident peak demand for all substation
demand is estimated for year 2009 based on the substation average loading during peak
load day and adjusted to system losses to meet the system peak load as mentioned.
The system coincident demand is allocated to the different circles as follows:
Table 4-7
Name of the Circle
Coincident Peak
demand (MW)
(Oct 2009)
Patna
423
1064
1595
Gaya
151
379
568
Munger
62
157
235
Bhagalpur
88
222
333
115
290
434
Chapra
69
173
260
Motihari
44
110
165
Darbhanga
66
167
251
Samastipur
59
148
222
Purnea
71
178
266
Saharsa
52
131
197
Rohtas
96
241
362
Bhojpur
48
121
181
Nalanda
54
135
203
1,398
3.515
5,271
Muzaffarpur
Total
Note: The load of transmission circles are included in the distribution circles and all circles in Patna
are combined together to form one single circle for the purpose of transmission planning.
The circle wise co-incident demand is further allocated to existing substations considering
substation reinforcement and future 132/33kV substations. The allocation of loads to
different substations is presented as follows:
4-10
020328-40RP-0400-00
Final Report
Table 4-8
CIRCLE
1
NAME OF THE SS
FY 2014
FY 2018
423
1064
1595
18
53
45
41
89
91
DIGHA
61
91
FATHUA-2
42
91
GAIGHAT-2
45
EXISTING
BIHTA-2
BIHTA
EXISTING
GAIGHAT
EXISTING
32
73
91
MOKAMA RLY
RAILWAY
12
19
HATHIDAH
EXISTING
11
19
29
91
91
JAKKANPUR-2
JAKKANPUR
EXISTING
85
115
115
KATRA
EXISTING
10
49
75
KHAGAUL-2
91
91
KHAGAUL-3
91
KHAGAUL
RAILWAY
13
24
38
KHAGAUL
EXISTING
85
66
53
MASURHI
EXISTING
22
33
MITHAPUR-2
73
91
MITHAPUR-3
91
MITHAPUR
EXISTING
76
73
91
KHUSRPUR RLY
RAILWAY
16
24
FATHUA
EXISTING
39
75
66
54
91
151
379
568
11
12
18
34
SIPARA
GAYA
AURANGABAD
BELAGANJ
EXISTING
CHANDAUTI-2
CHANDAUTI-3
RAILWAY
17
27
CHANDAUTI
EXISTING
25
44
38
GOH
11
HULASGANJ
4-11
020328-40RP-0400-00
Final Report
CIRCLE
Existing
(Oct 2009)
NAME OF THE SS
RAILWAY
11
JEHNABAD
EXISTING
17
48
60
11
NAWADA
EXISTING
14
45
68
PAHARPUR
RAILWAY
12
18
18
PAHARPUR
RAFIGANJ
RAILWAY
13
24
20
RAFIGANJ
EXISTING
14
18
37
SONNENAGAR-2
SONNENAGAR
RAILWAY
12
23
35
SONNENAGAR
EXISTING
24
50
50
TEKARI
WAZIRGANJ
17
41
57
62
157
235
BODHGAYA
EXISTING
MUNGER
JAMALPUR
EXISTING
17
45
68
JAMUI
EXISTING
14
40
61
LAKHISARAI
RAILWAY
16
24
LAKHISARAI
EXISTING
10
14
20
SHEIKHPURA
EXISTING
12
41
62
88
222
333
BHAGALPUR
BANKA
EXISTING
33
50
KAHALGAON
EXISTING
11
28
42
NAUGACHHIYA
EXISTING
19
28
45
SABOUR-2
FY 2018
JEHNABAD
KARPY
FY 2014
SABOUR
EXISTING
41
91
91
SULTANGANJ
EXISTING
21
51
77
115
290
434
18
45
67
45
60
91
91
12
18
MUZAFFARPUR
HAJIPUR
EXISTING
MUZAFFARPUR-2
MUZAFFARPUR
EXISTING
RUNI SAIDPUR
4-12
020328-40RP-0400-00
Final Report
CIRCLE
Existing
(Oct 2009)
NAME OF THE SS
SHEOHAR
SITAMHARI
EXISTING
SKMCH
VAISHALI
EXISTING
CHAPRA
CHAPRA-2
11
16
18
45
67
37
56
19
49
73
69
173
260
34
19
67
67
GOPALGANJ
EXISTING
18
39
57
SHITALPUR
EXISTING
16
24
SIWAN
EXISTING
24
47
71
44
110
165
19
25
27
35
MOTIHARI
EXISTING
DHANHA
DHAKA
EXISTING
13
MOTIHARI
EXISTING
18
31
49
RAMNAGAR
EXISTING
13
19
36
66
167
251
27
32
21
40
54
10
14
RAXAUL
DARBHANGA
GANGWARA
DARBHANGA
JAINAGAR
EXISTING
KUSHESWAR
EXISTING
BETTIAH
FY 2018
CHAPRA
MASRAKH
FY 2014
MADHUBANI
EXISTING
13
25
47
PANDAUL
EXISTING
25
52
86
PHULPARAS
EXISTING
12
59
148
222
41
62
29
31
31
23
30
53
77
SAMASTIPUR
DALSINGSARAI
HFC
EXISTING
SAMASTIPUR-2
SAMASTIPUR
EXISTING
4-13
020328-40RP-0400-00
Final Report
CIRCLE
Existing
(Oct 2009)
NAME OF THE SS
BEGUSARAI
10
PURNEA
23
30
71
178
266
23
35
KATIHAR
EXISTING
15
38
57
KISHANGANJ
EXISTING
14
36
54
29
32
80
91
52
131
197
EXISTING
SAHARSA
KATIYA
EXISTING
21
31
KHAGARIYA
EXISTING
12
30
45
23
46
69
MADHEPURA
SAHARSA
EXISTING
SONABARSHI
SUPAUL
EXISTING
13
19
UDAKISHANGANJ
EXISTING
11
16
96
241
362
ROHTAS
BANJARI
EXISTING
12
BHABUA
EXISTING
20
55
80
BIKRAMGANJ
EXISTING
12
27
40
DINARA
KARMNASA
RAILWAY
10
16
KARMNASA
EXISTING
13
28
47
KUDRA
RAILWAY
13
24
38
KUDRA
13
EXISTING
PURNEA
12
FY 2018
FORBESGANJ
PURNEA-2
11
FY 2014
SASARAM
EXISTING
13
27
39
DEHRI-ON-SONE
EXISTING
18
50
74
48
121
181
BHOJPUR
ARRA
RAILWAY
14
22
ARRA
EXISTING
15
30
44
13
16
24
BUXAR
DUMRAON
RAILWAY
4-14
020328-40RP-0400-00
Final Report
CIRCLE
Existing
(Oct 2009)
NAME OF THE SS
FY 2014
FY 2018
17
48
66
11
54
135
203
42
90
68
BARIPAHRI-2
41
HARNAUT
NALANDA
12
21
45
12
31
DUMRAON
EXISTING
JAGDISHPUR
14
NALANDA
BARIPAHRI
RAJGIR
EXISTING
EXISTING
EKANGASARAI
4.5
Generation Plan
The purpose of the generation planning is to estimate the generation capacity requirement
to meet the forecasted demand at the specified reliability level subject to the system
constraints. The least cost generation expansion plan has been developed as part of the
Power System Master Plan. The least cost indicative generation plan was developed using
SNC-Lavalins System Planning and Production Costing Model (SYPCO). Various scenarios
have been developed for the following load forecast scenarios
Scenario-1:Coal+Hydro
The scenario-5 developed is not considered for selection of least cost plan.
4.5.1
The following generation planning criteria was used to develop the least cost generation
plan:
Study Horizon Year:
The study horizon period for development of Generation Plan is 2008-09 to 2017-18,
inclusive, a 10 year period.
4-15
020328-40RP-0400-00
Final Report
Load Forecast:
The planning year is taken as equal to the financial year. For example financial year 2009
starts from April-2008 to March-2009, inclusive. Reference Year for Present Worthing and
Cost Data
Reliability Criterion:
The reliability criterion decides timing of new capacity additions required in future. The
reliability criterion used for the state of Bihar is as follows:
Up to FY 2012:
FY 2014 onwards:
Gas Turbines: This is subjected to the availability of the gas to the state.
Pumped Hydro Plants: The state of Bihar is planning huge pumped storage
capacities in the 13th Plan period and requires government intervention to advance
these units to be available in 12th Plan period.
4-16
020328-40RP-0400-00
Final Report
Table 4-9
Sl.No
Power Station
Remarks
2x250
Expected in FY 2014
2x195
Expected in FY 2014
Nabinagar
Power
Generating Company Pvt.
Ltd
(50:50
JV
of
GOB/BSEB & NTPC)
3x660
Expected in FY 2014
Total share
2,375
Sl.No
Power Station/Developer
Buxar
Thermal Power
Station at Chausa, DistrictBuxar
2x660
2x660
2x660
Total share
2,772
Remarks
Expected in FY 2015
The bidding process will be initiated once the coal linkages obtained for these projects.
Projects under IPP through MOU
The State Investment Promotion Board (SIPB) has given approval for four Independent
Power Producers (IPPs) to develop power projects in the state. BSEB has signed MOU with
these projects for facilitating certain infrastructure required for these projects and sharing
25% of power to BSEB. The details of these projects are as follows:
4-17
020328-40RP-0400-00
Final Report
Table 4-11
Sl.No
Power Station/Developer
Capacity (MW)
4x660
M/s Nalanda
Bhagalpur
Pirpainti,
2,000
1,000
Power
Company
Ltd.,Kolkata,
at
500
Total share
1,535
Future Imports
Name of
the
Agency
Capacit
y (MW)
Share (%)
Capacity
Available to
Bihar (MW)
Expected
Commissioning
Year
NTPC
3x660
16.36
324
Jun- 2011
NTPC
2x660
14.24
188
Feb- 2012
NTPC
4x250
5.8
58
FY 2014
KHSTPS Stage-II
NTPC
1x500
19.2
96
May-2009
NTPC
3x660
6.41
127
FY 2014
Subhansri HES
NHPC
4x250
20 to 30
250
FY 2012
NHPC
4x250
15
150
NLC
NLC
4x500
10
200
UMPP Tilaiya
(Jharkhand)
4,000
12.5
500
10
Shell Companies of
Orissa (under Orissa
Hydro Power
Corporation)
8,500
5.88
500
11
APGENCO (under
Andhra Pradesh
Power Development
Co. Ltd.)
4,400
25
Total
APGENCO
27,680
st
1 Unit FY 2014
1,100
3,493
Future Hydro
Bihar Hydro Power Corporation (BHPC) has planned to develop various hydro projects of
totaling capacity of about 244.5 MW in the horizon period.
4-18
020328-40RP-0400-00
Final Report
Table 4-13
Sl. No
Future Hydro
Name of the
Agency
Expected
Commissioning Year
Capacity (MW)
Small Hydro
BHPC
1.7
Jul 2009
Small Hydro
BHPC
8.4
Dec- 2009
Small Hydro
BHPC
6.4
Dec-2011
Small Hydro
BHPC
102
FY 2013
Dagmara HEP
BHPC
126
Total
4.5.2
244.5
The details of least cost generation plan for average load forecast scenario are as follows:
The supply options considered are coal, Imports and hydro. This scenario takes the
capacity additions planned under state, JV, IPP sectors and imports from central
generating stations. The capacity additions considered in this scenario are as
follows:
Coal:
o
Hydro:
o
Gas Turbines
The system switching over from negative reserve margin to the positive reserve
margin in FY 2014
The reserve margin at the end of the horizon period stays at 14%.
The capacity addition program under least cost generation plan is presented as below:
4-19
020328-40RP-0400-00
Final Report
Table 4-14
2010
2011
2012
2013
2014
2015
2016
2017
2018
Imports
448
Existing
65
200
BTPS-Extension
463
MTPS-Extension
361
Nabinagar Power-JV
916
458
Pirpainti TPP
427
Gas Turbine
495
99
198
Hydro
10
102
125
Total
10
455
662
1,739
326
557
625
Total-Horizon Period
4.5.3
4,373
The least cost generation plan shows that the majority of the capacity additions are taking
place in FY 2014. The total net capacity additions required to meet the forecast loads is
about 4373 MW for the year 2014. However according to the the status of various projects
under IPP route there is possibility of additional generation capacity to be commissioned in
the state.. Therefore, it is appropriate to take these capacities and any surplus arising from
these capacities was modelled as export to the neighbouring states. In this scenario the
following additional capacity was considered in the development of transmission Plan.
Based on these capacities the generation despached was scheduled for peak load and light
load conditions for FY 2014 and FY 2018.
The existing import and export points of BSEB system are as follows:
Export Points:
Kahalgaon-Balia
Biharsharff-Balia
Sultanganj-Deogarh
Rajgir- Barhi(DVC)
Sonenagar-Garhwa
Biharshariff- Gorakhpur
Kahalgaon-Maithon
4-20
020328-40RP-0400-00
Final Report
Purnea-Malda
Import Points:
Sonenagar-Rihand
Purnea-Siliguri
Biharshariff- TTPS
Kahalgaon-Farakka
Since the inter-state power flows are dictated by the capacity additions in the region and
network expansion in the region. Therefore, it is important to present the capacity additions
planned in the region. The expected capacity additions in the region are as flows:
North Karanpura :
1980 MW
Maithon RB:
1000 MW
Barh:
1980 MW
292 MW
Teesta IV:
495 MW
NabiNagar JV Rlws:
1980 MW
Kahalgaon-II:
1000 MW
Mejia U6:
250 MW
Bokaro Ext:
500 MW
Koderma:
Farakka-III:
500 MW
Mejia Extn:
1000 MW
Raghunathura:
1000 MW
1000 MW
1000 MW
4-21
020328-40RP-0400-00
Final Report
765kV Lines
Gaya-Tilaiya
Generation Scheduling
Based on the generation capacity additions program the generation schedules for FY 2014
and FY 2018 are prepared for the following scenarios:
Table 4-15
Station
Scheduled (MW)
Peak Load
Light Load
COAL
BTPS UNIT-6
90
90
BTPS UNIT-7
90
MTPS UNIT-1
90
90
MTPS UNIT-2
90
208
208
208
208
162
162
162
162
92
92
GAS
4-22
020328-40RP-0400-00
Final Report
Station
Scheduled (MW)
Peak Load
Light Load
92
92
92
92
1654
921
Total Thermal
Table 4-16
Station
Scheduled (MW)
Peak Load
Light Load
COAL
BHEP
KOSHI
18.4
18.4
Total Thermal
22.4
22.4
Table 4-17
Station
Scheduled (MW)
Peak Load
Light Load
176
176
176
176
176
176
176
439
439
439
439
439
439
580
580
580
580
4-23
020328-40RP-0400-00
Final Report
Station
Scheduled (MW)
Peak Load
Light Load
580
580
580
580
580
208
208
208
208
208
208
208
NABINAGAR UNIT-1
580
580
NABINAGAR UNIT-2
580
580
NABINAGAR UNIT-3
580
580
7493
6530
Table 4-18
Scheduled (MW)
Peak Load Light Load
Interstate Exchange
BARH(PGCIL)-GORAKHPUR-400KV
(3009)
(2118)
BIHARSHARIFF(PGCIL)-BALIA-400KV
(1916)
(1831)
PATNA(PGCIL)-BALIA-400KV
(2129)
(2001)
BIHASHARIFF(PGCIL)-KODERMAPG-400KV 1722
1243
BIHASHARIFF-TTPS-132KV
565
349
GAYA(PGCIL)-GODDA-765KV
GAYA(PGCIL)-MUGALSARAI-765KV
(2310)
(1713)
1207
GAYA(PGCIL)-NR(BALI)-765KV
(1718)
(1562)
KAHALGAON(PGCIL)-FARAKKA-400KV
468
449
KAHALGAON(PGCIL)-MAITHON-400KV
1614
906
KISHANGANJ-DALKHOLA-132KV
(104)
(104)
PURNEA(PGCIL)-MALDA-400KV
858
438
KISHANGANJ-SIKKIM-400KV
1280
880
KISHANGANJ-SILIGURI-400KV
900
750
PUSALI(PGCIL)-DALTONGANJ-400KV
(197)
(197)
PUSALI(PGCIL)-FATHEHPUR-765KV
(3261)
(2038)
4-24
020328-40RP-0400-00
Final Report
Station
Scheduled (MW)
Peak Load Light Load
RAJGIR-DVCBARHI-132KV
(20)
(20)
SONENAGAR-GARHWA-132KV
(32)
(32)
SONENAGAR-RIHAND-132KV
25
25
SULTANGANJ-DEOGARH-132KV
(15)
(15)
(5523)
(5383)
Table 4-19
Station
Scheduled (MW)
Peak Load
Substation Loads
Light Load
3,515
2,014
132
76
Ex-Bus Demand
3,647
2,090
5,523
5,383
7,493
6,530
Interstate Utilization
1,970
1,146
1,677
944
1,654
921
22
22
Total
1,677
944
3,647
2,090
BSEB Generation
Thermal
Hydro
Similarly, generation schedule for FY 2018 is presented for peak load and light load as
follows:
4-25
020328-40RP-0400-00
Final Report
Table 4-20
Station
Scheduled (MW)
Peak Load
Light Load
COAL
BTPS UNIT-6
90
80
BTPS UNIT-7
90
MTPS UNIT-1
90
80
MTPS UNIT-2
90
208
208
208
208
162
162
162
162
92
92
92
92
92
92
1654
901
GAS
Total Thermal
Table 4-21
Station
Scheduled (MW)
Peak Load
Light Load
HYDRO
BHEP
KOSHI
18.4
18.4
DAGMARA
40.0
69.0
Total Thermal
62.4
91.4
4-26
020328-40RP-0400-00
Final Report
Table 4-22
Station
Scheduled (MW)
Peak Load
Light Load
176
167
176
167
176
167
176
439
416
439
416
439
580
549
580
549
580
580
549
580
549
208
208
208
208
208
208
208
NABINAGAR UNIT-1
580
580
NABINAGAR UNIT-2
580
580
NABINAGAR UNIT-3
580
PIRPAINTI UNIT-1
580
580
PIRPAINTI UNIT-2
580
BUXAR UNIT-1
580
580
BUXAR UNIT-2
580
LAKHISARAI UNIT-1
580
580
LAKHISARAI UNIT-2
580
580
580
580
580
580
580
580
220
220
220
13733
9014
4-27
020328-40RP-0400-00
Final Report
Table 4-23
Station
Scheduled (MW)
Peak Load
Light Load
Interstate Exchange
BARH(PGCIL)-GORAKHPUR-400KV
BIHARSHARIFF(PGCIL)-BALIA-400KV
ARRA-BALIA-400KV
BIHASHARIFF(PGCIL)-KODERMAPG-400KV
BIHASHARIFF-TTPS-132KV
GAYA(PGCIL)-GODDA-765KV
GAYA(PGCIL)-MUGALSARAI-765KV
GAYA(PGCIL)-NORTH KARANPURA-400KV
GAYA(PGCIL)-NR(BALI)-765KV
GAYA(PGCIL)-TILAYYA-765KV
KAHALGAON(PGCIL)-FARAKKA-400KV
KAHALGAON(PGCIL)-MAITHON-400KV
KISHANGANJ-DALKHOLA-132KV
PURNEA(PGCIL)-MALDA-400KV
KISHANGANJ-SIKKIM-400KV
KISHANGANJ-SILIGURI-400KV
PUSALI(PGCIL)-DALTONGANJ-400KV
PUSALI(PGCIL)-FATHEHPUR-765KV
RAJGIR-DVCBARHI-132KV
SONENAGAR-GARHWA-132KV
SONENAGAR-RIHAND-132KV
SULTANGANJ-DEOGARH-132KV
Net Interstate Exchange
(3627)
(4257)
(4257)
1740
570
3131
(4472)
2150
(3261)
1854
183
1614
(104)
858
1568
980
(210)
(4484)
(20)
(32)
25
(15)
(2476)
(3034)
(3034)
1243
349
2237
(2784)
1207
(2149)
1854
183
824
(100)
438
880
750
(209)
(3057)
(20)
(32)
25
(15)
(10066)
(6922)
Station
Scheduled (MW)
Peak Load
Substation Loads
Light Load
5,271
3,020
112
64
5,383
3,084
10,066
6,922
13,733
9,014
3,666
2,092
Interstate Utilization
4-28
020328-40RP-0400-00
Final Report
Station
Scheduled (MW)
Peak Load
Light Load
1,717
992
1,654
901
62
91
Total
1,717
992
5,383
3,084
BSEB Generation
Thermal
Hydro
4.6
This section presents the transmission lines and substations under construction or
committed by the BSEB. These line are considered as part of the initial system for
development of 2018 transmission system for the state of Bihar
The following table provides the substations under construction or committed by the BSEB.
Table 4-25
Name of the substation
Capacity (MVA)
WAZIRGANJ
20
DIGHA
50
DINARA
20
KUDRA
20
AURANGABAD
10
JAGDISHPUR
20
KARPI
20
HARNUALT
20
NALANDA
20
GOH
20
MASHRAKH
20
DALSINGSARAI
20
RUNNISAIDPUR
20
SONABARSHI
20
KUSHESHWAR
20
KATRA
50
BUXAR
20
TEKARI
20
4-29
020328-40RP-0400-00
Final Report
Name of the substation
# Transformers
Capacity (MVA)
EKANGASARAI
20
HULSANGANJ
20
SKMCH
50
RAXAUL
20
Table 4-26
# Transformers
SIPARA, PATNA
Capacity (MVA)
150
50
100
50
100
20
HAJIPUR (NEW)
100
PUSAULI (NEW)
2`
150
BEGUSARAI
MADHEPURA
Table 4-27
# Transformers
Capacity (MVA)
BANKA
200
JAMALPUR
200
KISHANGANJ
315
The following table provides the transmission lines under construction or committed by the
BSEB.
Table 4-28
10
11
4-30
020328-40RP-0400-00
Final Report
Committed Transmission Lines
4.7
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
This section presents the results of the system studies carried out to determine the
proposed transmission system for FY 2018. The transmission system studies were carried
out with a purpose to ensure that the power generated from the exisitng and the planned
stations can be evacuated and also to supply the forecast loads for each circle which was
subsequently allocated among the proposed and existing substations.
The system studies were carried out for the following scenarios
The system peak load of the system for FY 2018 occurs during October and whereas the
system light loads condition occurs during April. The system peak load and light load
respectively used for the studies were 5,383 MW and 3042 MW. As per the grid code in
various states, a power factor of 0.9 was taken at the interface bus.
4-31
020328-40RP-0400-00
Final Report
4.7.1
As a first step, evacuation plans for the new generators coming into the system were taken
into account. This section presents the proposed transmission evacuation scheme for the
new generating station commissioned by FY 2018.
BTPS Extension
BTPS generating station extension comprises of 2x 250 MW units. It is expected to be
commissioned in FY 2014. The generation from these units are evacuated from the 220kV
transmission system with the following transmission reinforcement.
220kV DCDS AAAC line from BTPS to Hazipur (New) apart from the proposed
DCDS line
MTPS Extension
MTPS extension comprises of 2x 195 MW units. It is expected to be commissioned in FY
2014. The generation from these units are evacuated from the 220kV transmission system
with the following transmission reinforcement.
Two DCDS 400kV Quad Moose lines from Nabinagar to Pusauli (Power Grid)
LILO of 400kV DCDS Quad Moose line from Barh to Balia at Patna
LILO of 400kV DCDS Quad Moose line from Kahalgaon to Balia at Barh
One DCDS Quad Moose lines from Nabinagar to Pusauli (Power Grid)
4-32
020328-40RP-0400-00
Final Report
One DCDS 400kV Quad Moose lines from Buxar to Arra 400kV SS.
Two DCDS 400kV Twin Moose lines from Lakhisarai to Patna 400kV SS.
One DCDS 400kV Twin Moose lines from Pirpainti to Katihar 400kV SS.
One DCDS 400kV Quad Moose lines from JAS to 400kV Banka SS.
Two DCDS 400kV Quad Moose lines from JAS to 400kV Patna SS
Two DCDS 220kV Zebra lines from Vikas 220kV to Begusarai 220kV SS.
One DCDS and one DCSS 220kV AAAC lines from 220kV generating to proposed
400kV Arrah substation.
One DCDS and one DCSS 220kV AAAC lines from 220kV generating to 220kV
Bodhgaya substation.
4-33
020328-40RP-0400-00
Final Report
4.7.2
One 220kV DCDS line from 220kV generating to proposed 220kV Supaul substation.
System Performance without Additional Reinforcements
The system studies were carried out for FY 2018 peak load study considering the existing
and committed transmission network as an initial network. During this scenario, as expected
overloading of several transmission lines and undervoltage at many buses was observed.
This is mainly due to the fact that the present BSEB transmission system and committed
reinforcements will not be able to meet the peak koad requirements without additional
reinforcements.
The transmission system was modelled in the PSAF program and load flow analysis was
carried out. The Table 29 shown below presents the overloaded lines considering the load
and generation scenario for peak load scenario of FY 2018. In the table below the
percentage of overload along with the list of overloaded lines is also presented.
Table 4-29
SL
NO.
OVERLOAD
(%)
643.8
507.8
432.8
345.4
302.1
280.8
209.2
200.1
175.5
10
172.9
11
170.9
12
170.2
13
169.6
14
167.6
15
159.9
16
159.9
17
155.5
18
151.8
19
151.7
4-34
020328-40RP-0400-00
Final Report
SL
NO.
OVERLOAD
(%)
20
142.8
21
141.3
22
141.1
23
139.8
24
139.8
25
137.5
26
136.1
27
136.1
28
132.9
29
130.6
30
128.4
31
32
123.4
33
122.9
34
122.5
35
122.4
36
121.9
37
121.9
38
121.3
39
121.3
40
120.5
41
120.5
42
118.2
43
118.2
44
117.9
45
114.5
46
47
113.7
48
108.4
49
50
4-35
124
114
105
102.7
020328-40RP-0400-00
Final Report
In order to relieve the overloading of the transmission lines and voltage problems at several
buses the additional reinforcements (new Substation, new Lines and reactive compensation)
were proposed apart from the existing and committed network. All the additional
reinforcements were identified by carrying out the simulations using the load flow program.
The transmission system for 2018 was developed by including the existing network,
committed additions and system reinforcements as identified by the studies.
The following table presents the proposed transmission substations required for meeting the
load for FY 2018 for maintaining the voltages of the 220/132/33kV and 132/33kV.
Table 4-30
SL
NO.
COMMISSIONING
YEAR (FY)
NAME OF THE SS
10
MVA
20
MVA
50
MVA
2011
132KV AURANGABAD
2011
132KV BUXAR
2011
132KV DALSINGSARAI
2012
132KV DHANHA
2011
132KV DIGHA
2011
132KV DINARA
2011
132KV EKANGASARAI
2012
132KV FATHUA-2
2012
132KV GANGWARA
2011
132KV GOH
2011
132KV HARNAUT
10
2011
132KV HULASGANJ
11
2011
132KV JAGDISHPUR
12
2012
132KV JAKKANPUR-2
13
2011
132KV KARPY
14
2011
132KV KATRA
15
2013
132KV KHAGAUL-2
16
2011
132KV KUDRA
17
2011
132KV KUSHESWAR
18
2011
132KV MADHEPURA
19
2011
132KV MASRAKH
20
2014
132KV MITHAPUR-2
4-36
020328-40RP-0400-00
Final Report
# of T/F
SL
NO.
COMMISSIONING
YEAR (FY)
NAME OF THE SS
10
MVA
20
MVA
50
MVA
21
2011
132KV NALANDA
22
2011
132KV RAXAUL
23
2011
24
2011
132KV SHEOHAR
25
2011
132KV SKMCH
26
2011
132KV SONABARSHI
27
2011
132KV TEKARI
28
2011
132KV WAZIRGANJ
29
2010
132KV BEGUSARAI
30
2012
220KV SIPARA
31
2018
132KV PAHARPUR
32
2017
132KV BARIPAHRI-2
33
2018
132KV BIHTA-2
34
2016
132KV CHANDAUTI-2
35
2016
132KV CHAPRA-2
36
2016
132KV GAIGHAT-2
37
2016
132KV KHAGUAL-3
38
2017
132KV MITHAPUR-3
39
2017
132KV MUZAFFARPUR-2
40
2016
132KV PURNEA-2
41
2016
132KV SABOUR-2
42
2016
132KV SAMASTIPUR-2
43
2017
132KV SONNENAGAR-2
TOTAL (Number)
37
49
40
740
2,450
TOTAL (MVA)
The following Table 31 presents the increase in transmission capacity of the transmission
substations for the voltage ratio of 220/132kV and 400/220kV.
4-37
020328-40RP-0400-00
Final Report
Table 4-31
SL NO.
FY
100
150
200
315
1,500
220/
132 KV
220/
132 KV
220/
132 KV
400/
220 KV
765/
400 KV
NAME OF THE SS
2013
765KV SASARAM
2013
765KV GAYA
2012
400KV KISHANGANJ
2012
400KV JAMALPUR
2012
400KV BANKA
2012
400KV KATHIHAR
2011
220KV SUPAUL
2012
220KV SONENAGAR
2012
220KV SIPARA
10
2012
220KV SHEOHAR
11
2012
220KV KATHIHAR
12
2012
220KV PUSAULI
13
2015
220KV MUZAFFARPUR
14
2011
220KV MADHEPURA
15
2013
220KV KHAGAUL-2
16
2012
220KV JAKKANPUR
17
2011
220KV HAJIPUR
18
2012
220KV GAIGHAT
19
2010
220KV BEGUSARAI
20
2015
400KV ARRAH
21
2015
220KV SAMASTIPUR
22
2015
220KV SABOUR
23
2018
220KV HULSANGANJ
24
2016
220KV FORBESGANJ
25
2015
220KV CHAPRA
26
2017
220KV BIKRAMGANJ
29
12
2,900
1,800
800
2,520
7,500
TOTAL (Number)
TOTAL (MVA)
4-38
020328-40RP-0400-00
Final Report
4.7.4
This section presents the transmission substation augmentation required at various voltage
levels.
4-39
020328-40RP-0400-00
Final Report
The following table presents the augmentation of existing 220/132/33kV and 132/kV substations.
Table 4-32
NAME OF THE SS
2010
2011
2012
2013
2014
2015
2016
2017
2018
TOTAL
EXISTING
132KV ARRA
50
50
50
150
EXISTING
132KV BANJARI
20
20
EXISTING
132KV BANKA
50
50
50
150
EXISTING
132KV BARHI
100
50
150
EXISTING
132KV BARIPAHRI
50
50
100
EXISTING
132KV BELAGANJ
20
20
40
EXISTING
132KV BETTIAH
50
50
100
EXISTING
132KV BHABUA
50
50
50
150
EXISTING
132KV BIHTA
50
50
EXISTING
132KV BIKRAMGANJ
50
50
50
150
EXISTING
132KV CHANDAUTI
40
40
EXISTING
132KV CHAPRA
100
50
150
EXISTING
132KV DARBHANGA
50
50
100
EXISTING
132KV DHAKA
20
20
40
EXISTING
132KV DUMRAON
100
50
150
EXISTING
132KV FORBESGANJ
50
50
100
EXISTING
132KV GAIGHAT
100
100
EXISTING
132KV GOPALGANJ
100
50
150
EXISTING
132KV HAJIPUR
50
50
50
150
4-40
020328-40RP-0400-00
Final Report
T/F CAPACITY (MVA)
COMMISSIONING YEAR (FY)
NAME OF THE SS
2010
2011
2012
2013
2014
2015
2016
2017
2018
TOTAL
EXISTING
132KV HATHIDAH
100
50
150
EXISTING
132KV JAINAGAR
20
20
40
EXISTING
132KV JAMALPUR
50
50
100
EXISTING
132KV JAMUI
50
50
50
150
EXISTING
132KV JEHNABAD
50
100
150
EXISTING
132KV KARMNASA
20
20
20
50
110
EXISTING
132KV KATIHAR
50
50
50
150
EXISTING
132KV KATIYA
100
100
EXISTING
132KV KHAGARIYA
50
50
50
150
EXISTING
132KV KAHALGAON
50
50
100
EXISTING
132KV KISHANGANJ
50
50
50
150
EXISTING
132KV LAKHISARAI
50
50
100
EXISTING
132KV MASURHI
50
50
100
EXISTING
132KV MADHUBANI
50
50
50
150
EXISTING
132KV MITHAPUR
50
50
EXISTING
132KV MOTIHARI
50
50
50
150
EXISTING
132KV MUZAFFARPUR
50
50
EXISTING
132KV NAUGACHHIYA
50
50
100
EXISTING
132KV NAWADA
50
50
50
150
EXISTING
132KV PANDAUL
50
50
50
150
EXISTING
132KV PHULPARAS
20
20
40
4-41
020328-40RP-0400-00
Final Report
T/F CAPACITY (MVA)
COMMISSIONING YEAR (FY)
NAME OF THE SS
2010
2011
2012
2013
2014
2015
2016
2017
2018
TOTAL
EXISTING
132KV PURNEA
50
50
100
EXISTING
132KV RAFIGANJ
50
50
100
EXISTING
132KV RAJGIR
50
50
100
EXISTING
132KV RAMNAGAR
50
50
50
150
EXISTING
132KV SABOUR
50
50
100
EXISTING
132KV SAMASTIPUR
50
50
50
150
EXISTING
132KV SASARAM
50
50
50
150
EXISTING
132KV SAHARSA
50
50
50
150
EXISTING
132KV SHEIKHPURA
50
50
50
150
EXISTING
132KV SHITALPUR
50
50
100
EXISTING
132KV SITAMAHRI
50
50
50
150
EXISTING
132KV SIWAN
50
50
50
150
EXISTING
132KV SONNENAGAR
100
100
EXISTING
132KV SULTANGANJ
50
50
50
150
EXISTING
132KV SUPAUL
20
20
50
50
140
EXISTING
132KV VAISHALI
100
50
150
EXISTING
220KV BODHGAYA
50
50
EXISTING
220KV DEHRI-ON-SONE
50
50
100
2011
132KV AURANGABAD
40
40
2011
132KV DALSINGSARAI
50
50
2011
132KV DIGHA
50
50
4-42
020328-40RP-0400-00
Final Report
T/F CAPACITY (MVA)
COMMISSIONING YEAR (FY)
NAME OF THE SS
2010
2011
2012
2013
2014
2015
2016
2017
2018
TOTAL
2012
132KV FATHUA-2
50
50
2011
132KV HARNAUT
10
10
2011
132KV JAGDISHPUR
20
20
2012
132KV JAKKANPUR-2
50
50
2011
132KV KATRA
50
50
2013
132KV KHAGAUL-2
50
50
2011
132KV SKMCH
50
50
2012
220KV SIPARA
50
50
2016
132KV KHAGUAL-3
50
50
2017
132KV MITHAPUR-3
50
50
TOTAL
2,180
1,360
1,290
880
760
310
290
170
7,240
4-43
020328-40RP-0400-00
Final Report
The following table presents the augmentation of existing 220/132kV and above substations.
Table 4-33
NAME OF THE SS
2010
2011
2012
2013
2014
2015
2016
2017
2018
TOTAL
EXISTING
400KV KAHALGAON
100
100
EXISTING
400KV PUSAULI
150
150
EXISTING
400KV PURNEA
315
315
EXISTING
400KV PATNA
1,000
500
1,500
EXISTING
220KV KANTI
300
150
450
EXISTING
220KV KHAGAUL
300
150
450
EXISTING
220KV GOPALGANJ
100
100
EXISTING
220KV FATUHA
100
100
EXISTING
220KV DEHRI-ON-SONE
200
200
2012
220KV SHEOHAR
100
100
2011
220KV MADHEPURA
100
100
2013
220KV KHAGAUL-2
150
150
2012
220KV JAKKANPUR
150
150
2011
220KV HAJIPUR
100
100
2015
220KV SAMASTIPUR
100
100
2015
220KV SABOUR
100
100
2016
220KV FORBESGANJ
100
100
2015
220KV CHAPRA
100
100
4-44
020328-40RP-0400-00
Final Report
T/F CAPACITY (MVA)
COMMISSIONING YEAR (FY)
NAME OF THE SS
2010
2017
2011
2012
2013
2014
2015
2016
2017
2018
TOTAL
220KV BIKRAMGANJ
100
100
TOTAL
1,000
1,415
150
450
500
300
400
250
4,465
4-45
020328-40RP-0400-00
Final Report
4.7.5
Reactive Compensation
As presented in the earlier section, undervoltage was observed at the various buses during
simulation studies of peak load 2018 conditions. This section presents the reactive
compensation required to ensure the bus voltages within the specified limits under peak load
conditions and maintain the generator MVAr absorption within permitted limits. As a general
understanding, Inductive reactive compensation was planned for 400kV substations under
light load conditions and capacitive compensation at 132kV substations under peak load
conditions.
The power flow in BSEB power system flows is from the south-east region to northern region
and therefore the buses voltages in northern region were lesser than the minimum specified
limits and capacity compensation at 132kV substations in these regions was proposed. The
sizes of reactive compensation used in the study were 10/20/30 MVAr depending on the
requirement at each substation.
The following table shows the bus voltages which were outside the voltage limits (without
reactive compensation for FY 2018 Peak Load Scenario).
Table 4-34
Sl. No
VOLTAGE
(KV)
33
132KV SIWAN
0.794
33
132KV DANHA`
0.812
33
132KV GOPALGANJ
0.829
33
132KV NAWADA
0.837
132
132KV DANHA`
0.839
33
132KV MASRAKH
0.839
132
132KV SIWAN
0.839
33
132KV JAKKANPUR
0.842
33
132KV PANDAUL
0.845
10
33
132KV MITHAPUR-3
0.847
11
33
132KV MITHAPUR
0.847
12
33
132KV JAKKANPUR-2
0.850
13
33
132KV CHAPRA
0.851
14
33
132KV KHAGAUL-2
0.851
15
33
132KV KHAGUAL-3
0.851
16
33
132KV BETTIAH
0.852
17
33
132KV MITHAPUR-2
0.852
18
132
132KV MASRAKH
0.854
19
33
132KV MOTIHARI
0.854
20
33
132KV FATHUA-2
0.855
21
33
132KV GAIGHAT
0.855
NAME OF THE SS
4-46
Voltage
(p.u)
020328-40RP-0400-00
Final Report
Sl. No
VOLTAGE
(KV)
22
33
132KV RAXAUL
0.855
23
33
132KV DHAKA
0.857
24
33
132KV SAMASTIPUR
0.857
25
33
132KV MUZAFFARPUR
0.860
26
33
132KV CHAPRA-2
0.86
27
33
132KV KATRA
0.86
28
33
132KV DIGHA
0.86
29
33
132KV BIHTA
0.86
30
33
132KV MADHUBANI
0.86
31
33
132KV SITMHARI
0.86
32
33
132KV VAISHALI
0.86
33
33
220KV SIPARA
0.86
34
132
132KV GOPALGANJ
0.86
35
132
220KV GOPALGANJ
0.87
36
33
132KV PAHARPUR
0.87
37
33
132KV GAIGHAT-2
0.87
38
132
132KV RAXAUL
0.87
39
33
132KV GANGWARA
0.87
40
33
132KV DALSINGSARAI
0.87
41
33
132KV JEHNABAD
0.87
42
33
132KV RAMNAGAR
0.87
43
33
220KV FATHUA
0.87
44
132
132KV BETTIAH
0.87
45
132
132KV NAWADA
0.87
46
33
0.87
47
33
132KV SHITALPUR
0.88
48
33
132KV BIHTA-2
0.88
49
33
132KV DHARBHANGA
0.88
50
33
132KV KARPY
0.88
51
132
132KV MOTIHARI
0.87
52
33
132KV SKMCH
0.87
53
33
132KV SHEOHAR
0.87
54
132
132KV DHAKA
0.88
55
33
132KV HAJIPUR
0.88
56
33
132KV MASURHI
0.88
NAME OF THE SS
4-47
Voltage
(p.u)
020328-40RP-0400-00
Final Report
Sl. No
VOLTAGE
(KV)
Voltage
(p.u)
57
33
132KV WAZIRGANJ
0.88
58
33
132KV DUMRAON
0.88
59
33
132KV MUZAFFARPUR-2
0.88
60
33
132KV BELAGANJ
0.88
61
33
132KV KHAGAUL
0.88
62
132
132KV MADHUBANI
0.88
63
132
132KV RAMNAGAR
0.88
64
132
132KV PANDAUL
0.88
65
400
400KV MZAFFARPUR
1.05
NAME OF THE SS
The following table shows the reactive compensation required at various locations based on
the peak load condition of FY 2018 and FY 2014 load flow simulation. The in-service dates
of the capacitors based on the load flow simulation for FY 2018 and FY 2014 are also
presented in the following table.
Table 4-35
SL. NO
FY
VOLTAGE (KV)
NAME OF THE SS
Total
CAPAITY
(MVAr)
1,130
2011
33
132KV BUXAR
20
2011
33
132KV DHAKA
20
2011
33
132KV DUMRAON
30
2012
33
132KV GOPALGANJ
10
2012
33
132KV MOTIHARI
20
2014
33
132KV NAWADA
30
2012
33
132KV RAMNAGAR
20
2012
33
132KV SIWAN
30
2014
33
132KV BETTIAH
30
10
2013
33
132KV BIHTA
20
11
2011
33
132KV CHAPRA
20
12
2011
33
132KV DHANHA
20
13
2011
33
132KV JAMUI
10
14
2011
33
132KV RAXAUL
20
15
2012
33
132KV SHITALPUR
10
16
2014
33
132KV BHABUA
10
17
2012
33
132KV DHARBHANGA
20
4-48
020328-40RP-0400-00
Final Report
NAME OF THE SS
CAPAITY
(MVAr)
18
2011
33
132KV FATHUA-2
20
19
2013
33
132KV HAJIPUR
10
20
2013
33
132KV KHAGAUL-3
20
21
2015
33
132KV MASRAKH
10
22
2015
33
132KV MITHAPUR-2
30
23
2015
33
132KV PANDAUL
30
24
2015
33
132KV DUMRAON
10
25
2015
33
132KV FATHUA
10
26
2015
33
132KV GOPALGANJ
10
27
2015
33
132KV MASURHI
10
28
2015
33
132KV MITHAPUR
30
29
2015
33
132KV MUZAFFARPUR
10
30
2015
33
132KV PANDAUL
10
31
2015
33
132KV SITMHARI
10
32
2015
33
132KV VISHALI
10
33
2015
33
132KV DALSINGSARAI
20
34
2015
33
132KV JAKKANPUR
30
35
2015
33
132KV KATRA
10
36
2015
33
132KV KHAGAUL-2
30
37
2016
33
132KV MADHUBANI
20
38
2016
33
132KV KISHANGANJ
10
39
2016
33
132KV GAIGHAT
20
40
2016
33
132KV JAKKANPUR-2
20
41
2016
33
132KV JEHNABAD
20
42
2016
33
132KV KARPY
10
43
2016
33
132KV KHAGAUL
20
44
2016
33
132KV SAMASTIPUR
20
45
2017
132
220KV FATHUA
20
46
2016
33
132KV BODHGAYA
10
47
2016
33
132KV SABOUR
10
48
2016
33
132KV CHANDAUTI-2
10
49
2016
33
132KV DIGHA
20
50
2016
33
132KV JAINAGAR
20
51
2017
33
132KV KHAGARIYA
20
52
2017
33
132KV MITHAPUR-3
30
4-49
020328-40RP-0400-00
Final Report
NAME OF THE SS
CAPAITY
(MVAr)
53
2017
33
132KV SASARAM
10
54
2017
33
132KV WAZIRGANJ
30
55
2017
33
132KV LAKHISARAI
10
56
2017
33
132KV BANKA
10
57
2017
33
132KV BARIPAHRI
10
58
2017
33
132KV BIKRAMGANJ
20
59
2018
33
132KV CHANDAUTI
10
60
2017
33
132KV DINARA
10
61
2017
33
132KV GAIGHAT-2
20
62
2018
33
132KV HARNAUT
10
63
2018
33
132KV KATHAR
10
64
2018
33
132KV NAUGACHHIYA
10
65
2018
33
132KV PAHARPUR
10
66
2018
33
132KV SONNENAGAR
10
67
2018
132
220KV KHAGAUL-2
10
Similarly, the inductive compensation was proposed at various 400kV substations under light
load conditions to limit the 400kV bus voltages within specified limits. The bus voltages in the
proposed ARRAH and BANKA 400kV substations apart from the existing 400kV substation
are higher than the bus voltage limits under during light load condition.
The following table shows the inductive compensation required with the proposed in-service
dates at various location.
Table 4-36
FY
OWNER
VOLTAGE KV
NAME OF THE SS
CAPAITY
(MVAr)
800
2011
PGCIL
400
400KV MZAFFARPUR
100
2011
PGCIL
400
400KV MZAFFARPUR
100
2012
PGCIL
400
400KV MZAFFARPUR
100
2014
PGCIL
400
765KV SASARAM
200
2015
BSEB
400
400KV ARRAH
100
2017
BSEB
400
400KV JAMALPUR
100
2016
BSEB
400
400KV BANKA
100
4-50
020328-40RP-0400-00
Final Report
4.7.6
The peak load forecast used for studies for FY 2018 was 5,383 MW based on the load
forecast report. The system was simulated and studied to define the transmission system
needed to the above peak load. The system demand was allocated to various substations
which are presented in earlier section in this report. As discussed earlier, a specific
percentage of transmission losses are assumed for deriving the substation loads. These
values of substation loads was used as starting point for system study simulation and the
model was further refined and adjusted to meet the value of the peak load as defined in the
load forecast report.. All loads are assumed to have a power factor 0.9. The generation and
import/export schedules are prepared for the peak load condition. These schedules are
presented earlier in the report.
The single line diagram for 2018 peak load condition is presented in the end of section
(Figure BSEB 2018-1) The SLD presents the bus voltages, line flows (MW and MVAr). The
flows presented are per circuit and number of circuits are marked separately.
4.7.6.1
Details
MW
Substation Loads
5157
Generation
5504
122
2.2%
5382
Losses
132kV
58
1.08%
220kV
72
1.35%
400kV Losses
94
1.75%
Total Losses
225
4.18%
The system peak demand met was 5,382 MW which is almost equal to the projected system
peak demand of 5,383.
The total BSEB transmission losses of 225 MW represent the 4.18% of BSEB system
requirement. The transmission losses for the 132, 220 and 440 kV were found to be 1.08%,
1.35% and 1.75% respectively in the BSEB system.
All transformers and transmission lines were operating within their permitted load ratings. All
bus voltages were within permissible limits.
The N-1 contingency operation was carried out to test the system for satisfactory operation.
It is observed that during the N-1 contingency operation all branch loadings and bus voltages
were observed to be within limits.
The minimum and maximum voltages observed in the system simulations were 0.95 and
1.052 p.u. The summary of bus voltages as obtained during study are presented in the
following table:
4-51
020328-40RP-0400-00
Final Report
Table 4-38
Voltage
(KV)
Number
of Buses
0.95 to 1
1.00 to 1.05
1.05 to 1.1
765
0%
100%
0%
400
20
0%
20
100%
0%
220
42
0%
42
100%
0%
132
139
66
47%
73
53%
0%
203
66
Total
137
The circle wise demand, generation and losses are presented in the following table
Table 4-39
Reactive
Power
(MVAR)
Total generation
5504
1744
Static Load
5157
2498
Shunt loads
-430
5157
2067
347
-3053
2729
Total losses
347
-324
Mismatches
Active
Power
Reactive
Power
Total generation
-667
662
Static Load
1549
750
Shunt loads
-356
1549
394
39
-610
Transformer losses
653
39
42
Summary Data
COMPLETE SUMMARY REPORT
Total load
Line / cable losses
Transformer losses
Summary Data
Total load
Total losses
4-52
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
Active
Power
Reactive
Power
2285
-1378
Static Load
532
258
Shunt loads
-138
532
120
18
-502
Transformer losses
476
18
-26
Active
Power
Reactive
Power
1160
206
Static Load
228
110
Shunt loads
-19
228
91
10
-65
Transformer losses
130
10
65
Active
Power
Reactive
Power
Total generation
5486
-577
Spinning reserve
842
Static Load
323
157
Shunt loads
79
323
236
Summary Data
SUMMARY REPORT FOR CIRCLE: GAYA
Summary Data
Total generation
Total load
Total losses
Summary Data
Total generation
Total load
Total losses
Summary Data
Total load
4-53
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
27
-12
Transformer losses
617
27
605
Active
Power
Reactive
Power
Total generation
504
366
Static Load
421
204
Shunt loads
299
421
503
20
-562
Transformer losses
132
20
-430
Active
Power
Reactive
Power
Static Load
296
143
Shunt loads
-88
296
55
-31
Transformer losses
40
Total losses
Active
Power
Reactive
Power
-14
Summary Data
Total losses
Summary Data
Total load
Total losses
Summary Data
Total generation
Total load
Summary Data
Total generation
4-54
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
Static Load
160
78
Shunt loads
-133
160
-55
-27
Transformer losses
Total losses
-19
Active
Power
Reactive
Power
Static Load
243
118
Shunt loads
-97
243
21
12
-34
Transformer losses
23
12
-11
Active
Power
Reactive
Power
1036
470
Static Load
253
122
Shunt loads
-39
253
84
16
-54
Transformer losses
141
16
88
Summary Data
Total load
Summary Data
Total generation
Total load
Total losses
Summary Data
Total generation
Total load
Total losses
4-55
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
Active
Power
Reactive
Power
3302
15
Static Load
259
125
Shunt loads
-11
259
114
85
-31
Transformer losses
181
85
150
Active
Power
Reactive
Power
58
-76
Static Load
191
92
Shunt loads
-20
191
73
-56
Transformer losses
26
Total losses
-30
Active
Power
Reactive
Power
-4693
1424
Static Load
351
170
Shunt loads
70
351
240
47
-952
Transformer losses
81
47
-871
Summary Data
Summary Data
Total generation
Total load
Total losses
Summary Data
Total generation
Total load
Summary Data
Total generation
Total load
Total losses
4-56
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
Active
Power
Reactive
Power
-2821
-238
Static Load
176
85
Shunt loads
42
176
127
34
88
Transformer losses
191
34
280
Active
Power
Reactive
Power
-150
884
Static Load
176
85
Shunt loads
-20
176
65
24
-205
Transformer losses
30
24
-175
Summary Data
SUMMARY REPORT FOR CIRCLE: BHOJPUR
Summary Data
Total generation
Total load
Total losses
Summary Data
Total generation
Total load
Total losses
4.7.6.2
Three phase short-circuit studies were carried out to compute the short-circuit levels for
various shunt faults (bus faults) across the system for the year FY 2018-Peak load condition.
The sub-transient reactance of generators was used in the study. The tie-lines are modelled
in the short-circuit study considering the fault contribution from one node from each of the
neighbouring system. It was assumed that each of the neighbouring system contributed
around 20KA of fault current.
The short-circuit levels for three phase shunt faults at various buses are presented as below:
4-57
020328-40RP-0400-00
Final Report
Table 4-40
SL.
NO
BUS VOLTAGE
(KV)
FAULT
CURRENT
(KA)
FAULT
MVA
765KV SASARAM
765
27
36,105
765KV GAYA
765
29
38,211
400KV KAHALGAON*
400
40
27,706
400KV BANKA*
400
39
26,735
400KV PIRPAINTI
400
18
12,670
400KV JAMALPUR
400
20
13,726
400
40
27,431
400KV LAKHISARAI
400
19
13,048
400KV NABINAGAR
400
27
18,782
10
400KV BARH*
400
42
29,215
11
400KV NABINAGAR-RLY
400
19
13,266
12
400KV KATHIHAR
400
21
14,546
13
400KV KISHANGANJ
400
20
13,536
14
400KV MZAFFARPUR
400
18
12,542
15
400KV BIHARSHARIFF*
400
39
26,924
16
400KV PURNEA
400
24
16,483
17
400KV BUXAR
400
20
13,526
18
400KV PATNA*
400
44
30,683
19
400KV PUSAULI*
400
46
31,773
20
765KV SASARAM*
400
46
31,872
21
400KV ARRAH
400
29
19,989
22
765KV GAYA
400
26
18,012
23
400KV KAHALGAON
220
15
5,600
24
220KV GT BUXAR
220
13
5,078
25
220KV VIKAS
220
32
12,137
26
220KV GT-GAYA
220
16
5,938
27
400KV KISHANGANJ
220
18
7,017
28
220KV BTPS*
220
39
14,792
29
220KV BEGUSARAI*
220
39
14,703
30
400KV MUZAFFRPUR
220
18
6,909
31
220KV SAMASTIPUR
220
14
5,203
32
400KV PURNEA
220
21
8,074
33
220KV KANTI
220
29
11,085
34
400KV KATHIHAR
220
26
9,971
4-58
020328-40RP-0400-00
Final Report
SL.
NO
BUS VOLTAGE
(KV)
FAULT
CURRENT
(KA)
FAULT
MVA
35
220KV KATHIHAR
220
26
10,084
36
220KV DARBHANGA
220
25
9,366
37
220KV BODHGAYA
220
18
6,786
38
220KV SABOUR
220
22
8,498
39
400KV BIHARSHARIFF
220
35
13,472
40
220KV BIHARSHARIFF
220
36
13,587
41
220KV HULSANGANJ
220
15
5,563
42
220KV FORBESGANJ
220
3,000
43
220KV SHEOHAR
220
12
4,472
44
220KV MADHEPURA
220
14
5,407
45
220KV MUZAFFARPUR
220
2,118
46
220KV GOPALGANJ
220
2,481
47
220KV HAJIPUR*
220
44
16,674
48
400KV ARRAH
220
27
10,282
49
220KV ARRA
220
27
10,299
50
220KV FATUHA
220
47
17,863
51
220KV SONENAGAR
220
14
5,203
52
220KV BIKRAMGANJ
220
14
5,192
53
400KV PATNA*
220
49
18,551
54
400KV PUSAULI
220
20
7,538
55
220KV SIPARA*
220
48
18,404
56
220KV PUSAULI
220
20
7,522
57
220KV DEHRI-ON-SONE
220
14
5,219
58
220KV GAIGHAT*
220
45
17,182
59
220KV JAKKANPUR*
220
46
17,396
60
220KV SUPAUL
220
3,229
61
220KV KHAGAUL*
220
41
15,562
62
220KV KHAGAUL-2*
220
38
14,302
63
220KV CHAPRA
220
11
4,024
64
220KV DAGMARA
220
2,331
65
400KV BANKA
132
18
4,174
66
132KV NBANKA
132
18
4,152
67
220KV SAMASTIPUR
132
1,699
68
132KV SAMASTIPUR-2
132
1,639
69
400KV KAHALGAON
132
18
4,175
4-59
020328-40RP-0400-00
Final Report
SL.
NO
BUS VOLTAGE
(KV)
FAULT
CURRENT
(KA)
FAULT
MVA
70
220KV KATHIHAR
132
17
3,802
71
132KV KATHAR
132
16
3,632
72
132KV KAHALGAON
132
19
4,309
73
220KV SABOUR
132
21
4,829
74
132KV SABOUR
132
21
4,879
75
132KV SABOUR-2
132
19
4,348
76
220KV FORBESGANJ
132
11
2,548
77
400KV JAMALPUR
132
18
4,195
78
132KV FORBESGANJ
132
11
2,549
79
400KV PURNEA
132
18
4,091
80
132KV RAXAUL
132
846
81
132KV JAMALPUR
132
18
4,125
82
132KV PURNEA
132
18
4,122
83
132KV PURNEA-2
132
16
3,700
84
132KV BETTIAH
132
1,357
85
220KV MTPS
132
20
4,599
86
220KV BIHARSHARIFF
132
21
4,792
87
220KV GOPALGANJ
132
1,822
88
220KV SHEOHAR
132
14
3,119
89
132KV GOPALGANJ
132
1,819
90
132KV NAUGACHHIYA
132
1,225
91
132KV SHEOHAR
132
13
3,034
92
220KV MUZAFFARPUR
132
1,857
93
132KV MUZAFFARPUR-2
132
1,869
94
132
13
3,024
95
132KV DHAKA
132
1,200
96
220KV BODHGAYA
132
17
3,786
97
220KV MADHEPURA
132
13
2,948
98
132KV MADHEPURA
132
13
2,958
99
132KV HARNAUT
132
11
2,423
100
132KV KATIYA
132
1,790
101
132KV RAMNAGAR
132
883
102
132KV BARIPAHRI
132
15
3,503
103
132KV BARIPAHRI-2
132
15
3,458
104
132KV KOSHI
132
1,681
4-60
020328-40RP-0400-00
Final Report
SL.
NO
BUS VOLTAGE
(KV)
FAULT
CURRENT
(KA)
FAULT
MVA
105
132KV SKMCH
132
15
3,446
106
132KV NALANDA
132
1,436
107
132KV SITMHARI
132
12
2,741
108
220KV HULSANGANJ
132
15
3,414
109
132KV DHANHA
132
796
110
132KV HULASGANJ
132
15
3,405
111
132KV SONABARSHI
132
1,232
112
220KV BIKRAMGANJ
132
2,138
113
132KV MUZAFFARPUR
132
14
3,253
114
132KV EKANGASARAI
132
13
3,027
115
132KV MOTIHARI
132
1,849
116
220KV SUPAUL
132
13
3,047
117
132KV SULTANGANJ
132
16
3,708
118
132KV BIKRAMGANJ
132
2,137
119
132KV SUPAUL
132
13
3,073
120
220KV BEGUSARAI
132
21
4,899
121
132KV CHANDAUTI
132
16
3,757
122
132KV PAHARPUR
132
1,913
123
132KV BTPS
132
22
5,084
124
132KV TEKARI
132
12
2,693
125
132KV WAZIRGANJ
132
1,718
126
132KV KUSHESWAR
132
1,017
127
132KV LAKHISARAI
132
16
3,638
128
132KV RAJGIR
132
921
129
132KV KISHANGANJ
132
1,726
130
132KV GOH
132
1,567
131
132KV VAISHALI
132
12
2,748
132
400KV PUSAULI
132
15
3,483
133
132KV PHULPARAS
132
11
2,442
134
132KV SAHARSA
132
10
2,296
135
132KV CHANDAUTI-2
132
1,305
136
132KV MASRAKH
132
1,109
137
132KV SIWAN
132
1,362
138
132KV BELAGANJ
132
1,654
139
132KV HATHIDAH
132
20
4,664
4-61
020328-40RP-0400-00
Final Report
SL.
NO
BUS VOLTAGE
(KV)
FAULT
CURRENT
(KA)
FAULT
MVA
140
220KV SONENAGAR
132
13
2,894
141
220KV DEHRI-ON-SONE
132
15
3,349
142
132KV JAINAGAR
132
1,385
143
220KV DARBHANGA
132
12
2,696
144
132KV SONNENAGAR
132
13
2,935
145
132KV SONNENAGAR-2
132
12
2,836
146
132KV DHARBHANGA
132
12
2,699
147
132KV AURANGABAD
132
10
2,199
148
220KV HAJIPUR
132
17
3,881
149
220KV PUSAULI
132
15
3,531
150
132KV HAJIPUR
132
17
3,884
151
132KV BARHI
132
12
2,740
152
132KV BHABUA
132
15
3,449
153
132KV SHITALPUR
132
11
2,514
154
220KV ARRA
132
12
2,754
155
132KV UDAKISHANGANJ
132
963
156
132KV NAWADA
132
1,090
157
132KV DINARA
132
1,710
158
220KV CHAPRA
132
12
2,685
159
132KV KHAGARIYA
132
973
160
132KV CHAPRA
132
12
2,687
161
220KV SIPARA
132
24
5,421
162
132KV CHAPRA-2
132
11
2,523
163
220KV FATHUA
132
19
4,418
164
220KV GAIGHAT
132
20
4,532
165
132KV BIHTA-2
132
22
5,093
166
132KV KUDRA
132
14
3,241
167
132KV GAIGHAT-2
132
19
4,323
168
132KV SASARAM
132
11
2,572
169
132KV ARRA
132
12
2,707
170
132KV GAIGHAT
132
20
4,505
171
132KV FATHUA-2
132
18
4,133
172
132KV BANJARI
132
1,270
173
132KV RAFIGANJ
132
1,599
174
132KV MASURHI
132
10
2,333
4-62
020328-40RP-0400-00
Final Report
SL.
NO
BUS VOLTAGE
(KV)
FAULT
CURRENT
(KA)
FAULT
MVA
175
132KV MITHAPUR-2
132
17
3,969
176
132KV GANGWARA
132
2,070
177
132KV KARPY
132
1,600
178
220KV KHAGAUL
132
16
3,705
179
132KV JEHNABAD
132
13
2,866
180
220KV KHAGAUL-2
132
23
5,352
181
132KV KATRA
132
18
4,041
182
132KV JAGDISHPUR
132
1,413
183
220KV JAKKANPUR
132
21
4,767
184
132KV KHAGAUL
132
16
3,621
185
132KV SAMASTIPUR
132
16
3,690
186
132KV KHAGUAL-3
132
23
5,202
187
132KV KHAGAUL-2
132
23
5,259
188
132KV JAKKANPUR-2
132
20
4,656
189
132KV KARMNASA
132
11
2,603
190
132KV PANDAUL
132
10
2,212
191
132KV DIGHA
132
15
3,316
192
132KV BUXAR
132
1,203
193
132KV BIHTA
132
15
3,433
194
132KV DALSINGSARAI
132
14
3,141
195
132KV JAKKANPUR
132
24
5,532
196
132KV MITHAPUR
132
21
4,723
197
132KV MITHAPUR-3
132
18
4,009
198
132KV DUMRAON
132
1,582
199
132KV MADHUBANI
132
1,602
200
132KV SHEIKHPURA
132
10
2,217
201
132KV JAMUI
132
1,406
*the short-circuit levels for these susbstations are more than 36kA and were found critical and would
need detailed analysis consideriing input feed from other systems.
4.7.7
The light load condition for the BSEB was simulated with about 57% of total substation peak
load for the same year. As discussed earlier, the circles wise substations light load were
calculated using the ratio as defined above. The total substation loads during light load
condition was about 2,969 MW in FY 2018. The generation utilisation by BSEB to meet the
load was 3,042 MW. The load flow simulation was carried out for the above substation load
scenario and results are presented below:
4-63
020328-40RP-0400-00
Final Report
4.7.7.1
MW
Substation Loads
2972
Generation
3108
42
1.3%
3066
Losses
132kV
25
0.82%
220kV
27
0.87%
400kV Losses
43
1.39%
Total Losses
94
3.07%
800
1090
The system demand met by BSEB during light load is 3,066 MW which is about 57% of the
system peak demand.
The total BSEB transmission losses of 94 MW represent 3.07% of BSEB system
requirement. The transmission system losses for 132, 220 and 400 kV were limited to
0.82%, 0.87% and 1.39% respectively in the BSEB system.
All transformers and transmission lines were operating within their permitted load ratings. All
bus voltages were within permissible limits.
The N-1 contingency operation was carried out to test the system for satisfactory operation.
It was observed that during the N-1 contingency operation all branch loadings and bus
voltages were operating satisfactorily.
The minimum and maximum voltages observed in the system were 0.986 and 1.091 p.u.
The summary of bus voltages are presented in the following table:
Table 4-42
Voltage (KV)
Number of Buses
0.95 to 1
1.00 to 1.05
1.05 to 1.1
765
0%
100%
0%
400
20
5%
19
95%
0%
220
42
0%
39
100%
7%
132
139
5%
121
95%
12
9%
203
Total
181
4-64
15
020328-40RP-0400-00
Final Report
The circle wise demand, generation and losses are presented in the following table
Table 4-43
Reactive
Power
(MVAR)
Total generation
3109
-2879
Static Load
2972
1439
Shunt loads
-301
2972
1138
137
-5348
1331
Total losses
137
-4017
Mismatches
Active
Power
Reactive
Power
-255
355
Static Load
842
408
Shunt loads
-397
842
11
19
-864
Transformer losses
302
19
-562
Active
Power
Reactive
Power
2142
-1586
Static Load
311
151
Shunt loads
-150
311
-546
Summary Data
COMPLETE SUMMARY REPORT
Total load
Line / cable losses
Transformer losses
Summary Data
Total generation
Total load
Total losses
Summary Data
Total generation
Total load
Line / cable losses
4-65
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
Transformer losses
250
Total losses
-296
Active
Power
Reactive
Power
Total generation
580
67
Static Load
133
64
Shunt loads
89
133
153
-120
Transformer losses
61
Total losses
-59
Active
Power
Reactive
Power
Total generation
3638
Spinning reserve
671
Static Load
189
92
Shunt loads
78
189
169
10
-155
Transformer losses
351
10
196
Active
Power
Reactive
Power
404
-79
Summary Data
Summary Data
Total load
Summary Data
Total load
Total losses
Summary Data
Total generation
4-66
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
Static Load
246
119
Shunt loads
297
246
417
-673
Transformer losses
60
Total losses
-613
Active
Power
Reactive
Power
Static Load
161
78
Shunt loads
-102
161
-24
-46
Transformer losses
12
Total losses
-34
Active
Power
Reactive
Power
-17
Static Load
92
45
Shunt loads
-127
92
-82
-34
Transformer losses
Total losses
-31
Summary Data
Total load
Summary Data
Total generation
Total load
Summary Data
Total generation
Total load
4-67
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
Active
Power
Reactive
Power
Static Load
141
68
Shunt loads
-109
141
-41
-70
Transformer losses
Total losses
-64
Active
Power
Reactive
Power
Total generation
716
14
Static Load
197
95
Shunt loads
-42
197
53
-101
Transformer losses
79
Total losses
-22
Active
Power
Reactive
Power
1968
-533
Static Load
141
68
Shunt loads
-12
141
57
30
-763
Transformer losses
60
30
-703
Summary Data
Summary Data
Total generation
Total load
Summary Data
Total load
Summary Data
Total generation
Total load
Total losses
4-68
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
Active
Power
Reactive
Power
87
-77
Static Load
111
54
Shunt loads
-21
111
32
-90
Transformer losses
13
Total losses
-78
Active
Power
Reactive
Power
-3266
772
Static Load
203
99
Shunt loads
180
203
278
15
-1412
Transformer losses
46
15
-1366
Active
Power
Reactive
Power
-2454
-837
Static Load
103
50
Shunt loads
36
103
86
17
-125
Summary Data
SUMMARY REPORT FOR CIRCLE: SAHARSA
Summary Data
Total generation
Total load
Summary Data
Total generation
Total load
Total losses
Summary Data
Total generation
Total load
Line / cable losses
4-69
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
80
17
-45
Active
Power
Reactive
Power
-455
-963
Static Load
103
50
Shunt loads
-21
103
28
10
-351
Transformer losses
10
10
-341
Summary Data
Transformer losses
Total losses
Summary Data
Total generation
Total load
Total losses
4.7.7.2
Three phase short-circuit studies were carried out to compute the short-circuit levels for
various shunt faults (bus faults) across the system for the year FY 2018-Light load condition.
The sub-transient reactance of generators was used in the study to determine the maximum
fault currents. The tie-lines are modelled in the short-circuit study considering the fault
contribution from one node from each of the neighbouring system. It was assumed that
20KA of fault contribution is from each of the neighbouring system.
The short-circuit levels for three phase shunt faults at various buses are presented as below:
Table 4-44
SL. NO
BUS
VOLTAG
E (KV)
FAULT
CURRENT
(KA)
FAULT
MVA
765KV SASARAM
765
26
33,893
765KV GAYA
765
27
36,107
400KV PURNEA
400
20
13,576
400KV KATHIHAR
400
17
11,779
400KV KISHANGANJ
400
16
11,396
400KV PIRPAINTI
400
14
9,825
400KV LAKHISARAI
400
15
10,391
400KV KAHALGAON
400
35
24,429
4-70
020328-40RP-0400-00
Final Report
SL. NO
9
NAME OF THE
SS/GENERATING
STATION
BUS
VOLTAG
E (KV)
FAULT
CURRENT
(KA)
FAULT
MVA
400KV BANKA
400
34
23,413
10
400
34
23,663
11
400KV BIHARSHARIFF
400
36
24,991
12
400KV NABINAGAR-RLY
400
18
12,135
13
400KV NABINAGAR
400
24
16,290
14
400KV JAMALPUR
400
19
13,144
15
400KV MZAFFARPUR
400
17
12,061
16
400KV PATNA
400
37
25,821
17
400KV BUXAR
400
16
10,751
18
400KV PUSAULI
400
42
29,180
19
765KV SASARAM
400
42
29,341
20
400KV BARH
400
36
24,728
21
400KV ARRAH
400
25
17,240
22
765KV GAYA
400
26
17,841
23
400KV KISHANGANJ
220
17
6,551
24
400KV PURNEA
220
20
7,562
25
400KV KATHIHAR
220
24
9,161
26
220KV KATHIHAR
220
24
9,275
27
220KV FORBESGANJ
220
2,991
28
220KV GOPALGANJ
220
2,520
29
220KV MADHEPURA
220
14
5,345
30
220KV SABOUR
220
21
8,049
31
220KV SUPAUL
220
3,280
32
400KV MUZAFFRPUR
220
17
6,643
33
400KV KAHALGAON
220
14
5,459
34
220KV DARBHANGA
220
23
8,800
35
220KV VIKAS
220
28
10,673
36
220KV KANTI
220
27
10,236
37
220KV SAMASTIPUR
220
13
5,027
38
220KV BEGUSARAI
220
34
13,024
39
220KV BTPS
220
35
13,282
40
220KV SHEOHAR
220
12
4,384
41
400KV BIHARSHARIFF
220
33
12,486
42
220KV BIHARSHARIFF
220
33
12,563
43
220KV MUZAFFARPUR
220
2,129
4-71
020328-40RP-0400-00
Final Report
SL. NO
NAME OF THE
SS/GENERATING
STATION
BUS
VOLTAG
E (KV)
FAULT
CURRENT
(KA)
FAULT
MVA
44
220KV DAGMARA
220
2,391
45
220KV HULSANGANJ
220
13
5,117
46
220KV CHAPRA
220
11
4,035
47
220KV HAJIPUR
220
40
15,274
48
220KV GT-GAYA
220
12
4,395
49
220KV BODHGAYA
220
14
5,342
50
220KV FATUHA
220
43
16,275
51
220KV GAIGHAT
220
41
15,716
52
220KV JAKKANPUR
220
42
15,865
53
220KV SIPARA
220
44
16,689
54
400KV PATNA
220
44
16,807
55
220KV KHAGAUL-2
220
35
13,314
56
220KV KHAGAUL
220
37
14,265
57
220KV GT -BUXAR
220
3,490
58
220KV BIKRAMGANJ
220
13
5,006
59
220KV ARRA
220
23
8,799
60
400KV ARRAH
220
23
8,754
61
220KV SONENAGAR
220
13
4,874
62
400KV PUSAULI
220
19
7,280
63
220KV PUSAULI
220
19
7,264
64
220KV DEHRI-ON-SONE
220
13
4,922
65
132KV DHANHA
132
844
66
132KV BETTIAH
132
1,435
67
132KV RAMNAGAR
132
940
68
132KV RAXAUL
132
902
69
220KV GOPALGANJ
132
1,896
70
132KV GOPALGANJ
132
1,894
71
132KV SIWAN
132
1,435
72
132KV MASRAKH
132
1,170
73
132KV DHAKA
132
1,247
74
132KV JAINAGAR
132
1,453
75
132KV MOTIHARI
132
1,915
76
220KV MADHEPURA
132
13
3,009
77
132KV MADHEPURA
132
13
3,020
78
220KV SUPAUL
132
14
3,119
4-72
020328-40RP-0400-00
Final Report
SL. NO
NAME OF THE
SS/GENERATING
STATION
BUS
VOLTAG
E (KV)
FAULT
CURRENT
(KA)
FAULT
MVA
79
132KV SUPAUL
132
14
3,146
80
220KV KATHIHAR
132
17
3,790
81
132KV PHULPARAS
132
11
2,525
82
220KV FORBESGANJ
132
11
2,585
83
132KV KATHAR
132
16
3,629
84
132KV SONABARSHI
132
1,279
85
132KV FORBESGANJ
132
11
2,587
86
400KV PURNEA
132
18
4,084
87
132KV PURNEA
132
18
4,117
88
132KV PURNEA-2
132
16
3,709
89
132KV MADHUBANI
132
1,682
90
132KV SAHARSA
132
10
2,367
91
132KV KATIYA
132
1,843
92
132KV KOSHI
132
1,733
93
132KV NAUGACHHIYA
132
1,256
94
132KV PANDAUL
132
10
2,300
95
132KV SITMHARI
132
12
2,787
96
220KV SHEOHAR
132
14
3,144
97
132KV SHEOHAR
132
13
3,061
98
132KV UDAKISHANGANJ
132
1,009
99
400KV BANKA
132
18
4,124
100
132KV NBANKA
132
18
4,103
101
132
13
3,055
102
220KV DARBHANGA
132
12
2,763
103
132KV DHARBHANGA
132
12
2,767
104
132KV WAZIRGANJ
132
1,715
105
132KV GANGWARA
132
2,147
106
132KV NAWADA
132
1,113
107
220KV MTPS
132
20
4,569
108
132KV PAHARPUR
132
1,898
109
132KV SKMCH
132
15
3,470
110
220KV SABOUR
132
21
4,802
111
132KV SABOUR
132
21
4,852
112
132KV SABOUR-2
132
19
4,336
113
220KV MUZAFFARPUR
132
1,883
4-73
020328-40RP-0400-00
Final Report
SL. NO
NAME OF THE
SS/GENERATING
STATION
BUS
VOLTAG
E (KV)
FAULT
CURRENT
(KA)
FAULT
MVA
114
132KV MUZAFFARPUR-2
132
1,896
115
132KV MUZAFFARPUR
132
14
3,279
116
220KV BODHGAYA
132
16
3,569
117
220KV SAMASTIPUR
132
1,690
118
132KV SAMASTIPUR-2
132
1,631
119
400KV KAHALGAON
132
18
4,153
120
132KV KAHALGAON
132
19
4,289
121
132KV VAISHALI
132
12
2,793
122
400KV JAMALPUR
132
18
4,189
123
132KV JAMALPUR
132
18
4,123
124
132KV KHAGARIYA
132
1,001
125
132KV CHAPRA
132
12
2,754
126
220KV CHAPRA
132
12
2,751
127
132KV CHANDAUTI
132
16
3,607
128
132KV CHAPRA-2
132
11
2,590
129
220KV HULSANGANJ
132
15
3,362
130
132KV HULASGANJ
132
15
3,354
131
132KV TEKARI
132
12
2,663
132
220KV BIHARSHARIFF
132
21
4,741
133
132KV SHITALPUR
132
11
2,575
134
132KV BELAGANJ
132
1,658
135
132KV GOH
132
1,580
136
132KV EKANGASARAI
132
13
3,012
137
132KV HARNAUT
132
11
2,436
138
132KV CHANDAUTI-2
132
1,327
139
132KV BARIPAHRI
132
15
3,496
140
132KV BARIPAHRI-2
132
15
3,452
141
132KV GAIGHAT-2
132
19
4,371
142
220KV GAIGHAT
132
20
4,573
143
220KV FATHUA
132
20
4,462
144
132KV GAIGHAT
132
20
4,548
145
132KV KARPY
132
1,643
146
132KV FATHUA-2
132
18
4,185
147
132KV MITHAPUR-2
132
18
4,027
148
132KV KATRA
132
18
4,099
4-74
020328-40RP-0400-00
Final Report
SL. NO
NAME OF THE
SS/GENERATING
STATION
BUS
VOLTAG
E (KV)
FAULT
CURRENT
(KA)
FAULT
MVA
149
220KV JAKKANPUR
132
21
4,801
150
132KV JAKKANPUR-2
132
21
4,695
151
132KV KISHANGANJ
132
1,813
152
220KV KHAGAUL-2
132
23
5,362
153
132KV JEHNABAD
132
13
2,897
154
132KV KUSHESWAR
132
1,027
155
132KV KHAGAUL-2
132
23
5,274
156
132KV KHAGUAL-3
132
23
5,219
157
132KV MITHAPUR-3
132
18
4,066
158
132KV MITHAPUR
132
21
4,764
159
220KV BEGUSARAI
132
20
4,590
160
220KV HAJIPUR
132
17
3,906
161
132KV HAJIPUR
132
17
3,909
162
132KV JAKKANPUR
132
24
5,539
163
132KV BTPS
132
21
4,715
164
132KV MASURHI
132
10
2,378
165
132KV LAKHISARAI
132
16
3,656
166
220KV SIPARA
132
24
5,387
167
132KV SULTANGANJ
132
16
3,743
168
132KV BIHTA-2
132
22
5,075
169
132KV SAMASTIPUR
132
16
3,708
170
132KV HATHIDAH
132
19
4,451
171
132KV BUXAR
132
1,239
172
132KV BARHI
132
12
2,734
173
132KV DALSINGSARAI
132
14
3,178
174
132KV NALANDA
132
1,462
175
220KV KHAGAUL
132
16
3,722
176
132KV KHAGAUL
132
16
3,642
177
132KV DUMRAON
132
1,622
178
132KV DIGHA
132
15
3,347
179
220KV BIKRAMGANJ
132
2,142
180
132KV BIKRAMGANJ
132
2,142
181
132KV BIHTA
132
15
3,459
182
220KV ARRA
132
12
2,749
183
132KV SHEIKHPURA
132
10
2,246
4-75
020328-40RP-0400-00
Final Report
SL. NO
4.7.8
NAME OF THE
SS/GENERATING
STATION
BUS
VOLTAG
E (KV)
FAULT
CURRENT
(KA)
FAULT
MVA
184
132KV ARRA
132
12
2,710
185
132KV JAGDISHPUR
132
1,436
186
132KV JAMUI
132
1,450
187
400KV PUSAULI
132
15
3,471
188
132KV DINARA
132
1,736
189
220KV PUSAULI
132
15
3,525
190
132KV BHABUA
132
15
3,448
191
132KV RAJGIR
132
960
192
132KV KUDRA
132
14
3,249
193
132KV KARMNASA
132
11
2,623
194
132KV SASARAM
132
11
2,589
195
220KV DEHRI-ON-SONE
132
15
3,357
196
132KV BANJARI
132
1,284
197
220KV SONENAGAR
132
13
2,924
198
132KV SONNENAGAR
132
13
2,969
199
132KV AURANGABAD
132
10
2,220
200
132KV SONNENAGAR-2
132
13
2,869
201
132KV RAFIGANJ
132
1,618
The two main purposes for development of the transmission system for FY 2018 was to
evacuate the base case generation and transmit the power to various 33kV loads centres,
which include existing and proposed 132kV/33 substations.
From the simulation studies it could be observed that the transmission system so developed
was able to meet the requirements of meeting the load demand with the planned generation
without any deviation from the planning criteria under normal and contingency conditions.
4.8
This section presents the proposed transmission system for FY 2014 and also presents the
results of system studies that were carried out. The transmission system studies were
carried out to evacuate the planned capacity additions and to supply the forecast loads for
each circle which were subsequently allocated among the proposed and existing
substations.
The system studies for are carried out for the following scenarios in FY 2014.
Peak Load
Light Load
The system peak load of the system for FY 2014 occurs during October and whereas the
system light loads condition occurs during April.
4-76
020328-40RP-0400-00
Final Report
The system peak load and light load respectively for the FY 2014 used for the studies were
3,647 MW and 2078 MW. The peak load was based on the load forecast report developed
earlier.
The power grid 400kV Barh bus was taken as slack bus.
The various transmission lines and substation covering all voltages were iteratively removed
from the list proposed for load flow studies in FY 2018. The commissioned schedule of the
various network presented in previous section beyond FY 2014 were removed from load flow
studies conducted for FY 2014.
The most of the network reinforcements planned in FY 2018 are phased in FY 2014 based
on the network requirement
4.8.1
The peak load forecast for FY 2014 is 3,647 MW. The system was simulated and studied to
meet the above peak. The system demand was allocated to various substations which has
been presented in the earlier section of ihis report. As discussed earlier, a specific
percentage of transmission losses were assumed for deriving the substation loads. These
loads were used as starting point for load simulation and loads for the peak load. Further,
the substation loads were adjusted globally to meet the system peak demand during the
peak load flow base case studies. All loads were assumed to have a power factor 0.9. The
generation and import/export schedules were prepared for the peak load condition. These
schedules are presented earlier in the report.
The single line diagram for 2014 peak load condition is presented in the end of section
(Figure BSEB 2014-1) The SLD presents the bus voltages, line flows (MW and MVAr). The
flows presented are per circuit and number of circuits are marked separately
4.8.1.1
MW
Substation Loads
3540
Generation
3766
119
3.2%
3647
Losses
132kV
35
0.95%
220kV
46
1.27%
400kV Losses
27
0.73%
Total Losses
107
2.94%
The system peak demand met is 3,647 MW which was equal to the projected system peak
demand.
Developing the PSMP for Bihar
4-77
020328-40RP-0400-00
Final Report
The total BSEB transmission losses of 107 MW represent the 2.94% of BSEB system
requirement. The losses comprise of 0.95%, 1.27% and 0.73% respectively for 132, 220 kV
and 400 kV transmission system of BSEB.
All transformers and transmission lines were operating within their permitted load ratings. All
bus voltages were within permissible limits.
The N-1 contingency operation was carried out to test the system for satisfactory operation.
It is observed that during the N-1 contingency operation all branch loadings and bus voltages
are operating satisfactorily.
The minimum and maximum voltages observed in the system were within 0.95 and 1.05 p.u.
for all the 400 kV and above, few buses of 220 kV were at 1.052 which is within the voltage
limits The summary of bus voltages are presented in the following table
Table 4-46
Voltage
(KV)
Number
of Buses
0.95 to 1
1.00 to 1.05
1.05 to 1.1
765
0%
100%
0%
400
15
0%
15
100%
0%
220
32
0%
31
100%
3%
132
120
63
53%
57
48%
0%
169
63
Total
105
The circle wise demand, generation and losses are presented in the following table
Table 4-47
Reactive
Power
(MVAR)
Total generation
3767
436
Static Load
3540
1715
Shunt loads
194
3540
1909
226
-3341
1868
Total losses
226
-1472
Mismatches
Summary Data
COMPLETE SUMMARY REPORT
Total load
Line / cable losses
Transformer losses
4-78
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
Active
Power
Reactive
Power
-2117
638
Static Load
1067
517
Shunt loads
-19
1067
497
27
-228
Transformer losses
515
27
287
Active
Power
Reactive
Power
Total generation
568
-1002
Static Load
380
184
Shunt loads
-9
380
174
14
-490
Transformer losses
428
14
-62
Active
Power
Reactive
Power
Static Load
157
76
Shunt loads
-10
157
66
-103
Transformer losses
14
Total losses
-88
Summary Data
Summary Data
Total generation
Total load
Total losses
Summary Data
Total load
Total losses
Summary Data
Total generation
Total load
4-79
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
Active
Power
Reactive
Power
Total generation
2006
-373
Spinning reserve
365
Static Load
223
108
Shunt loads
223
108
-142
Transformer losses
220
Total losses
77
Active
Power
Reactive
Power
Total generation
505
318
Static Load
291
141
Shunt loads
319
291
460
13
-634
Transformer losses
110
13
-524
Active
Power
Reactive
Power
204
99
Summary Data
Summary Data
Total load
Summary Data
Total load
Total losses
Summary Data
Total generation
Static Load
4-80
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
-67
204
31
-31
Transformer losses
25
Total losses
-7
Active
Power
Reactive
Power
-8
Static Load
110
53
Shunt loads
-51
110
-29
Transformer losses
Total losses
-25
Active
Power
Reactive
Power
Static Load
168
81
Shunt loads
-51
168
30
-50
Transformer losses
13
Total losses
-38
Active
Power
Reactive
Power
Summary Data
Shunt loads
Total load
Summary Data
Total generation
Total load
Summary Data
Total generation
Total load
Summary Data
4-81
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
Total generation
596
316
Static Load
148
72
Shunt loads
148
72
-29
Transformer losses
82
Total losses
53
Active
Power
Reactive
Power
2934
-345
Static Load
178
86
Shunt loads
178
86
47
-507
Transformer losses
102
47
-405
Active
Power
Reactive
Power
18
-16
Static Load
132
64
Shunt loads
132
64
-61
Transformer losses
16
Total losses
-46
Summary Data
Total load
Summary Data
Total generation
Total load
Total losses
Summary Data
Total generation
Total load
4-82
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
Active
Power
Reactive
Power
-3458
1224
Static Load
242
117
Shunt loads
101
242
218
59
-790
Transformer losses
244
59
-547
Active
Power
Reactive
Power
Total generation
276
97
Static Load
121
59
Shunt loads
-19
121
40
-46
Transformer losses
43
Total losses
-3
Active
Power
Reactive
Power
2433
-413
Static Load
121
59
Shunt loads
121
59
22
-199
Transformer losses
53
22
-146
Summary Data
Summary Data
Total generation
Total load
Total losses
Summary Data
Total load
Summary Data
Total generation
Total load
Total losses
4-83
020328-40RP-0400-00
Final Report
4.8.1.2
Three phase short-circuit studies were carried out to compute the short-circuit levels for
various shunt faults (bus faults) across the system for the year FY 2014-Peak load condition.
The sub-transient reactance of generators is used in the study. The tie-lines are modelled in
the short-circuit study considering the fault contribution from a node from each of the
neighbouring system. It was assumed that 20KA of fault contribution is from each of the
neighbouring system.
The short-circuit levels for three phase shunt faults at various buses are presented as below:
Table 4-48
SL. NO
BUS
VOLTAGE
(KV)
FAULT
CURRENT
(KA)
FAULT
MVA
765KV SASARAM
765
12
15,592
765KV GAYA
765
12
15,381
400KV KISHANGANJ
400
15
10,277
400KV PURNEA
400
17
11,635
400KV KATHIHAR
400
13
9,133
400KV KAHALGAON
400
30
20,835
400KV NABINAGAR-RLY
400
17
11,901
400KV BARH
400
33
23,088
400KV PATNA
400
22
15,417
10
400KV NABINAGAR
400
23
16,227
11
400KV BANKA
400
18
12,553
12
400KV JAMALPUR
400
17
11,740
13
400KV MZAFFARPUR
400
16
10,981
14
400KV BIHARSHARIFF
400
29
20,129
15
400KV PUSAULI
400
31
21,269
16
765KV SASARAM
400
30
20,799
17
765KV GAYA
400
20
13,550
18
400KV KISHANGANJ
220
13
4,779
19
400KV KATHIHAR
220
15
5,799
20
220KV KATHIHAR
220
15
5,815
21
400KV PURNEA
220
18
6,793
22
220KV GT -BUXAR
220
10
3,919
23
400KV MUZAFFRPUR
220
16
6,237
24
220KV BTPS
220
28
10,748
25
220KV GT-GAYA
220
14
5,145
26
220KV KANTI
220
24
9,136
27
220KV DARBHANGA
220
21
7,914
4-84
020328-40RP-0400-00
Final Report
SL. NO
NAME OF THE
SS/GENERATING
STATION
BUS
VOLTAGE
(KV)
FAULT
CURRENT
(KA)
FAULT
MVA
28
220KV MADHEPURA
220
11
4,198
29
220KV BEGUSARAI
220
27
10,368
30
400KV KAHALGAON
220
13
5,005
31
220KV SUPAUL
220
2,567
32
220KV SHEOHAR
220
11
4,012
33
400KV BIHARSHARIFF
220
30
11,533
34
220KV BODHGAYA
220
17
6,312
35
220KV BIHARSHARIFF
220
30
11,605
36
220KV ARRA
220
16
6,236
37
220KV HAJIPUR
220
33
12,673
38
220KV GOPALGANJ
220
2,323
39
220KV FATUHA
220
34
13,144
40
400KV PATNA
220
34
13,144
41
220KV SIPARA
220
34
13,013
42
220KV GAIGHAT
220
34
12,805
43
220KV JAKKANPUR
220
33
12,752
44
220KV KHAGAUL
220
30
11,574
45
220KV KHAGAUL-2
220
29
10,993
46
220KV PUSAULI
220
18
6,766
47
400KV PUSAULI
220
18
6,779
48
220KV SONENAGAR
220
13
4,806
49
220KV DEHRI-ON-SONE
220
13
4,817
50
220KV KATHIHAR
132
14
3,274
51
132KV KATHAR
132
14
3,148
52
400KV BANKA
132
15
3,427
53
132KV NBANKA
132
15
3,408
54
400KV PURNEA
132
15
3,457
55
220KV MADHEPURA
132
10
2,339
56
132KV MADHEPURA
132
10
2,359
57
132KV PURNEA
132
15
3,472
58
132KV SONABARSHI
132
1,127
59
220KV SUPAUL
132
11
2,516
60
132KV SUPAUL
132
11
2,533
61
132KV SAHARSA
132
1,957
62
132KV NAUGACHHIYA
132
1,189
4-85
020328-40RP-0400-00
Final Report
SL. NO
NAME OF THE
SS/GENERATING
STATION
BUS
VOLTAGE
(KV)
FAULT
CURRENT
(KA)
FAULT
MVA
63
400KV JAMALPUR
132
16
3,768
64
132KV JAMALPUR
132
16
3,717
65
132KV PHULPARAS
132
2,148
66
132KV UDAKISHANGANJ
132
910
67
220KV MTPS
132
17
3,965
68
400KV KAHALGAON
132
14
3,247
69
220KV DARBHANGA
132
11
2,542
70
220KV SHEOHAR
132
11
2,452
71
132KV KAHALGAON
132
14
3,286
72
132KV SHEOHAR
132
11
2,403
73
132KV DHARBHANGA
132
11
2,546
74
132
10
2,357
75
132KV JAINAGAR
132
1,057
76
132KV RAXAUL
132
819
77
132KV SKMCH
132
12
2,705
78
132KV DHAKA
132
1,120
79
132KV SITMHARI
132
10
2,268
80
132KV FORBESGANJ
132
1,456
81
132KV GANGWARA
132
1,970
82
220KV BIHARSHARIFF
132
17
3,782
83
132KV PANDAUL
132
2,067
84
132KV KATIYA
132
1,290
85
132KV KOSHI
132
1,235
86
132KV MUZAFFARPUR
132
13
2,885
87
132KV KISHANGANJ
132
1,707
88
132KV SABOUR
132
13
2,967
89
132KV BETTIAH
132
1,290
90
220KV GOPALGANJ
132
1,670
91
132KV MOTIHARI
132
1,688
92
132KV EKANGASARAI
132
1,976
93
132KV HULASGANJ
132
1,623
94
132KV GOPALGANJ
132
1,665
95
132KV MADHUBANI
132
1,494
96
132KV RAMNAGAR
132
856
97
132KV NALANDA
132
1,333
4-86
020328-40RP-0400-00
Final Report
SL. NO
NAME OF THE
SS/GENERATING
STATION
BUS
VOLTAGE
(KV)
FAULT
CURRENT
(KA)
FAULT
MVA
98
220KV BEGUSARAI
132
20
4,632
99
132KV BTPS
132
21
4,839
100
220KV BODHGAYA
132
14
3,233
101
132KV BARIPAHRI
132
13
2,955
102
132KV KUSHESWAR
132
1,006
103
132KV HARNAUT
132
2,171
104
400KV PUSAULI
132
14
3,166
105
132KV BARHI
132
11
2,565
106
132KV SULTANGANJ
132
14
3,122
107
132KV LAKHISARAI
132
14
3,169
108
132KV HATHIDAH
132
19
4,383
109
132KV RAJGIR
132
877
110
132KV VAISHALI
132
2,114
111
220KV PUSAULI
132
14
3,141
112
132KV BHABUA
132
13
3,069
113
220KV HAJIPUR
132
13
2,939
114
132KV HAJIPUR
132
13
2,949
115
132KV SAMASTIPUR
132
16
3,556
116
220KV ARRA
132
11
2,471
117
132KV CHANDAUTI
132
13
2,960
118
132KV DHANHA
132
766
119
132KV SIWAN
132
1,203
120
132KV KUDRA
132
12
2,814
121
220KV SONENAGAR
132
11
2,611
122
132KV KHAGARIYA
132
964
123
132KV DALSINGSARAI
132
13
2,972
124
132KV SONNENAGAR
132
12
2,641
125
132KV ARRA
132
11
2,441
126
132KV AURANGABAD
132
2,029
127
220KV DEHRI-ON-SONE
132
13
2,936
128
132KV KARMNASA
132
10
2,362
129
220KV SIPARA
132
28
6,405
130
132KV TEKARI
132
1,470
131
132KV BELAGANJ
132
1,470
132
132KV JAGDISHPUR
132
1,337
4-87
020328-40RP-0400-00
Final Report
SL. NO
NAME OF THE
SS/GENERATING
STATION
BUS
VOLTAGE
(KV)
FAULT
CURRENT
(KA)
FAULT
MVA
133
132KV SHEIKHPURA
132
2,105
134
132KV GOH
132
1,052
135
220KV FATHUA
132
24
5,381
136
220KV GAIGHAT
132
30
6,819
137
132KV SASARAM
132
10
2,381
138
220KV JAKKANPUR
132
24
5,426
139
220KV KHAGAUL-2
132
22
5,124
140
132KV FATHUA-2
132
21
4,766
141
132KV GAIGHAT
132
29
6,728
142
132KV JAKKANPUR-2
132
23
5,202
143
132KV MASRAKH
132
808
144
132KV BANJARI
132
1,213
145
132KV KHAGAUL-2
132
22
5,085
146
132KV MITHAPUR
132
29
6,661
147
132KV SHITALPUR
132
1,866
148
132KV MASURHI
132
11
2,402
149
132KV PAHARPUR
132
1,433
150
132KV KATRA
132
22
5,035
151
132KV MITHAPUR-2
132
22
5,086
152
132KV JAKKANPUR
132
24
5,523
153
132KV WAZIRGANJ
132
1,320
154
220KV KHAGAUL
132
15
3,402
155
132KV JAMUI
132
1,348
156
132KV KHAGAUL
132
15
3,327
157
132KV RAFIGANJ
132
1,506
158
132KV BIHTA
132
14
3,163
159
132KV JEHNABAD
132
12
2,853
160
132KV DIGHA
132
13
2,932
161
132KV KARPY
132
1,592
162
132KV NAWADA
132
910
163
132KV CHAPRA
132
1,311
164
132KV DINARA
132
910
165
132KV BIKRAMGANJ
132
1,040
166
132KV BUXAR
132
929
167
132KV DUMRAON
132
1,147
4-88
020328-40RP-0400-00
Final Report
4.8.2
The light load condition for the BSEB was simulated is based on about 57% of total
substation peak loads. However, the circle wise substations peak loads considered for light
load conditions was based on the historical data. The total substation loads during light load
condition was about 2,022 MW in FY 2014. The generation utilisation by BSEB to meet the
load was 2,077 MW. The load flow simulation was carried out for the above substation load
scenario.
4.8.2.1
MW
Substation Loads
2022
Generation
2142
65
3.0%
2077
Losses
132kV
14
0.68%
220kV
21
1.02%
400kV Losses
20
0.97%
Total Losses
55
2.67%
400
250
The system demand met by BSEB during light load is 2,077 MW which is about 57% of the
system peak demand.
The total BSEB transmission losses of 55 MW represent 2.67% of BSEB system
requirement. The losses comprises of 0.68%, 1.02% and 0.97% respectively for 132,220kV
and 400kV transmission system of BSEB.
All transformers and transmission lines were operating within their permitted load ratings. All
bus voltages were within permissible limits.
The N-1 contingency operation was carried out to test the system for satisfactory operation.
It is observed that during the N-1 contingency operation all branch loadings and bus voltages
were operating satisfactorily.
The minimum and maximum voltages observed in the system were 0.987 and 1.058 p.u and
they were within the planning critera as mentione in the earlier sections. The summary of
bus voltages are presented in the following table:
4-89
020328-40RP-0400-00
Final Report
Table 4-50
Voltage
(KV)
1.00 to 1.05
1.05 to 1.1
765
0%
100%
0%
400
15
0%
15
100%
0%
220
32
0%
27
100%
16%
132
120
5%
106
95%
7%
169
Total
150
13
The circle wise demand generation and losses are presented in the following table
Table 4-51
Reactive
Power
(MVAR)
Total generation
2143
-1823
Static Load
2022
979
Shunt loads
393
2022
1372
120
-4415
1220
Total losses
120
-3196
Mismatches
Active
Power
Reactive
Power
-1745
323
Static Load
572
277
Shunt loads
-21
572
256
18
-339
Transformer losses
337
18
-2
Summary Data
COMPLETE SUMMARY REPORT
Total load
Line / cable losses
Transformer losses
Summary Data
Total generation
Total load
Total losses
4-90
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
Active
Power
Reactive
Power
Total generation
289
-1364
Static Load
221
107
Shunt loads
-10
221
97
-518
Transformer losses
305
Total losses
-213
Active
Power
Reactive
Power
Static Load
91
44
Shunt loads
-10
91
34
-119
Transformer losses
Total losses
-114
Active
Power
Reactive
Power
Total generation
1830
-389
Spinning reserve
341
Static Load
129
63
Shunt loads
110
Summary Data
Summary Data
Total load
Summary Data
Total generation
Total load
Summary Data
4-91
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
129
173
-163
Transformer losses
190
Total losses
27
Active
Power
Reactive
Power
Total generation
415
-35
Static Load
169
82
Shunt loads
319
169
400
-672
Transformer losses
54
Total losses
-618
Active
Power
Reactive
Power
Static Load
112
54
Shunt loads
-76
112
-21
-44
Transformer losses
Total losses
-37
Active
Power
Reactive
Power
Summary Data
Total load
Summary Data
Total load
Summary Data
Total generation
Total load
Summary Data
4-92
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
-17
Static Load
64
31
Shunt loads
-55
64
-24
-34
Transformer losses
Total losses
-32
Active
Power
Reactive
Power
Static Load
97
47
Shunt loads
-54
97
-8
-66
Transformer losses
Total losses
-62
Active
Power
Reactive
Power
Total generation
506
86
Static Load
114
55
Shunt loads
114
55
-48
Transformer losses
52
Total losses
Summary Data
Total generation
Total load
Summary Data
Total generation
Total load
Summary Data
Total load
4-93
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
Active
Power
Reactive
Power
1964
-590
Static Load
97
47
Shunt loads
Total load
97
47
23
-794
Transformer losses
41
23
-753
Active
Power
Reactive
Power
Total generation
18
-17
Static Load
76
37
Shunt loads
76
37
-80
Transformer losses
Total losses
-74
Active
Power
Reactive
Power
-2235
992
Static Load
139
67
Shunt loads
211
139
278
32
-1165
Transformer losses
192
32
-973
Summary Data
Summary Data
Total generation
Total losses
Summary Data
Total load
Summary Data
Total generation
Total load
Total losses
4-94
020328-40RP-0400-00
Final Report
Active
Power
(MW)
Reactive
Power
(MVAR)
Active
Power
Reactive
Power
Static Load
70
34
Shunt loads
-20
70
14
-72
Transformer losses
Total losses
-68
Active
Power
Reactive
Power
1096
-814
Static Load
70
34
Shunt loads
Total load
70
34
13
-302
Transformer losses
23
13
-279
Summary Data
SUMMARY REPORT FOR CIRCLE: BHOJPUR
Summary Data
Total generation
Total load
Summary Data
Total generation
Total losses
4.8.2.2
Three phase short-circuit studies were carried out to compute the short-circuit levels for
various shunt faults (bus faults) across the system for the year FY 2014-Light load condition.
The sub-transient reactance of generators was used in the study to detemine the maximum
fault currents. The tie-lines were modelled in the short-circuit study considering the fault
contribution from one node from each of the neighbouring system. It is assumed that 20KA
of fault contribution is from each of the neighbouring system.
The short-circuit levels for three phase shunt faults at various buses are presented as below:
4-95
020328-40RP-0400-00
Final Report
Table 4-52
SL. NO
NAME OF THE
SS/GENERATING
STATION
BUS
VOLTAGE
(KV)
FAULT
CURRENT (KA)
FAULT
MVA
765KV SASARAM
765
12
16,165
765KV GAYA
765
12
15,994
400KV KATHIHAR
400
12
8,339
400KV KAHALGAON
400
30
20,701
400KV PURNEA
400
15
10,347
400KV JAMALPUR
400
17
11,725
400KV KISHANGANJ
400
13
9,082
400KV BANKA
400
18
12,559
400KV NABINAGAR
400
24
16,551
10
400KV MZAFFARPUR
400
16
10,902
11
400KV BIHARSHARIFF
400
29
20,149
12
400KV NABINAGAR-RLY
400
16
11,121
13
400KV PUSAULI
400
33
22,580
14
765KV SASARAM
400
32
22,077
15
400KV BARH
400
29
20,167
16
400KV PATNA
400
22
15,032
17
765KV GAYA
400
20
13,892
18
220KV MADHEPURA
220
11
4,121
19
220KV SUPAUL
220
2,560
20
400KV KATHIHAR
220
15
5,543
21
220KV KATHIHAR
220
15
5,561
22
400KV KISHANGANJ
220
12
4,527
23
400KV PURNEA
220
17
6,451
24
220KV GOPALGANJ
220
2,334
25
220KV DARBHANGA
220
20
7,495
26
220KV KANTI
220
22
8,554
27
400KV MUZAFFRPUR
220
16
6,026
28
220KV SHEOHAR
220
10
3,921
29
400KV KAHALGAON
220
13
5,015
30
220KV BTPS
220
27
10,227
31
220KV BEGUSARAI
220
26
9,865
32
400KV BIHARSHARIFF
220
28
10,836
33
220KV BIHARSHARIFF
220
29
10,881
34
220KV HAJIPUR
220
31
11,829
4-96
020328-40RP-0400-00
Final Report
SL. NO
NAME OF THE
SS/GENERATING
STATION
BUS
VOLTAGE
(KV)
FAULT
CURRENT (KA)
FAULT
MVA
35
220KV GT-GAYA
220
10
3,885
36
220KV BODHGAYA
220
13
5,140
37
220KV FATUHA
220
32
12,189
38
220KV GAIGHAT
220
31
11,871
39
220KV GT -BUXAR
220
2,685
40
400KV PUSAULI
220
17
6,493
41
220KV PUSAULI
220
17
6,478
42
220KV ARRA
220
13
5,137
43
220KV JAKKANPUR
220
31
11,772
44
220KV KHAGAUL-2
220
27
10,240
45
220KV KHAGAUL
220
28
10,612
46
400KV PATNA
220
32
12,135
47
220KV SIPARA
220
32
12,019
48
220KV SONENAGAR
220
12
4,473
49
220KV DEHRI-ON-SONE
220
12
4,507
50
132KV RAXAUL
132
849
51
132KV BETTIAH
132
1,331
52
220KV MADHEPURA
132
10
2,349
53
132KV MADHEPURA
132
10
2,371
54
132KV SONABARSHI
132
1,143
55
220KV SUPAUL
132
11
2,530
56
132KV SUPAUL
132
11
2,547
57
220KV GOPALGANJ
132
1,710
58
132KV GOPALGANJ
132
1,706
59
132KV RAMNAGAR
132
887
60
132KV SAHARSA
132
1,977
61
132KV PHULPARAS
132
10
2,172
62
132KV UDAKISHANGANJ
132
928
63
220KV KATHIHAR
132
14
3,236
64
132KV KATHAR
132
14
3,117
65
132KV SIWAN
132
1,249
66
132KV DHAKA
132
1,147
67
132KV DHANHA
132
797
68
132KV MOTIHARI
132
1,723
69
132KV JAINAGAR
132
1,082
4-97
020328-40RP-0400-00
Final Report
SL. NO
NAME OF THE
SS/GENERATING
STATION
BUS
VOLTAGE
(KV)
FAULT
CURRENT (KA)
FAULT
MVA
70
400KV PURNEA
132
15
3,433
71
132KV PURNEA
132
15
3,449
72
132KV PANDAUL
132
2,101
73
220KV DARBHANGA
132
11
2,557
74
132KV MASRAKH
132
845
75
220KV SHEOHAR
132
11
2,459
76
132KV DHARBHANGA
132
11
2,563
77
132KV SHEOHAR
132
11
2,411
78
132
10
2,367
79
132KV MADHUBANI
132
1,528
80
132KV GANGWARA
132
2,000
81
132KV SITMHARI
132
10
2,285
82
400KV BANKA
132
15
3,440
83
132KV NBANKA
132
15
3,422
84
220KV MTPS
132
17
3,924
85
132KV NAUGACHHIYA
132
1,194
86
132KV SKMCH
132
12
2,700
87
132KV KATIYA
132
1,317
88
132KV KOSHI
132
1,262
89
400KV JAMALPUR
132
17
3,790
90
132KV JAMALPUR
132
16
3,740
91
132KV FORBESGANJ
132
1,486
92
132KV MUZAFFARPUR
132
11
2,603
93
400KV KAHALGAON
132
14
3,274
94
132KV KAHALGAON
132
15
3,317
95
132KV VAISHALI
132
2,142
96
132KV KISHANGANJ
132
1,755
97
132KV SABOUR
132
13
3,005
98
132KV CHAPRA
132
1,358
99
132KV SHITALPUR
132
1,903
100
132KV SULTANGANJ
132
14
3,166
101
132KV LAKHISARAI
132
14
3,179
102
132KV KUSHESWAR
132
998
103
132KV SAMASTIPUR
132
15
3,507
104
220KV BEGUSARAI
132
19
4,312
4-98
020328-40RP-0400-00
Final Report
SL. NO
NAME OF THE
SS/GENERATING
STATION
BUS
VOLTAGE
(KV)
FAULT
CURRENT (KA)
FAULT
MVA
105
132KV HAJIPUR
132
13
2,943
106
220KV HAJIPUR
132
13
2,932
107
132KV BTPS
132
20
4,459
108
132KV DALSINGSARAI
132
13
2,953
109
132KV KHAGARIYA
132
970
110
132KV HATHIDAH
132
18
4,150
111
132KV JAMUI
132
1,367
112
132KV BARHI
132
11
2,515
113
132KV SHEIKHPURA
132
2,092
114
220KV BIHARSHARIFF
132
17
3,784
115
132KV EKANGASARAI
132
1,956
116
132KV HULASGANJ
132
1,605
117
132KV BARIPAHRI
132
13
2,944
118
132KV HARNAUT
132
2,154
119
400KV PUSAULI
132
14
3,088
120
220KV BODHGAYA
132
13
3,000
121
132KV NALANDA
132
1,323
122
220KV PUSAULI
132
13
3,070
123
132KV BHABUA
132
13
3,004
124
132KV CHANDAUTI
132
12
2,800
125
132KV KARMNASA
132
10
2,322
126
132KV TEKARI
132
1,425
127
132KV KUDRA
132
12
2,758
128
132KV BELAGANJ
132
1,425
129
132KV PAHARPUR
132
1,387
130
132KV GOH
132
1,027
131
220KV FATHUA
132
23
5,213
132
132KV FATHUA-2
132
20
4,632
133
132KV WAZIRGANJ
132
1,282
134
220KV GAIGHAT
132
29
6,553
135
220KV SIPARA
132
27
6,138
136
132KV GAIGHAT
132
28
6,471
137
220KV ARRA
132
10
2,358
138
132KV KATRA
132
21
4,888
139
220KV JAKKANPUR
132
23
5,245
4-99
020328-40RP-0400-00
Final Report
4.8.3
SL. NO
NAME OF THE
SS/GENERATING
STATION
BUS
VOLTAGE
(KV)
140
132KV JAKKANPUR-2
132
22
5,036
141
132KV MITHAPUR
132
28
6,406
142
132KV MITHAPUR-2
132
22
4,936
143
220KV KHAGAUL-2
132
22
4,957
144
132KV ARRA
132
10
2,335
145
132KV RAJGIR
132
881
146
132KV MASURHI
132
10
2,347
147
132KV KHAGAUL-2
132
22
4,922
148
132KV JAGDISHPUR
132
1,298
149
132KV JAKKANPUR
132
23
5,341
150
132KV JEHNABAD
132
12
2,776
151
132KV NAWADA
132
897
152
220KV KHAGAUL
132
14
3,288
153
132KV KARPY
132
1,565
154
132KV KHAGAUL
132
14
3,218
155
132KV BIHTA
132
13
3,062
156
132KV DIGHA
132
12
2,846
157
132KV SASARAM
132
10
2,338
158
132KV BANJARI
132
1,193
159
220KV DEHRI-ON-SONE
132
13
2,881
160
220KV SONENAGAR
132
11
2,575
161
132KV SONNENAGAR
132
11
2,607
162
132KV AURANGABAD
132
1,997
163
132KV DINARA
132
904
164
132KV BUXAR
132
929
165
132KV RAFIGANJ
132
1,485
166
132KV DUMRAON
132
1,144
167
132KV BIKRAMGANJ
132
1,035
FAULT
CURRENT (KA)
FAULT
MVA
The transmission system was developed to evacuate the base case generation and transmit
the power to various 33kV loads of existing and proposed 132/33 kV substations.
The transmission system operated successfully for a range of steady state operation
condition including the peak load and light load condition.
4-100
020328-40RP-0400-00
Final Report
4.9
Investment Costing
This section presents the investment cost required as per the proposed transmission system
during transmission system studies. The cost estimates were carried out for the future
network which includes the proposed substation and lines by BSEB.
The cost estimates are carried out for BSEB network only. The 400kV and above network
planned by PGCIL were not considered in the Investment planning. However, the additional
400kV network identified during the study was taken in the investment planning and it was
assumed these projects will be built by BSEB.
The cost of the transmission line entry bays for the lines of BSEB terminating at 400kV
PGCIL substations was not considered and assumed the line entry bay at PGCIL substation
end will be built by PGCIL.
For all generating stations, it is assumed that BSEB was responsible for cost of the line bay
entries at generating stations end.
4.9.1
This section presents the methodology for estimation of transmission costs for expansion of
400kV, 220kV and 132kV transmission system. The investment required to transfer the load
form generating station to loads within the oprating criteria requires investment under the
following heads:
Investment required for transmission reinforcement for meeting the load growth
The following methodology was used to estimate the cost of the Transmission System
Expansion up to FY 2018.
1. Equipment cost:
The equipment cost data was prepared for each equipment based on the data used
by various utilities in India. Since the latest cost for most of the major equipment was
not readily available, suitable escalation factors were used to fine tune the data to
represent current prices.
2. per-km cost:
The per-km cost of circuit was calculated based on the recent BSEB tenders which
included line cost of 400kV, 220kV, 132kV transmission lines.
3. Substation Cost:
The methodology for estimating the substation cost was based on modular approach
where substation cost was divided into following components
These costs were based on the standard substation design practice in India.
However, it should be noted that the cost data varies over the various substation
designs
4-101
020328-40RP-0400-00
Final Report
4. The list of transmission projects was prepared including the associated substation
bays (line, transformer and reactors) and respective commissioning dates are
assigned.
5. The cost for the line entry bays are attached to the associated transmission lines to
give the total cost for the transmission lines and its associated equipment.
For estimating the cost of new substation, the cost of the Substation Only should be
added to the cost of required transformer bays, line bays and reactor bays.
The substation cost of augmentation carried out by considering transformer bay cost.
4.9.2
The cost data used for estimation of transmission costs are based on the following
equipment data. The data is divided into following modules
Line Data
kV
Cost ( Rs.
Lakhs)
400
3702.00
220
2211.00
132
885.00
The above cost data does not include line entry bays.
(b) Transformer Bay Module Cost Data
Description
Capacity
500 MVA
2763
315 MVA
2640
200 MVA
2325
150 MVA
1408
100 MVA
1210
50 MVA
925
50 MVA
471
20 MVA
375
4-102
020328-40RP-0400-00
Final Report
Description
Capacity
16 MVA
345
12.5 MVA
305
13.5 MVA
315
10 MVA
285
Voltage
(kV)
Cost (Rs.
Lakhs)
Capacity
400
100 MVAr
1224
400
63 MVAr
1198
400
50 MVAr
1100
Voltage
(kV)
Capacity
Cost (Rs.
Lakhs)
132
30 MVAr
265
132
20 MVAr
245
132
10 MVAr
213
33
10 MVAr
48
33
30 MVAr
125
kV
400
809
220
240
132
165
kV
400
290
400
160
220
65
220
60
220
50
220
48
4-103
020328-40RP-0400-00
Final Report
Description
4.9.3
kV
220
15
220
14
132
39
132
31
132
The summary various transmission expansion costs are presented in the following table. The
details of component wise cost estimates are provided in the subsequent sections.
Table 4-53
400kV
Transmission Lines
New Substations
264,661
37,308
Substation Augmentation
Shunt Reactors
0
3,672
305,641
220kV
Transmission Lines
142,248
New Substations
93,995
Substation Augmentation
27,192
263,435
132kV
Transmission Lines
174,498
New Substations
77,919
Substation Augmentation
71,937
329,883
Total Investment
5,529
898,959
4-104
020328-40RP-0400-00
Final Report
The total cost of the transmission expansion estimated to about Rs. 8,989 Crores over the
period of ten years starting from FY 2009 to FY 2018. The allocation of total investment into
400kV, 220kV and 132kV voltages are in the ratio of 34%: 29%: 37%.
4.9.4
Investment Planning
This section presents the schedule of investments required to transmit the planned
generation to the forecasted load up to FY 2018. As discussed in the previous section, the
cost of transmission investment is about Rs.8,989 Crores and to be required over the ten
year period. The year wise schedules of commissioning of various transmission projects
were arrived based on the following methodology:
Identification of various transmission substation and lines required over the period
from FY 2010 to FY 2014 based on the load flow studies conducted for FY 2014
Similarly the identification of various transmission lines and substation required over
the period starting from FY 2015 to FY 2018 based on the load flow studies carried
out for FY 2018.
Schedule the commissioning dates of lines and substation planned for the period of
FY 2010 to FY 2014 based on the load growth during the period
Similarly, schedule the commissioning dates of lines and substation planned for the
period of FY 2015 to FY 2018 based on the load growth during the period
Schedule the augmentation of various substation for the period FY 2010 and FY
2014 and for the period FY 2015 to FY 2018 are carried based on the load growth in
the respective periods.
Based on the methodology discussed above, the schedule of in-service dates for various
transmission components were arrived and presented in the subsequent sections.
The annual disbursements required to meet the scheduled in-service dates of various
transmission projects were arrived assuming 24 months of construction period and the
investments are occurring 24 months period prior to the beginning of the year of
commissioning. The disbursement required for first 12 months period is 40% of total
investment and 60% is for the next 12 months period, in case of substation and lines. The
disbursement required for substation augmentation including transformers, capacitor bays
and reactor bays is of 12 months period prior to the beginning of the commissioning year.
The estimation of present worth of total investment is carried out by taking discount rate of
10%. The present worth of annual disbursements at the beginning of FY 2009 is estimated
as Rs. 6,106 Crores.
The schedule of annual investment and annual disbursements required are presented in the
following tables and graphs.
4-105
020328-40RP-0400-00
Final Report
Table 4-54
ITEM
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
Total
400kV
Transmission Lines
11,768
78,804
77,488
96,601
264,661
New Substations
28,326
8,982
37,308
Substation Augmentation
Shunt Reactors
1,224
1,224
1,224
3,672
Total
40,094
80,028
87,694
1,224
96,601
305,641
Transmission Lines
12,448
22,319
46,415
5,709
11,897
29,668
4,919
3,479
5,395
142,248
New Substations
4,631
13,893
38,027
5,027
19,734
4,631
3,421
4,631
93,995
Substation Augmentation
9,262
1,210
1,408
4,224
3,630
4,840
2,618
27,192
Total
17,079
45,474
85,652
12,144
16,121
49,402
13,180
11,740
12,644
263,435
Transmission Lines
11,353
80,320
38,504
6,508
11,191
2,232
10,312
6,915
7,162
174,498
New Substations
1,827
39,273
9,135
1,827
2,298
12,789
7,308
3,462
77,919
Substation
21,282
13,371
12,525
9,036
7,719
3,111
3,105
1,788
71,937
807
605
288
394
999
821
730
885
5,529
Total
13,180
141,682
61,615
21,148
22,919
10,950
27,033
18,058
13,297
329,883
30,259
187,156
187,362
33,292
119,068
148,046
41,437
29,798
122,542
898,959
220kV
132kV
Augmentation
Total Investment
4-106
020328-40RP-0400-00
Final Report
Figure 4-2
4-107
020328-40RP-0400-00
Final Report
Table 4-55
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
Total
400kV
Transmission Lines
4,707
7,061
31,522
78,278
46,493
38,640
57,961
264,661
New Substations
11,330
16,996
3,593
5,389
37,308
Substation Augmentation
Shunt Reactors
1,224
1,224
1,224
3,672
Total
16,038
24,056
31,522
83,094
53,106
1,224
38,640
57,961
305,641
Transmission Lines
4,979
16,396
31,198
30,892
8,184
19,005
19,768
4,343
4,245
3,237
142,248
New Substations
1,852
8,336
23,547
24,827
3,016
7,894
13,693
4,147
3,905
2,779
93,995
9,262
1,210
1,408
4,224
3,630
4,840
2,618
27,192
6,831
24,732
64,007
56,929
12,608
31,123
33,461
12,120
12,990
8,634
263,435
2,603
39,427
64,838
25,913
8,381
7,608
5,464
8,953
7,014
4,297
174,498
731
16,805
27,218
6,212
2,015
1,379
5,116
10,597
5,770
2,077
77,919
Substation Augmentation
21,282
13,371
12,525
9,036
7,719
3,111
3,105
1,788
71,937
807
605
288
394
999
821
730
885
5,529
3,334
56,232
114,145
46,101
23,210
18,416
19,298
23,482
16,618
9,047
329,883
10,165
80,964
194,189
127,086
67,340
132,634
105,864
36,826
68,249
75,642
898,959
220kV
Substation Augmentation
Total
132kV
Transmission Lines
New Substations
Total
4-108
020328-40RP-0400-00
Final Report
Figure 4-3
4-109
020328-40RP-0400-00
Final Report
4.9.5
FY
NAME OF THE SS
Total
#T/F BAYS
SCHEDULE OF
DISBURSEMENTS
COST
10
20
50
10
20
50
(Rs.Lakhs)
YEAR (-2)
YEAR (-1)
40
740
2,450
37
49
77,919
31,168
46,751
20
1455
582
873
2011
132KV AURANGABAD
2011
132KV BUXAR
40
1635
654
981
2011
132KV DALSINGSARAI
100
1827
731
1,096
2011
132KV DIGHA
100
1827
731
1,096
2011
132KV DINARA
40
1635
654
981
2012
132KV DHAHNA
100
1827
731
1,096
2011
132KV EKANGASARAI
40
1635
654
981
2012
132KV FATHUA-2
100
1827
731
1,096
2012
132KV GANGWARA
100
1827
731
1,096
10
2011
132KV GOH
40
1635
654
981
11
2011
132KV HARNAUT
40
1635
654
981
12
2011
132KV HULASGANJ
40
1635
654
981
13
2011
132KV JAGDISHPUR
20
1260
504
756
14
2012
132KV JAKKANPUR-2
100
1827
731
1,096
15
2011
132KV KARPY
40
1635
654
981
16
2011
132KV KATRA
100
1827
731
1,096
17
2013
132KV KHAGAUL-2
100
1827
731
1,096
4-110
020328-40RP-0400-00
Final Report
SL
NO.
FY
NAME OF THE SS
#T/F BAYS
SCHEDULE OF
DISBURSEMENTS
COST
10
20
50
10
20
50
(Rs.Lakhs)
YEAR (-2)
YEAR (-1)
18
2011
132KV KUDRA
40
1635
654
981
19
2011
132KV KUSHESWAR
40
1635
654
981
20
2011
132KV MADHEPURA
20
1455
582
873
21
2011
132KV MASRAKH
40
1635
654
981
22
2014
132KV MITHAPUR-2
150
2298
919
1,379
23
2011
132KV NALANDA
40
1635
654
981
24
2011
132KV RAXAUL
40
1635
654
981
25
2011
40
1635
654
981
26
2011
132KV SHEOHAR
40
1635
654
981
27
2011
132KV SKMCH
100
1827
731
1,096
28
2011
132KV SONABARSHI
40
1635
654
981
29
2011
132KV TEKARI
40
1635
654
981
30
2011
132KV WAZIRGANJ
40
1635
654
981
31
2010
132KV BEGUSARAI
100
1827
731
1,096
32
2012
220KV SIPARA
100
1827
731
1,096
33
2018
132KV PAHARPUR
40
1635
654
981
34
2017
132KV BARIPAHRI-2
100
1827
731
1,096
35
2018
132KV BIHTA-2
100
1827
731
1,096
36
2016
132KV CHANDAUTI-2
100
1827
731
1,096
37
2016
132KV CHAPRA-2
100
1827
731
1,096
38
2016
132KV GAIGHAT-2
100
1827
731
1,096
4-111
020328-40RP-0400-00
Final Report
SL
NO.
4.9.6
FY
NAME OF THE SS
#T/F BAYS
SCHEDULE OF
DISBURSEMENTS
COST
10
20
50
10
20
50
(Rs.Lakhs)
YEAR (-2)
YEAR (-1)
39
2016
132KV KHAGUAL-3
100
1827
731
1,096
40
2017
132KV MITHAPUR-3
100
1827
731
1,096
41
2017
132KV MUZAFFARPUR-2
100
1827
731
1,096
42
2016
132KV PURNEA-2
100
1827
731
1,096
43
2016
132KV SABOUR-2
100
1827
731
1,096
44
2016
132KV SAMASTIPUR-2
100
1827
731
1,096
45
2017
132KV SONNENAGAR-2
100
1827
731
1,096
FY
ASSET
Total
Capacity
(MVA)
Total
SCHEDULE OF
DISBURSEMENTS
COST
(Rs.Lakhs)
YEAR (-2)
YEAR (-1)
131,303
52,521
78,782
2013
PGCIL
765KV SASARAM
765
3,000
2013
PGCIL
765KV GAYA
765
4,500
2012
PGCIL
400KV KISHANGANJ
400
945
2012
BSEB
400KV JAMALPUR
400
400
8352
3,341
5,011
2012
BSEB
400KV BANKA
400
400
8352
3,341
5,011
2012
BSEB
400KV KATHIHAR
400
945
11622
4,649
6,973
4-112
020328-40RP-0400-00
Final Report
SL
NO.
FY
ASSET
NAME OF THE SS
Total
Capacity
(MVA)
SCHEDULE OF
DISBURSEMENTS
COST
(Rs.Lakhs)
YEAR (-2)
YEAR (-1)
2011
BSEB
220KV SUPAUL
220
200
4631
1,852
2,779
2012
BSEB
220KV SONENAGAR
220
200
4631
1,852
2,779
2012
BSEB
220KV SIPARA
220
450
6435
2,574
3,861
10
2012
BSEB
220KV SHEOHAR
220
200
4631
1,852
2,779
11
2012
BSEB
220KV KATHIHAR
220
300
5841
2,336
3,505
12
2012
BSEB
220KV PUSAULI
220
300
5027
2,011
3,016
13
2015
BSEB
220KV MUZAFFARPUR
220
300
5841
2,336
3,505
14
2011
BSEB
220KV MADHEPURA
220
200
4631
1,852
2,779
15
2013
BSEB
220KV KHAGAUL-2
220
300
5027
2,011
3,016
16
2012
BSEB
220KV JAKKANPUR
220
300
5027
2,011
3,016
17
2011
BSEB
220KV HAJIPUR
220
200
4631
1,852
2,779
18
2012
BSEB
220KV GAIGHAT
220
450
6435
2,574
3,861
19
2010
BSEB
220KV BEGUSARAI
220
200
4631
1,852
2,779
20
2015
BSEB
400KV ARRAH
400
630
8982
3,593
5,389
21
2015
BSEB
220KV SAMASTIPUR
220
200
4631
1,852
2,779
22
2015
BSEB
220KV SABOUR
220
200
4631
1,852
2,779
23
2018
BSEB
220KV HULSANGANJ
220
200
4631
1,852
2,779
24
2016
BSEB
220KV FORBESGANJ
220
200
4631
1,852
2,779
25
2015
BSEB
220KV CHAPRA
220
200
4631
1,852
2,779
26
2017
BSEB
220KV BIKRAMGANJ
220
100
3421
1,368
2,053
4-113
020328-40RP-0400-00
Final Report
4.9.7
NAME OF THE SS
T/F BAY
CAP(MVA)
SSCODE
COST
(Rs.lakhs)
SCHEDULE OF
DISBURSEMENTS
YEAR (-1)
Total
7,240
71,937
71,937
2011
132KV ARRA
1ARRA132
50
471
471
2012
132KV ARRA
1ARRA132
50
471
471
2015
132KV ARRA
1ARRA132
50
471
471
2015
132KV AURANGABAD
1AURGBD132
20
375
375
2015
132KV AURANGABAD
1AURGBD132
20
375
375
2014
132KV BANJARI
1BANJR132
20
375
375
2011
132KV BARHI
1BARH132
50
471
471
2011
132KV BARHI
1BARH132
50
471
471
2015
132KV BARHI
1BARH132
50
471
471
2012
132KV BARIPAHRI
1BARIPAH132
50
471
471
2013
132KV BARIPAHRI
1BARIPAH132
50
471
471
2013
132KV BELAGANJ
1BELAGJ132
20
375
375
2014
132KV BELAGANJ
1BELAGJ132
20
375
375
2011
132KV BETTIAH
1BETTH132
50
471
471
2012
132KV BETTIAH
1BETTH132
50
471
471
2011
132KV BHABUA
1BHABUA132
50
471
471
2013
132KV BHABUA
1BHABUA132
50
471
471
4-114
020328-40RP-0400-00
Final Report
FY
NAME OF THE SS
T/F BAY
CAP(MVA)
SSCODE
COST
(Rs.lakhs)
SCHEDULE OF
DISBURSEMENTS
YEAR (-1)
2014
132KV BHABUA
1BHABUA132
50
471
471
2013
132KV BIHTA
1BIHTA132
50
471
471
2011
132KV BIKRAMGANJ
1BIKRMGJ132
50
471
471
2013
132KV BIKRAMGANJ
1BIKRMGJ132
50
471
471
2017
132KV BIKRAMGANJ
1BIKRMGJ132
50
471
471
2011
132KV CHANDAUTI
1CHNDAU132
20
375
375
2011
132KV CHANDAUTI
1CHNDAU132
20
375
375
2011
132KV CHAPRA
1CHPRA132
50
471
471
2011
132KV CHAPRA
1CHPRA132
50
471
471
2013
132KV CHAPRA
1CHPRA132
50
471
471
2015
132KV DALSINGSARAI
1DALSING132
50
471
471
2015
132KV DHAKA
1DHAKA132
20
375
375
2017
132KV DHAKA
1DHAKA132
20
375
375
2011
132KV DHARBHANGA
1DARBH132
50
471
471
2012
132KV DHARBHANGA
1DARBH132
50
471
471
2012
132KV DIGHA
1DIGHA132
50
471
471
2011
132KV DUMRAON
1DUMROAN132
50
471
471
2011
132KV DUMRAON
1DUMROAN132
50
471
471
2013
132KV DUMRAON
1DUMROAN132
50
471
471
2015
132KV FATHUA-2
1FATH2-132
50
471
471
2011
132KV FORBESGANJ
1FORBESGJ132
50
471
471
4-115
020328-40RP-0400-00
Final Report
FY
NAME OF THE SS
T/F BAY
CAP(MVA)
SSCODE
COST
(Rs.lakhs)
SCHEDULE OF
DISBURSEMENTS
YEAR (-1)
2013
132KV FORBESGANJ
1FORBESGJ132
50
471
471
2011
132KV GAIGHAT
1GAIGHAT132
50
471
471
2011
132KV GAIGHAT
1GAIGHAT132
50
471
471
2011
132KV GOPALGANJ
1GOPLGJ132
50
471
471
2011
132KV GOPALGANJ
1GOPLGJ132
50
471
471
2015
132KV GOPALGANJ
1GOPLGJ132
50
471
471
2012
132KV HAJIPUR
1HAJPUR132
50
471
471
2013
132KV HAJIPUR
1HAJPUR132
50
471
471
2015
132KV HAJIPUR
1HAJPUR132
50
471
471
2016
132KV HARNAUT
1HARNAUT132
10
285
285
2011
132KV HATHIDAH
1HATIDH132
50
471
471
2011
132KV HATHIDAH
1HATIDH132
50
471
471
2015
132KV HATHIDAH
1HATIDH132
50
471
471
2014
132KV JAGDISHPUR
1JAGDSP132
20
375
375
2011
132KV JAINAGAR
1JAINGAR132
20
375
375
2012
132KV JAINAGAR
1JAINGAR132
20
375
375
2013
132KV JAKKANPUR-2
1JAKK2-132
50
471
471
2011
132KV JAMALPUR
1JAMLPUR132
50
471
471
2016
132KV JAMALPUR
1JAMLPUR132
50
471
471
2011
132KV JAMUI
1JAMUY132
50
471
471
2013
132KV JAMUI
1JAMUY132
50
471
471
4-116
020328-40RP-0400-00
Final Report
FY
NAME OF THE SS
T/F BAY
CAP(MVA)
SSCODE
COST
(Rs.lakhs)
SCHEDULE OF
DISBURSEMENTS
YEAR (-1)
2017
132KV JAMUI
1JAMUY132
50
471
471
2013
132KV JEHNABAD
1JEHBAD132
50
471
471
2014
132KV JEHNABAD
1JEHBAD132
50
471
471
2014
132KV JEHNABAD
1JEHBAD132
50
471
471
2011
132KV KAHALGAON
1KHLGAON132
50
471
471
2012
132KV KAHALGAON
1KHLGAON132
50
471
471
2012
132KV KARMNASA
1KARMNSA132
20
375
375
2013
132KV KARMNASA
1KARMNSA132
20
375
375
2014
132KV KARMNASA
1KARMNSA132
20
375
375
2016
132KV KARMNASA
1KARMNSA132
50
471
471
2011
132KV KATHAR
1KATHAR132
50
471
471
2014
132KV KATHAR
1KATHAR132
50
471
471
2018
132KV KATHAR
1KATHAR132
50
471
471
2014
132KV KATIYA
1KATIYA132
50
471
471
2014
132KV KATIYA
1KATIYA132
50
471
471
2015
132KV KATRA
1KATRA132
50
471
471
2011
132KV KHAGARIYA
1KHGRIA132
50
471
471
2012
132KV KHAGARIYA
1KHGRIA132
50
471
471
2015
132KV KHAGARIYA
1KHGRIA132
50
471
471
2014
132KV KHAGAUL-2
1KGL2-132
50
471
471
2017
132KV KHAGUAL-3
1KGL3-132
50
471
471
4-117
020328-40RP-0400-00
Final Report
FY
NAME OF THE SS
T/F BAY
CAP(MVA)
SSCODE
COST
(Rs.lakhs)
SCHEDULE OF
DISBURSEMENTS
YEAR (-1)
2011
132KV KISHANGANJ
1KISHNGJ132
50
471
471
2013
132KV KISHANGANJ
1KISHNGJ132
50
471
471
2015
132KV KISHANGANJ
1KISHNGJ132
50
471
471
2011
132KV LAKHISARAI
1LAKHSAR132
50
471
471
2012
132KV LAKHISARAI
1LAKHSAR132
50
471
471
2011
132KV MADHUBANI
1MDHUBN132
50
471
471
2013
132KV MADHUBANI
1MDHUBN132
50
471
471
2016
132KV MADHUBANI
1MDHUBN132
50
471
471
2011
132KV MASURHI
1MASURH132
50
471
471
2012
132KV MASURHI
1MASURH132
50
471
471
2011
132KV MITHAPUR
1MITHAPUR132
50
471
471
2018
132KV MITHAPUR-3
1MITH3-132
50
471
471
2011
132KV MOTIHARI
1MOTIHAR132
50
471
471
2012
132KV MOTIHARI
1MOTIHAR132
50
471
471
2016
132KV MOTIHARI
1MOTIHAR132
50
471
471
2011
132KV MUZAFFARPUR
1MZFPUR132
50
471
471
2011
132KV NAUGACHHIYA
1NAUGACH132
50
471
471
2012
132KV NAUGACHHIYA
1NAUGACH132
50
471
471
2012
132KV NAWADA
1NAWAD132
50
471
471
2013
132KV NAWADA
1NAWAD132
50
471
471
2015
132KV NAWADA
1NAWAD132
50
471
471
4-118
020328-40RP-0400-00
Final Report
FY
NAME OF THE SS
T/F BAY
CAP(MVA)
SSCODE
COST
(Rs.lakhs)
SCHEDULE OF
DISBURSEMENTS
YEAR (-1)
2011
132KV NBANKA
1BANKA132
50
471
471
2012
132KV NBANKA
1BANKA132
50
471
471
2014
132KV NBANKA
1BANKA132
50
471
471
2011
132KV PANDAUL
1PANDUL132
50
471
471
2013
132KV PANDAUL
1PANDUL132
50
471
471
2014
132KV PANDAUL
1PANDUL132
50
471
471
2017
132KV PHULPARAS
1PHULPRS132
20
375
375
2018
132KV PHULPARAS
1PHULPRS132
20
375
375
2011
132KV PURNEA
1PURNEA132
50
471
471
2012
132KV PURNEA
1PURNEA132
50
471
471
2013
132KV RAFIGANJ
1RAFIGJ132
50
471
471
2014
132KV RAFIGANJ
1RAFIGJ132
50
471
471
2012
132KV RAJGIR
1RAJGIR132
50
471
471
2014
132KV RAJGIR
1RAJGIR132
50
471
471
2013
132KV RAMNAGAR
1RAMNGR132
50
471
471
2014
132KV RAMNAGAR
1RAMNGR132
50
471
471
2017
132KV RAMNAGAR
1RAMNGR132
50
471
471
2012
132KV SABOUR
1SABOUR132
50
471
471
2014
132KV SABOUR
1SABOUR132
50
471
471
2011
132KV SAHARSA
1SHARSA132
50
471
471
2012
132KV SAHARSA
1SHARSA132
50
471
471
4-119
020328-40RP-0400-00
Final Report
FY
NAME OF THE SS
T/F BAY
CAP(MVA)
SSCODE
COST
(Rs.lakhs)
SCHEDULE OF
DISBURSEMENTS
YEAR (-1)
2013
132KV SAHARSA
1SHARSA132
50
471
471
2012
132KV SAMASTIPUR
1SAMSTPUR132
50
471
471
2013
132KV SAMASTIPUR
1SAMSTPUR132
50
471
471
2014
132KV SAMASTIPUR
1SAMSTPUR132
50
471
471
2011
132KV SASARAM
1SASARM132
50
471
471
2013
132KV SASARAM
1SASARM132
50
471
471
2015
132KV SASARAM
1SASARM132
50
471
471
2011
132KV SHEIKHPURA
1SHEKPUR132
50
471
471
2013
132KV SHEIKHPURA
1SHEKPUR132
50
471
471
2018
132KV SHEIKHPURA
1SHEKPUR132
50
471
471
2011
132KV SHITALPUR
1SHITLPR132
50
471
471
2012
132KV SHITALPUR
1SHITLPR132
50
471
471
2011
132KV SITMHARI
1SITMHRY132
50
471
471
2012
132KV SITMHARI
1SITMHRY132
50
471
471
2015
132KV SITMHARI
1SITMHRY132
50
471
471
2011
132KV SIWAN
1SIWAN132
50
471
471
2012
132KV SIWAN
1SIWAN132
50
471
471
2014
132KV SIWAN
1SIWAN132
50
471
471
2016
132KV SKMCH
1SKMCH132
50
471
471
2012
132KV SONNENAGAR
1SONNGR132
50
471
471
2012
132KV SONNENAGAR
1SONNGR132
50
471
471
4-120
020328-40RP-0400-00
Final Report
FY
NAME OF THE SS
T/F BAY
CAP(MVA)
SSCODE
COST
(Rs.lakhs)
SCHEDULE OF
DISBURSEMENTS
YEAR (-1)
2011
132KV SULTANGANJ
1SULTGJ132
50
471
471
2012
132KV SULTANGANJ
1SULTGJ132
50
471
471
2013
132KV SULTANGANJ
1SULTGJ132
50
471
471
2011
132KV SUPAUL
1SUPAUL132
20
375
375
2012
132KV SUPAUL
1SUPAUL132
20
375
375
2016
132KV SUPAUL
1SUPAUL132
50
471
471
2017
132KV SUPAUL
1SUPAUL132
50
471
471
2013
132KV VAISHALI
1VAISHL132
50
471
471
2013
132KV VAISHALI
1VAISHL132
50
471
471
2014
132KV VAISHALI
1VAISHL132
50
471
471
2015
220KV BODHGAYA
2BDGAYA132
50
471
471
2011
220KV DEHRI-ONSONE
2DEHSON132
50
471
471
2012
220KV DEHRI-ONSONE
2DEHSON132
50
471
471
2013
220KV SIPARA
2SIPARA132
50
471
471
4-121
020328-40RP-0400-00
Final Report
4.9.8
ASSET
Cost estimates for 220kV and above Substation Augmentation (Rs. Lakhs)
NAME OF THE SS
VOLTAGE
T/F BAY
CAP(MVA)
COST
(Rs.lakhs)
SCHEDULE OF
DISBURSEMENTS
YEAR (-1)
4,465
27,192
27,192
2012
PGCIL
400KV PATNA
400
500
2012
PGCIL
400KV PATNA
400
500
2015
PGCIL
400KV PATNA
400
500
2012
PGCIL
400KV PURNEA
400
315
2011
BSEB
220KV DEHRI-ON-SONE
220
100
1210
1,210
2011
BSEB
220KV DEHRI-ON-SONE
220
100
1210
1,210
2011
BSEB
220KV FATUHA
220
100
1210
1,210
2012
BSEB
220KV GOPALGANJ
220
100
1210
1,210
2011
BSEB
220KV KHAGAUL
220
150
1408
1,408
2011
BSEB
220KV KHAGAUL
220
150
1408
1,408
2014
BSEB
220KV KHAGAUL
220
150
1408
1,408
2014
BSEB
220KV KHAGAUL-2
220
150
1408
1,408
2011
BSEB
220KV KANTI
220
150
1408
1,408
2011
BSEB
220KV KANTI
220
150
1408
1,408
2014
BSEB
220KV KANTI
220
150
1408
1,408
2011
PGCIL
400KV KAHALGAON
220
100
2013
BSEB
400KV PUSAULI
220
150
1408
1,408
4-122
020328-40RP-0400-00
Final Report
FY
ASSET
NAME OF THE SS
VOLTAGE
T/F BAY
CAP(MVA)
COST
(Rs.lakhs)
SCHEDULE OF
DISBURSEMENTS
YEAR (-1)
4.9.9
2018
BSEB
220KV BIKRAMGANJ
220
100
1210
1,210
2017
BSEB
220KV CHAPRA
220
100
1210
1,210
2017
BSEB
220KV FORBESGANJ
220
100
1210
1,210
2016
BSEB
220KV HAJIPUR
220
100
1210
1,210
2018
BSEB
220KV JAKKANPUR
220
150
1408
1,408
2016
BSEB
220KV MADHEPURA
220
100
1210
1,210
2016
BSEB
220KV SABOUR
220
100
1210
1,210
2017
BSEB
220KV SAMASTIPUR
220
100
1210
1,210
2017
BSEB
220KV SHEOHAR
220
100
1210
1,210
FY
OWNER
TRANSMISSION
LINE
Total
#CKTS
LENGTH
(R-KM)
40
3,168
CONDUCTOR
2015
BSEB
400KV BUXAR to
400KV ARRAH
63
QUADMOOSE
2015
BSEB
400KV BUXAR to
400KV ARRAH
63
QUADMOOSE
TOWER
CONFIGURATION
DCDS
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST (
Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
241,200
47
23,461
264,661
9,135
1,618
10,753
9,135
1,618
10,753
DCDS
4-123
020328-40RP-0400-00
Final Report
FY
2018
2018
2009
2009
2018
2018
2018
2018
OWNER
TRANSMISSION
LINE
BSEB
400KV JASINFRA
GENERATION to
400KV BANKA
BSEB
400KV JASINFRA
GENERATION to
400KV BANKA
PGCIL
400KV
MZAFFARPUR to
400KV
BIHARSHARIFF
PGCIL
400KV
MZAFFARPUR to
400KV
BIHARSHARIFF
BSEB
400KV PATNA to
400KV JASINFRA
GENERATION
BSEB
400KV PATNA to
400KV JASINFRA
GENERATION
BSEB
400KV PATNA to
400KV JASINFRA
GENERATION
BSEB
400KV PATNA to
400KV JASINFRA
GENERATION
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST (
Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
DCDS
1
10
QUADMOOSE
1,450
1,618
3,068
1,450
1,618
3,068
21,605
1,618
23,223
21,605
809
22,414
21,605
809
22,414
21,605
809
22,414
DCDS
1
10
QUADMOOSE
DCDS
131
TWINMOOSE
DCDS
131
TWINMOOSE
DCDS
149
QUADMOOSE
DCDS
149
QUADMOOSE
DCDS
149
QUADMOOSE
DCDS
149
QUADMOOSE
4-124
020328-40RP-0400-00
Final Report
OWNER
TRANSMISSION
LINE
2015
BSEB
400KV PATNA to
400KV LAKHISARAI
123
TWINMOOSE
2015
BSEB
400KV PATNA to
400KV LAKHISARAI
123
TWINMOOSE
2015
BSEB
400KV PATNA to
400KV LAKHISARAI
123
TWINMOOSE
2015
BSEB
400KV PATNA to
400KV LAKHISARAI
123
TWINMOOSE
2009
PGCIL
400KV PATNA to
400KV KAHALGAON
257
QUADMOOSE
2009
PGCIL
400KV PATNA to
400KV KAHALGAON
257
QUADMOOSE
2012
BSEB
400KV PURNEA to
400KV KATHIHAR
35
QUADMOOSE
2012
BSEB
400KV PURNEA to
400KV KATHIHAR
35
QUADMOOSE
2014
BSEB
400KV PUSAULI to
400KV NABINAGAR
85
QUADMOOSE
2014
BSEB
400KV PUSAULI to
400KV NABINAGAR
85
QUADMOOSE
2014
BSEB
400KV PUSAULI to
400KV NABINAGAR
85
QUADMOOSE
2014
BSEB
400KV PUSAULI to
400KV NABINAGAR
85
QUADMOOSE
FY
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST (
Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
DCDS
9,840
809
10,649
9,840
809
10,649
9,840
809
10,649
9,840
809
10,649
5,075
809
5,884
5,075
809
5,884
12,325
809
13,134
12,325
809
13,134
12,325
809
13,134
12,325
809
13,134
DCDS
DCDS
DCDS
DCDS
DCDS
DCDS
DCDS
DCDS
DCDS
DCDS
DCDS
4-125
020328-40RP-0400-00
Final Report
FY
2014
2014
2009
2009
2015
2015
2012
2012
OWNER
TRANSMISSION
LINE
BSEB
400KV PUSAULI to
400KV NABINAGAR
RAILWAY
BSEB
400KV PUSAULI to
400KV NABINAGAR
RAILWAY
PGCIL
400KV PUSAULI to
400KV
BIHARSHARIFF
PGCIL
400KV PUSAULI to
400KV
BIHARSHARIFF
BSEB
400KV PIRPAINTI
GENERATION to
400KV KATHIHAR
BSEB
400KV PIRPAINTI
GENERATION to
400KV KATHIHAR
PGCIL
PGCIL
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST (
Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
DCDS
1
85
QUADMOOSE
12,325
809
13,134
12,325
809
13,134
5,075
1,618
6,693
5,075
1,618
6,693
DCDS
1
85
QUADMOOSE
DCDS
194
TWINMOOSE
DCDS
194
TWINMOOSE
DCDS
35
QUADMOOSE
DCDS
35
QUADMOOSE
DCDS
25
TWINMOOSE
DCDS
25
TWINMOOSE
4-126
020328-40RP-0400-00
Final Report
FY
2012
2012
2015
2015
OWNER
TRANSMISSION
LINE
PGCIL
PGCIL
PGCIL
PGCIL
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST (
Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
DCDS
2
20
TWINMOOSE
DCDS
20
TWINMOOSE
DCDS
15
QUADMOOSE
DCDS
15
QUADMOOSE
4-127
020328-40RP-0400-00
Final Report
4.9.10
FY
OWNER
TRANSMISSION
LINE
2010
BSEB
2010
BSEB
2014
BSEB
2014
BSEB
2014
BSEB
2012
BSEB
2012
BSEB
2013
BSEB
Total
220KV
BIHARSHARIFF to
220KV
BEGUSARAI
220KV
BIHARSHARIFF to
220KV
BEGUSARAI
220KV BTPS to
220KV
BEGUSARAI
220KV BTPS to
220KV
BEGUSARAI
220KV BTPS to
220KV
BEGUSARAI
220KV GAIGHAT to
220KV FATUHA
220KV GAIGHAT to
220KV FATUHA
220KV GAYA GT
STATION to 220KV
BODHGAYA
2013
BSEB
220KV GAYA GT
STATION to 220KV
LINE COST
(Rs. Lakhs)
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
102,970
164
39,278
142,248
#CKTS
LENGTH
(R-KM)
106
3,095
75
ZEBRA
DCDS
2,250
479
2,729
75
ZEBRA
DCDS
2,250
479
2,729
AAAC
DCDS
228
479
707
AAAC
DCDS
228
479
707
AAAC
DCSS
350
479
829
AAAC
DCDS
163
479
642
AAAC
DCDS
163
479
642
15
AAAC
DCDS
488
479
967
15
AAAC
DCDS
488
479
967
CONDUCTOR
4-128
TOWER
CONFIGURATION
NO.OF
LINE
ENTRY
BAYS
020328-40RP-0400-00
Final Report
FY
OWNER
2013
BSEB
2014
BSEB
2014
BSEB
2014
BSEB
2014
BSEB
2015
BSEB
2015
BSEB
2011
BSEB
2011
BSEB
2011
BSEB
2011
BSEB
2012
BSEB
2012
BSEB
2012
BSEB
TRANSMISSION
LINE
BODHGAYA
220KV GAYA GT
STATION to 220KV
BODHGAYA
220KV HAJIPUR to
220KV BTPS
220KV HAJIPUR to
220KV BTPS
220KV HAJIPUR to
220KV BTPS
220KV HAJIPUR to
220KV BTPS
220KV HAJIPUR to
220KV CHAPRA
220KV HAJIPUR to
220KV CHAPRA
220KV HAJIPUR to
220KV FATUHA
220KV HAJIPUR to
220KV FATUHA
220KV HAJIPUR to
220KV FATUHA
220KV HAJIPUR to
220KV FATUHA
220KV HAJIPUR to
220KV GAIGHAT
220KV HAJIPUR to
220KV GAIGHAT
220KV
JAKKANPUR to
220KV FATUHA
#CKTS
LENGTH
(R-KM)
LINE COST
(Rs. Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
CONDUCTOR
TOWER
CONFIGURATION
15
AAAC
DCSS
750
479
1,229
42
AAAC
DCDS
1,365
479
1,844
42
AAAC
DCDS
1,365
479
1,844
42
AAAC
DCDS
1,365
479
1,844
42
AAAC
DCDS
1,365
479
1,844
58
ZEBRA
DCDS
1,740
479
2,219
58
ZEBRA
DCDS
1,740
479
2,219
15
AAAC
DCDS
488
479
967
15
AAAC
DCDS
488
479
967
15
AAAC
DCDS
488
479
967
15
AAAC
DCDS
488
479
967
14
AAAC
DCDS
455
479
934
14
AAAC
DCDS
455
479
934
18
AAAC
DCDS
569
479
1,048
4-129
020328-40RP-0400-00
Final Report
FY
OWNER
2012
BSEB
2012
BSEB
2012
BSEB
2012
BSEB
2012
BSEB
2013
BSEB
2013
BSEB
2011
BSEB
2011
BSEB
2012
2012
BSEB
BSEB
TRANSMISSION
LINE
220KV
JAKKANPUR to
220KV FATUHA
220KV
JAKKANPUR to
220KV GAIGHAT
220KV
JAKKANPUR to
220KV GAIGHAT
220KV KHAGAUL
to 220KV
JAKKANPUR
220KV KHAGAUL
to 220KV
JAKKANPUR
220KV KHAGAUL-2
to 220KV
JAKKANPUR
220KV KHAGAUL-2
to 220KV
JAKKANPUR
220KV
MADHEPURA to
220KV
DARBHANGA
220KV
MADHEPURA to
220KV
DARBHANGA
220KV
MADHEPURA to
220KV KATHIHAR
220KV
#CKTS
LENGTH
(R-KM)
LINE COST
(Rs. Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
CONDUCTOR
TOWER
CONFIGURATION
18
AAAC
DCDS
569
479
1,048
AAAC
DCDS
163
479
642
AAAC
DCDS
163
479
642
AAAC
DCDS
195
479
674
AAAC
DCDS
195
479
674
AAAC
DCDS
195
479
674
AAAC
DCDS
195
479
674
137
AAAC
DCDS
4,453
479
4,932
137
AAAC
DCDS
4,453
479
4,932
1
1
78.25
78.25
AAAC
AAAC
DCDS
DCDS
2,543
2,543
2
2
479
479
3,022
3,022
4-130
020328-40RP-0400-00
Final Report
FY
OWNER
2012
BSEB
2012
BSEB
2011
BSEB
2011
BSEB
2010
BSEB
2012
BSEB
2012
BSEB
2015
BSEB
2015
BSEB
2015
BSEB
2015
BSEB
TRANSMISSION
LINE
MADHEPURA to
220KV KATHIHAR
220KV
MADHEPURA to
220KV KATHIHAR
220KV KANTI to
220KV
GOPALGANJ
220KV KANTI to
220KV HAJIPUR
220KV KANTI to
220KV HAJIPUR
220KV
MUZAFFARPUR to
220KV
DARBHANGA
220KV PUSAULI to
220KV DEHRI-ONSONE
220KV PUSAULI to
220KV DEHRI-ONSONE
220KV SABOUR to
220KV
BEGUSARAI
220KV SABOUR to
220KV KATHIHAR
220KV SABOUR to
220KV KATHIHAR
220KV
SAMASTIPUR to
220KV
BEGUSARAI
#CKTS
LENGTH
(R-KM)
78.25
LINE COST
(Rs. Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
CONDUCTOR
TOWER
CONFIGURATION
AAAC
DCSS
3,913
479
4,392
101.35
ZEBRA
SC-STRINGING
1,419
479
1,898
75
ZEBRA
DCDS
479
479
75
ZEBRA
DCDS
2,250
479
2,729
67
ZEBRA
DCSS
3,216
479
3,695
55
ZEBRA
DCDS
1,650
479
2,129
55
ZEBRA
DCDS
1,650
479
2,129
52
AAAC
DCDS
1,690
479
2,169
22
AAAC
DCDS
715
479
1,194
22
AAAC
DCDS
715
479
1,194
68
ZEBRA
DCDS
2,040
479
2,519
4-131
020328-40RP-0400-00
Final Report
FY
OWNER
2015
BSEB
2012
BSEB
2012
BSEB
2012
BSEB
2012
BSEB
2015
BSEB
2015
BSEB
2011
BSEB
2011
BSEB
2018
BSEB
TRANSMISSION
LINE
220KV
SAMASTIPUR to
220KV
BEGUSARAI
220KV SHEOHAR
to 220KV KANTI
220KV SHEOHAR
to 220KV KANTI
220KV
SONENAGAR to
220KV BODHGAYA
220KV
SONENAGAR to
220KV DEHRI-ONSONE
220KV SUPAUL to
220KV DAGMARA
GENERATION
220KV SUPAUL to
220KV DAGMARA
GENERATION
220KV SUPAUL to
220KV
MADHEPURA
220KV SUPAUL to
220KV
MADHEPURA
220KV VIKAS
GENERATION to
220KV
BEGUSARAI
#CKTS
LENGTH
(R-KM)
LINE COST
(Rs. Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
CONDUCTOR
TOWER
CONFIGURATION
68
ZEBRA
DCDS
2,040
479
2,519
41
ZEBRA
DCDS
1,230
479
1,709
41
ZEBRA
DCDS
1,230
479
1,709
84
ZEBRA
DC/SC
4,032
479
4,511
7.25
ZEBRA
DC/SC
348
479
827
42
ZEBRA
DCDS
1,260
479
1,739
42
ZEBRA
DCDS
1,260
479
1,739
56
ZEBRA
DCDS
1,680
479
2,159
56
ZEBRA
DCDS
1,680
479
2,159
10
ZEBRA
DCDS
300
479
779
4-132
020328-40RP-0400-00
Final Report
FY
OWNER
2018
BSEB
2018
BSEB
2018
BSEB
2015
BSEB
2015
BSEB
2015
BSEB
2015
BSEB
2015
BSEB
2015
BSEB
2012
BSEB
2012
BSEB
TRANSMISSION
LINE
220KV VIKAS
GENERATION to
220KV
BEGUSARAI
220KV VIKAS
GENERATION to
220KV
BEGUSARAI
220KV VIKAS
GENERATION to
220KV
BEGUSARAI
400KV ARRAH to
220KV BUXAR GT
STATION
400KV ARRAH to
220KV BUXAR GT
STATION
400KV ARRAH to
220KV BUXAR GT
STATION
400KV ARRAH to
220KV ARRA
400KV ARRAH to
220KV ARRA
400KV ARRAH to
220KV ARRA
400KV KATHIHAR
to 220KV
KATHIHAR
400KV KATHIHAR
to 220KV
KATHIHAR
#CKTS
LENGTH
(R-KM)
LINE COST
(Rs. Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
CONDUCTOR
TOWER
CONFIGURATION
10
ZEBRA
DCDS
300
479
779
10
ZEBRA
DCDS
300
479
779
10
ZEBRA
DCDS
300
479
779
63
AAAC
DCDS
2,048
479
2,527
63
AAAC
DCDS
2,048
479
2,527
63
AAAC
DCSS
3,150
479
3,629
ZEBRA
DCDS
30
479
509
ZEBRA
DCDS
30
479
509
ZEBRA
DCSS
48
479
527
AAAC
DCDS
65
479
544
AAAC
DCDS
65
479
544
4-133
020328-40RP-0400-00
Final Report
FY
OWNER
2012
BSEB
2016
BSEB
2016
BSEB
2012
BSEB
2012
BSEB
2012
BSEB
2012
BSEB
2012
BSEB
2012
BSEB
2012
BSEB
2012
BSEB
2013
BSEB
TRANSMISSION
LINE
400KV KATHIHAR
to 220KV
KATHIHAR
400KV
KISHANGANJ to
220KV
FORBESGANJ
400KV
KISHANGANJ to
220KV
FORBESGANJ
400KV
KISHANGANJ to
220KV KATHIHAR
400KV
KISHANGANJ to
220KV KATHIHAR
400KV PATNA to
220KV FATUHA
400KV PATNA to
220KV GAIGHAT
400KV PATNA to
220KV GAIGHAT
400KV PATNA to
220KV
JAKKANPUR
400KV PATNA to
220KV
JAKKANPUR
400KV PATNA to
220KV KHAGAUL
400KV PATNA to
220KV KHAGAUL-2
#CKTS
LENGTH
(R-KM)
LINE COST
(Rs. Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
CONDUCTOR
TOWER
CONFIGURATION
AAAC
DCSS
100
479
579
74
ZEBRA
DCDS
2,220
240
2,460
74
ZEBRA
DCDS
2,220
240
2,460
69
AAAC
DCDS
2,243
240
2,482
69
AAAC
DCDS
2,243
240
2,482
12
AAAC
DCSS
600
240
840
13
AAAC
DCDS
423
240
662
13
AAAC
DCDS
423
240
662
AAAC
DCDS
163
240
402
AAAC
DCDS
163
240
402
20
AAAC
DCSS
1,000
240
1,240
12
ZEBRA
DCDS
360
240
600
4-134
020328-40RP-0400-00
Final Report
FY
OWNER
2013
BSEB
2012
BSEB
2012
BSEB
2012
BSEB
2010
BSEB
2015
BSEB
2012
BSEB
2012
BSEB
2012
BSEB
2011
BSEB
2011
BSEB
2018
BSEB
2018
BSEB
TRANSMISSION
LINE
400KV PATNA to
220KV KHAGAUL-2
400KV PATNA to
220KV SIPARA
400KV PATNA to
220KV SIPARA
400KV PATNA to
220KV SIPARA
400KV PURNEA to
220KV
BEGUSARAI
400KV PURNEA to
220KV SABOUR
400KV PUSAULI to
220KV PUSAULI
400KV PUSAULI to
220KV PUSAULI
400KV PUSAULI to
220KV PUSAULI
LILO OF FATHUAKHAGUAL LINE AT
PATNA
LILO OF FATHUAKHAGUAL LINE AT
SIPARA
LILO OF 220KV
BIHARSHARIFF BODHGAYA AT
220KV
HULSANGANJ
LILO OF 220KV
BIHARSHARIFF BODHGAYA AT
#CKTS
LENGTH
(R-KM)
12
LINE COST
(Rs. Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
CONDUCTOR
TOWER
CONFIGURATION
ZEBRA
DCDS
360
240
600
0.225
AAAC
DCDS
240
247
0.225
AAAC
DCDS
240
247
0.225
AAAC
DCDS
240
247
94
AAAC
DCDS
3,055
240
3,295
52
AAAC
DCDS
1,690
240
1,930
0.5
ZEBRA
DCDS
15
240
255
0.5
ZEBRA
DCDS
15
240
255
0.5
ZEBRA
DCSS
24
240
264
9.3
ZEBRA
DCDS
558
240
798
0.45
ZEBRA
DCDS
27
240
267
15
ZEBRA
DCDS
900
240
1,140
15
ZEBRA
DCDS
900
240
1,140
4-135
020328-40RP-0400-00
Final Report
FY
OWNER
2014
BSEB
2014
BSEB
2017
BSEB
2017
BSEB
2012
BSEB
2012
BSEB
TRANSMISSION
LINE
220KV
HULSANGANJ
LILO OF 1ST CKT
220KV D/C MTPS BEGUSARAI LINE
AT BTPS
LILO OF 2ND CKT
220KV D/C MTPS BEGUSARAI LINE
AT BTPS
LILO OF 1ST CKT
220KV D/C
PUSAULI -ARRAH
LINE AT
BIKRAMGANJ
LILO OF 2ND CKT
220KV D/C
PUSAULI -ARRAH
LINE AT
BIKRAMGANJ
LILO OF 1ST CKT
220KV D/C
BODHGAYA DEHRI-ON-SONE
LINE AT
SONENAGAR
220KV SS
LILO OF 2ND CKT
220KV D/C
BODHGAYA DEHRI-ON-SONE
LINE AT
SONENAGAR
#CKTS
LENGTH
(R-KM)
LINE COST
(Rs. Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
CONDUCTOR
TOWER
CONFIGURATION
15
ZEBRA
DCDS
900
240
1,140
15
ZEBRA
DCDS
900
240
1,140
25
ZEBRA
DCDS
1,500
240
1,740
25
ZEBRA
DCDS
1,500
240
1,740
ZEBRA
DCDS
180
240
420
ZEBRA
DCDS
180
240
420
4-136
020328-40RP-0400-00
Final Report
FY
4.9.11
OWNER
TRANSMISSION
LINE
220KV SS
LENGTH
(R-KM)
#CKTS
LINE COST
(Rs. Lakhs)
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
CONDUCTOR
TOWER
CONFIGURATION
NO.OF
LINE
ENTRY
BAYS
OWNER
TRANSMISSION
LINE
#CKTS
Total
LENGTH
(R-KM)
259
CONDUCTOR
TOWER
CONFIGURATION
4,292
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
97,938
464
COST
(Rs.
Lakhs)
76,560
Total Cost
(Rs.Lakhs)
174,498
BSEB
132KV
BARIPAHRI-2 to
132KV
BARIPAHRI
PANTHER
DCDS
20
330
350
2017
BSEB
132KV
BARIPAHRI-2 to
132KV
BARIPAHRI
PANTHER
DCDS
20
330
350
2013
BSEB
132KV BIHTA to
132KV ARRA
40
PANTHER
DCDS
780
330
1,110
2013
BSEB
132KV BIHTA to
132KV ARRA
40
PANTHER
DCDS
780
330
1,110
2017
4-137
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2011
BSEB
132KV
CHANDAUTI to
132KV BELAGANJ
28
PANTHER
DCDS
553
330
883
2011
BSEB
132KV DUMRAON
to 132KV BUXAR
16
PANTHER
DCDS
315
330
645
2011
BSEB
132KV DUMRAON
to 132KV BUXAR
16
PANTHER
DCDS
315
330
645
2011
BSEB
132KV DUMRAON
to 132KV DINARA
44
PANTHER
SC-STRINGING
352
330
682
2011
BSEB
132KV
GOPALGANJ to
132KV BETTIAH
71
PANTHER
SC
2,191
330
2,521
2010
BSEB
132KV HAJIPUR
to 132KV
CHAPRA
80
PANTHER
SC-STRINGING
640
330
970
2011
BSEB
132KV HAJIPUR
to 132KV
DALSINGSARAI
24
PANTHER
SC-STRINGING
192
330
522
2017
BSEB
132KV HARNAUT
to 132KV
BARIPAHRI-2
10
PANTHER
DCDS
195
330
525
2011
BSEB
132KV
HULASGANJ to
132KV
EKANGASARAI
20
PANTHER
DCDS
390
330
720
2011
BSEB
132KV
HULASGANJ to
20
PANTHER
DCDS
390
330
720
4-138
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
132KV
EKANGASARAI
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2011
BSEB
132KV
JAGDISHPUR to
132KV ARRA
28
PANTHER
DCDS
547
330
877
2011
BSEB
132KV
JAGDISHPUR to
132KV ARRA
28
PANTHER
DCDS
547
330
877
2013
BSEB
132KV
JEHNABAD to
132KV
CHANDAUTI
48
PANTHER
DCSS
1,488
330
1,818
2011
BSEB
132KV KARPY to
132KV
JEHNABAD
23
PANTHER
DCDS
442
330
772
2011
BSEB
132KV KARPY to
132KV
JEHNABAD
23
PANTHER
DCDS
442
330
772
2011
BSEB
132KV KATRA to
132KV GAIGHAT
PANTHER
DCDS
162
330
492
2011
BSEB
132KV KATRA to
132KV GAIGHAT
PANTHER
DCDS
162
330
492
2013
BSEB
PANTHER
DCDS
117
330
447
2013
BSEB
PANTHER
DCDS
117
330
447
4-139
020328-40RP-0400-00
Final Report
CONDUCTOR
TOWER
CONFIGURATION
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
TRANSMISSION
LINE
JAKKANPUR
2016
BSEB
PANTHER
DCSS
186
330
516
2010
BSEB
132KV
KHAGARIYA to
132KV BTPS
50
PANTHER
SC-STRINGING
400
330
730
2014
BSEB
132KV KHAGAUL
to 132KV BIHTA
PANTHER
DCDS
137
330
467
2011
BSEB
132KV KHAGAUL
to 132KV DIGHA
PANTHER
SC
124
330
454
2012
BSEB
132KV
KISHANGANJ to
132KV
FORBESGANJ
74
PANTHER
DCSS
2,294
330
2,624
2011
BSEB
132KV KUDRA to
132KV DINARA
32
PANTHER
DCSS
1,002
330
1,332
2010
BSEB
132KV
LAKHISARAI to
132KV
JAMALPUR
45
PANTHER
SC-STRINGING
360
330
690
2010
BSEB
132KV MASURHI
to 132KV
CHANDAUTI
60
PANTHER
SC-STRINGING
480
330
810
2014
BSEB
132KV
MITHAPUR-2 to
PANTHER
DCSS
124
330
454
#CKTS
LENGTH
(R-KM)
LINE
COST
(Rs.
Lakhs)
4-140
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
132KV GAIGHAT2
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2014
BSEB
132KV
MITHAPUR-2 to
132KV GAIGHAT
PANTHER
DCSS
124
330
454
2017
BSEB
132KV
MITHAPUR-3 to
132KV
JAKKANPUR-2
PANTHER
DCSS
155
330
485
2015
BSEB
132KV MITHAPUR
to 132KV
JAKKANPUR-2
PANTHER
DCSS
155
330
485
2011
BSEB
132KV PANDAUL
to 132KV
DHARBHANGA
21
PANTHER
DCSS
651
330
981
2016
BSEB
132KV
PHULPARAS to
132KV JAINAGAR
43
PANTHER
DCSS
1,333
330
1,663
2014
BSEB
132KV
PHULPARAS to
132KV PANDAUL
56
PANTHER
DCDS
1,092
330
1,422
2011
BSEB
132KV
PHULPARAS to
132KV PANDAUL
56
PANTHER
DCDS
1,092
330
1,422
2011
BSEB
132KV PURNEA
to 132KV KATHAR
29
PANTHER
DCSS
899
330
1,229
2016
BSEB
132KV PURNEA-2
to 132KV
PANTHER
DCDS
59
330
389
4-141
020328-40RP-0400-00
Final Report
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2016
BSEB
132KV PURNEA-2
to 132KV
PURNEA
PANTHER
DCDS
39
330
369
2011
BSEB
132KV
RAMNAGAR to
132KV BETTIAH
41.5
PANTHER
DCSS
1,287
330
1,617
2011
BSEB
132KV RAXAUL to
132KV BETTIAH
37.19
PANTHER
DCDS
725
330
1,055
2011
BSEB
132KV RAXAUL to
132KV BETTIAH
37.19
PANTHER
DCDS
725
330
1,055
2011
BSEB
132KV SABOUR
to 132KV NBANKA
41.58
PANTHER
DCSS
1,289
330
1,619
2010
BSEB
132KV SABOUR
to 132KV
KAHALGAON
PANTHER
SC-STRINGING
72
330
402
2014
BSEB
132KV
SAMASTIPUR to
132KV BTPS
67.2
PANTHER
DCSS
2,083
330
2,413
BSEB
132KV
SAMASTIPUR to
132KV
DALSINGSARAI
PANTHER
SC-STRINGING
64
330
394
BSEB
132KV
SAMASTIPUR to
132KV
DALSINGSARAI
PANTHER
DCSS
248
330
578
2011
CONDUCTOR
TOWER
CONFIGURATION
NO.OF
LINE
ENTRY
BAYS
TRANSMISSION
LINE
PURNEA
2011
#CKTS
LENGTH
(R-KM)
LINE
COST
(Rs.
Lakhs)
4-142
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2011
BSEB
132KV SASARAM
to 132KV
BANJARI
45.86
PANTHER
DCSS
1,422
330
1,752
2011
BSEB
132KV SAHARSA
to 132KV
MADHEPURA
18
PANTHER
DCDS
351
330
681
2011
BSEB
132KV SAHARSA
to 132KV
MADHEPURA
17
PANTHER
DCDS
332
330
662
2011
BSEB
132KV
SHEIKHPURA to
132KV JAMUI
49
PANTHER
DCSS
1,519
330
1,849
2012
BSEB
132KV SITMHARI
to 132KV
MOTIHARI
27
PANTHER
DCSS
837
330
1,167
2011
BSEB
132KV SITMHARI
to 132KV RUNI
SAIDPUR
22
PANTHER
DCDS
429
330
759
2011
BSEB
132KV SITMHARI
to 132KV RUNI
SAIDPUR
22
PANTHER
DCDS
429
330
759
2011
BSEB
132KV SIWAN to
132KV
GOPALGANJ
29.94
PANTHER
DCDS
584
330
914
2011
BSEB
132KV SIWAN to
132KV MASRAKH
58
PANTHER
DCSS
1,798
330
2,128
4-143
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2017
BSEB
132KV SKMCH to
132KV
MUZAFFARPUR-2
25
PANTHER
DCSS
775
330
1,105
2011
BSEB
132KV SKMCH to
132KV RUNI
SAIDPUR
22
PANTHER
DCDS
429
330
759
2011
BSEB
132KV SKMCH to
132KV RUNI
SAIDPUR
22
PANTHER
DCDS
429
330
759
2011
BSEB
132KV SKMCH to
132KV SITMHARI
35
PANTHER
SC
1,085
330
1,415
BSEB
132KV
SONABARSHI to
132KV
MADHEPURA
40
PANTHER
DCDS
780
330
1,110
BSEB
132KV
SONABARSHI to
132KV
MADHEPURA
40
PANTHER
DCDS
780
330
1,110
BSEB
132KV
SONNENAGAR to
132KV
SONNENAGAR-2
PANTHER
DCDS
20
330
350
BSEB
132KV
SONNENAGAR to
132KV
SONNENAGAR-2
PANTHER
DCDS
20
330
350
2011
2011
2017
2017
4-144
020328-40RP-0400-00
Final Report
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
BSEB
132KV
SULTANGANJ to
132KV
JAMALPUR
38
PANTHER
SC-STRINGING
304
330
634
BSEB
132KV
SULTANGANJ to
132KV
KAHALGAON
28
PANTHER
SC-STRINGING
224
330
554
BSEB
132KV
SULTANGANJ to
132KV
KAHALGAON
28
PANTHER
DCSS
868
330
1,198
BSEB
132KV
SULTANGANJ to
132KV
LAKHISARAI
40
PANTHER
SC-STRINGING
320
330
650
2012
BSEB
132KV
SULTANGANJ to
132KV
LAKHISARAI
40
PANTHER
DCSS
1,240
330
1,570
2010
BSEB
132KV
SULTANGANJ to
132KV SABOUR
35
PANTHER
SC-STRINGING
280
330
610
2011
BSEB
132KV SUPAUL to
132KV KATIYA
94
PANTHER
DCDS
1,833
330
2,163
2011
BSEB
132KV SUPAUL to
132KV KATIYA
94
PANTHER
DCDS
1,833
330
2,163
2011
BSEB
132KV SUPAUL to
18
PANTHER
DCDS
351
330
681
FY
2010
2011
2012
2011
OWNER
TRANSMISSION
LINE
LINE
COST
(Rs.
Lakhs)
4-145
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
132KV
MADHEPURA
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2011
BSEB
132KV SUPAUL to
132KV
MADHEPURA
15
PANTHER
DCDS
293
330
623
2011
BSEB
132KV SUPAUL to
132KV
PHULPARAS
30
PANTHER
SC
930
330
1,260
2014
BSEB
132KV SUPAUL to
132KV
PHULPARAS
30
PANTHER
DCDS
585
330
915
2014
BSEB
132KV SUPAUL to
132KV
PHULPARAS
30
PANTHER
DCDS
585
330
915
2011
BSEB
132KV TEKARI to
132KV
CHANDAUTI
28.36
PANTHER
DCDS
553
330
883
2011
BSEB
132KV TEKARI to
132KV
CHANDAUTI
28.36
PANTHER
DCDS
553
330
883
2011
BSEB
132KV TEKARI to
132KV GOH
22.3
PANTHER
DCDS
435
330
765
2011
BSEB
132KV TEKARI to
132KV GOH
22.3
PANTHER
DCDS
435
330
765
2011
BSEB
132KV
UDAKISHANGANJ
to 132KV
50.35
PANTHER
DCSS
1,561
330
1,891
4-146
020328-40RP-0400-00
Final Report
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2011
BSEB
132KV
WAZIRGANJ to
132KV NAWADA
28.5
PANTHER
DCDS
556
330
886
BSEB
132KV
WAZIRGANJ to
132KV
PAHARPUR
PANTHER
DCDS
98
330
428
2018
BSEB
220KV
BODHGAYA to
132KV
PAHARPUR
33
PANTHER
DCSS
1,023
330
1,353
2010
BSEB
132KV
BEGUSARAI to
132KV BTPS
PANTHER
SC
124
330
454
2010
BSEB
132KV
BEGUSARAI to
132KV BTPS
PANTHER
DCDS
78
330
408
2010
BSEB
132KV
BEGUSARAI to
132KV BTPS
PANTHER
DCDS
78
330
408
2011
BSEB
132KV
BEGUSARAI to
132KV
KUSHESWAR
65.1
PANTHER
SC
2,018
330
2,348
2011
BSEB
132KV
BEGUSARAI to
65.1
PANTHER
DCSS
2,018
330
2,348
CONDUCTOR
TOWER
CONFIGURATION
NO.OF
LINE
ENTRY
BAYS
TRANSMISSION
LINE
SAHARSA
2011
#CKTS
LENGTH
(R-KM)
LINE
COST
(Rs.
Lakhs)
4-147
020328-40RP-0400-00
Final Report
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
BSEB
132KV
BEGUSARAI to
132KV
SAMASTIPUR
67
PANTHER
SC
2,077
330
2,407
2010
BSEB
132KV
BEGUSARAI to
132KV
SAMASTIPUR
67
PANTHER
DCSS
2,077
330
2,407
2012
BSEB
132KV DHANHA
to 220KV
GOPALGANJ
60
PANTHER
DCDS
1,170
330
1,500
2012
BSEB
132KV DHANHA
to 220KV
GOPALGANJ
60
PANTHER
DCDS
1,170
330
1,500
2012
BSEB
132KV
DARBHANGA to
132KV
GANGWARA
10
PANTHER
DCSS
310
330
640
2012
BSEB
132KV PANDAUL
to 132KV
GANGWARA
12
PANTHER
DCSS
372
330
702
BSEB
220KV
BIHARSHARIFF to
132KV
BARIPAHRI-2
10
PANTHER
DCSS
310
330
640
FY
2010
2017
OWNER
TRANSMISSION
LINE
132KV
KUSHESWAR
LINE
COST
(Rs.
Lakhs)
4-148
020328-40RP-0400-00
Final Report
FY
2011
2011
2011
2011
2017
2017
2017
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
BSEB
220KV
BIHARSHARIFF to
132KV
EKANGASARAI
26
PANTHER
DCDS
507
330
837
BSEB
220KV
BIHARSHARIFF to
132KV
EKANGASARAI
26
PANTHER
DCDS
507
330
837
BSEB
220KV
BIHARSHARIFF to
132KV
HULASGANJ
44.54
PANTHER
SC
1,381
330
1,711
BSEB
220KV
BIHARSHARIFF to
132KV
SHEIKHPURA
38.6
PANTHER
DCSS
1,197
330
1,527
BSEB
220KV
BIKRAMGANJ to
132KV
BIKRAMGANJ
PANTHER
DCDS
39
330
369
BSEB
220KV
BIKRAMGANJ to
132KV
BIKRAMGANJ
PANTHER
DCDS
39
330
369
BSEB
220KV
BIKRAMGANJ to
132KV
BIKRAMGANJ
PANTHER
DCSS
62
330
392
OWNER
TRANSMISSION
LINE
LINE
COST
(Rs.
Lakhs)
4-149
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2016
BSEB
220KV CHAPRA
to 132KV
CHAPRA-2
PANTHER
DCDS
39
330
369
2016
BSEB
220KV CHAPRA
to 132KV
CHAPRA-2
PANTHER
DCDS
39
330
369
2015
BSEB
220KV CHAPRA
to 132KV
CHAPRA
0.7
PANTHER
DCDS
14
330
344
2015
BSEB
220KV CHAPRA
to 132KV
CHAPRA
0.7
PANTHER
DCDS
14
330
344
BSEB
220KV
DARBHANGA to
132KV
DHARBHANGA
PANTHER
DCDS
20
330
350
2011
BSEB
220KV
DARBHANGA to
132KV
DHARBHANGA
PANTHER
DCDS
20
330
350
2011
BSEB
220KV DEHRION-SONE to
132KV DINARA
62
PANTHER
SC-STRINGING
496
330
826
2012
BSEB
220KV FATHUA to
132KV FATHUA-2
PANTHER
DCDS
39
330
369
2012
BSEB
220KV FATHUA to
132KV FATHUA-2
PANTHER
DCDS
39
330
369
2011
4-150
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2012
BSEB
220KV FATHUA to
132KV FATHUA-2
PANTHER
DCSS
62
330
392
2011
BSEB
220KV FATHUA to
132KV KATRA
8.3
PANTHER
DCDS
162
330
492
2011
BSEB
220KV FATHUA to
132KV KATRA
8.3
PANTHER
DCDS
162
330
492
BSEB
220KV
FORBESGANJ to
132KV
FORBESGANJ
PANTHER
DCDS
20
330
350
BSEB
220KV
FORBESGANJ to
132KV
FORBESGANJ
PANTHER
DCDS
20
330
350
BSEB
220KV
FORBESGANJ to
132KV
FORBESGANJ
PANTHER
DCDS
20
330
350
2016
BSEB
220KV
FORBESGANJ to
132KV
FORBESGANJ
PANTHER
DCDS
20
330
350
2016
BSEB
220KV
FORBESGANJ to
132KV KATIYA
54
PANTHER
DCSS
1,674
330
2,004
2016
BSEB
220KV GAIGHAT
to 132KV
GAIGHAT-2
PANTHER
DCDS
20
330
350
2016
2016
2016
4-151
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2016
BSEB
220KV GAIGHAT
to 132KV
GAIGHAT-2
PANTHER
DCDS
20
330
350
2012
BSEB
220KV GAIGHAT
to 132KV
GAIGHAT
PANTHER
DCDS
20
330
350
2012
BSEB
220KV GAIGHAT
to 132KV
GAIGHAT
PANTHER
DCDS
20
330
350
2012
BSEB
220KV GAIGHAT
to 132KV
GAIGHAT
PANTHER
DCSS
31
330
361
2014
BSEB
220KV GAIGHAT
to 132KV
MITHAPUR-2
PANTHER
DCSS
124
330
454
2011
BSEB
220KV HAJIPUR
to 132KV
HAJIPUR
0.7
PANTHER
DCDS
14
330
344
2011
BSEB
220KV HAJIPUR
to 132KV
HAJIPUR
0.7
PANTHER
DCDS
14
330
344
2011
BSEB
220KV HAJIPUR
to 132KV
HAJIPUR
0.7
PANTHER
DCDS
14
330
344
2011
BSEB
220KV HAJIPUR
to 132KV
HAJIPUR
0.7
PANTHER
DCDS
14
330
344
4-152
020328-40RP-0400-00
Final Report
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
BSEB
220KV
HULSANGAJ to
132KV
CHANDAUTI-2
40
PANTHER
DCDS
780
330
1,110
BSEB
220KV
HULSANGAJ to
132KV
CHANDAUTI-2
40
PANTHER
DCDS
780
330
1,110
BSEB
220KV
HULSANGAJ to
132KV
HULASGANJ
PANTHER
DCDS
20
330
350
BSEB
220KV
HULSANGAJ to
132KV
HULASGANJ
PANTHER
DCDS
20
330
350
2018
BSEB
220KV
HULSANGAJ to
132KV
HULASGANJ
PANTHER
DCSS
31
330
361
2018
BSEB
220KV
HULSANGAJ to
132KV TEKARI
30
PANTHER
DCDS
585
330
915
2018
BSEB
220KV
HULSANGAJ to
132KV TEKARI
30
PANTHER
DCDS
585
330
915
2012
BSEB
220KV
JAKKANPUR to
132KV
PANTHER
DCDS
20
330
350
FY
2018
2018
2018
2018
OWNER
TRANSMISSION
LINE
LINE
COST
(Rs.
Lakhs)
4-153
020328-40RP-0400-00
Final Report
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
#CKTS
CONDUCTOR
TOWER
CONFIGURATION
BSEB
220KV
JAKKANPUR to
132KV
JAKKANPUR-2
PANTHER
DCDS
20
330
350
BSEB
220KV
JAKKANPUR to
132KV
JAKKANPUR-2
PANTHER
DCSS
31
330
361
BSEB
220KV
JAKKANPUR to
132KV
MITHAPUR-3
PANTHER
DCDS
98
330
428
2017
BSEB
220KV
JAKKANPUR to
132KV
MITHAPUR-3
PANTHER
DCDS
98
330
428
2012
BSEB
220KV
JAKKANPUR to
132KV MITHAPUR
PANTHER
DCDS
98
330
428
2012
BSEB
220KV
JAKKANPUR to
132KV MITHAPUR
PANTHER
DCDS
98
330
428
2012
BSEB
220KV KATHIHAR
to 132KV KATHAR
PANTHER
DCDS
39
330
369
2012
BSEB
220KV KATHIHAR
to 132KV KATHAR
PANTHER
DCDS
39
330
369
2012
2012
2017
OWNER
NO.OF
LINE
ENTRY
BAYS
LENGTH
(R-KM)
FY
TRANSMISSION
LINE
JAKKANPUR-2
LINE
COST
(Rs.
Lakhs)
4-154
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2012
BSEB
220KV KATHIHAR
to 132KV
PURNEA
37
PANTHER
DCDS
722
330
1,052
2012
BSEB
220KV KATHIHAR
to 132KV
PURNEA
37
PANTHER
DCDS
722
330
1,052
2012
BSEB
220KV KATHIHAR
to 132KV
PURNEA
31
PANTHER
DCSS
961
330
1,291
2013
BSEB
PANTHER
DCSS
186
330
516
2013
BSEB
PANTHER
DCDS
20
330
350
2013
BSEB
PANTHER
DCDS
20
330
350
2013
BSEB
PANTHER
DCSS
31
330
361
2016
BSEB
PANTHER
DCDS
20
330
350
2016
BSEB
PANTHER
DCDS
20
330
350
4-155
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2016
BSEB
PANTHER
DCSS
31
330
361
2014
BSEB
220KV KHAGAUL
to 132KV BIHTA
PANTHER
DCDS
137
330
467
2011
BSEB
220KV KHAGAUL
to 132KV DIGHA
PANTHER
SC
124
330
454
2011
BSEB
220KV KHAGAUL
to 132KV DIGHA
PANTHER
DCSS
124
330
454
2012
BSEB
220KV KHAGAUL
to 132KV
KHAGAUL
PANTHER
DCSS
31
330
361
BSEB
220KV
MADHEPURA to
132KV
MADHEPURA
PANTHER
DCDS
39
330
369
BSEB
220KV
MADHEPURA to
132KV
MADHEPURA
PANTHER
DCDS
39
330
369
BSEB
220KV
MADHEPURA to
132KV
MADHEPURA
PANTHER
DCDS
39
330
369
BSEB
220KV
MADHEPURA to
132KV
MADHEPURA
PANTHER
DCDS
39
330
369
2011
2011
2011
2011
4-156
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2014
BSEB
220KV MTPS to
132KV
MUZAFFARPUR
15.5
PANTHER
DCSS
481
330
811
2011
BSEB
220KV MTPS to
132KV SKMCH
14.136
PANTHER
DCSS
438
330
768
2011
BSEB
220KV MTPS to
132KV VAISHALI
30.1
PANTHER
DCDS
587
330
917
2011
BSEB
220KV MTPS to
132KV VAISHALI
30.1
PANTHER
DCDS
587
330
917
BSEB
220KV
MUZAFFARPUR
to 132KV
MUZAFFARPUR-2
PANTHER
DCDS
59
330
389
2017
BSEB
220KV
MUZAFFARPUR
to 132KV
MUZAFFARPUR-2
PANTHER
DCDS
59
330
389
2010
BSEB
220KV ARRA to
132KV ARRA
PANTHER
SC
93
330
423
2011
BSEB
220KV ARRA to
132KV ARRA
PANTHER
DCSS
93
330
423
2012
BSEB
220KV PUSAULI
to 132KV BHABUA
10
PANTHER
DCDS
195
330
525
2012
BSEB
220KV PUSAULI
to 132KV BHABUA
10
PANTHER
DCDS
195
330
525
2012
BSEB
220KV PUSAULI
to 132KV KUDRA
10
PANTHER
DCDS
195
330
525
2017
4-157
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2012
BSEB
220KV PUSAULI
to 132KV KUDRA
10
PANTHER
DCDS
195
330
525
2015
BSEB
220KV SABOUR
to 132KV
SABOUR
PANTHER
DCDS
20
330
350
2015
BSEB
220KV SABOUR
to 132KV
SABOUR
PANTHER
DCDS
20
330
350
2015
BSEB
220KV SABOUR
to 132KV
SABOUR
PANTHER
DCSS
31
330
361
2016
BSEB
220KV SABOUR
to 132KV
SABOUR-2
PANTHER
DCDS
39
330
369
2016
BSEB
220KV SABOUR
to 132KV
SABOUR-2
PANTHER
DCDS
39
330
369
BSEB
220KV
SAMASTIPUR to
132KV
SAMASTIPUR-2
PANTHER
DCDS
39
330
369
2016
BSEB
220KV
SAMASTIPUR to
132KV
SAMASTIPUR-2
PANTHER
DCDS
39
330
369
2012
BSEB
220KV SHEOHAR
to 132KV RUNI
SAIDPUR
PANTHER
DCDS
98
330
428
2016
4-158
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2012
BSEB
220KV SHEOHAR
to 132KV RUNI
SAIDPUR
PANTHER
DCDS
98
330
428
2012
BSEB
220KV SHEOHAR
to 132KV
SHEOHAR
PANTHER
DCDS
20
330
350
2012
BSEB
220KV SHEOHAR
to 132KV
SHEOHAR
PANTHER
DCDS
20
330
350
2012
BSEB
220KV SHEOHAR
to 132KV
SITMHARI
17
PANTHER
DCDS
332
330
662
2012
BSEB
220KV SHEOHAR
to 132KV
SITMHARI
17
PANTHER
DCDS
332
330
662
2018
BSEB
220KV SIPARA to
132KV BIHTA-2
PANTHER
DCDS
20
330
350
2018
BSEB
220KV SIPARA to
132KV BIHTA-2
PANTHER
DCDS
20
330
350
2012
BSEB
220KV SIPARA to
132KV
JAKKANPUR
19
PANTHER
DCDS
371
330
701
2012
BSEB
220KV SIPARA to
132KV
JAKKANPUR
19
PANTHER
DCDS
371
330
701
2012
BSEB
220KV SIPARA to
132KV
26
PANTHER
DCDS
507
330
837
4-159
020328-40RP-0400-00
Final Report
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2012
BSEB
220KV SIPARA to
132KV
JEHNABAD
26
PANTHER
DCDS
507
330
837
2012
BSEB
220KV SIPARA to
132KV MASURHI
14
PANTHER
DCSS
434
330
764
BSEB
220KV
SONNENAGAR to
132KV
AURANGABAD
9.12
PANTHER
SC
283
330
613
2012
BSEB
220KV
SONNENAGAR to
132KV
AURANGABAD
9.12
PANTHER
DCSS
283
330
613
2012
BSEB
220KV
SONNENAGAR to
132KV RAFIGANJ
23.5
PANTHER
SC-STRINGING
188
330
518
2012
BSEB
220KV
SONNENAGAR to
132KV RAFIGANJ
23.5
PANTHER
DCSS
729
330
1,059
BSEB
220KV
SONNENAGAR to
132KV
SONNENAGAR
PANTHER
DCDS
20
330
350
BSEB
220KV
SONNENAGAR to
132KV
SONNENAGAR
PANTHER
DCDS
20
330
350
2012
2012
CONDUCTOR
TOWER
CONFIGURATION
NO.OF
LINE
ENTRY
BAYS
TRANSMISSION
LINE
JEHNABAD
2012
#CKTS
LENGTH
(R-KM)
LINE
COST
(Rs.
Lakhs)
4-160
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2011
BSEB
220KV SUPAUL to
132KV SAHARSA
35
PANTHER
DCSS
1,085
330
1,415
2011
BSEB
220KV SUPAUL to
132KV SUPAUL
PANTHER
DCDS
20
330
350
2011
BSEB
220KV SUPAUL to
132KV SUPAUL
PANTHER
DCDS
20
330
350
2011
BSEB
220KV SUPAUL to
132KV SUPAUL
PANTHER
DCSS
31
330
361
2012
BSEB
400KV BANKA to
132KV NBANKA
0.5
PANTHER
DCDS
10
330
340
2012
BSEB
400KV BANKA to
132KV NBANKA
0.5
PANTHER
DCDS
10
330
340
2012
BSEB
400KV BANKA to
132KV NBANKA
0.5
PANTHER
DCSS
16
330
346
BSEB
400KV
JAMALPUR to
132KV
JAMALPUR
PANTHER
DCDS
20
330
350
BSEB
400KV
JAMALPUR to
132KV
JAMALPUR
PANTHER
DCDS
20
330
350
2012
BSEB
400KV
JAMALPUR to
132KV
JAMALPUR
PANTHER
DCSS
31
330
361
2012
BSEB
400KV
45
PANTHER
DCDS
878
330
1,208
2012
2012
4-161
020328-40RP-0400-00
Final Report
TRANSMISSION
LINE
JAMALPUR to
132KV
LAKHISARAI
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
LINE
COST
(Rs.
Lakhs)
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
FY
OWNER
2012
BSEB
400KV
JAMALPUR to
132KV
LAKHISARAI
45
PANTHER
DCDS
878
330
1,208
BSEB
400KV
KAHALGAON to
132KV
KAHALGAON
PANTHER
DCDS
59
330
389
2012
BSEB
400KV
KAHALGAON to
132KV
KAHALGAON
PANTHER
DCDS
59
330
389
2014
BSEB
400KV PURNEA
to 132KV
KISHANGANJ
54.9
PANTHER
DCSS
1,702
330
2,032
2012
BSEB
400KV PUSAULI
to 132KV BHABUA
10
PANTHER
DCDS
195
330
525
2012
BSEB
400KV PUSAULI
to 132KV BHABUA
10
PANTHER
DCDS
195
330
525
BSEB
LILO OF
BARIPAHRIFATHUA 132KV
S/C LINE AT
HARNUAT
11.48
PANTHER
DCDS
448
165
613
2014
2011
4-162
020328-40RP-0400-00
Final Report
FY
2011
2011
2011
2011
2011
2011
2011
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
BSEB
LILO OF DEHRIKARMNASA
132KV S/C LINE
AT KUDRA
PANTHER
DCDS
273
165
438
BSEB
LILO OF
CHAPRA-SIWAN
LINE AT
MUSRAKH
PANTHER
DCDS
165
165
BSEB
LILO OF
BARIPAHRIRAJGIR LINE AT
NALANDA
1.5
PANTHER
DCDS
59
165
224
BSEB
LILO OF 132KV
D/C FATHUAGAIGHAT AT
KATRA
3.6
PANTHER
DCDS
140
165
305
BSEB
LILO OF 132KV
S/C GAIGHATMITHAPUR AT
SIPARA
9.81
PANTHER
DCDS
383
165
548
BSEB
LILO OF IST
132KV GAYAJAKKANPUR AT
SIPARA
9.98
PANTHER
DCDS
389
165
554
BSEB
LILO OF 2ND
132KV GAYAJAKKANPUR AT
SIPARA
10.742
PANTHER
DCDS
419
165
584
OWNER
TRANSMISSION
LINE
LINE
COST
(Rs.
Lakhs)
4-163
020328-40RP-0400-00
Final Report
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
BSEB
LILO OF 132KV
D/C SITAMHARIMUZAFFARPUR
AT SKMCH
0.5
PANTHER
DCDS
20
165
185
BSEB
LILO OF 132KV
BARUANIPURNEA AT
NAUGACHIYA
0.85
PANTHER
DCDS
33
165
198
BSEB
LILO OF 132KV
DC BARUANISAMASTIPUR AT
BEGUSARAI
3.85
PANTHER
DCDS
150
165
315
BSEB
LILO OF
HAZIPURSAMASTIPUR
132KV D/C LINE
AT
DALSINGSARAI
1.03
PANTHER
DCDS
40
165
205
BSEB
PANTHER
DCDS
234
165
399
2011
BSEB
LILO OF DEHRIKARMANASA
132KV S/C AT
KUDRA
PANTHER
DCDS
273
165
438
2011
BSEB
LILO OF
BODHGAYANAWADA 132KV
0.8
PANTHER
DCDS
31
165
196
FY
2011
2011
2011
2011
2011
OWNER
TRANSMISSION
LINE
LINE
COST
(Rs.
Lakhs)
4-164
020328-40RP-0400-00
Final Report
FY
2011
2011
2012
NO.OF
LINE
ENTRY
BAYS
COST
(Rs.
Lakhs)
Total Cost
(Rs.Lakhs)
#CKTS
LENGTH
(R-KM)
CONDUCTOR
TOWER
CONFIGURATION
BSEB
15
PANTHER
DCDS
585
165
750
BSEB
LILO OF
SAHARSASUPAUL LINE AT
MADHEPURA
1.5
PANTHER
DCDS
59
165
224
BSEB
LILO OF 132KV
S/C LINE
NAUGACHIYA
PURNEA LINE AT
KATIHAR
15
PANTHER
DCDS
585
165
750
OWNER
TRANSMISSION
LINE
S/C LINE AT
WAZIRGANJ
LINE
COST
(Rs.
Lakhs)
4-165
020328-40RP-0400-00
Final Report
4.9.12
VOLTAGE
(KV)
CAPAITY
(MVAR)
NAME OF THE SS
Total
COST
(Rs.lakhs)
1,130
5,529
2011
33
132KV BUXAR
20
96
2011
33
132KV DHAKA
20
96
2011
33
132KV DUMRAON
30
125
2011
33
132KV GOPALGANJ
10
48
2011
33
132KV MOTIHARI
20
96
2011
33
132KV NAWADA
30
125
2011
33
132KV RAMNAGAR
20
96
2011
33
132KV SIWAN
30
125
2012
33
132KV BETTIAH
30
125
2012
33
132KV BIHTA
20
96
2012
33
132KV CHAPRA
20
96
2012
33
132KV DHANHA
20
96
2012
33
132KV JAMUI
10
48
2012
33
132KV RAXAUL
20
96
2012
33
132KV SHITALPUR
10
48
2013
33
132KV BHABUA
10
48
2013
33
132KV DHARBHANGA
20
96
2013
33
132KV FATHUA-2
20
96
2013
33
132KV HAJIPUR
10
48
2014
33
132KV KHAGAUL-3
20
96
2014
33
132KV MASRAKH
10
48
2014
33
132KV MITHAPUR-2
30
125
2014
33
132KV PANDAUL
30
125
2015
33
132KV DUMRAON
10
48
2015
33
132KV FATHUA
10
48
2015
33
132KV GOPALGANJ
10
48
2015
33
132KV MASURHI
10
48
2015
33
132KV MITHAPUR
30
125
2015
33
132KV MUZAFFARPUR
10
48
2015
33
132KV PANDAUL
10
48
2015
33
132KV SITMHARI
10
48
2015
33
132KV VISHALI
10
48
4-166
020328-40RP-0400-00
Final Report
VOLTAGE
(KV)
NAME OF THE SS
2015
33
132KV DALSINGSARAI
20
96
2015
33
132KV JAKKANPUR
30
125
2015
33
132KV KATRA
10
48
2015
33
132KV KHAGAUL-2
30
125
2015
33
132KV MADHUBANI
20
96
2016
33
132KV KISHANGANJ
10
48
2016
33
132KV GAIGHAT
20
96
2016
33
132KV JAKKANPUR-2
20
96
2016
33
132KV JEHNABAD
20
96
2016
33
132KV KARPY
10
48
2016
33
132KV KHAGAUL
20
96
2016
33
132KV SAMASTIPUR
20
96
2016
132
220KV FATHUA
20
245
2017
33
132KV BODHGAYA
10
48
2017
33
132KV SABOUR
10
48
2017
33
132KV CHANDAUTI-2
10
48
2017
33
132KV DIGHA
20
96
2017
33
132KV JAINAGAR
20
96
2017
33
132KV KHAGARIYA
20
96
2017
33
132KV MITHAPUR-3
30
125
2017
33
132KV SASARAM
10
48
2017
33
132KV WAZIRGANJ
30
125
2018
33
132KV LAKHISARAI
10
48
2018
33
132KV BANKA
10
48
2018
33
132KV BARIPAHRI
10
48
2018
33
132KV BIKRAMGANJ
20
96
2018
33
132KV CHANDAUTI
10
48
2018
33
132KV DINARA
10
48
2018
33
132KV GAIGHAT-2
20
96
2018
33
132KV HARNAUT
10
48
2018
33
132KV KATHAR
10
48
2018
33
132KV NAUGACHHIYA
10
48
2018
33
132KV PAHARPUR
10
48
2018
33
132KV SONNENAGAR
10
48
2018
132
220KV KHAGAUL-2
10
213
FY
4-167
CAPAITY
(MVAR)
COST
(Rs.lakhs)
020328-40RP-0400-00
Final Report
4.9.13
4.10
OWNER
VOLTAGE KV
CAPAITY
(MVAr)
COST
(Rs.lakhs)
Total
600
3,672
NAME OF THE SS
2011
PGCIL
400
400KV MZAFFARPUR
100
2011
PGCIL
400
400KV MZAFFARPUR
100
2012
PGCIL
400
400KV MZAFFARPUR
100
2015
BSEB
400
400KV ARRAH
100
1224
2016
BSEB
400
400KV BANKA
100
1224
2014
BSEB
400
400KV JAMALPUR
100
1224
Summary
The present report discussed and presented the key issues, transmission planning basis,
methodology for development of transmission expansion plan for the horizon year (2017-18).
Base case Transmission plan was developed based on the most likely Load Forecast and
Generation plan as presented in the earlier reports. The system studies were carried out, for
the horizon year FY 2018 and also for the intermediate year FY 2014. The load flow
scenarios carried out for each of the above years were as follows:
3,230 MVA
2,375 MVA
4,700 MVA
7,240 MVA
2,400 MVA
1,884 Ckt-km
3,095 Ckt-km
4,292 Ckt-km
1,130 MVAr
600 MVAr
4-168
020328-40RP-0400-00
Final Report
The load flow studies show satisfactory operation of transmission system with reinforcement
under steady state operation for FY 2018 and FY 2014 with peak load and light load
conditions.
The total annual investment for the above requirement is about Rs. 8,989 Crores.
The present worth of annual disbursements required to meet the in-service dates proposed
at 10% discount rate is estimated as Rs. 6,106 Crores at the beginning of FY 2009.
4-169
020328-40RP-0400-00
Final Report
DISTRIBUTION PLANNING
5.1
Overview
This section describes the distribution planning studies that were carried out as part of the
ADB funded Master Plan activities for the state of Bihar. The distribution planning studies
utilised the results of the load forecast and the transmission expansion plan as major inputs
to determine the additional distribution facilities that will be required over the planning period
(2010-2014).
5.2
The ultimate objective of the distribution planning studies is to determine the distribution
expansion plan for the BSEB system over the study period 2010-2014, consistent with the
requirements of the load forecast and the transmission expansion plan. The expansion plan
was divided into two parts the first part comprised of 33 kV network and the second part
was 11 kV network and below. For determining the expansion plan for 33 kV network
detailed simulation studies were carried out to determine the system strengthening required
and based on the result of these studies, the system strengthening required in 11 kV and LT
was worked out.
5.2.1
The existing distribution system of BSEB is very weak at many places and needs
strengthening. In addition to system strengthening and as discussed in the earlier generation
expansion scenario report which is also the part of Master Plan for BSEB, the BSEB system
is facing shortage of power in terms of peak and energy demand at present. However over
the next few years it is expected that there will be the increase in availability of power and the
transmission system strengthening will provide the back bone for transmission of the
required power from generating centers to load centers. It is therefore very necessary to
develop a distribution network in place to receive and transfer the power received from the
various generation sources to the ultimate consumer. The distribution network has to be
such that the supply at the consumer end is of good and reliable quality. Another important
factor is to keep the distribution losses to a minimum value as these losses occurring in the
distribution system are loss to the utility in terms of financial and also pollute the
environment. The planning of the distribution network for a system largely depends on the
correctness of the required input data and the tools employed to work out the future
requirement.
According to the assessment made in the load forecast report for most likely scenario and
the transmission planning of BSEB, the peak demand of power by 2014 is expected to
increase by a factor of about 2.33 times of the unrestricted demand of FY 2009. To meet the
load growth, as per the Least Cost Generation Plan report the Net Capacity Additions (MW)
by the year 2014 are expected to increase by 2866 MW. The increase in load growth and
generation necessitates a strong transmission and distribution system, which with maximum
efficiency and reliability is available to evacuate the available power to the load end.
The horizon period for the distribution planning studies and transmission studies is quite
different. In transmission system, because of long lines, right of way, environmental
clearance, bulk power, long gestation period etc, It is necessary to have a horizon of at least
10 years. On the other hand for the distribution system, when compared to the transmission
system the lines are short, with lesser clearances as defined above and also as the ground
5-1
020328-40RP-0400-00
Final Report
realities are not going to be likely the same for longer period of time, the planning horizon
period is usually taken as 5 years
For carrying out the distribution planning studies of BSEB, following scenarios were
examined:
The distribution planning was carried out considering the Peak Load under the average Load
Forecast Scenario as per the load forecast report. Normally distribution systems are radial in
nature and studied for handling the transfer of power to the ultimate consumer in all
situations keeping the quality of supply with in prescribed limits and incurring minimum
losses.
As a first step for planning the distribution system to meet the 2014 load requirements, the
existing 33 kV system was modeled and studied. This study brought out the shortcomings
and reinforcements needed in the existing system. It is very necessary that the existing
system gets strengthened before planning exercise for future years is carried out.
Accordingly existing system was strengthened and reinforcements included in the form of
additional circuits, augmentation of conductor size, transformation capacity and capacitors
required by the present distribution network were identified. The results for this analysis were
presented section 4. The reinforced system was simulated and studied and results are
presented in the section 4.2. The reinforced system was used as base case system for
planning the 2014 distribution network of BSEB. The studies for 2014 system identified
several areas for system strengthening which included new grid and/or distribution
substations, reinforcement of distribution lines, augmentation of conductor, capacitor
installation etc. All the reinforcements constitute the distribution investment plan, however it
should be noted that it gives only guiding figures for investment.
The software study was carried out for each and every 33 kV feeder in the BSEB system.
The 33kV network is the basic and most important link between the transmission network
and the ultimate Distribution network. The planning study identified the requirement of new
substations abased on the load requirements. Actual location of 11 kV lines and the DTRs
can easily be decided as per local requirements once the set up of the 33/11 kV S/S is
finalized. For Investment planning the provision for 11 kV network, the DTRs and the LT lines
has been made along with every new 33/11 kV S/S for each capacity addition / augmentation
at the existing S/S on the basis of certain assumptions, which are stated in another sub head
of this report.
5.2.2
The BSEB distribution system has evolved over time in the last few years by ad-hoc system
planning. Basically one of the major reasons for this was the severe shortage in availability of
power after division of the State. However, this position is expected to change as BSEB has
put into place for integration of power plants from private and state sector. Therefore it is
necessary, keeping the load growth and generation plan a proper and systematic planning
an Electricity Distribution System in BSEB is set up.
The summary below presents the needs for proper planning at BSEB:
5-2
020328-40RP-0400-00
Final Report
Normal Development
Industrial Development
Rise in per capita income resulting in the further rise of the electricity
consumption
Increase in population
Reduction in outages
Reduction in fluctuations
The following defines the necessary steps for reinforcing the distribution system:
Erection of new sub stations at right place (load centre) with appropriate transformer
capacities
5.3
The following methodology has been adopted for Distribution Planning for the years 2010
and 2014
5.3.1
The existing network of lines and sub stations were modeled and studied using the
software Cymdist. All possible reinforcements were identified so that the healthy
network could be prepared and studied.
The reinforced network in the scenario of demand and availability of power in 2010
has been brought out
5.3.2
The load forecast prepared in the load forecast report and also Transmission
Planning study for the year 2014 was the basis for planning,
5-3
020328-40RP-0400-00
Final Report
Reinforcement identified to make sure the study results meet the panning criteria
The need for augmentation / addition of transformer capacity at the existing sub
stations and creation of new sub stations identified and proposed
Remodeling of lines and construction of new lines identified and proposed on the basis of
study modeled on Cymdist
The Distribution Planning has been carried out for all the circles of BSEB followed by EHV
S/S wise. All the 33 kV Feeders were modeled separately and the 33/11 kV substation was
modeled as load. Proposals of additions of transformers, augmentation of transformer
capacities, new sub stations, upgrading of line conductors, conversion of lines from S/C to
D/C and construction of new lines was made based on the system study results.
At the start of the process, the new 33/11 kV sub stations and the connecting 33 kV lines
already planned by BSEB were taken into consideration so as to avoid any duplication and
/or confusion.
The block diagrams showing 33 kV feeders emanating from the EHV S/Ss along with the
connected 33/11 kV S/S have been drawn circle wise along with a diagram for the entire
state for two scenarios, viz., 2009 (existing) and 2014 (planned)
Input at 33 kV feeder is equal to the sum of the 33 kV feeder end load and the line loss, i.e.
Input power at 33 kV
Circle
PESU (E)
PESU (W)
Patna
Nalanda (Bihar Sharif)
Chapra
Motihari
Bhojpur (Ara)
Gaya
Saharsa
Bhagalpur
Munger
Samastipur
Purnea
Sasaram
Muzaffarpur
Darbhanga
5-4
020328-40RP-0400-00
Final Report
It should be noted that the study of Distribution Planning does not provide:
Specific geographical route, by name , of the proposed new 33 kV lines except those
already covered under plan
5.3.3
Limitations:
Accuracy of software results and hence the planning largely depends on the correctness of
input data such as
Line Length
Conductor Size
Power Factor
5.3.4
The following assumptions have been made while carrying out this study of Distribution
Planning
I. Power factor at the sending end (source EHV S/S) of the 33 kV line has been taken
uniformly as 85%
II. Length of 33 kV line to connect a new 33/11 kV S/S to an existing or new EHV S/S or
an existing 33/11 kV S/S to a new EHV S/S at the same H.Q. has been taken as below
Large Towns
5 km
3 km
10 km
III. Length of 33 kV lines connecting S/S at places other than those of the EHV S/Ss have
been assumed on the basis of the geographical map of Bihar, as far as possible, to
avoid wide deviations from the actual line lengths
IV. 11 kV Lines have been considered as below
b) Rural
020328-40RP-0400-00
Final Report
d) Rural -
Large Towns
Other Cities
Rural
630 KVA
2 Nos.
315 KVA
8 Nos.
200 kVA
10 Nos.
315 kVA
2 Nos.
200 kVA
10 Nos.
100 kVA
8 Nos.
200 kVA
5 Nos.
100 kVA
15 Nos.
Cities
0.50 km
Rural
1.00 km
5.3.4.1
The criteria for the maximum transformer capacity for urban, semi-urban and rural area have
been fixed as shown in the section 5.2.4. Also, the usual Xmer capacities considered for the
S/Ss in the urban and rural areas have been shown in the Table 2.
Table 5-2
Urban
Urban
Semi Urban
Rural
40
20
10
10
3.15
3.15**
1.6 / 1.0**
5-6
020328-40RP-0400-00
Final Report
5.3.4.2
The maximum capacity of the DTRs in the areas of large towns, other District H.Q.s and the
rural considered is shown in Table 3.
Table 5-3
5.3.4.3
Large Towns
Other Towns
Rural Area
630
315
200
315
200
100
200
100
The maximum current carrying capacity of the conductors used in the lines for different
voltage classes, 33 kV and below, in BSEB along with the recommended maximum loading
is shown in Table 4.
Table 5-4
5.3.4.4
WOLF
400
DOG
280
RACOON
180
RABBIT
165
WEASEL
110
Voltage Limits
The Normal permissible voltage limits for the system are as shown in the Table 5.
Table 5-5
Voltage Limits
[Type
quote
from
the
Voltage Limits
(kV)
33
(+/-) 10%
29.6 - 36.3
11
(+/-) 10%
9.8 - 12.2
0.4 (LT)
(+/-) 10%
0.36 - 0.44
5-7
020328-40RP-0400-00
Final Report
5.3.4.5
Conductor Details
The circuit formations recommended for use in 33 kV and 11 kV lines are shown in the Table
6.
Table 5-6
Voltage Class
5.3.4.6
33 kV
11 kV
D/C DOG
S/C DOG
D/C RACOON
S/C RACOON
Details of 33 kV lines with total length of each line and the 33/11 kV S/Ss with their capacity
and the number and rating of individual transformer installed at each of the S/Ss connected
to the feeder, as on 2009, in respect of each circle are given in the Tables 7.
Table 5-7
Circle
Feeder
name
1.PESU
(East)
1.Bahadurpu
r-Saidpur
Total
Feeder
length km)
12
Transformer
- wise
Capacity
(No.MVA)
Total S/S
Capacity
(MVA)
1.
Bahadurpur
4x5
20
2. Saidpur
4x5
20
33/11 kV
S/Ss on
feeder
2. PESU V
(Kankarbag)
Mithapur
1. Kankarbag
5x5
25
3. PESU IV
(R K Nagar)
Mithapur
6.2
1. R K Nagar
2x10
20
3x5
15
1.
Karbaghiya
3x5 + 1x3.15
18.15
2. R. Nagar
3x5
15
3.
Machhuatoli
2x5
10
1. Meena
Bazar
1x5
2. Mangal
Talab
4x5
20
3. Malsalami
2x5
10
2. Ashok
Nagar
4. PESU I &
II
5. City
Mithapur
Gaighat
10.75
10
5-8
020328-40RP-0400-00
Final Report
Circle
Feeder
name
6. NMCH Meena Bazar
EHV S/S
from where
feeder
emanating
Gaighat
Total
Feeder
length km)
3.5
Transformer
- wise
Capacity
(No.MVA)
Total S/S
Capacity
(MVA)
1. NMCH
1x10+1x5
15
2. Meena
Bazar
4x5
20
2x5
10
33/11 kV
S/Ss on
feeder
7. Gaighat
Gaighat
0.2
1. Gaighat
8. Pahari
Katra
7.5
1. Pahari
3x5+1x3.15
18.15
2.
Sampatchak
1x5+2x3.15
11.3
3. HTC
9. Katra
Fatuah
15
1. Katra
10.Dina Iron
Fatuah
15
1. Karmali
Chak
1.5
5x5
25
2x10
20
2. HTC (Dina
Iron)
17.14
3. HTC
11.Telecom
Jakkanpur
20.3
1.6
1. S K
Memorial
1x10+2x5
20
2. PMCH
2x5
10
105.45
2.PESU
(West)
1. Khagaul
III & IV
2. Khagaul II
Khagaul
Khagaul
16.8
22.5
347.84
1. Garikhana
3x5
15
2. Pataliputra
4x5
20
3. Rajapur
2x5
10
4. S K Puri
1x10+3x5
25
5. A N
College
4x5
20
1. Phulwari
1x5
1x10+1x5
15
1x5+1x3.15
8.15
4. IGIMS
4x5
20
5. Walmi
2x5
10
1. Bhusaula
1x5+1x3.15
8.15
2. S K Puri
1x10+3x5
25
3. A N
College
4x5
20
1. Digha
2x5
10
2. Excise
3. Veterinary
College
3. Khagaul I
4. Danapur I
Khagaul
Khagaul
28.5
22
5-9
020328-40RP-0400-00
Final Report
Circle
Feeder
name
EHV S/S
from where
feeder
emanating
Total
Feeder
length km)
Transformer
- wise
Capacity
(No.MVA)
Total S/S
Capacity
(MVA)
2. R B I
1x5
3. Digha C/S
2x5
10
33/11 kV
S/Ss on
feeder
5. Danapur
II
Khagaul
1. Danapur
4x5
20
6. Vidyut
Bhawan
Jakkanpur
1.Vidyut
Bhawan
2x5
10
2. High Court
2x5
10
1. Sinchai
Bhawan
2x5
10
2. Vikas
Bhawan
2x5
10
3. Board's
Colony
4x5
20
7. Sinchai
Bhawan
Jakkanpur
8. PESU IX
Jakkanpur
5.15
1. Bandar
Bagicha
5x5
25
9. PESU VII
Jakkanpur
1. Sahitya
Sammelan
2x5
10
2. Maurya
Lok
3x5
15
1. Beur
2x5
10
2. Khagaul
2x5
10
1.
Gardanibag
2x5
10
2. Anishabad
2x5
10
1. Jakkanpur
4x5
20
10.PESU VI
11.PESU III
12.Jakkanpu
r
Jakkanpur
Jakkanpur
Jakkanpur
12
0.1
140.05
3.
Patna
416.3
1. GISCO
Bihta
14
1. HTC
2. Bihta I
Bihta
1. Bihta
1x5+3x3.1.5
14.45
3. Bihta II
Bihta
47
1. Pareo
2x3
2. Kanpa
1x3+1x3.15+
1x1.6
7.75
3.
Lalbhasara
1x3+1x3.15
6.15
4. Paliganj
1x5+1x3.15+
1x3
11.15
1. Bihta A/F
1x5+1x1.6
6.6
2x5
10
4. Bihta A/F
Bihta
15.7
2. Maner
5-10
14
020328-40RP-0400-00
Final Report
Circle
Feeder
name
EHV S/S
from where
feeder
emanating
Total
Feeder
length km)
33/11 kV
S/Ss on
feeder
Transformer
- wise
Capacity
(No.MVA)
6. Bihta A/F
- Balmukund
Bihta
4.2
1. HTC
12.14
7. Bihta A/F
- HTC Group
Bihta
1. HTC
Group
11.68
8.
Biharibigha
Barh
12
1.
Biharibigha
9. Barh
Barh
23
1. Barh
2.
Bakhtiyarpur
10.NTPC I &
II
Barh
11.Fatuah
Fatuah
12.NeoraNaubatpur
Khagaul
4
26.8
14
2x3.15
6.3
4x5
20
1x5+3x1.5+2
x3.15
15.8
1. HTC
2.67
1. Fatuah
3x5+1x3.15
18.15
2.
Daniyaman
1x3.15+1x1.
6
4.75
3. Khusrupur
2x3.15
6.3
1. Neora
2x3.15
6.3
2. Naubatpur
2x5
10
13.Masaurhi
New
Masaurhi
0.7
1. Masaurhi
New
2x5+1x3
13
14.Masaurhi
Old
Masaurhi
18.6
1. Masaurhi
Old
2x3
2. Dhanaura
2x3.15
6.3
1. Haathidah
4x5
20
2. Mokama
2x5
10
15.HathidahMokama
Hathidah
14.1
209.1
4.
Nalanda
Total S/S
Capacity
(MVA)
1. Parwalpur
1x5+1x3.15
8.15
(Hulasganj of
Gaya Circle
2.
Ekangersarai
2x5
10
not included)
3. Hilsa
2x5+1x3
13
4. Islampur
2x3.15
6.3
5. Khudaganj
2x3.15
6.3
1.
Ramchandra
pur
4x5+2x3
26
4x5+1x3.15+
1x3
26.15
1.
Ekangersarai
Bari Pahari
67
245.49
2.
Ramchandra
pur
Bari Pahari
3. Bari
Pahari
Bari Pahari
0.1
5-11
1. Bari
Pahari
020328-40RP-0400-00
Final Report
Circle
Feeder
name
4. Sohasarai
EHV S/S
from where
feeder
emanating
Bari Pahari
Total
Feeder
length km)
33/11 kV
S/Ss on
feeder
Transformer
- wise
Capacity
(No.MVA)
Total S/S
Capacity
(MVA)
15
1. Sohasarai
4x5+1x3
23
1x5+2x3.15
11.3
3x3.15
9.45
1x5+1x3.15
8.15
3. Thertheri
1x3.15
3.15
4. Dhamauli
1x3.15
3.15
5. Harnaut
3x3.15
9.45
2x3.15
6.3
2x5+2x3.15
16.3
2. Raiter
2x5
10
1. Rajgir
3x5
15
2. Rahui
5. Noorsarai
Bari Pahari
48
1. Noorsarai
2. Chandi
6. Silao
Rajgir
1. Silao
7. Nalanda
Rajgir
15
1. Nalanda
8. Rajgir
Rajgir
2.5
158.6
5.
Chapra
1. Fulwaria
2. Gopalganj
3. Barauli
4. Srinagar
Gopalganj
Gopalganj
Gopalganj
Siwan
71
63
40
18
211.15
1. Fulwaria
2x3.15
6.3
2. Hathua
1x3.15
3.15
3. Hussepur
2x5
10
1. Gopalganj
2x5
10
2. Kuchaikot
1x5
3. Jhajhwa
1x1.6
1.6
1. Barauli
2x3.15
6.3
2.
Baikunthpur
2x3.15
6.3
1. Srinagar
2x3.15
6.3
2. Mairwa
2x3.15
6.3
3x5
15
5. Siwan
Siwan
0.2
1. Siwan
6.
Maharajganj
Siwan
40
1.
Maharajganj
1x3.15+1x5
8.15
2. Ekma
1x1.5+1x3
4.5
1. Baniapur
2x3.15
6.3
2. Mashrakh
2x3.15
6.3
2x3.15+1x5
11.3
7. BaniapurMashrakh
Siwan
55
8. Sonepur
Hajipur
1. Sonepur
9.
Prabhunathn
agar
Chapra
25
1.
Prabhunathn
agar
2x5
10
2. Manjhi
1x5
5-12
020328-40RP-0400-00
Final Report
Circle
Feeder
name
EHV S/S
from where
feeder
emanating
Total
Feeder
length km)
33/11 kV
S/Ss on
feeder
10.Telpa
Chapra
0.1
1. Telpa
11.Marworah
Chapra
46
1. Marworah
2. Taraiya
12.Sheetalpu
r
Sheetalpur
0.1
1. Sheetalpur
Transformer
- wise
Capacity
(No.MVA)
Total S/S
Capacity
(MVA)
5x5
25
1x3.15+1x5
8.15
1x5
2x3.15
6.3
363.4
6.
Motihari
172.25
1. Valmiki
Nagar
Surajpura,
Nepal
3.5
1. Valmiki
Nagar
1x3.15
3.15
2.
Ramnagar
Ramnagar
54.5
1. Ramnagar
1x5+1x3.15
8.15
2. Bagaha
1x5+1x1.6
6.6
3. Lauria
Ramnagar
23
1. Lauria
1x1.6
1.6
4.
Narkatiaganj
Ramnagar
20
1.
Narkatiaganj
2x3.15
6.3
5. Raxaul
Nepal
19
1. Raxaul
1x5+2x3.15
11.3
2. Adopur
1x3.15
3.15
6. Dhaka
Dhaka
0.1
1. Dhaka
2x5
10
7. Bettiah
Bettiah
2.5
1. Bettiah
3x5
15
2. HTC
8.
MadhopurHarsiddhi
Motihari
46
1. Madhopur
1x3.15
3.15
2. Harsiddhi
1x3.15
3.15
1x3.15+1x1.
6
4.75
9. Areraj
Motihari
33
1. Areraj
10.Motihari
Motihari
0.1
1. Motihari
3x5
15
11.Chakia
Motihari
47
1. Chakia
1x3+2x3.15
9.3
1x3
2. Madhuban
248.7
7.
Bhojpur
1. Buxar
Dumraon
56
105.6
1. Buxar
2x5
10
2. Itarhi
1x3.15
3.15
1x3.15+2x1.
5
6.15
4. Industrial
1x3.15
3.15
3. Chausa
2. Dumraon
Dumraon
1. Dumraon
2x5
10
3.
Nawanagar
Dumraon
30
1.
Nawanagar
2x3.15
6.3
5-13
020328-40RP-0400-00
Final Report
Circle
Feeder
name
4. Bramhpur
EHV S/S
from where
feeder
emanating
Dumraon
Total
Feeder
length km)
43
Transformer
- wise
Capacity
(No.MVA)
Total S/S
Capacity
(MVA)
2. Murar
1x1.6
1.6
3. Akarsai
1x3.15
3.15
1.
Krishnapura
m
2x3.15
6.3
2. Brahmpur
1x3.15
3.15
3. Shahpur
2x3.15
6.3
1x5+1x3.15
8.15
1. Garhani
1x3.15
3.15
2. Pero
2x3.15
6.3
2x3.15
6.3
33/11 kV
S/Ss on
feeder
4. Bihian
5. Garhani
Ara
48
6.
Jagdishpur
Ara
30
1.
Jagdishpur
7. Japani
Farm
Ara
20
1. Japani
Farm
3x5
15
2. Serai
2x3.15
6.3
3x5
15
2. Bahirha
2x3.15
6.3
3. Sandes
2x3.15
6.3
4. Agiaon
2x3.15
6.3
1. Koilwar
2x5+1x3.15
13.15
8.
Powerganj
9. Koilwar
Ara
Bihta
63
10
1. Powerganj
303
8. Gaya
1. Kako
2. Ataullah
3. Tehta
4. Ghosi
Irki
Irki
Irki
Irki
29
59
27
18
5-14
151.5
1. Kako
1x1.6+1x3.1
5
4.75
2. Charui
1x1.6+1x3.1
5
4.75
1x3+2x1.6
6.2
2. Kurtha
2x3.15
6.3
3. Karpi
1x1.6
1.6
4. Arwal
1x1.6+2x3.1
5
7.9
1. Tehta
1x1.6+1x3.1
5
4.75
2. Makpa
1x3.15
3.15
3.
Makhdumpur
1x5+1x3.15
8.15
1. Ghosi
1x3.15+1x1.
4.75
1. Ataullah
020328-40RP-0400-00
Final Report
Circle
Feeder
name
5. Irki
6. Rafiganj
I&II
EHV S/S
from where
feeder
emanating
Irki
Rafiganj
Total
Feeder
length km)
13.1
21
33/11 kV
S/Ss on
feeder
8. Guraru
9. Tekari
10.Belaganj
Rafiganj
Rafiganj
Tekari
Belaganj
38
55
12.2
36.2
Total S/S
Capacity
(MVA)
2.
Jehanabad
3x5
15
1. Irki
2x5
10
2.
Shakurabad
1x3.15
3.15
1. Rafiganj
1x5+1x3.15
8.15
1x3
1. Uchauli
1x3.15
3.15
2. Madanpur
1x3.15
3.15
1. Guraru
2x3.15
6.3
2. Paraiya
2x3.15
6.3
1. Tekari
1x5
2. Koach
1x3.15
3.15
1. Belaganj
2x3.15
6.3
2. Chakand
2x3.15
6.3
3. Panari
2x3.15
6.3
4. Paibigha
2x5
10
2. Goh
7. Uchauli
Transformer
- wise
Capacity
(No.MVA)
6
11.Chandauti
Chandauti
(Gaya)
0.1
1. Chandauti
5x5
25
12.Dandibag
Chandauti
12
1. Dandibag
3x5
15
13.Gandhi
Maidan
Chandauti
10
1. Gandhi
Maidan
2x5
10
2. pancahiti
Akhara
3x5
15
1. A P
Colony
2x5
10
2. Railway
Maidan
4x5
20
14.A P
Colony
Chandauti
15.Central
Stores
Chandauti
1. Central
Stores
2x3.15
6.3
16.Medical
Chandauti
15
1. Medical
2x5
10
2. Cherki
1x3.15+1x1.
6
4.75
1. Sherghati
1x5+1x3.15
8.15
1x3.15
3.15
17.Sherghati
Bodh Gaya
154
2. Gurua
5-15
020328-40RP-0400-00
Final Report
Circle
Feeder
name
EHV S/S
from where
feeder
emanating
Total
Feeder
length km)
Transformer
- wise
Capacity
(No.MVA)
Total S/S
Capacity
(MVA)
3. Amas
2x3.15
6.3
4. Banke
Bazar
2x3.15
6.3
5. Imamganj
1x3.15
3.15
6. Dumaria
2x3.15
6.3
1x3.15+1x1.
6
4.75
8.
Chkrabaria
2x3.15
6.3
9. Dobhi
2x3.15
6.3
3x5+1x3.15
18.15
2. Tankuppa
2x3.15
6.3
3. Paimar
1x1.6
1.6
4. Wazirganj
2x3.15
6.3
5. Fatehpur
1x3.15
3.15
6. Gere
2x3.15
6.3
7. Bhore
DEF
33/11 kV
S/Ss on
feeder
7. Shobh
18.Manpur
Bodh Gaya
107
1. Manpur
19.Industrial
Area
Bodh Garya
1. Ind. Area
20.M U
Campus
Bodh Garya
1. M U
Campus
2. Buddhist
Complex
2x3.15
6.3
3x5+1x3.15
18.15
2x5
10
2x5+1x3.15
13.15
21.Sone
Nagar
Barun
0.1
1. Sone
Nagar
22.Barem
Barun
22
1. Barem
2x3.15
6.3
23.Tengra
Barun
13
1. Tengra
2x3.15
6.3
24.Aurangab
ad
Barun
79
1.
Aurangabad
4x5
20
2. Obra
2x3
3. Daud
Nagar
1x3+1x1.6
4.6
4. Gangti
2x3.15
6.3
1x3+1x1.5
4.5
1x3.15
3.15
5. Deo
25.Sone
Hydel
Barun
HTC
26.Nabi
Barun
64
1. Nabi
5-16
020328-40RP-0400-00
Final Report
Circle
Feeder
name
EHV S/S
from where
feeder
emanating
Total
Feeder
length km)
Nagar
27.Hasua
28.Nawada
29.Akbarpur
30.Roh
Transformer
- wise
Capacity
(No.MVA)
Total S/S
Capacity
(MVA)
2. Amba
2x3.15
6.3
1. Hasua
1x5+1x3
2. Nadirganj
2x3
1. Nawada
3x5
15
2.
Bhadhokhara
2x3
3. Nawada
New
2x3
1. Akbarpur
1x3
2. Rajauli
1x5+1x3
3. Sirdala
1x3
1. Roh
1x1.6
1.6
2. Kaukol
1x1.6
1.6
3.
Warsaliganj
2x3
4.
Pakribarwan
1x3
33/11 kV
S/Ss on
feeder
Nagar
Nawada
Nawada
Nawada
Nawada
20
13.5
29
64
31.Hulasganj
from
Islampur
Bari Pahari
12
1. Hulasganj
1x1.6
1.6
32,Atari
Rajgir
50
1. Atari
1x3.15
3.15
2. Khizr
Sarai
2x3.15
6.3
995.2
9.
Saharsa
1. Supaul
Supaul
62.5
545.4
1. Supaul
2x5
10
2. Kishanpur
2x1.6
3.2
3. Pipra
2x3.15
6.3
4. Raghopur
1x3.15+1x1.
6
4.75
1x5+1x3.15
8.15
2x5
10
2. Simri
Bkhtiyarpur
Saharsa
25
1. Simri
Bakhtiyarpur
3. New
Market
Saharsa
2.5
1. New
Market
4. Saharsa
Saharsa
0.1
1. Saharsa
3x5+1x1.6
16.6
5.
Madhepura
Saharsa
62
1.
Madhepura
2x5
10
2. Singhswar
1x5
5-17
020328-40RP-0400-00
Final Report
Circle
Feeder
name
6. Khagaria
EHV S/S
from where
feeder
emanating
Khagaria
Total
Feeder
length km)
20.1
33/11 kV
S/Ss on
feeder
Transformer
- wise
Capacity
(No.MVA)
3. Murliganj
1x3.15+1x1.
6
4.75
1. Khagaria
3x5
15
2. Mansi
1x3+1x1.5
4.5
3.
Maheshkunt
1x5+1x3.15
8.15
7. Alam
Nagar
Udakishanga
nj
25
1. Alam
Nagar
1x1.6+1x1.5
3.1
8.
Udakishanga
nj
Udakishanga
nj
0.1
1.
Udakishanga
nj
1x5+1x3.15
8.15
197.3
10.
Bhagalp
ur
Total S/S
Capacity
(MVA)
117.65
1. Bihpur
Naugachhia
15
1. Bihpur
2.
Naugachhia
Naugachhia
3.5
1.
Naugachhia
3. Belhar
from Tarapur
Sultanganj
22
1. Belhar
4. Patwara
Sultanganj
26
1. Patwara
5.
Sultanganj
Sultanganj
0.1
6. Shahkund
Sultanganj
14
7. Barari
Sabour
8. C S
Compund
Sabour
12.3
8.7
2x3.15
6.3
1x5+2x3.15
11.3
1x3.15
3.15
1x3
1. Sultanganj
2x5+1x3.15
13.15
1. Shahkund
1x3.15
3.15
1. Barari
1x5
2. Central
Jail
1x5
3. Mayaganj
2x5
10
1. C S
Compound
2x5
10
2. T T School
2x5
10
1. Sabour
2x3.15
6.3
2x3.15
6.3
9. Sabour
Sabour
5.5
10.Gouradih
Sabour
1. Gouradih
11.Aliganj I
Sabour
27
1. Aliganj
1x5
2.
Jagdishpur
1x5
2x5+1x3.15
13.15
1. Aliganj
2x5
10
2.
Mojahidpur
1x5
3. Nath
Nagar
12.Aliganj II
Sabour
13
5-18
020328-40RP-0400-00
Final Report
Circle
Feeder
name
EHV S/S
from where
feeder
emanating
Total
Feeder
length km)
33/11 kV
S/Ss on
feeder
Transformer
- wise
Capacity
(No.MVA)
Total S/S
Capacity
(MVA)
13.Sanhaula
Kahalgaon
29
1. Sanhaula
1x5+1x3.15
8.15
14.Kahalgao
n
Kahalgaon
32
1. Kahalgaon
3x5+1x3.15
18.15
2. Pirpainti
1x1+1x3.15
4.15
2x5
10
1x3.15+1x3
6.15
1x3.15
3.15
1x3+1x1.6
4.6
15.Banka
Banka
49.15
1. Banka
2. Amarpur
3. Rajaun
4. Bousi
264.25
11.Mun
ger
1. Tarapur
Sultanganj
34
185.15
1. Tarapur
2. Kharagpur
2x5
10
1x3+1x5
2x3.15+1x1.
6
7.9
2. Barhaiya
Hathidah
12
1. Barhaiya
3. Ariari
Sheikhpura
57
1. Ariari
1x3.15
3.15
2. Bhalua
1x3.15
3.15
3. Katari
1x1.6
1.6
4. Barkna
1x1.5
1.5
1. Onama
1x1.6
1.6
2. Mirzapur
1x3.15+1x1.
6
4.75
1x1.6
1.6
1x5+1x3.15+
1x1.6
9.75
2x5+1x3.15
13.15
2x3.15
6.3
1x5+1x3.15+
1x.75
8.9
1. Salempur
1x5+1x3.15
8.15
2. Haibatganj
2x3.15
6.3
1. Jamui
3x5+1x3.15
18.15
2. Khaira
2x3.15
6.3
3. Sikandara
2x3.15
6.3
1. Gidhour
1x3.15
3.15
4. Onama
Sheikhpura
20
5.
Hathiyama
Sheikhpura
1. Hathiyama
6.
Sheikhpura
Sheikhpura
0.5
1.
Sheikhpura
7. Purani
Bazar
Lakhisarai
7.3
1. Purani
Bazar
2. Court Area
3. Balaji
8.
SalempurHaibatganj
9. Jamui
10.Gidhour-
Lakhisarai
Mallehpur
Mallehpur
28
43
43.5
5-19
020328-40RP-0400-00
Final Report
Circle
Feeder
name
EHV S/S
from where
feeder
emanating
Total
Feeder
length km)
Transformer
- wise
Capacity
(No.MVA)
Total S/S
Capacity
(MVA)
2. Jhajha
1x5+1x3.15
8.15
3. Sono
1x1.6+1x3.1
5+1x5
9.75
33/11 kV
S/Ss on
feeder
Jhajha
11.Dakranala
Jamalpur
1. Dakranala
1x5+1x1.5
6.5
12.Ramchan
drapur
Jamalpur
1.
Ramchandra
pur
1x1.5
1.5
2x3.15+2x5
16.3
1x3.15
3.15
2. Rly.
Workshop
13.Safiabad
Jamalpur
18.2
1. Safiabad
2. Baniyarpur
14.ITC
Jamalpur
HTC
15.Karnchau
ra
Jamalpur
13
1.
Karnchaura
3x5
15
16.Nandlalpu
r
Jamalpur
1. Nandlalpur
2x5
10
17.Bindwara
Jamalpur
2.5
1x5+1x3.15
8.15
1. Bindwara
2.135
309
12.
Samasti
pur
1. Pusa
Mohanpur
32
2. Mohanpur
Mohanpur
30.6
3. Jute Mill
Mohanpur
10
4.
Sarairanjan
Mohanpur
18.5
5. Jitwarpur
Mohanpur
10
6. Railway
Mohanpur
3.75
7.
Dalsingsarai
Mohanpur
52
210.335
1. Pusa
2x3.15
6.3
1. Mohanpur
3x5
15
2.
Warisnagar
1x3.15
3.15
3. Kalyanpur
1x3.15
3.15
HTC
1.
Sarairanjan
1x3.15
3.15
2. Patei
1x3.15
3.15
1x5+1x3.15
8.15
1. Jitwarpur
HTC
2x3.15
6.3
2. Mohadi
Nagar
2x1.6
3.2
1x5+1x1.6
6.6
1x3.15+1x1.
6
4.75
Mohanpur
24
1. Sirsia
9. RoseraBibhutipur
Mohanpur
65
1. Rosera
5-20
2.5
1.
Dalsinghsara
i
8. Sirsia
2.5
020328-40RP-0400-00
Final Report
Circle
Feeder
name
10.Bangradih
EHV S/S
from where
feeder
emanating
BTPS
Total
Feeder
length km)
37.8
33/11 kV
S/Ss on
feeder
Transformer
- wise
Capacity
(No.MVA)
Total S/S
Capacity
(MVA)
2. Bibhutipur
1x3.15
3.15
3. Hassanpur
1x1.6
1.6
1. Deona
2. Bangradih
2x5
2x5+2x3.15
3. Jai
Mangala(HT
C)
6.5
4. Jai Matadi
(HTC)
1.5
5. Bachhaura
1x3.15+1x1.
6
11.IOC
BTPS
15
HTC
12.Railway
BTPS
12
HTC
13.Begusarai
BTPS
56
1. Begusarai
5x5
25
2. Manjhaul
1x3.15+1x3
6.15
3. Ganga
Dairy
4. Baliya
1.25
2x3.15
366.65
13.Purn
ea
4.75
6.3
132.1
1. Kursaila
Naugachhia
16.5
1. Kursaila
2x3.15
6.3
2.
Narpatganj
Forbesganj
18
1.
Narpatganj
2x3.15
6.3
3. Raniganj
Forbesganj
28
1. Raniganj
2x3.15
6.3
4.
ForbesganjAraria
Forbesganj
32
1.
Forbesganj
3x5
15
2. Araria
2x5
10
3. Jokihat
2x3.15
6.3
1. Dighal
Bank
2x3.15
6.3
2.
Bahadurganj
2x3.15
6.3
2x3.15
6.3
5. Dighal
Bank
Kishanganj
32
6. Sarai
Kishanganj
22
1. Sarai
7.
Paschimpali
Kishanganj
1.
Paschimpali
2x5+1x3.15
13.15
8. Purabpali
Kishanganj
12
1. Purabpali
2x5
10
9.
Thakurganj
Kishanganj
60
1.
Thakurganj
1x5+1x3.15
8.15
5-21
020328-40RP-0400-00
Final Report
Circle
Feeder
name
EHV S/S
from where
feeder
emanating
Total
Feeder
length km)
33/11 kV
S/Ss on
feeder
Transformer
- wise
Capacity
(No.MVA)
Total S/S
Capacity
(MVA)
3x5
15
10.Group
Control
Purnea
0.1
1. Group
Control
11.Banmank
hiMadhubani
Purnea
44
1.
Banmankhi
1x3.15+1x3
6.15
2.
Madhubani
2x5
10
1. Zero Mile
3x5
15
2. City
1x5
1.
Belagachhi
1x5
2. Dalkola
1x1.6
1.6
3. Sonaily
1x3.15
3.15
4. Baloni
1x5
5. Pranpur
1x1.6
1.6
1. Naranga
2x5+1x3.15
13.15
2. Mirganj
2x3.15
6.3
3. Dargaha
1x1.5
1.5
1x5+1x3.15
8.15
3x5
15
2. Gore Beri
2x1.5
3. Falka
1x1.5
1.5
12.Zero Mile
13.Belgachhi
14.Naranga
Purnea
Purnea
Purnea
16
120
71
15.Jalalgarh
Purnea
25
1. Jalalgarh
16.Beri
Katihar
38
1. Beri
17.Industrial
Estate
Katihar
1. Industrial
Estate
2x5+1x3.15
13.15
18.Binodpur
Katihar
1. Binodpur
2x5
10
549.6
14.
Sasara
m
1. Karmnasa
2. DVPL
3. Ramgarh
Karmnasa
Karmnasa
Karmnasa
31.1
17
48
5-22
239.65
1. Karmnasa
1x3.15
3.15
2. Durgawati
1x5
3. Chand
3x5
15
1. HTC
1.5
2. Larma
1x3.15
3.15
1. Kalyanpur
1x3.15
3.15
2. Ramgarh
3x5
15
3. Chourasia
1x3.15
3.15
4. Nuaon
2x3.15
6.3
020328-40RP-0400-00
Final Report
Circle
Feeder
name
EHV S/S
from where
feeder
emanating
Total
Feeder
length km)
33/11 kV
S/Ss on
feeder
Transformer
- wise
Capacity
(No.MVA)
Total S/S
Capacity
(MVA)
4. Kakrait
Karmnasa
17
1. Kakrait
2x5
10
5. Dinara
Bikramganj
38
1. Dinara
2x3.15
6.3
2. Kochas
3x3.15
9.45
6. Dawath
Biramganj
1. Dawath
2x3.15
6.3
7. Sunjhauli
Biramganj
22
1. Sanjhauli
2x3.15
6.3
8. Surjapura
Biramganj
0.1
1. Surajpura
2x3.15
6.3
9.
Bikramganj
Biramganj
26
1.
Bikramganj
2x5+1x3.15
13.15
2. Karakat
2x3.15
6.3
10.Parsathua
Mohania
20
1. Parsathua
2x3.15
6.3
11.Chainpur
Mohania
21
1. Chainpur
2x3.15
6.3
12.Kudra Bhabhua
New
Mohania
50
1. Bhabhua
New
2x5
10
2. Kudra
3x5
15
3. Karamchat
1x1.5
1.5
4. Cenari
1x3.15
3.15
1. Mohania
3x5
15
2. Bhabhua
2x5+1x3.15
13.15
3. Adhaura
1x3.15
3.15
4. Bahuara
1x3.15+1x2.
5
5.65
1x5+1x1
13.Mohania
Mohania
93.1
14.Pusauli
PGCIL
Pusauli
0.1
1. Pusauli
15.Beda Takia
Sasaram
23
1. Beda
4x5
20
2. Takia
3x5
15
3. Nokha
1x3.15
3.15
1. Naigaon
1x5+1x3.15
8.15
2. Sheosagar
1x5+1x3.15
8.15
1. BMP Dehri
4x5
20
16.NaigaonSheosagar
17.BMP
Dehri I & II
Sasaram
Dehri-onSone
17
42
2. PHED
(HTC)
3. Basa
Karwanda
5-23
1.5
2x3.15
6.3
020328-40RP-0400-00
Final Report
Circle
Feeder
name
EHV S/S
from where
feeder
emanating
Total
Feeder
length km)
33/11 kV
S/Ss on
feeder
Transformer
- wise
Capacity
(No.MVA)
18.JVLO&FL
Dehri-onSone
1. HTC
3.15
19.Akorigola
Dehri-onSone
1. Akorigola
1x5+1x3.15
8.15
20.Nasarigan
j
Dehri-onSone
20
1. Nasariganj
2x3.15
6.3
21.Rajpur
Dehri-onSone
21
1. Rajpur
2x3.15
6.3
22.Nauhatta
Banjari
37
1. Nauhatta
2x3.15
6.3
23.Samhauta
Banjari
0.1
1. Samhauta
3x5
15
24.Indra Puri
Barun
12
1. Indra Puri
2x5+1x3.15+
1x1.5+1x.5
15.15
25.Kripabal
Barun
30
1. Kripabal
2x5+1x3.15
13.15
604.5
15.
Muzaffa
rpur
Total S/S
Capacity
(MVA)
360.45
1. Shivhar
Sitamarhi
30
1. Shivhar
2x3.15
6.3
2. Runi
Saidpur
Sitamarhi
25
1. Runi
Saidpur
1x5+1x3.15
8.15
3. Pupri
Sitamarhi
28
1. Pupri
2x3.15
6.3
4. Dumra
Sitamarhi
1. Dumra
3x5
15
5. Sursand
Sitamarhi
30
1. Sursand
2x3.15
6.3
2x5
10
2. Nepal
6. Mehua
Vaishali
30
1. Mehua
7.
Prataptand
Vaishali
15
1.
Prataptand
2x3.15
6.3
8. Lalganj
Vaishali
10
1. Lalganj
1x5+1x3.15
8.15
9. Sarai
Vaishali
20
1. Sarai
2x3.15
6.3
10.Motipur
Muzaffarpur
35
1. Motipur
1x5+1x3.15
8.15
11.Maripur
Muzaffarpur
1. Maripur
2x5
10
12.Vaishali
Muzaffarpur
1. Vaishali
2x5
10
13.Kurhani
Muzaffarpur
30
1. Kurhani
1x5
14.Dholi
Muzaffarpur
28
1. Dholi
1x5+1x3.15
8.15
15.SKMCH
Muzaffarpur
25
1. SKMCH
2x5
10
1x5+1x3.15
8.5
3. MIT
2x5
10
1. IDPL
2x5+2x10
30
2.
Sikandarpur
16.IDPL
Muzaffarpur
3.5
5-24
020328-40RP-0400-00
Final Report
Circle
Feeder
name
EHV S/S
from where
feeder
emanating
Total
Feeder
length km)
33/11 kV
S/Ss on
feeder
Transformer
- wise
Capacity
(No.MVA)
Total S/S
Capacity
(MVA)
17.Khabra
Muzaffarpur
1.5
1. Khabra
1x5
18.Bhikapura
Muzaffarpur
0.1
1.
Bhikanpura
2x5
10
19.Railway
Muzaffarpur
20.Nayatola
Muzaffarpur
9.5
3x5
15
21.Railway
Hajipur
HTC
22.Bidupur
Hajipur
10
1. Bidupur
2x5
10
23.EDIP
Hajipur
10
1. EDIP
2x3
24.Hajipur IE
Hajipur
1. Hajipur IE
3x5
15
25.Konharag
hat
Hajipur
1.
Konharaghat
3x5
15
26.Mehnar
Mohanpur
2x3.15
6.3
7.5
HTC
1. Nayatola
1. Mehnar
2.6
390.1
16.
Darbha
nga
257.5
1. Basopatti
Jaynagar
20
1. Basopatti
2x5
10
2. Jaynagar
Jaynagar
48.5
1. Jaynagar
2x3.15
6.3
2. Khagauli
2x5
10
3. Ladonia
1x3.15
3.15
3. Khutauna
Phulparas
20
1. Khutauna
1x5
4. Phulparas
Phulparas
39
1. Phulparas
2x3.15
6.3
2. Jalpatganj
2x3.15
3.15
3. Nirmali
1x3.15
3.15
1. Benipatti
1x1.6+1x5
6.6
2.
Ahilyasthan
2x5
10
2x3.15
6.3
2.
Madhubani
2x5
10
1. Rajnagar
2x3.15
6.3
2. Babubarhi
1x3.15
3.15
5. Benipatti
6. Rahika
7. Rajnagar
Rahika
Rahika
Pandaul
54
5.1
46
1. Rahika
8. Raiyam
Pandaul
14
1. Raiyam
1x3.15
3.15
9. Pandaul
Pandaul
0.1
1. Pandaul
1x5+1x3.15
8.15
10.Benipur
Pandaul
50
1. Benipur
2x3.15
6.3
2. Biraul
1x1.6+1x3.1
5
4.75
1.
1x1.6+1x3.1
4.75
11.Manigach
Pandaul
5-25
020328-40RP-0400-00
Final Report
Feeder
name
Circle
EHV S/S
from where
feeder
emanating
Total
Feeder
length km)
hi
33/11 kV
S/Ss on
feeder
Manigachhi
12.Jhanjharp
ur
13.Donar
Pandaul
Ramnagar
59
13
Total S/S
Capacity
(MVA)
1.
Jhanjharpur
2x3.15
6.3
2. Madhopur
2x1.6
3.2
1x5+1x3.15
8.15
1x3.15+1x5+
1x1.6
9.75
1. Donar
2. Gangwara
14.Bela
Ramnagar
22
1. Bela
2x5
10
15.Pandasari
Ramnagar
9.1
1. Pandsarai
1x5
2. Jail
(Laharia
Sarai)
1x5
3. DMCH
2x5
10
4. Urban
2x5
10
1. Pouria
1x1.6
1.6
1x3.15+1x1.
6
4.75
1x3.15
3.15
16.PouriaAriar
Ramnagar
46
2. Ariar
3. Baheri
453.8
5.4
Transformer
- wise
Capacity
(No.MVA)
5
193.4
Data Collection
The data collection was a very complex exercise. At the start up of the project, meetings
were held with BSEB senior management and the formats for data collection and
requirement of SLDs was explained to the counterpart BSEB head office and field personnel.
The data collection has been a continuation process, during the course of project, several
meetings were held with the BSEB personnel to explain the importance of the data collection
and improve the quality. The data collection was also discussed with the field personnel
during the visit to site. However it was observed that the data in some of the cases submitted
by the BSEB site personnel was inconsistent. Also in some cases the required data was
unavailable for some reasons or faulty housekeeping of data. In such cases, the data was
assessed on reasonable basis scientifically supported principles have been used to project
for the missing data and fill up the data void. Therefore for the study purpose certain
assumptions have been taken into account which is described in the section 5.2 of the report.
5.4.1
Distribution projects which are committed or under progress, with the scheduled in-service
dates, are listed in Table 8 and Table 9. These tables include the data for committed 33 kV
5-26
020328-40RP-0400-00
Final Report
substations and 33 kV distribution lines. These projects were included as part of base case
distribution reinforcement studies.
Table 5-8
Circle
District
Sub Station
Capacity (MVA)
Nalanda
(Bihar Sharif)
Nalanda
Badi
2x5
Sarbahadi
2x5
Chiksura Bazar
2x5
Tetrawan
2x5
Hernaut (Cheral)
2x5
Kalyan Bigha
2x5
Ghosarwan
2x5
Chainpur
2x5
Malti
2x5
10
Bhindidih
2x5
11
Andawas
2x5
12
Katri Sarai
2x5
13
Akhgaon
2x5
14
2x5
15
Barhara
2x5
16
Giddha
2x5
17
2x5
18
Pandey Patti
2x5
19
Ghogha
2x5
20
Sanhauli
2x5
21
Mananpur
2x5
22
Piei Bazar
2x5
23
Kajra
2x5
Bhojpur
Ara
Buxar
Bhagalpur
Bhagalpur
Munger
Lakhisarai
5-27
020328-40RP-0400-00
Final Report
Circle
District
Sheikhpura
Sub Station
Capacity (MVA)
24
Ghuskuri
2x5
25
Lohain
2x5
26
Toygarh
2x5
Gaya
27
Nawgarh
2x5
Aurangabad
28
Dihra
2x5
29
Saikia
2x5
30
Sonwa
2x5
31
Dhongra
2x5
32
Nowaman
2x5
Muzaffarpur
33
Bhagwanpur Chowk
2x5
Samastipur
34
Kuboliram
2x5
35
Karpoorigram
2x5
Purnea
36
Vaisi
2x5
Araria
37
Bahargaon
2x5
38
Kusgaon
2x5
39
Malgaon
2x5
40
Sour Bazar
2x5
41
Balwa Hat
2x5
42
Salkhua
2x5
43
Kumarkhand
2x5
44
Bihariganj
2x5
45
Puraini
2x5
46
Ghailar
2x5
47
Larganj
2x5
48
Parasrama
2x5
Madhubani
49
Rudrapur
2x5
Motihari
50
Chhitwani
2x5
Bettiah
51
Chautarwa
2x5
Gaya
Jehanabad
Muzaffarpur
Samastipur
Purnea
Saharsa
Saharsa
Madhepura
Supaul
Darbhanga
Motihari
5-28
020328-40RP-0400-00
Final Report
Circle
District
Sub Station
Capacity (MVA)
PESU (E)
Patna
52
Table 5-9
Circle
District
Deedarganj
2x5
Committed 33 kV Lines
33 kV Line
Sub Stations to
be connected
Line Length
(km)
Nalanda
(Bihar
Sharif)
Nalanda
Badi
12
Sarbahadi
17
Chiksura Bazar
10
Tetrawan
Hernaut (Cheral)
Kalyan Bigha
Ghosarwan
10
Chainpur
12
Malti
0.5
10
Bhindidih
11
Andawas
16
12
Katri Sarai
13
Akhgaon
0.5
14
0.5
15
Barhara
14
16
Giddha
17
Chhotka Dhakai
Chak
18
Pandey Patti
19
Ghogha
12
20
Sanhauli
11
2.5
Bhojpur
Ara
Buxar
Bhagalpur
Bhagalpur
Munger
5-29
020328-40RP-0400-00
Final Report
Circle
District
33 kV Line
Sub Stations to
be connected
Line Length
(km)
21
Mananpur
16
22
Piei Bazar
12
23
Kajra
20
24
Ghuskuri
30
25
Lohain
26
Toygarh
Gaya
27
Nawgarh
15
Aurangabad
28
Dihra
10
29
Saikia
30
Sonwa
12
31
Dhongra
10
32
Nowaman
Muzaffarpur
33
Bhagwanpur
Chowk
Samastipur
34
Kuboliram
35
Karpoorigram
3.5
Purnea
36
Vaisi
10
Araria
37
Bahargaon
13
38
Kusgaon
39
Malgaon
10
40
Sour Bazar
12
41
Balwa Hat
19
42
Salkhua
19
43
Kumarkhand
12
44
Bihariganj
10
45
Puraini
10
46
Ghailar
10
47
Larganj
Lakhisarai
Sheikhpura
Gaya
Jehanabad
Muzaffarpur
2.5
Samastipur
8
Purnea
Saharsa
Saharsa
Madhepura
Supaul
5-30
020328-40RP-0400-00
Final Report
Circle
District
33 kV Line
Sub Stations to
be connected
Line Length
(km)
48
Parasrama
16
Madhubani
49
Rudrapur
30
Motihari
50
Chhitwani
Bettiah
51
Chautarwa
15
Patna
52
Deedarganj
Darbhanga
Motihari
PESU (E)
5.4.2
For the study of the Distribution system loss analysis of BSEB, the state of the art windows
based CYMDIST (Cyme Distribution) Tool was used.
CYMDIST is optimization software for analysis and planning of Distribution system. It has an
edge over similar software in terms of availability of;
Optimization of network
Reliability analysis
This program was developed by Cyme International T&D Canada and has been continually
improved since its debut.
In Canada, USA, Germany, Sweden and other European countries, the software is being
extensively used by the utilities and consultants for planning and analysis of power systems.
This tool is also extensively used in Indian utilities like Madhya Pradesh, Kerala, West
Bengal etc and many private distribution companies viz., NDPL, Torrent and Reliance energy
Ltd. for planning and monitoring purposes.
5.4.2.1
Salient features
CYMDIST is a planning tool and is used to analyze, plan, optimize and manage the planning
and information system for electrical networks. CYMDIST can perform several types of
analyses on balanced or unbalanced three-phase, two-phase and single-phase systems that
are operated in radial, looped or meshed configurations:
Basic module interactive graphic including symbol editor, data and database
management.
Load allocation.
Load Balancing.
Load growth.
5-31
020328-40RP-0400-00
Final Report
Capacitor placement.
Fault Flow.
Harmonic Analysis.
Contingency Analysis..
GIS Interface.
5.5
5.5.1
System Study of the existing 2009-2010 network of the 33 kV system using the Cymdist
Software
Based on the data collected which included the SLDs, the line lengths, transformer details
collected from BSEB, individual feeders were modeled on CYMDIST and a study involving
load flow was carried out to determine the loading and voltage on each feeder section length
and transformer of feeder. It was noted that a considerable number of 33 kV lines were found
to be showing very high losses due to the fact that they (the 33 kV Lines) have been wired
with 7/12, 7/14 or 7/16 SWG GI wire as per input data provided for Planning study. Use of GI
wire for transfer of electricity is not recommended anywhere in India and there were
problems of simulating the system using GI wire in its design, because of high resistance of
GI wires, abnormally high drop in voltages were observed at the receiving end of the line.
The simulation results brought out very clearly that for the loading conditions of 2009-10 the
need for augmentation of transformer capacity is not very high up on the list of
reinforcements for many of the distribution circles but it is necessary to replace the line
conductors. This was required to reduce the line loss and improve voltages at the receiving
end of the lines. In some of the cases it was also found that though the conductor used is
standard one but is inadequate to carry the current flowing or power it is carrying through the
major portion of the feeder line. In such cases it was proposed to replace the conductor of
the adequate capacity.
For cases where a need was felt to augment or add the transformer capacity the same was
recommended and included in the planning report.
Capacity augmentation / addition of Transformer capacity
For 2010 condition the proposal has been made, as per the study, to augment the
transformer capacities, to add the transformers and to erect new substation. The circle wise
details in respect of 33/11 kV sub stations are furnished in Table X. The proposals have also
been made to strengthen the 33 kV lines by replacing the conductors and to construct the
new lines. The circle wise details in respect of lines have been brought out in Table 10
5-32
020328-40RP-0400-00
Final Report
Table 5-10
Circle
1 PESU (East)
Feeder
BahadurpurSaidpur
Source EHV
S/S
Work proposed
Conversion of S/C DOG to D/C
WOLF ACSR
Mithapur
Length
(km)
6.0
Mithapur
5.0
R K Nagar
Mithapur
2.5
Mithapur
2.0
to Karbagahiya
City feeder
Gaighat
10.0
Malsalami S/S
NMCH
Gaighat
3.5
Khagaul
Khagaul
to IGIMS
Khagaul I
Khagaul
Khagaul to Bhusaula
2. Conversion of S/C DOG to D/C
WOLF from
10
Bhusaula to A N College
Danapur I
Khagaul
12
to Digha
PESU 9
Jakkanpur
5-33
020328-40RP-0400-00
Final Report
Circle
Feeder
PESU 7
Source EHV
S/S
Jakkanpur
Work proposed
Replacement of DOG with WOLF
ACSR from
Length
(km)
Jakkanpur
Pareo-Kanpa
Bihta
26.0
2.7
5.3
Bihta
2.1
Balmukund HTC
Bihta
3.5
Fatuah
12.0
12.0
Sohasarai
Bari Pahari
11.7
Bari Pahari
2.0
Bari Pahari
49.0
between Ekangersarai to
Hulasganj and
5-34
020328-40RP-0400-00
Final Report
Circle
Feeder
Source EHV
S/S
Work proposed
Length
(km)
Khudaganj S/Ss
2. Replacement of DOG with
WOLF ACSR
30.0
Rajgir
54.5
Rajgir
0.5
15.3
Bari Pahari
23.0
Bettiah
Bettiah
1.1
Ram Nagar
12.5
Ram Nagar
27.0
Motihari
16.5
Motihari
20.5
Motihari
5-35
6.0
020328-40RP-0400-00
Final Report
Circle
Feeder
Source EHV
S/S
Work proposed
Length
(km)
Japani farmSarai
Ara
5.0
Ara
6.0
Dumraon
4.0
Dumraon
20.0
10.0
Kako-Charui
Irki
6.0
Irki
13.5
Irki
6.5
Rafiganj
9.5
Rafiganj
6.5
12.5
5-36
020328-40RP-0400-00
Final Report
Circle
Feeder
Tekari-Konch
Source EHV
S/S
Work proposed
Replacement of GI wire with DOG
ACSR
Tekari
Length
(km)
12.0
Shergahti
Chandauti
(Gaya)
Bodh Gaya
6.0
20.8
10.0
5.0
Bodh Gaya
30.0
Bodh Gaya
3.0
Nawada
4.0
Nawada
10.0
32.0
Barun
22.0
5-37
020328-40RP-0400-00
Final Report
Circle
9. Saharsa
Feeder
Supaul
Source EHV
S/S
Work proposed
Replacement of DOG with WOLF
ACSR
Supaul
Length
(km)
0.5
Sanhaula
Kahalgaon
9.0
Banka
0.1
Jamui
Mallehpur
8.0
Lakhisarai
3.0
Sheikhpura
4.0
Sheikhpura
8.0
Sheikhpura
34.0
IOC
BTPS
7.5
BTPS
16.5
BTPS
20.0
Mohanpur
5-38
15.0
020328-40RP-0400-00
Final Report
Circle
13. Purnea
14. Sasaram
Feeder
Source EHV
S/S
Work proposed
Length
(km)
Dalsingsarai
Mohanpur
26.0
Rosera
Mohanpur
23.0
Purnea
6.0
Belgachhi
Purnea
8.0
Beri
Purnea
20.0
KalyanpurRamgarh
Karmnasa
30.0
Mohania
1.0
Mohania
0.1
Sasaram
5.0
Mehua-Patepur
Vaishali
45.0
Prataptand
Vaishali
15.0
Konharaghat
Hajipur
8.0
Bhikanpura
5-39
9.0
020328-40RP-0400-00
Final Report
Circle
Source EHV
S/S
Feeder
Work proposed
Length
(km)
WOLF ACSR
from Bhikanpura GSS to SKMCH
S/S
IDPL
Bhikanpura
3.5
JhanjharpurMadhepura
Pandaul
10.0
Gangwara-Bela
Ram Nagar
18.0
Ram Nagar
13.0
Table 5-11
Circle
Sub Station
Work
1. PESU(East)
2. PESU(West)
3. Patna
Bihta AF
Sheetalpur
Siwan
Valmiki Nagar
Bettiah
Lauria
4. Nalanda
5. Chapra
6. Motihari
5-40
020328-40RP-0400-00
Final Report
Circle
Sub Station
Work
Motihari
Kako
Guraru
Panari
Central Stores
10.Bhagalpur
Shahkund
11.Munger
Ramchandrapur
Onama
Mirjapur
Barkana
Deona
Pusa
Jitwarpur
13.Purnea
Group Control
14.Sasaram
Kalyanpur
Dinara
Bhabhua New
Pusauli
Takia
Nokha
Beda
Nahatta
Pupri
Dumar
Lalganj
EDIP
Hajipur IE
Konharaghat
7. Bhojpur
8. Gaya
9. Saharsa
12.Samastipur
15.Muzaffarpur
5-41
020328-40RP-0400-00
Final Report
Circle
16.Darbhanga
5.5.2
Sub Station
Work
Motipur
MIT
Sikandarpur
SKMCH
Khabra
Bhikanpura
Rajnagar
Raiyam
Pandaul
System Study of the planned network for 2014 of the 33 kV system using the Cymdist
Software
The network developed for 2010 was used as a base case for developing the network for
2014. Individual feeders were modeled on CYMDIST and a study involving load flow was
carried out to determine the loading and voltage on the each section of the feeder. From the
load flow, the power flow and voltage on the transformers connected to the feeder were also
determined.
As a starting point, the load from 2014 was modeled on the 2010 system and it was noted
that a considerable number of 33 kV lines were found to be showing very high losses and
very low voltage due to the fact that the existing 33kV lines were not capable for transporting
the load requirement of 2014. Moreover at many places as mentioned before in the report GI
wire was used as distribution line and use of GI wire for transfer of electricity is not
recommended, because of high resistance of GI wires. This high resistance would result in
abnormally high voltage drop at the intermediate and receiving end of the line. In some cases
it was observed that although the conductor used was a standard one but was inadequate to
carry the amount of required current or power in major sections of the feeder line. In such
cases it was proposed to replace the conductor of the adequate capacity in the particular
sections.
The simulation results brought out very clearly that with the loading conditions of 2014 the
need for new grid and distribution substation along with additional distribution lines and
augmentation of transformer capacity at the existing distribution substations. The distribution
system simulation study also highlighted the areas where the improvement in losses and
voltage could be achieved by using higher size of conductor for some initial sections of the
line.
5-42
020328-40RP-0400-00
Final Report
Table 5-12
Circle
Feeder
Karmali Chak
S.K. Memorial
1.PESU
(East)
2.PESU
(West)
Source EHV
S/S
Fatuah
Jakkanpur
Work proposed
Length
(km)
15.6
14.3
4.5
Mithapur (2)
10
Saidpur
Mithapur (2)
10
Bahadurpur
Mithapur (2)
10
R. Nagar
Mithapur (2)
10.5
Ashok Nagar
Mithapur
6.1
R.K.Nagar
Mithapur
0.2
Gaighat
Gaighat
0.2
NMCH
Gaighat
1.5
Katra (2)
Katra
Pahari
Katra
7.5
Malsalami
Katra
Mangal Talab
Katra
Jakkanpur
(2)
PMCH
Mithapur (2)
10
A.N.College
Khagaul (2)
10
S.K.Puri
Khagaul (2)
Garikhana I & II
Khagaul
5-43
18
020328-40RP-0400-00
Final Report
Circle
Feeder
Source EHV
S/S
Length
(km)
Work proposed
Garikhana (both lines)
Pataliputra (one line)
and
upto
Danapur
Digha
10
Digha
Digha
R.B.I.
Digha
Danapur (2)
Digha
10
IGIMS
Sipara
10
Veterinary
College
Sipara
10
10
1.5
1.5
Maurya Lok
Sinchai Bhawan
Jakkanpur
Jakkanpur
Anishabad
Jakkanpur
Gardanibag
Jakkanpur
Vidyut Bhawan
Jakkanpur
3.5
Sahitya
Sammelan
Jakkanpur
(2)
10
Bandar Bagicha
(2)
Jakkanpur
(2)
10
Beur
Jakkanpur
(2)
10
10
5-44
020328-40RP-0400-00
Final Report
Circle
3. Patna
Feeder
Source EHV
S/S
Work proposed
Length
(km)
A.F. Bihta
Bihta
10
Pareo
Bihta
15
GISCO
Khagaul (2)
10
Maner
Khagaul (2)
10
Neora
Khagaul
10
Fatuah (2)
Fatuah (2)
Khusrupur
Fatuah (2)
4. Nalanda
Masaurhi Old
Masaurhi
Masarhi New
Masaurhi
0.85
Barh
Barh
Barh (2)
Barh
14
Hathidah (2)
Hathidah
Hilsa
Ekangersarai
12
Islampur
Ekangersarai
12
Ekangersarai
15
Ekangersarai
Masaurhi
10
Dhamauli
Harnaut
5-45
020328-40RP-0400-00
Final Report
Circle
Feeder
Source EHV
S/S
Work proposed
Length
(km)
GSS to Dhamauli
Noorsarai
Harnaut
15
12
2.5
Andawas
Rajgir
16
Rajgir
Rajgir
2.5
10
17
12
Giriak
Rajgir
from
Rajgir-Giriak
10
Bari Pahari
Bari Pahari
0.5
Bari Pahari
2.5
Gopalganj
20
Gopalganj
Gopalganj
Srinagar
Siwan
Ramchandrapur
(2)
Ramchandrapur
Sohasarai
5. Chapra
Fulwaria
5-46
020328-40RP-0400-00
Final Report
Circle
6. Motihari
7. Bhojpur
Feeder
Source EHV
S/S
Work proposed
Length
(km)
Maharajganj
Siwan
20
Siwan (2)
Siwan
Mashrakh
Mashrakh
Taraiya
Mashrakh
11
Baikunthpur
Mashrakh
18
Prabhunath
Nagar
Chapra
Telpa
Chapra
0.1
Sheetalpur
Sheetalpur
0.1
Ramnagar
Ramnagar
0.5
Chautarwa
Ramnagar
15
Raxaul
Raxaul
Adopur
Raxaul
Bettiah
Bettiah
Bettiah (2)
Bettiah
Chakia
Motihari
35
Chhitwani
Motihari
Chausa
Buxar
Buxar
Buxar
Pandy Patti
Buxar
Dumraon (2)
Dumraon
Nawanagar
Dumraon
Final Report
Circle
Feeder
Source EHV
S/S
Work proposed
Length
(km)
Nawanagar
Garhani
8. Gaya
Jagdishpur
18
25
10
Jagdishpur
Jagdishpur
Japani Farm
Ara
Powerganj
Ara
14
Zero Mile
Ara
0.5
Karpi
Karpi
Goh
Goh
Daudnagar
Goh
25
Kako
Irki
17
Irki
12
0.3
Rafiganj
25
Belaganj
0.2
0.2
Tehta
Irki
Guraru
Belaganj
Irki
5-48
020328-40RP-0400-00
Final Report
Circle
Feeder
Source EHV
S/S
Work proposed
Length
(km)
Hulasganj
10
Sonwa
Hulasganj
12
Hulasganj
Hulasganj
Nawagarh
Hulasganj
15
Aurangabad
Aurangabad
Aurangabad
Deo
Aurangabad
Barun (2)
Barun
Dihara
Barun
10
Wazirganj
Wazirganj
Atari
Wazirganj
12
Gurua
Sherghati
Amas
Sherghati
Banke
Sherghati
Shergahti
Sherghati
Imamganj
Sherghati
Central Stores
Chandauti
6.5
Obra
Gandhi Maidan
Chandauti
5-49
020328-40RP-0400-00
Final Report
Circle
Feeder
Length
(km)
Work proposed
Conversion of S/C DOG to D/C WOLF
from
Gandhi Maidan to Panchaiti
Akhara
Dandibag
Chandauti
12
Manpur
Bodh Gaya
18
Bodh Gaya
M.U. Campus
9. Saharsa
Source EHV
S/S
Nawada
Nawada
Akbarpur
Nawada
14
15
0.5
16
Supaul
Supaul
Hulasganj
Saharsa (2)
Saharsa
Sour Bazar
Saharsa
12
Balwahat
Saharsa
19
19
Balwahat
to
Old Saharsa
Saharsa
0.1
Madhepura
Madhepura
12
10
Replacement
of
PANTHER ACSR
0.1
Khagaria
Khagaria
5-50
conductor
with
020328-40RP-0400-00
Final Report
Circle
Feeder
Length
(km)
10
10
Udakishanga
nj
13
Puraini
Udakishanga
nj
10
Sanhauli
Naugachhia
11
Naugachhia
Naugachhia
3.5
8.2
4.7
Sabour
Aliganj I
Sabour
Aliganj II
Sabour
Banka (2)
Banka
Banka
Banka
0.15
Kahalgaon
12
Kahalgaon
Kahalgaon
Tarapur
Sultanganj
20
Ramchandrapur
Jamalpur
Safiabad
Jamalpur
0.2
Karnachaura
Jamalpur
13
Ghogha
11. Munger
Work proposed
Bihariganj
CS Compound
10.Bhagalpur
Source EHV
S/S
5-51
020328-40RP-0400-00
Final Report
Circle
Feeder
Source EHV
S/S
Work proposed
Length
(km)
Balaji
Kajra
Haibatganj
Jamui
Gidhour
Ghuskuri
Onama
Sheikhpura
7.3
20
12
20
16
Mallehpur
Mallehpur
12
30
12
Sheikhpura
Mohanpur
0.6
Mohanpur
10
3.5
Lakhisarai
Lakhisarai
Lakhisarai
Sheikhpura
Sheikhpura
12.Samastipur
Mohanpur
Jitwarpur
Dalsingsarai
Dalsingsarai
5-52
020328-40RP-0400-00
Final Report
Circle
13. Purnea
14. Sasaram
Feeder
Source EHV
S/S
Length
(km)
Work proposed
Pateri
Dalsingsarai
25
Bachhwara
Dalsingsarai
12
Bibhutipur
Dalsingsarai
15
Bangrahdih (2)
BTPS
20
Deona (2)
Zero Mile
Kankaul
Zero Mile
15
Begusarai
Zero Mile
12
Raniganj
Forbesganj
13
from
BTPS
to
Mile
12
to
10
Group Control
Purnea
0.1
Banmankhi
Purnea
40
Zero Mile
Purnea
12
10
Naranga
Purnea
Jalalgarh
Purnea
25
Beri
Katihar
Barsoi
Katihar
50
Pranpur
Katihar
30
Karmnasa
Karmnasa
0.9
18
Karmnasa
Final Report
Circle
Feeder
Source EHV
S/S
Work proposed
Length
(km)
Ramgarh
15.
Muzaffarpur
Ramgarh (2)
Karmnasa
30
Mohania (2)
Mohania
15
Dinara
Dinara
Bikramganj
Bikramganj
Bikramganj (2)
Bikramganj
Kudra
Kudra
Karamchat
Kudra
20
38
Sasaram (2)
Sasaram
Sasaram (3)
Sasaram
10
Dehri-OnSone
Samhauta
Banjari
0.1
Samhauta (2)
Banjari
Kirpabal (2)
Barun
30
30
15
Indrapuri
Barun
Indrapuri (2)
Barun
Indrapuri (2)
Shivhar
Shivhar
Runi Saidpur
Runi Saidpur
Pupri
Sitamarhi
28
5-54
020328-40RP-0400-00
Final Report
Circle
Feeder
Source EHV
S/S
Work proposed
Length
(km)
Sitamarhi
Dumra
Sitamarhi
Sursand
Sonbarsa
20
Sonbarsa
Sonbarsa
Patepur
Vaishali
30
Lalganj
Vaishali
10
Sarai
Vaishali
20
Bidupur
Hajipur
10
Hajipur I E
Hajipur
10
Konharaghat (2)
Hajipur
10
SKMCH (2)
Mohanpur
MIT
SKMCH
10
Sikandarpur (2)
SKMCH
10
SKMCH
SKMCH
Kurhani
SKMCH
15
Motipur
SKMCH
35
Motipur (2)
Muzaffarpur
20
Dholi
Muzaffarpur
28
IDPL (2)
Muzaffarpur
IDPL
Muzaffarpur
3.5
Khabra
Muzaffarpur
1.5
5-55
020328-40RP-0400-00
Final Report
Circle
Feeder
Source EHV
S/S
Work proposed
Length
(km)
16.
Darbhanga
Bhikanpura
Muzaffarpur
0.1
Bhagwanpur
Chowk
Muzaffarpur
2.5
Nayatola (2)
Muzaffarpur
10
Hajipur I E (2)
Muzaffarpur
10
Jay Nagar
Jay Nagar
0.5
Benipatti
Rahika
32
Rahika
Rahika
0.1
Bela
Gangwara
Gangwara
Gangwara
Donar
Gangwara
Panda Sarai
Ram Nagar
D/C WOLF line from Gangwara (New)
GSS to DMCH
Anar
Kusheshwar
30
Biraul
Kusheshwar
20
Raj Nagar
Pandaul
33
Pandaul
Pandaul
0.1
Jhanjharpur
Pandaul
39
Rudrapur
Phulparas
30
Phulparas
Phulparas
5-56
020328-40RP-0400-00
Final Report
Table 5-13
Circle
Sub Station
Work
Deedarganj
S.K.Memorial
Saidpur
Bahadurpur
R.Nagar
Machhuatoli
Ashok Nagar
R.K.Nagar
Karbigahiya
1. PESU (East)
Gaighat
NMCH
Meena Bazar
Katra (2)
Pahari
2. PESU (West)
Malsalami
Mangal Talab
PMCH
A.N.College
S.K.Puri
Garikhana
Pataliputra
Rajapur
Walmi
Danapur
Digha
Digha C/S
RBI
Danapur (2)
5-57
020328-40RP-0400-00
Final Report
Circle
3. Patna
Sub Station
Work
IGIMS
Excise
Vaterinery College
Board`s Colony
Jakkanpur
Maurya Lok
Bandar Bagicha
Sinchai Bhawan
Anishabad
Gardanibag
Vidyut Bhawan
High Court
Sahitya Sammelan
Beur
Khagaul
Phulwari
Vikas Bhawan
Bhusaula
A.F.Bihta
Pareo
Bihta
Kanpa
Lalbhasara
Paliganj
Maner
Neora
Naubatpur
Fatuah (2)
Khusrupur
5-58
020328-40RP-0400-00
Final Report
Circle
Sub Station
Daniyaman
Work
Augmentattion of 1x1.6 and 1x3.15 MVA
with 2x5 MVA Xmers
Fatuah
Karnawad Punpun
Masaurhi Old
4. Nalanda
Dhanaura
Masaurhi New
Barh (2)
Biharibigha
Mokama
Hathidah (2)
Islampur
Khudaganj
Ekangersarai
Chiksurabazar
Dhamauli
Kalyanbigha
Chainpur
Thertheri
Cheral (Railways)
Bhindidih
Andawas
Ghosarwan
Tetrawan
Sarbahadi
Badi
Katrisarai
Parwalpur
Ramchandrapur (2)
Ramchandrapur
Bari Parhari
5-59
020328-40RP-0400-00
Final Report
Circle
Sub Station
Work
Malti
Sohasarai
5. Chapra
6. Motihari
Fulwaria
Hathua
Gopalganj
Jhajhwa
Kuchaikot
Srinagar
Mairwa
Maharajganj
Ekma
Siwan (2)
Mashrakh
Baniapur
Taraiya
Marworah
Prabhunath Nagar
Manjhi
Telpa
Sheetalpur
Valmiki Nagar
Dhanha
Ramnagar
Chautarwa
Lauria
Narkatiaganj
Raxaul
Adopur
Dhaka
Bettiah
Bettiah (2)
Madhopur
Harsidhi
5-60
020328-40RP-0400-00
Final Report
Circle
Sub Station
Areraj
Work
Augmentation of 1x1.6 with 1x5 MVA Xmer
and addition of 1x5 MVA Xmer
Motihari (2)
Motihari
Chakia
Madhuban
Chhitwani
Chausa
Itarhi
Purushottampur
Buxar
Industrial
7. Bhojpur
Pandey Patti
Dumraon (2)
Nawanagar
Murar
Akarsai
Krishnapuram
Bramhapur
Chhotka Dhakai
Garhani
Piro
Agiaon
Japani Farm
8. Gaya
Powerganj
Power House
Barhara
Zero Mile
Kako
Charui
Tehta
Makpa
Makhdampur
5-61
020328-40RP-0400-00
Final Report
Circle
Sub Station
Work
Ghosi
Jehanabad
Irki
Nowaman
Rafiganj
Uchauli
Madanpur
Guraru
Paraiya
Tekari
Koach
Belaganj
Panari
Chakand
Dhongra
Sonwa
Nawagarh
Barun
Tengra
Nabinagar
Amba
Barun (2)
Dihara
Chandauti
Central Stores
A.P.Coloy
Railway Maidan
Gandhi Maidan
Panchaiti Akhara
Dandibag
Manpur
Tankuppa
5-62
020328-40RP-0400-00
Final Report
Circle
Sub Station
Bhore
M.U.Campus
Work
Replacement of defective Xmer with 1x5
MVA
Augmentation of 1x3.15 + 1x5 MVA with
2x10 MVA Xmers
Buddhist Complex
Hasua
Nadirganj
Nawada
Nawada New
Bhadhokhara
Akbarpur
Rajauli
Sirdala
Roh
Warsaliganj
Pakribarwan
Kaukol
Barem
Supaul
9. Saharsa
10.Bhagalpur
Parasrama
Larganj
Sahrsa (2)
Sour Bazar
Balwahat
Salakhua
New Market
Madhepura
Kumarkhand
Ghailar
Khagaria
Mansi
Maheshkunt
Bihariganj
Puraini
Bihpur
5-63
020328-40RP-0400-00
Final Report
Circle
Sub Station
Sanhauli
Sultanganj
Work
New S/S with 2x5 MVA Xmer capacity
Augmentation of 1x3.15 with 1x10 MVA
Xmer
and addition of 1x5 MVA Xmer
Barari
Central Jail
Mayaganj
C S Compound
T T School
Sabour
Aliganj
Mojahidpur
Aliganj
Jagdishpur
Nath Nagar
Banka (2)
Banka
Rajouna
Bousi
Sanhoula
Ghogha
Kahalgaon
11. Munger
Tarapur
Kharagpur
Dakranala
Ramchandrapur
Safiabad
Baniyarpur
Karnchaura
Nandlalpur
Bindwara
Purani Bazar
Court Area
5-64
020328-40RP-0400-00
Final Report
Circle
Sub Station
Work
Kajra
Piri Bazar
Manpur
Jamui
Khaira
Sikandara
Gidhour
Jhajha
Sono
Ghuskuri
Lohain
Toygarh
Hathiyama
Sheikhpura
12.Samastipur
Pusa
Mohanpur
Warisnagar
Kalyanpur
Sarairanjan
Jitwarpur
Magardahi
Kuboliram
Karpoorigram
Dalsingsarai
Mehuddinnagar
Pateri
Bachchwara
Bibhutipur
Rosera
Hassanpur
Bangrahdih (2)
Deona (2)
5-65
020328-40RP-0400-00
Final Report
Circle
13. Purnea
14. Sasaram
Sub Station
Work
Kankaul
Begusarai
Manjhaul
Balia
Narpatganj
Bahargaon
Kusgaon
Malgaon
Sarai
Paschimpali
Purabpali
Group control
Madhubani
Zero Mile
City
Vaisi
Naranga
MLR Ganj
Jalalgarh
Beri
Gore Beri
Falka
Industrial Estate
Binodpur
Karmnasa
Durgawati
Chand
Larma
Kalyanpur
Chourasia
Nuaon
Kakrait
Parsathua
Chainpur
Mohania (2)
Bhabhua Old
5-66
020328-40RP-0400-00
Final Report
Circle
Sub Station
Work
Xmer
Bahuara
Dinara
Kochas
Sanjhouli
Surajpura
Kararkat
Bikramganj (2)
Pusauli
Kudra
Bhabhua New
Karamchat
Cenari
Adhaura
Takia Sasaram
Nokha
Sasaram (2)
Sasaram (3)
Naigaon
Sheosagar
Basa Karwandia
Akorigola
Nasariganj
Rajpur
Nauhatta
Samhauta
Samhauta (2)
15. Muzaffarpur
Kirpabal (2)
Indrapuri (2)
Shivhar
Runi Saidpur
Pupri
Dumra (2)
Sursand
5-67
020328-40RP-0400-00
Final Report
Circle
16. Darbhanga
Sub Station
Work
Sonbarsa
Lalganj
Sarai
Bidupur
EDIP
Konharaghat
Konharaghat(2)
SKMCH (2)
MIT
Sikandarpur (2)
Kurhani
Motipur (2)
Maripur
Vaishali
Dholi
IDPL (2)
IDPL
Khabra
Bhagwanpur chowk
Nayatola (2)
Hajipur I E (2)
Jay Nagar
Khajauli
Ladania
Benipatti
Rahika
Madhubani
Bela
Gangwara
Donar
Panda Sarai
DMCH
Urban
Pouriya
Baheri
Anar
5-68
020328-40RP-0400-00
Final Report
Circle
Sub Station
Kusheshwar
Biraul
Benipur
Raj Nagar
Babu Barhi
Pandaul
5.6
Work
Manigachi
Jhanjharpur
Madhepur
Rudrapur
Phulparas
Nirmali
Talpatganj
This section presents the Distribution system for the 33 kV network after incorporation of all
the planned items (2014 scenario). This network has also shown as block diagram for
complete BSEB and is attached as Appendix 8. The block diagrams for each circle have also
been drawn and are attached to the Appendix 8.
The following table gives the details of 33 kV lines and sub stations, cirlce wise, as on 2014
after implementaiton of the Distribution plan.
Table 5-14
Circle
1.PESU
(East)
Feeder name
EHV S/S
from where
feeder
emanating
33/11 kV S/Ss on
feeder
Total Sub
Capacity
MVA
5x5
25
1. Katra
Fatuah
1. Katra
2. Dina Iron
Fatuah
1. HTC
1.6
2. HTC
17.14
3. Karmali Chak
Fatuah
1. Karmali Chak
2x10
20
2. Deedarganj
2x5
10
4. S.K. Memorial
Jakkanpur
1. S.K.Memorial
3x10
30
Mithapur (2)
3x10
30
6. Saidpur
Mithapur (2)
1. Saidpur
4x10
40
7. Bahadurpur
Mithapur (2)
1. Bahadurpur
4x10
40
5-69
020328-40RP-0400-00
Final Report
Circle
Feeder name
8. R. Nagar
EHV S/S
from where
feeder
emanating
Mithapur (2)
Total Sub
Capacity
MVA
1. R.Nagar
2x10+1x5
25
2. Machhuatoli
1x10+2x5
20
33/11 kV S/Ss on
feeder
9. Kankar Bag
Mithapur
1. Kankar Bag
5x5
25
10.Ashok Nagar
Mithapur
1. Ashok Nagar
4x10
40
11.R.K.Nagar
Mithapur
1. R.K.Nagar
4x10
40
12.Karbigahiya
Mithapur
1. Karbigahiya
2x10+2x5
30
13.Gaighat
Gaighat
1. Gaighat
2x10+1x5
25
14.NMCH
Gaighat
1. NMCH
3x10
30
15.Meena Bazar
Gaighat
1. Meena Bazar
2x10+2x5
30
16.Katra (2)
Katra
1. Katra (2)
2x10
20
17.Pahari
Katra
1. Pahari
3x10+1x5
35
1x5+2x3.15
11.3
2. Sampatchak
(Patna)
3. HTC (Patna)
1.5
18.Malsalami
Katra
1. Malsalami
2x10
20
19.Mangal Talab
Katra
1. Mangal Talab
4x10
40
20.Meena Bazar
(2)
Jakkanpur
(2)
1. Meena Bazar
(2)
3x10
30
21.PMCH
Mithapur (2)
1. PMCH
1x10+1x5
15
651.5
2.PESU
(West)
1. A.N.College
Khagaul (2)
1. A.N.College
1x10+3x5
25
2. S.K.Puri
Khagaul (2)
1. S.K.Puri
3x10+1x5
35
3. Garikhana I & II
Khagaul
1. Garikhana
3x10
30
2. Pataliputra
3x10+1x5
35
2x10
20
3. Rajapur
4. Walmi
Khagaul
1. Walmi
1x10+1x5
15
5. Bhusaula-Vikas
B.
Khagaul
1. Bhusaula
1x5+1x10
25
2. Vikas Bhawan
1x5+1x10
25
6. Danapur
Digha
1. Danapur
1x10+3x5
25
7. Digha
Digha
1. Digha
1x10+2x5
20
2. Digha Central
Stores
1x10+1x5
15
1x10
10
8. R.B.I.
Digha
1. RBI
5-70
020328-40RP-0400-00
Final Report
Circle
Feeder name
EHV S/S
from where
feeder
emanating
33/11 kV S/Ss on
feeder
2. HTC (Group)
9. Danapur (2)
Digha
1. Danapur (2)
10. IGIMS
Sipara
11.Veterinary
College
Sipara
Total Sub
Capacity
MVA
6.9
3x10
30
1. IGIMS
2x10+2x5
30
2. Excise
2x10
20
1x10+1x3.15
13.15
2x10+2x5
30
1. Veterinary
College
2. Board`s Colony
12.Jakkanpur
Jakkanpur
1. Jakkanpur
2x10
20
13.Maurya Lok
Jakkanpur
1. Maurya Lok
3x10
30
2. Bandar
Bagicha
2x10+3x5
35
14.Karnawad
Punpun
Jakkanpur
1. Karnawad
Punpun
1x3+2x5
13
15.Sinchai Bhawan
Jakkanpur
1. Sinchai
Bhawan
1x10+1x5
15
16.Anishabad
Jakkanpur
1. Anishabad
2x10
20
2. Gardanibag
2x10
20
1. Vidyut Bhawan
2x10
20
2. High Court
2x10
20
17.Vidyut Bhawan
Jakkanpur
18.Sahitya
Sammelan
Jakkanpur
(2)
1. Sahitya
Sammelan
2x10
20
19.Bandar Bagicha
(2)
Jakkanpur
(2)
1. Bandar
Bagicha (2)
2x10
20
20.Beur
Jakkanpur
(2)
1. Beur
2x10
20
2. Khagaul
2x10
20
3. HTC
7.2
4. HTC
5. Phulwari
1x10
10
701.3
3. Patna
1. A.F. Bihta
Bihta
1. A.F.Bihta
2. Pareo
Bihta
1. Pareo
3x5
15
2x5+2x3
16
2. Koilwar (Ara
Circle)
2x5+1x3.15
13.15
3. Giddha (Ara
Circle)
2x5
10
5-71
020328-40RP-0400-00
Final Report
Circle
Feeder name
3. Bihta I & II
EHV S/S
from where
feeder
emanating
Bihta
Total Sub
Capacity
MVA
1. Bihta
1x10+3x5
25
2. Kanpa
1x3+1x3.15+1x5
11.15
3. Lalbhasara
2x5+1x3.15
13.15
4. Paliganj
3x5+1x3.15
18.15
33/11 kV S/Ss on
feeder
4. GISCO
Khagaul (2)
HTC
14
5. Balmukund
Khagaul (2)
HTC group
6. Maner
Khagaul (2)
1. Maner
1x10+2x5
20
7. Neora
Khagaul
1. Neora
3x5
15
2. Naubatpur
4x5
20
23.82
8. Fatuah (2)
Fatuah (2)
1. Fatuah (2)
2x10
20
9. Khusrupur
Fatuah (2)
1. Khusrupur
2x5+1x3.15
13.15
2. Daniyaman
2x5
10
4x5
20
10.Fatuah
Fatuah
1. Fatuah
11.Dina Iron
Fatuah
1. HTC
17.14
2. HTC
1.6
12.Masaurhi Old
Masaurhi
1. Masaurhi Old
2. Dhanaura
13.Masarhi New
Masaurhi
1. Masaurhi New
14.NTPC I & II
Barh
HTC
15.Barh
Barh
1. Barh
2. Bakhtiyarpur
1x10+1x5
15
1x5+2x3.15
11.3
2x5+1x10
20
2.67
4x5
20
1x5+3x1.5+2x3.
15
15.8
16.Barh (2)
Barh
1. Barh (2)
2x5
10
17.Biharibigha
Barh
1. Biharibigha
2x5
10
18.Hathidah
Hathidah
1. Hathidah
4x5
20
2. Mokama
1x10+1x5
15
2x5
10
19.Hathidah (2)
Hathidah
1. Hathidah (2)
446.1
4.
Nalanda
1. Hilsa
2. Islampur
3. Ekangersarai
Ekangersarai
Ekangersarai
Ekangersarai
1. Hilsa
2x5+1x3
13
2. Hilsa (2)
2x5
10
1. Islampur
1x5+2x3.15
11.3
2. Khudaganj
1x5+2x3.15
11.3
4x5
20
1. Ekangersarai
5-72
020328-40RP-0400-00
Final Report
Circle
Feeder name
EHV S/S
from where
feeder
emanating
33/11 kV S/Ss on
feeder
Total Sub
Capacity
MVA
2x5
10
4. Chiksurabazar
Masaurhi
1. Chiksurabazar
5. Dhamauli
Harnaut
1. Dhamauli
1x5+1x3.15
8.15
2. Rahui
1x5+2x3.15
11.3
1. Noorsarai
1x5+3x3.15
14.45
2x5
10
1x5+1x3.15
8.15
4. Chainpur
2x5
10
5. Thertheri
1x5+1x3.15
8.15
1. Harnaut
3x3.15
9.45
2. Cheral
(Railways)
2x5
10
2x3.15
6.3
2. Bhindidih
2x5
10
6. Noorsarai
Harnaut
2. Kalyanbigha
3. Chandi
7. Harnaut
8. Silao
Harnaut
Rajgir
1. Silao
9. Andawas
Rajgir
1. Andawas
2x5
10
10.Rajgir
Rajgir
1. Rajgir
3x5
15
2. Ghosarwan
2x5
10
1. Tetrawan
2x5
10
2. Sarbahadi
2x5
10
2x3.15
6.3
4. Badi
2x5
10
5. Katrisarai
2x5
10
2x5+2x10
30
11.Giriak
Rajgir
3. Giriak
12.Nalanda
Nalanda
1. Nalanda
13.Raiter
Nalanda
1. Bihar Sharif
2. Raiter
3x5
15
14.Parwalpur
Bari Pahari
1. Parwalpur
3x5
15
15.Ramchandrapur
(2)
Bari Pahari
1.
Ramchandrapur
(2)
2x10
20
16.Ramchandrapur
Bari Pahari
1.
Ramchandrapur
3x10
30
17.Bari Pahari
Bari Pahari
1. Bari Parhari
4x10
40
18.Asthawan
Bari Pahari
1. Asthawan
2x3.15
6.3
2. Malti
2x5
10
1. Sohasarai
3x10
30
19.Sohasarai
Bari Pahari
5-73
020328-40RP-0400-00
Final Report
Circle
Feeder name
EHV S/S
from where
feeder
emanating
33/11 kV S/Ss on
feeder
Total Sub
Capacity
MVA
460.2
1. Fulwaria
2. Gopalganj
Gopalganj
Gopalganj
1. Fulwaria
2x5+2x3.15
16.3
2. Hathua
1x5+1x3.15
8.15
3. Hussepur
3x5
15
1. Gopalganj
2x10+2x5
30
2. Jhajhwa
1x5+1x1.6
6.6
2x5
10
1. Srinagar
1x5+2x3.15
11.3
2. Mairwa
1x5+2x3.15
11.3
4x5
20
1x3.15+2x5
13.15
1x5+1x1.5+1x3
9.5
3. Kuchaikot
3. Srinagar
Siwan
4. Siwan
Siwan
1. Siwan
5. Maharajganj
Siwan
1. Maharajganj
2. Ekma
5.
Chapra
6. Siwan (2)
Siwan
1. Siwan (2)
3x10
30
7. Mashrakh
Mashrakh
1. Mashrakh
1x5+2x3.15
11.3
2. Baniapur
1x5+2x3.15
11.3
2x5
10
1x3.15+2x5
13.15
1. Baikunthpur
2x3.15
6.3
2. Barouli
2x3.15
6.3
1x10+2x5
20
2. Manjhi
2x5
10
3x10+2x5
40
8. Taraiya
Mashrakh
1. Taraiya
2. Marworah
9. Baikunthpur
10.Prabhunath
Nagar
Mashrakh
Chapra
1. Prabhunath
Nagar
11.Telpa
Chapra
1. Telpa
12.Sheetalpur
Sheetalpur
1. Sheetalpur
3x5+1x3.15
18.15
13.Sonepur
Hajipur
1. Sonepur
2x3.15+1x5
11.3
339.1
6.
Motihari
1. Valmiki Nagar
Nepal
1. Valmiki Nagar
1x3.15+2x5
13.15
2. Dhanha
Dhanha
1. Dhanha
2x5
10
3. Ramnagar
Ramnagar
1. Ramnagar
4x5
20
1x5+1x1.6
6.6
2x5
10
2x3.15+1x1.6
7.9
2x5+2x3.15
16.3
2. Bagha
4. Chautarwa
Ramnagar
1. Chautarwa
5. Lauria
Ramnagar
1. Lauria
6. Narkatiaganj
Ramnagar
1. Narkatiaganj
5-74
020328-40RP-0400-00
Final Report
Circle
Feeder name
EHV S/S
from where
feeder
emanating
33/11 kV S/Ss on
feeder
Total Sub
Capacity
MVA
7. Raxaul
Raxaul
1. Raxaul
3x5+1x3.15
18.15
8. Adopur
Raxaul
1. Adopur
1x3.15+1x5
8.5
9. Dhaka
Dhaka
1. Dhaka
4x5
20
10.Bettiah
Bettiah
1. Bettiah
2x10
20
11.Bettiah (2)
Bettiah
1. Bettiah (2)
2x10
20
12.Madhopur
Motihari
1. Madhopur
1x5+1x3.15
8.15
2. Harsidhi
1x5+1x3.15
8.15
1x3.15+2x5
13.15
13.Areraj
Motihari
1. Areraj
14.Motihari (2)
Motihari
1. Motihari (2)
2x5
10
15.Motihari
Motihari
1. Motihari
2x10
20
16.Chakia
Motihari
1. Chakia
1x5+1x3+2x3.15
14.3
2. Madhuban
1x5+1x3
1. Chhitwani
2x5
10
17.Chhitwani
Motihari
262.4
7.
Bhojpur
1. Chausa
Buxar
1. Chausa
1x5+1x3.15+1x1
.5
9.65
1x5+1x3.15
8.15
3.
Purushottampur
1x5
1. Buxar
2x10
20
2. Industrial
1x10
10
2. Itarhi
2. Buxar
Buxar
3. Pandy Patti
Buxar
1. Pandey Patti
2x5
10
4. Dumraon
Dumraon
1. Dumraon
2x5
10
5. Dumraon (2)
Dumraon
1. Dumraon (2)
3x5
15
6. Nawanagar
Dumraon
1. Nawanagar
1x5+2x3.15
11.3
1x3.15+1x1.6
4.75
3. Akarsai
1x5+1x3.15
8.15
1. Krishnapuram
1x5+2x3.15
11.3
2. Bramhapur
1x5+1x3.15
8.15
3. Sahpur
2x3.15
6.3
4. Bihian
1x5+1x3.15
8.15
1. Simri
2x3.15
6.3
2x5
10
2. Murar
7. Bramhpur
8. Simri
Dumraon
Dumraon
2. Chhotka
Dhakai Chak
5-75
020328-40RP-0400-00
Final Report
Circle
Feeder name
9. Garhani
EHV S/S
from where
feeder
emanating
Jagdishpur
Total Sub
Capacity
MVA
1. Garhani
1x5+1x3.15
8.15
2. Piro
1x5+2x3.15
11.3
3. Agiaon
2x5
10
4. Sandes
2x3.15
6.3
1x5+2x3.15
11.3
3x10
30
2x3.15
6.3
1. Powerganj
2x10
20
2. Power House
1x10
10
3. Barhara
2x5
10
1. Zero Mile
2x5
10
33/11 kV S/Ss on
feeder
10.Jagdishpur
Jagdishpur
1. Jagdishpur
11.Japani Farm
Ara
1. Japani Farm
2. Serai
12.Powerganj
13.Zero Mile
Ara
Ara
295.6
8. Gaya
1. Karpi
Karpi
1. Karpi
1x1.6
1.6
1x3+2x1.6
6.2
3. Kurtha
2x3.15
6.3
2. Ataullah
2. Arwal
Karpi
1. Arwal
1x1.6+2x3.15
7.9
3. Goh
Goh
1. Goh
1x3
4. Daudnagar
Goh
1. Daudnagar
1x3+1x1.6
4.6
2x5
10
1. Kako
1x5+1x1.6+1x3.
15
9.75
2. Charui
1x5+1x1.6+1x3.
15
9.75
1. Tehta
1x5+1x3.15
8.15
2. Makpa
2x3.15
6.3
2x5+1x3.15
13.15
1x5+1x1.6+1x3.
15
9.75
2. Jehanabad
3x10
30
1. Irki
4x5
20
2. Sakurabad
1x3.15
3.15
3. Nowaman
2x5
10
2. Haspura
5. Kako
6. Tehta
Irki
Irki
3. Makhdampur
7. Ghosi
8. Irki
Irki
Irki
1. Ghosi
9. Rafiganj I & II
Rafiganj
1. Rafiganj
3x5+1x3.15
18.15
10.Uchauli
Rafiganj
1. Uchauli
1x5+1x3.15
8.15
5-76
020328-40RP-0400-00
Final Report
Circle
Feeder name
11.Guraru
12.Tekari
13.Belaganj
EHV S/S
from where
feeder
emanating
Rafiganj
Tekari
Belaganj
Total Sub
Capacity
MVA
2. Madanpur
1x5+1x3.15
8.15
1. Guraru
2x5+2x3.15
16.3
2. Paraiya
1x5+2x3.15
11.3
1.Tekari
2x5
10
2. Koach
1x5+1x3.15
8.15
1. Belaganj
2x5+2x3.15
16.3
2. Panari
2x5+2x3.15
16.3
3. Paibigha
2x5
10
33/11 kV S/Ss on
feeder
14.Chakand
Belaganj
1. Chakand
2x5+2x3.15
16.3
15.Dhongra
Hulasganj
1. Dhongra
2x5
10
16.Sonwa
Hulasganj
1. Sonwa
2x5
10
17.Hulasganj
Hulasganj
1. Hulasganj
2x5
10
18.Nawagarh
Hulasganj
1. Nawagarh
2x5
10
19.Aurangabad
Aurangabad
1. Aurangabad
4x5
20
20.Obra
Aurangabad
1. Obra
2x3
2. Phesar
2x3.15
6.3
3. Sokhea
2x5
10
1x3+1x1.5
4.5
2. Gangti
2x3.15
6.3
21.Deo
Aurangabad
1. Deo
22.Sone Nagar
Barun
1. Barun
3x5+1x3.15
18.15
23.Barem
Barun
1. Barem
2x3.15+2x5
16.3
24.Tengra
Barun
1. Tengra
2x5+2x3.15
16.3
25.Sone Hydel
Barun
HTC
26.Nabinagar
Barun
1. Nabinagar
1x5+1x3.15
8.15
2. Amba
1x5+2x3.15
11.3
27.Barun (2)
Barun
1. Barun (2)
2x5
10
28.Dihara
Barun
1. Dihara
2x5
10
29.Wazirganj
Wazirganj
1. Wazirganj
2x3.15
6.3
2. Fatehpur
1x3.15
3.15
3. Paimer
1x1.6
1.6
1. Atari
1x3.15
3.15
2. Khizr Sarai
2x3.15
6.3
1. Gurua
1x3.15
3.15
30.Atari
31.Gurua
Wazirganj
Sherghati
5-77
020328-40RP-0400-00
Final Report
Circle
Feeder name
EHV S/S
from where
feeder
emanating
33/11 kV S/Ss on
feeder
Total Sub
Capacity
MVA
32.Amas
Sherghati
1. Amas
2x3.15
6.3
33.Banke
Sherghati
1. Banke
2x3.15
6.3
34.Shergahti
Sherghati
1. Sherghati
1x5+1x3.15
8.15
2. Dobhi
2x3.15
6.3
1. Imamganj
1x3.15
3.15
2. Dumaria
2x3.15
6.3
3x10+1x5
35
35.Imamganj
Sherghati
36.Chandauti
Chandauti
1. Chandauti
37.Medical
Chandauti
1. Medical
2x5
10
2. Cherki
1x1.6+1x3.15
4.75
2x5+1x10+1x3.1
5
23.15
3x5
15
2. Railway
Maidan
2x10+2x5
30
1. Gandhi Maidan
2x10+1x5
25
2. Panchaiti
Akhara
3x10
30
3x10+1x5
35
1x3.15+1x1.6
4.75
2x3.15
6.3
1. Manpur
4x5+1x3.15
23.15
2. Tankuppa
1x5+1x3.15
8.15
3. Gere
2x3.15
6.3
4. Bhore
1x5
2x3.15
6.3
38.Central Stores
Chandauti
1. Central Stores
39.A.P.Colony
Chandauti
1. A.P.Coloy
40.Gandhi Maidan
Chandauti
41.Dandibag
Chandauti
1. Dandibag
42.Shobh
Bodh Gaya
1. Shobh
2. Charkbria
43.Manpur
Bodh Gaya
44.Industrial Area
Bodh Gaya
1. Industrial Area
45.M.U. Campus
Bodh Gaya
1. M.U.Campus
2x10+2x5
30
2. Buddhist
Complex
1x10+2x5
20
2x5
10
1x5+1x3
3x10
30
2. Nawada New
1x5+2x3
11
3. Bhadhokhara
1x5+2x3.
11
1. Akbarpur
1x5+1x3
11
46.Hasua
Nawada
1. Hasua
2. Nadirganj
47.Nawada
48.Akbarpur
Nawada
Nawada
1. Nawada
5-78
020328-40RP-0400-00
Final Report
Circle
Feeder name
49.Roh
EHV S/S
from where
feeder
emanating
Nawada
Total Sub
Capacity
MVA
2. Rajauli
2x5+1x3
13
3. Sirdala
1x5+1x3
11
1x3.15+1x1.6
4.75
2. Warsaliganj
1x5+2x3.
11
3. Pakribarwan
1x5+1x3
11
1x3.15+1x1.6
4.75
33/11 kV S/Ss on
feeder
1. Roh
4. Kaukol
996.5
9.
Saharsa
1. Supaul
Supaul
1. Supaul
2x10+1x5
25
2. Parasrama
2x5
10
3. Kishanpur
2x1.6
3.2
2x.3.15
6.3
1x3.15+1x1.6
4.75
6. Larganj
2x5
10
4. Pipra
5. Raghopur
2. Saharsa (2)
Saharsa
1. Sahrsa (2)
3x10
30
3. Sour Bazar
Saharsa
1. Sour Bazar
2x5
10
4. Balwahat
Saharsa
1. Balwahat
2x5
10
2. Salakhua
2x5
10
1x5+1x3.15
8.15
5. Simri
Bakhtiyarpur
Saharsa
1. Simri
Bakhtiyarpur
6. New Market
Saharsa
1. New Market
1x10+2x5
20
7. Old Saharsa
Saharsa
1. Old Saharsa
3x5+1x1.6
16.6
8. Madhepura
Madhepura
1. Madhepura
3x5
15
2. Muraliganj
1x3.15+1x1.6
4.75
3. Kumarkhand
2x5
10
1. Singheswar
1x5
2. Ghailar
2x5
10
2x10+3x5
35
1x5+1x3+1x1.5
9.5
3x5+1x3.15
18.15
2x5
10
1x5+1x3.15
8.15
9. Singheswar
10.Khagaria
Madhepura
Khagaria
1. Khagaria
2. Mansi
3. Maheshkunt
11.Bihariganj
Udakishanga
nj
1. Bihariganj
12.Udakishanganj
Udakishanga
nj
1. Udakishanganj
5-79
020328-40RP-0400-00
Final Report
Circle
Feeder name
EHV S/S
from where
feeder
emanating
33/11 kV S/Ss on
feeder
13.Puraini
Udakishanga
nj
1. Puraini
14.Alamnagar
Udakishanga
nj
1. Alamnagar
Total Sub
Capacity
MVA
2x5
10
1x1.6+1x1.5
3.1
302.7
1. Bihpur
Naugachhia
1. Bihpur
2x5
10
2. Sanhauli
Naugachhia
1. Sanhauli
2x5
10
3. Naugachhia
Naugachhia
1. Naugachhia
1x5+2x3.15
11.3
4. Patwara
Sultanganj
1. Patwara
1x3
5. Sultanganj
Sultanganj
1. Sultanganj
3x5+1x10
25
6. Shahkund
Sultanganj
1. Shahkund
1x5+1x3.15
8.15
7. Barari
Sabour
1. Barari
1x10+1x5
15
2. Central Jail
1x10+1x5
15
3. Mayaganj
1x10+1x5
15
1. C S Compound
1x10+2x5
20
2. T T School
1x10+2x5
20
1x10+2x3.15
16.3
2x3.15
6.3
1x10+2x5
20
2x5
10
1x10+1x5
15
2. Jagdishpur
2x5
10
3. Nath Nagar
2x5+1x10
20
8. CS Compound
10.
Bhagalpu
r
Sabour
9. Sabour
Sabour
1. Sabour
10.Gouradih
Sabour
1. Gouradih
11.Aliganj I
Sabour
1. Aliganj
2. Mojahidpur
12.Aliganj II
Sabour
1. Aliganj
13.Banka (2)
Banka
1. Banka (2)
2x5
10
14.Banka
Banka
1. Banka
3x5
15
2. Amarpur
1x3.15+1x3
6.15
3. Rajouna
1x5+1x3.15
8.15
2x5+1x3+1x1.6
14.6
2x5+1x3.15
13.15
2x5
10
3x5+1x10
25
1x1+1x3.15
4.15
4. Bousi
15.Sanhoula
Kahalgaon
1. Sanhoula
16.Ghogha
Kahalgaon
1. Ghogha
17.Kahalgaon
Kahalgaon
1. Kahalgaon
2. Pirpainti
356.3
5-80
020328-40RP-0400-00
Final Report
Circle
11.
Munger
Feeder name
1. Tarapur
EHV S/S
from where
feeder
emanating
Sultanganj
Total Sub
Capacity
MVA
4x5
20
2. Kharagpur
1x3+2x5
13
33/11 kV S/Ss on
feeder
1. Tarapur
2. Dakranala
Jamalpur
1. Dakranala
2x5+1x1.5
11.5
3. Ramchandrapur
Jamalpur
1.
Ramchandrapur
2x5+1x1.5
11.5
1. Safiabad
2x3.15+3x5
21.3
2. Baniyarpur
1x5+1x3.15
8.15
2. Railways (HTC)
4. Safiabad
Jamalpur
5. ITC
Jamalpur
1. ITC (HTC)
6. Karnachaura
Jamalpur
1. Karnchaura
2x10+2x5
30
7. Nandlalpur
Jamalpur
1. Nandlalpur
3x5
15
8. Bindwara
Jamalpur
1. Bindwara
3x5+1x3.15
18.15
9. Balaji
Lakhisarai
1. Balaji
1x5+1x3.15+1x.
75
8.9
10.Purani Bazar
Lakhisarai
1. Purani Bazar
2x5+2x10
30
1x10+2x3.15
16.3
1. Kajra
2x5
10
2. Piri Bazar
2x5
10
1. Salempur
1x5+1x3.15
8.15
2x5
10
2x3.15
6.3
1. Jamui
2x5+2x10
30
2. Khaira
1x5+2x3.15
11.3
3. Sikandara
1x5+2x3.15
11.3
1. Gidhour
1x5+1x3.15
8.15
2. Jhajha
2x5+1x3.15
13.15
3. Sono
2x5+1x3.15
13.15
2x5
10
2. Court Area
11.Kajra
12.Haibatganj
Lakhisarai
Lakhisarai
2. Manpur
3. Haibatganj
13.Jamui
14.Gidhour
Mallehpur
Mallehpur
15.Ghuskuri
Sheikhpura
1. Ghuskuri
16.Ariari
Sheikhpura
1. Ariari
1x3.15
3.15
2. Bhalua
1x1.6
1.6
3. Lohain
2x5
10
4. Katari
1x1.6
1.6
5. Barkna
1x5+1x1.6
6.6
5-81
020328-40RP-0400-00
Final Report
Circle
Feeder name
17.Onama
EHV S/S
from where
feeder
emanating
Sheikhpura
Total Sub
Capacity
MVA
1. Onama
1x5+1x1.6
6.6
2. Mirzapur
1x5+1x3.15+1x1
.6
9.75
3. Toygarh
2x5
10
33/11 kV S/Ss on
feeder
18.Hathiyama
Sheikhpura
1. Hathiyama
1x3.15+1x1.6
4.75
19.Sheikhpura
Sheikhpura
1. Sheikhpura
1x5+2x10
25
427.4
12.
Samastip
ur
1. Pusa
Mohanpur
1. Pusa
2x5+2x3.15
16.3
2. Mohanpur
Mohanpur
1. Mohanpur
2x10
20
2. Warisnagar
1x5+1x3.15
8.15
3. Kalyanpur
1x5+1x3.15
8.15
3. Jute Mill
Mohanpur
HTC
4. Sarairanjan
Mohanpur
1. Sarairanjan
5. Jitwarpur
Mohanpur
1x5+1x3.15
8.15
1. Jitwarpur
2x10
20
2. Magardahi
2x10
20
6. Rly.Samastipur
Mohanpur
HTC
7. Sirsia
Mohanpur
1. Sirsia
8. Dalsingsarai
Dalsingsarai
6.6
2. Kuboliram
2x5
10
3. Karpoorigram
2x5
10
1. Dalsingsarai
1x5+2x3.15
11.3
2. Mohadinnagar
1x5+2x1.6
8.2
1x5+1x3.15
8.15
1x5+1x3.15+1x1
.6
9.75
1x5+1x3.15
8.15
1x5+1x3.15+1x1
.6
9.75
1x5+1x1.6
6.6
3x5
15
2x5+2x3.15
16.3
Dalsingsarai
1. Pateri
10.Bachchwara
Dalsingsarai
1. Bachchwara
11.Bibhutipur
Dalsingsarai
1. Bibhutipur
2. Rosera
3. Hassanpur
BTPS
1. Deona
2. Bangrahdih
2.5
1x5+1x1.6
9. Pateri
12.Deona
2.5
3. Jai Mangla
(HTC)
6.5
4. Jai Mata Di
(HTC)
1.5
5-82
020328-40RP-0400-00
Final Report
Circle
Feeder name
EHV S/S
from where
feeder
emanating
33/11 kV S/Ss on
feeder
Total Sub
Capacity
MVA
2x10
20
13.Bangrahdih (2)
BTPS
1. Bangrahdih (2)
14.IOC
BTPS
HTC
15.Railways
BTPS
HTC
16.Deona (2)
Zero Mile
1. Deona (2)
2x10
20
17.Kankaul
Zero Mile
1. Kankaul
2x10
20
18.Begusarai
Zero Mile
1. Begusarai
3x10
30
2. Manjhaul
2x5+1x3.15+1x3
16.15
3. Ganga Dairy
(HTC)
4. Balia
1.25
1x5+2x3.15
11.3
360.3
13.
Purnea
1. Narpatganj
Forbesganj
1. Narpatganj
2. Raniganj
Forbesganj
1. Raniganj
3. Forbesganj
Forbesganj
1x5+2x3.15
11.3
2x3.15
6.3
2. Bahargaon
2x5
10
1. Forbesganj
3x5
15
2. Araria
2x5
10
3. Kusgaon
2x5
10
2x3.15
6.3
2x5
10
1. Bahadurganj
2x3.15
6.3
2. Dighal Bank
2x3.15
6.3
1x5+2x3.15
11.3
1x10+2x5+1x3.1
5
23.15
1x10+2x5
20
4. Jokihat
5. Malgaon
4. Bahadurganj
Kishanganj
5. Sarai
Kishanganj
1. Sarai
6. Paschimpali
Kishanganj
1. Paschimpali
7. Purabpali
Kishanganj
1. Purabpali
8. Thakurganj
Kishanganj
1. Chhatargarh
2x3.15
6.3
2. Thakurganj
1x5+1x3.15
8.15
1x5+3x10
35
9. Group Control
Purnea
1. Group control
10.Banmankhi
Purnea
1. Banmankhi
1x3.15+1x3
6.15
2. Madhubani
3x5
15
1. Zero Mile
4x5
20
2. City
2x5
10
1. Belgachhi
1x5
11.Zero Mile
12.Belgachhi
Purnea
Purnea
5-83
020328-40RP-0400-00
Final Report
Circle
Feeder name
EHV S/S
from where
feeder
emanating
Total Sub
Capacity
MVA
1x3.15
3.15
2x5
10
1. Naranga
3x5+1x3.15
18.15
2. MLR Ganj
1x5+2x3.15
11.3
3. Dargaha
1x1.5
1.5
3x5+1x3.15
18.15
4x5
20
2. Gore Beri
1x3.15+2x1.5
6.15
3. Falka
1x3.15+1x1.5
4.65
4. Sonaily
1x3.15
3.15
1x5
33/11 kV S/Ss on
feeder
2. Dalkola
3. Vaisi
13.Naranga
Purnea
14.Jalalgarh
Purnea
1. Jalalgarh
15.Beri
Katihar
1. Beri
16.Barsoi
Katihar
1. Barsoi
17.Pranpur
Katihar
1. Pranpur
1x1.6
1.6
18.Industrial Estate
Katihar
1. Industrial
Estate
2x5+1x3.15
13.15
19.Binodpur
Katihar
1. Binodpur
3x5
15
20.Kursaila
Naugachhia
1. Kursaila
2x3.15
6.3
388.8
14.
Sasaram
1. Karmnasa
2. Larma
Karmnasa
Karmnasa
1. Karmnasa
1x5+1x3.15
8.15
2. Durgawati
2x5
10
3. Chand
4x5
20
1. Larma
1x5+1x3.15
8.15
2. DVPL (HTC)
3. Kalyanpur
Karmnasa
1.5
1. Kalyanpur
3x5+1x3.15
18.15
2. Ramgarh
3x5
15
3. Chourasia
1x5+1x3.15
8.15
4. Nuaon
1x5+2x3.15
11.3
4. Ramgarh (2)
Karmnasa
1. Ramgarh (2)
2x5
10
5. Kakrait
Karmnasa
1. Kakrait
3x5
15
6. Parsathua
Mohania
1. Parsathua
1x5+2x3.15
11.3
7. Chainpur
Mohania
1. Chainpur
1x5+2x3.15
11.3
8. Mohania (2)
Mohania
1. Mohania (2)
2x10
20
9. Mohania
Mohania
1. Mohania
3x5
15
2x5+1x10
20
2. Bhabhua Old
5-84
020328-40RP-0400-00
Final Report
Circle
Feeder name
EHV S/S
from where
feeder
emanating
Total Sub
Capacity
MVA
1x5+1x2.5+1x3.
15
10.65
1. Dinara
2x5+2x3.15
16.3
2. Kochas
1x5+2x3.15
11.3
3. Dawath
2x3.15
6.3
33/11 kV S/Ss on
feeder
3. Bahuara
10.Dinara
Dinara
11.Sanjhouli
Bikramganj
1. Sanjhouli
1x5+2x3.15
11.3
12.Surajpura
Bikramganj
1. Surajpura
1x5+2x3.15
11.3
13.Bikramganj
Bikramganj
1. Bikramganj
2x5+1x3.15
13.15
2. Kararkat
1x5+2x3.15
11.3
2x10
20
14.Bikramganj (2)
Bikramganj
1. Bikramganj (2)
15.Pusauli
PGCIL
Pusauli
1. Pusauli
2x5+1x10
20
16.Kudra
Kudra
1. Kudra
4x5
20
2x10+3x5
35
1x3.15+1x1.5
4.65
2. Cenari
1x5+1x3.15
8.15
3. Adhaura
1x5+1x3.15
8.15
1. Beda Sasaram
5x5
25
2. Takia Sasaram
1x10+3x5
25
2x5+1x3.15
13.15
2. Bhabhua New
17.Karamchat
18.Beda Sasaram
Kudra
Sasaram
1. Karamchat
3. Nokha
19.Sasaram (2)
Sasaram
1. Sasaram (2)
2x10
20
20.Sasaram (3)
Sasaram
1. Sasaram (3)
2x10
20
21.Naigaon
Sasaram
1. Naigaon
3x5+1x3.15
18.15
2. Sheosagar
3x5+1x3.15
18.15
Dehri-OnSone
2x10
20
Dehri-OnSone
1. BMP Dehri
4x5
20
1x5+2x3.15
11.3
2. Basa
Karwandia
3. PHED (HTC)
24.JVLO&FL
Pahleja
Dehri-OnSone
1. HTC
25.Akorigola
Dehri-OnSone
1. Akorigola
5-85
1.5
3.15
3x5+1x3.15
18.15
020328-40RP-0400-00
Final Report
Circle
Feeder name
EHV S/S
from where
feeder
emanating
33/11 kV S/Ss on
feeder
Total Sub
Capacity
MVA
26.Nasariganj
Dehri-OnSone
1. Nasariganj
2x5+2x3.15
16.3
27.Rajpur
Dehri-OnSone
1. Rajpur
1x5+2x3.15
11.3
28.Nauhatta
Banjari
1. Nauhatta
2x5+2x3.15
16.3
29.Samhauta
Banjari
1. Samhauta
4x5
20
30.Samhauta (2)
Banjari
1. Samhauta (2)
1x10+1x5
15
31.Kirpabal (2)
Barun
1. Kirpabal (2)
2x5
10
2. Kirpabal
2x5+1x3.15
13.15
2x5+1x3.15+1x1
.5+1x0.5
15.15
2x10
20
32.Indrapuri
Barun
1. Indrapuri
33.Indrapuri (2)
Barun
1. Indrapuri (2)
761.3
15.
Muzaffar
pur
1. Shivhar
Shivhar
1. Shivhar
2x5 + 2x3.15
16.3
2. Runi Saidpur
Runi Saidpur
1. Runi Saidpur
3x5+1x3.15
18.15
3. Pupri
Sitamarhi
1. Pupri
2x5+2x3.15
16.3
4. Dumra (2)
Sitamarhi
1. Dumra (2)
2x10
20
5. Dumra
Sitamarhi
1. Dumra
4x5
20
6. Sursand
Sonbarsa
1. Sursand
2x5+2x3.15
16.3
7. Sonbarsa
Sonbarsa
1. Sonbarsa
2x5
10
8. Nepal
Sonbarsa
1. Nepal
9. Patepur
Vaishali
1. Mehua
2x5
10
2. Patepur
2x3.15
6.3
2x3.15
6.3
10.Prataptand
Vaishali
1. Prataptand
11.Lalganj
Vaishali
1. Lalganj
4x5+1x3.15
23.15
12.Sarai
Vaishali
1. Sarai
2x5+2x3.15
16.3
13.Railway (HTC)
Hajipur
2.6
2.6
14.Bidupur
Hajipur
1. Bidupur
1x10+2.5
12.5
15.EDIP
Hajipur
1. EDIP
2x5+2x3
16
16.Hajipur I E
Hajipur
1. Hajipur I E
4x5
20
17.Hajipur I E (2)
Hajipur
1. Hajipur I E (2)
2x10
20
18.Konharaghat
Hajipur
1. Konharaghat
2x10
20
19.Konharaghat (2)
Hajipur
1. Konharaghat
2x10
20
20.Mehnar
Mohanpur
1. Mehnar
1x5+2x3.15
11.3
5-86
020328-40RP-0400-00
Final Report
Circle
Feeder name
EHV S/S
from where
feeder
emanating
33/11 kV S/Ss on
feeder
Total Sub
Capacity
MVA
2x10
20
1x5+2x10
25
21.SKMCH (2)
SKMCH
1. SKMCH (2)
22.MIT
SKMCH
1. MIT
23.Sikandarpur (2)
SKMCH
1. Sikandarpur (2)
2x10
20
24.SKMCH
SKMCH
1. SKMCH
3x5
15
2x5+1x3.15
13.15
2. Sikandarpur
25.Kurhani
SKMCH
1. Kurhani
2x5
10
26.Motipur
Muzaffarpur
1. Motipur
2x5+1x3.15
13.15
27.Motipur (2)
Muzaffarpur
1. Motipur (2)
2x10
20
28.Maripur
Muzaffarpur
1. Maripur
1x10+2x5
20
29.Vaishali
Muzaffarpur
1. Vaishali
2x5
10
30.Dholi
Muzaffarpur
1. Dholi
2x5+1x1.5
11.5
31.IDPL (2)
Muzaffarpur
1. IDPL (2)
2x10
20
32.IDPL
Muzaffarpur
1. IDPL
2x5+2x10
30
33.Khabra
Muzaffarpur
1. Khabra
2x10
20
34.Bhikanpura
Muzaffarpur
1. Bhikanpura
2x5
10
35.Bhagwanpur
Chowk
Muzaffarpur
1. Bhagwanpur
chowk
2x5
10
36.Railway (HTC)
Muzaffarpur
37.Nayatola (2)
Muzaffarpur
1. Nayatola (2)
2x10
20
38.Nayatola
Muzaffarpur
1. Nayatola
3x5
15
604.3
16.
Darbhang
a
1. Basopatti
Jay Nagar
1. Basopatti
2x5
10
2. Jay Nagar
Jay Nagar
1. Jay Nagar
1x5+2x3.15
11.3
2. Khajauli
3x5
15
3. Ladania
1x5+1x3.15
8.15
1. Benipatti
1x1.6+2x5
11.6
2x5
10
1x10+2x3.15
16.3
2. Madhubani
2x10
20
3x5
15
1x3.15+1x5+1x1
0
18.15
2x5+1x3.15
13.15
3. Benipatti
Rahika
2. Ahilyasthan
4. Rahika
Rahika
1. Rahika
5. Bela
Gangwara
1. Bela
6. Gangwara
Gangwara
1. Gangwara
7. Donar
Gangwara
1. Donar
5-87
020328-40RP-0400-00
Final Report
Circle
Feeder name
8. Panda Sarai
EHV S/S
from where
feeder
emanating
Ram Nagar
Total Sub
Capacity
MVA
1. Panda Sarai
2x5
10
2. Laheria Sarai
(Jail)
2x5
10
3. DMCH
3x5
15
4. Urban
3x5
15
33/11 kV S/Ss on
feeder
9. Pouriya
Ram Nagar
1. Pouriya
1x3.15+1x1.6
4.75
10.Anar
Kusheshwar
1. Baheri
1x5+1x3.15
8.15
1x5+1x3.15+1x1
.6
9.75
2x5
10
1x5+1x1.6+1x3.
15
9.75
2. Benipur
1x5+2x3.15
11.3
1. Raj Nagar
2x5+2x3.15
16.3
2. Babu Barhi
1x5+1x3.15
8.15
2. Anar
11.Kusheshwar
Kusheshwar
1. Kusheshwar
12.Biraul
Kusheshwar
1. Biraul
13.Raj Nagar
Pandaul
14.Raiyam
Pandaul
1. Raiyam
1x5+1x3.15
8.15
15.Pandaul
Pandaul
1. Pandaul
2x5+1x10
20
16.Manigachi
Pandaul
1. Manigachi
1x5+1x1.6+1x3.
15
9.75
17.Jhanjharpur
Pandaul
1. Jhanjharpur
1x5+2x3.15
11.3
2. Madhepur
1x3.15+2x1.6
6.35
18.Khatauna
Phulparas
1. Khatauna
1x5
19.Rudrapur
Phulparas
1. Rudrapur
2x5
10
20.Phulparas
Phulparas
1. Phulparas
1x5+2x3.15
11.3
2. Nirmali
1x5+1x3.15
8.15
3. Tulpatganj
1x5+2x3.15
11.3
378.1
5-88
020328-40RP-0400-00
Final Report
5.7
5.7.1
Methodology
This section discusses the scheduling for the Distribution Investment Plan to year 2014, to
transmit the planned power available from grid substations to the forecast loads.
The studies and resulting recommendations for the distribution system were based on the
data available as July 2010.
The substation loads were based on the Load Forecast up to year 2014, and also from the
data available from transmission planning report as discussed in section 2
The generation schedules were determined from the Based Generation Plan as discussed in
Section 2
The Distribution Expansion Plan necessary to transmit the power available at the grid
substation to the forecast load is discussed in Section 5.4.
The equipment cost estimates, summarized in Section 5.2 and detailed in Appendix 6, were
based on recent (2009-10) DPRs for the BSEB.
The investment estimates do not include land requirements for the distribution system.
It was assumed that 33 kV transmission and substation projects could be commissioned
within 12 months of project go-ahead being issued and for this reason Interest During
Construction (IDC) is not included.
Contingencies are included.
Operation and Maintenance Budgets are not included.
The project cost estimates are given in Rs. Lakhs.
5.7.2
Schedule of Investments
The estimated investment in the Distribution system (33 kV lines, substations and additional
bays, 11kV lines and additional Bays, DTRs and LT lines) are Rs. 368,058 Lakhs. This
investment includes the investment required for year 2010 to bring the existing network to
meet the load requirements of 2010 with reasonable quality.
Table 5-15
2010
2011
2012
2013
2014
Total
BSEB
(2010-
5,296
4,775
2,442
575
3,669
2,727
19,483
3,205
4,807
8,012
16,023
8,368
12,552
20,920
41,840
398
597
996
1,992
5,563
8,345
13,909
27,817
1,361
2,042
3,403
6,807
9,167
13,750
22,916
45,833
6,455
9,682
16,137
32,274
341
511
851
1,703
34,857
52,286
87,144
174,287
37,342
88,455
3,983
58,076
14,189
95,334
67,274
3,405
368,058
5-89
020328-40RP-0400-00
Final Report
5.7.3
The estimated cash flows for every year for the distribution expansion are given in Table 5.31 below.
The Table 5.3-1 presents the Investment amount in Rs Lakhs (for 33 kV Lines, Substations,
additional Bays and 11 kV lines, additional Bays and DTRs, LT lines and finally shunt
compensation on the 11 kV side)
Table 5-16
Circle
Table 5.3-1 Summary of Investment Cost for Distribution for 2010 (Amount in Rs Lakhs)
33 kV
11 kV
Shunt
33 kV Lines 33 kV S/Ss
Additional
11 kV Lines Additional
DTRs
LT Lines
Compensatio
Bays
bays
n (11 kV)
Total
PESU (E)
202
202
426
426
441
109
72
14
97
81
814
801
801
195
108
27
194
81
606
PESU (W)
Patna
Nalanda
Chapra
Motihari
333
692
251
55
357
244
1,933
240
240
932
293
144
41
260
203
1,873
36
109
72
14
81
81
393
248
436
251
55
341
285
1,616
677
327
180
41
260
203
1,688
135
109
36
14
97
41
431
220
872
503
110
682
488
2,875
403
1,307
610
164
1,055
773
4,314
198
327
215
41
244
244
1,270
5,296
4,775
2,442
575
3,669
2,727
19,483
Bhojpur
Gaya
Saharsa
Bhagalpur
Munger
Samastipur
Purnea
Sasaram
Muzaffarpur
Darbhanga
Total BSEB
5-90
020328-40RP-0400-00
Final Report
Table 5-17
Table 5.3-1 Summary of Investment Cost for Distribution for 2011 (Amount in Rs Lakhs)
33 kV
11 kV
Circle
33 kV Lines 33 kV S/Ss
Additional
11 kV Lines Additional
DTRs
Bays
bays
PESU (E)
242
666
30
259
99
974
PESU (W)
285
709
30
223
85
839
Patna
130
430
20
291
62
366
Nalanda
220
630
33
603
122
739
Chapra
86
292
10
162
38
247
Motihari
65
364
13
287
60
374
Bhojpur
178
425
25
251
63
403
Gaya
283
952
53
664
153
971
Saharsa
155
455
28
481
101
621
Bhagalpur
82
358
8
230
60
381
Munger
180
479
18
420
88
533
Samastipur
210
464
28
291
74
474
Purnea
172
337
15
287
60
382
Sasaram
322
778
28
472
129
823
Muzaffarpur
342
668
41
370
111
698
Darbhanga
254
362
18
273
55
343
Total BSEB
3,205
8,368
398
5,563
1,361
5-91
9,167
LT Lines
Shunt
Compensatio
n (11 kV)
Total
293
2,563
252
2,424
366
17
1,681
684
10
3,040
179
22
1,035
317
14
1,495
301
22
1,668
741
51
3,868
545
14
2,401
265
1,390
476
43
2,237
334
19
1,894
326
39
1,617
566
46
3,163
509
19
2,758
301
17
1,623
6,455
341
34,857
020328-40RP-0400-00
Final Report
Table 5-18
Circle
Table 5.3-1 Summary of Investment Cost for Distribution for 2012 (Amount in Rs Lakhs)
33 kV
11 kV
Shunt
33 kV Lines 33 kV S/Ss
Additional
11 kV Lines Additional
DTRs
LT Lines
Compensati
Bays
bays
on (11 kV)
Total
PESU (E)
362
999
46
388
148
1,462
440
3,844
428
1,064
46
334
127
1,259
378
3,635
195
644
30
436
92
549
549
25
2,522
330
944
49
905
183
1,109
1,026
14
4,561
129
438
15
242
58
370
269
33
1,553
97
547
19
431
90
560
476
22
2,242
267
638
38
377
95
604
452
33
2,502
425
1,428
80
996
230
1,456
1,111
76
5,802
233
683
42
722
152
931
818
22
3,602
123
536
11
345
90
572
397
11
2,085
270
719
27
630
133
799
714
65
3,356
314
697
42
436
112
711
501
29
2,841
258
505
23
431
90
573
488
58
2,426
483
1,167
42
708
193
1,235
849
69
4,744
513
1,003
61
555
166
1,047
763
29
4,137
382
543
27
409
83
514
452
25
2,434
4,807
12,552
597
8,345
2,042
13,750
9,682
511
52,286
PESU (W)
Patna
Nalanda
Chapra
Motihari
Bhojpur
Gaya
Saharsa
Bhagalpur
Munger
Samastipur
Purnea
Sasaram
Muzaffarpur
Darbhanga
Total BSEB
5-92
020328-40RP-0400-00
Final Report
Table 5-19
Circle
Table 5.3-1 Summary of Investment Cost for Distribution for 2013 (amount in Rs. Lakhs)
33 kV
11 kV
Shunt
33 kV Lines 33 kV S/Ss
Additional
11 kV Lines Additional
DTRs
LT Lines Compensatio
Bays
bays
n (11 kV)
Total
PESU (E)
604
1,665
76
646
247
2,436
733
6,406
713
1,773
76
557
212
2,098
631
6,059
324
1,074
51
727
154
914
916
42
4,203
550
1,574
82
1,508
305
1,848
1,709
24
7,601
215
729
25
404
96
617
448
54
2,588
161
911
32
718
151
934
794
36
3,737
445
1,063
63
628
158
1,006
753
54
4,171
708
2,379
133
1,661
384
2,427
1,852
127
9,670
388
1,138
70
1,203
253
1,551
1,363
36
6,003
205
894
19
575
150
953
661
18
3,476
449
1,198
44
1,050
221
1,332
1,190
109
5,594
524
1,161
70
727
186
1,185
834
48
4,735
431
841
38
718
150
954
814
97
4,043
805
1,944
70
1,180
321
2,058
1,414
115
7,906
855
1,671
101
925
277
1,745
1,272
48
6,895
636
904
44
682
138
857
753
42
4,057
8,012
20,920
996
13,909
3,403
22,916
16,137
851
87,144
PESU (W)
Patna
Nalanda
Chapra
Motihari
Bhojpur
Gaya
Saharsa
Bhagalpur
Munger
Samastipur
Purnea
Sasaram
Muzaffarpur
Darbhanga
Total BSEB
5-93
020328-40RP-0400-00
Final Report
Table 5-20
Circle
33 kV Lines
Shunt
Compensatio
n (11 kV)
Total
PESU (E)
1,208
3,330
152
1,293
493
4,872
1,465
12,813
1,425
3,546
152
1,113
425
4,195
1,262
12,118
PESU (W)
Patna
649
2,148
101
1,454
308
1,829
1,831
85
8,405
1,099
3,148
165
3,016
610
3,696
3,419
48
15,202
429
1,459
51
808
192
1,234
895
109
5,176
323
1,822
63
1,436
301
1,868
1,587
72
7,473
Nalanda
Chapra
Motihari
Bhojpur
890
2,126
127
1,257
315
2,013
1,506
109
8,341
1,416
4,759
266
3,321
767
4,854
3,704
254
19,341
776
2,275
140
2,406
507
3,103
2,727
72
12,006
410
1,788
38
1,149
300
1,907
1,323
36
6,951
899
2,395
89
2,101
442
2,664
2,381
217
11,187
1,048
2,322
140
1,454
372
2,370
1,669
97
9,471
861
1,683
76
1,436
301
1,908
1,628
193
8,087
1,610
3,888
140
2,359
643
4,116
2,829
229
15,813
1,709
3,342
203
1,849
555
3,491
2,544
97
13,789
1,272
1,809
89
1,364
276
1,714
1,506
85
8,115
16,023
41,840
1,992
27,817
6,807
45,833
32,274
1,703
174,287
Gaya
Saharsa
Bhagalpur
Munger
Samastipur
Purnea
Sasaram
Muzaffarpur
Darbhanga
Total BSEB
5-94
020328-40RP-0400-00
Final Report
PROJECT FORMULATION
Financial
Year
BTPS
Expansion
MTPS
Expansion
Nabinagar
Pirpainti
Gas
Turbines
Hydro
Total
2008
163
163
2009
172
172
2010
364
323
327
230
1243
2011
1061
942
1280
600
230
4113
2012
1213
1077
2042
1020
268
5619
6-1
020328-40RP-0400-00
Final Report
Financial
Year
BTPS
Expansion
MTPS
Expansion
Nabinagar
Pirpainti
Gas
Turbines
Hydro
Total
2013
394
350
1770
180
176
2870
2014
1307
305
176
1788
2015
1089
889
1978
2016
354
1016
240
1610
2017
330
360
690
2018
Note: The constant rupees are cash flows during construction period and do not include interest
during construction (IDC).
The capitalised investment for Scenario-2 under average load forecast scenario is presented
in the following table. The total investment for the entire horizon period is Rs. 24,335 Crores.
Table 6-2
Financial
Year
MTPS
Expansion
Nabinagar
Pirpainti
Gas
Turbines
Hydro
Total
2010
59
59
2011
2012
37
37
2013
1636
598
2234
2014
3667
3256
3293
327
10542
2015
3293
1149
4442
2016
2017
3293
3293
2018
3073
654
3728
Note: The capitalized investment is the total cash flow during construction plus the interest during
construction.
Similarly, the annual constant investments for the least scenario (Scenario-2:
Coal+Hydro+Imports) under average load forecast scenario is presented in the following
table. The total annual investment for the entire horizon period is Rs. 33,852 Crores.
6-2
020328-40RP-0400-00
Final Report
Table 6-3
BTPS
Expansi
on
MTPS
Expansi
on
Nabinag
ar
Pirpain
ti
Lakhisar
ai
Buxa
r
Gas
Turbine
s
Hydr
o
Tot
al
2008
163
163
2009
172
172
2010
364
323
980
230
189
6
2011
1061
942
2859
305
720
230
611
7
2012
1213
1077
3267
1194
1080
268
809
9
2013
394
350
1062
1906
610
120
176
461
8
2014
1347
1779
610
420
176
433
2
2015
330
2033
1779
480
462
2
2016
661
2033
300
299
3
2017
661
180
840
2018
Financi
al Year
Note: The constant rupees are cash flows during construction period and do not include interest
during construction (IDC).
The capitalised investment for Scenario-2 under optimistic load forecast scenario is
presented in the following table. The total investment for the entire horizon period is Rs.
40,682 Crores.
Table 6-4
BTPS
Expansi
on
MTPS
Expansi
on
Nabinag
ar
Pirpain
ti
Lakhisar
ai
Bux
ar
Gas
Turbin
es
Hydr
o
Total
2010
59
59
2011
2012
37
37
2013
1963
598
2561
2014
3667
3256
9879
1680
0
Financi
al Year
6-3
020328-40RP-0400-00
Final Report
BTPS
Expansi
on
MTPS
Expansi
on
Nabinag
ar
Pirpain
ti
Lakhisar
ai
Bux
ar
Gas
Turbin
es
Hydr
o
Total
2015
3073
327
1149
4549
2016
3073
654
3728
2017
6147
327
6474
2018
6147
327
6474
Financi
al Year
Note: The capitalized investment is the total cash flow during construction plus the interest
during construction.
The following table presents the summary of annul constant and capitalised investments for
Scenario-2 for both Average and Optimistic Load Forecast Scenario.
Table 6-5
Financial Year
Constant
Rupees
(Rs.Crores)
Capitalized
Investment
(Rs.Crores)
Constant
Rupees
(Rs.Crores)
Capitalized
Investment
(Rs.Crores)
2008
163
163
2009
172
172
2010
1243
59
1896
59
2011
4113
6117
2012
5619
37
8099
37
2013
2870
2234
4618
2561
2014
1788
10542
4332
16800
2015
1978
4442
4622
4549
2016
1610
2993
3728
2017
690
3293
840
6474
2018
3728
6474
Note: The constant rupees are cash flows during construction period and do not include interest
during construction (IDC) whereas capitalized investment includes IDC.
6.2
The transmission expansion capital works program was developed as per the proposed
transmission system during transmission system studies and the cost estimates for the
future network which includes the proposed substation and lines by BSEB.
As discussed in Section 4.9, the cost estimates are carried out for BSEB network only. The
400kV and above network planned by PGCIL were not considered in the capital works
6-4
020328-40RP-0400-00
Final Report
program. However, the additional 400kV network identified during the study was taken in the
investment planning and it was assumed these projects will be built by BSEB.
The cost of the transmission line entry bays for the lines of BSEB terminating at 400kV
PGCIL substations was not considered and assumed the line entry bay at PGCIL substation
end will be built by PGCIL. For all generating stations, it is assumed that BSEB was
responsible for cost of the line bay entries at generating stations end.
The total investment of the transmission expansion capital works program for the five-year
period from 2010 to 2014 are provided in the table below.
Table 6-6
Financial Year
ITEM
2010
2011
2012
2013
2014
Total
400kV
Transmission Lines
11,768
78,804
90,572
New Substations
28,326
28,326
Substation Augmentation
Shunt Reactors
1,224
1,224
Sub-Total
40,094
80,028
120,122
0
220kV
Transmission Lines
New Substations
Substation Augmentation
Sub-Total
12,448
22,319
46,415
5,709
11,897
98,788
4,631
13,893
38,027
5,027
61,578
9,262
1,210
1,408
4,224
16,104
17,079
45,474
85,652
12,144
16,121
176,470
0
132kV
Transmission Lines
11,353
80,320
38,504
6,508
11,191
147,876
1,827
39,273
9,135
1,827
2,298
54,360
21,282
13,371
12,525
9,036
56,214
807
605
288
394
2,094
Sub-Total
13,180
141,682
61,615
21,148
22,919
260,544
Total Investment
30,259
187,156
187,362
33,292
119,068
557,137
New Substations
Substation
Augmentation
The schedules of disbursements to meet in-service dates and the details of the capital works
6-5
020328-40RP-0400-00
Final Report
program for the five-year period from 2010 to 2014 are provided in the Table 55 to Table 64
in Section 4.
6.3
The distribution expansion capital works program was developed as per the proposed
Distribution Expansion Plan necessary to transmit the power available at the grid substation
to the forecast load and the equipment cost estimates based on recent (2009-10) DPRs for
the BSEB.
As discussed in Section 5.6, the investment estimates do not include land requirements for
the distribution system; it was assumed that 33 kV transmission and substation projects
could be commissioned within 12 months of project go-ahead being issued and for this
reason Interest During Construction (IDC) was not included; contingencies were included;
operation and Maintenance Budgets were not included.
The total investment of the distribution expansion capital works program for the five-year
period from 2010 to 2014 are provided in the table below.
Table 6-7
Year
33 kV
Lines
33 kV
S/Ss
33 kV
Additional
Bays
11 kV
Lines
11 kV
Additional
Bays
DTRs
LT
Lines
Shunt
Compensation
(11 kV)
Total
2010
5,296
4,775
2,442
575
3,669
2,727
19,483
2011
3,205
8,368
398
5,563
1,361
9,167
6,455
341
34,857
2012
4,807
12,552
597
8,345
2,042
13,750
9,682
511
52,286
2013
8,012
20,920
996
13,909
3,403
22,916
16,137
851
87,144
2014
16,023
41,840
1,992
27,817
6,807
45,833
32,274
1,703
174,287
Total BSEB
(2010-14)
37,342
88,455
3,983
58,076
14,189
95,334
67,274
3,405
368,058
The details of the capital works program for the five-year period from 2010 to 2014 are
provided in the Table 5.3-1 in Section 5.
6-6
020328-40RP-0400-00
Final Report
CAPACITY BUILDING
As is stated in the Terms of Reference, one of the objectives of this work is training and
capacity building. The work has carried out with the counterpart staff participating in all
components of the work: data collection, data validation, analyses, and preparing the text
and conclusions of the various reports and technical memoranda. The training program for
the counterpart staff has been designed keeping in mind the requirements and availability of
BSEB staff.
The capacity building activities had included the identification and procurement of planning
software that BSEB planning unit need for ongoing generation, transmission and distribution
planning work and hands-on training in the use of this software. The master plan studies
require considerable use of computer models in all analyses leading to the PSMP, therefore
considerable effort has been put into ensuring that BSEB counterparts fully understand the
capabilities, operating requirements and results that these models represent. Workshops,
seminars and consultation meetings have been organized and held with BSEB management
and counterpart staff as well as the stakeholders to receive feedback on policy.
The training program has covered the following topics: load forecasting; power system
expansion planning fundamentals and modeling techniques; hydro-thermal systems;
transmission planning and distribution planning. The audience of these sessions has
included the assigned counterparts, as well as other individuals assigned from BSEB.
Structured training materials including the manuals for the planning software have been
provided in hard copy to seminar participants, to aid in their long-term learning.
The training workshops on the technical topics are listed below:
Table 7-1
No.
Workshop
Topics
Date
Power System
Planning and Load
Forecasting
Generation Planning
Transmission
Planning
Distribution Planning
The presentations for the four training workshops are provided in Appendix 11 14:
Appendix 11 Presentation for the Workshop on Load Forecast
Appendix 12 Presentation for the Workshop on Generation Planning
Appendix 13 Presentation for the Workshop on Transmission Planning
Appendix 14 Presentation for the Workshop on Distribution Planning
7-1
020328-40RP-0400-00
Final Report
8.1
Planning Models
The following power system planning software as specified in the proposal have been
purchased for the study and training. The Consultant has been using all the proposed
software in numerous similar master plan studies in India and other countries. The software
proved to be efficient and effective in facilitating the formulation of power system
development plans. The purchased software is listed as follows:
The Advanced Power System Planning and Production Costing (SYPCO)
Power Systems Analysis Framework (PSAF)
Distribution System Analysis (CYMDIST)
All the programs purchased for the study have been transferred to BSEB free of charge.
8.2
SYPCO program is used to compare alternative methods for meeting a given load over a
selected period of time. The program can also be used to develop a generation scenario
based on a given set of criteria. A feature in the program enables peaking plants to be
added to compensate for a given loss of load probability.
8-1
020328-40RP-0400-00
Final Report
Once the generation plan has been developed, the production costs are determined by
estimating the energy produced by each unit either on a probabilistic basic or by using a
simplified method. The investment costs are determined by using either the UAP, or SLD, or
Capital Cost methods. The sensitivity of the results to different discount rates is
automatically determined.
This computer program consists of several interrelated modules. The program is very
flexible and the level of detail and the options used can be tailored to the problem at hand.
SYPCO operates on the IBM-PC or compatible computer using Microsoft Windows NT 4.0,
Windows 2003, Windows XP or Windows 2007.
The users manual of SYPCO (hard copy and CD copy) and the database used for the
preparation of the generation plans have been provided to BSEB.
8.3
PSAF is an integrated power systems analysis software package that includes the Graphic
User Interface, Data Base Manager, and Electrical Equipment Parameter Estimation for
creating the Network one-line diagram and associated database.
PSAF is directly applicable to both utility-type and industrial three-phase electric power
systems.
A wide selection of network equipment and controllers is supported by a built-in database
that contains industry standard equipment characteristics. Every type of equipment features
more than one modelling possibility depending on the purpose and extent of the simulation
to be conducted.
PSAF offers both graphical and tabular data entry modes, user-preferred single-line diagram
drawing options (including exporting to AutoCADTM) and sophisticated facilities for
reporting, plotting and customizing the simulation reports.
PSAF for Windows requires an IBM PC or compatible computer using Microsoft Windows
NT 4.0, Windows 2003, Windows XP or Windows 2007.
The users manual of PSAF (hard copy and CD copy) and the database used for the
preparation of the generation plans have been provided to BSEB.
8.4
8-2
020328-40RP-0400-00
Final Report
CYMDIST is a powerful tool to assist planners in creating "what-if" studies and performing
simulations to evaluate the impact of modifications to your network, actual or future.
With the newly added Network Forecaster function planners can view/modify/create timedependent projects in the selected period, that consist of any modifications such as the
addition of any load at a given date (year, month or day), change/ replacement of power
transformers within the substation, rephasing/reconductoring project, network switching or
reconfiguration, etc.
CYMDIST requires an IBM PC or compatible computer using Windows 2003, XP or Server
2007.
The users manual of CYMDIST (hard copy and CD copy) and the database used for the
preparation of the generation plans have been provided to BSEB.
8.5
The Consultant has supervised the installation, start-up and initial operation of the planning
model(s) at BSEBs office, and supply all computer applications, planning model(s) users
manuals (hard copy and CD copy), and the database used for the preparation of the power
sector master plan to BSEB.
8-3
020328-40RP-0400-00
Final Report
CONCLUSIONS,
STARTEGY
9.1
Stakeholder issues
RECOMMENDATIONS
AND
IMPLEMENTATION
The 1st and 2nd Power System Master Plan for Bihar were presented to a group of
stakeholders in Patna during the course of the study. These stakeholders included:
BSEB;
Energy Department, Government of Bihar;
Subsequent to the presentations, the stakeholders comments were duly taken account of
and incorporated in the report.
9.2
Conclusions
Load Forecasting
Bihar has been suffering from constraints in the energy availability since last eight
years. There is a high level of suppressed demand in the Bihar;
According to the Tariff order for year 2006-07, BSEB had total connections of
1,730,904 as on 1st May 2006, out of which around 48% (833,033 Nos.) connections
were unmetered;
The peak demand in for 2009 is about 2,000 MW and this is forecast to increase to
between 5,383 MW (Average Load Forecast Scenario) and 8,243 MW (Optimistic
Load Forecast Scenario) in 2018.
9-1
020328-40RP-0400-00
Final Report
Table 9-1
Priority Order
Generation Requirements
Four generation scenarios were formulated for each load forecast scenario and considered
for selection of least cost plan:
Scenario-1:Coal+Hydro
Generation plan for each scenario was developed to meet the reliability requirements.
Results of each scenario were analysed in detail. The Scenario-2 was found to be least cost
option comparing with other scenario for both the load forecast scenario.
The net capacity additions under Scenario-2 are estimated to be 4,373 for the Average Load
Forecast Scenario and 7,068 MW for the Optimistic Load Forecast Scenario.
Transmission Requirements
The network expansion is planned to meet the system peak demand of 5,383 MW (Average
Load Forecast Scenario) in FY 2018. The summary of various transmission capacities
required to transfer the power from generating station to 132kV loads are as follows.
3,230 MVA
2,375 MVA
4,700 MVA
7,240 MVA
2,400 MVA
1,884 Ckt-km
9-2
020328-40RP-0400-00
Final Report
3,095 Ckt-km
4,292 Ckt-km
1,130 MVAr
600 MVAr
The load flow studies show satisfactory operation of transmission system with reinforcement
under steady state operation for FY 2018 and FY 2014 with peak load and light load
conditions.
Distribution Requirements
The studies and resulting recommendations for the distribution system were based on the
data available as July 2010.
The substation loads were based on the Load Forecast up to year 2014, and also from the
data available from transmission planning report The generation schedules were determined
from the Based Generation Plan
The Distribution Expansion Plan necessary to transmit the power available at the grid
substation was developed based on the inputs
The estimated investment in the Distribution system (33 kV lines, substations and additional
bays, 11kV lines and additional Bays, DTRs and LT lines) Rs. 368,058 Lakhs. This
investment includes the investment required for year 2010 to bring the existing network to
meet the load requirements of 2010 with reasonable quality
Investment Requirements
The total capitalised generation investment under Scenario-2 for the study period of 2010
2018 is estimated to be Rs. 24,336 Crores for the Average Load Forecast Scenario and Rs.
40,684 Crores for the Optimistic Load Forecast Scenario.
The total annual investment for the transmission is about Rs. 8,989 Crores for the study
periof of 2010 - 2018. The present worth of annual disbursements required to meet the inservice dates proposed at 10% discount rate is estimated as Rs. 6,106 Crores at the
beginning of FY 2009.
An investment of about Rs. 368,058 Lakhs is required to expand and reinforce the
distribution system by the year 2014.
9.3
Generation Expansion
Based on the study it is recommended that:
The BSEB should immediately take necessary steps to bridge the demand supply
gas exist before FY 2014. The alternatives for the first five year for the horizon period
are as follows:
o
9-3
020328-40RP-0400-00
Final Report
Many projects are expected to be commissioned in FY 2014 and if all the projects are
materialised BSEB will have comfortable position in meeting the demand. However, if
any delay of these projects may further extend the deficit period beyond FY 2013.
Therefore, BSEB should closely monitor these projects and if required a separate
Project Monitoring Cell (PMC) to be created to closely monitor these projects.
The BSEB should take immediate steps to obtain the necessary approvals from
concerned departments for R&M works of existing plants and immediately start R&M
works of one unit of BTPS and one unit of MTPS. BSEB should also closely monitor
the R&M works of these plants and make sure these units are available before the
planned R&M period which will improve the power supply position to certain extent
As of now BSEB has not planned any peak load plants. The alternatives proposed for
peaking capacity in this report are Gas Turbines and Pumped Storage Hydro. The
gas is expected to be available to the state after FY 2012. Therefore, BSEB should
look at the possibility of setting up these plants through JV/IPP/ any other mode in
the state. The Bihar Hydro Corporation has plans to build many pumped storage in
the state. Since Bihar state will have enough base load capacity after FY 2014,
pumped storage hydro could be an alternative for peaking capacity if the capital cost
of the plant is lower enough to compete with gas turbines.
The reserve requirement for the state of Bihar is about 14% and 7% respectively for
Average Load Forecast Scenario and Optimistic Load Forecast Scenario and the
installed net capacity additions requirement under two load forecast scenarios are
only in between 4,400 MW to 7,500 MW. Therefore, if all the projects are
materialised as per the BSEB plan the state will experience huge surplus and need to
examine the possibility of exporting such surplus power to other states in the country.
BSEB should take up detail generation planning studies before entering into the any
long-term contracts with Independent Power Producers (IPPs) or power purchase
from other sources or deciding upon the new project
BSEB should plan future capacity additions based on the system requirements and
not on their availability in the market place. Such system requirements should be
arrived through long-term generation planning studies.
BSEB should carry out detailed financial analysis before finalizing PPAs or contracts
with other parties.
Transmission Expansion
The existing transmission system cannot meet the current unrestricted demand
within the specified operating criteria and requires substantial investment even if it is
assumed there is no load growth and generation expansion.
It is expected that the transmission expansion in the near future will at least avoid or
reduce the present load shedding caused due to transmission capacity constraints
and ease power supply position to important commercial and industrial consumers.
Therefore, BSEB should extensively plan transmission system and ensure
transmission system in pace with generation capacity addition plan to avoid any
further load shedding.
BSEB should closely monitor the construction of existing substation and lines and
bring them as per the schedule date of commissioning.
9-4
020328-40RP-0400-00
Final Report
Since most of the 132/33kV substations are planned early period of the planning and
therefore a close vigil on these projects is required.
The total number of substations and lines scheduled for the commissioned in the ten
year period and associated transmission investment is a quite considerable.
Distribution Network
This previous recent history of shortages of power and energy has had negative
environmental and social impacts, including the use of small and inefficient generators and
alternative fossil fuels during power outages. Also, the lack of a reliable electrical supply has
had a negative social impact throughout Bihar since it has restricted the growth in economic
activity. the provision of reliable electric power should help to alleviate the environmental
pollution from alternative sources of power that are necessary because the BSEB was not
able to satisfy the suppressed load demand from the industrial, commercial and private
sectors
It is therefore can be considered that the proposed distribution system, coupled with the
commissioning of new generation and improvements in the transmission system will have
positive environmental and social impacts
The existing BSEB distribution system cannot meet the current demands within the specified
operating criteria, and would require substantial investment, even if there were to be no
increase in load, and no generation expansion.
Without the extensive transmission and distribution system expansion, the new generation
cannot be evacuated and there can be no increase in the supplied consumer load. The
increase in consumer load demand would just add to the already significant suppressed
demand, resulting in more load-shedding in BSEB.
Therefore, the recommended expenditures in distribution systems are essential for the new
generation to be evacuated to satisfy the projected growth in load.
The proposed schedules for commissioning new distribution lines and substations are very
tight, and will require significant commitments of BSEB senior management.
9-5
020328-40RP-0400-00
Final Report
Appendix 1
Bihar State Electricity Board- Brief Profile and Future Sector Development
Programme
The Bihar State Electricity Board (referred to as BSEB or Board hereinafter) was
constituted under section 5 of Electricity (Supply) Act, 1948 on 1st April 1958. It is a
deemed licensee in terms of Section 14 of the Electricity Act, 2003. It is engaged in the
business of generation, transmission and distribution of electricity in the State of Bihar.
In the year 2000 the State of Bihar was bifurcated into two successor States of Bihar and
Jharkhand and the; Bihar State Electricity Board was bifurcated into two separate
Boards with effect from 1st April, 2001. Since its inception BSEB has filed two tariff
petitions to the Bihar State Electricity Regulatory Commission (BERC)- first for year
2006-07 and second for year 2008-09. Tariff orders have been notified for both the tariff
petitions. Brief overview of current capacity in generation, transmission and distribution
is summarized below.
A.1.1 Consumer Profile
Sales to different consumer segments as reported by BSEB for FY 2009 are mentioned
in Figure A-1 below.
Figure A-1
Clearly, the sales are dominated by the Domestic Category followed by Industrial HT
sales. Irrigation also forms very large part of the entire sales pie.
A.1.2 Current Status
Generation
At present, Bihar has two thermal generating plants located at Muzaffarpur and Barauni
whose total installed capacity is 540MW. The only Hydel generating plant at Kosi has
been transferred to Bihar State Hydro Power Corporation. The present status of the
thermal plants is given below:
-1-
Final Report
Table A-1
Name
Unit Capacity
(MW)
Date of
Present status
Commissioning
Have
retired
been
Unit 4
50 MW
09/11/1969
Unit 5
50 MW
01/12/1971
Unit 6
110 MW
01/12/1984
Unit 7
110 MW
31.03.1985
110 MW
31/03/1985
Unit 2
110 MW
17/03/1986
Total
540 MW
Voltage
Transmission
lines
( Ckt-km)
No. of
substations
Total sub
station
capacity
(MVA)
Number of
Transformers
*440 kV
75.00
220 kV
957.02
1300
11
132 kV
3648.71
44
2077.90
93
* Charged at 220 kV
-2-
Final Report
The existing transmission system is capable to meet a demand of about 1,100 MW.
Distribution
Table A-3
Distribution Network
Voltage
Sub
transmission/Distribution No. of substations
lines (Ckt-kM)
Transformer
capacity (MVA)
33 kV
5761.80
362
2544.46
11 kV
35053.77
35746*
2,982,915
LT lines
65859.81
*Distribution transformers
Except for a few locations, the major drawal of power from Central Sector is on 220 KV.
Hence, against 1300 MVA transformer capacity at 220 KV level, about 1100 MW power
can be drawn. This provides marginal extra capacity to meet any emergency in
operations. Utilization of power to meet consumers load above 33 KV is less than 10%.
Thus, about 900 MW power is being distributed through 33KV, 11KV and L.T. system.
A1.3
A1.3.1 Generation
Existing installed capacity
The existing installed capacity of BSEB is 585 MW. There are two thermal power plants
in Bihar owned by BSEB namely Barauni Thermal Power Station (BTPS) (3x15 + 2x50 +
2x110 MW) and Muzaffarpur Thermal Power Station (MTPS) (2x110 MW). At present,
these stations are not in operation due to various reasons. The unit wise details of the
capacity and broad reason for shut down are presented as below.
Table A-4
Name of the
Plant/Unit
Installed
Capacity (MW)
Status of
Operation
Remarks
a)
3x15 MW
Obsolete
b)
2x50 MW
Shutdown
DPR for R&M Prepared by NTPC.
Since March CEA opinioned in Oct08 R&M is
95 /Apr96
not techno-economically viable
c)
2x110 MW
R&M
/LE Defects in MP rotor bearing and
Proposed
others are attended by BHEL
BTPS
MTPS
-3-
Final Report
Name of the
Plant/Unit
Installed
Capacity (MW)
Status of
Operation
a)
2x110 MW
One unit is
running under
deteriorated
condition and
other unit is
under R&M
Remarks
The commercial offer of Rs. 601. 185 Crores was submitted by BHEL in jan08 excluding
civil works and taxes & duties for Unit No. 6&7 of BTPS
BSEB requested CEA on 12.03.08 for price settlement. CEA opinioned that scheme is
non-viable on the basis of MOP ceiling price of Rs. 1.25 crores/MW on 30-07-08.
The matter was raised by BSEB before Dr. S.C.Jha, Chairman, Special task Force on
Bihar in Planning Commission on 16-10-08
BHEL submitted revised offer of Rs. 476 crores. The price was negotiated and settled at
Rs. 428 Crores excluding restoration, consultancy and taxes etc. But CEA still did not
agree.
The meeting on 27-11-08 convened by Dr. Jha in Planning Commission, New Delhi.
CEA agreed to review the decision treating it as a special case.
The BTG offer submitted by BHEL was examined by KBUNL. The issues of price were
deliberated between CMD-NTPC & CMD-BHEL on 11-09-2008. The final agreed price
by BHEL for R&M of MTPS is Rs. 212.792 Crores.
R&M of BOP packages will be carried out by KBUNL at the estimated cost of Rs. 170
Crores.
The total expenditure of R&M of Unit No. 1&2 including restoration, consultancy, taxes &
duties at the name plate rating comes to Rs. 471.8 Crores
-4-
Final Report
The meeting convened by Dr. S.C.Jha, Chairman, Special task Force on Bihar on 31-1208 to follow up progress of R&M schemes of MTPS
Sl.
No
Power Station
Tala HEP
Capacity (MW)
% Allocation
Allocation
(MW)
1,020
25.5%
260.10
Chuka HEP
270
29.63%
80.00
Ranjeet HEP
60
35.0%
21.00
Teesta HEP
510
21.26%
108.43
Farakka STPS
1,600
24.62%
393.92
Kahalgaon STPS-I
840
30.21%
253.76
Kahalgaon STPS-II*
1,000
6.66%
66.70
Talcher STPS
1,000
37.0%
370.00
Total
1,553.81
Sl.
No
Details
Capacity
(MW)
2,980
3,960
6,140
-5-
Final Report
Sl.
No
Details
Capacity
(MW)
Approved by SIPB
8,290
Total
21,370
The detail of capacity addition from various power plants and their status sectors is
tabulated as below.
Table A-7
Capacity Remarks
(MW)
2x250
Extension MTPS
2x250
of 3x660
(JV
2x660
Survey Completed
2x660
Geo-Technical
progress
2x660
EIA-report prepared
Study
under
TOR-approved by MOEF
AAI clearance approved
Coal linkages fees deposited
Approved by SIPB under IPP (MOU signed)
M/s JAS Infrastructure Capital Pvt. 4x660
Ltd. at Banka, Bhagalpur
Land identified
Coal block allotted
Water clearances obtained
Final Report
Capacity Remarks
(MW)
Water clearances obtained
Land identified
Approved by SIPB
M/s Subas Projects & Marketing 1,200
Ltd., at Lakhisarai
M/s IL&FS, at Motipur, Muzaffarpur
Land identified
500
Ltd.,
at 1,320
Land identified
Land identified
Application for coal block submitted
1,800
Apart from the state capacity, the state has an allocation of 500 MW power from Tilaiya
UMPP (4000 MW). The power purchase agreement was executed on 10-09-08.
A1.3.2 Transmission System Development in Bihar
A comprehensive sub transmission and distribution system strengthening scheme for
Bihar has been formulated under Rashtriya Sam Vikas Yojna (RSVY)1 in consultation
with the BSEB. The total scheme is funded through central assistance under special
plan for Bihar. The total scheme is envisaged to be implemented in the following
phases2.
Source: The report of the special task force on Bihar on Road Map for Development of Power Sector
in Bihar, July-2007.
2
Source: The presentation made by BSEB before Honble Chief Minister of Bihar on 14-12-2008
-7-
Final Report
The total evacuation capacity after strengthening of the transmission and distribution
system under this scheme is presented in the following tables.
Table A-8
Transmission System
Sl.
No
Particulars
3,096
2,080
5,176
Table A-9
Capacity (MVA)
Sl.
No
Particulars
Capacity (MVA)
Existing
3,294
Under execution
2,656
RGGVY
318
State sector
Total
6,268
The details of the each phase are discussed in the subsequent sections.
Sub-Transmission Scheme Phase-I
The total amount released by Planning Commission under Phase-I is Rs. 552.4 Crores.
The expenditure under Phase-I as on 31-11-08 is 453.59 and the Planning Commission
permitted to transfer the balance available fund of Rs. 98.91 Crores to Phase-II. The
implementation of scheme is being done by PGCIL on behalf of BESB. The construction
of 18 No. new grid substations, 1 No. 33/11 kV substation and 876 km of associated
transmission lines is already completed and taken over under this scheme. The details
of the scheme are as follows:
Final Report
Baniapur
Sampatchak, Begusarai
Katra, Tekari, Naugachiya, Hulasganj, Raxaul, Ekangarsarai, SKMCH (Muz) and Buxar
Construction of GSS at Raxaul, SKMCH, Naugachiya, Hulasgang, Tekari, Katra & Buxar
with associated transmission lines are under progress and expected to be completed by
June 2009, except SKMCH and Naugachiya.
Land for Ekangarsarai is expected to be transferred and the land is not yet transferred to
Sampatchak
-9-
Final Report
Madhepura, Hajipur
Land is available at Dalsinghsarai, Wazairganj, Hajipur, Goh, Jagdishpur and many other
places the land has been identified.
Supply of materials has already been commenced for Madhepura, Jagdishpur, Goh,
Wazirganj, Nalanda, Harnaut, Dalsinghsarai GSS
- 10 -
Final Report
power substations are overloaded and many cases the burnt out of transformers were
observed.
Table A-10
No.
of
villages
where
infrastructure
developed
(no.)
No.
of
villages
electrified not
as
per
RGGVY (no.)
No.
of
villages
electrified as
per RGGVY
(no.)
No. of
Villages
taken
over
PGCIL
18,054
12,281
4,708
1,932
2,354
NHPC
6,008
1,475
16
261
277
BSEB
4,988
Total
29,050
4,724
2,193
2,631
The amount sanctioned and fund released under rural electrification program is
presented below.
Table A-11
Sl. Implementing
No Agency
Sanctioned
Amount
Villages to be Amount
electrified
released
(No.)
(Rs.
Crores)
(Rs. Crores)
1
PGCIL (24
districts)
1,973.22 (AREP)
18,054
119.64 (MNP)
(AREP+MNP)
Expenditure
up to Sep08
(Rs. Crores)
1,412.74
(AREP)
1,356.64
(AREP)
102.3
(MNP)
78.57 (MNP)
NHPC (6 districts)
500.98
(AREP+RGGVY)
6,008
224.15
201.73
BSEB (8 districts)
616.52
4,988
The proposal of revised DPR under RGGVY Rs. 1,827.47 Crores is yet to be sanctioned
by REC/MOP, GOI. Two districts namely Muzaffarpur and Vaishali had been taken
under MNP initially and now sanctioned under RGGVY in 11th Plan.
The various constraints in implementing of RGGVY observed are as follows:
DPRs prepared originally were subject to change with revised benchmark for all
categories of villages
- 11 -
Final Report
Revised benchmark fixed by Ministry of Power, Govt. of India in February 2008 (i.e. Rs.
13 lakhs per un-electrified villages and Rs. 4 lakhs per electrified villages) is not
adequate to meet the demands of rural consumers
Logistic of villages in Bihar is far more different from the villages of other states. The
villages of Bihar are densely populated and bigger in size in comparison to other states.
As such uniform benchmarks applicable for all states are not justifiable.
The existing infrastructure of villages of developed states covers almost 80% of the
villages, whereas existing infrastructure in the villages of Bihar is much lesser than those
of developed states.
PGCIL has submitted estimated cost of Rs.4095 Crores for additional 3-phase
infrastructure in villages of all 38 districts.
Sanctioned
Sl.
No
Scheme
RE
24
12
12
ACA
40
---
RGGVY
171
47
36
Sl.
No
Revised
- 12 -
Final Report
Sl.
No
Revised
0% to 35%
65% to 70%
8%
36% to 50%
Above 70% to
80%
10%
51% 75%
Above 80% to
90%
12%
76% to 100%
Above 90% to
100%
14%
A sum of Rs. 75 is to be paid for every new service connection. An additional incentive
for installing new service connection in large number is ranging from Rs. 50 to Rs. 70
per connection. Apart from this, a sum of Rs.1.0 per consumer per month on the
collection of minimum 50% of the total monthly collection targets is provided. The
performance of the franchisee is reviewed every three months. In case of the franchisee
failing to collect the average minimum monthly collection targets i.e. 35%/65% of
monthly targets, a penalty of 2% of the average shortfall assessed for every three
months is levied.
Status of APDRP program in Bihar
As part of APDRP program the total amount of Rs. 1066.58 Crores was sanctioned. The
source of funds received under this scheme is from GOI, PFC and GOB. The
expenditure under this scheme as of now is 645.68 Crores. The status of work in 12
circles (PESU(E), PESU (W), Patna, Muzaffarpur, Gaya, Rohtas, Darbhanga, Chapra,
Bhagalpur, Purnea, Saharsa & Munger) is presented as below.
Table A-14
Total Qty. to
executed (No.)
be Total
Qty.
executed (No.)
40
34
R&M of PSS
212
203
972 Km
762.8 Km
4,119 Km
3,749 Km
New DTs
2,226 Nos.
2,189 Nos.
R&M of DTs
6,728 Nos
5,944 Nos.
2,62,571 Nos
1,85,333 Nos
- 13 -
Final Report
Total Qty. to
executed (No.)
be Total
Qty.
executed (No.)
3,05,000 Nos
2,37,807 Nos
143 Nos
39 Nos
DT Meter (PGCIL)
4,228
2,910
705
682
201
176
The number of PSS for which land handed over to PGCIL is 38.
Status of metering in distribution system
The thrust on proper metering of consumers, distribution transformer (DTs), 11 kV and
33kV feeders is on in many circles in BSEB. The system metering work is entrusted to
M/s Secure Meters along with maintenance contract for five years including meter
reading with data analysis for two years. The metering at various levels in distribution
system is tabulated below.
Table A-15
Particulars
Total No.
Meter Installed
(No)
176
123
11 kV Feeder
277
257
6,902
6,737
33 kV Feeder
201
176
11 kV Feeder
705
682
4,228
2,910
DT Meter
By PGCIL (8 circles)
DT Meter
Consumer Meter
By BSEB (4 circles)
- 14 -
Final Report
Particulars
Total No.
Meter Installed
(No)
1-Phase
2,46,300
2,23,458
3-Phase
58,700
14,349
1-Phase
2,53,206
1,83,347
3-Phase
9,365
1,986
By PGCIL (8 circles)
The metering for remaining 4 circles not covered under APDRP is covered under ADB
funding. This includes the metering of 57 No. 33 kV feeders, 96 No. 11kV feeders, 4 No
33kV consumers, 42 No. 11kV consumers and 1,01,176 No. LT consumer meters (1Phase & 3-Phase). NIT was issued for 4 lakhs consumer meters out of total 9Lakhs
consumers unmetered. The balance 5Lakhs consumers will be metered in the next
phase. The work order for supply and installation of 40,057 No. 3-phase consumers (i.e.
State Tube Wells, Lift Irrigation, Water Supply, Agriculture and other consumers) has
already been issued.
Anti-theft initiatives
BSEB has taken many initiatives to control power theft in the distribution system. As part
of the theft control measures a Special Task Force (STF) was created at Board head
quarters in November 2007. All filed offices were equipped with Anti Power Theft (APT)
squads for conducting regular checks /raids. STF is headed by an officer in the rank of
Electrical Superintending Engineer (Energy Accounting). STF consists of 22 officers in
the rank of EEE/AEE. STF is fully equipped with measuring equipments and testing
equipments with full mobility. STF is also supported by 1:4 district armed force with
magistrate. The total number of premises inspected in FY 2009 (up to Oct08) was 1464.
The total number of cases in which FIR lodged was 297. The persons arrested in the
period were 58. The total amount realized was Rs. 713.28 Lakhs.
- 15 -
Final Report
Appendix 2
Historical GDP for the State of Bihar
(All figures are in Indian Rupee)
GDP at 1999-2000 Prices
Sector
Agriculture
1,520,245
2,086,135
1,628,760
2,066,604
1,689,948
1,941,748
1,698,380
2,172,949
1,908,325
91,061
96,295
98,771
102,316
106,604
111,676
116,602
121,603
126,756
Fishing
69,666
76,924
98,479
106,927
109,147
109,534
114,470
106,906
114,874
1,680,972
2,259,354
1,826,010
2,275,847
1,905,699
2,162,958
1,929,452
2,401,458
2,149,955
9,444
13,342
24,254
6,795
5,570
4,382
7,476
6,419
6,400
1,690,415
2,272,696
1,850,265
2,282,642
1,911,269
2,167,340
1,936,927
2,407,876
2,156,355
361,400
338,989
314,355
338,616
331,723
352,658
378,947
400,246
418,302
-6.2%
-7.3%
7.7%
-2.0%
6.3%
7.5%
5.6%
4.5%
Manufacturing
5.1 Manu-Registered
115,065
78,584
67,724
84,163
62,181
79,040
87,155
96,361
106,133
5.2 Manu-Unregistered
246,335
260,405
246,632
254,453
269,541
273,618
291,792
303,885
312,168
Construction
192,919
195,250
215,939
257,473
251,752
310,399
569,833
741,919
775,018
71,852
77,800
60,214
61,571
63,170
65,444
72,782
77,198
82,152
626,172
612,039
590,508
657,660
646,645
728,500
1,021,562
1,219,363
1,275,471
-1-
Final Report
Sector
Industry
635,615
625,381
614,763
664,455
652,215
732,882
1,029,037
1,225,782
1,281,872
372,396
405,384
405,059
435,725
407,067
439,091
489,087
539,672
542,528
8.1 Railways
156,375
175,517
180,244
183,662
138,312
148,520
161,319
175,855
175,855
139,261
150,387
149,788
157,546
158,205
165,599
167,454
177,825
180,681
8.4 Communication
76,760
79,480
75,027
94,517
110,550
124,972
160,314
185,992
185,992
754,085
870,094
952,999
1,135,742
1,141,966
1,388,069
1,357,104
1,741,314
1,960,068
10
181,914
201,432
247,359
236,669
229,532
242,491
260,262
319,976
319,976
11
209,709
220,979
230,439
239,966
250,855
263,763
278,237
294,723
312,882
12
Public administration
379,361
412,939
446,152
384,602
436,253
458,763
443,199
521,040
509,162
13
Other services
805,941
829,506
826,758
832,877
866,359
868,354
953,042
1,061,398
1,022,945
c.
2,703,406
2,940,334
3,108,766
3,265,581
3,332,031
3,660,530
3,780,930
4,478,123
4,667,561
14
5,019,993
5,825,069
5,549,539
6,205,883
5,889,945
6,556,371
6,739,419
8,105,362
8,099,388
8.3 Storage
-2-
Final Report
Appendix 3
TECHNICAL AND COST CHARACTERISITCS
Existing BSEB Plants
Description
Plant-1
Plant-2
BTPS
MTPS
Source
14%
Thermal
Performance
Report 2006-07,
CEA
33.12%
21.3%
Thermal
Performance
Report 2006-07,
CEA
1799
1799
4520
4520
4768
3600
0.06
0.076
Fixed O&M
(Rs/kW/Year)
1959
1959
Auxiliary Consumption
(%)
Unit Maintenance
(Weeks)
17.64%
-1-
Assumption
BSEB
BSEB
BSEB
Assumption
Assumption
Final Report
Existing Imports
Thermal
Description
Name of the Unit
Transmission
Losses (%)
Plant-1
Farakka
STPS
3.42%
6.53%
Plant-2
Plant-3
Kahalgaon Kahalgaon
STPS-I
STPS-II
3.42%
8.74%
3.42%
7.5%
Plant-4
Remarks
Talcher
3.42%
RLDC
5.67%
Thermal
Performance
Report 200607, CEA
Thermal
Performance
Report 200607, CEA
5.75%
1.24%
2%
3.04%
Variable Tariff
(Rs/kWh)
1.02
1.12
1.12
0.42
BSEB
Fixed Tariff
(Rs/KW/Month)
708
504
504
729.6
BSEB
2450.16
1090
90% of
PLF
2653
BSEB
Description
Plant-1
Plant-2
Plant-3
Plant-4
Teesta
HEP
Tala HEP
Chuka
HEP
Ranjeet
HEP
Transmission
Losses (%)
3.42%
7.38%
3.42%
3.42%
0.5%
0.5%
0.5%
0.5%
2%
2%
2%
2%
Variable
(Rs/kWh)
1.77
1.12
0.71
BSEB
624
782
489.6
BSEB
391.3
973.8
554.03
115.10
BSEB
Annual Gross
Energy Availability
(MU)
Hydro
Tariff
Fixed
Tariff
(Rs/KW/Month)
Annual
Energy
(MU)
Gross
Availability
-2-
Remarks
RLDC
Assumption
Assumption
Final Report
Appendix 4
RESTRICTED LOAD DURATION CURVES
Restricted Load Duration Curve Profiles
-1-
Final Report
-2-
Final Report
-3-
Final Report
-4-
Final Report
-5-
Final Report
Appendix 5
DESCRIPTION OF SYPCO (ADVANCED POWER SYSTEM PLANNING AND
PRODUCTION COSTING SOFTWARE)
This annexure presents a description of the computer programs utilized to develop the
generation expansion plans. Details are provided for SYPCO.
SYPCO
This section describes the computer program SYPCO (Advanced Power System
Planning and Production Costing), a tool for costing power system generation plans. The
program can be used to examine a generation expansion scheme based on a given set
of criteria by comparing the cost of alternative generation scenarios to serve a given load
over a selected period of time. The criteria normally would consist of a load forecast,
existing generation capability, future generation facilities, fuel, operation and
maintenance (O & M) costs and the target reliability with which the load is to be served.
SYPCO has the capability of evaluating thermal and hydro generation, as well as
interconnection ties with neighbouring systems.
Using SYPCO, peak load units can be added to satisfy a given loss of load probability
criterion.
Once the generation expansion plan has been developed, there are a number of options
available to determine the cost of operating the system. The production costs are
determined by simulating the operation of the system for a given method. Investment
costs for the selected generation plan can be determined by using a number of costing
methods. The production and investment costs are then combined to calculate the total
annual costs along with the cumulative present worth.
The information required to determine the sensitivity to varying discount rates, escalation
in fuel prices, capital costs, and operation and maintenance costs is readily available by
selecting appropriate options. Thus, alternative generation scenarios can be evaluated
rapidly and the sensitivity of the results to critical economic parameters can be
assessed.
SYPCO consists of several interrelated modules as shown in the following figure.
-1-
Final Report
The program is very flexible and the level of detail and the options selected can be
tailored to the problem at hand. The basic options, which may be selected, are as
follows:
- Generation Expansion - Automatic addition of peak load units.
- Loss of Load Probability Analysis (LOLP) - Analysis based on either monthly (12
intervals per year) or the annual load duration curves.
- Production Costing - Interval or annual based on either the simplified or the
Probabilistic method.
- Investment Costing - Based on either the uniform annual payment method, the
straight-line depreciation method, or the capital cost method.
Any combination of these options may be selected for a given study. The following
subsections provide an indication of the level of detail possible and briefly describe the
various modules.
Load Model
This module uses the input load data and converts it into a form that is usable by the
other program modules. Depending on the level of detail desired the availability of data,
either the interval load duration curves (ILDC), or the Annual Load Duration Curve
-2-
Final Report
(ALDC). For each case, the annual peak load (in MW) and annual energy (in GWh) as
well as other characteristic information is required.
Hydro Scheduler
This module schedules the hydro units and determines the load, which has to be served
by thermal units.
It is possible to model two types of hydro units.
Base hydro
Peak hydro
Base hydro units have no storage capability and are assumed to operate all the time that
water is available. They are stacked at the bottom of the load duration curve. Peak
hydro units on the other hand, have storage capability and are scheduled using the
insertion technique; see the following figures (for LOLP purposes either the firm energy
or average energy may be used).
In this way peak hydro units serve in essentially a peak shaving mode. The level at
which they are stacked is determined in such a way that all their available energy is
utilized, if possible.
Hydro scheduling can be done, depending on the load model used, on one of the
following basis:
For scheduling under the Annual Load Duration Curve, the capacity and energy (energy
for peak hydro only) of the unit is required. However, for scheduling under the Interval
Load Duration Curves the distribution of the hydro capacity for both base and peak
hydro and the distribution of hydro energy for peak hydro units for each of the intervals is
required. Typically the following is the input hydro data:
-3-
Final Report
Hydro capacity
Hydro capacity
Firm energy
Average energy
The interval capacity and energy data for hydro units may be specified in any consistent
units.
For stacking base hydro units and peak hydro units the capacity is derated by the forced
outage rate of the unit. This results in a reduction in energy output from the base hydro
units. For peak hydro units the energy is recoverable.
After scheduling the hydro units and determining the stackable peak hydro capacity the
load left over i.e. the load to be served by thermal units, is determined. The output from
the hydro scheduler consists of one of the following:
-4-
Final Report
pi
The loss of load probability for a system having n units and a total installed capacity, C,
is:
LOLP = ELDCn(C)
(2)
If LOLP is greater than the system design criteria, then peaking units are added until the
desired reliability is achieved. When the annual LDC is used, an approximation is made
for the maintenance of units. For calculating LOLP, the firm capability of the hydro is
usually used, but the other capabilities can be examined if desired.
Production Costing
The objective of this module is to simulate the operation of the power system and to
determine the cost of energy production. The energy produced by each unit can be
computed for two distinct levels of detail: interval basis using the ILDC, or annual basis
using the ALDC.
For production costing, the costs associated with the production, generally fixed per
year, are computed. The load model prepares the appropriate load data and produces
the thermal load duration curves. Once the interval load duration curve has been
determined, the thermal units are stacked in order of priority. The unit with the lowest
variable cost (fuel and variable O & M) is stacked first after the must run units.
The energy produced by the thermal units can be calculated by either one of two ways:
Simplified Method - This method is illustrated in the following figure. The energy
produced by a unit is the area under the duration curve. The unit capacity is derated by
the unit forced outage rate and to account for unit maintenance, the unit capability is also
generally derated by the planned outage rate. The derated capacity (Di) is given by:
-5-
Final Report
Di = Ci {1 - (PORi + FORi)}
(3)
Where:
Ci
The energy produced by unit i (Ei) is the area under the load duration curve multiplied by
the unit availability.
Qi
Ei= pi
ELDC ( i -1 ) ( x ) dx
Q ( i-1 )
Where Qi and Qi-1 are the load levels at which the unit is stacked.
On a probabilistic basis, there will always be some unserviced energy. After stacking
the n available thermal units having a total capacity of C, the expected unserviced
energy (UE) is:
PL+C
UE =
ELDC i ( x ) dx
-6-
Final Report
Where :
PL = Peak Load
The energy required to pump the water into the storage reservoir is:
Ep
E
p
and the energy generated from the water stored in the reservoir is:
Eg E g
The roundtrip or overall efficiency of the pumping/generation cycle is:
p g
-7-
Final Report
SYPCO uses monthly load duration curves (LDC) to represent the system load, where
the load is represented by a non-chronological format. Therefore the results obtained in
SYPCO only provide the overall monthly operation.
The operation of a pumped storage unit is shown in the following figure where the
pumped energy is added to the LDC and the generated energy is removed from the
peak of the curve.
-8-
Final Report
S YP CO LDC curves
7000
6000
5000
Restored energy
Load (MW)
4000
Pumped energy
3000
2000
1000
0
0
10
20
30
40
50
60
70
80
90
100
Num ber o f po in ts
O riginal LD C
Economics
The economics of operating a pumped storage unit is based on the difference between
the cost between the cost of storing the energy and the avoided cost of not producing
the energy provided by the pumped storage unit. This difference is determined by the
overall efficiency of the pumping/generation cycle as well as the thermal units affected
by the pumped storage unit - shown in the following formulae:
The cost of pumping the energy is :
C p E p UPC p
and the avoided cost of generating with the stored water is:
-9-
Final Report
C g E g UPC g
Where UPC p is the variable cost of the thermal unit pumping the water and UPC g is the
avoided cost of not having to generate that energy had the pumped storage unit not run.
These costs are expressed in mills/kWh.
Therefore, to operate economically:
Cg C p
Substituting,
E g UPC g E p UPC p
Or
UPC g UPC p
To operate economically, the avoided cost of the generation UPC g reduced by the
overall efficiency must be greater than the cost of pumping the water UPC p . As the
storage unit may span more than one thermal unit, UPC may be made up of several
thermal units costs. The operating cost savings can be expressed as:
Maintenance schedules
Interconnection usage
Reliability - LOLP
To properly model the effect of pumped storage units on all of these phenomena, an
iterative annual optimization is necessary.
Investment Costing
The investment-costing module uses the generation expansion plan, the cashflow
pattern and the number of years of construction given in the database to produce a
cashflow profile for all investments. Any special investments entered are also treated in
- 10 -
Final Report
the same way. Then based on the method of calculation used, the annual costs are
calculated. Three methods of calculation are available: uniform annual payments (UAP),
straight-line depreciation (SLD), and capital cost.
The uniform annual payments method calculates the annual capital costs using a
uniform charge to cover both interest and depreciation. The full cost is paid back over
the life of the plant. These costs appear for each year of the plant life starting in the
commissioning year along with other charges such as interim replacement and
insurance.
The straight-line depreciation method calculates the annual capital costs using straightline depreciation, with interest calculated on the diminishing balance. As with the UAP
method, the full cost is paid back over the life of the plant and the costs appear for each
year of the plant life starting in the commissioning year along with the other charges
such as interim replacement and insurance.
The capital cost method assumes that the entire capitalized investment is assumed to be
spent in the commissioning year. The investment costs for future years of the life of the
plant include charges for items such as interim replacement and insurance.
Economic Analysis
The economic analysis is carried out by simulating the operation of the system for a
period of time long enough to absorb the project under study. This is called the
simulation period. In order to measure the effect of the project(s) on long term operating
costs, the operation simulated in the last year of the simulation period is held constant
for a period long enough to measure these effects. The overall period of comparison is
called the evaluation period. For hydro plants, this evaluation period is usually 50 years.
The following figure shows the relationship between evaluation period, simulation period,
reference year for discounting and reference year for cost data.
The present worth analysis consists of obtaining the present worth of all costs, both
production and investment costs, for a basic discount rate and for up to five additional
discount rates. When investment costs are determined for these additional discount
rates, the interest during construction is automatically recalculated to reflect the discount
rate being used.
- 11 -
Final Report
Maintenance Schedule
- 12 -
APPENDIX 6
EQUIPMENT UNIT COST
TABLES:
A-1 to A-17
Appendix A-1
PARTICULARS
Amount in
Rs. Lakh
74.48
9.33
5.15
0.22
4.37
0.52
1.85
0.12
2.62
4.98
0.17
0.46
0.46
22.31
127.01
Appendix A-2
PARTICULARS
Amount in
Rs. Lakh
39.16
9.33
5.15
0.22
4.37
0.52
1.85
0.12
2.62
4.98
0.17
0.46
0.46
16.48
85.86
Appendix A-3
PARTICULARS
Amount in
Rs. Lakh
74.48
1.52
19.19
24.73
1.92
10.39
17.60
0.88
1.18
0.18
0.16
15.19
0.43
16.35
13.19
5.68
1.08
0.91
1.18
42.66
248.91
Appendix A-4
PARTICULARS
Amount in
Rs. Lakh
74.48
9.98
5.38
0.22
4.21
6.34
0.52
0.30
0.09
13.63
0.68
5.83
2.34
0.46
0.34
0.48
25.66
150.94
Appendix A-5
PARTICULARS
Amount in
Rs. Lakh
39.16
1.52
19.19
24.73
1.92
10.39
17.60
0.88
1.18
0.18
0.16
15.19
0.43
16.35
13.19
5.68
1.08
0.91
1.18
34.96
205.88
Appendix A-6
PARTICULARS
Amount in
Rs. Lakh
39.16
9.98
5.38
0.22
4.21
6.34
0.52
0.30
0.09
13.63
0.68
5.83
2.34
0.46
0.34
0.48
19.00
108.96
Appendix A-7
PARTICULARS
1
2
3
4
5
6
7
8
9
Rail Pole
Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Erection / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based
Cost does not include charges towards land compensation, etc., if any
Amount in
Rs. Lakh
8.43
4.36
1.49
1.26
1.20
0.19
1.58
1.85
2.13
22.49
Appendix A-8
PARTICULARS
1
2
3
4
5
6
7
8
9
Rail Pole
Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Erection / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based
Cost does not include charges towards land compensation, etc., if any
Amount in
Rs. Lakh
7.73
2.18
0.63
0.63
1.20
0.10
1.32
1.38
1.58
16.74
Appendix A-9
Estimated per km Cost of New 33 kV S/C Line with DOG ACSR (50 m span)
SL
PARTICULARS
1
2
3
4
5
6
7
8
9
Rail Pole
Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Erection / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based
Cost does not include charges towards land compensation, etc., if any
Amount in
Rs. Lakh
7.73
1.51
0.63
0.63
1.20
0.10
1.32
1.31
1.51
15.92
Appendix A-10
Estimated per km Cost of New 33 kV S/C Line with DOG ACSR (100 m span)
SL
PARTICULARS
1
2
3
4
5
6
7
8
9
Rail Pole
Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Erection / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based
Cost does not include charges towards land compensation, etc., if any
Amount in
Rs. Lakh
3.87
1.51
0.44
0.42
1.20
0.07
0.79
0.83
0.95
10.08
Appendix A-11
Estimated per km Cost of Replacement of 33 kV S/C Line Cond. with DOG ACSR (with 100
metre span)
SL
PARTICULARS
1
2
3
4
5
6
7
8
Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Dismantling / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based
Amount in
Rs. Lakh
1.51
0.34
0.42
0.33
0.02
0.45
0.54
0.35
3.96
Appendix A-12
Estimated per km Cost of Replacement of 33 kV S/C Line Cond. with DOG ACSR
(with 50 metre span)
SL
PARTICULARS
1
2
3
4
5
6
7
8
Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Dismantling / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based
Amount in
Rs. Lakh
1.51
0.68
0.63
0.33
0.03
0.76
0.69
0.45
5.09
Appendix A-13
Estimated per km Cost of Replacement of 33 kV S/C Line Cond. with WOLF ACSR
SL
PARTICULARS
1
2
3
4
5
6
7
8
Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Dismantling / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based
Amount in
Rs. Lakh
2.18
0.68
0.63
0.33
0.03
0.76
0.81
0.53
5.95
Appendix A-14
Estimated per km Cost of Conversion of 33 kV S/C Line to D/C line with WOLF ACSR
SL
PARTICULARS
1
2
3
4
5
6
7
8
Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Dismantling / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based
Amount in
Rs. Lakh
4.36
1.59
1.26
0.33
0.07
0.76
1.46
0.96
10.80
Appendix A-15
PARTICULARS
Amount in
Rs. Lakh
32.21
0.67
1.68
0.16
3.47
3.99
42.19
Appendix A-16
PARTICULARS
ERECTION OF 33 kV BAY
33kV Equipments
AC/DC Supply
Sub Station Auxiliaries
Structures
Insulators and Hardwares
Sub Station Lighting
Spares
Civil Works (other than foundations) (w/o land cost, if any)
Civil Foundations
Erection Charges
Cable Laying and associated work
Stringing and Jumpering
Testing, Commissioning and misc. works
Transport, Insurance, Service charges, Contingencies, etc.
Total
Prices are 2010-11 (1st quarter) based
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Amount in
Rs. Lakh
8.85
0.05
1.48
2.69
0.29
0.12
1.12
0.30
2.14
1.09
0.18
0.23
0.19
6.64
25.37
Appendix A-17
PARTICULARS
1
2
3
4
5
6
7
8
9
10
Cost of 11 kV Equipments
Auxiliaries (Cables & Conductors)
Structures
Insulators & Hardwares
Civil Works (Other than Foundations)
Civil Foundations
Erection Charges
Cable Laying & Associated Work
Stringing & Jumpering
Testing,Commissioning and Associated Work
Total
Contingencies @5%
Grand Total
Add 10%
Total
Amount in
Rs. Lakh
5.38
1.40
3.25
0.09
0.19
0.70
0.41
0.23
0.17
0.04
11.86
0.59
12.45
1.25
13.70
APPENDIX 7
TOTAL COST
TABLES:
B-1 to B-7
APPENDIX B-1
Feeder
Source
EHV S/S
Work proposed
Length
(km)
Circle Total
Cost
(Rs. Lakh)
2010
1. PESU (East)
1. Bahadurpur-Saidpur
Mithapur
2. Kankarbag
3. R K Nagar
Mithapur
Mithapur
4. Karbagahiya-R.Nagar Mithapur
5. City feeder
Gaighat
6. NMCH
Gaighat
Khagaul
2. Khagaul II
Khagaul
3. Khagaul I
Khagaul
2. PESU (West)
3. Patna
4. Danapur I
Khagaul
5. PESU 9
6. PESU 7
Jakkanpur
Jakkanpur
7. PESU 6
Jakkanppur
1. Pareo-Kanpa
Bihta
6.0
10.80
64.80
5.0
2.5
5.95
5.95
29.75
14.88
2.0
5.95
11.90
10.0
5.95
59.50
3.5
5.95
20.83
201.65
8
5.95
47.60
10.80
10.80
5.95
53.55
10.80
64.80
10
10.80
108.00
12
5.95
71.40
5
5
5.95
5.95
29.75
29.75
10.80
10.80
26.0
10.80
280.80
2.7
3.96
10.56
5.3
3.96
21.12
426.45
APPENDIX B-1
3. Patna
Feeder
Source
EHV S/S
2. Bihta A/F
3. Balmukund HTC
Bihta
Bihta
4. Fatuah
Fatuah
1. Sohasarai
Bari Pahari
2. Ramchandrapur
Bari Pahari
3. Ekangersarai
Bari Pahari
4. Nalanda
4. Silao
Rajgir
5. Nalanda
Rajgir
6. Noor Sarai
Bari Pahari
Work proposed
between Lalbhasara and Paliganj
Replacement of DOG with WOLF ACSR (3 ckts.)
Replacement of DOG with WOLF ACSR from
Bihta A/F to Balmukund HTC
1. Replacement of GI Wire with DOG ACSR
between Fatuah and Daniyaman S/Ss
2. Replacement of GI Wire with DOG ACSR
between Fatuah and Khusrupur S/Ss
Replacement of RABBIT and GI wire with DOG
ACSR between Sohasarai and Rahui S/Ss
Replacement of DOG with WOLF ACSR
from Bari Pahari GSS to Ramchandrapur S/S
1. Replacement of GI Wire with DOG ACSR
between Ekangersarai to Hulasganj and
Khudaganj S/Ss
2. Replacement of DOG with WOLF ACSR
between Bari Pahari GSS and Ekangersarai S/S
Replacement of GI wire with DOG ACSR betweeen
Rajgir GSS and Silao-Athri-Khizr Sarai S/Ss
1. Replacement of DOG with WOLF ACSR
between Rajgir GSS and next node
2. Replacement of GI Wire with DOG ACSR
between Nalanda and Raiter S/Ss
Replacement of GI wire with DOG ACSR betweeen
Bari Pahari and Noor Sarai
Length
(km)
2.1
3.5
5.95
5.95
12.50
20.83
12.0
3.96
47.52
12.0
3.96
47.52
11.7
3.96
46.33
2.0
5.95
11.90
49.0
3.96
194.04
30.0
5.95
178.50
54.5
3.96
215.82
0.5
5.95
2.98
15.3
3.96
60.59
23.0
3.96
91.08
Circle Total
Cost
(Rs. Lakh)
440.84
801.24
5. Chapra
6. Motihari
1. Bettiah
Bettiah
2. Lauria
Ram Nagar
3. Ram Nagar
Ram Nagar
4. Areraj
Motihari
5. Madhopur-Harsiddhi
Motihari
6. Chakia-Madhuban
Motihari
1.1
5.95
6.55
12.5
3.96
49.50
27.0
3.96
106.92
16.5
3.96
65.34
20.5
3.96
81.18
6.0
3.96
23.76
333.25
APPENDIX B-1
7. Bhojpur
Source
EHV S/S
Feeder
1. Japani farm-Sarai
Ara
2. Powerganj
Ara
3. Nawanagar-Murar
Dumraon
4. Buxar
Dumraon
1. Kako-Charui
Irki
2. Tehta-Makpa
Irki
3. Irki-Shakurabad
Irki
4. Rafiganj
Rafiganj
5. Uchauli-Madanpur
Rafiganj
8. Gaya
6. Tekari-Konch
Tekari
7. Gandhi Maidan
Chandauti
(Gaya)
Bodh Gaya
8. Shergahti
9. Manpur
Bodh Gaya
Work proposed
Replacement of DOG with WOLF ACSR
between Ara GSS and Japani farm S/S
Replacement of DOG with WOLF ACSR from
Ara GSS to Powerganj S/S
Replacement of GI wire with DOG ACSR
between Nawanagar and Murar S/Ss
1. Replacement of DOG with WOLF ACSR
from Dumraon GSS to Buxar S/S
2. Replacement of GI Wire with DOG ACSR
between Buxar and Chausa S/Ss
Replacement of GI wire with DOG ACSR
between Kako and Charui S/Ss
Replacement of GI wire with DOG ACSR
Irki GSS and Makhadampur - Tehta - Makpa S/Ss
Replacement of GI wire with DOG ACSR
between Irki and Shakurabad S/Ss
Replacement of GI wire with DOG ACSR
between Rafiganj and Goh S/Ss
1. Replacement of GI wire and RABBIT with DOG
ACSR between Rafiganj and Uchauli S/Ss
2. Replacement of GI Wire with DOG ACSR
between Uchauli and Madanpur S/Ss
Replacement of GI wire with DOG ACSR
between Tekari and Konch S/Ss
Replacement of DOG with WOLF ACSR
from Chandauti and Gandhi Maidan S/Ss
1. Replacement of DOG with WOLF ACSR
between Bodh Gaya GSS and Sherghati S/S
2. Replacement of GI Wire with DOG ACSR
between Imamganj and Dumaria S/Ss
3. Replacement of GI wire with DOG ACSR
between Sherghati and Gurua S/Ss
Replacement of GI wire with DOG ACSR
Length
(km)
5.0
5.95
29.75
6.0
5.95
35.70
4.0
3.96
15.84
20.0
5.95
119.00
10.0
3.96
39.60
6.0
3.96
23.76
13.5
3.96
53.46
6.5
3.96
25.74
9.5
3.96
37.62
6.5
3.96
25.74
12.5
3.96
49.50
12.0
3.96
47.52
6.0
5.95
35.70
20.8
5.95
123.76
10.0
3.96
39.60
5.0
3.96
19.80
30.0
3.96
118.80
Circle Total
Cost
(Rs. Lakh)
239.89
APPENDIX B-1
8. Gaya
9. Saharsa
10.Bhagalpur
11.Munger
12.Samastipur
Feeder
Source
EHV S/S
10.MU Campus
Bodh Gaya
11.Akbarpur
Nawada
12.Warsaliganj
Nawada
13.Aurangabad
Barun
1. Supaul
Supaul
1. Sanhaula
Kahalgaon
2. Banka-Bausi
Banka
1. Jamui
Mallehpur
2. Purani Bazar
Lakhisarai
3. Onama
Sheikhpura
4. Hathiyama
Sheikhpura
5. Ariari
Sheikhpura
1. IOC
BTPS
2. Bangerdih
BTPS
3. Begusarai
BTPS
4. Manhar
5. Dalsingsarai
6. Rosera
Mohanpur
Mohanpur
Mohanpur
Work proposed
between Manpur - Paimar - Wazirganj S/Ss
Replacement of DOG with WOLF ACSR
from Bodh Gaya to MU Campus
Replacement of GI wire with DOG ACSR
between Akbarpur and Sirdala S/Ss
1. Replacement of GI Wire with DOG ACSR
between Warsaliganj and Pakribarwan S/Ss
2. Replacement of GI Wire with DOG ACSR
between Warsaliganj - Roh - Kankol S/Ss
Replacement of DOG with WOLF ACSR
from Barun GSS to Aurangabad S/S
Replacement of DOG with WOLF ACSR
from Supaul GSS to Supaul S/S
Replacement of GI wire with DOG ACSR
between Kahalgaon and Sanhaula S/Ss
Replacement of DOG with WOLF ACSR
from Banka GSS to Banka S/S
Replacement of DOG with WOLF ACSR
from Mallehpur GSS to Jamui S/S
Replacement of DOG with WOLF ACSR
from Lakhisarai GSS to Lakhisarai S/S
Replacement of GI wire with DOG ACSR
between Sheikhpura GSS and Onama S/S
Replacemento of GI wire with DOG ACSR
between Sheikhpura GSS and Hathiyama S/S
Replacement of GI wire with DOG ACSR
between Sheikhpura GSS and Ariari S/S
Replacement of GI wire with DOG ACSR
between BTPS and IOC S/S
Conversion of S/C DOG to D/C WOLF ACSR
between BTPS and Bangerdih
Conversion of S/C DOG to D/C WOLF ACSR
between BTPS and Begusarai
Replacement of GI wire with DOG ACSR
Replacement of GI wire with DOG ACSR
Replacement of GI wire with DOG ACSR
Length
(km)
3.0
5.95
17.85
4.0
3.96
15.84
10.0
3.96
39.60
32.0
3.96
126.72
22.0
5.95
130.90
0.5
5.95
2.98
9.0
3.96
35.64
0.1
5.95
0.60
8.0
5.95
47.60
3.0
5.95
17.85
4.0
3.96
15.84
8.0
3.96
31.68
34.0
3.96
134.64
7.5
3.96
29.70
16.5
10.80
178.20
20.0
10.80
216.00
15.0
26.0
23.0
3.96
3.96
3.96
59.40
102.96
91.08
Circle Total
Cost
(Rs. Lakh)
931.91
2.98
36.24
247.61
677.34
APPENDIX B-1
13.Purnea
Feeder
Source
EHV S/S
Work proposed
Length
(km)
Purnea
Purnea
Purnea
6.0
8.0
20.0
3.96
3.96
3.96
23.76
31.68
79.20
1. Kalyanpur-Ramgarh
Karmnasa
30.0
5.95
178.50
2. Kudra
Mohania
1.0
10.80
10.80
3. Mohania
Mohania
0.1
10.80
1.08
4. Beda-Takia
Sasaram
5.0
5.95
29.75
1. Mehua-Patepur
2. Prataptand
3. Konharaghat
Vaishali
Vaishali
Hajipur
45.0
15.0
8.0
3.96
3.96
5.95
178.20
59.40
47.60
4. SKMCH
Bhikanpura
9.0
10.80
97.20
5. IDPL
Bhikanpura
3.5
5.95
20.83
10.0
18.0
3.96
5.95
39.60
107.10
13.0
3.96
51.48
Circle Total
Cost
(Rs. Lakh)
134.64
14.Sasaram
15.Muzaffarpur
1. JhanjharpurMadhepura
2. Gangwara-Bela
Pandaul
Ram Nagar
3. Pouria
Ram Nagar
16.Darbhanga
220.13
403.23
198.18
5295.56
APPENDIX B-1
Feeder
Source
EHV S/S
Work proposed
Length
(km)
Circle Total
Cost
(Rs. Lakh)
2011-2014
1. Katra
2. Dina Iron
3. Karmali Chak
Fatuah
Fatuah
Fatuah
4. S.K. Memorial
Jakkanpur
5.
6.
7.
8.
15.6
6
16.74
15.92
261.14
95.52
Mithapur (2)
Mithapur (2)
Mithapur (2)
Mithapur (2)
14.3
4.5
10
10
10
10.5
10.8
42.19
22.49
22.49
22.49
22.49
154.44
189.86
224.90
224.90
224.90
236.15
Mithapur
Mithapur
6.1
22.49
137.19
Mithapur
Mithapur
0.2
42.19
8.44
13.Gaighat
Gaighat
0.2
10.8
2.16
14.NMCH
15.Meena Bazar
16.Katra (2)
17.Pahari
18.Malsalami
19.Mangal Talab
20.Meena Bazar (2)
21.PMCH
Gaighat
Gaighat
Katra
Katra
Katra
Katra
Jakkanpur (2)
Mithapur (2)
1.5
10.8
16.20
S/C WOLF line from Katra GSS to new S/S Katra (2)
Conversion of S/C WOLF to D/C WOLF from Katra GSS to Pahari
S/C WOLF line from Katra GSS to Malsalami
D/C WOLF line from Katra GSS to Mangal Talab
D/C WOLF line from Jakkanpur (2) (New) GSS to Mina Bazar (2)
S/C WOLF line from Mithapur (2) (New) GSS to PMCH
5
7.5
5
5
5
10
16.74
10.8
16.74
22.49
22.49
16.74
83.70
81.00
83.70
112.45
112.45
167.40
9. Kankar Bag
10.Ashok Nagar
1. PESU (East) 11.R.K.Nagar
12.Karbigahiya
2416.491
2. PESU (West)
1. A.N.College
2. S.K.Puri
3. Garikhana I & II
Khagaul (2)
Khagaul (2)
Khagaul
10
18
22.49
22.49
10.8
224.90
0.00
194.40
APPENDIX B-1
Feeder
Source
EHV S/S
Work proposed
Length
(km)
Circle Total
Cost
(Rs. Lakh)
2. PESU (West)
4. Walmi
5. Danapur
6. Digha
Khagaul
Digha
Digha
10
5
16.74
22.49
167.40
112.45
7. R.B.I.
Digha
16.74
83.70
8. Danapur (2)
9. IGIMS
Digha
Sipara
10
10
22.49
22.49
224.90
224.90
10.Veterinary College
Sipara
10
22.49
224.90
10.8
32.40
10.8
32.40
2
10
10.8
22.49
21.60
224.90
1.5
1.5
42.19
42.19
63.29
63.29
10.8
43.20
11.Jakkanpur
Jakkanpur
12.Maurya Lok
Jakkanpur
13.Karnawad Punpun
Jakkanpur
14.Sinchai Bhawan
Jakkanpur
15.Anishabad
Jakkanpur
16.Gardanibag
17.Vidyut Bhawan
Jakkanpur
Jakkanpur
5
3.5
5.95
42.19
29.75
147.67
18.Sahitya Sammelan
Jakkanpur (2)
D/C WOLF line from Jakkanpur (2) (New) GSS to Sahitya Sammelan
10
22.49
224.90
Jakkanpur (2)
Jakkanpur (2)
D/C WOLF line from Jakkanpur (2) (New) GSS to Bandar Bagicha (2)
D/C WOLF line from Jakkanpur (2) (New) GSS to Beur
Replacement of DOG with WOLF ACSR from Beur to Khagaul S/S
10
10
10
22.49
22.49
5.95
224.90
224.90
59.50
2850.24
APPENDIX B-1
Feeder
Work proposed
Length
(km)
1. A.F. Bihta
Bihta
S/C WOLF line from Khagaul (2) (New) GSS to A/F Bihta for HTC
Group
10
16.74
167.40
2. Pareo
Bihta
D/C WOLF line from Bihta GSS to Bihta S/S for separate line to Pareo
22.49
134.94
15
5
5.95
15.92
89.25
79.60
S/C DOG line from Khagaul (2) (New) GSS to GISCO HTC
10
15.92
159.20
S/C WOLF line from Khagaul (2) (New) GSS to A/F Bihta for Maner
Replacement of DOG with WOLF from Neora to Naubatpur
10
10
16.74
5.95
167.40
59.50
S/C WOLF line from Fatuah (2) (New) GSS to Fatuah (2)
S/C WOLF line from Fatuah (2) (New) GSS to Fatuah for Daniyaman +
Khusrupur feeders
16.74
83.70
16.74
83.70
3.
4.
5.
6.
7.
3. Patna
Source
EHV S/S
Bihta I & II
GISCO
Balmukund
Maner
Neora
Bihta
Khagaul (2)
Khagaul (2)
Khagaul (2)
Khagaul
8. Fatuah (2)
Fatuah (2)
9. Khusrupur
10.Fatuah
11.Dina Iron
Fatuah (2)
Fatuah
Fatuah
12.Masaurhi Old
Masaurhi
5.95
29.75
13.Masarhi New
14.NTPC I & II
15.Barh
Masaurhi
Barh
Barh
0.85
5.95
5.06
10.8
75.60
16.Barh (2)
17.Biharibigha
18.Hathidah
Barh
Barh
Hathidah
15.92
79.60
5.95
16.74
83.30
Hathidah
14
19.Hathidah (2)
1. Hilsa
2. Islampur
Ekangersarai
Ekangersarai
12
12
5.95
5.95
71.40
71.40
3. Ekangersarai
Ekangersarai
15
16.74
251.10
Circle Total
Cost
(Rs. Lakh)
1298.00
4. Nalanda
APPENDIX B-1
4. Nalanda
Feeder
Source
EHV S/S
4. Chiksurabazar
5. Dhamauli
Masaurhi
Harnaut
6. Noorsarai
Harnaut
7. Harnaut
Harnaut
8. Silao
Rajgir
9. Andawas
10.Rajgir
Rajgir
Rajgir
11.Giriak
Rajgir
12.Parwalpur
13.Ramchandrapur (2)
Bari Pahari
Bari Pahari
14.Ramchandrapur
15.Bari Pahari
16.Asthawan
Bari Pahari
Bari Pahari
Bari Pahari
17.Sohasarai
Bari Pahari
1. Fulwaria
Gopalganj
Work proposed
Length
(km)
10
5
5
15
3
12
10.08
16.74
10.08
16.74
15.92
10.08
100.80
83.70
50.40
251.10
47.76
120.96
2.5
15.92
39.80
8
16
2.5
10
7
17
10.08
15.92
5.95
15.92
10.08
10.08
80.64
254.72
14.88
159.20
70.56
171.36
12
10
10.08
10.08
120.96
100.80
16.74
83.70
10.8
21.60
0.5
10.08
5.04
2.5
10.8
27.00
Circle Total
Cost
(Rs. Lakh)
2198.88
5. Chapra
2.
3.
4.
5.
6.
Gopalganj
Srinagar
Siwan
Maharajganj
Siwan (2)
Gopalganj
Siwan
Siwan
Siwan
Siwan
20
10.8
216.00
2
3
10.8
5.95
21.60
17.85
20
2
5.95
22.49
119.00
44.98
APPENDIX B-1
5. Chapra
Feeder
Source
EHV S/S
7. Mashrakh
8. Taraiya
9. Baikunthpur
Mashrakh
Mashrakh
Mashrakh
10.Prabhunath Nagar
Work proposed
Length
(km)
3
11
18
16.74
16.74
10.08
50.22
184.14
181.44
Chapra
10.8
21.60
11.Telpa
Chapra
Conversion of S/C DOG line with D/C WOLF from Telpa GSS to Telpa
0.1
10.8
1.08
12.Sheetalpur
Sheetalpur
0.1
5.95
0.60
1. Valmiki Nagar
2. Dhanha
Nepal
Dhanha
3.
4.
5.
6.
7.
8.
9.
Ramnagar
Ramnagar
Ramnagar
Ramnagar
Raxaul
Raxaul
Dhaka
Circle Total
Cost
(Rs. Lakh)
858.51
Ramnagar
Chautarwa
Lauria
Narkatiaganj
Raxaul
Adopur
Dhaka
6. Motihari
10.Bettiah
11.Bettiah (2)
12.Madhopur
13.Areraj
Bettiah
Bettiah
Motihari
Motihari
14.Motihari (2)
15.Motihari
16.Chakia
17.Chhitwani
Motihari
Motihari
Motihari
Motihari
1.
2.
3.
4.
5.
Buxar
Buxar
Buxar
Dumraon
Dumraon
0.5
15
5.95
10.08
2.98
151.20
3
3
16.74
15.92
50.22
47.76
2
5
10.8
16.74
21.60
83.70
35
5
5.95
15.92
208.25
79.60
S/C WOLF line from Buxar (New) GSS to Itarhi - Chausa tapping
D/C WOLF line from Buxar (New) GSS to Buxar
S/C DOG line from Buxar (New) GSS to Pandey Patti
5
5
5
16.74
22.49
15.92
83.70
112.45
79.60
15.92
79.60
20
5.95
119.00
645.31
7. Bhojpur
Chausa
Buxar
Pandy Patti
Dumraon
Dumraon (2)
6. Nawanagar
Dumraon
APPENDIX B-1
7. Bramhapur
7. Bhojpur
Source
EHV S/S
Feeder
Work proposed
Length
(km)
Circle Total
Cost
(Rs. Lakh)
Dumraon
Conversion of S/C DOG to D/C WOLF from Dumraon GSS to
Bramhapur
18
10.8
194.40
5
25
10
2
10.08
22.49
16.74
10.08
50.40
562.25
167.40
20.16
10.8
54.00
6
1
14
0.5
10.8
42.19
10.08
15.92
64.80
42.19
141.12
7.96
8. Simri
Dumraon
9. Garhani
Jagdishpur
10.Jagdishpur
Jagdishpur
11.Japani Farm
Ara
Conversion of S/C WOLF to D/C WOLF from Ara GSS to Japani Farm
12.Powerganj
Ara
13.Zero Mile
Ara
1.
2.
3.
4.
5.
Karpi
Karpi
Goh
Goh
Irki
S/C DOG line from Karpi (New) GSS and Karpi S/S
10.08
30.24
3
25
17
10.08
10.08
5.95
30.24
252.00
101.15
6. Tehta
7. Ghosi
Irki
Irki
12
5.95
71.40
8. Irki
Irki
7
0.3
4
10.8
10.8
10.08
75.60
3.24
40.32
9. Rafiganj I & II
10.Uchauli
11.Guraru
12.Tekari
Rafiganj
Rafiganj
Rafiganj
Tekari
25
5.95
148.75
13.Belaganj
Belaganj
0.2
0.2
10.8
2.16
14.Chakand
15.Dhongra
16.Sonwa
Belaganj
Hulasganj
Hulasganj
10
12
10.08
10.08
100.80
120.96
1779.03
8. Gaya
Karpi
Arwal
Goh
Daudnagar
Kako
APPENDIX B-1
8. Gaya
Feeder
Source
EHV S/S
17.Hulasganj
18.Nawagarh
19.Aurangabad
Hulasganj
Hulasganj
Aurangabad
20.Obra
Aurangabad
21.Deo
22.Barun
23.Barem
24.Tengra
25.Sone Hydel
26.Nabinagar
27.Barun (2)
28.Dihara
29.Wazirganj
30.Atari
31.Gurua
32.Amas
Aurangabad
Barun
Barun
Barun
Barun
Barun
Barun
Barun
Wazirganj
Wazirganj
Sherghati
Sherghati
33.Banke
34.Shergahti
35.Imamganj
36.Chandauti
37.Medical
38.Central Stores
39.A.P.Colony
Sherghati
Sherghati
Sherghati
Chandauti
Chandauti
Chandauti
Chandauti
40.Gandhi Maidan
Chandauti
41.Dandibag
42.Shobh
43.Manpur
44.Industrial Area
Chandauti
Bodh Gaya
Bodh Gaya
Bodh Gaya
45.M.U. Campus
Bodh Gaya
Length
(km)
Work proposed
3
15
5
10.08
10.08
16.74
30.24
151.20
83.70
16.74
83.70
16.74
83.70
5
10
3
12
3
3
15.92
10.08
16.74
10.08
15.92
15.92
79.60
100.80
50.22
120.96
47.76
47.76
S/C DOG line from Sherghati (New) GSS to Sherghati for Banke Bazar
S/C DOG line from Sherghati (New) GSS to Sherghati
S/C DOG line from Sherghati (New) GSS to Sherghati for Imamganj
3
3
3
15.92
15.92
15.92
47.76
47.76
47.76
5.95
11.90
6.5
10.8
70.20
10.8
64.80
Chandauti to Dandibag
4
12
10.8
10.8
43.20
129.60
18
10.8
194.40
10.8
32.40
Circle Total
Cost
(Rs. Lakh)
APPENDIX B-1
8. Gaya
Feeder
Source
EHV S/S
Work proposed
Length
(km)
5.95
11.90
46.Hasua
Nawada
47.Nawada
Nawada
10.8
32.40
48.Akbarpur
Nawada
14
15
10.8
5.95
151.20
89.25
49.Roh
Nawada
Circle Total
Cost
(Rs. Lakh)
2831.03
9. Saharsa
1. Supaul
Supaul
0.5
16
6
5
10.8
10.08
10.08
22.49
5.40
161.28
60.48
112.45
2. Saharsa (2)
Saharsa
3. Sour Bazar
4. Balwahat
Saharsa
Saharsa
12
19
19
10.08
10.08
10.08
120.96
191.52
191.52
5. Simri Bakhtiyarpur
6. New Market
Saharsa
Saharsa
7. Old Saharsa
8. Madhepura
Saharsa
Madhepura
0.1
5
12
10.8
16.74
10.08
1.08
83.70
120.96
9. Singheswar
Madhepura
10.Khagaria
Khagaria
10
0.1
10.08
25
100.80
2.50
11.Bihariganj
12.Udakishanganj
13.Puraini
14.Alamnagar
Conversion of S/C DOG line to D/C WOLF from Khagaria GSS to Mansi
Replacement of DOG with WOLF ACSR from Mansi to Maheshkunt
Udakishanganj S/C DOG line from Udakishanganj GSS to Bihariganj
Udakishanganj
Udakishanganj S/C DOG line from Udakishanganj GSS to Puraini
Udakishanganj
10
10
13
10.8
5.95
10.08
108.00
59.50
131.04
10
10.08
100.80
1. Bihpur
2. Sanhauli
Naugachhia
Naugachhia
1551.99
10.Bhagalpur
11
10.08
110.88
APPENDIX B-1
Feeder
3. Naugachhia
4. Patwara
5. Sultanganj
6. Shahkund
7. Barari
10.Bhagalpur
Source
EHV S/S
Naugachhia
Sultanganj
Sultanganj
Sultanganj
Sabour
Work proposed
Replacement of DOG with WOLF from Naugachhia GSS to Naugachhia
S/S
Length
(km)
3.5
5.95
20.83
Conversion of S/C DOG to D/C WOLF from Sabour GSS to Central Jail
Conversion of S/C DOG to D/C WOLF from Sabour GSS to C S
Compound
8.2
10.8
88.56
10.8
43.20
8. CS Compound
9. Sabour
10.Gouradih
Sabour
Sabour
Sabour
11.Aliganj I
Sabour
Conversion of S/C DOG to D/C WOLF line from Sabour GSS to Aliganj
10.8
75.60
12.Aliganj II
Sabour
13.Banka (2)
Banka
Conversion of S/C DOG to D/C WOLF line from Sabour GSS to Aliganj
Replacement of DOG with WOLF from Aliganj to Nath Nagar
S/C DOG line from Banka GSS to Banka (2) S/S
7
7
5
10.8
5.95
15.92
75.60
41.65
79.60
14.Banka
Banka
Conversion of S/C WOLF to D/C WOLF from Banka GSS to Banka S/S
Replacement of DOG with WOLF from Banka S/S to Rajauna-Bousi
tapping
0.15
10.8
1.62
5.95
35.70
15.Sanhoula
16.Ghogha
Kahalgaon
Kahalgaon
12
10.08
120.96
17.Kahalgaon
Kahalgaon
10.8
97.20
1. Tarapur
Sultanganj
20
10.8
216.00
2. Dakranala
Jamalpur
3. Ramchandrapur
Jamalpur
5.95
23.80
4. Safiabad
Jamalpur
0.2
5.95
1.19
5. ITC
Jamalpur
6. Karnachaura
Jamalpur
13
10.8
140.40
Circle Total
Cost
(Rs. Lakh)
791.40
11. Munger
APPENDIX B-1
Feeder
7. Nandlalpur
8. Bindwara
9. Balaji
10.Purani Bazar
11. Munger
Source
EHV S/S
Jamalpur
Jamalpur
Lakhisarai
Lakhisarai
11.Kajra
Lakhisarai
12.Haibatganj
Lakhisarai
13.Jamui
Mallehpur
14.Gidhour
Mallehpur
15.Ghuskuri
16.Ariari
Sheikhpura
Sheikhpura
17.Onama
Sheikhpura
18.Hathiyama
Sheikhpura
19.Sheikhpura
Sheikhpura
1. Pusa
Mohanpur
2. Mohanpur
3. Jute Mill
4. Sarairanjan
Mohanpur
Mohanpur
Mohanpur
5. Jitwarpur
Mohanpur
6. Rly.Samastipur
7. Sirsia
Mohanpur
Mohanpur
Work proposed
Length
(km)
7.3
15.92
116.22
7
20
12
20
16
10.8
10.08
10.08
75.60
201.60
120.96
10.08
161.28
10.8
86.40
12
2
30
10.8
5.95
10.08
129.60
11.90
302.40
10.08
40.32
12
5.95
71.40
10.08
50.40
5.95
47.60
Circle Total
Cost
(Rs. Lakh)
1797.07
12.Samastipur
0.6
10.8
6.48
Conversion of S/C DOG line to D/C WOLF line from Mohanpur GSS to
Jitwarpur
S/C WOLF line from Jitwarpur to Magardahi
10
6
10.8
16.74
108.00
100.44
10.08
80.64
APPENDIX B-1
12.Samastipur
Feeder
Source
EHV S/S
8. Dalsingsarai
Dalsingsarai
9. Pateri
10.Bachhwara
11.Bibhutipur
12.Deona
13.Bangrahdih (2)
14.IOC
15.Railways
16.Deona (2)
17.Kankaul
18.Begusarai
Dalsingsarai
Dalsingsarai
Dalsingsarai
BTPS
BTPS
BTPS
BTPS
Zero Mile
Zero Mile
Zero Mile
1. Narpatganj
2. Raniganj
Forbesganj
Forbesganj
3. Forbesganj
Forbesganj
Work proposed
Length
(km)
3.5
5
10.08
16.74
35.28
83.70
25
12
15
10.08
10.08
16.74
252.00
120.96
251.10
20
16.74
334.80
S/C WOLF line from Zero Mile (Begusarai) GSS to Deona (2)
S/C WOLF line from Zero Mile GSS to Kankaul
D/C WOLF line from Zero Mile GSS to Begusarai
12
15
12
16.74
16.74
22.49
200.88
251.10
269.88
Circle Total
Cost
(Rs. Lakh)
2095.26
4.
5.
6.
7.
8.
Bahadurganj
Sarai
Paschimpali
Purabpali
Thakurganj
13
10.08
131.04
7
10
10.08
10.08
70.56
100.80
Kishan ganj
Kishanganj
Kishanganj
Kishanganj
Kishanganj
13. Purnea
9. Group Control
Purnea
Conversion of S/C DOG to D/C WOLF line from Purnea GSS to Group
Control
0.1
10.8
1.08
10.Banmankhi
Purnea
40
5.95
238.00
11.Zero Mile
12.Belgachhi
Purnea
Purnea
12
5.95
71.40
10
10.08
100.80
1
25
4
10.8
5.95
10.8
10.80
148.75
43.20
13.Naranga
14.Jalalgarh
15.Beri
Purnea
Purnea
Katihar
APPENDIX B-1
13. Purnea
Feeder
Source
EHV S/S
Work proposed
Length
(km)
16.Barsoi
17.Pranpur
18.Industrial Estate
19.Binodpur
20.Kursaila
Katihar
Katihar
Katihar
Katihar
Naugachhia
50
30
10.08
10.08
504.00
302.40
1. Karmnasa
Karmnasa
0.9
10.8
9.72
18
5.95
107.10
2. Larma
3. Kalyanpur
Karmnasa
Karmnasa
Conversion of S/C WOLF to D/C WOLF from Karmnasa GSS to
Ramgarh
S/C WOLF line from Karmnasa GSS to Ramgarh (2)
30
30
10.8
16.74
324.00
502.20
16.74
83.70
15
5
5.95
16.74
89.25
83.70
10.8
64.80
10.8
64.80
3
20
38
22.49
5.95
10.08
67.47
119.00
383.04
5
10
22.49
16.74
112.45
167.40
22.49
112.45
Circle Total
Cost
(Rs. Lakh)
1722.83
4.
5.
6.
7.
8.
9.
14. Sasaram
Ramgarh (2)
Kakrait
Parsathua
Chainpur
Mohania (2)
Mohania
Karmnasa
Karmnasa
Mohania
Mohania
Mohania
Mohania
10.Dinara
11.Sanjhouli
12.Surajpura
Dinara
Bikramganj
Bikramganj
13.Bikramganj
Bikramganj
14.Bikramganj (2)
15.Pusauli
16.Kudra
17.Karamchat
Bikramganj
PGCIL Pusauli
Kudra
D/C WOLF line from Kudra (New) GSS to Kudra
Kudra
Replacement of DOG with WOLF from Kudra to Karamchat
S/C DOG line from Cenari to Adhaura
Sasaram
Sasaram
D/C WOLF line from Sasaram GSS to Sasaram (2) S/S
Sasaram
S/C WOLF line from Sasaram GSS to Sasaram (3) S/S
Sasaram
Dehri-On-Sone D/C WOLF line from Dehri-on-Sone GSS to BMP Dehri (2)
Dehri-On-Sone
18.Beda Sasaram
19.Sasaram (2)
20.Sasaram (3)
21.Naigaon
22.BMP Dehri (2)
23.BMP Dehri I & II
APPENDIX B-1
14. Sasaram
Feeder
24.JVLO&FL Pahleja
25.Nasariganj
26.Rajpur
27.Nauhatta
28.Samhauta
29.Samhauta (2)
30.Kirpabal (2)
Source
EHV S/S
Work proposed
31.Indrapuri
32.Indrapuri (2)
Dehri-On-Sone
Dehri-On-Sone
Dehri-On-Sone
Banjari
Banjari
Replacement of DOG with WOLF from Banjari GSS to Samhauta
Banjari
S/C WOLF line from Banjari GSS to Samhauta (2)
Barun
S/C DOG line from Barun to Kirpabal (2)
Conversion of S/C DOG to D/C WOLF from Barun GSS to Kirpabal
Barun
S/C WOLF line from Barun Sone Nagar GSS to Indra Puri to
Barun
Indrapuri (2)
1. Shivhar
2. Runi Saidpur
3. Pupri
4. Dumra (2)
5. Dumra
6. Sursand
7. Sonbarsa
8. Nepal
9. Patepur
10.Prataptand
Shivhar
Runi Saidpur
Sitamarhi
Sitamarhi
Sitamarhi
Sonbarsa
Sonbarsa
Sonbarsa
Vaishali
Vaishali
Length
(km)
0.1
3
30
30
15
5.95
16.74
10.08
10.8
16.74
0.60
50.22
302.40
324.00
251.10
3
3
28
5
5
20
3
15.92
16.74
5.95
16.74
5.95
22.49
15.92
47.76
50.22
166.60
83.70
29.75
449.80
47.76
30
5.95
178.50
10
20
5.95
5.95
59.50
119.00
10
5.95
59.50
10
5.95
59.50
10
16.74
167.40
S/C WOLF line from SKMCH (New) GSS to SKMCH (2) S/S
S/C WOLF line from SKMCH (New) GSS to MIT
S/C WOLF line from SKMCH (New) GSS to Sikandarpur (2)
D/C WOLF line from SKMCH (New) GSS to SKMCH S/S
S/C DOG line from SKMCH (New) GSS to Kurhani
Replacement of DOG with WOLF from Bhikanpura GSS to Motipur
S/C WOLF line from Bhikanpura GSS to Motipur (2)
5
10
10
5
15
35
20
16.74
16.74
16.74
22.49
10.08
5.95
16.74
83.70
167.40
167.40
112.45
151.20
208.25
334.80
Circle Total
Cost
(Rs. Lakh)
3219.40
11.Lalganj
12.Sarai
15. Muzaffarpur 13.Railway (HTC)
14.Bidupur
15.EDIP
16.Hajipur I E
17.Konharaghat
18.Konharaghat (2)
19.Manhar
20.SKMCH (2)
21.MIT
22.Sikandarpur (2)
23.SKMCH
24.Kurhani
25.Motipur
26.Motipur (2)
Vaishali
Vaishali
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Mohanpur
SKMCH
SKMCH
SKMCH
SKMCH
SKMCH
Muzaffarpur
APPENDIX B-1
15. Muzaffarpur
Feeder
Source
EHV S/S
Work proposed
Length
(km)
27.Maripur
28.Vaishali
29.Dholi
30.IDPL (2)
31.IDPL
32.Khabra
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
33.Bhikanpura
34.Bhagwanpur Chowk
35.Railway (HTC)
36.Nayatola (2)
37.Nayatola
38.Hajipur I E (2)
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
1. Basopatti
Jay Nagar
2. Jay Nagar
3. Benipatti
Jay Nagar
Rahika
Replacement of DOG with WOLF from Jay Nagar GSS to Jay Nagar
Replacement of DOG with WOLF from Rahika GSS to Benipatti
0.5
32
5.95
5.95
2.98
190.40
4. Rahika
Rahika
5.
6.
7.
8.
Gangwara
Gangwara
Gangwara
Ram Nagar
Conversion of S/C DOG to D/C WOLF from Rahika GSS to Rahika S/S
Replacement of DOG with WOLF from Rahika S/S to Madhubani
D/C WOLF line from Gangwara (New) GSS to Gangwara for Bela
S/C WOLF line from Gangwara (New) GSS to Gangwara S/S
S/C WOLF line from Gangwara (New) GSS to Gangwara for Donar
0.1
5
4
3
3
10.8
5.95
22.49
16.74
16.74
1.08
29.75
89.96
50.22
50.22
22.49
179.92
30
16.74
502.20
20
16.74
334.80
Conversion of S/C DOG to D/C WOLF from Pandaul GSS to Raj Nagar
33
10.8
356.40
0.1
5.95
0.60
39
5.95
232.05
28
5
3.5
1.5
5.95
16.74
10.8
5.95
166.60
83.70
37.80
8.93
0.1
2.5
5.95
16.74
0.60
41.85
10
16.74
167.40
10
16.74
167.40
Circle Total
Cost
(Rs. Lakh)
3418.46
16. Darbhanga
Bela
Gangwara
Donar
Panda Sarai
9. Pouriya
10.Anar
11.Kusheshwar
12.Biraul
Ram Nagar
Kusheshwar
Kusheshwar
Kusheshwar
13.Raj Nagar
14.Raiyam
15.Pandaul
16.Manigachi
17.Jhanjharpur
18.Khatauna
Pandaul
Pandaul
Pandaul
Pandaul
Pandaul
Phulparas
APPENDIX B-1
16. Darbhanga
Feeder
Source
EHV S/S
19.Rudrapur
Phulparas
20.Phulparas
Phulparas
Work proposed
S/C WOLF line from Phulparas GSS to Rudrapur
Conversion of S/C DOG to D/C WOLF from Phulparas GSS to
Phulparas S/S
Length
(km)
30
16.74
502.20
10.8
21.60
Circle Total
Cost
(Rs. Lakh)
2544.37
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
Year
1. PESU(East)
2. PESU(West)
2010
2010
2010
3. Patna
4. Nalanda
Sub Station
Bihta AF
Work
Total Cost
(Rs. Lakh)
0
0
108.96
108.96
2010
2010
2010
Sheetalpur
Siwan
0
85.86
108.96
2010
2010
2010
2010
Valmiki Nagar
Bettiah
Lauria
Motihari
108.96
254.02
75.00
254.02
0
75.00
108.96
0
108.96
5. Chapra
6. Motihari
7. Bhojpur
8. Gaya
Circle Total
Cost
(Rs. Lakh)
194.82
692.00
2010
2010
2010
2010
2010
Kako
Guraru
Panari
Central Stores
292.92
9. Saharsa
10.Bhagalpur
11.Munger
2010
2010
Shahkund
0
108.96
2010
2010
2010
2010
Ramchandrapur
Onama
Mirjapur
Barkana
108.96
108.96
108.96
108.96
2010
2010
2010
Deona
Pusa
Jitwarpur
108.96
108.96
108.96
2010
Group Control
108.96
2010
2010
Kalyanpur
Dinara
108.96
108.96
108.96
435.83
12.Samastipur
326.87
13.Purnea
14.Sasaram
108.96
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
14.Sasaram
Year
Sub Station
Work
Total Cost
(Rs. Lakh)
2010
2010
2010
2010
2010
2010
Bhabhua New
Pusauli
Takia
Nokha
Beda
Nahatta
108.96
108.96
108.96
108.96
108.96
108.96
2010
2010
2010
2010
2010
2010
2010
2010
2010
2010
2010
2010
Pupri
Dumar
Lalganj
EDIP
Hajipur IE
Konharaghat
Motipur
MIT
Sikandarpur
SKMCH
Khabra
Bhikanpura
108.96
108.96
108.96
108.96
108.96
108.96
108.96
108.96
108.96
108.96
108.96
108.96
2010
2010
2010
Rajnagar
Raiyam
Pandaul
108.96
108.96
108.96
Circle Total
Cost
(Rs. Lakh)
871.67
15.Muzaffarpur
1307.50
16.Darbhanga
326.87
4775.36
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
Year
Sub Station
1. Katra
1. HTC
2. HTC
1. Karmali Chak
2. Deedarganj
1. S.K.Memorial
1. Kankar Bag (2)
1. Saidpur
1. Bahadurpur
1. R.Nagar
2. Machhuatoli
1. Kankar Bag
1. Ashok Nagar
1. PESU (East)
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
1. R.K.Nagar
1. Karbigahiya
1. Gaighat
1. NMCH
1. Meena Bazar
1. Katra (2)
1. Pahari
2. Sampatchak (Patna)
3. HTC (Patna)
1. Malsalami
1. Mangal Talab
2. Meena Bazar (2)
1. PMCH
Work
Total Cost
(Rs. Lakh)
314.84
254.02
550.79
508.04
508.04
254.02
150.94
381.03
150.94
301.88
254.02
254.02
508.04
550.79
127.01
Circle Total
Cost
(Rs. Lakh)
127.01
150.94
127.01
150.94
254.02
399.85
381.03
6659.21
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
2. PESU (West)
Year
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
Sub Station
1. A.N.College
1. S.K.Puri
1. Garikhana
2. Pataliputra
3. Rajapur
1. Walmi
1. Danapur
1. Digha
2. Digha C/S
1. RBI
2. HTC (Group)
1. Danapur (2)
1. IGIMS
2. Excise
1. Vaterinery College
2. Board`s Colony
1. Jakkanpur
1. Maurya Lok
2. Bandar Bagicha
1. Karnawad Punpun
Work
Augmentation of 1*5 with 1*10 MVA Xmer
Augmentation of 2*5 with 2*10 MVA Xmer
Augmentation of 3*5 with 3*10 MVA Xmers
Augmentation of 3*5 with 3*10 MVA Xmers
Augmentation of 2*5 with 2*10 MVA Xmers
Augmentation of 1*5 with 1*10 MVA Xmer
Augmentation of 1*5 with 1*10 MVA Xmer
Augmentation of 1*5 with 1*10 MVA Xmer
Augmentation of 1*5 with 1*10 MVA Xmer
Augmentation of 1*5 with 1*10 MVA Xmer
Total Cost
(Rs. Lakh)
Circle Total
Cost
(Rs. Lakh)
127.01
254.02
381.03
381.03
254.02
127.01
127.01
127.01
127.01
127.01
550.79
254.02
127.01
127.01
254.02
254.02
381.03
254.02
171.73
127.01
254.02
254.02
254.02
254.02
254.02
399.85
254.02
254.02
127.01
127.01
127.01
7091.81
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
Year
Sub Station
1. A.F.Bihta
1. Pareo
2. Koilwar (Ara Circle)
3. Giddha (Ara Circle)
1. Bihta
3. Patna
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2. Kanpa
3. Lalbhasara
4. Paliganj
HTC
HTC group
1. Maner
1. Neora
2. Naubatpur
1. Fatuah (2)
1. Khusrupur
2. Daniyaman
1. Fatuah
1. HTC
2. HTC
1. Masaurhi Old
2. Dhanaura
1. Masaurhi New
HTC
1. Barh
2. Bakhtiyarpur
1. Barh (2)
1. Biharibigha
1. Hathidah
2. Mokama
1. Hathidah (2)
Work
Total Cost
(Rs. Lakh)
85.86
217.92
314.84
298.74
Circle Total
Cost
(Rs. Lakh)
85.86
85.86
108.96
85.86
108.96
150.94
171.73
108.96
217.92
399.85
85.86
108.96
171.73
212.87
314.84
171.73
150.94
314.84
85.86
108.96
127.01
4295.86
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
Year
4. Nalanda
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
Sub Station
1. Hilsa
2. Hilsa (2)
1. Islampur
2. Khudaganj
1. Ekangersarai
1. Chiksurabazar
1. Dhamauli
2. Rahui
1. Noorsarai
2. Kalyanbigha
3. Chandi
4. Chainpur
5. Thertheri
1. Harnaut
2. Cheral (Railways)
1. Silao
2. Bhindidih
1. Andawas
1. Rajgir
2. Ghosarwan
1. Tetrawan
2. Sarbahadi
3. Giriak
4. Badi
5. Katrisarai
1. Parwalpur
Work
108.96
108.96
217.92
314.84
108.96
314.84
314.84
108.96
314.84
314.84
314.84
314.84
314.84
314.84
Total Cost
(Rs. Lakh)
Circle Total
Cost
(Rs. Lakh)
314.84
314.84
85.86
108.96
399.85
381.03
508.04
314.84
381.03
6296.62
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
5. Chapra
6. Motihari
Year
Sub Station
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
1. Fulwaria
2. Hathua
1. Gopalganj
2. Jhajhwa
3. Kuchaikot
1. Srinagar
2. Mairwa
1. Siwan
1. Maharajganj
2. Ekma
1. Siwan (2)
1. Mashrakh
2. Baniapur
1. Taraiya
2. Marworah
1. Baikunthpur
2. Barouli
1. Prabhunath Nagar
2. Manjhi
1. Telpa
1. Sheetalpur
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2. Bagha
1. Chautarwa
1. Lauria
1. Narkatiaganj
1. Raxaul
Work
Total Cost
(Rs. Lakh)
217.92
108.96
217.92
108.96
108.96
108.96
108.96
108.96
108.96
423.80
108.96
108.96
108.96
108.96
150.94
108.96
381.03
217.92
108.96
314.84
217.92
85.86
314.84
75.00
217.92
85.86
108.96
108.96
217.92
399.85
108.96
108.96
Circle Total
Cost
(Rs. Lakh)
2917.02
1. Valmiki Nagar
1. Dhanha
1. Ramnagar
1. Adopur
1. Dhaka
1. Bettiah
1. Bettiah (2)
1. Madhopur
2. Harsidhi
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
6. Motihari
7. Bhojpur
Year
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
Sub Station
1. Areraj
1. Motihari (2)
1. Motihari
1. Chakia
2. Madhuban
1. Chhitwani
Work
Total Cost
(Rs. Lakh)
85.86
108.96
314.84
127.01
108.96
108.96
314.84
85.86
108.96
108.96
254.02
127.01
314.84
423.80
108.96
108.96
108.96
108.96
108.96
314.84
108.96
108.96
85.86
381.03
150.94
254.02
248.91
314.84
314.84
Circle Total
Cost
(Rs. Lakh)
3644.23
1. Chausa
2. Itarhi
3. Purushottampur
1. Buxar
2. Industrial
1. Pandey Patti
1. Dumraon
1. Dumraon (2)
1. Nawanagar
2. Murar
3. Akarsai
1. Krishnapuram
2. Bramhapur
3. Sahpur
4. Bihian
1. Simri
2. Chhotka Dhakai
1. Garhani
2. Piro
3. Agiaon
4. Sandes
1. Jagdishpur
1. Japani Farm
2. Serai
1. Powerganj
2. Power House
3. Barhara
1. Zero Mile
4251.45
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
Year
8. Gaya
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
Sub Station
1. Karpi
2. Ataullah
3. Kurtha
1. Arwal
1. Goh
1. Daudnagar
2. Haspura
1. Kako
2. Charui
1. Tehta
2. Makpa
3. Makhdampur
1. Ghosi
2. Jehanabad
1. Irki
2. Sakurabad
3. Nowaman
1. Rafiganj
1. Uchauli
2. Madanpur
1. Guraru
2. Paraiya
1.Tekari
2. Koach
1. Belaganj
2. Panari
3. Paibigha
1. Chakand
1. Dhongra
1. Sonwa
1. Hulasganj
1. Nawagarh
1. Aurangabad
1. Obra
2. Phesar
3. Sokhea
1. Deo
2. Gangti
Work
Total Cost
(Rs. Lakh)
108.96
108.96
85.86
75.00
108.96
108.96
381.03
217.92
314.84
217.92
108.96
108.96
108.96
108.96
108.96
108.96
217.92
217.92
217.92
314.84
314.84
314.84
Circle Total
Cost
(Rs. Lakh)
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
Year
8. Gaya
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
Sub Station
1. Barun
1. Barem
1. Tengra
HTC
1. Nabinagar
2. Amba
1. Barun (2)
1. Dihara
1. Wazirganj
2. Fatehpur
3. Paimer
1. Atari
2. Khizr Sarai
1. Gurua
1. Amas
1. Banke
1. Sherghati
2. Dobhi
1. Imamganj
2. Dumaria
1. Chandauti
1. Medical
2. Cherki
1. Central Stores
1. A.P.Coloy
2. Railway Maidan
1. Gandhi Maidan
2. Panchaiti Akhara
1. Dandibag
1. Shobh
2. Charkbria
1. Manpur
2. Tankuppa
3. Gere
Work
Total Cost
(Rs. Lakh)
108.96
217.92
108.96
108.96
314.84
314.84
254.02
150.94
85.86
150.94
108.96
254.02
127.01
150.94
381.03
254.02
150.94
108.96
85.86
Circle Total
Cost
(Rs. Lakh)
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
8. Gaya
9. Saharsa
Year
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
Sub Station
4. Bhore
1. Industrial Area
1. M.U.Campus
2. Buddhist Complex
1. Hasua
2. Nadirganj
1. Nawada
2. Nawada New
3. Bhadhokhara
1. Akbarpur
2. Rajauli
3. Sirdala
1. Roh
2. Warsaliganj
3. Pakribarwan
4. Kaukol
1. Barem
Work
Total Cost
(Rs. Lakh)
85.86
254.02
Circle Total
Cost
(Rs. Lakh)
150.94
85.86
85.86
381.03
108.96
108.96
108.96
108.96
108.96
75.00
108.96
108.96
217.92
9517.61
1. Supaul
2. Parasrama
3. Kishanpur
4. Pipra
5. Raghopur
6. Larganj
1. Sahrsa (2)
1. Sour Bazar
1. Balwahat
2. Salakhua
1. Simri Bakhtiyarpur
1. New Market
1. Old Saharsa
1. Madhepura
2. Muraliganj
3. Kumarkhand
1. Singheswar
127.01
150.94
314.84
314.84
550.79
314.84
314.84
314.84
150.94
108.96
314.84
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
9. Saharsa
10.Bhagalpur
Work
Total Cost
(Rs. Lakh)
Year
Sub Station
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2. Ghailar
1. Khagaria
2. Mansi
3. Maheshkunt
1. Bihariganj
1. Udakishanganj
1. Puraini
1. Alamnagar
314.84
301.88
108.96
217.92
314.84
314.84
1. Bihpur
1. Sanhauli
1. Naugachhia
1. Patwara
1. Sultanganj
171.72
314.84
127.01
108.96
150.94
150.94
150.94
150.94
150.94
150.94
150.94
108.96
150.94
108.96
127.01
314.84
108.96
108.96
217.92
108.96
314.84
127.01
Circle Total
Cost
(Rs. Lakh)
4550.98
1. Shahkund
1. Barari
2. Central Jail
3. Mayaganj
1. C S Compound
2. T T School
1. Sabour
1. Gouradih
1. Aliganj
2. Mojahidpur
1. Aliganj
2. Jagdishpur
3. Nath Nagar
1. Banka (2)
1. Banka
2. Amarpur
3. Rajouna
4. Bousi
1. Sanhoula
1. Ghogha
1. Kahalgaon
2. Pirpainti
3576.48
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
Year
11. Munger
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
Sub Station
1. Tarapur
2. Kharagpur
1. Dakranala
1. Ramchandrapur
2. Railways (HTC)
1. Safiabad
2. Baniyarpur
1. ITC (HTC)
1. Karnchaura
1. Nandlalpur
1. Bindwara
1. Balaji
1. Purani Bazar
2. Court Area
1. Kajra
2. Piri Bazar
1. Salempur
2. Manpur
3. Haibatganj
1. Jamui
2. Khaira
3. Sikandara
1. Gidhour
2. Jhajha
3. Sono
1. Ghuskuri
1. Ariari
2. Bhalua
3. Lohain
4. Katari
5. Barkna
1. Onama
2. Mirzapur
3. Toygarh
1. Hathiyama
Work
Total Cost
(Rs. Lakh)
217.92
108.96
108.96
108.96
108.96
108.96
127.01
150.94
108.96
217.92
127.01
150.94
150.94
314.84
314.84
314.84
254.02
108.96
108.96
108.96
108.96
85.86
314.84
314.84
314.84
75.00
Circle Total
Cost
(Rs. Lakh)
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
11. Munger
12.Samastipur
Year
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
Sub Station
1. Sheikhpura
1. Pusa
1. Mohanpur
2. Warisnagar
3. Kalyanpur
HTC
1. Sarairanjan
1. Jitwarpur
2. Magardahi
HTC
1. Sirsia
2. Kuboliram
3. Karpoorigram
1. Dalsingsarai
2. Mehuddinnagar
1. Pateri
1. Bachchwara
1. Bibhutipur
2. Rosera
3. Hassanpur
1. Deona
2. Bangrahdih
3. Jai Mangla (HTC)
4. Jai Mata Di (HTC)
1. Bangrahdih (2)
HTC
HTC
1. Deona (2)
1. Kankaul
1. Begusarai
2. Manjhaul
3. Ganga Dairy (HTC)
4. Balia
Work
Augmentattion of 1*1.6 + 1*3.15 MVA Xmers
with 2*10 MVA Xmers
Addition of 1*5 MVA Xmer
Augmentation of 3*5 + 1*3.15 MVA with
2*10 MVA Xmers
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Total Cost
(Rs. Lakh)
Circle Total
Cost
(Rs. Lakh)
254.02
4790.22
108.96
254.02
108.96
108.96
108.96
254.02
399.85
314.84
314.84
108.96
108.96
108.96
108.96
108.96
108.96
108.96
399.85
399.85
399.85
381.03
217.92
108.96
4643.56
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
Year
13. Purnea
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
Sub Station
1. Narpatganj
1. Raniganj
2. Bahargaon
1. Forbesganj
2. Araria
3. Kusgaon
4. Jokihat
5. Malgaon
1. Bahadurganj
2. Dighal Bank
1. Sarai
1. Paschimpali
1. Purabpali
1. Chhatargarh
2. Thakurganj
1. Group control
1. Banmankhi
2. Madhubani
1. Zero Mile
2. City
1. Belgachhi
2. Dalkola
3. Vaisi
1. Naranga
2. MLR Ganj
3. Dargaha
1. Jalalgarh
1. Beri
2. Gore Beri
3. Falka
4. Sonaily
5. Barsoi
6. Pranpur
1. Industrial Estate
1. Binodpur
1. Kursaila
Work
Total Cost
(Rs. Lakh)
108.96
314.84
314.84
314.84
108.96
150.94
150.94
381.03
108.96
108.96
108.96
314.84
108.96
75.00
217.92
108.96
75.00
75.00
108.96
108.96
Circle Total
Cost
(Rs. Lakh)
3365.82
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
Year
Sub Station
14. Sasaram
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
1. Karmnasa
2. Durgawati
3. Chand
1. Larma
2. DVPL (HTC)
1. Kalyanpur
2. Ramgarh
3. Chourasia
4. Nuaon
1. Ramgarh (2)
1. Kakrait
1. Parsathua
1. Chainpur
1. Mohania (2)
1. Mohania
2. Bhabhua Old
3. Bahuara
1. Dinara
2. Kochas
3. Dawath
1. Sanjhouli
1. Surajpura
1. Bikramganj
2. Kararkat
1. Bikramganj (2)
1. Pusauli
1. Kudra
2. Bhabhua New
1. Karamchat
2. Cenari
3. Adhaura
1. Beda Sasaram
2. Takia Sasaram
3. Nokha
1. Sasaram (2)
1. Sasaram (3)
1. Naigaon
2. Sheosagar
Work
Total Cost
(Rs. Lakh)
108.96
108.96
108.96
108.96
326.87
108.96
108.96
108.96
108.96
108.96
399.85
127.01
108.96
108.96
108.96
108.96
108.96
108.96
399.85
85.86
108.96
301.88
75.00
108.96
108.96
150.94
108.96
399.85
399.85
217.92
217.92
Circle Total
Cost
(Rs. Lakh)
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
14. Sasaram
15. Muzaffarpur
Year
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
Sub Station
1. BMP Dehri (2)
1. BMP Dehri
2. Basa Karwandia
3. PHED (HTC)
1. HTC
1. Akorigola
1. Nasariganj
1. Rajpur
1. Nauhatta
1. Samhauta
1. Samhauta (2)
1. Kirpabal (2)
2. Kirpabal
1. Indrapuri
1. Indrapuri (2)
Work
Total Cost
(Rs. Lakh)
550.79
108.96
217.92
217.92
108.96
217.92
108.96
357.86
314.84
399.85
217.92
217.92
108.96
399.85
217.92
217.92
217.92
217.92
150.94
108.96
254.02
399.85
399.85
254.02
Circle Total
Cost
(Rs. Lakh)
7776.98
1. Shivhar
1. Runi Saidpur
1. Pupri
1. Dumra (2)
1. Dumra
1. Sursand
1. Sonbarsa
1. Nepal
1. Mehua
2. Patepur
1. Prataptand
1. Lalganj
1. Sarai
HTC
1. Bidupur
1. EDIP
1. Hajipur
1. Konharaghat
1. Konharaghat(2)
1. Manhar @
1. SKMCH (2)
1. MIT
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
15. Muzaffarpur
16. Darbhanga
Year
Sub Station
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
1. Sikandarpur (2)
1. SKMCH
1. Kurhani
1. Motipur
1. Motipur (2)
1. Maripur
1. Vaishali
1. Dholi
1. IDPL (2)
1. IDPL
1. Khabra
1. Bhikanpura
1. Bhagwanpur chowk
HTC
1. Nayatola (2)
1. Nayatola
1. Hajipur I E (2)
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
Work
Total Cost
(Rs. Lakh)
399.85
108.96
399.85
150.94
108.96
108.96
399.85
254.02
254.02
314.84
399.85
Circle Total
Cost
(Rs. Lakh)
399.85
6683.88
1. Basopatti
1. Jay Nagar
2. Khajauli
3. Ladania
1. Benipatti
2. Ahilyasthan
1. Rahika
2. Madhubani
1. Bela
1. Gangwara
1. Donar
1. Panda Sarai
2. Laheria Sarai (Jail)
3. DMCH
4. Urban
1. Pouriya
1. Baheri
2. Anar
1. Kusheshwar
1. Biraul
108.96
108.96
108.96
108.96
150.94
254.02
108.96
127.01
108.96
108.96
108.96
108.96
75.00
108.96
108.96
314.84
108.96
APPENDIX B-2
Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
16. Darbhanga
Year
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
Sub Station
2. Benipur
1. Raj Nagar
2. Babu Barhi
1. Raiyam
1. Pandaul
1. Manigachi
1. Jhanjharpur
2. Madhepur
1. Khatauna
1. Rudrapur
1. Phulparas
2. Nirmali
3. Talpatganj
Work
Total Cost
(Rs. Lakh)
108.96
108.96
108.96
127.01
108.96
108.96
75.00
314.84
108.96
108.96
108.96
Circle Total
Cost
(Rs. Lakh)
3617.83
APPENDIX B-3
1. PESU (East)
1. Katra
2. Dina Iron
3. Karmali Chak
Source
EHV S/S
Fatuah
Fatuah
Fatuah
4. S.K. Memorial
Jakkanpur
Mithapur (2)
Mithapur (2)
Mithapur (2)
Mithapur (2)
Mithapur
Mithapur
Mithapur
Mithapur
Gaighat
Gaighat
Gaighat
Katra
Katra
Katra
Katra
Jakkanpur (2)
Mithapur (2)
1. A.N.College
2. S.K.Puri
3. Garikhana I & II
Khagaul (2)
Khagaul (2)
Khagaul
Name of 33 kV
4. Walmi
5. Danapur
6. Digha
7. R.B.I.
8. Danapur (2)
2. PESU (West) 9. IGIMS
10.Veterinary College
Khagaul
Digha
Digha
Digha
Digha
Sipara
Sipara
11.Jakkanpur
12.Maurya Lok
Jakkanpur
Jakkanpur
13.Karnawad Punpun
14.Sinchai Bhawan
Jakkanpur
Jakkanpur
33 kV Bay
(No.)
Total Cost
(Rs. Lakh)
1
1
0
25.37
25.37
0
1
1
1
1
25.37
25.37
25.37
25.37
1
0
25.37
0
0
0
0
0
S/C WOLF line from Katra GSS to new S/S Katra (2)
Conversion of S/C WOLF to D/C WOLF from Katra GSS to Pahari
S/C WOLF line from Katra GSS to Malsalami
D/C WOLF line from Katra GSS to Mangal Talab
D/C WOLF line from Jakkanpur (2) (New) GSS to Mina Bazar (2)
S/C WOLF line from Mithapur (2) (New) GSS to PMCH
1
0
1
1
1
1
1
1
0
25.37
0
25.37
25.37
25.37
25.37
304.44
25.37
25.37
0
1
1
1
1
1
1
0
0
25.37
25.37
25.37
25.37
25.37
25.37
0
0
Conversion of S/C DOG to D/C WOLF line from Sahitya Sammelan to Maurya Lok
D/C WOLF line from Jakkanpur (2) (New) GSS to Bandar Bagicha
0
1
0
25.37
0
0
0
0
Work proposed
APPENDIX B-3
Name of 33 kV
15.Anishabad
16.Gardanibag
17.Vidyut Bhawan
18.Sahitya Sammelan
2. PESU (West)
19.Bandar Bagicha (2)
20.Beur
3. Patna
4. Nalanda
Source
EHV S/S
Jakkanpur
Jakkanpur
Jakkanpur
Jakkanpur (2)
Jakkanpur (2)
Jakkanpur (2)
1. A.F. Bihta
2. Pareo
Bihta
Bihta
3.
4.
5.
6.
7.
8.
9.
Bihta
Khagaul (2)
Khagaul (2)
Khagaul (2)
Khagaul
Fatuah (2)
Fatuah (2)
Bihta I & II
GISCO
Balmukund
Maner
Neora
Fatuah (2)
Khusrupur
S/C WOLF line from Khagaul (2) (New) GSS to A/F Bihta for HTC Group
D/C WOLF line from Bihta GSS to Bihta S/S for separate line to Pareo
Replacement of DOG with WOLF from Pareo to Koilwar (Bhojpur circle)
S/C DOG line from Koilwar (Bhojpur) to Giddha New S/S (Bhojpur)
1
1
0
1
Total Cost
(Rs. Lakh)
0
0
0
25.37
25.37
25.37
0
304.44
25.37
25.37
0
25.37
S/C DOG line from Khagaul (2) (New) GSS to GISCO HTC
25.37
S/C WOLF line from Khagaul (2) (New) GSS to A/F Bihta for Maner
Replacement of DOG with WOLF from Neora to Naubatpur
S/C WOLF line from Fatuah (2) (New) GSS to Fatuah (2)
S/C WOLF line from Fatuah (2) (New) GSS to Fatuah for
Daniyaman + Khusrupur feeders
1
0
1
1
25.37
0
25.37
25.37
0
0
0
0
Work proposed
Conversion of S/C DOG to D/C WOLF from Jakkanpur GSS to Gardanibag
Replacement of DOG with WOLF ACSR from Anishabad to Gardanibag
Laying 2nd Cable length from Jakkanpur GSS to Vidyut Bhawan
D/C WOLF line from Jakkanpur (2) (New) GSS to Sahitya Sammelan
D/C WOLF line from Jakkanpur (2) (New) GSS to Bandar Bagicha (2)
D/C WOLF line from Jakkanpur (2) (New) GSS to Beur
Replacement of DOG with WOLF ACSR from Beur to Khagaul S/S
33 kV Bay
(No.)
0
0
0
1
1
1
0
10.Fatuah
11.Dina Iron
12.Masaurhi Old
13.Masarhi New
14.NTPC I & II
15.Barh
16.Barh (2)
17.Biharibigha
18.Hathidah
Fatuah
Fatuah
Masaurhi
Masaurhi
Barh
Barh
Barh
Barh
Hathidah
19.Hathidah (2)
Hathidah
0
1
1. Hilsa
Ekangersarai
0
25.37
202.96
0
2. Islampur
3. Ekangersarai
Ekangersarai
Ekangersarai
0
3
0
76.11
4. Chiksurabazar
5. Dhamauli
Masaurhi
Harnaut
6. Noorsarai
Harnaut
0
1
1
1
0
1
0
25.37
25.37
25.37
0
25.37
APPENDIX B-3
Name of 33 kV
7. Harnaut
Source
EHV S/S
Harnaut
8. Silao
Rajgir
9. Andawas
10.Rajgir
Rajgir
Rajgir
11.Giriak
Rajgir
12.Parwalpur
13.Ramchandrapur (2)
14.Ramchandrapur
15.Bari Pahari
16.Asthawan
Bari Pahari
Bari Pahari
Bari Pahari
Bari Pahari
Bari Pahari
17.Sohasarai
Bari Pahari
1. Fulwaria
Gopalganj
2. Gopalganj
3. Srinagar
4. Siwan
5. Maharajganj
6. Siwan (2)
7. Mashrakh
8. Taraiya
9. Baikunthpur
10.Prabhunath Nagar
11.Telpa
12.Sheetalpur
Gopalganj
Siwan
Siwan
Siwan
Siwan
Mashrakh
Mashrakh
Mashrakh
Chapra
Chapra
Sheetalpur
1. Valmiki Nagar
2. Dhanha
3. Ramnagar
4. Chautarwa
5. Lauria
6. Narkatiaganj
7. Raxaul
8. Adopur
9. Dhaka
10.Bettiah
Nepal
Dhanha
Ramnagar
Ramnagar
Ramnagar
Ramnagar
Raxaul
Raxaul
Dhaka
Bettiah
4. Nalanda
5. Chapra
6. Motihari
33 kV Bay
(No.)
Total Cost
(Rs. Lakh)
1
1
0
0
0
1
0
1
25.37
25.37
0
0
0
25.37
0
25.37
1
0
25.37
0
1
0
25.37
0
329.81
Conversion of S/C DOG line to D/C WOLF from Gopalganj GSS to Hathua tapping
Conversion of S/C DOG line to D/C WOLF from Gopalganj GSS to Gopalganj S/S
Replacement of DOG with WOLF from Siwan GSS to Srinagar
0
0
0
0
0
0
0
1
1
1
1
0
0
0
0
25.37
25.37
25.37
25.37
0
0
0
101.48
0
1
0
25.37
1
1
25.37
25.37
Conversion of S/C WOLF to D/C WOLF from Bettiah GSS to Bettiah S/S
Work proposed
APPENDIX B-3
11.Bettiah (2)
12.Madhopur
13.Areraj
14.Motihari (2)
15.Motihari
16.Chakia
17.Chhitwani
Source
EHV S/S
Bettiah
Motihari
Motihari
Motihari
Motihari
Motihari
Motihari
1.
2.
3.
4.
5.
6.
7.
Buxar
Buxar
Buxar
Dumraon
Dumraon
Dumraon
Dumraon
Circle
6. Motihari
Name of 33 kV
Chausa
Buxar
Pandy Patti
Dumraon
Dumraon (2)
Nawanagar
Bramhapur
8. Simri
Dumraon
9. Garhani
Jagdishpur
10.Jagdishpur
11.Japani Farm
12.Powerganj
Jagdishpur
Ara
Ara
13.Zero Mile
Ara
1.
2.
3.
4.
5.
6.
7.
Karpi
Karpi
Goh
Goh
Irki
Irki
Irki
7. Bhojpur
8. Gaya
Karpi
Arwal
Goh
Daudnagar
Kako
Tehta
Ghosi
33 kV Bay
(No.)
1
Total Cost
(Rs. Lakh)
25.37
0
1
S/C WOLF line from Buxar (New) GSS to Itarhi - Chausa tapping
D/C WOLF line from Buxar (New) GSS to Buxar
S/C DOG line from Buxar (New) GSS to Pandey Patti
1
1
1
0
25.37
126.85
25.37
25.37
25.37
1
0
25.37
0
1
1
1
1
0
0
0
1
1
S/C DOG line from Karpi (New) GSS and Karpi S/S
25.37
25.37
25.37
25.37
0
0
0
25.37
25.37
253.7
25.37
1
1
0
0
25.37
25.37
0
0
0
0
1
0
0
25.37
Work proposed
S/C WOLF line from Bettiah GSS to Bettiah (2)
8. Irki
Irki
9. Rafiganj I & II
10.Uchauli
11.Guraru
12.Tekari
13.Belaganj
Rafiganj
Rafiganj
Rafiganj
Tekari
Belaganj
Conversion of S/C DOG with D/C WOLF from Belaganj GSS to Belaganj S/S
S/C DOG line from Belaganj GSS to Belaganj S/S for Panari
0
1
0
25.37
APPENDIX B-3
8. Gaya
Name of 33 kV
14.Chakand
15.Dhongra
16.Sonwa
17.Hulasganj
18.Nawagarh
19.Aurangabad
20.Obra
21.Deo
22.Barun
23.Barem
24.Tengra
25.Sone Hydel
26.Nabinagar
27.Barun (2)
28.Dihara
29.Wazirganj
30.Atari
31.Gurua
32.Amas
33.Banke
34.Shergahti
35.Imamganj
36.Chandauti
37.Medical
38.Central Stores
39.A.P.Colony
Source
EHV S/S
Belaganj
Hulasganj
Hulasganj
Hulasganj
Hulasganj
Aurangabad
Aurangabad
Aurangabad
Barun
Barun
Barun
Barun
Barun
Barun
Barun
Wazirganj
Wazirganj
Sherghati
Sherghati
Sherghati
Sherghati
Sherghati
Chandauti
Chandauti
Chandauti
Chandauti
40.Gandhi Maidan
Chandauti
41.Dandibag
42.Shobh
43.Manpur
44.Industrial Area
45.M.U. Campus
Chandauti
Bodh Gaya
Bodh Gaya
Bodh Gaya
Bodh Gaya
46.Hasua
47.Nawada
48.Akbarpur
Nawada
Nawada
Nawada
49.Roh
Nawada
33 kV Bay
(No.)
Total Cost
(Rs. Lakh)
1
1
1
1
1
1
1
25.37
25.37
25.37
25.37
25.37
25.37
25.37
1
1
1
1
1
1
1
1
1
25.37
25.37
25.37
25.37
25.37
25.37
25.37
25.37
25.37
Conversion of S/C DOG to D/C WOLF from Chandauti to A P Colony - Railway Maidan
Conversion of S/C DOG to D/C WOLF from Chandauti to Gandhi Maidan
Conversion of S/C DOG to D/C WOLF from Gandhi Maidan to Panchaiti Akhara
Conversion of S/C DOG to D/C WOLF from Chandauti to Dandibag
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Work proposed
532.77
APPENDIX B-3
1. Supaul
Source
EHV S/S
Supaul
2. Saharsa (2)
3. Sour Bazar
4. Balwahat
Saharsa
Saharsa
Saharsa
5.
6.
7.
8.
Saharsa
Saharsa
Saharsa
Madhepura
Circle
9. Saharsa
Name of 33 kV
Simri Bakhtiyarpur
New Market
Old Saharsa
Madhepura
9. Singheswar
Madhepura
10.Khagaria
Khagaria
Work proposed
Conversion of S/C WOLF to D/C WOLF from Supaul GSS to Supaul
S/C DOG line from Supaul GSS to Parasrama
S/C DOG line tapping from Pipra - Raghopur to Larganj
D/C WOLF line from Saharsa GSS to Saharsa (2)
S/C DOG line from Saharsa GSS to Sour Bazar
S/C DOG line from Saharsa GSS to Balwahat
S/C DOG line from Balwahat to Salakhua
Conversion of S/C DOG line to D/C WOLF from Saharsa GSS to Saharsa
S/C WOLF line from Madhepura (New) GSS to Madhepura
S/C DOG line from Muraliganj to Kumarkhand
11.Bihariganj
12.Udakishanganj
13.Puraini
14.Alamnagar
1. Bihpur
2. Sanhauli
3. Naugachhia
4. Patwara
5. Sultanganj
6. Shahkund
7. Barari
Naugachhia
Naugachhia
Naugachhia
Sultanganj
Sultanganj
Sultanganj
Sabour
8. CS Compound
Sabour
9. Sabour
10.Gouradih
11.Aliganj I
12.Aliganj II
Sabour
Sabour
Sabour
Sabour
13.Banka (2)
14.Banka
Banka
Banka
15.Sanhoula
16.Ghogha
17.Kahalgaon
Kahalgaon
Kahalgaon
Kahalgaon
33 kV Bay
(No.)
0
1
1
1
1
1
1
Total Cost
(Rs. Lakh)
0
25.37
25.37
25.37
25.37
25.37
25.37
0
1
1
0
25.37
25.37
1
0
0
0
1
25.37
0
0
0
25.37
25.37
279.07
10.Bhagalpur
1
0
25.37
0
Conversion of S/C DOG to D/C WOLF from Sabour GSS to Central Jail
Conversion of S/C DOG to D/C WOLF from Sabour GSS to C S Compound
Replacement of DOG with WOLF ACSR from CS Compund to TT School
0
0
0
0
0
0
Conversion of S/C DOG to D/C WOLF line from Sabour GSS to Aliganj
Conversion of S/C DOG to D/C WOLF line from Sabour GSS to Aliganj
Replacement of DOG with WOLF from Aliganj to Nath Nagar
S/C DOG line from Banka GSS to Banka (2) S/S
Conversion of S/C WOLF to D/C WOLF from Banka GSS to Banka S/S
Replacement of DOG with WOLF from Banka S/S to Rajauna-Bousi tapping
0
0
0
1
0
0
0
0
0
25.37
0
0
1
0
25.37
0
76.11
APPENDIX B-3
1. Tarapur
2. Dakranala
3. Ramchandrapur
4. Safiabad
5. ITC
6. Karnachaura
7. Nandlalpur
8. Bindwara
9. Balaji
10.Purani Bazar
Source
EHV S/S
Sultanganj
Jamalpur
Jamalpur
Jamalpur
Jamalpur
Jamalpur
Jamalpur
Jamalpur
Lakhisarai
Lakhisarai
11.Kajra
Lakhisarai
12.Haibatganj
Lakhisarai
13.Jamui
14.Gidhour
Mallehpur
Mallehpur
15.Ghuskuri
16.Ariari
Sheikhpura
Sheikhpura
17.Onama
Sheikhpura
18.Hathiyama
19.Sheikhpura
Sheikhpura
Sheikhpura
1.
2.
3.
4.
5.
Pusa
Mohanpur
Jute Mill
Sarairanjan
Jitwarpur
Mohanpur
Mohanpur
Mohanpur
Mohanpur
Mohanpur
6. Rly.Samastipur
7. Sirsia
Mohanpur
Mohanpur
Circle
11. Munger
Name of 33 kV
12.Samastipur
8. Dalsingsarai
9. Pateri
10.Bachhwara
11.Bibhutipur
12.Deona
13.Bangrahdih (2)
14.IOC
15.Railways
Dalsingsarai
Dalsingsarai
Dalsingsarai
Dalsingsarai
BTPS
BTPS
BTPS
BTPS
33 kV Bay
(No.)
0
Total Cost
(Rs. Lakh)
0
0
0
0
0
25.37
Conversion of S/C DOG to D/C WOLF from Lakhisarai GSS to Court Area
S/C DOG line from Lakhisarai GSS to Kajra
S/C DOG line from Kajra to Piri Bazar
Replacement of DOG with WOLF from Lakhisarai to Salempur
S/C DOG line from Lakhisarai - Kendy tapping to Mananpur
Conversion of S/C DOG to D/C WOLF from Mallehpur GSS to Jamui
Conversion of S/C DOG to D/C WOLF from Mallehpur GSS to Gidhour tapping
Replacement of DOG with WOLF from Gidhour tapping and Jhajha
S/C DOG line from Sheikhpura GSS to Ghuskuri
0
1
1
0
1
0
0
0
1
0
25.37
25.37
0
25.37
0
0
0
25.37
1
0
1
25.37
0
25.37
0
177.59
Conversion of S/C DOG line to D/C WOLF from Mohanpur GSS to Mohanpur S/S
Conversion of S/C DOG line to D/C WOLF line from Mohanpur GSS to Jitwarpur
S/C WOLF line from Jitwarpur to Magardahi
0
1
0
25.37
1
1
1
1
1
1
25.37
25.37
25.37
25.37
25.37
25.37
25.37
Work proposed
Conversion of S/C DOG to D/C WOLF from Sultanganj to Tarapur
APPENDIX B-3
16.Deona (2)
17.Kankaul
18.Begusarai
Source
EHV S/S
Zero Mile
Zero Mile
Zero Mile
1. Narpatganj
2. Raniganj
Forbesganj
Forbesganj
3. Forbesganj
Forbesganj
Circle
12.Samastipur
13. Purnea
14. Sasaram
Name of 33 kV
4. Bahadurganj
5. Sarai
6. Paschimpali
7. Purabpali
8. Thakurganj
9. Group Control
10.Banmankhi
11.Zero Mile
12.Belgachhi
Kishan ganj
Kishanganj
Kishanganj
Kishanganj
Kishanganj
Purnea
Purnea
Purnea
Purnea
13.Naranga
14.Jalalgarh
15.Beri
16.Barsoi
17.Pranpur
18.Industrial Estate
19.Binodpur
20.Kursaila
Purnea
Purnea
Katihar
Katihar
Katihar
Katihar
Katihar
Naugachhia
1. Karmnasa
Karmnasa
2. Larma
3. Kalyanpur
Karmnasa
Karmnasa
4.
5.
6.
7.
8.
9.
Ramgarh (2)
Kakrait
Parsathua
Chainpur
Mohania (2)
Mohania
10.Dinara
11.Sanjhouli
Karmnasa
Karmnasa
Mohania
Mohania
Mohania
Mohania
Dinara
Bikramganj
33 kV Bay
(No.)
1
1
1
Total Cost
(Rs. Lakh)
25.37
25.37
25.37
279.07
25.37
1
1
25.37
25.37
Conversion of S/C DOG to D/C WOLF line from Purnea GSS to Group Control
Replacement of RABBIT with WOLF from Purnea GSS to Banmankhi
Replacement of DOG with WOLF from Purnea GSS to Zero Mile
0
0
0
0
0
0
1
0
0
0
1
1
25.37
0
0
0
25.37
25.37
152.22
0
0
1
0
25.37
25.37
0
1
0
25.37
Work proposed
S/C WOLF line from Zero Mile (Begusarai) GSS to Deona (2)
S/C WOLF line from Zero Mile GSS to Kankaul
D/C WOLF line from Zero Mile GSS to Begusarai
APPENDIX B-3
14. Sasaram
15. Muzaffarpur
12.Surajpura
13.Bikramganj
14.Bikramganj (2)
15.Pusauli
16.Kudra
17.Karamchat
Source
EHV S/S
Bikramganj
Bikramganj
Bikramganj
PGCIL Pusauli
Kudra
Kudra
18.Beda Sasaram
19.Sasaram (2)
20.Sasaram (3)
21.Naigaon
22.BMP Dehri (2)
23.BMP Dehri I & II
24.JVLO&FL Pahleja
25.Nasariganj
26.Rajpur
27.Nauhatta
28.Samhauta
29.Samhauta (2)
30.Kirpabal (2)
Sasaram
Sasaram
Sasaram
Sasaram
Dehri-On-Sone
Dehri-On-Sone
Dehri-On-Sone
Dehri-On-Sone
Dehri-On-Sone
Banjari
Banjari
Banjari
Barun
31.Indrapuri
32.Indrapuri (2)
Barun
Barun
1. Shivhar
2. Runi Saidpur
3. Pupri
4. Dumra (2)
5. Dumra
6. Sursand
7. Sonbarsa
8. Nepal
9. Patepur
10.Prataptand
11.Lalganj
12.Sarai
13.Railway (HTC)
14.Bidupur
15.EDIP
16.Hajipur I E
17.Konharaghat
18.Konharaghat (2)
19.Manhar
20.SKMCH (2)
Shivhar
Runi Saidpur
Sitamarhi
Sitamarhi
Sitamarhi
Sonbarsa
Sonbarsa
Sonbarsa
Vaishali
Vaishali
Vaishali
Vaishali
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Mohanpur
Name of 33 kV
33 kV Bay
(No.)
Total Cost
(Rs. Lakh)
0
0
0
0
1
0
1
25.37
0
25.37
1
1
25.37
25.37
25.37
0
1
1
0
1
0
25.37
25.37
0
25.37
1
1
0
1
0
1
1
279.07
25.37
25.37
0
25.37
0
25.37
25.37
Replacement of RABBIT and DOG with WOLF from Vaishali GSS to Lalganj
Replacement of DOG with WOLF from Vaishali GSS to Sarai
0
0
0
0
25.37
S/C WOLF line from SKMCH (New) GSS to SKMCH (2) S/S
25.37
Work proposed
APPENDIX B-3
21.MIT
22.Sikandarpur (2)
23.SKMCH
24.Kurhani
25.Motipur
26.Motipur (2)
27.Maripur
28.Vaishali
29.Dholi
30.IDPL (2)
31.IDPL
32.Khabra
33.Bhikanpura
34.Bhagwanpur Chowk
35.Railway (HTC)
36.Nayatola (2)
37.Nayatola
38.Hajipur I E (2)
Source
EHV S/S
SKMCH
SKMCH
SKMCH
SKMCH
SKMCH
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
1.
2.
3.
4.
Basopatti
Jay Nagar
Benipatti
Rahika
Jay Nagar
Jay Nagar
Rahika
Rahika
5.
6.
7.
8.
Bela
Gangwara
Donar
Panda Sarai
Gangwara
Gangwara
Gangwara
Ram Nagar
Circle
15. Muzaffarpur
16. Darbhanga
Name of 33 kV
9. Pouriya
10.Anar
11.Kusheshwar
12.Biraul
Ram Nagar
Kusheshwar
Kusheshwar
Kusheshwar
13.Raj Nagar
Pandaul
14.Raiyam
15.Pandaul
16.Manigachi
17.Jhanjharpur
Pandaul
Pandaul
Pandaul
Pandaul
18.Khatauna
19.Rudrapur
20.Phulparas
Phulparas
Phulparas
Phulparas
33 kV Bay
(No.)
1
1
1
1
0
1
Total Cost
(Rs. Lakh)
25.37
25.37
25.37
25.37
0
25.37
0
1
0
0
0
1
0
25.37
0
0
0
25.37
25.37
25.37
405.92
Replacement of DOG with WOLF from Jay Nagar GSS to Jay Nagar
Replacement of DOG with WOLF from Rahika GSS to Benipatti
Conversion of S/C DOG to D/C WOLF from Rahika GSS to Rahika S/S
Replacement of DOG with WOLF from Rahika S/S to Madhubani
D/C WOLF line from Gangwara (New) GSS to Gangwara for Bela
S/C WOLF line from Gangwara (New) GSS to Gangwara S/S
S/C WOLF line from Gangwara (New) GSS to Gangwara for Donar
0
0
0
0
1
1
1
0
0
0
0
25.37
25.37
25.37
25.37
25.37
25.37
Conversion of S/C DOG to D/C WOLF from Pandaul GSS to Raj Nagar
1
0
25.37
0
3983.09
Work proposed
S/C WOLF line from SKMCH (New) GSS to MIT
S/C WOLF line from SKMCH (New) GSS to Sikandarpur (2)
D/C WOLF line from SKMCH (New) GSS to SKMCH S/S
S/C DOG line from SKMCH (New) GSS to Kurhani
Replacement of DOG with WOLF from Bhikanpura GSS to Motipur
S/C WOLF line from Bhikanpura GSS to Motipur (2)
APPENDIX B-4
33 kV feeder
11 kV bays
km
Cost
(Rs.Lakh)
No.
Cost
(Rs.Lakh)
2010
1. PESU(East)
2. PESU(West)
3. Patna
1. Bihta AF
Bihta AF
10
1. Sheetalpur
2. Siwan
Sheetalpur
Siwan
1
1
10
5
1.
2.
3.
4.
Valmiki Nagar
Bettiah
Lauria
Motihari
Valmiki Nagar
Bettiah
Lauria
Motihari
1
1
1
1
10
10
5
10
1.
2.
3.
4.
Kako-Charui
Guraru-Paraiya
Belaganj
Central Stores
Kako
Guraru
Panari
Central Stores
1
1
5
10
1. Shahkund
Shahkund
10
1. Railway W/S
2. Onama
Ramchandrapur
Onama
Mirjapur
Barkana
1
1
1
1
5
10
10
10
Deona
Pusa
Jitwarpur
1
1
1
10
10
5
1. Group Control
Group Control
1.
2.
3.
4.
5.
Kalyanpur
Dinara
Bhabhua New
Pusauli
Takia
Nokha
Beda
Nauhatta
1
1
1
1
1
1
1
1
10
10
10
10
5
10
5
10
Pupri
Dumra
Lalganj
EDIP
Hajipur IE
Konharaghat
Motipur
MIT
Sikandarpur
SKMCH
Khabra
Bhikanpura
1
1
1
1
1
1
1
1
1
1
1
1
10
5
5
5
5
10
10
5
10
5
10
5
4. Nalanda
5. Chapra
6. Motihari
7. Bhojpur
8. Gaya
9. Saharsa
10.Bhagalpur
11.Munger
3. Ariari
1. Bangardih
2. Pusa
12.Samastipur
3. Jitwarpur
13.Purnea
14.Sasaram
Kalyanpur
Dinara
Kudra
Pusauli
Beda-Takia
6. Nauhatta
1.
2.
3.
4.
5.
6.
15.Muzaffarpur 7.
8.
Pupri
Dumra
Lalganj
EDIP
Hajipur IE
Konharaghat
Motipur
SKMCH
9. Khabra
1.Bhikanpura
71.81
71.81
0.00
71.81
35.91
107.72
71.81
71.81
35.91
71.81
251.35
0.00
35.91
71.81
35.91
143.63
0.00
71.81
71.81
35.91
71.81
71.81
71.81
251.35
71.81
71.81
35.91
179.54
35.91
35.91
71.81
71.81
71.81
71.81
35.91
71.81
35.91
71.81
502.70
71.81
35.91
35.91
35.91
35.91
71.81
71.81
35.91
71.81
35.91
71.81
35.91
610.42
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
13.70
13.70
0.00
13.70
13.70
27.40
13.70
13.70
13.70
13.70
54.80
0.00
13.70
13.70
13.70
41.10
0.00
13.70
13.70
13.70
13.70
13.70
13.70
54.80
13.70
13.70
13.70
41.10
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
109.60
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
164.40
APPENDIX B-4
33 kV feeder
1. Rajnagar
2. Raiyam
16.Darbhanga 3. Pandaul
11 kV bays
Rajnagar
Raiyam
Pandaul
No.
km
1
1
1
10
10
10
Cost
(Rs.Lakh)
71.81
71.81
71.81
215.44
2441.70
No.
1
1
1
Cost
(Rs.Lakh)
13.70
13.70
13.70
41.10
575.40
APPENDIX B-4
33 kV feeder
11 kV bays
Cost
(Rs.Lakh)
No.
Cost
(Rs.Lakh)
3
2
9
4
4
2
2
15
10
45
20
20
10
10
107.72
71.81
323.17
143.63
143.63
71.81
71.81
3
2
9
4
4
2
2
41.10
27.40
123.30
54.80
54.80
27.40
27.40
5
4
2
3
25
20
10
15
179.54
143.63
71.81
107.72
5
4
2
3
68.50
54.80
27.40
41.10
No.
2011-2014
1. Katra
2. Dina Iron
3. Karmali Chak
4.
5.
6.
7.
8.
S.K. Memorial
Kankar Bag (2)
Saidpur
Bahadurpur
R. Nagar
9. Kankar Bag
1.Ashok Nagar
11.R.K.Nagar
1. PESU (East) 12.Karbigahiya
13.Gaighat
1. Katra
1. HTC
2. HTC
1. Karmali Chak
2. Deedarganj
1. S.K.Memorial
1. Kankar Bag (2)
1. Saidpur
1. Bahadurpur
1. R.Nagar
2. Machhuatoli
1. Kankar Bag
1. Ashok Nagar
1. R.K.Nagar
1. Karbigahiya
1. Gaighat
14.NMCH
1. NMCH
15
107.72
41.10
15.Meena Bazar
16.Katra (2)
17.Pahari
1. Meena Bazar
1. Katra (2)
1. Pahari
2. Sampatchak (Patna)
3. HTC (Patna)
1. Malsalami
1. Mangal Talab
2. Meena Bazar (2)
1. PMCH
2
6
4
10
30
20
71.81
215.44
143.63
2
6
4
27.40
82.20
54.80
2
4
9
2
10
20
45
10
2
4
9
2
1. A.N.College
1. S.K.Puri
1. Garikhana
2. Pataliputra
3. Rajapur
4. Walmi
1. Walmi
5. Danapur
1. Danapur
6. Digha
1. Digha
2. Digha Central Stores
7. R.B.I.
1. RBI
2. HTC (Group)
8. Danapur (2)
1. Danapur (2)
9. IGIMS
1. IGIMS
2. Excise
1.Vaterinery College 1. Vaterinery College
2. Board`s Colony
2. PESU (West)
11.Jakkanpur
1. Jakkanpur
12.Maurya Lok
1. Maurya Lok
2. Bandar Bagicha
13.Karnawad Punpun 1. Karnawad Punpun
14.Sinchai Bhawan
1. Sinchai Bhawan
15.Anishabad
1. Anishabad
16.Gardanibag
1. Gardanibag
17.Vidyut Bhawan
1. Vidyut Bhawan
2. High Court
18.Sahitya Sammelan 1. Sahitya Sammelan
19.Bandar Bagicha (2)1. Bandar Bagicha (2)
2.Beur
1. Beur
2. Khagaul
3. HTC
4. HTC
5. Phulwari
1
1
3
3
2
1
1
1
1
1
5
5
15
15
10
5
5
5
5
5
71.81
143.63
323.17
71.81
2585.33
35.91
35.91
107.72
107.72
71.81
35.91
35.91
35.91
35.91
35.91
1
1
3
3
2
1
1
1
1
1
27.40
54.80
123.30
27.40
986.40
13.70
13.70
41.10
41.10
27.40
13.70
13.70
13.70
13.70
13.70
9
2
1
1
2
2
3
2
1
1
2
2
2
2
2
6
2
2
45
10
5
5
10
10
15
10
5
5
10
10
10
10
10
30
10
10
323.17
71.81
35.91
35.91
71.81
71.81
107.72
71.81
35.91
35.91
71.81
71.81
71.81
71.81
71.81
215.44
71.81
71.81
9
2
1
1
2
2
3
2
1
1
2
2
2
2
2
6
2
2
123.30
27.40
13.70
13.70
27.40
27.40
41.10
27.40
13.70
13.70
27.40
27.40
27.40
27.40
27.40
82.20
27.40
27.40
35.91
13.70
18.Malsalami
19.Mangal Talab
2.Meena Bazar (2)
21.PMCH
1. A.N.College
2. S.K.Puri
3. Garikhana I & II
APPENDIX B-4
33 kV feeder
11 kV bays
21.Vikas Bhawan
1. Bhusaula
2. Vikas Bhawan
1
1
5
5
1. A.F. Bihta
2. Pareo
1. A.F.Bihta
1. Pareo
2. Koilwar (Ara Circle)
3. Giddha (Ara Circle)
1. Bihta
2. Kanpa
3. Lalbhasara
4. Paliganj
HTC
HTC group
1. Maner
1. Neora
2. Naubatpur
1. Fatuah (2)
1. Khusrupur
2. Daniyaman
1. Fatuah
1. HTC
2. HTC
1. Masaurhi Old
2. Dhanaura
1. Masaurhi New
HTC
1. Barh
2. Bakhtiyarpur
1. Barh (2)
1. Biharibigha
1. Hathidah
2. Mokama
1. Hathidah (2)
1
2
5
10
Cost
(Rs.Lakh)
35.91
35.91
2226.25
35.91
71.81
60
1
1
1
2. PESU (West)
3. Bihta I & II
4.
5.
6.
7.
GISCO
Balmukund
Maner
Neora
8. Fatuah (2)
9. Khusrupur
3. Patna
1.Fatuah
11.Dina Iron
12.Masaurhi Old
13.Masarhi New
14.NTPC I & II
15.Barh
16.Barh (2)
17.Biharibigha
18.Hathidah
19.Hathidah (2)
430.89
82.20
10
10
10
71.81
71.81
71.81
1
1
1
13.70
13.70
13.70
2
2
2
6
1
1
20
20
20
30
10
10
143.63
143.63
143.63
215.44
71.81
71.81
2
2
2
6
1
1
27.40
27.40
27.40
82.20
13.70
13.70
2
1
1
20
10
10
143.63
71.81
71.81
2
1
1
27.40
13.70
13.70
6
1
60
10
430.89
71.81
6
1
82.20
13.70
2
6
20
60
143.63
430.89
2908.49
2
6
27.40
82.20
616.50
1
1
2
6
1
10
10
20
60
10
71.81
71.81
143.63
430.89
71.81
1
1
2
6
1
13.70
13.70
27.40
82.20
13.70
60
430.89
82.20
6
1
60
10
430.89
71.81
6
1
82.20
13.70
60
430.89
82.20
6
6
60
60
430.89
430.89
6
6
82.20
82.20
6
6
6
60
60
60
430.89
430.89
430.89
6
6
6
82.20
82.20
82.20
6
6
1
6
1
2
60
60
10
30
5
10
430.89
430.89
71.81
215.44
35.91
71.81
6
6
1
6
1
2
82.20
82.20
13.70
82.20
13.70
27.40
km
No.
1
1
1. Hilsa
4. Nalanda
1. Hilsa
2. Hilsa (2)
2. Islampur
1. Islampur
2. Khudaganj
3. Ekangersarai
1. Ekangersarai
4. Chiksurabazar
1. Chiksurabazar
5. Dhamauli
1. Dhamauli
2. Rahui
6. Noorsarai
1. Noorsarai
2. Kalyanbigha
3. Chandi
4. Chainpur
5. Thertheri
7. Harnaut
1. Harnaut
2. Cheral (Railways)
8. Silao
1. Silao
2. Bhindidih
9. Andawas
1. Andawas
1.Rajgir
1. Rajgir
2. Ghosarwan
11.Giriak
1. Tetrawan
2. Sarbahadi
3. Giriak
4. Badi
5. Katrisarai
12.Parwalpur
1. Parwalpur
13.Ramchandrapur (2)1. Ramchandrapur (2)
14.Ramchandrapur 1. Ramchandrapur
15.Bari Pahari
1. Bari Parhari
1
2
Cost
(Rs.Lakh)
13.70
13.70
849.40
13.70
27.40
No.
APPENDIX B-4
33 kV feeder
16.Asthawan
4. Nalanda
17.Sohasarai
1. Fulwaria
2. Gopalganj
3. Srinagar
4. Siwan
5. Maharajganj
5. Chapra
6. Siwan (2)
7. Mashrakh
8. Taraiya
9. Baikunthpur
1.Prabhunath Nagar
11.Telpa
12.Sheetalpur
1. Valmiki Nagar
2. Dhanha
3. Ramnagar
6. Motihari
4. Chautarwa
5. Lauria
6. Narkatiaganj
7. Raxaul
8. Adopur
9. Dhaka
1.Bettiah
11.Bettiah (2)
12.Madhopur
13.Areraj
14.Motihari (2)
15.Motihari
16.Chakia
17.Chhitwani
1. Chausa
2. Buxar
7. Bhojpur
3.
4.
5.
6.
Pandy Patti
Dumraon
Dumraon (2)
Nawanagar
7. Bramhpur
8. Simri
11 kV bays
km
6
1
60
5
1. Fulwaria
2. Hathua
1. Gopalganj
2. Jhajhwa
3. Kuchaikot
1. Srinagar
2. Mairwa
1. Siwan
1. Maharajganj
2. Ekma
1. Siwan (2)
1. Mashrakh
2. Baniapur
1. Taraiya
2. Marworah
1. Baikunthpur
2. Barouli
1. Prabhunath Nagar
2. Manjhi
1. Telpa
1. Sheetalpur
2
1
2
1
1
1
1
1. Valmiki Nagar
1. Dhanha
1. Ramnagar
2. Bagha
1. Chautarwa
1. Lauria
1. Narkatiaganj
1. Raxaul
1. Adopur
1. Dhaka
1. Bettiah
1. Bettiah (2)
1. Madhopur
2. Harsidhi
1. Areraj
1. Motihari (2)
1. Motihari
1. Chakia
2. Madhuban
1. Chhitwani
1. Asthawan
2. Malti
1. Sohasarai
1. Chausa
2. Itarhi
3. Purushottampur
1. Buxar
2. Industrial
1. Pandey Patti
1. Dumraon
1. Dumraon (2)
1. Nawanagar
2. Murar
3. Akarsai
1. Krishnapuram
2. Bramhapur
3. Sahpur
4. Bihian
1. Simri
Cost
(Rs.Lakh)
No.
6
1
Cost
(Rs.Lakh)
20
10
10
10
10
10
10
430.89
35.91
6032.43
143.63
71.81
71.81
71.81
71.81
71.81
71.81
2
1
2
1
1
1
1
82.20
13.70
1219.30
27.40
13.70
27.40
13.70
13.70
13.70
13.70
1
1
5
1
1
1
1
10
10
30
10
10
10
10
71.81
71.81
215.44
71.81
71.81
71.81
71.81
1
1
5
1
1
1
1
13.70
13.70
68.50
13.70
13.70
13.70
13.70
2
1
3
2
20
10
15
10
2
1
3
2
1
6
2
10
60
20
143.63
71.81
107.72
71.81
1615.83
71.81
430.89
143.63
1
6
2
27.40
13.70
41.10
27.40
383.60
13.70
82.20
27.40
6
1
2
1
1
2
60
10
20
5
10
20
430.89
71.81
143.63
35.91
71.81
143.63
6
1
2
1
1
2
82.20
13.70
27.40
13.70
13.70
27.40
6
1
1
2
3
1
1
1
6
30
10
10
20
30
5
10
10
60
6
1
1
2
3
1
1
1
6
2
1
1
2
1
3
20
10
10
10
5
15
215.44
71.81
71.81
143.63
215.44
35.91
71.81
71.81
430.89
2872.58
143.63
71.81
71.81
71.81
35.91
107.72
2
1
1
2
1
3
82.20
13.70
13.70
27.40
41.10
13.70
13.70
13.70
82.20
602.80
27.40
13.70
13.70
27.40
13.70
41.10
5
1
1
1
1
1
30
10
10
10
10
10
215.44
71.81
71.81
71.81
71.81
71.81
5
1
1
1
1
1
68.50
13.70
13.70
13.70
13.70
13.70
APPENDIX B-4
33 kV feeder
9. Garhani
7. Bhojpur
1.Jagdishpur
11.Japani Farm
12.Powerganj
13.Zero Mile
1. Karpi
2. Arwal
3. Goh
4. Daudnagar
5. Kako
6. Tehta
7. Ghosi
8. Irki
9. Rafiganj I & II
1.Uchauli
11.Guraru
12.Tekari
8. Gaya
13.Belaganj
14.Chakand
15.Dhongra
16.Sonwa
17.Hulasganj
18.Nawagarh
19.Aurangabad
2.Obra
21.Deo
22.Barun
23.Barem
24.Tengra
25.Sone Hydel
26.Nabinagar
27.Barun (2)
28.Dihara
29.Wazirganj
30.Atari
11 kV bays
2. Chhotka Dhakai
1. Garhani
2. Piro
3. Agiaon
4. Sandes
1. Jagdishpur
1. Japani Farm
2. Serai
1. Powerganj
2. Power House
3. Barhara
1. Zero Mile
1. Karpi
2. Ataullah
3. Kurtha
1. Arwal
1. Goh
1. Daudnagar
2. Haspura
1. Kako
2. Charui
1. Tehta
2. Makpa
3. Makhdampur
1. Ghosi
2. Jehanabad
1. Irki
2. Sakurabad
3. Nowaman
1. Rafiganj
1. Uchauli
2. Madanpur
1. Guraru
2. Paraiya
1.Tekari
2. Koach
1. Belaganj
2. Panari
3. Paibigha
1. Chakand
1. Dhongra
1. Sonwa
1. Hulasganj
1. Nawagarh
1. Aurangabad
1. Obra
2. Phesar
3. Sokhea
1. Deo
2. Gangti
1. Barun
1. Barem
1. Tengra
HTC
1. Nabinagar
2. Amba
1. Barun (2)
1. Dihara
1. Wazirganj
2. Fatehpur
3. Paimer
1. Atari
No.
km
6
1
1
60
10
10
Cost
(Rs.Lakh)
430.89
71.81
71.81
6
1
1
Cost
(Rs.Lakh)
82.20
13.70
13.70
25
179.54
68.50
1
3
6
3
5
15
60
15
35.91
107.72
430.89
107.72
2513.51
1
3
6
3
13.70
41.10
82.20
41.10
630.20
1
1
1
1
1
1
3
2
10
10
10
10
10
10
15
10
71.81
71.81
71.81
71.81
71.81
71.81
107.72
71.81
1
1
1
1
1
1
3
2
13.70
13.70
13.70
13.70
13.70
13.70
41.10
27.40
6
2
1
1
1
1
1
1
2
2
60
10
10
10
10
10
10
10
20
20
430.89
71.81
71.81
71.81
71.81
71.81
71.81
71.81
143.63
143.63
6
2
1
1
1
1
1
1
2
2
82.20
27.40
13.70
13.70
13.70
13.70
13.70
13.70
27.40
27.40
2
6
6
20
60
60
143.63
430.89
430.89
2
6
6
27.40
82.20
82.20
60
430.89
82.20
35.91
13.70
20
143.63
27.40
1
1
3
6
10
10
15
60
71.81
71.81
107.72
430.89
1
1
3
6
13.70
13.70
41.10
82.20
0.00
13.70
No.
APPENDIX B-4
33 kV feeder
31.Gurua
32.Amas
33.Banke
34.Shergahti
35.Imamganj
36.Chandauti
37.Medical
38.Central Stores
39.A.P.Colony
4.Gandhi Maidan
41.Dandibag
42.Shobh
8. Gaya
43.Manpur
44.Industrial Area
45.M.U. Campus
46.Hasua
47.Nawada
48.Akbarpur
49.Roh
11 kV bays
2. Khizr Sarai
1. Gurua
1. Amas
1. Banke
1. Sherghati
2. Dobhi
1. Imamganj
2. Dumaria
1. Chandauti
1. Medical
2. Cherki
1. Central Stores
1. A.P.Coloy
2. Railway Maidan
1. Gandhi Maidan
2. Panchaiti Akhara
1. Dandibag
1. Shobh
2. Charkbria
1. Manpur
2. Tankuppa
3. Gere
4. Bhore
1. Industrial Area
1. M.U.Campus
2. Buddhist Complex
1. Hasua
2. Nadirganj
1. Nawada
2. Nawada New
3. Bhadhokhara
1. Akbarpur
2. Rajauli
3. Sirdala
1. Roh
2. Warsaliganj
3. Pakribarwan
4. Kaukol
No.
Cost
(Rs.Lakh)
20
0.00
143.63
1
4
13.70
54.80
km
1
4
2
0
1
2
3
3
4
10
71.81
32.47
5
10
15
15
20
35.91
71.81
107.72
107.72
143.63
1
2
3
3
4
13.70
27.40
41.10
41.10
54.80
10
71.81
13.70
10
71.81
13.70
2
2
4
4
3
1
1
1
1
1
1
1
1
1
2
10
10
40
40
30
5
10
10
10
10
10
10
10
10
20
71.81
71.81
287.26
287.26
215.44
35.91
71.81
71.81
71.81
71.81
71.81
71.81
71.81
71.81
143.63
6642.85
2
2
4
4
3
1
1
1
1
1
1
1
1
1
2
32.47
27.40
54.80
54.80
41.10
13.70
13.70
13.70
13.70
13.70
8.63
13.70
13.70
8.63
27.40
1534.40
30
215.44
41.10
60
430.89
82.20
6
9
6
6
6
60
45
60
60
60
430.89
323.17
430.89
430.89
430.89
6
9
6
6
6
82.20
123.30
82.20
82.20
82.20
10
71.81
27.40
35.91
13.70
60
430.89
82.20
6
2
1
2
60
10
10
20
430.89
71.81
71.81
143.63
6
2
1
2
82.20
27.40
13.70
27.40
1. Supaul
9. Saharsa
1. Supaul
2. Parasrama
3. Kishanpur
4. Pipra
5. Raghopur
6. Larganj
2. Saharsa (2)
1. Sahrsa (2)
3. Sour Bazar
1. Sour Bazar
4. Balwahat
1. Balwahat
2. Salakhua
5. Simri Bakhtiyarpur 1. Simri Bakhtiyarpur
6. New Market
1. New Market
7. Old Saharsa
1. Old Saharsa
8. Madhepura
1. Madhepura
2. Muraliganj
3. Kumarkhand
9. Singheswar
1. Singheswar
2. Ghailar
1.Khagaria
1. Khagaria
2. Mansi
3. Maheshkunt
Cost
(Rs.Lakh)
No.
APPENDIX B-4
9. Saharsa
33 kV feeder
11.Bihariganj
12.Udakishanganj
13.Puraini
14.Alamnagar
1. Bihariganj
1. Udakishanganj
1. Puraini
1. Alamnagar
60
Cost
(Rs.Lakh)
430.89
60
1. Bihpur
2. Sanhauli
3. Naugachhia
4. Patwara
5. Sultanganj
6. Shahkund
7. Barari
1. Bihpur
1. Sanhauli
1. Naugachhia
1. Patwara
1. Sultanganj
1. Shahkund
1. Barari
2. Central Jail
3. Mayaganj
1. C S Compound
2. T T School
1. Sabour
1. Gouradih
1. Aliganj
2. Mojahidpur
1. Aliganj
2. Jagdishpur
3. Nath Nagar
1. Banka (2)
1. Banka
2. Amarpur
3. Rajouna
4. Bousi
1. Sanhoula
1. Ghogha
1. Kahalgaon
2. Pirpainti
1
6
8. CS Compound
1.Bhagalpur
9. Sabour
1.Gouradih
11.Aliganj I
12.Aliganj II
13.Banka (2)
14.Banka
15.Sanhoula
16.Ghogha
17.Kahalgaon
1. Tarapur
2. Dakranala
3. Ramchandrapur
4. Safiabad
5. ITC
6. Karnachaura
7. Nandlalpur
8. Bindwara
9. Balaji
1.Purani Bazar
11. Munger
11 kV bays
11.Kajra
12.Haibatganj
13.Jamui
14.Gidhour
15.Ghuskuri
16.Ariari
1. Tarapur
2. Kharagpur
1. Dakranala
1. Ramchandrapur
2. Railways (HTC)
1. Safiabad
2. Baniyarpur
1. ITC (HTC)
1. Karnchaura
1. Nandlalpur
1. Bindwara
1. Balaji
1. Purani Bazar
2. Court Area
1. Kajra
2. Piri Bazar
1. Salempur
2. Manpur
3. Haibatganj
1. Jamui
2. Khaira
3. Sikandara
1. Gidhour
2. Jhajha
3. Sono
1. Ghuskuri
1. Ariari
2. Bhalua
3. Lohain
4. Katari
Cost
(Rs.Lakh)
82.20
430.89
82.20
10
60
4811.58
71.81
430.89
1
6
1013.80
10.14
82.20
10
71.81
32.47
2
2
2
2
2
2
10
10
10
10
10
10
71.81
71.81
71.81
71.81
71.81
71.81
2
2
2
2
2
2
27.40
27.40
27.40
27.40
27.40
27.40
2
1
2
1
1
3
1
10
10
10
10
10
15
5
71.81
71.81
71.81
71.81
71.81
107.72
35.91
2
1
2
1
1
3
1
27.40
13.70
27.40
13.70
18.77
41.10
13.70
1
2
1
6
1
10
20
10
60
10
71.81
143.63
71.81
430.89
71.81
1
2
1
6
1
13.70
27.40
13.70
82.20
18.77
2
1
1
1
20
10
10
10
2298.07
143.63
71.81
71.81
71.81
2
1
1
1
600.75
27.40
13.70
13.70
13.70
1
1
10
10
71.81
71.81
1
1
13.70
13.70
3
1
2
30
10
20
215.44
71.81
143.63
3
1
2
41.10
13.70
27.40
3
2
6
6
15
10
60
60
107.72
71.81
430.89
430.89
3
2
6
6
46.17
27.40
82.20
82.20
60
430.89
82.20
2
1
1
1
1
1
6
10
10
10
10
5
10
60
71.81
71.81
71.81
71.81
35.91
71.81
430.89
2
1
1
1
1
1
6
32.47
13.70
13.70
13.70
13.70
9.59
82.20
60
430.89
82.20
No.
km
No.
APPENDIX B-4
33 kV feeder
17.Onama
11. Munger
18.Hathiyama
19.Sheikhpura
1. Pusa
2. Mohanpur
3. Jute Mill
4. Sarairanjan
5. Jitwarpur
6. Rly.Samastipur
7. Sirsia
8. Dalsingsarai
9. Pateri
1.Bachchwara
12.Samastipur 11.Bibhutipur
12.Deona
13.Bangrahdih (2)
14.IOC
15.Railways
16.Deona (2)
17.Kankaul
18.Begusarai
1. Narpatganj
2. Raniganj
3. Forbesganj
4. Bahadurganj
13. Purnea
5.
6.
7.
8.
Sarai
Paschimpali
Purabpali
Thakurganj
9. Group Control
1.Banmankhi
11.Zero Mile
12.Belgachhi
11 kV bays
km
Cost
(Rs.Lakh)
No.
Cost
(Rs.Lakh)
60
430.89
82.20
15
1. Pusa
1. Mohanpur
2. Warisnagar
3. Kalyanpur
HTC
1. Sarairanjan
1. Jitwarpur
2. Magardahi
HTC
1. Sirsia
2. Kuboliram
3. Karpoorigram
1. Dalsingsarai
2. Mehuddinnagar
1. Pateri
1. Bachchwara
1. Bibhutipur
2. Rosera
3. Hassanpur
1. Deona
2. Bangrahdih
3. Jai Mangla (HTC)
4. Jai Mata Di (HTC)
1. Bangrahdih (2)
HTC
HTC
1. Deona (2)
1. Kankaul
1. Begusarai
2. Manjhaul
3. Ganga Dairy (HTC)
4. Balia
1
2
1
1
10
10
10
10
107.72
4201.15
71.81
71.81
71.81
71.81
1
2
1
1
41.79
883.51
13.70
27.40
13.70
13.70
1
1
6
10
10
30
71.81
71.81
215.44
1
1
6
13.70
18.77
82.20
6
6
1
1
1
1
1
1
1
60
60
10
10
10
10
10
10
10
430.89
430.89
71.81
71.81
71.81
71.81
71.81
71.81
71.81
6
6
1
1
1
1
1
1
1
82.20
82.20
13.70
13.70
13.70
13.70
13.70
13.70
13.70
30
215.44
82.20
6
6
1
2
30
30
5
20
215.44
215.44
35.91
143.63
6
6
1
2
82.20
82.20
13.70
27.40
10
1. Narpatganj
1. Raniganj
2. Bahargaon
1. Forbesganj
2. Araria
3. Kusgaon
4. Jokihat
5. Malgaon
1. Bahadurganj
2. Dighal Bank
1. Sarai
1. Paschimpali
1. Purabpali
1. Chhatargarh
2. Thakurganj
1. Group control
1. Banmankhi
2. Madhubani
1. Zero Mile
2. City
1. Belgachhi
2. Dalkola
3. Vaisi
10
71.81
2908.49
71.81
13.70
744.87
13.70
60
430.89
82.20
60
430.89
82.20
60
430.89
82.20
1
2
2
10
10
10
71.81
71.81
71.81
1
2
2
13.70
27.40
27.40
15
107.72
41.10
1
1
1
10
5
5
71.81
35.91
35.91
1
1
1
13.70
13.70
13.70
60
430.89
82.20
5. Barkna
1. Onama
2. Mirzapur
3. Toygarh
1. Hathiyama
1. Sheikhpura
APPENDIX B-4
33 kV feeder
13.Naranga
14.Jalalgarh
15.Beri
13. Purnea
16.Industrial Estate
17.Binodpur
18.Kursaila
1. Karmnasa
14. Sasaram
11 kV bays
1. Naranga
2. MLR Ganj
3. Dargaha
1. Jalalgarh
1. Beri
2. Gore Beri
3. Falka
4. Sonaily
5. Barsoi
6. Pranpur
1. Industrial Estate
1. Binodpur
1. Kursaila
1. Karmnasa
2. Durgawati
3. Chand
2. Larma
1. Larma
2. DVPL (HTC)
3. Kalyanpur
1. Kalyanpur
2. Ramgarh
3. Chourasia
4. Nuaon
4. Ramgarh (2)
1. Ramgarh (2)
5. Kakrait
1. Kakrait
6. Parsathua
1. Parsathua
7. Chainpur
1. Chainpur
8. Mohania (2)
1. Mohania (2)
9. Mohania
1. Mohania
2. Bhabhua Old
3. Bahuara
1.Dinara
1. Dinara
2. Kochas
3. Dawath
11.Sanjhouli
1. Sanjhouli
12.Surajpura
1. Surajpura
13.Bikramganj
1. Bikramganj
2. Kararkat
14.Bikramganj (2)
1. Bikramganj (2)
15.Pusauli
1. Pusauli
16.Kudra
1. Kudra
2. Bhabhua New
17.Karamchat
1. Karamchat
2. Cenari
3. Adhaura
18.Beda Sasaram
1. Beda Sasaram
2. Takia Sasaram
3. Nokha
19.Sasaram (2)
1. Sasaram (2)
2.Sasaram (3)
1. Sasaram (3)
21.Naigaon
1. Naigaon
2. Sheosagar
22.BMP Dehri (2)
1. BMP Dehri (2)
23.BMP Dehri I & II
1. BMP Dehri
2. Basa Karwandia
3. PHED (HTC)
24.JVLO&FL Pahleja 1. HTC
1. Akorigola
25.Nasariganj
1. Nasariganj
26.Rajpur
1. Rajpur
27.Nauhatta
1. Nauhatta
28.Samhauta
1. Samhauta
29.Samhauta (2)
1. Samhauta (2)
No.
km
1
1
10
10
Cost
(Rs.Lakh)
71.81
71.81
1
1
Cost
(Rs.Lakh)
13.70
8.63
2
1
1
1
20
10
10
10
143.63
71.81
71.81
71.81
2
1
1
1
27.40
13.70
8.63
8.63
1
1
5
10
35.91
71.81
1
1
13.70
13.70
1
1
1
1
10
10
10
10
2872.58
71.81
71.81
71.81
71.81
1
1
1
1
601.29
13.70
13.70
13.70
13.70
30
215.44
41.10
1
1
10
10
71.81
71.81
1
1
13.70
13.70
1
1
1
6
10
10
10
30
71.81
71.81
71.81
215.44
1
1
1
6
13.70
13.70
13.70
82.20
1
1
1
1
5
10
10
10
35.91
71.81
71.81
71.81
1
1
1
1
18.77
13.70
13.70
13.70
1
1
10
10
71.81
71.81
1
1
13.70
13.70
1
6
2
1
4
1
1
10
30
10
5
20
10
10
71.81
215.44
71.81
35.91
143.63
71.81
71.81
1
6
2
1
4
1
1
13.70
82.20
24.66
13.70
54.80
8.63
13.70
2
1
6
6
2
2
9
10
10
30
30
20
20
45
71.81
71.81
215.44
215.44
143.63
143.63
323.17
2
1
6
6
2
2
9
27.40
13.70
82.20
82.20
27.40
27.40
123.30
10
71.81
13.70
2
2
1
2
1
5
20
20
10
10
10
22
143.63
143.63
71.81
71.81
71.81
157.99
2
2
1
2
1
5
27.40
27.40
13.70
27.40
13.70
68.50
No.
APPENDIX B-4
33 kV feeder
30.Kirpabal (2)
14. Sasaram
31.Indrapuri
32.Indrapuri (2)
1.
2.
3.
4.
5.
6.
7.
8.
9.
1. Kirpabal (2)
2. Kirpabal
1. Indrapuri
1. Indrapuri (2)
Shivhar
Runi Saidpur
Pupri
Dumra (2)
Dumra
Sursand
Sonbarsa
Nepal
Patepur
1. Shivhar
1. Runi Saidpur
1. Pupri
1. Dumra (2)
1. Dumra
1. Sursand
1. Sonbarsa
1. Nepal
1. Mehua
2. Patepur
1.Prataptand
1. Prataptand
11.Lalganj
1. Lalganj
12.Sarai
1. Sarai
13.Railway (HTC)
HTC
14.Bidupur
1. Bidupur
15.EDIP
1. EDIP
16.Hajipur I E
1. Hajipur I E
17.Konharaghat
1. Konharaghat
18.Konharaghat (2) 1. Konharaghat(2)
19.Manhar
1. Manhar @
15. Muzaffarpur
2.SKMCH (2)
1. SKMCH (2)
21.MIT
1. MIT
22.Sikandarpur (2)
1. Sikandarpur (2)
23.SKMCH
1. SKMCH
24.Kurhani
1. Kurhani
25.Motipur
1. Motipur
26.Motipur (2)
1. Motipur (2)
27.Maripur
1. Maripur
28.Vaishali
1. Vaishali
29.Dholi
1. Dholi
3.IDPL (2)
1. IDPL (2)
31.IDPL
1. IDPL
32.Khabra
1. Khabra
33.Bhikanpura
1. Bhikanpura
34.Bhagwanpur Chowk1. Bhagwanpur chowk
35.Railway (HTC)
HTC
36.Nayatola (2)
1. Nayatola (2)
37.Nayatola
1. Nayatola
38.Hajipur I E (2)
1. Hajipur I E (2)
1. Basopatti
2. Jay Nagar
3. Benipatti
4. Rahika
16. Darbhanga
5.
6.
7.
8.
Bela
Gangwara
Donar
Panda Sarai
9. Pouriya
1.Anar
11 kV bays
1. Basopatti
1. Jay Nagar
2. Khajauli
3. Ladania
1. Benipatti
2. Ahilyasthan
1. Rahika
2. Madhubani
1. Bela
1. Gangwara
1. Donar
1. Panda Sarai
2. Laheria Sarai (Jail)
3. DMCH
4. Urban
1. Pouriya
1. Baheri
2. Anar
No.
km
60
30
2
2
1
6
Cost
(Rs.Lakh)
430.89
No.
6
Cost
(Rs.Lakh)
82.20
10
10
10
30
215.44
4718.22
71.81
71.81
71.81
215.44
2
2
1
6
82.20
1285.06
27.40
27.40
13.70
82.20
2
2
20
20
143.63
143.63
2
2
27.40
27.40
2
2
20
20
143.63
143.63
2
2
27.40
27.40
2
1
20
5
143.63
35.91
2
1
27.40
13.70
1
6
5
30
35.91
215.44
1
6
13.70
82.20
6
2
6
30
10
30
215.44
71.81
215.44
6
2
6
82.20
27.40
82.20
35.91
13.70
6
2
1
1
6
1
2
30
20
5
10
30
5
20
215.44
143.63
35.91
71.81
215.44
35.91
143.63
6
2
1
1
6
1
2
82.20
27.40
13.70
13.70
82.20
13.70
27.40
60
430.89
82.20
30
215.44
82.20
30
215.44
3698.45
82.20
1109.70
1
1
1
1
10
10
10
10
71.81
71.81
71.81
71.81
1
1
1
1
13.70
13.70
13.70
13.70
2
2
1
2
1
1
10
10
10
20
10
10
71.81
71.81
71.81
143.63
71.81
71.81
2
2
1
2
1
1
27.40
27.40
13.70
23.02
13.70
13.70
1
1
1
1
1
5
5
10
10
10
35.91
35.91
71.81
71.81
71.81
1
1
1
1
1
13.70
13.70
8.63
13.70
13.70
APPENDIX B-4
33 kV feeder
11.Kusheshwar
12.Biraul
13.Raj Nagar
14.Raiyam
15.Pandaul
16.Manigachi
16. Darbhanga
17.Jhanjharpur
18.Khatauna
19.Rudrapur
2.Phulparas
11 kV bays
1. Kusheshwar
1. Biraul
2. Benipur
1. Raj Nagar
2. Babu Barhi
1. Raiyam
1. Pandaul
1. Manigachi
1. Jhanjharpur
2. Madhepur
1. Khatauna
1. Rudrapur
1. Phulparas
2. Nirmali
3. Talpatganj
No.
km
6
1
1
1
1
60
10
10
10
10
Cost
(Rs.Lakh)
430.89
71.81
71.81
71.81
71.81
6
1
1
1
1
Cost
(Rs.Lakh)
82.20
13.70
13.70
13.70
13.70
1
1
1
1
10
10
10
10
71.81
71.81
71.81
71.81
1
1
1
1
18.77
13.70
13.70
8.63
6
1
1
1
60
10
10
10
430.89
71.81
71.81
71.81
2728.95
6
1
1
1
82.20
13.70
13.70
13.70
552.25
No.
APPENDIX B-5
Cirlcle
33 kV feeder
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
1. PESU(East)
2. PESU(West)
3. Patna
1. Bihta AF
Bihta AF
20
6. Motihari
11.Munger
0.00
Sheetalpur
Siwan
20
20
0.00
0.00
1.
2.
3.
4.
Valmiki Nagar
Bettiah
Lauria
Motihari
20
20
20
20
0.00
0.00
0.00
0.00
Valmiki Nagar
Bettiah
Lauria
Motihari
1.
2.
3.
4.
Kako-Charui
Guraru-Paraiya
Belaganj
Central Stores
Kako
Guraru
Panari
Central Stores
20
20
20
9. Saharsa
10.Bhagalpur
1. Sheetalpur
2. Siwan
7. Bhojpur
8. Gaya
0.00
4. Nalanda
5. Chapra
2010
0
14.96
10
0.00
2
2
2
2
0.00
29.19
0.00
14.96
14.96
10
10
53.08
53.08
8
8
29.19
29.19
0.00
14.96
0.00
14.96
5
10
5
10
26.54
53.08
26.54
53.08
15
8
15
8
54.73
29.19
54.73
29.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.96
53.08
0.00
5
5
10
26.54
26.54
0.00
53.08
0.00
15
15
8
0.00
0.00
0.00
26.54
15
54.73
14.96
0.00
0.00
10
5
5
53.08
26.54
26.54
8
15
15
29.19
54.73
54.73
1. Shahkund
Shahkund
20
0.00
1. Railway W/S
2. Onama
Ramchandrapur
Onama
Mirjapur
20
20
20
0.00
0.00
0.00
0.00
54.73
54.73
0.00
29.19
0.00
0
0
0
0
97.23
97.23
0.00
0.00
97.23
97.23
194.45
81.27
97.23
81.27
97.23
356.99
0.00
0.00
81.27
81.27
0.00
97.23
259.76
0.00
0.00
81.27
81.27
97.23
81.27
81.27
APPENDIX B-5
Cirlcle
33 kV feeder
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
3. Ariari
Barkana
20
0.00
0.00
26.54
15
54.73
1. Bangardih
2. Pusa
3. Jitwarpur
Deona
Pusa
Jitwarpur
20
20
20
0.00
0.00
0.00
0.00
0.00
14.96
5
5
10
26.54
26.54
53.08
15
15
8
54.73
54.73
29.19
1. Group Control
Group Control
20
0.00
14.96
10
53.08
29.19
1.
2.
3.
4.
5.
Kalyanpur
Dinara
Bhabhua New
Pusauli
Takia
Nokha
Beda
Nahatta
20
20
20
20
20
20
20
20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.96
0.00
14.96
0.00
5
5
5
5
10
5
10
5
26.54
26.54
26.54
26.54
53.08
26.54
53.08
26.54
15
15
15
15
8
15
8
15
54.73
54.73
54.73
54.73
29.19
54.73
29.19
54.73
Pupri
Dumar
Lalganj
EDIP
Hajipur IE
Konharaghat
Motipur
MIT
Sikandarpur
SKMCH
Khabra
Bhikanpura
20
20
20
20
20
20
20
20
20
20
20
20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.96
14.96
0.00
0.00
14.96
0.00
14.96
0.00
14.96
5
5
5
10
10
5
5
10
5
10
5
10
26.54
26.54
26.54
53.08
53.08
26.54
26.54
53.08
26.54
53.08
26.54
53.08
15
15
15
8
8
15
15
8
15
8
15
8
54.73
54.73
54.73
29.19
29.19
54.73
54.73
29.19
54.73
29.19
54.73
29.19
Rajnagar
Raiyam
Pandaul
20
20
20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5
5
5
26.54
26.54
26.54
0.00
15
15
15
54.73
54.73
54.73
0.00
11.Munger
12.Samastipur
13.Purnea
14.Sasaram
Kalyanpur from
Dinara
Kudra
Pusauli
Beda-Takia
6. Nauhatta
1.
2.
3.
4.
5.
6.
15.Muzaffarpur 7.
8.
Pupri
Dumra
Lalganj
EDIP
Hajipur IE
Konharaghat
Motipur
SKMCH
9. Khabra
10.Bhikanpura
1. Rajnagar
2. Raiyam
16.Darbhanga 3. Pandaul
2
2
2
2
2
2
2
81.27
341.03
81.27
81.27
97.23
259.76
97.23
97.23
81.27
81.27
81.27
81.27
97.23
81.27
97.23
81.27
682.07
81.27
81.27
81.27
97.23
97.23
81.27
81.27
97.23
81.27
97.23
81.27
97.23
1055.01
81.27
81.27
81.27
243.81
3668.61
APPENDIX B-5
Cirlcle
33 kV feeder
1. Katra
2. Dina Iron
1. PESU (East)
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
1. Katra
1. HTC
2. HTC
3. Karmali Chak
1. Karmali Chak
2. Deedarganj
4. S.K. Memorial 1. S.K.Memorial
5. Kankar Bag (2) 1. Kankar Bag (2)
6. Saidpur
1. Saidpur
7. Bahadurpur
1. Bahadurpur
8. R. Nagar
1. R.Nagar
2. Machhuatoli
9. Kankar Bag
1. Kankar Bag
10.Ashok Nagar
1. Ashok Nagar
0
0
0
0
60
40
180
80
80
40
40
11.R.K.Nagar
12.Karbigahiya
1. R.K.Nagar
1. Karbigahiya
80
40
13.Gaighat
1. Gaighat
60
14.NMCH
1. NMCH
60
15.Meena Bazar
16.Katra (2)
17.Pahari
1. Meena Bazar
1. Katra (2)
1. Pahari
40
120
80
100
2. Sampatchak (Patna)
3. HTC (Patna)
18.Malsalami
1. Malsalami
40
19.Mangal Talab
1. Mangal Talab
80
20.Meena Bazar (2) 2. Meena Bazar (2) 180
21.PMCH
1. PMCH
40
0
0
0
0
6
4
18
8
8
4
4
0
10
0
8
4
0
6
0
6
0
4
12
8
0
0
0
4
8
18
4
2011-2014
0.00
0.00
0.00
0.00
67.26
44.84
201.78
89.68
89.68
44.84
44.84
0.00
112.10
0.00
89.68
44.84
0.00
67.26
0.00
67.26
0.00
44.84
134.52
89.68
0.00
0.00
0.00
44.84
89.68
201.78
44.84
0
0
0
0
24
16
72
32
32
16
16
0
40
0
32
16
0
24
0
24
0
16
48
32
0
0
0
16
32
72
16
0.00
0.00
0.00
0.00
179.49
119.66
538.48
239.32
239.32
119.66
119.66
0.00
299.15
0.00
239.32
119.66
0.00
179.49
0.00
179.49
0.00
119.66
358.98
239.32
0.00
0.00
0.00
119.66
239.32
538.48
119.66
0
0
0
0
30
20
90
40
40
20
20
0
50
0
40
20
0
30
0
30
0
20
60
40
0
0
0
20
40
90
20
0.00
0.00
0.00
0.00
159.24
106.16
477.71
212.31
212.31
106.16
106.16
0.00
265.39
0.00
212.31
106.16
0.00
159.24
0.00
159.24
0.00
106.16
318.47
212.31
0.00
0.00
0.00
106.16
212.31
477.71
106.16
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
405.99
270.66
1217.96
541.32
541.32
270.66
270.66
0.00
676.64
0.00
541.32
270.66
0.00
405.99
0.00
405.99
0.00
270.66
811.97
541.32
0.00
0.00
0.00
270.66
541.32
1217.96
270.66
9743.68
APPENDIX B-5
Cirlcle
33 kV feeder
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
1. A.N.College
1. A.N.College
20
2. S.K.Puri
1. S.K.Puri
20
3. Garikhana I & II 1. Garikhana
60
2. Pataliputra
60
3. Rajapur
40
4. Walmi
1. Walmi
20
5. Danapur
1. Danapur
20
6. Digha
1. Digha
20
2. Digha Central Stores
20
7. R.B.I.
1. RBI
20
2. HTC (Group)
8. Danapur (2)
1. Danapur (2)
180
9. IGIMS
1. IGIMS
40
2. Excise
20
10.Vaterinery College1. Vaterinery College 20
2. Board`s Colony 40
11.Jakkanpur
1. Jakkanpur
40
12.Maurya Lok
1. Maurya Lok
60
2. PESU (West)
2. Bandar Bagicha 40
13.Karnawad Punpun1. Karnawad Punpun 20
14.Sinchai Bhawan
15.Anishabad
16.Gardanibag
17.Vidyut Bhawan
1. Sinchai Bhawan 20
1. Anishabad
40
1. Gardanibag
40
1. Vidyut Bhawan
40
2. High Court
40
18.Sahitya Sammelan
1. Sahitya Sammelan40
19.Bandar Bagicha (2)
1. Bandar Bagicha (2)
120
20.Beur
1. Beur
40
2. Khagaul
40
3. HTC
4. HTC
5. Phulwari
20
21.Vikas Bhawan 1. Bhusaula
20
2. Vikas Bhawan
20
2
2
6
6
4
2
2
2
2
2
0
18
4
2
2
4
4
6
4
2
0
2
4
4
4
4
4
12
4
4
0
0
2
2
2
22.42
22.42
67.26
67.26
44.84
22.42
22.42
22.42
22.42
22.42
0.00
201.78
44.84
22.42
22.42
44.84
44.84
67.26
44.84
22.42
0.00
22.42
44.84
44.84
44.84
44.84
44.84
134.52
44.84
44.84
0.00
0.00
22.42
22.42
22.42
8
8
24
24
16
8
8
8
8
8
0
72
16
8
8
16
16
24
16
8
0
8
16
16
16
16
16
48
16
16
0
0
8
8
8
59.83
59.83
179.49
179.49
119.66
59.83
59.83
59.83
59.83
59.83
0.00
538.48
119.66
59.83
59.83
119.66
119.66
179.49
119.66
59.83
0.00
59.83
119.66
119.66
119.66
119.66
119.66
358.98
119.66
119.66
0.00
0.00
59.83
59.83
59.83
10
10
30
30
20
10
10
10
10
10
0
90
20
10
10
20
20
30
20
10
0
10
20
20
20
20
20
60
20
20
0
0
10
10
10
53.08
53.08
159.24
159.24
106.16
53.08
53.08
53.08
53.08
53.08
0.00
477.71
106.16
53.08
53.08
106.16
106.16
159.24
106.16
53.08
0.00
53.08
106.16
106.16
106.16
106.16
106.16
318.47
106.16
106.16
0.00
0.00
53.08
53.08
53.08
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
135.33
135.33
405.99
405.99
270.66
135.33
135.33
135.33
135.33
135.33
0.00
1217.96
270.66
135.33
135.33
270.66
270.66
405.99
270.66
135.33
0.00
135.33
270.66
270.66
270.66
270.66
270.66
811.97
270.66
270.66
0.00
0.00
135.33
135.33
135.33
8390.39
APPENDIX B-5
Cirlcle
33 kV feeder
1. A.F. Bihta
2. Pareo
3. Bihta I & II
4.
5.
6.
7.
3. Patna
GISCO
Balmukund
Maner
Neora
8. Fatuah (2)
9. Khusrupur
10.Fatuah
11.Dina Iron
12.Masaurhi Old
13.Masarhi New
14.NTPC I & II
15.Barh
16.Barh (2)
17.Biharibigha
18.Hathidah
19.Hathidah (2)
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
1. A.F.Bihta
20
1. Pareo
40
2. Koilwar (Ara Circle)
3. Giddha (Ara Circle)
120
1. Bihta
2. Kanpa
3. Lalbhasara
20
20
4. Paliganj
20
HTC
HTC group
1. Maner
1. Neora
40
40
2. Naubatpur
1. Fatuah (2)
1. Khusrupur
40
120
20
2. Daniyaman
20
1. Fatuah
1. HTC
2. HTC
1. Masaurhi Old
40
2. Dhanaura
1. Masaurhi New
HTC
1. Barh
2. Bakhtiyarpur
1. Barh (2)
1. Biharibigha
1. Hathidah
2. Mokama
1. Hathidah (2)
20
20
120
20
40
120
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5
10
0
30
0
0
5
5
0
5
0
0
0
10
10
0
10
30
5
0
5
0
0
0
0
10
0
5
5
0
0
0
30
5
0
10
30
26.54
53.08
0.00
159.24
0.00
0.00
26.54
26.54
0.00
26.54
0.00
0.00
0.00
53.08
53.08
0.00
53.08
159.24
26.54
0.00
26.54
0.00
0.00
0.00
0.00
53.08
0.00
26.54
26.54
0.00
0.00
0.00
159.24
26.54
0.00
53.08
159.24
15
30
0
90
0
0
15
15
0
15
0
0
0
30
30
0
30
90
15
0
15
0
0
0
0
30
0
15
15
0
0
0
90
15
0
30
90
54.73
109.46
0.00
328.38
0.00
0.00
54.73
54.73
0.00
54.73
0.00
0.00
0.00
109.46
109.46
0.00
109.46
328.38
54.73
0.00
54.73
0.00
0.00
0.00
0.00
109.46
0.00
54.73
54.73
0.00
0.00
0.00
328.38
54.73
0.00
109.46
328.38
81.27
162.54
0.00
487.62
0.00
0.00
81.27
81.27
0.00
81.27
0.00
0.00
0.00
162.54
162.54
0.00
162.54
487.62
81.27
0.00
81.27
0.00
0.00
0.00
0.00
162.54
0.00
81.27
81.27
0.00
0.00
0.00
487.62
81.27
0.00
162.54
487.62
3657.11
APPENDIX B-5
Cirlcle
33 kV feeder
1. Hilsa
2. Islampur
3. Ekangersarai
4. Chiksurabazar
5. Dhamauli
6. Noorsarai
7. Harnaut
8. Silao
4. Nalanda
9. Andawas
10.Rajgir
11.Giriak
12.Parwalpur
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
1. Hilsa
2. Hilsa (2)
1. Islampur
20
2. Khudaganj
20
1. Ekangersarai
40
1. Chiksurabazar
120
1. Dhamauli
20
2. Rahui
1. Noorsarai
2. Kalyanbigha
120
3. Chandi
4. Chainpur
120
5. Thertheri
20
1. Harnaut
2. Cheral (Railways) 120
1. Silao
2. Bhindidih
120
1. Andawas
120
1. Rajgir
2. Ghosarwan
120
1. Tetrawan
120
2. Sarbahadi
120
3. Giriak
4. Badi
120
5. Katrisarai
120
1. Parwalpur
20
13.Ramchandrapur (2)
1. Ramchandrapur (2)
120
14.Ramchandrapur 1. Ramchandrapur 20
15.Bari Pahari
1. Bari Parhari
40
16.Asthawan
1. Asthawan
2. Malti
1. Sohasarai
120
20
17.Sohasarai
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12
2
4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
89.75
14.96
0.00
29.92
0.00
0.00
0.00
0.00
14.96
0.00
0
0
5
5
10
30
5
0
0
30
0
30
5
0
30
0
30
30
0
30
30
30
0
30
30
5
0
60
10
0
20
0
0
0
30
10
0
0.00
0.00
26.54
26.54
53.08
159.24
26.54
0.00
0.00
159.24
0.00
159.24
26.54
0.00
159.24
0.00
159.24
159.24
0.00
159.24
159.24
159.24
0.00
159.24
159.24
26.54
0.00
318.47
53.08
0.00
106.16
0.00
0.00
0.00
159.24
53.08
0.00
0
0
15
15
30
90
15
0
0
90
0
90
15
0
90
0
90
90
0
90
90
90
0
90
90
15
0
48
8
0
16
0
0
0
90
8
0
0.00
0.00
54.73
54.73
109.46
328.38
54.73
0.00
0.00
328.38
0.00
328.38
54.73
0.00
328.38
0.00
328.38
328.38
0.00
328.38
328.38
328.38
0.00
328.38
328.38
54.73
0.00
175.14
29.19
0.00
58.38
0.00
0.00
0.00
328.38
29.19
0.00
0.00
0.00
81.27
81.27
162.54
487.62
81.27
0.00
0.00
487.62
0.00
487.62
81.27
0.00
487.62
0.00
487.62
487.62
0.00
487.62
487.62
487.62
0.00
487.62
487.62
81.27
0.00
583.35
97.23
0.00
194.45
0.00
0.00
0.00
487.62
97.23
0.00
7392.52
APPENDIX B-5
Cirlcle
33 kV feeder
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
1. Fulwaria
5. Chapra
6. Motihari
1. Fulwaria
40
2. Hathua
20
2. Gopalganj
1. Gopalganj
40
2. Jhajhwa
20
3. Kuchaikot
20
3. Srinagar
1. Srinagar
20
2. Mairwa
20
4. Siwan
1. Siwan
5. Maharajganj
1. Maharajganj
20
2. Ekma
20
6. Siwan (2)
1. Siwan (2)
100
7. Mashrakh
1. Mashrakh
20
2. Baniapur
20
8. Taraiya
1. Taraiya
20
2. Marworah
20
9. Baikunthpur
1. Baikunthpur
2. Barouli
10.Prabhunath Nagar1. Prabhunath Nagar 40
2. Manjhi
20
11.Telpa
1. Telpa
60
12.Sheetalpur
1. Sheetalpur
40
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1. Valmiki Nagar
2. Dhanha
3. Ramnagar
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.
5.
6.
7.
Chautarwa
Lauria
Narkatiaganj
Raxaul
8. Adopur
9. Dhaka
10.Bettiah
11.Bettiah (2)
12.Madhopur
13.Areraj
1. Valmiki Nagar
1. Dhanha
1. Ramnagar
2. Bagha
1. Chautarwa
1. Lauria
1. Narkatiaganj
1. Raxaul
1. Adopur
1. Dhaka
1. Bettiah
1. Bettiah (2)
1. Madhopur
2. Harsidhi
1. Areraj
20
120
40
120
20
40
20
20
40
120
20
20
40
10
6
4
0
12
0.00
0.00
29.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
74.79
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44.87
29.92
10
5
20
5
5
5
5
0
5
5
50
5
5
5
5
0
0
10
5
30
20
53.08
26.54
106.16
26.54
26.54
26.54
26.54
0.00
26.54
26.54
265.39
26.54
26.54
26.54
26.54
0.00
0.00
53.08
26.54
159.24
106.16
30
15
16
15
15
15
15
0
15
15
40
15
15
15
15
0
0
30
15
24
16
109.46
54.73
58.38
54.73
54.73
54.73
54.73
0.00
54.73
54.73
145.95
54.73
54.73
54.73
54.73
0.00
0.00
109.46
54.73
87.57
58.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
89.75
0.00
0.00
0.00
5
30
10
0
30
5
10
5
0
5
10
0
60
5
5
10
26.54
159.24
53.08
0.00
159.24
26.54
53.08
26.54
0.00
26.54
53.08
0.00
318.47
26.54
26.54
53.08
15
90
30
0
90
15
30
15
0
15
30
0
48
15
15
30
54.73
328.38
109.46
0.00
328.38
54.73
109.46
54.73
0.00
54.73
109.46
0.00
175.14
54.73
54.73
109.46
162.54
81.27
194.45
81.27
81.27
81.27
81.27
0.00
81.27
81.27
486.13
81.27
81.27
81.27
81.27
0.00
0.00
162.54
81.27
291.68
194.45
2467.01
81.27
487.62
162.54
0.00
487.62
81.27
162.54
81.27
0.00
81.27
162.54
0.00
583.35
81.27
81.27
162.54
APPENDIX B-5
Cirlcle
6. Motihari
33 kV feeder
14.Motihari (2)
15.Motihari
16.Chakia
17.Chhitwani
1. Chausa
2. Buxar
3.
4.
5.
6.
Pandy Patti
Dumraon
Dumraon (2)
Nawanagar
7. Bramhpur
7. Bhojpur
8. Simri
9. Garhani
10.Jagdishpur
11.Japani Farm
12.Powerganj
13.Zero Mile
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
1. Motihari (2)
1. Motihari
1. Chakia
2. Madhuban
1. Chhitwani
60
20
20
20
120
1. Chausa
40
2. Itarhi
20
3. Purushottampur 20
1. Buxar
40
2. Industrial
20
1. Pandey Patti
60
1. Dumraon
1. Dumraon (2)
100
1. Nawanagar
20
2. Murar
20
3. Akarsai
20
1. Krishnapuram
20
2. Bramhapur
20
3. Sahpur
4. Bihian
1. Simri
2. Chhotka Dhakai 120
1. Garhani
20
2. Piro
20
3. Agiaon
4. Sandes
1. Jagdishpur
1. Japani Farm
100
2. Serai
1. Powerganj
2. Power House
3. Barhara
1. Zero Mile
20
60
120
60
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6
2
4
2
6
10
2
6
6
0.00
44.87
14.96
0.00
0.00
0.00
0
30
10
5
5
30
0.00
159.24
53.08
26.54
26.54
159.24
0
24
8
15
15
90
0.00
87.57
29.19
54.73
54.73
328.38
0.00
0.00
0.00
29.92
14.96
44.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
74.79
0.00
0.00
14.96
44.87
0.00
44.87
10
5
5
20
10
30
0
25
5
5
5
5
5
0
0
0
30
5
5
0
0
0
50
0
0
10
30
30
30
53.08
26.54
26.54
106.16
53.08
159.24
0.00
132.70
26.54
26.54
26.54
26.54
26.54
0.00
0.00
0.00
159.24
26.54
26.54
0.00
0.00
0.00
265.39
0.00
0.00
53.08
159.24
159.24
159.24
30
15
15
16
8
24
0
75
15
15
15
15
15
0
0
0
90
15
15
0
0
0
40
0
0
8
24
90
24
109.46
54.73
54.73
58.38
29.19
87.57
0.00
273.65
54.73
54.73
54.73
54.73
54.73
0.00
0.00
0.00
328.38
54.73
54.73
0.00
0.00
0.00
145.95
0.00
0.00
29.19
87.57
328.38
87.57
0.00
291.68
97.23
81.27
81.27
487.62
3735.41
162.54
81.27
81.27
194.45
97.23
291.68
0.00
406.35
81.27
81.27
81.27
81.27
81.27
0.00
0.00
0.00
487.62
81.27
81.27
0.00
0.00
0.00
486.13
0.00
0.00
97.23
291.68
487.62
291.68
4025.59
APPENDIX B-5
Cirlcle
33 kV feeder
1. Karpi
2. Arwal
3. Goh
4. Daudnagar
5. Kako
6. Tehta
7. Ghosi
8. Irki
8. Gaya
9. Rafiganj I & II
10.Uchauli
11.Guraru
12.Tekari
13.Belaganj
14.Chakand
15.Dhongra
16.Sonwa
17.Hulasganj
18.Nawagarh
19.Aurangabad
20.Obra
21.Deo
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
1. Karpi
2. Ataullah
3. Kurtha
1. Arwal
1. Goh
1. Daudnagar
2. Haspura
1. Kako
2. Charui
1. Tehta
2. Makpa
3. Makhdampur
1. Ghosi
2. Jehanabad
1. Irki
2. Sakurabad
3. Nowaman
1. Rafiganj
1. Uchauli
2. Madanpur
1. Guraru
2. Paraiya
1.Tekari
2. Koach
1. Belaganj
2. Panari
3. Paibigha
1. Chakand
1. Dhongra
1. Sonwa
1. Hulasganj
1. Nawagarh
1. Aurangabad
1. Obra
2. Phesar
3. Sokhea
1. Deo
2. Gangti
20
20
20
20
20
20
60
40
120
40
20
20
20
20
20
20
40
40
40
120
120
120
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6
4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44.87
29.92
0.00
0.00
29.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
5
5
5
5
5
5
30
20
0
30
20
5
5
5
5
5
5
10
10
0
10
30
30
0
30
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.54
26.54
26.54
26.54
26.54
26.54
159.24
106.16
0.00
159.24
106.16
26.54
26.54
26.54
26.54
26.54
26.54
53.08
53.08
0.00
53.08
159.24
159.24
0.00
159.24
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
15
15
15
15
15
15
24
16
0
90
16
15
15
15
15
15
15
30
30
0
30
90
90
0
90
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.73
54.73
54.73
54.73
54.73
54.73
87.57
58.38
0.00
328.38
58.38
54.73
54.73
54.73
54.73
54.73
54.73
109.46
109.46
0.00
109.46
328.38
328.38
0.00
328.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
81.27
81.27
81.27
81.27
81.27
81.27
291.68
194.45
0.00
487.62
194.45
81.27
81.27
81.27
81.27
81.27
81.27
162.54
162.54
0.00
162.54
487.62
487.62
0.00
487.62
0.00
0.00
0.00
0.00
0.00
0.00
APPENDIX B-5
Cirlcle
33 kV feeder
22.Barun
23.Barem
24.Tengra
25.Sone Hydel
26.Nabinagar
27.Barun (2)
28.Dihara
29.Wazirganj
30.Atari
31.Gurua
32.Amas
33.Banke
34.Shergahti
8. Gaya
35.Imamganj
36.Chandauti
37.Medical
38.Central Stores
1. Barun
1. Barem
1. Tengra
HTC
1. Nabinagar
2. Amba
1. Barun (2)
1. Dihara
1. Wazirganj
2. Fatehpur
3. Paimer
1. Atari
2. Khizr Sarai
1. Gurua
1. Amas
1. Banke
1. Sherghati
2. Dobhi
1. Imamganj
2. Dumaria
1. Chandauti
1. Medical
2. Cherki
1. Central Stores
39.A.P.Colony
1. A.P.Coloy
2. Railway Maidan
40.Gandhi Maidan 1. Gandhi Maidan
41.Dandibag
42.Shobh
43.Manpur
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
20
40
20
20
60
120
20
20
80
40
20
40
60
2. Panchaiti Akhara 60
1. Dandibag
80
1. Shobh
2. Charkbria
1. Manpur
2. Tankuppa
3. Gere
20
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
0
0
4
2
4
6
6
8
14.96
0.00
0.00
0.00
0.00
0.00
44.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59.83
0.00
0.00
0.00
29.92
0.00
14.96
29.92
44.87
0.00
44.87
59.83
0.00
0.00
0.00
0.00
0.00
0.00
10
0
10
0
5
5
30
30
0
5
0
0
0
0
0
0
0
0
0
5
40
0
0
20
0
10
20
30
0
30
40
0
0
0
5
0
0
53.08
0.00
53.08
0.00
26.54
26.54
159.24
159.24
0.00
26.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.54
212.31
0.00
0.00
0.00
106.16
0.00
53.08
106.16
159.24
0.00
159.24
212.31
0.00
0.00
0.00
26.54
0.00
0.00
8
0
30
0
15
15
24
90
0
15
0
0
0
0
0
0
0
0
0
15
32
0
0
16
0
8
16
24
0
24
32
0
0
0
15
0
0
29.19
0.00
109.46
0.00
54.73
54.73
87.57
328.38
0.00
54.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.73
116.76
0.00
0.00
0.00
58.38
0.00
29.19
58.38
87.57
0.00
87.57
116.76
0.00
0.00
0.00
54.73
0.00
0.00
97.23
0.00
162.54
0.00
81.27
81.27
291.68
487.62
0.00
81.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
81.27
388.90
0.00
0.00
0.00
194.45
0.00
97.23
194.45
291.68
0.00
291.68
388.90
0.00
0.00
0.00
81.27
0.00
0.00
APPENDIX B-5
Cirlcle
33 kV feeder
44.Industrial Area
45.M.U. Campus
46.Hasua
47.Nawada
8. Gaya
48.Akbarpur
49.Roh
9. Saharsa
4. Bhore
1. Industrial Area
1. M.U.Campus
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
20
40
2. Buddhist Complex 40
1. Hasua
80
2. Nadirganj
80
1. Nawada
60
2. Nawada New
20
3. Bhadhokhara
20
1. Akbarpur
20
2. Rajauli
20
3. Sirdala
20
1. Roh
20
2. Warsaliganj
20
3. Pakribarwan
20
4. Kaukol
20
40
1. Supaul
1. Supaul
2. Saharsa (2)
2. Parasrama
3. Kishanpur
4. Pipra
5. Raghopur
6. Larganj
1. Sahrsa (2)
3. Sour Bazar
4. Balwahat
DTRs
33/11 kV Sub
Station
60
120
120
180
1. Sour Bazar
120
1. Balwahat
120
2. Salakhua
120
5. Simri Bakhtiyarpur1. Simri Bakhtiyarpur
6. New Market
1. New Market
40
7. Old Saharsa
1. Old Saharsa
8. Madhepura
1. Madhepura
20
2. Muraliganj
3. Kumarkhand
120
9. Singheswar
1. Singheswar
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
4
4
6
2
18
4
0
2
0.00
0.00
29.92
0.00
29.92
0.00
0.00
44.87
14.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5
0
20
0
20
20
20
30
10
5
5
5
5
5
5
5
5
10
26.54
0.00
106.16
0.00
106.16
106.16
106.16
159.24
53.08
26.54
26.54
26.54
26.54
26.54
26.54
26.54
26.54
53.08
15
0
16
0
16
60
60
24
8
15
15
15
15
15
15
15
15
30
54.73
0.00
58.38
0.00
58.38
218.92
218.92
87.57
29.19
54.73
54.73
54.73
54.73
54.73
54.73
54.73
54.73
109.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
134.62
0.00
0.00
0.00
0.00
0.00
29.92
0.00
14.96
0.00
0.00
0.00
0
0
15
0
30
0
30
90
0
30
30
30
0
20
0
10
0
30
0
0.00
0.00
79.62
0.00
159.24
0.00
159.24
477.71
0.00
159.24
159.24
159.24
0.00
106.16
0.00
53.08
0.00
159.24
0.00
0
0
45
0
90
0
90
72
0
90
90
90
0
16
0
8
0
90
0
0.00
0.00
164.19
0.00
328.38
0.00
328.38
262.70
0.00
328.38
328.38
328.38
0.00
58.38
0.00
29.19
0.00
328.38
0.00
81.27
0.00
194.45
0.00
194.45
325.08
325.08
291.68
97.23
81.27
81.27
81.27
81.27
81.27
81.27
81.27
81.27
162.54
9708.49
0.00
0.00
243.81
0.00
487.62
0.00
487.62
875.03
0.00
487.62
487.62
487.62
0.00
194.45
0.00
97.23
0.00
487.62
0.00
APPENDIX B-5
Cirlcle
33 kV feeder
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
11.Bihariganj
12.Udakishanganj
13.Puraini
14.Alamnagar
120
40
20
40
120
1.
2.
3.
4.
5.
1. Bihpur
1. Sanhauli
1. Naugachhia
1. Patwara
1. Sultanganj
20
120
Bihpur
Sanhauli
Naugachhia
Patwara
Sultanganj
6. Shahkund
7. Barari
8. CS Compound
10.Bhagalpur
2. Ghailar
1. Khagaria
2. Mansi
3. Maheshkunt
1. Bihariganj
1. Udakishanganj
1. Puraini
1. Alamnagar
10.Khagaria
9. Saharsa
DTRs
33/11 kV Sub
Station
9. Sabour
10.Gouradih
11.Aliganj I
12.Aliganj II
13.Banka (2)
14.Banka
15.Sanhoula
16.Ghogha
17.Kahalgaon
1. Shahkund
1. Barari
2. Central Jail
3. Mayaganj
1. C S Compound
2. T T School
1. Sabour
1. Gouradih
1. Aliganj
2. Mojahidpur
1. Aliganj
2. Jagdishpur
3. Nath Nagar
1. Banka (2)
1. Banka
2. Amarpur
3. Rajouna
4. Bousi
1. Sanhoula
1. Ghogha
1. Kahalgaon
2. Pirpainti
120
40
40
40
40
40
40
40
40
20
40
20
20
60
20
20
40
20
120
20
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30
10
5
10
30
0
30
0
159.24
53.08
26.54
53.08
159.24
0.00
159.24
0.00
90
30
15
30
90
0
90
0
328.38
109.46
54.73
109.46
328.38
0.00
328.38
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
29.92
0.00
0.00
0.00
29.92
29.92
29.92
29.92
29.92
0.00
29.92
0.00
29.92
0.00
0.00
44.87
14.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5
30
0
0
20
0
0
10
20
20
20
20
20
0
20
5
20
5
5
30
10
0
5
10
5
30
5
0
26.54
159.24
0.00
0.00
106.16
0.00
0.00
53.08
106.16
106.16
106.16
106.16
106.16
0.00
106.16
26.54
106.16
26.54
26.54
159.24
53.08
0.00
26.54
53.08
26.54
159.24
26.54
0.00
15
90
0
0
16
0
0
30
16
16
16
16
16
0
16
15
16
15
15
24
8
0
15
30
15
90
15
0
54.73
328.38
0.00
0.00
58.38
0.00
0.00
109.46
58.38
58.38
58.38
58.38
58.38
0.00
58.38
54.73
58.38
54.73
54.73
87.57
29.19
0.00
54.73
109.46
54.73
328.38
54.73
0.00
4
4
4
4
4
4
4
6
2
487.62
162.54
81.27
162.54
487.62
0.00
487.62
0.00
6205.40
81.27
487.62
0.00
0.00
194.45
0.00
0.00
162.54
194.45
194.45
194.45
194.45
194.45
0.00
194.45
81.27
194.45
81.27
81.27
291.68
97.23
0.00
81.27
162.54
81.27
487.62
81.27
0.00
3813.70
APPENDIX B-5
Cirlcle
33 kV feeder
1. Tarapur
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
1. Tarapur
2. Kharagpur
2. Dakranala
1. Dakranala
3. Ramchandrapur 1. Ramchandrapur
2. Railways (HTC)
4. Safiabad
1. Safiabad
2. Baniyarpur
5. ITC
1. ITC (HTC)
6. Karnachaura
1. Karnchaura
40
20
20
20
7. Nandlalpur
8. Bindwara
9. Balaji
10.Purani Bazar
1. Nandlalpur
1. Bindwara
1. Balaji
1. Purani Bazar
20
40
2. Court Area
1. Kajra
2. Piri Bazar
1. Salempur
2. Manpur
3. Haibatganj
1. Jamui
40
120
120
2. Khaira
3. Sikandara
1. Gidhour
2. Jhajha
3. Sono
1. Ghuskuri
1. Ariari
2. Bhalua
3. Lohain
4. Katari
5. Barkna
1. Onama
2. Mirzapur
3. Toygarh
1. Hathiyama
20
20
20
20
20
120
11.Kajra
11. Munger
DTRs
33/11 kV Sub
Station
12.Haibatganj
13.Jamui
14.Gidhour
15.Ghuskuri
16.Ariari
17.Onama
18.Hathiyama
20
20
60
60
120
40
120
120
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
29.92
0.00
0.00
0.00
0.00
0.00
29.92
0.00
0.00
0.00
0.00
14.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10
5
5
5
0
5
5
0
15
0
5
10
0
15
0
20
30
30
0
30
0
20
0
5
5
5
10
5
30
0
0
30
0
0
0
0
30
0
53.08
26.54
26.54
26.54
0.00
26.54
26.54
0.00
79.62
0.00
26.54
53.08
0.00
79.62
0.00
106.16
159.24
159.24
0.00
159.24
0.00
106.16
0.00
26.54
26.54
26.54
53.08
26.54
159.24
0.00
0.00
159.24
0.00
0.00
0.00
0.00
159.24
0.00
30
15
15
15
0
15
15
0
45
0
15
30
0
45
0
16
90
90
0
90
0
16
0
15
15
15
8
15
90
0
0
90
0
0
0
0
90
0
109.46
54.73
54.73
54.73
0.00
54.73
54.73
0.00
164.19
0.00
54.73
109.46
0.00
164.19
0.00
58.38
328.38
328.38
0.00
328.38
0.00
58.38
0.00
54.73
54.73
54.73
29.19
54.73
328.38
0.00
0.00
328.38
0.00
0.00
0.00
0.00
328.38
0.00
162.54
81.27
81.27
81.27
0.00
81.27
81.27
0.00
243.81
0.00
81.27
162.54
0.00
243.81
0.00
194.45
487.62
487.62
0.00
487.62
0.00
194.45
0.00
81.27
81.27
81.27
97.23
81.27
487.62
0.00
0.00
487.62
0.00
0.00
0.00
0.00
487.62
0.00
APPENDIX B-5
Cirlcle
33 kV feeder
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
19.Sheikhpura
1. Sheikhpura
60
0
0
0.00
0.00
1. Pusa
2. Mohanpur
1. Pusa
1. Mohanpur
20
40
20
20
3. Jute Mill
4. Sarairanjan
5. Jitwarpur
2. Warisnagar
3. Kalyanpur
HTC
1. Sarairanjan
1. Jitwarpur
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11. Munger
20
20
2. Magardahi
120
6. Rly.Samastipur HTC
7. Sirsia
1. Sirsia
2. Kuboliram
120
3. Karpoorigram
120
8. Dalsingsarai
1. Dalsingsarai
20
2. Mehuddinnagar 20
9. Pateri
1. Pateri
20
12.Samastipur 10.Bachchwara
1. Bachchwara
20
11.Bibhutipur
1. Bibhutipur
20
2. Rosera
20
3. Hassanpur
20
12.Deona
1. Deona
2. Bangrahdih
3. Jai Mangla (HTC)
4. Jai Mata Di (HTC)
13.Bangrahdih (2) 1. Bangrahdih (2) 120
14.IOC
HTC
15.Railways
HTC
16.Deona (2)
1. Deona (2)
120
17.Kankaul
1. Kankaul
120
18.Begusarai
1. Begusarai
20
2. Manjhaul
40
3. Ganga Dairy (HTC)
4. Balia
20
2
12
12
12
2
44.87
0.00
30
0
159.24
0.00
24
0
87.57
0.00
0.00
29.92
0.00
0.00
0.00
0.00
0.00
14.96
0.00
89.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
89.75
0.00
0.00
0.00
89.75
14.96
0.00
0.00
0.00
5
20
0
5
5
0
5
10
0
60
0
0
30
30
5
5
5
5
5
5
5
0
0
0
0
60
0
0
30
60
10
10
0
5
26.54
106.16
0.00
26.54
26.54
0.00
26.54
53.08
0.00
318.47
0.00
0.00
159.24
159.24
26.54
26.54
26.54
26.54
26.54
26.54
26.54
0.00
0.00
0.00
0.00
318.47
0.00
0.00
159.24
318.47
53.08
53.08
0.00
26.54
15
16
0
15
15
0
15
8
0
48
0
0
90
90
15
15
15
15
15
15
15
0
0
0
0
48
0
0
90
48
8
30
0
15
54.73
58.38
0.00
54.73
54.73
0.00
54.73
29.19
0.00
175.14
0.00
0.00
328.38
328.38
54.73
54.73
54.73
54.73
54.73
54.73
54.73
0.00
0.00
0.00
0.00
175.14
0.00
0.00
328.38
175.14
29.19
109.46
0.00
54.73
291.68
0.00
5328.88
81.27
194.45
0.00
81.27
81.27
0.00
81.27
97.23
0.00
583.35
0.00
0.00
487.62
487.62
81.27
81.27
81.27
81.27
81.27
81.27
81.27
0.00
0.00
0.00
0.00
583.35
0.00
0.00
487.62
583.35
97.23
162.54
0.00
81.27
4739.57
APPENDIX B-5
Cirlcle
33 kV feeder
1. Narpatganj
2. Raniganj
13. Purnea
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
1. Narpatganj
1. Raniganj
2. Bahargaon
3. Forbesganj
1. Forbesganj
2. Araria
3. Kusgaon
4. Jokihat
5. Malgaon
4. Bahadurganj
1. Bahadurganj
2. Dighal Bank
5. Sarai
1. Sarai
6. Paschimpali
1. Paschimpali
7. Purabpali
1. Purabpali
8. Thakurganj
1. Chhatargarh
2. Thakurganj
9. Group Control 1. Group control
10.Banmankhi
1. Banmankhi
2. Madhubani
11.Zero Mile
1. Zero Mile
2. City
12.Belgachhi
1. Belgachhi
2. Dalkola
3. Vaisi
13.Naranga
1. Naranga
2. MLR Ganj
3. Dargaha
14.Jalalgarh
1. Jalalgarh
15.Beri
1. Beri
2. Gore Beri
3. Falka
4. Sonaily
5. Barsoi
6. Pranpur
16.Industrial Estate 1. Industrial Estate
17.Binodpur
1. Binodpur
18.Kursaila
1. Kursaila
20
120
120
120
20
40
40
60
20
20
20
120
20
20
40
20
20
20
20
20
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4
4
2
2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
29.92
29.92
0.00
0.00
44.87
0.00
0.00
14.96
14.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.96
0.00
0.00
5
0
30
0
0
30
0
30
0
0
5
20
20
0
0
30
0
5
10
10
0
0
30
5
5
0
10
5
5
5
0
0
0
10
5
0
26.54
0.00
159.24
0.00
0.00
159.24
0.00
159.24
0.00
0.00
26.54
106.16
106.16
0.00
0.00
159.24
0.00
26.54
53.08
53.08
0.00
0.00
159.24
26.54
26.54
0.00
53.08
26.54
26.54
26.54
0.00
0.00
0.00
53.08
26.54
0.00
15
0
90
0
0
90
0
90
0
0
15
16
16
0
0
24
0
15
8
8
0
0
90
15
15
0
30
15
15
15
0
0
0
8
15
0
54.73
0.00
328.38
0.00
0.00
328.38
0.00
328.38
0.00
0.00
54.73
58.38
58.38
0.00
0.00
87.57
0.00
54.73
29.19
29.19
0.00
0.00
328.38
54.73
54.73
0.00
109.46
54.73
54.73
54.73
0.00
0.00
0.00
29.19
54.73
0.00
81.27
0.00
487.62
0.00
0.00
487.62
0.00
487.62
0.00
0.00
81.27
194.45
194.45
0.00
0.00
291.68
0.00
81.27
97.23
97.23
0.00
0.00
487.62
81.27
81.27
0.00
162.54
81.27
81.27
81.27
0.00
0.00
0.00
97.23
81.27
0.00
3816.68
APPENDIX B-5
Cirlcle
33 kV feeder
1. Karmnasa
2. Larma
3. Kalyanpur
4.
5.
6.
7.
8.
9.
Ramgarh (2)
Kakrait
Parsathua
Chainpur
Mohania (2)
Mohania
10.Dinara
14. Sasaram
11.Sanjhouli
12.Surajpura
13.Bikramganj
14.Bikramganj (2)
15.Pusauli
16.Kudra
17.Karamchat
18.Beda Sasaram
19.Sasaram (2)
20.Sasaram (3)
21.Naigaon
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
1. Karmnasa
2. Durgawati
3. Chand
1. Larma
2. DVPL (HTC)
1. Kalyanpur
2. Ramgarh
3. Chourasia
4. Nuaon
1. Ramgarh (2)
1. Kakrait
1. Parsathua
1. Chainpur
1. Mohania (2)
1. Mohania
2. Bhabhua Old
3. Bahuara
1. Dinara
2. Kochas
3. Dawath
1. Sanjhouli
1. Surajpura
1. Bikramganj
2. Kararkat
1. Bikramganj (2)
1. Pusauli
1. Kudra
2. Bhabhua New
1. Karamchat
2. Cenari
3. Adhaura
1. Beda Sasaram
2. Takia Sasaram
3. Nokha
1. Sasaram (2)
1. Sasaram (3)
1. Naigaon
2. Sheosagar
20
20
20
20
60
20
20
20
20
20
120
20
20
20
20
20
20
20
120
36
20
80
12.6
20
40
20
120
120
40
40
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12
0
2
0
4
12
12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
89.75
0.00
14.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59.83
0.00
0.00
0.00
0.00
29.92
0.00
89.75
89.75
0.00
0.00
5
5
5
5
0
15
0
5
5
0
5
5
5
60
0
10
5
5
5
0
5
5
0
5
30
9
5
40
3.15
5
0
0
20
5
60
60
10
10
26.54
26.54
26.54
26.54
0.00
79.62
0.00
26.54
26.54
0.00
26.54
26.54
26.54
318.47
0.00
53.08
26.54
26.54
26.54
0.00
26.54
26.54
0.00
26.54
159.24
47.77
26.54
212.31
16.72
26.54
0.00
0.00
106.16
26.54
318.47
318.47
53.08
53.08
15
15
15
15
0
45
0
15
15
0
15
15
15
48
0
8
15
15
15
0
15
15
0
15
90
27
15
32
9.45
15
0
0
16
15
48
48
30
30
54.73
54.73
54.73
54.73
0.00
164.19
0.00
54.73
54.73
0.00
54.73
54.73
54.73
175.14
0.00
29.19
54.73
54.73
54.73
0.00
54.73
54.73
0.00
54.73
328.38
98.51
54.73
116.76
34.48
54.73
0.00
0.00
58.38
54.73
175.14
175.14
109.46
109.46
81.27
81.27
81.27
81.27
0.00
243.81
0.00
81.27
81.27
0.00
81.27
81.27
81.27
583.35
0.00
97.23
81.27
81.27
81.27
0.00
81.27
81.27
0.00
81.27
487.62
146.28
81.27
388.90
51.20
81.27
0.00
0.00
194.45
81.27
583.35
583.35
162.54
162.54
APPENDIX B-5
Cirlcle
14. Sasaram
33 kV feeder
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
180
1.
2.
3.
4.
5.
6.
7.
8.
9.
40
40
20
120
Shivhar
Runi Saidpur
Pupri
Dumra (2)
Dumra
Sursand
Sonbarsa
Nepal
Patepur
1. Shivhar
1. Runi Saidpur
1. Pupri
1. Dumra (2)
1. Dumra
1. Sursand
1. Sonbarsa
1. Nepal
1. Mehua
2. Patepur
10.Prataptand
1. Prataptand
15. Muzaffarpur
11.Lalganj
1. Lalganj
12.Sarai
1. Sarai
13.Railway (HTC) HTC
14.Bidupur
1. Bidupur
15.EDIP
1. EDIP
16.Hajipur I E
1. Hajipur I E
17.Konharaghat
1. Konharaghat
18.Konharaghat (2) 1. Konharaghat(2)
19.Manhar
1. Manhar @
20.SKMCH (2)
1. SKMCH (2)
21.MIT
1. MIT
20
40
40
20
40
20
100
120
120
40
40
40
40
40
20
20
120
120
40
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2
10
2
0
12
4
134.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.96
74.79
0.00
0.00
0.00
0.00
90
0
5
0
0
10
10
5
10
10
50
30
0
0
30
477.71
0.00
26.54
0.00
0.00
53.08
53.08
26.54
53.08
53.08
265.39
159.24
0.00
0.00
159.24
72
0
15
0
0
30
30
15
30
8
40
90
0
0
90
262.70
0.00
54.73
0.00
0.00
109.46
109.46
54.73
109.46
29.19
145.95
328.38
0.00
0.00
328.38
29.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.96
0.00
0.00
0.00
0.00
89.75
29.92
20
10
5
30
0
10
10
0
0
0
0
10
10
0
10
10
0
5
30
0
60
20
106.16
53.08
26.54
159.24
0.00
53.08
53.08
0.00
0.00
0.00
0.00
53.08
53.08
0.00
53.08
53.08
0.00
26.54
159.24
0.00
318.47
106.16
16
30
15
90
0
30
30
0
0
0
0
30
30
0
30
8
0
15
90
0
48
16
58.38
109.46
54.73
328.38
0.00
109.46
109.46
0.00
0.00
0.00
0.00
109.46
109.46
0.00
109.46
29.19
0.00
54.73
328.38
0.00
175.14
58.38
875.03
0.00
81.27
0.00
0.00
162.54
162.54
81.27
162.54
97.23
486.13
487.62
0.00
0.00
487.62
8231.23
194.45
162.54
81.27
487.62
0.00
162.54
162.54
0.00
0.00
0.00
0.00
162.54
162.54
0.00
162.54
97.23
0.00
81.27
487.62
0.00
583.35
194.45
APPENDIX B-5
Cirlcle
33 kV feeder
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
3. Benipatti
4. Rahika
5.
6.
16. Darbhanga
7.
8.
Bela
Gangwara
Donar
Panda Sarai
9. Pouriya
10.Anar
11.Kusheshwar
12.Biraul
1. Basopatti
1. Jay Nagar
20
2. Khajauli
20
3. Ladania
20
1. Benipatti
20
2. Ahilyasthan
1. Rahika
40
2. Madhubani
40
1. Bela
20
1. Gangwara
40
1. Donar
20
1. Panda Sarai
20
2. Laheria Sarai (Jail)
3. DMCH
20
4. Urban
20
1. Pouriya
20
1. Baheri
20
2. Anar
20
1. Kusheshwar
120
1. Biraul
20
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2
12
2
0
12
4
4
2
2
0.00
0.00
0.00
0.00
0.00
0.00
14.96
0.00
89.75
14.96
0.00
0.00
0.00
0.00
0.00
0.00
89.75
30
0
5
0
30
10
10
5
60
10
10
0
30
0
30
0
60
159.24
0.00
26.54
0.00
159.24
53.08
53.08
26.54
318.47
53.08
53.08
0.00
159.24
0.00
159.24
0.00
318.47
90
0
15
0
90
30
8
15
48
8
30
0
90
0
90
0
48
328.38
0.00
54.73
0.00
328.38
109.46
29.19
54.73
175.14
29.19
109.46
0.00
328.38
0.00
328.38
0.00
175.14
0.00
0.00
0.00
0.00
0.00
0.00
29.92
29.92
0.00
0.00
0.00
0.00
0.00
14.96
14.96
0.00
0.00
0.00
0.00
0.00
0
5
5
5
5
0
20
20
5
10
5
5
0
10
10
5
5
5
30
5
0.00
26.54
26.54
26.54
26.54
0.00
106.16
106.16
26.54
53.08
26.54
26.54
0.00
53.08
53.08
26.54
26.54
26.54
159.24
26.54
0
15
15
15
15
0
16
16
15
30
15
15
0
8
8
15
15
15
90
15
0.00
54.73
54.73
54.73
54.73
0.00
58.38
58.38
54.73
109.46
54.73
54.73
0.00
29.19
29.19
54.73
54.73
54.73
328.38
54.73
487.62
0.00
81.27
0.00
487.62
162.54
97.23
81.27
583.35
97.23
162.54
0.00
487.62
0.00
487.62
0.00
583.35
6981.71
0.00
81.27
81.27
81.27
81.27
0.00
194.45
194.45
81.27
162.54
81.27
81.27
0.00
97.23
97.23
81.27
81.27
81.27
487.62
81.27
APPENDIX B-5
Cirlcle
33 kV feeder
13.Raj Nagar
16. Darbhanga
14.Raiyam
15.Pandaul
16.Manigachi
17.Jhanjharpur
18.Khatauna
19.Rudrapur
20.Phulparas
DTRs
Nos.
630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)
33/11 kV Sub
Station
2. Benipur
1. Raj Nagar
2. Babu Barhi
1. Raiyam
1. Pandaul
1. Manigachi
1. Jhanjharpur
2. Madhepur
1. Khatauna
1. Rudrapur
1. Phulparas
2. Nirmali
3. Talpatganj
20
20
20
20
20
20
20
120
20
20
20
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5
5
5
0
5
5
5
5
0
30
5
5
5
26.54
26.54
26.54
0.00
26.54
26.54
26.54
26.54
0.00
159.24
26.54
26.54
26.54
15
15
15
0
15
15
15
15
0
90
15
15
15
54.73
54.73
54.73
0.00
54.73
54.73
54.73
54.73
0.00
328.38
54.73
54.73
54.73
81.27
81.27
81.27
0.00
81.27
81.27
81.27
81.27
0.00
487.62
81.27
81.27
81.27
3427.77
APPENDIX B-6
33 kV feeder
Length
(km)
Cost
(Rs.Lakh)
2010
1. PESU(East)
2. PESU(West)
3. Patna
1. Bihta AF
Bihta AF
20
1. Sheetalpur
2. Siwan
Sheetalpur
Siwan
10
10
1.
2.
3.
4.
Valmiki Nagar
Bettiah
Lauria
Motihari
Valmiki Nagar
Bettiah
Lauria
Motihari
20
10
20
10
1.
2.
3.
4.
Kako-Charui
Guraru-Paraiya
Belaganj
Central Stores
Kako
Guraru
Panari
Central Stores
20
20
1. Shahkund
Shahkund
20
1. Railway W/S
2. Onama
3. Ariari
Ramchandrapur
Onama
Mirjapur
Barkana
10
20
20
20
1. Bangardih
2. Pusa
3. Jitwarpur
Deona
Pusa
Jitwarpur
20
20
10
1. Group Control
Group Control
10
1.
2.
3.
4.
5.
Kalyanpur
Dinara
Bhabhua New
Pusauli
Takia
Nokha
Beda
Nahatta
20
20
10
10
10
20
10
20
Pupri
Dumar
Lalganj
EDIP
Hajipur IE
Konharaghat
20
20
20
10
10
20
4. Nalanda
5. Chapra
6. Motihari
7. Bhojpur
8. Gaya
10
9. Saharsa
10.Bhagalpur
11.Munger
12.Samastipur
13.Purnea
14.Sasaram
Kalyanpur from
Dinara
Kudra
Pusauli
Beda-Takia
6. Nauhatta
1.
2.
3.
15.Muzaffarpur
4.
5.
6.
Pupri
Dumra
Lalganj
EDIP
Hajipur IE
Konharaghat
0
0
0
0
81.40
81.40
0.00
0.00
40.70
40.70
81.40
81.40
40.70
81.40
40.70
244.19
0.00
81.40
81.40
40.70
203.49
0.00
81.40
81.40
40.70
81.40
81.40
81.40
284.89
81.40
81.40
40.70
203.49
40.70
40.70
81.40
81.40
40.70
40.70
40.70
81.40
40.70
81.40
488.38
81.40
81.40
81.40
40.70
40.70
81.40
APPENDIX B-6
33 kV feeder
7. Motipur
8. SKMCH
9. Khabra
10.Bhikanpura
Motipur
MIT
Sikandarpur
SKMCH
Khabra
Bhikanpura
1. Rajnagar
2. Raiyam
3. Pandaul
Rajnagar
Raiyam
Pandaul
15.Muzaffarpur
16.Darbhanga
Length
(km)
20
10
20
10
20
10
20
20
20
Cost
(Rs.Lakh)
81.40
40.70
81.40
40.70
81.40
40.70
773.26
81.40
81.40
81.40
244.19
2726.77
APPENDIX B-6
33 kV feeder
Length
(km)
Cost
(Rs.Lakh)
30
20
90
40
40
20
20
122.09
81.40
366.28
162.79
162.79
81.40
81.40
50
203.49
9. Kankar Bag
10.Ashok Nagar
2011-2014
1. Katra
1. HTC
2. HTC
1. Karmali Chak
2. Deedarganj
1. S.K.Memorial
1. Kankar Bag (2)
1. Saidpur
1. Bahadurpur
1. R.Nagar
2. Machhuatoli
1. Kankar Bag
1. Ashok Nagar
11.R.K.Nagar
12.Karbigahiya
1. R.K.Nagar
1. Karbigahiya
40
20
162.79
81.40
13.Gaighat
1. Gaighat
30
122.09
14.NMCH
1. NMCH
30
122.09
15.Meena Bazar
16.Katra (2)
17.Pahari
1. Meena Bazar
1. Katra (2)
1. Pahari
20
60
40
81.40
244.19
162.79
18.Malsalami
19.Mangal Talab
20.Meena Bazar (2)
21.PMCH
2. Sampatchak (Patna)
3. HTC (Patna)
1. Malsalami
1. Mangal Talab
2. Meena Bazar (2)
1. PMCH
20
40
90
20
1. Katra
2. Dina Iron
3. Karmali Chak
4.
5.
6.
7.
8.
1. PESU (East)
S.K. Memorial
Kankar Bag (2)
Saidpur
Bahadurpur
R. Nagar
1. A.N.College
2. S.K.Puri
3. Garikhana I & II
4. Walmi
5. Danapur
6. Digha
7. R.B.I.
8. Danapur (2)
9. IGIMS
2. PESU (West)
10.Vaterinery College
11.Jakkanpur
12.Maurya Lok
13.Karnawad Punpun
14.Sinchai Bhawan
15.Anishabad
16.Gardanibag
17.Vidyut Bhawan
18.Sahitya Sammelan
1. A.N.College
1. S.K.Puri
1. Garikhana
2. Pataliputra
3. Rajapur
1. Walmi
1. Danapur
1. Digha
2. Digha Central Stores
1. RBI
2. HTC (Group)
1. Danapur (2)
1. IGIMS
2. Excise
1. Vaterinery College
2. Board`s Colony
1. Jakkanpur
1. Maurya Lok
2. Bandar Bagicha
1. Karnawad Punpun
10
10
30
30
20
10
10
10
10
10
81.40
162.79
366.28
81.40
2930.26
40.70
40.70
122.09
122.09
81.40
40.70
40.70
40.70
40.70
40.70
90
20
10
10
20
20
30
20
10
366.28
81.40
40.70
40.70
81.40
81.40
122.09
81.40
40.70
1. Sinchai Bhawan
1. Anishabad
1. Gardanibag
1. Vidyut Bhawan
2. High Court
1. Sahitya Sammelan
10
20
20
20
20
20
40.70
81.40
81.40
81.40
81.40
81.40
APPENDIX B-6
33 kV feeder
19.Bandar Bagicha (2)
20.Beur
2. PESU (West)
21.Vikas Bhawan
1. A.F. Bihta
2. Pareo
3. Bihta I & II
4.
5.
6.
7.
GISCO
Balmukund
Maner
Neora
8. Fatuah (2)
9. Khusrupur
Length
(km)
60
20
20
Cost
(Rs.Lakh)
244.19
81.40
81.40
10
10
10
20
40
40.70
40.70
40.70
2523.28
81.40
162.79
120
488.38
2. Kanpa
3. Lalbhasara
20
20
81.40
81.40
4. Paliganj
20
81.40
HTC
HTC group
1. Maner
1. Neora
2. Naubatpur
1. Fatuah (2)
1. Khusrupur
40
40
40
120
20
162.79
162.79
162.79
488.38
81.40
2. Daniyaman
20
81.40
1. Fatuah
1. HTC
2. HTC
1. Masaurhi Old
40
162.79
20
20
81.40
81.40
120
20
488.38
81.40
40
120
162.79
488.38
3662.82
3. Patna
10.Fatuah
11.Dina Iron
12.Masaurhi Old
13.Masarhi New
14.NTPC I & II
15.Barh
16.Barh (2)
17.Biharibigha
18.Hathidah
19.Hathidah (2)
2. Dhanaura
1. Masaurhi New
HTC
1. Barh
2. Bakhtiyarpur
1. Barh (2)
1. Biharibigha
1. Hathidah
2. Mokama
1. Hathidah (2)
APPENDIX B-6
33 kV feeder
1. Hilsa
Cost
(Rs.Lakh)
20
20
40
120
20
81.40
81.40
162.79
488.38
81.40
120
488.38
120
20
488.38
81.40
120
488.38
120
120
488.38
488.38
120
120
120
488.38
488.38
488.38
120
120
20
488.38
488.38
81.40
12.Parwalpur
13.Ramchandrapur (2)
14.Ramchandrapur
1. Ramchandrapur (2)
1. Ramchandrapur
60
10
244.19
40.70
15.Bari Pahari
16.Asthawan
1. Bari Parhari
1. Asthawan
2. Malti
1. Sohasarai
20
81.40
120
10
488.38
40.70
40
20
20
20
20
20
20
6837.27
162.79
81.40
81.40
81.40
81.40
81.40
81.40
20
20
50
20
20
20
20
81.40
81.40
203.49
81.40
81.40
81.40
81.40
40
20
30
20
162.79
81.40
122.09
81.40
1790.71
3. Ekangersarai
4. Chiksurabazar
5. Dhamauli
6. Noorsarai
7. Harnaut
8. Silao
9. Andawas
10.Rajgir
11.Giriak
17.Sohasarai
1. Fulwaria
2. Gopalganj
3. Srinagar
4. Siwan
5. Maharajganj
5. Chapra
Length
(km)
1. Hilsa
2. Hilsa (2)
1. Islampur
2. Khudaganj
1. Ekangersarai
1. Chiksurabazar
1. Dhamauli
2. Rahui
1. Noorsarai
2. Kalyanbigha
3. Chandi
4. Chainpur
5. Thertheri
1. Harnaut
2. Cheral (Railways)
1. Silao
2. Bhindidih
1. Andawas
1. Rajgir
2. Ghosarwan
1. Tetrawan
2. Sarbahadi
3. Giriak
4. Badi
5. Katrisarai
1. Parwalpur
2. Islampur
4. Nalanda
6. Siwan (2)
7. Mashrakh
8. Taraiya
9. Baikunthpur
10.Prabhunath Nagar
11.Telpa
12.Sheetalpur
1. Fulwaria
2. Hathua
1. Gopalganj
2. Jhajhwa
3. Kuchaikot
1. Srinagar
2. Mairwa
1. Siwan
1. Maharajganj
2. Ekma
1. Siwan (2)
1. Mashrakh
2. Baniapur
1. Taraiya
2. Marworah
1. Baikunthpur
2. Barouli
1. Prabhunath Nagar
2. Manjhi
1. Telpa
1. Sheetalpur
APPENDIX B-6
33 kV feeder
1. Valmiki Nagar
2. Dhanha
3. Ramnagar
4.
5.
6.
7.
6. Motihari
Chautarwa
Lauria
Narkatiaganj
Raxaul
8. Adopur
9. Dhaka
10.Bettiah
11.Bettiah (2)
12.Madhopur
13.Areraj
14.Motihari (2)
15.Motihari
16.Chakia
17.Chhitwani
1. Chausa
2. Buxar
3.
4.
5.
6.
Pandy Patti
Dumraon
Dumraon (2)
Nawanagar
7. Bramhpur
7. Bhojpur
8. Simri
9. Garhani
10.Jagdishpur
11.Japani Farm
12.Powerganj
13.Zero Mile
1. Karpi
8. Gaya
2. Arwal
3. Goh
4. Daudnagar
5. Kako
Length
(km)
20
120
40
Cost
(Rs.Lakh)
81.40
488.38
162.79
120
20
40
20
488.38
81.40
162.79
81.40
20
40
81.40
162.79
60
20
20
40
30
10
20
20
120
40
20
20
20
10
30
244.19
81.40
81.40
162.79
122.09
40.70
81.40
81.40
488.38
3174.45
162.79
81.40
81.40
81.40
40.70
122.09
100
20
20
20
20
20
406.98
81.40
81.40
81.40
81.40
81.40
120
20
20
488.38
81.40
81.40
50
203.49
2. Serai
1. Powerganj
2. Power House
3. Barhara
1. Zero Mile
10
30
120
30
40.70
122.09
488.38
122.09
3011.65
1. Karpi
2. Ataullah
3. Kurtha
1. Arwal
1. Goh
1. Daudnagar
2. Haspura
1. Kako
20
81.40
1. Valmiki Nagar
1. Dhanha
1. Ramnagar
2. Bagha
1. Chautarwa
1. Lauria
1. Narkatiaganj
1. Raxaul
1. Adopur
1. Dhaka
1. Bettiah
1. Bettiah (2)
1. Madhopur
2. Harsidhi
1. Areraj
1. Motihari (2)
1. Motihari
1. Chakia
2. Madhuban
1. Chhitwani
1. Chausa
2. Itarhi
3. Purushottampur
1. Buxar
2. Industrial
1. Pandey Patti
1. Dumraon
1. Dumraon (2)
1. Nawanagar
2. Murar
3. Akarsai
1. Krishnapuram
2. Bramhapur
3. Sahpur
4. Bihian
1. Simri
2. Chhotka Dhakai
1. Garhani
2. Piro
3. Agiaon
4. Sandes
1. Jagdishpur
1. Japani Farm
APPENDIX B-6
33 kV feeder
6. Tehta
7. Ghosi
8. Irki
9. Rafiganj I & II
10.Uchauli
11.Guraru
12.Tekari
13.Belaganj
14.Chakand
15.Dhongra
16.Sonwa
17.Hulasganj
18.Nawagarh
19.Aurangabad
20.Obra
21.Deo
8. Gaya
22.Barun
23.Barem
24.Tengra
25.Sone Hydel
26.Nabinagar
27.Barun (2)
28.Dihara
29.Wazirganj
30.Atari
31.Gurua
32.Amas
33.Banke
34.Shergahti
35.Imamganj
36.Chandauti
37.Medical
38.Central Stores
39.A.P.Colony
40.Gandhi Maidan
Length
(km)
20
20
20
20
20
30
20
Cost
(Rs.Lakh)
81.40
81.40
81.40
81.40
81.40
122.09
81.40
120
20
20
20
20
20
20
20
40
40
488.38
81.40
81.40
81.40
81.40
81.40
81.40
81.40
162.79
162.79
40
120
120
162.79
488.38
488.38
120
488.38
10
40.70
40
162.79
20
20
30
120
81.40
81.40
122.09
488.38
20
81.40
20
40
81.40
162.79
1. Medical
2. Cherki
1. Central Stores
20
81.40
1. A.P.Coloy
2. Railway Maidan
1. Gandhi Maidan
10
20
30
40.70
81.40
122.09
2. Charui
1. Tehta
2. Makpa
3. Makhdampur
1. Ghosi
2. Jehanabad
1. Irki
2. Sakurabad
3. Nowaman
1. Rafiganj
1. Uchauli
2. Madanpur
1. Guraru
2. Paraiya
1.Tekari
2. Koach
1. Belaganj
2. Panari
3. Paibigha
1. Chakand
1. Dhongra
1. Sonwa
1. Hulasganj
1. Nawagarh
1. Aurangabad
1. Obra
2. Phesar
3. Sokhea
1. Deo
2. Gangti
1. Barun
1. Barem
1. Tengra
HTC
1. Nabinagar
2. Amba
1. Barun (2)
1. Dihara
1. Wazirganj
2. Fatehpur
3. Paimer
1. Atari
2. Khizr Sarai
1. Gurua
1. Amas
1. Banke
1. Sherghati
2. Dobhi
1. Imamganj
2. Dumaria
1. Chandauti
APPENDIX B-6
33 kV feeder
Length
(km)
30
40
Cost
(Rs.Lakh)
122.09
162.79
20
81.40
20
81.40
20
81.40
20
80
80
30
10
20
20
20
20
20
20
20
20
81.40
325.58
325.58
122.09
40.70
81.40
81.40
81.40
81.40
81.40
81.40
81.40
81.40
0.00
7407.04
60
244.19
120
488.38
120
90
488.38
366.28
120
120
120
488.38
488.38
488.38
20
81.40
10
40.70
120
488.38
11.Bihariganj
12.Udakishanganj
13.Puraini
14.Alamnagar
1. Sour Bazar
1. Balwahat
2. Salakhua
1. Simri Bakhtiyarpur
1. New Market
1. Old Saharsa
1. Madhepura
2. Muraliganj
3. Kumarkhand
1. Singheswar
2. Ghailar
1. Khagaria
2. Mansi
3. Maheshkunt
1. Bihariganj
1. Udakishanganj
1. Puraini
1. Alamnagar
120
20
20
40
120
488.38
81.40
81.40
162.79
488.38
120
488.38
1.
2.
3.
4.
5.
1. Bihpur
1. Sanhauli
1. Naugachhia
1. Patwara
1. Sultanganj
20
120
5453.53
81.40
488.38
20
81.40
41.Dandibag
42.Shobh
43.Manpur
44.Industrial Area
45.M.U. Campus
8. Gaya
46.Hasua
47.Nawada
48.Akbarpur
49.Roh
1. Shobh
2. Charkbria
1. Manpur
2. Tankuppa
3. Gere
4. Bhore
1. Industrial Area
1. M.U.Campus
2. Buddhist Complex
1. Hasua
2. Nadirganj
1. Nawada
2. Nawada New
3. Bhadhokhara
1. Akbarpur
2. Rajauli
3. Sirdala
1. Roh
2. Warsaliganj
3. Pakribarwan
4. Kaukol
1. Supaul
2. Saharsa (2)
2. Parasrama
3. Kishanpur
4. Pipra
5. Raghopur
6. Larganj
1. Sahrsa (2)
5.
6.
7.
8.
Simri Bakhtiyarpur
New Market
Old Saharsa
Madhepura
9. Singheswar
10.Khagaria
10.Bhagalpur
2. Panchaiti Akhara
1. Dandibag
1. Supaul
3. Sour Bazar
4. Balwahat
9. Saharsa
Bihpur
Sanhauli
Naugachhia
Patwara
Sultanganj
APPENDIX B-6
33 kV feeder
Length
(km)
Cost
(Rs.Lakh)
40
20
20
20
20
20
162.79
81.40
81.40
81.40
81.40
81.40
20
20
20
20
20
30
81.40
81.40
81.40
81.40
81.40
122.09
0.00
20
40
20
120
20
81.40
162.79
81.40
488.38
81.40
40
20
20
20
2645.37
162.79
81.40
81.40
81.40
20
20
81.40
81.40
5. ITC
6. Karnachaura
1. Tarapur
2. Kharagpur
1. Dakranala
1. Ramchandrapur
2. Railways (HTC)
1. Safiabad
2. Baniyarpur
1. ITC (HTC)
1. Karnchaura
60
244.19
7. Nandlalpur
8. Bindwara
9. Balaji
10.Purani Bazar
1. Nandlalpur
1. Bindwara
1. Balaji
1. Purani Bazar
20
40
81.40
162.79
30
122.09
2. Court Area
1. Kajra
2. Piri Bazar
1. Salempur
2. Manpur
3. Haibatganj
1. Jamui
20
120
120
81.40
488.38
488.38
120
488.38
20
81.40
2. Khaira
3. Sikandara
1. Gidhour
2. Jhajha
3. Sono
1. Ghuskuri
1. Ariari
2. Bhalua
3. Lohain
4. Katari
5. Barkna
1. Onama
2. Mirzapur
20
20
20
10
20
120
81.40
81.40
81.40
40.70
81.40
488.38
120
488.38
6. Shahkund
7. Barari
8. CS Compound
9. Sabour
10.Gouradih
11.Aliganj I
10.Bhagalpur
12.Aliganj II
13.Banka (2)
14.Banka
15.Sanhoula
16.Ghogha
17.Kahalgaon
1. Tarapur
2. Dakranala
3. Ramchandrapur
4. Safiabad
11.Kajra
11. Munger
12.Haibatganj
13.Jamui
14.Gidhour
15.Ghuskuri
16.Ariari
17.Onama
1. Shahkund
1. Barari
2. Central Jail
3. Mayaganj
1. C S Compound
2. T T School
1. Sabour
1. Gouradih
1. Aliganj
2. Mojahidpur
1. Aliganj
2. Jagdishpur
3. Nath Nagar
1. Banka (2)
1. Banka
2. Amarpur
3. Rajouna
4. Bousi
1. Sanhoula
1. Ghogha
1. Kahalgaon
2. Pirpainti
APPENDIX B-6
11. Munger
33 kV feeder
Cost
(Rs.Lakh)
488.38
30
122.09
3. Toygarh
1. Hathiyama
1. Sheikhpura
1. Pusa
2. Mohanpur
1. Pusa
1. Mohanpur
20
20
4761.67
81.40
81.40
20
20
81.40
81.40
3. Jute Mill
4. Sarairanjan
5. Jitwarpur
2. Warisnagar
3. Kalyanpur
HTC
1. Sarairanjan
1. Jitwarpur
20
10
81.40
40.70
60
244.19
120
120
10
10
10
10
20
20
20
488.38
488.38
40.70
40.70
40.70
40.70
81.40
81.40
81.40
60
244.19
120
60
10
40
488.38
244.19
40.70
162.79
20
20
81.40
3337.24
81.40
120
488.38
120
488.38
120
488.38
20
20
20
81.40
81.40
81.40
30
122.09
20
10
10
81.40
40.70
40.70
8. Dalsingsarai
9. Pateri
10.Bachchwara
11.Bibhutipur
12.Deona
13.Bangrahdih (2)
14.IOC
15.Railways
16.Deona (2)
17.Kankaul
18.Begusarai
1. Narpatganj
2. Raniganj
3. Forbesganj
4. Bahadurganj
13. Purnea
Length
(km)
120
18.Hathiyama
19.Sheikhpura
6. Rly.Samastipur
7. Sirsia
12.Samastipur
5.
6.
7.
8.
Sarai
Paschimpali
Purabpali
Thakurganj
9. Group Control
10.Banmankhi
11.Zero Mile
2. Magardahi
HTC
1. Sirsia
2. Kuboliram
3. Karpoorigram
1. Dalsingsarai
2. Mehuddinnagar
1. Pateri
1. Bachchwara
1. Bibhutipur
2. Rosera
3. Hassanpur
1. Deona
2. Bangrahdih
3. Jai Mangla (HTC)
4. Jai Mata Di (HTC)
1. Bangrahdih (2)
HTC
HTC
1. Deona (2)
1. Kankaul
1. Begusarai
2. Manjhaul
3. Ganga Dairy (HTC)
4. Balia
1. Narpatganj
1. Raniganj
2. Bahargaon
1. Forbesganj
2. Araria
3. Kusgaon
4. Jokihat
5. Malgaon
1. Bahadurganj
2. Dighal Bank
1. Sarai
1. Paschimpali
1. Purabpali
1. Chhatargarh
2. Thakurganj
1. Group control
1. Banmankhi
2. Madhubani
1. Zero Mile
2. City
APPENDIX B-6
33 kV feeder
12.Belgachhi
13.Naranga
14.Jalalgarh
15.Beri
13. Purnea
16.Industrial Estate
17.Binodpur
18.Kursaila
1. Karmnasa
2. Larma
3. Kalyanpur
4.
5.
6.
7.
8.
9.
Ramgarh (2)
Kakrait
Parsathua
Chainpur
Mohania (2)
Mohania
10.Dinara
14. Sasaram
11.Sanjhouli
12.Surajpura
13.Bikramganj
14.Bikramganj (2)
15.Pusauli
16.Kudra
17.Karamchat
18.Beda Sasaram
19.Sasaram (2)
20.Sasaram (3)
21.Naigaon
22.BMP Dehri (2)
23.BMP Dehri I & II
24.JVLO&FL Pahleja
Length
(km)
Cost
(Rs.Lakh)
120
20
20
488.38
81.40
81.40
40
20
20
20
162.79
81.40
81.40
81.40
10
20
40.70
81.40
20
20
20
20
3255.84
81.40
81.40
81.40
81.40
60
244.19
20
20
81.40
81.40
20
20
20
60
81.40
81.40
81.40
244.19
10
20
20
20
40.70
81.40
81.40
81.40
20
20
81.40
81.40
20
60
20
20
40
10
20
81.40
244.19
81.40
81.40
162.79
40.70
81.40
20
20
60
60
40
40
90
81.40
81.40
244.19
244.19
162.79
162.79
366.28
20
81.40
APPENDIX B-6
14. Sasaram
33 kV feeder
25.Nasariganj
26.Rajpur
27.Nauhatta
28.Samhauta
29.Samhauta (2)
30.Kirpabal (2)
31.Indrapuri
32.Indrapuri (2)
1.
2.
3.
4.
5.
6.
7.
8.
9.
Shivhar
Runi Saidpur
Pupri
Dumra (2)
Dumra
Sursand
Sonbarsa
Nepal
Patepur
10.Prataptand
11.Lalganj
12.Sarai
13.Railway (HTC)
14.Bidupur
15.EDIP
16.Hajipur I E
17.Konharaghat
18.Konharaghat (2)
19.Manhar
15. Muzaffarpur
20.SKMCH (2)
21.MIT
22.Sikandarpur (2)
23.SKMCH
24.Kurhani
25.Motipur
26.Motipur (2)
27.Maripur
28.Vaishali
29.Dholi
30.IDPL (2)
31.IDPL
32.Khabra
33.Bhikanpura
34.Bhagwanpur Chowk
35.Railway (HTC)
36.Nayatola (2)
37.Nayatola
38.Hajipur I E (2)
1. Basopatti
2. Jay Nagar
Length
(km)
40
40
20
40
10
50
120
Cost
(Rs.Lakh)
162.79
162.79
81.40
162.79
40.70
203.49
488.38
120
20
40
20
60
488.38
5657.02
81.40
162.79
81.40
244.19
40
40
162.79
162.79
40
40
162.79
162.79
40
10
162.79
40.70
20
120
81.40
488.38
60
20
120
244.19
81.40
488.38
20
81.40
120
40
10
20
60
10
40
488.38
162.79
40.70
81.40
244.19
40.70
162.79
60
244.19
120
488.38
60
244.19
5087.25
20
20
20
20
81.40
81.40
81.40
81.40
20
20
20
81.40
81.40
81.40
APPENDIX B-6
33 kV feeder
6. Gangwara
7. Donar
8. Panda Sarai
9. Pouriya
10.Anar
11.Kusheshwar
12.Biraul
16. Darbhanga 13.Raj Nagar
14.Raiyam
15.Pandaul
16.Manigachi
17.Jhanjharpur
18.Khatauna
19.Rudrapur
20.Phulparas
Length
(km)
20
20
20
Cost
(Rs.Lakh)
81.40
81.40
81.40
10
10
20
20
20
120
20
20
20
20
40.70
40.70
81.40
81.40
81.40
488.38
81.40
81.40
81.40
81.40
20
20
20
20
81.40
81.40
81.40
81.40
120
20
20
20
488.38
81.40
81.40
81.40
3011.65
APPENDIX B-7
1. PESU (East)
Feeder name
1. Katra
2. Dina Iron
Fatuah
Fatuah
3. Karmali Chak
Fatuah
4.
5.
6.
7.
8.
Jakkanpur
Mithapur (2)
Mithapur (2)
Mithapur (2)
Mithapur (2)
S.K. Memorial
Kankar Bag (2)
Saidpur
Bahadurpur
R. Nagar
9. Kankar Bag
10.Ashok Nagar
11.R.K.Nagar
12.Karbigahiya
13.Gaighat
14.NMCH
15.Meena Bazar
16.Katra (2)
17.Pahari
Mithapur
Mithapur
Mithapur
Mithapur
Gaighat
Gaighat
Gaighat
Katra
Katra
18.Malsalami
19.Mangal Talab
20.Meena Bazar (2)
21.PMCH
Katra
Katra
Jakkanpur (2)
Mithapur (2)
1. A.N.College
2. S.K.Puri
3. Garikhana I & II
Khagaul (2)
Khagaul (2)
Khagaul
4. Walmi
5. Bhusaula-Vikas B.
Khagaul
Khagaul
6. Danapur
7. Digha
Digha
Digha
8. R.B.I.
Digha
33/11 kV S/Ss on
feeder
11 kV Shunt
Compensatio
n (MVAr)
No. of
Banks
Cost
(Rs. Lakh)
1. Katra
1. HTC
2. HTC
1. Karmali Chak
2. Deedarganj
1. S.K.Memorial
1. Kankar Bag (2)
1. Saidpur
1. Bahadurpur
1. R.Nagar
2. Machhuatoli
1. Kankar Bag
1. Ashok Nagar
1. R.K.Nagar
1. Karbigahiya
1. Gaighat
1. NMCH
1. Meena Bazar
1. Katra (2)
1. Pahari
2. Sampatchak (Patna)
3. HTC (Patna)
1. Malsalami
1. Mangal Talab
1. Meena Bazar (2)
1. PMCH
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1. A.N.College
1. S.K.Puri
1. Garikhana
2. Pataliputra
3. Rajapur
1. Walmi
1. Bhusaula
2. Vikas Bhawan
1. Danapur
1. Digha
2. Digha Central Stores
1. RBI
2. HTC (Group)
1. Danapur (2)
1. IGIMS
2. Excise
1. Veterinary College
2. Board`s Colony
1. Jakkanpur
1. Maurya Lok
2. Bandar Bagicha
1. Karnawad Punpun
1. Sinchai Bhawan
1. Anishabad
2. Gardanibag
1. Vidyut Bhawan
2. High Court
1. Sahitya Sammelan
1. Bandar Bagicha (2)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
9. Danapur (2)
2. PESU (West) 10. IGIMS
Digha
Sipara
11.Veterinary College
Sipara
12.Jakkanpur
13.Maurya Lok
Jakkanpur
Jakkanpur
14.Karnawad Punpun
15.Sinchai Bhawan
16.Anishabad
Jakkanpur
Jakkanpur
Jakkanpur
17.Vidyut Bhawan
Jakkanpur
18.Sahitya Sammelan
19.Bandar Bagicha (2)
Jakkanpur (2)
Jakkanpur (2)
APPENDIX B-7
Feeder name
33/11 kV S/Ss on
feeder
20.Beur
Jakkanpur (2)
1. Beur
2. Khagaul
3. HTC
4. HTC
5. Phulwari
1. A.F. Bihta
2. Pareo
Bihta
Bihta
3. Bihta I & II
Bihta
1. A.F.Bihta
1. Pareo
2. Koilwar (Ara Circle)
3. Giddha (Ara Circle)
1. Bihta
2. Kanpa
3. Lalbhasara
4. Paliganj
HTC
HTC group
1. Maner
1. Neora
2. Naubatpur
1. Fatuah (2)
1. Khusrupur
2. Daniyaman
1. Fatuah
1. HTC
2. HTC
1. Masaurhi Old
2. Dhanaura
1. Masaurhi New
HTC
1. Barh
2. Bakhtiyarpur
1. Barh (2)
1. Biharibigha
1. Hathidah
2. Mokama
1. Hathidah (2)
2. PESU (West)
11 kV Shunt
Compensatio
n (MVAr)
No. of
Banks
Cost
(Rs. Lakh)
0
0
0
0
0
4.
5.
6.
7.
GISCO
Balmukund
Maner
Neora
Khagaul (2)
Khagaul (2)
Khagaul (2)
Khagaul
8. Fatuah (2)
9. Khusrupur
Fatuah (2)
Fatuah (2)
10.Fatuah
11.Dina Iron
Fatuah
Fatuah
12.Masaurhi Old
Masaurhi
13.Masarhi New
14.NTPC I & II
15.Barh
Masaurhi
Barh
Barh
16.Barh (2)
17.Biharibigha
18.Hathidah
Barh
Barh
Hathidah
19.Hathidah (2)
Hathidah
1. Hilsa
Ekangersarai
2. Islampur
Ekangersarai
3. Ekangersarai
4. Chiksurabazar
5. Dhamauli
Ekangersarai
Masaurhi
Harnaut
6. Noorsarai
Harnaut
7. Harnaut
Harnaut
8. Silao
Rajgir
9. Andawas
10.Rajgir
Rajgir
Rajgir
3. Patna
1.2
1.2
1.2
2
2
2
24.15
24.15
24.15
1.2
24.15
1.2
24.15
1.2
24.15
1.2
24.15
1.2
24.15
1.2
24.15
1.2
24.15
169.05
4. Nalanda
1. Hilsa
2. Hilsa (2)
1. Islampur
2. Khudaganj
1. Ekangersarai
1. Chiksurabazar
1. Dhamauli
2. Rahui
1. Noorsarai
2. Kalyanbigha
3. Chandi
4. Chainpur
5. Thertheri
1. Harnaut
2. Cheral (Railways)
1. Silao
2. Bhindidih
1. Andawas
1. Rajgir
APPENDIX B-7
Feeder name
11.Giriak
Rajgir
12.Nalanda
13.Raiter
Nalanda
Nalanda
14.Parwalpur
15.Ramchandrapur (2)
16.Ramchandrapur
17.Bari Pahari
18.Asthawan
Bari Pahari
Bari Pahari
Bari Pahari
Bari Pahari
Bari Pahari
19.Sohasarai
Bari Pahari
1. Fulwaria
Gopalganj
2. Gopalganj
Gopalganj
3. Srinagar
Siwan
4. Siwan
5. Maharajganj
Siwan
Siwan
6. Siwan (2)
7. Mashrakh
Siwan
Mashrakh
8. Taraiya
Mashrakh
9. Baikunthpur
Mashrakh
10.Prabhunath Nagar
Chapra
11.Telpa
12.Sheetalpur
13.Sonepur
Chapra
Sheetalpur
Hajipur
1. Valmiki Nagar
2. Dhanha
3. Ramnagar
Nepal
Dhanha
Ramnagar
4. Chautarwa
5. Lauria
6. Narkatiaganj
7. Raxaul
8. Adopur
9. Dhaka
10.Bettiah
11.Bettiah (2)
12.Madhopur
Ramnagar
Ramnagar
Ramnagar
Raxaul
Raxaul
Dhaka
Bettiah
Bettiah
Motihari
13.Areraj
Motihari
4. Nalanda
33/11 kV S/Ss on
feeder
2. Ghosarwan
1. Tetrawan
2. Sarbahadi
3. Giriak
4. Badi
5. Katrisarai
1. Nalanda
1. Bihar Sharif
2. Raiter
1. Parwalpur
1. Ramchandrapur (2)
1. Ramchandrapur
1. Bari Parhari
1. Asthawan
2. Malti
1. Sohasarai
11 kV Shunt
Compensatio
n (MVAr)
No. of
Banks
Cost
(Rs. Lakh)
1.2
24.15
1.2
1.2
2
2
24.15
24.15
1.2
1.2
2
2
24.15
24.15
1.2
24.15
1.2
24.15
1.2
24.15
1.2
24.15
1.2
24.15
1.2
24.15
1.2
24.15
1.2
24.15
1.2
24.15
96.60
5. Chapra
1. Fulwaria
2. Hathua
3. Hussepur
1. Gopalganj
2. Jhajhwa
3. Kuchaikot
1. Srinagar
2. Mairwa
1. Siwan
1. Maharajganj
2. Ekma
1. Siwan (2)
1. Mashrakh
2. Baniapur
1. Taraiya
2. Marworah
1. Baikunthpur
2. Barouli
1. Prabhunath Nagar
2. Manjhi
1. Telpa
1. Sheetalpur
1. Sonepur
217.35
6. Motihari
1. Valmiki Nagar
1. Dhanha
1. Ramnagar
2. Bagha
1. Chautarwa
1. Lauria
1. Narkatiaganj
1. Raxaul
1. Adopur
1. Dhaka
1. Bettiah
1. Bettiah (2)
1. Madhopur
2. Harsidhi
1. Areraj
APPENDIX B-7
6. Motihari
Feeder name
14.Motihari (2)
15.Motihari
16.Chakia
Motihari
Motihari
Motihari
17.Chhitwani
Motihari
1. Chausa
Buxar
2. Buxar
Buxar
3.
4.
5.
6.
Buxar
Dumraon
Dumraon
Dumraon
33/11 kV S/Ss on
feeder
1. Motihari (2)
1. Motihari
1. Chakia
2. Madhuban
1. Chhitwani
11 kV Shunt
Compensatio
n (MVAr)
No. of
Banks
Cost
(Rs. Lakh)
1.2
1.2
2
2
24.15
24.15
144.90
Pandy Patti
Dumraon
Dumraon (2)
Nawanagar
7. Bramhpur
Dumraon
7. Bhojpur
8. Simri
Dumraon
9. Garhani
Jagdishpur
10.Jagdishpur
11.Japani Farm
Jagdishpur
Ara
12.Powerganj
Ara
13.Zero Mile
Ara
1. Karpi
Karpi
1. Chausa
2. Itarhi
3. Purushottampur
1. Buxar
2. Industrial
1. Pandey Patti
1. Dumraon
1. Dumraon (2)
1. Nawanagar
2. Murar
3. Akarsai
1. Krishnapuram
2. Bramhapur
3. Sahpur
4. Bihian
1. Simri
2. Chhotka Dhakai Chak
1. Garhani
2. Piro
3. Agiaon
4. Sandes
1. Jagdishpur
1. Japani Farm
2. Serai
1. Powerganj
2. Power House
3. Barhara
1. Zero Mile
1.2
24.15
1.2
1.2
2
2
24.15
24.15
1.2
24.15
1.2
24.15
1.2
1.2
1.2
2
2
2
24.15
24.15
24.15
1.2
24.15
217.35
2. Arwal
3. Goh
4. Daudnagar
Karpi
Goh
Goh
5. Kako
Irki
6. Tehta
Irki
7. Ghosi
Irki
8. Irki
Irki
9. Rafiganj I & II
10.Uchauli
Rafiganj
Rafiganj
11.Guraru
Rafiganj
8. Gaya
1. Karpi
2. Ataullah
3. Kurtha
1. Arwal
1. Goh
1. Daudnagar
2. Haspura
1. Kako
2. Charui
1. Tehta
2. Makpa
3. Makhdampur
1. Ghosi
2. Jehanabad
1. Irki
2. Sakurabad
3. Nowaman
1. Rafiganj
1. Uchauli
2. Madanpur
1. Guraru
1.2
24.15
1.2
1.2
1.2
2
2
2
24.15
24.15
24.15
1.2
24.15
1.2
24.15
APPENDIX B-7
8. Gaya
Feeder name
12.Tekari
Tekari
13.Belaganj
Belaganj
14.Chakand
15.Dhongra
16.Sonwa
17.Hulasganj
18.Nawagarh
19.Aurangabad
20.Obra
Belaganj
Hulasganj
Hulasganj
Hulasganj
Hulasganj
Aurangabad
Aurangabad
21.Deo
Aurangabad
22.Sone Nagar
23.Barem
24.Tengra
25.Sone Hydel
26.Nabinagar
Barun
Barun
Barun
Barun
Barun
27.Barun (2)
28.Dihara
29.Wazirganj
Barun
Barun
Wazirganj
30.Atari
Wazirganj
31.Gurua
32.Amas
33.Banke
34.Shergahti
Sherghati
Sherghati
Sherghati
Sherghati
35.Imamganj
Sherghati
36.Chandauti
37.Medical
Chandauti
Chandauti
38.Central Stores
39.A.P.Colony
Chandauti
Chandauti
40.Gandhi Maidan
Chandauti
41.Dandibag
42.Shobh
Chandauti
Bodh Gaya
43.Manpur
Bodh Gaya
44.Industrial Area
45.M.U. Campus
Bodh Gaya
Bodh Gaya
46.Hasua
Nawada
33/11 kV S/Ss on
feeder
2. Paraiya
1.Tekari
2. Koach
1. Belaganj
2. Panari
3. Paibigha
1. Chakand
1. Dhongra
1. Sonwa
1. Hulasganj
1. Nawagarh
1. Aurangabad
1. Obra
2. Phesar
3. Sokhea
1. Deo
2. Gangti
1. Barun
1. Barem
1. Tengra
HTC
1. Nabinagar
2. Amba
1. Barun (2)
1. Dihara
1. Wazirganj
2. Fatehpur
3. Paimer
1. Atari
2. Khizr Sarai
1. Gurua
1. Amas
1. Banke
1. Sherghati
2. Dobhi
1. Imamganj
2. Dumaria
1. Chandauti
1. Medical
2. Cherki
1. Central Stores
1. A.P.Coloy
2. Railway Maidan
1. Gandhi Maidan
2. Panchaiti Akhara
1. Dandibag
1. Shobh
2. Charkbria
1. Manpur
2. Tankuppa
3. Gere
4. Bhore
1. Industrial Area
1. M.U.Campus
2. Buddhist Complex
1. Hasua
11 kV Shunt
Compensatio
n (MVAr)
1.2
No. of
Banks
Cost
(Rs. Lakh)
24.15
1.2
1.2
1.2
2
2
2
24.15
24.15
24.15
1.2
24.15
1.2
1.2
2
2
24.15
24.15
1.2
1.2
2
2
24.15
24.15
1.2
24.15
APPENDIX B-7
Feeder name
47.Nawada
Nawada
48.Akbarpur
Nawada
49.Roh
Nawada
1. Supaul
Supaul
8. Gaya
33/11 kV S/Ss on
feeder
2. Nadirganj
1. Nawada
2. Nawada New
3. Bhadhokhara
1. Akbarpur
2. Rajauli
3. Sirdala
1. Roh
2. Warsaliganj
3. Pakribarwan
4. Kaukol
11 kV Shunt
Compensatio
n (MVAr)
No. of
Banks
Cost
(Rs. Lakh)
1.2
1.2
1.2
1.2
1.2
2
2
2
2
2
24.15
24.15
24.15
24.15
24.15
507.15
9. Saharsa
2. Saharsa (2)
Saharsa
3. Sour Bazar
4. Balwahat
Saharsa
Saharsa
5.
6.
7.
8.
Saharsa
Saharsa
Saharsa
Madhepura
Simri Bakhtiyarpur
New Market
Old Saharsa
Madhepura
9. Singheswar
Madhepura
10.Khagaria
Khagaria
11.Bihariganj
12.Udakishanganj
13.Puraini
14.Alamnagar
Udakishanganj
Udakishanganj
Udakishanganj
Udakishanganj
1. Bihpur
2. Sanhauli
3. Naugachhia
4. Patwara
5. Sultanganj
6. Shahkund
7. Barari
Naugachhia
Naugachhia
Naugachhia
Sultanganj
Sultanganj
Sultanganj
Sabour
8. CS Compound
Sabour
9. Sabour
10.Gouradih
11.Aliganj I
Sabour
Sabour
Sabour
12.Aliganj II
Sabour
1. Supaul
2. Parasrama
3. Kishanpur
4. Pipra
5. Raghopur
6. Larganj
1. Sahrsa (2)
1. Sour Bazar
1. Balwahat
2. Salakhua
1. Simri Bakhtiyarpur
1. New Market
1. Old Saharsa
1. Madhepura
2. Muraliganj
3. Kumarkhand
1. Singheswar
2. Ghailar
1. Khagaria
2. Mansi
3. Maheshkunt
1. Bihariganj
1. Udakishanganj
1. Puraini
1. Alamnagar
1.2
1.2
1.2
2
2
2
24.15
24.15
24.15
1.2
1.2
2
2
24.15
24.15
1.2
24.15
144.90
10. Bhagalpur
1. Bihpur
1. Sanhauli
1. Naugachhia
1. Patwara
1. Sultanganj
1. Shahkund
1. Barari
2. Central Jail
3. Mayaganj
1. C S Compound
2. T T School
1. Sabour
1. Gouradih
1. Aliganj
2. Mojahidpur
1. Aliganj
2. Jagdishpur
1.2
24.15
APPENDIX B-7
Feeder name
13.Banka (2)
14.Banka
Banka
Banka
15.Sanhoula
16.Ghogha
17.Kahalgaon
Kahalgaon
Kahalgaon
Kahalgaon
10. Bhagalpur
33/11 kV S/Ss on
feeder
3. Nath Nagar
1. Banka (2)
1. Banka
2. Amarpur
3. Rajouna
4. Bousi
1. Sanhoula
1. Ghogha
1. Kahalgaon
2. Pirpainti
11 kV Shunt
Compensatio
n (MVAr)
No. of
Banks
Cost
(Rs. Lakh)
1.2
24.15
1.2
24.15
72.45
1. Tarapur
Sultanganj
2. Dakranala
3. Ramchandrapur
Jamalpur
Jamalpur
4. Safiabad
Jamalpur
5. ITC
6. Karnachaura
7. Nandlalpur
8. Bindwara
9. Balaji
10.Purani Bazar
Jamalpur
Jamalpur
Jamalpur
Jamalpur
Lakhisarai
Lakhisarai
11.Kajra
Lakhisarai
12.Haibatganj
Lakhisarai
13.Jamui
Mallehpur
14.Gidhour
Mallehpur
11. Munger
15.Ghuskuri
16.Ariari
Sheikhpura
Sheikhpura
17.Onama
Sheikhpura
18.Hathiyama
19.Sheikhpura
Sheikhpura
Sheikhpura
1. Pusa
2. Mohanpur
Mohanpur
Mohanpur
1. Tarapur
2. Kharagpur
1. Dakranala
1. Ramchandrapur
2. Railways (HTC)
1. Safiabad
2. Baniyarpur
1. ITC (HTC)
1. Karnchaura
1. Nandlalpur
1. Bindwara
1. Balaji
1. Purani Bazar
2. Court Area
1. Kajra
2. Piri Bazar
1. Salempur
2. Manpur
3. Haibatganj
1. Jamui
2. Khaira
3. Sikandara
1. Gidhour
2. Jhajha
3. Sono
1. Ghuskuri
1. Ariari
2. Bhalua
3. Lohain
4. Katari
5. Barkna
1. Onama
2. Mirzapur
3. Toygarh
1. Hathiyama
1. Sheikhpura
1.2
1.2
2
2
24.15
24.15
1.2
1.2
1.2
1.2
1.2
1.2
2
2
2
2
2
2
24.15
24.15
24.15
24.15
24.15
24.15
1.2
1.2
1.2
1.2
1.2
1.2
2
2
2
2
2
2
24.15
24.15
24.15
24.15
24.15
24.15
1.2
1.2
1.2
1.2
2
2
2
2
24.15
24.15
24.15
24.15
1. Pusa
1. Mohanpur
2. Warisnagar
3. Kalyanpur
HTC
1. Sarairanjan
1. Jitwarpur
2. Magardahi
1.2
24.15
1.2
1.2
2
2
24.15
24.15
434.70
12. Samastipur
3. Jute Mill
4. Sarairanjan
5. Jitwarpur
Mohanpur
Mohanpur
Mohanpur
APPENDIX B-7
Feeder name
6. Rly.Samastipur
7. Sirsia
Mohanpur
Mohanpur
8. Dalsingsarai
Dalsingsarai
9. Pateri
10.Bachchwara
11.Bibhutipur
Dalsingsarai
Dalsingsarai
Dalsingsarai
12.Deona
BTPS
13.Bangrahdih (2)
14.IOC
15.Railways
16.Deona (2)
17.Kankaul
18.Begusarai
BTPS
BTPS
BTPS
Zero Mile
Zero Mile
Zero Mile
1. Narpatganj
2. Raniganj
Forbesganj
Forbesganj
3. Forbesganj
Forbesganj
12. Samastipur
33/11 kV S/Ss on
feeder
HTC
1. Sirsia
2. Kuboliram
3. Karpoorigram
1. Dalsingsarai
2. Mohadinnagar
1. Pateri
1. Bachchwara
1. Bibhutipur
2. Rosera
3. Hassanpur
1. Deona
2. Bangrahdih
3. Jai Mangla (HTC)
4. Jai Mata Di (HTC)
1. Bangrahdih (2)
HTC
HTC
1. Deona (2)
1. Kankaul
1. Begusarai
2. Manjhaul
3. Ganga Dairy (HTC)
4. Balia
11 kV Shunt
Compensatio
n (MVAr)
No. of
Banks
Cost
(Rs. Lakh)
1.2
1.2
2
2
24.15
24.15
1.2
24.15
1.2
1.2
2
2
24.15
24.15
193.20
13. Purnea
4. Bahadurganj
Kishanganj
5.
6.
7.
8.
Kishanganj
Kishanganj
Kishanganj
Kishanganj
Sarai
Paschimpali
Purabpali
Thakurganj
9. Group Control
10.Banmankhi
Purnea
Purnea
11.Zero Mile
Purnea
12.Belgachhi
Purnea
13.Naranga
Purnea
14.Jalalgarh
15.Beri
Purnea
Katihar
1. Narpatganj
1. Raniganj
2. Bahargaon
1. Forbesganj
2. Araria
3. Kusgaon
4. Jokihat
5. Malgaon
1. Bahadurganj
2. Dighal Bank
1. Sarai
1. Paschimpali
1. Purabpali
1. Chhatargarh
2. Thakurganj
1. Group control
1. Banmankhi
2. Madhubani
1. Zero Mile
2. City
1. Belgachhi
2. Dalkola
3. Vaisi
1. Naranga
2. Mirganj
3. Dargaha
1. Jalalgarh
1. Beri
2. Gore Beri
3. Falka
4. Sonaily
1.2
24.15
1.2
1.2
1.2
1.2
2
2
2
2
24.15
24.15
24.15
24.15
1.2
1.2
2
2
24.15
24.15
1.2
1.2
1.2
2
2
2
24.15
24.15
24.15
1.2
1.2
1.2
2
2
2
24.15
24.15
24.15
1.2
1.2
2
2
24.15
24.15
APPENDIX B-7
13. Purnea
Feeder name
33/11 kV S/Ss on
feeder
16.Barsoi
17.Pranpur
18.Industrial Estate
19.Binodpur
20.Kursaila
Katihar
Katihar
Katihar
Katihar
Naugachhia
1. Barsoi
1. Pranpur
1. Industrial Estate
1. Binodpur
1. Kursaila
1. Karmnasa
Karmnasa
2. Larma
Karmnasa
3. Kalyanpur
Karmnasa
1. Karmnasa
2. Durgawati
3. Chand
1. Larma
2. DVPL (HTC)
1. Kalyanpur
2. Ramgarh
3. Chourasia
4. Nuaon
1. Ramgarh (2)
1. Kakrait
1. Parsathua
1. Chainpur
1. Mohania (2)
1. Mohania
2. Bhabhua Old
3. Bahuara
1. Dinara
2. Kochas
3. Dawath
1. Sanjhouli
1. Surajpura
1. Bikramganj
2. Kararkat
1. Bikramganj (2)
1. Pusauli
1. Kudra
2. Bhabhua New
1. Karamchat
2. Cenari
3. Adhaura
1. Beda Sasaram
2. Takia Sasaram
3. Nokha
1. Sasaram (2)
1. Sasaram (3)
1. Naigaon
2. Sheonagar
1. BMP Dehri (2)
1. BMP Dehri
2. Basa Karwandia
3. PHED (HTC)
1. HTC
1. Akorigola
1. Nasariganj
1. Rajpur
1. Nauhatta
1. Samhauta
1. Samhauta (2)
1. Kirpabal (2)
11 kV Shunt
Compensatio
n (MVAr)
1.2
No. of
Banks
Cost
(Rs. Lakh)
24.15
386.40
4.
5.
6.
7.
8.
9.
Ramgarh (2)
Kakrait
Parsathua
Chainpur
Mohania (2)
Mohania
10.Dinara
14. Sasaram
Karmnasa
Karmnasa
Mohania
Mohania
Mohania
Mohania
Dinara
11.Sanjhouli
12.Surajpura
13.Bikramganj
Bikramganj
Bikramganj
Bikramganj
14.Bikramganj (2)
15.Pusauli
16.Kudra
Bikramganj
PGCIL Pusauli
Kudra
17.Karamchat
Kudra
18.Beda Sasaram
Sasaram
19.Sasaram (2)
20.Sasaram (3)
21.Naigaon
Sasaram
Sasaram
Sasaram
Dehri-On-Sone
Dehri-On-Sone
24.JVLO&FL Pahleja
25.Akorigola
26.Nasariganj
27.Rajpur
28.Nauhatta
29.Samhauta
30.Samhauta (2)
31.Kirpabal (2)
Dehri-On-Sone
Dehri-On-Sone
Dehri-On-Sone
Dehri-On-Sone
Banjari
Banjari
Banjari
Barun
1.2
24.15
1.2
1.2
1.2
1.2
2
2
2
2
24.15
24.15
24.15
24.15
1.2
24.15
1.2
24.15
1.2
24.15
1.2
1.2
2
2
24.15
24.15
1.2
24.15
1.2
24.15
1.2
24.15
1.2
24.15
1.2
24.15
1.2
24.15
APPENDIX B-7
14. Sasaram
Feeder name
32.Indrapuri
33.Indrapuri (2)
Barun
Barun
1.
2.
3.
4.
5.
6.
7.
8.
9.
Shivhar
Runi Saidpur
Sitamarhi
Sitamarhi
Sitamarhi
Sonbarsa
Sonbarsa
Sonbarsa
Vaishali
33/11 kV S/Ss on
feeder
2. Kirpabal
1. Indrapuri
1. Indrapuri (2)
11 kV Shunt
Compensatio
n (MVAr)
1.2
1.2
1.2
No. of
Banks
Cost
(Rs. Lakh)
2
2
2
24.15
24.15
24.15
458.85
15. Muzaffarpur
Shivhar
Runi Saidpur
Pupri
Dumra (2)
Dumra
Sursand
Sonbarsa
Nepal
Patepur
10.Prataptand
11.Lalganj
12.Sarai
13.Railway (HTC)
14.Bidupur
15.EDIP
16.Hajipur I E
17.Hajipur I E (2)
18.Konharaghat
19.Konharaghat (2)
20.Mehnar
21.SKMCH (2)
22.MIT
23.Sikandarpur (2)
24.SKMCH
Vaishali
Vaishali
Vaishali
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Mohanpur
SKMCH
SKMCH
SKMCH
SKMCH
25.Kurhani
26.Motipur
27.Motipur (2)
28.Maripur
29.Vaishali
30.Dholi
31.IDPL (2)
32.IDPL
33.Khabra
34.Bhikanpura
35.Bhagwanpur Chowk
36.Railway (HTC)
37.Nayatola (2)
38.Nayatola
SKMCH
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
1. Basopatti
2. Jay Nagar
Jay Nagar
Jay Nagar
3. Benipatti
Rahika
4. Rahika
Rahika
5. Bela
6. Gangwara
7. Donar
Gangwara
Gangwara
Gangwara
1. Shivhar
1. Runi Saidpur
1. Pupri
1. Dumra (2)
1. Dumra
1. Sursand
1. Sonbarsa
1. Nepal
1. Mehua
2. Patepur
1. Prataptand
1. Lalganj
1. Sarai
1. Bidupur
1. EDIP
1. Hajipur I E
1. Hajipur I E (2)
1. Konharaghat
1. Konharaghat
1. Mehnar
1. SKMCH (2)
1. MIT
1. Sikandarpur (2)
1. SKMCH
2. Sikandarpur
1. Kurhani
1. Motipur
1. Motipur (2)
1. Maripur
1. Vaishali
1. Dholi
1. IDPL (2)
1. IDPL
1. Khabra
1. Bhikanpura
1. Bhagwanpur chowk
1.2
24.15
1.2
24.15
1.2
1.2
2
2
24.15
24.15
1.2
24.15
1.2
1.2
2
2
24.15
24.15
1.2
24.15
1. Nayatola (2)
1. Nayatola
193.20
16. Darbhanga
1. Basopatti
1. Jay Nagar
2. Khajauli
3. Ladania
1. Benipatti
2. Ahilyasthan
1. Rahika
2. Madhubani
1. Bela
1. Gangwara
1. Donar
1.2
24.15
1.2
1.2
2
2
24.15
24.15
APPENDIX B-7
Feeder name
8. Panda Sarai
Ram Nagar
9. Pouriya
10.Anar
Ram Nagar
Kusheshwar
11.Kusheshwar
12.Biraul
Kusheshwar
Kusheshwar
13.Raj Nagar
Pandaul
14.Raiyam
15.Pandaul
16.Manigachi
17.Jhanjharpur
Pandaul
Pandaul
Pandaul
Pandaul
18.Khatauna
19.Rudrapur
20.Phulparas
Phulparas
Phulparas
Phulparas
16. Darbhanga
33/11 kV S/Ss on
feeder
1. Panda Sarai
2. Laheria Sarai (Jail)
3. DMCH
4. Urban
1. Pouriya
1. Baheri
2. Anar
1. Kusheshwar
1. Biraul
2. Benipur
1. Raj Nagar
2. Babu Barhi
1. Raiyam
1. Pandaul
1. Manigachi
1. Jhanjharpur
2. Madhepur
1. Khatauna
1. Rudrapur
1. Phulparas
2. Nirmali
3. Tulpatganj
11 kV Shunt
Compensatio
n (MVAr)
No. of
Banks
Cost
(Rs. Lakh)
1.2
24.15
1.2
24.15
1.2
1.2
2
2
24.15
24.15
169.05