Final Report

TRANSMISSION EXPANSION PLANNING

The objective of the Transmission Planning was to develop Transmission Expansion Plan
based on the load forecast and generation supply scenario developed as part of the Power
System Master Plan for the state of Bihar. The purpose of this report was to present a
comprehensive summary of the process, assumptions, methodology, transmission network
expansion plan and investment required to ensure the transmission system which would be
capable transmitting the planned generation to meet the forecast loads up to FY 2018. The
results of the load forecast, generation and transmission plan will be used to develop the
distribution plan
The proposed transmission system was evaluated for the load and generation conditions for
FY 2018 and FY 2014. The following system conditions were studied for FY 2018 and FY
2014.

Peak Load Scenario

Light Load Scenario

The system studies were carried out for the above scenarios and analyzed the transmission
system required in FY 2014 and FY 2018.
The planning studies do not include a detailed evaluation of the stability and protection
system requirement for transmission lines and substations.
The transmission investment plan was prepared based on the transmission network
expansion plan developed and was based on load flow studies.
4.1

Key Issues

It is important to review the key issues before undertaking the development of long - term
transmission generation plan. This helps the utility to formulate strategies and help to
develop policies for attaining the stated goals.
4.1.1

Transmission Planning Studies in BSEB

Central Electricity Authority (CEA) has been responsible for development of load forecast,
generation plan, transmission plan in the country and the states neither had the capacity nor
the opportunity to develop their own plans before reforms were initiated in the country.
However, BSEB had carried out Long-Term Transmission Plan up to FY 2021 with the help
of M/s Power Research and Development Consultants Private Limited (PRDCL). These
plans were developed during June 2009 and were based on the CEA 17th EPS Forecast.
The present system studies are carried out based on the load forecast and generation plan
as developed under the Power System Master Plan project funded by ADB. The
transmission plan took into account the transmission projects already in the pipe line and
committed projects of the BSEB Transmission Power System. .
4.1.2

Suppressed Demand

Presently, the state of Bihar is experiencing huge shortage of power in terms of energy and
capacity. The gap between supply and demand has been estimated at 16.4% of energy and
27.6% of capacity in year 2008-09.

Developing the PSMP for Bihar

4-1

020328-40RP-0400-00

Final Report

4.1.3

Committed / Planned Capacity Additions

The projects either under construction or about to commence construction are termed as
committed units. In order to bridge the gap between supply and demand, the BSEB, in
consultation with Government of Bihar, has signed a number of MoUs with many central and
private sector power developers. The committed / planned capacity additions in the state are
about 20,600 MW and inter-state imports planned is about 3,490 MW. Apart from these, the
state hydro power corporation of Bihar has planned a total capacity of about 244 MW which
will be commissioned in 11th plan and 12th plan periods. The evacuation plans for the
various generating plants discussed in the other sections.
4.2

TRANSMISSION PLANNING METHODOLOGY

The methodology used for Transmission Planning for FY 2018 and FY 2014 was as follows:
For 2018 Study

Develop system planning criteria based on CEA guidelines for development of


transmission plan.

Model forecast loads by circle from the load forecast developed as part of Power
System Master plan

Allocate the circle wise demand to existing and future 220/33KV and 132/33KV
substations

Schedule existing, committed, future generation projects and inter-state generation


expected by FY 2018.

Consider all existing and committed transmission projects.

Schedule reinforcement required for existing 220kV and 132kV substations and
schedule new substations as necessary.

Develop the transmission system required to meet the study criteria based on the
load flow study.

For 2014 Study

The criterion as developed above was also used for 2014.

Model forecast loads by circle from the developed load forecast as part of Power
System Master plan

Allocate the circle wise demand to existing and future 220/33KV and 132/33KV
substations

Remove generation projects not scheduled for FY 2014

Modify imports and exports based on the availability various interstate projects
outside the state.

The total reinforcements were identified keeping in mind the 2018 scenario and for
2014 the projects were phased in and transmission projects not scheduled for FY
2014 or not required were removed from the system.

Validate the transmission system for satisfactory operation for FY 2014 for the
scenarios considered under the study.

The above steps are further explained in the following sub-sections.


Developing the PSMP for Bihar

4-2

020328-40RP-0400-00

Final Report

4.2.1

Scheduling of Substation Loads

The scheduling of substations loads was carried out as follows:

First the existing circle wise co-incident demand based on the existing substation
loads was calculated.

Allocate system demand for study year to all circles proportionally based on existing
circle wise coincident demand duly taking certain percentage of transmission system
losses.

Allocate circle wise demand forecast to existing 132/33 or 220/33kV substations


considering N-1 contingency of transformers and plan suitable additions of new
transformers to take the additional load.

The new substations are planned in the vicinity of existing overloaded substations
and the load is allocated accordingly so that the substations load is not more than
their capacity.

4.2.2

Generation Scheduling

The generation scheduling is carried out considering the existing and future projects get
commissioned as per the generation plan and expected interstate power exchanges. The
generation scheduling is carried out as follows:

Estimate the generation capacity required to meet the forecast loads after
considering certain percentage of initial transmission losses assumption

Estimate the availability of each generating unit for the load scenario (System Peak
and Light Load) under consideration and compute the generation capacity available
to the grid considering station auxiliary consumption and spinning reserve required
from the unit.

Forecast interstate exchanges based on the existing interstate exchanges, future


capacity additions and interstate lines planned in the region by central transmission
utility(CTU)

The generation is scheduled on the priority basis where the must run units are
despatched first.

Schedule expected hydro generation from the existing and future hydro station for
the load scenario under consideration based on the historical availability

Schedule the generation from peaking stations from Gas Turbines for peak load
scenario based on the system peak requirement

Schedule thermal generation from the BSEB stations and shared generation from
central sector and IPPs within the state

Reschedule few thermal plants generation in such a way that the total scheduled
generation from the state, PVT/IPP and interstate exchanges should be equal to
estimated generation requirement.

The details of the generation plan are discussed in the generation planning report.

Developing the PSMP for Bihar

4-3

020328-40RP-0400-00

Final Report

4.2.3

PSAF Load Flow Analysis

The transmission system analysis is carried out using Load Flow and AC contingency
modules of Power System Analysis Framework (PSAF) V3.10 simulation tool developed by
CYME International. The transmission network database was developed using PSAF to
simulate the power flow scenarios to analyse the 2018 and 2014 transmission system.
4.3

TRANSMISSION PLANNING BASIS

This section presents all key assumptions and criteria used in development of transmission
expansion plan. All the developed scenarios meet the uniform requirement in terms of
performance as; a uniform planning criteria was adopted for the study.
The various parameters are discussed as below:
4.3.1

Study Horizon Year

The study horizon period for development of Transmission Plan is 2008-09 to 2017-18,
inclusive, a 10 year period.
4.3.2

Load Forecast Considered

Average load forecast scenario was used to develop the base case Transmission Plan for
FY 2018 and 2014.
4.3.3

Load Flow Simulation Years

Load Flow simulations were carried out for the horizon period and included the simulation
and studies for the intermediate year as follows:

Horizon Year Simulation: FY 2018

Intermediate Year Simulation: FY 2014.

4.3.4

Scenarios

The scenarios considered for each simulation year were as follows:

Peak Load Scenario

Light Load Scenario

The light load and peak load simulation were carried out to estimate the reinforcements and
reactive compensation required during peak and light load condition.
The historical system load of Bihar power system shows that the Peak Load Scenario
occurs during October whereas the Light Load Scenario occurs during April. The historical
data shows that the light load is about 57% of the annual system peak load.
All loads are assumed to have power factor of 0.9, which is a reasonable assumption
considering that in most of the national grid code, 0.9 pf has to be maintained between
transmission and distribution utilities.

Developing the PSMP for Bihar

4-4

020328-40RP-0400-00

Final Report

4.3.5

Study Criteria

The study criteria used for the simulation for FY 2014 and FY 2018 are based on the CEA
criteria and the key parameters are discussed in the following sections:
4.3.5.1

Equipment Loading and Substation Reinforcement

Under normal and N-1 contingency operation, no element of transmission should be loaded
beyond its thermal limit. The maximum number of transformers in a substation was limited to
three numbers though few existing substations had more than three transformers.
As 132/33 kV transformers are mostly radial, so a special methodology was developed to
limit the loading of the radial feeders. The loading limit of 132kV transformers was reduced
from their thermal limit; this was done considering the reliability requirement in the event of
outage of a single transformer. In the case of substation having single transformer the
substation was loaded up to 50% assuming that under contingency conditions such as
outage of transformer the load will be met by the neighbouring substations. Similarly
minimum loading criteria used for the substations having more than one transformer was
limited to 50%. Based on the above the maximum loading limit of the transformers is shown
in the Table 1 below:
Table 4-1

Maximum Transformer Loading Criteria

Sl.No

Number of Transformers in the


132/33kV substation

Maximum Transformer Loading


Limit (%)

80%

75%

67%

50%

50%

The maximum substation capacity adopted for each type of substation used in the planning
studies was based on CEA criteria and outlined as follows:
Table 4-2
Sl.No

Substation Reinforcement

Type of Substation

Transformer Size
(MVA)

Substation
Capacity (MVA)

765/400kV

1500

3500

400/220kV

315

1000

220/132kV

100

320

132/33kV

50

150

The loading limit of transmission lines are derived based on Thermal Limit and Permissible
Loading Limit Curves. These curves were developed using St Clair method to determine the
line loading limits as a function of line lengths. The permissible loading limit curve is a plot
of length of line on X-Axis and loading limit in terms of % Surge Impedance Loading (SIL) on
Y-Axis. The permissible line loading limit depends on many factors such as voltage
regulation, stability and current carrying capacity of the line. The permissible line loading
curve is derived assuming a voltage regulation of 5% and phase angle difference of 30 deg
Developing the PSMP for Bihar

4-5

020328-40RP-0400-00

Final Report

between the two ends of the line. For the lines whose permissible line loading as determined
from the curve is higher than the thermal loading limit, the permissible loading limit is
restricted to thermal loading limit only. The permissible thermal loading limit curve is plotted
as follows:

Figure 4-1

Line Loading Limit as function of length

Based on the above the loading limit of transmission lines for various voltages was derived
as follows:
Table 4-3
Description

Quad
Bersimis

Quad
Moose

Line Loading Limits


Twin
Moose

AAAC 560
Sq.mm

Zebra

Panther

Voltage (kV)

765

400

400

220

220

132

Thermal Limit at
45 deg C ambient
temp (Amps) and
& 75 degC
conductor
temperature

2788

2380

1190

808

546

366

Thermal Limit
(MVA)

3694

1649

824

308

208

84

SIL (MVA)

2316

615

515

132

132

48

Line length
(<=100km)

2316

1649

824

308

208

84

Developing the PSMP for Bihar

4-6

020328-40RP-0400-00

Final Report
Description

Quad
Bersimis

Quad
Moose

Twin
Moose

AAAC 560
Sq.mm

Zebra

Panther

Line length (>100


and<=200km)

2316

1076

824

231

208

Line length
(>200km
and<=300km)

846

708

4.3.6

Voltage Limits

The permissible voltage limits as per CEA guidelines are as follows:


Table 4-4
Sl. No

4.3.7

Voltage Limits

Bus Voltage

Voltage Limits
(%)

Voltage Limits
(kV)

765kv

+/-4.8

728kV to 800kV

400kV

+/-5%

380kV to 420kV

220kV

+/-10%

198kV to 245kV

132kV

+/-10%

122kV to 145kV

Contingency Criteria

The transmission planning is based on a deterministic approach using the single line
contingency criteria (N-1). This is the most common approach used worldwide, and it
requires the system to be able to operate satisfactorily with one element out of service (line
or transformer), and also to survive the transition state from the normal operating state to
contingency state without any operator intervention
4.3.8

Transmission projects

The starting point of the transmission system expansion planning is the modelling of the
following transmission projects:

All existing transmission system from 400kV to 132kV network

All projects under construction

All projects committed to be commissioned

4.3.9

Reactive Compensation

The reactive compensation was required to support the active power transfer from
generating station to loads.
The reactive power requirement in the system is partly met by the line charging from the
lines loading below surge impedance loading and partly from the generating stations.
Under the lightly loaded transmission lines generate more reactive power than they
consume which increases the line voltages. Under these conditions it is very important to
ensure that the generators which are in electrical vicinity to such lines absorb reactive power
generated but are within limits of the absorption capacity of the generators. In all cases

Developing the PSMP for Bihar

4-7

020328-40RP-0400-00

Final Report

including peak and light load conditions it was ensured that the limits of the reactive power
absorption or generation were respected at all times. Further under light load conditions in
order to limit the voltages within the prescribed limits, inductive compensation is required
normally for the 400kV system. The inductive compensation required will depend up on the
actual load and the power factor. For the system studied a power factor of 0.9 was assumed
and it should be noted that considerably more reactors will be required if the global power
factor of the load was increased from 0.9 to 0.95
For the planning studies, the reactor was added in step of 50, 63 and 100MVAr (these are
the sizes normally used in the Transmission Companies in India)
For peak load conditions, to meet the load reactive demand and maintain the system
voltages within acceptable limits during normal and contingency operation, it was necessary
to install substation capacitors. From the system studies it could be inferred that the
capacitive compensation was required at different buses to maintain the voltage within
limits. It should be noted that the present transmission plan presents the indicative value of
the capacitive requirement and the study does not consider the detail exercise for optimal
location of reactors and identifying optimal sizes, which are part of a detailed reactive power
management studies.
The capacitor requirements are planned for the capacities in multiple of 10MVAr. The ideal
location for capacitors should be next to the load but for transmission planning purposed the
location of such capacitors was taken at 132kV and 33kV buses.
4.4

Load Forecast

The section presents brief description of the load forecast study and the results of the load
forecast as presented in the Report on Load Forecast as part of the Power System Master
Plan. The summary of the study are as follows:
The various categories considered for forecasting the load are:

Domestic

Non-Domestic

Public Lighting

LT-Industry

HT-Industry

Railway Traction

Public Water Works

Irrigation

The approach used for each category forecast is tabulated as below


Table 4-5

Load Forecast Approaches

Approach
Trend/Adjusted Trend

Categories
Non-Domestic, Public Lighting, LT-Industry, HT-Industry, Railway Traction
and Public water works

Partial End Use

Domestic

End Use

Irrigation

Developing the PSMP for Bihar

4-8

020328-40RP-0400-00

Final Report

The horizon period for the forecast is from FY 2009 to FY 2018. Two load forecast scenarios
were developed. These scenarios are as follows:

Average Load Growth Scenario

Optimistic Load Growth Scenario

4.4.1

Summary results of Load Forecast

The summary of results for the above two forecasts are presented in the following table:
Average Load Growth Scenario

Optimistic Load Growth Scenario

Domestic sales growth projected at CAGR of


16.4%

Domestic sales growth projected at CAGR of


22.9%

Irrigation sales growth projected at CAGR of


10.2%

Irrigation sales growth projected at CAGR of


11.3%

Sales to Industry category projected at


CAGR of 14.18%

Sales to Industry category projected at


CAGR of 17.17%

Total Sales growth projected at CAGR of


14.2%

Total Sales growth projected at CAGR of


19.1%

Reduction of T&D Losses projected at CAGR


of -7.6%

Reduction of T&D Losses projected at CAGR


of -7.6%

System energy growth projected at CAGR of


10.5%

System energy growth projected at CAGR of


15.3%

System Peak Demand growth projected at


CAGR of 10.6%

System Peak Demand growth projected at


CAGR of 15.4%

The results of annual load forecast are presented as follows:


Table 4-6

Summary of Load Forecast Results

Average Load Forecast Scenario


Financial Year

Annual Energy
Requirement
(MU)

Annual Peak
Demand (MW)

Optimistic Load Forecast Scenario


Annual Energy
Requirement
(MU)

Annual Peak
Demand (MW)

2009

12,110

2,048

12,571

2,126

2010

13,355

2,310

14,701

2,543

2011

14,742

2,617

17,101

3,036

2012

16,311

2,956

19,863

3,599

2013

18,327

3,286

22,935

4,113

2014

20,551

3,647

26,512

4,705

2015

22,766

3,998

30,400

5,339

2016

25,255

4,390

35,040

6,092

2017

28,204

4,854

41,091

7,072

2018

31,592

5,383

48,381

8,243

Developing the PSMP for Bihar

4-9

020328-40RP-0400-00

Final Report

4.4.2

Allocation of Substation Loads

The unconstrained load forecast represents the total Bihar state demand including
transmission and distribution losses, net of generating station auxiliaries. The circle wise coincident demand forecast is developed based on the methodology discussed in the previous
section.
The substation load demand forecast is developed assuming typical percentage of
transmission losses. The system coincident peak demand after deduction of transmission
losses works out to 3515 MW and 5271 MW respectively for FY 2014 and FY 2018. The
above demand forecast for loads is the starting point and are assigned in the load flow
database. Subsequently, while carrying out the load flow studies (which calculates the
actual transmission losses), the substation loads are adjusted globally to match the forecast
demand.
The system peak demand met by BSEB for FY 2010 in the month of October-2009. The
peak demand met was 1,506 MW. The coincident demand for all substations during system
peak demand was not available. Hence, the coincident peak demand for all substation
demand is estimated for year 2009 based on the substation average loading during peak
load day and adjusted to system losses to meet the system peak load as mentioned.
The system coincident demand is allocated to the different circles as follows:
Table 4-7
Name of the Circle

Circle wise co-incident demand

Coincident Peak
demand (MW)
(Oct 2009)

FY 2014- Peak Load


(MW)

FY 2018- Peak Load


(MW)

Patna

423

1064

1595

Gaya

151

379

568

Munger

62

157

235

Bhagalpur

88

222

333

115

290

434

Chapra

69

173

260

Motihari

44

110

165

Darbhanga

66

167

251

Samastipur

59

148

222

Purnea

71

178

266

Saharsa

52

131

197

Rohtas

96

241

362

Bhojpur

48

121

181

Nalanda

54

135

203

1,398

3.515

5,271

Muzaffarpur

Total

Note: The load of transmission circles are included in the distribution circles and all circles in Patna
are combined together to form one single circle for the purpose of transmission planning.

The circle wise co-incident demand is further allocated to existing substations considering
substation reinforcement and future 132/33kV substations. The allocation of loads to
different substations is presented as follows:

Developing the PSMP for Bihar

4-10

020328-40RP-0400-00

Final Report

Table 4-8

CIRCLE
1

Allocation of Loads between Existing and Proposed 220/33kV


and 132/33kV Substations (MW)
Existing
(Oct 2009)

NAME OF THE SS

FY 2014

FY 2018

423

1064

1595

18

53

45

41

89

91

DIGHA

61

91

FATHUA-2

42

91

GAIGHAT-2

45

PATNA, PESU(E), PESU(W)


BARHI

EXISTING

BIHTA-2
BIHTA

EXISTING

GAIGHAT

EXISTING

32

73

91

MOKAMA RLY

RAILWAY

12

19

HATHIDAH

EXISTING

11

19

29

91

91

JAKKANPUR-2
JAKKANPUR

EXISTING

85

115

115

KATRA

EXISTING

10

49

75

KHAGAUL-2

91

91

KHAGAUL-3

91

KHAGAUL

RAILWAY

13

24

38

KHAGAUL

EXISTING

85

66

53

MASURHI

EXISTING

22

33

MITHAPUR-2

73

91

MITHAPUR-3

91

MITHAPUR

EXISTING

76

73

91

KHUSRPUR RLY

RAILWAY

16

24

FATHUA

EXISTING

39

75

66

54

91

151

379

568

11

12

18

34

SIPARA

GAYA
AURANGABAD
BELAGANJ

EXISTING

CHANDAUTI-2
CHANDAUTI-3

RAILWAY

17

27

CHANDAUTI

EXISTING

25

44

38

GOH

11

HULASGANJ

Developing the PSMP for Bihar

4-11

020328-40RP-0400-00

Final Report

CIRCLE

Existing
(Oct 2009)

NAME OF THE SS
RAILWAY

11

JEHNABAD

EXISTING

17

48

60

11

NAWADA

EXISTING

14

45

68

PAHARPUR

RAILWAY

12

18

18

PAHARPUR
RAFIGANJ

RAILWAY

13

24

20

RAFIGANJ

EXISTING

14

18

37

SONNENAGAR-2
SONNENAGAR

RAILWAY

12

23

35

SONNENAGAR

EXISTING

24

50

50

TEKARI

WAZIRGANJ

17

41

57

62

157

235

BODHGAYA

EXISTING

MUNGER
JAMALPUR

EXISTING

17

45

68

JAMUI

EXISTING

14

40

61

LAKHISARAI

RAILWAY

16

24

LAKHISARAI

EXISTING

10

14

20

SHEIKHPURA

EXISTING

12

41

62

88

222

333

BHAGALPUR
BANKA

EXISTING

33

50

KAHALGAON

EXISTING

11

28

42

NAUGACHHIYA

EXISTING

19

28

45

SABOUR-2

FY 2018

JEHNABAD

KARPY

FY 2014

SABOUR

EXISTING

41

91

91

SULTANGANJ

EXISTING

21

51

77

115

290

434

18

45

67

45

60

91

91

12

18

MUZAFFARPUR
HAJIPUR

EXISTING

MUZAFFARPUR-2
MUZAFFARPUR

EXISTING

RUNI SAIDPUR

Developing the PSMP for Bihar

4-12

020328-40RP-0400-00

Final Report

CIRCLE

Existing
(Oct 2009)

NAME OF THE SS
SHEOHAR
SITAMHARI

EXISTING

SKMCH
VAISHALI

EXISTING

CHAPRA
CHAPRA-2

11

16

18

45

67

37

56

19

49

73

69

173

260

34

19

67

67

GOPALGANJ

EXISTING

18

39

57

SHITALPUR

EXISTING

16

24

SIWAN

EXISTING

24

47

71

44

110

165

19

25

27

35

MOTIHARI
EXISTING

DHANHA
DHAKA

EXISTING

13

MOTIHARI

EXISTING

18

31

49

RAMNAGAR

EXISTING

13

19

36

66

167

251

27

32

21

40

54

10

14

RAXAUL

DARBHANGA
GANGWARA
DARBHANGA
JAINAGAR

EXISTING

KUSHESWAR

EXISTING

BETTIAH

FY 2018

CHAPRA

MASRAKH

FY 2014

MADHUBANI

EXISTING

13

25

47

PANDAUL

EXISTING

25

52

86

PHULPARAS

EXISTING

12

59

148

222

41

62

29

31

31

23

30

53

77

SAMASTIPUR
DALSINGSARAI
HFC

EXISTING

SAMASTIPUR-2
SAMASTIPUR

Developing the PSMP for Bihar

EXISTING

4-13

020328-40RP-0400-00

Final Report

CIRCLE

Existing
(Oct 2009)

NAME OF THE SS
BEGUSARAI

10

PURNEA

23

30

71

178

266

23

35

KATIHAR

EXISTING

15

38

57

KISHANGANJ

EXISTING

14

36

54

29

32

80

91

52

131

197

EXISTING

SAHARSA
KATIYA

EXISTING

21

31

KHAGARIYA

EXISTING

12

30

45

23

46

69

MADHEPURA
SAHARSA

EXISTING

SONABARSHI
SUPAUL

EXISTING

13

19

UDAKISHANGANJ

EXISTING

11

16

96

241

362

ROHTAS
BANJARI

EXISTING

12

BHABUA

EXISTING

20

55

80

BIKRAMGANJ

EXISTING

12

27

40

DINARA
KARMNASA

RAILWAY

10

16

KARMNASA

EXISTING

13

28

47

KUDRA

RAILWAY

13

24

38

KUDRA

13

EXISTING

PURNEA

12

FY 2018

FORBESGANJ

PURNEA-2

11

FY 2014

SASARAM

EXISTING

13

27

39

DEHRI-ON-SONE

EXISTING

18

50

74

48

121

181

BHOJPUR
ARRA

RAILWAY

14

22

ARRA

EXISTING

15

30

44

13

16

24

BUXAR
DUMRAON

Developing the PSMP for Bihar

RAILWAY

4-14

020328-40RP-0400-00

Final Report

CIRCLE

Existing
(Oct 2009)

NAME OF THE SS

FY 2014

FY 2018

17

48

66

11

54

135

203

42

90

68

BARIPAHRI-2

41

HARNAUT

NALANDA

12

21

45

12

31

DUMRAON

EXISTING

JAGDISHPUR

14

NALANDA
BARIPAHRI

RAJGIR

EXISTING

EXISTING

EKANGASARAI

4.5

Generation Plan

The purpose of the generation planning is to estimate the generation capacity requirement
to meet the forecasted demand at the specified reliability level subject to the system
constraints. The least cost generation expansion plan has been developed as part of the
Power System Master Plan. The least cost indicative generation plan was developed using
SNC-Lavalins System Planning and Production Costing Model (SYPCO). Various scenarios
have been developed for the following load forecast scenarios

Average Load Forecast Scenario

Optimistic load forecast scenario

The generation plan was developed by reviewing various projects committed/planned by


BSEB, various agencies including IPPs, Central generating stations and Hydro Power
Corporation of Bihar. The following scenarios were formulated for each load forecast
scenario

Scenario-1:Coal+Hydro

Scenario-2: Coal+ Hydro+ Import

Scenario-3: Coal+ Hydro+ CCGT

Scenario-4: Coal+ Hydro+ Import+ Pump Hydro

Scenario-5: Coal+ Hydro+ Export

The scenario-5 developed is not considered for selection of least cost plan.
4.5.1

Generation Planning Criteria

The following generation planning criteria was used to develop the least cost generation
plan:
Study Horizon Year:
The study horizon period for development of Generation Plan is 2008-09 to 2017-18,
inclusive, a 10 year period.

Developing the PSMP for Bihar

4-15

020328-40RP-0400-00

Final Report

Load Forecast:

Average Load Forecast Scenario

Optimistic load forecast scenario

The planning year is taken as equal to the financial year. For example financial year 2009
starts from April-2008 to March-2009, inclusive. Reference Year for Present Worthing and
Cost Data
Reliability Criterion:
The reliability criterion decides timing of new capacity additions required in future. The
reliability criterion used for the state of Bihar is as follows:

Up to FY 2012:

LOLP: 3% (262.8 hours/year)

EUE: Not used

From FY 2012 to FY 2013:

LOLP : 2% (175.2 hours/year)

EUE : Not used

FY 2014 onwards:

LOLP : 1% (87.6 hours/year)

EUE : 0.15% of system annual energy requirement

Basic Supply Options:


The supply options available for peak load plants are as follows:

Gas Turbines: This is subjected to the availability of the gas to the state.

Pumped Hydro Plants: The state of Bihar is planning huge pumped storage
capacities in the 13th Plan period and requires government intervention to advance
these units to be available in 12th Plan period.

Basic Discount Rate: 10%


Committed Projects:
Projects of BSEB
BSEB has planned to expand the present two power plants namely BTPS and MTPS. The
BSEB has also committed to build a 50%:50% Joint Venture power plant at Nabinagar with
NTPC. The details of these projects are tabulated as below:

Developing the PSMP for Bihar

4-16

020328-40RP-0400-00

Final Report

Table 4-9
Sl.No

Power Station

Committed Projects of BSEB


Capacity
(MW)

Remarks

Extension of BTPS, DistBegusarai

2x250

Expected in FY 2014

Extension of MTPS, Kanti,


Dist-Muzaffarpur

2x195

Expected in FY 2014

Nabinagar
Power
Generating Company Pvt.
Ltd
(50:50
JV
of
GOB/BSEB & NTPC)

3x660

Expected in FY 2014

Total share

2,375

Projects under Tariff Based competitive Bidding Route (Case-2)


The joint venture company Bihar Power Infrastructure Company (BPIC) has been formed
with IL&FS and BSEB to facilitate Case-2 bidding process in Bihar for identified projects of
total capacity of about 3,960 MW. BSEB will have 70% share from these projects. The
details of these projects are tabulated as below:
Table 4-10

Projects under Tariff Based Competitive Bidding Route (Case-2)


Capacity
(MW)

Sl.No

Power Station/Developer

Buxar
Thermal Power
Station at Chausa, DistrictBuxar

2x660

Lakhisarai Thermal Power


Station at Kajra, DistrictLakhisarai

2x660

Pirpainti Thermal Power


station at Pirpainti, DistBhagalpur

2x660

Total share

2,772

Remarks
Expected in FY 2015

The bidding process will be initiated once the coal linkages obtained for these projects.
Projects under IPP through MOU
The State Investment Promotion Board (SIPB) has given approval for four Independent
Power Producers (IPPs) to develop power projects in the state. BSEB has signed MOU with
these projects for facilitating certain infrastructure required for these projects and sharing
25% of power to BSEB. The details of these projects are as follows:

Developing the PSMP for Bihar

4-17

020328-40RP-0400-00

Final Report

Table 4-11
Sl.No

Projects under IPP through MOU

Power Station/Developer

Capacity (MW)

M/s JAS Infrastructure Capital Pvt. Ltd., Nagpur at Banka,


Bhagalpur

4x660

M/s Nalanda
Bhagalpur

Pirpainti,

2,000

M/s Adhunik Power and Natural Resources Ltd., Kolkata, at


Pirpainti/Lakhisarai

1,000

M/s Vikas Metal and Power Ltd., at Begusarai

Power

Company

Ltd.,Kolkata,

at

500

Total share

1,535

Imports from Central Generating Stations and Other Agencies


BSEB will be benefited from the various capacity additions programs of central generating
stations. The details of the capacity additions and the proposed share from these projects
are tabulated as below:
Table 4-12
Sl.
No

Name of the Project

Future Imports

Name of
the
Agency

Capacit
y (MW)

Share (%)

Capacity
Available to
Bihar (MW)

Expected
Commissioning
Year

Barh TPS Stage-I

NTPC

3x660

16.36

324

Jun- 2011

Barh TPS Stage-II

NTPC

2x660

14.24

188

Feb- 2012

Nabi Nagar (RLY) TPS

NTPC

4x250

5.8

58

FY 2014

KHSTPS Stage-II

NTPC

1x500

19.2

96

May-2009

North Karanpura TPS

NTPC

3x660

6.41

127

FY 2014

Subhansri HES

NHPC

4x250

20 to 30

250

FY 2012

Siang Middle HEP

NHPC

4x250

15

150

NLC

NLC

4x500

10

200

UMPP Tilaiya
(Jharkhand)

4,000

12.5

500

10

Shell Companies of
Orissa (under Orissa
Hydro Power
Corporation)

8,500

5.88

500

11

APGENCO (under
Andhra Pradesh
Power Development
Co. Ltd.)

4,400

25

Total

APGENCO

27,680

st

1 Unit FY 2014

1,100

3,493

Future Hydro
Bihar Hydro Power Corporation (BHPC) has planned to develop various hydro projects of
totaling capacity of about 244.5 MW in the horizon period.

Developing the PSMP for Bihar

4-18

020328-40RP-0400-00

Final Report

Table 4-13
Sl. No

Name of the Project

Future Hydro

Name of the
Agency

Expected
Commissioning Year

Capacity (MW)

Small Hydro

BHPC

1.7

Jul 2009

Small Hydro

BHPC

8.4

Dec- 2009

Small Hydro

BHPC

6.4

Dec-2011

Small Hydro

BHPC

102

FY 2013

Dagmara HEP

BHPC

126

12th Plan Period

Total

4.5.2

244.5

Summary of Least Cost Generation Plan

The details of least cost generation plan for average load forecast scenario are as follows:

The supply options considered are coal, Imports and hydro. This scenario takes the
capacity additions planned under state, JV, IPP sectors and imports from central
generating stations. The capacity additions considered in this scenario are as
follows:

Coal:
o

Committed: BTPS Expansion, MTPS Expansion, Nabinagar-JV between


BSEB and NTPC

New: Pirpainti Thermal Power

Hydro:
o

Small Hydro, Dagmara Hydro

Imports: Barh TPS Stage-1 and Stage-2

Gas Turbines

The capacity additions up to FY 2013 are limited by only hydro

Large capacity additions are occurring in FY 2014.

The import capacity mix is reducing from 84.7% to 31.6%

Energy mix of coal fired plants is increasing from 5.9% to 64.2%

The deficit is continuing up to FY 2013 because of limited capacity additions

The system switching over from negative reserve margin to the positive reserve
margin in FY 2014

Meeting both the reliability targets from FY 2014.

The reserve margin at the end of the horizon period stays at 14%.

The capacity addition program under least cost generation plan is presented as below:

Developing the PSMP for Bihar

4-19

020328-40RP-0400-00

Final Report

Table 4-14

Net Capacity Additions (MW): Least Cost Generation PlanAverage LF Scenario


Financial Year

Name of the Project


2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

Imports

448

Existing

65

200

BTPS-Extension

463

MTPS-Extension

361

Nabinagar Power-JV

916

458

Pirpainti TPP

427

Gas Turbine

495

99

198

Hydro

10

102

125

Total

10

455

662

1,739

326

557

625

Total-Horizon Period

4.5.3

4,373

Integration of Generation Plan into the Transmission System Studies

The least cost generation plan shows that the majority of the capacity additions are taking
place in FY 2014. The total net capacity additions required to meet the forecast loads is
about 4373 MW for the year 2014. However according to the the status of various projects
under IPP route there is possibility of additional generation capacity to be commissioned in
the state.. Therefore, it is appropriate to take these capacities and any surplus arising from
these capacities was modelled as export to the neighbouring states. In this scenario the
following additional capacity was considered in the development of transmission Plan.

Pirpainti Thermal Power : 660MW

Lakhisarai Thermal Power: 2x660 MW

Buxar Thermal Power: 2x660MW

JAS Infra: 4x660 MW

Vikas Metal: 500MW

Based on these capacities the generation despached was scheduled for peak load and light
load conditions for FY 2014 and FY 2018.
The existing import and export points of BSEB system are as follows:
Export Points:

Kahalgaon-Balia

Biharsharff-Balia

Sultanganj-Deogarh

Rajgir- Barhi(DVC)

Sonenagar-Garhwa

Biharshariff- Gorakhpur

Kahalgaon-Maithon

Developing the PSMP for Bihar

4-20

020328-40RP-0400-00

Final Report

Purnea-Malda

Sasaram HVDC Link

Import Points:

Sonenagar-Rihand

Purnea-Siliguri

Biharshariff- TTPS

Kahalgaon-Farakka

Since the inter-state power flows are dictated by the capacity additions in the region and
network expansion in the region. Therefore, it is important to present the capacity additions
planned in the region. The expected capacity additions in the region are as flows:

North Karanpura :

1980 MW

Maithon RB:

1000 MW

Barh:

1980 MW

Teesta Low Dam III &IV:

292 MW

Teesta IV:

495 MW

NabiNagar JV Rlws:

1980 MW

Kahalgaon-II:

1000 MW

Mejia U6:

250 MW

Bokaro Ext:

500 MW

Koderma:

Farakka-III:

500 MW

Mejia Extn:

1000 MW

Raghunathura:

1000 MW

Durgapur Steel TPS:

1000 MW

1000 MW

Source: National Electricity Plan


The inter-regional transmission systems planned in the region are as follows:
400kV Lines

LILO of Kahalgaon- Balia 400kV DCDS Quad line at Barh

LILO of Barh to Balia -400kV DCDS Quad Line at 400kV Patna

Purnea-Malda -400kV DCDS 2nd Line

Barh-Gorakhpur- 400kv DCDS Quad Line.

Gaya-North Karanpura- 400kV DCDS Quad Line

Gaya-Ranchi Pooling Station 400kV DCDS line

Gaya-Koderma-400kV DCDS Quad Line

Biharshariff-Koderma 400kV DCDS Quad line

Developing the PSMP for Bihar

4-21

020328-40RP-0400-00

Final Report

Biaharshariff -Sasaram- 400kv DCDS Quad Line -2nd Ckt

Biahrsharff-Purnea 400kV DCDS Quad Line

LILO of Pusauli Allahabad line at Varanasi (Mugalsarai)- 400kV single ckt

Pusauli- Dlatonganj -400kv DCDS

Patna- Kishanganj- 400kV DCDS Quad Line

765kV Lines

Gaya-Varanasi -765kV Line -2 S/C

Gaya-Balia- 765Kv Line

Gaya-Tilaiya

Gaya-Godda- 765kV Line-2 XS/C

Sasaram- Fathepur -765kV Line -2xS/C

Source: CEA, updated as on July 2009


4.5.4

Generation Scheduling

Based on the generation capacity additions program the generation schedules for FY 2014
and FY 2018 are prepared for the following scenarios:

Peak Load Scenario

Light Load Scenario

The generation schedule for FY 2014 is presented in the following table:

Table 4-15

Generation Scheduling for FY 2014: Thermal

Station

Scheduled (MW)
Peak Load

Light Load

COAL
BTPS UNIT-6

90

90

BTPS UNIT-7

90

MTPS UNIT-1

90

90

MTPS UNIT-2

90

BTPS EXTENSION UNIT-1

208

208

BTPS EXTENSION UNIT-2

208

208

MTPS EXTENSION Unit-1

162

162

MTPS EXTENSION UNIT-2

162

162

GAS TURBINE UNIT-1

92

GAS TURBINE UNIT-2

92

GAS

Developing the PSMP for Bihar

4-22

020328-40RP-0400-00

Final Report

Station

Scheduled (MW)
Peak Load

Light Load

GAS TURBINE UNIT-3

92

GAS TURBINE UNIT-4

92

GAS TURBINE UNIT-5

92

GAS TURBINE UNIT-6

92

GAS TURBINE UNIT-7

GAS TURBINE UNIT-8

1654

921

Total Thermal

Table 4-16

Generation Scheduling for FY 2014: Hydro

Station

Scheduled (MW)
Peak Load

Light Load

COAL
BHEP

KOSHI

18.4

18.4

Total Thermal

22.4

22.4

Table 4-17

Generation Scheduling for FY 2014: Shared Resources within


State

Station

Scheduled (MW)
Peak Load

Light Load

Shared Resources Within the State


KHALGAON STAGE1 UNIT-1

176

176

KHALGAON STAGE1 UNIT-2

176

176

KHALGAON STAGE1 UNIT-3

176

176

KHALGAON STAGE1 UNIT-4

176

KHALGAON STAGE 2 UNIT-1

439

439

KHALGAON STAGE 2 UNIT-2

439

439

KHALGAON STAGE 2 UNIT-3

439

439

BARH STAGE 1 UNIT-1

580

580

BARH STAGE 1 UNIT-2

580

580

Developing the PSMP for Bihar

4-23

020328-40RP-0400-00

Final Report

Station

Scheduled (MW)
Peak Load

Light Load

BARH STAGE 1 UNIT-3

580

BARH STAGE-2 UNIT-1

580

580

BARH STAGE-2 UNIT-2

580

580

NABINAGAR RAILWAY UNIT-1

208

208

NABINAGAR RAILWAY UNIT-2

208

208

NABINAGAR RAILWAY UNIT-3

208

208

NABINAGAR RAILWAY UNIT-4

208

NABINAGAR UNIT-1

580

580

NABINAGAR UNIT-2

580

580

NABINAGAR UNIT-3

580

580

7493

6530

Total Shared Capacity

Table 4-18

Generation Scheduling for FY 2014: Inter-State Exchange


Station

Scheduled (MW)
Peak Load Light Load

Interstate Exchange
BARH(PGCIL)-GORAKHPUR-400KV

(3009)

(2118)

BIHARSHARIFF(PGCIL)-BALIA-400KV

(1916)

(1831)

PATNA(PGCIL)-BALIA-400KV

(2129)

(2001)

BIHASHARIFF(PGCIL)-KODERMAPG-400KV 1722

1243

BIHASHARIFF-TTPS-132KV

565

349

GAYA(PGCIL)-GODDA-765KV

GAYA(PGCIL)-MUGALSARAI-765KV

(2310)

(1713)

GAYA(PGCIL)-NORTH KARANPURA-400KV 1755

1207

GAYA(PGCIL)-NR(BALI)-765KV

(1718)

(1562)

KAHALGAON(PGCIL)-FARAKKA-400KV

468

449

KAHALGAON(PGCIL)-MAITHON-400KV

1614

906

KISHANGANJ-DALKHOLA-132KV

(104)

(104)

PURNEA(PGCIL)-MALDA-400KV

858

438

KISHANGANJ-SIKKIM-400KV

1280

880

KISHANGANJ-SILIGURI-400KV

900

750

PUSALI(PGCIL)-DALTONGANJ-400KV

(197)

(197)

PUSALI(PGCIL)-FATHEHPUR-765KV

(3261)

(2038)

Developing the PSMP for Bihar

4-24

020328-40RP-0400-00

Final Report
Station

Scheduled (MW)
Peak Load Light Load

RAJGIR-DVCBARHI-132KV

(20)

(20)

SONENAGAR-GARHWA-132KV

(32)

(32)

SONENAGAR-RIHAND-132KV

25

25

SULTANGANJ-DEOGARH-132KV

(15)

(15)

Net Interstate Exchange

(5523)

(5383)

The summary of Generation Schedule for FY 2014 is presented as follows:

Table 4-19

Summary of Generation Scheduling for FY 2014

Station

Scheduled (MW)
Peak Load

Substation Loads

Light Load

3,515

2,014

132

76

Ex-Bus Demand

3,647

2,090

Net Interstate Exports

5,523

5,383

Shared Resources within State

7,493

6,530

Interstate Utilization

1,970

1,146

Net Load to be met by BSEB

1,677

944

1,654

921

22

22

Total

1,677

944

Total Generation Utilization

3,647

2,090

Peak Demand Losses (3.62% initial assumption)

BSEB Generation
Thermal
Hydro

Similarly, generation schedule for FY 2018 is presented for peak load and light load as
follows:

Developing the PSMP for Bihar

4-25

020328-40RP-0400-00

Final Report

Table 4-20

Generation Scheduling for FY 2018: Thermal

Station

Scheduled (MW)
Peak Load

Light Load

COAL
BTPS UNIT-6

90

80

BTPS UNIT-7

90

MTPS UNIT-1

90

80

MTPS UNIT-2

90

BTPS EXTENSION UNIT-1

208

208

BTPS EXTENSION UNIT-2

208

208

MTPS EXTENSION Unit-1

162

162

MTPS EXTENSION UNIT-2

162

162

GAS TURBINE UNIT-1

92

GAS TURBINE UNIT-2

92

GAS TURBINE UNIT-3

92

GAS TURBINE UNIT-4

GAS TURBINE UNIT-5

92

GAS TURBINE UNIT-6

92

GAS TURBINE UNIT-7

92

GAS TURBINE UNIT-8

1654

901

GAS

Total Thermal

Table 4-21

Generation Scheduling for FY 2018: Hydro

Station

Scheduled (MW)
Peak Load

Light Load

HYDRO
BHEP

KOSHI

18.4

18.4

DAGMARA

40.0

69.0

Total Thermal

62.4

91.4

Developing the PSMP for Bihar

4-26

020328-40RP-0400-00

Final Report

Table 4-22

Generation Scheduling for FY 2018: Shared Resources within State

Station

Scheduled (MW)
Peak Load

Light Load

Shared Resources Within the State


KHALGAON STAGE1 UNIT-1

176

167

KHALGAON STAGE1 UNIT-2

176

167

KHALGAON STAGE1 UNIT-3

176

167

KHALGAON STAGE1 UNIT-4

176

KHALGAON STAGE 2 UNIT-1

439

416

KHALGAON STAGE 2 UNIT-2

439

416

KHALGAON STAGE 2 UNIT-3

439

BARH STAGE 1 UNIT-1

580

549

BARH STAGE 1 UNIT-2

580

549

BARH STAGE 1 UNIT-3

580

BARH STAGE-2 UNIT-1

580

549

BARH STAGE-2 UNIT-2

580

549

NABINAGAR RAILWAY UNIT-1

208

208

NABINAGAR RAILWAY UNIT-2

208

208

NABINAGAR RAILWAY UNIT-3

208

208

NABINAGAR RAILWAY UNIT-4

208

NABINAGAR UNIT-1

580

580

NABINAGAR UNIT-2

580

580

NABINAGAR UNIT-3

580

PIRPAINTI UNIT-1

580

580

PIRPAINTI UNIT-2

580

BUXAR UNIT-1

580

580

BUXAR UNIT-2

580

LAKHISARAI UNIT-1

580

580

LAKHISARAI UNIT-2

580

JAS INFRA UNIT-1

580

580

JAS INFRA UNIT-2

580

580

JAS INFRA UNIT-3

580

580

JAS INFRA UNIT-4

580

VIKS METAL UNIT-1

220

220

VIKS METAL UNIT-2

220

13733

9014

Total Shared Capacity

Developing the PSMP for Bihar

4-27

020328-40RP-0400-00

Final Report

Table 4-23

Generation Scheduling for FY 2018: Inter-State Exchange

Station

Scheduled (MW)
Peak Load

Light Load

Interstate Exchange
BARH(PGCIL)-GORAKHPUR-400KV
BIHARSHARIFF(PGCIL)-BALIA-400KV
ARRA-BALIA-400KV
BIHASHARIFF(PGCIL)-KODERMAPG-400KV
BIHASHARIFF-TTPS-132KV
GAYA(PGCIL)-GODDA-765KV
GAYA(PGCIL)-MUGALSARAI-765KV
GAYA(PGCIL)-NORTH KARANPURA-400KV
GAYA(PGCIL)-NR(BALI)-765KV
GAYA(PGCIL)-TILAYYA-765KV
KAHALGAON(PGCIL)-FARAKKA-400KV
KAHALGAON(PGCIL)-MAITHON-400KV
KISHANGANJ-DALKHOLA-132KV
PURNEA(PGCIL)-MALDA-400KV
KISHANGANJ-SIKKIM-400KV
KISHANGANJ-SILIGURI-400KV
PUSALI(PGCIL)-DALTONGANJ-400KV
PUSALI(PGCIL)-FATHEHPUR-765KV
RAJGIR-DVCBARHI-132KV
SONENAGAR-GARHWA-132KV
SONENAGAR-RIHAND-132KV
SULTANGANJ-DEOGARH-132KV
Net Interstate Exchange

(3627)
(4257)
(4257)
1740
570
3131
(4472)
2150
(3261)
1854
183
1614
(104)
858
1568
980
(210)
(4484)
(20)
(32)
25
(15)

(2476)
(3034)
(3034)
1243
349
2237
(2784)
1207
(2149)
1854
183
824
(100)
438
880
750
(209)
(3057)
(20)
(32)
25
(15)

(10066)

(6922)

The summary of Generation Schedule for FY 2018 is presented as follows:


Table 4-24

Summary of Generation Scheduling for FY 2018

Station

Scheduled (MW)
Peak Load

Substation Loads

Light Load

5,271

3,020

112

64

5,383

3,084

Net Interstate Exports

10,066

6,922

Shared Resources within State

13,733

9,014

3,666

2,092

Peak Demand Losses (2.08% initial assumption)


Ex-Bus Demand

Interstate Utilization

Developing the PSMP for Bihar

4-28

020328-40RP-0400-00

Final Report

Station

Scheduled (MW)
Peak Load

Net Load to be met by BSEB

Light Load

1,717

992

1,654

901

62

91

Total

1,717

992

Total Generation Utilization

5,383

3,084

BSEB Generation
Thermal
Hydro

4.6

Commited Transmission System

This section presents the transmission lines and substations under construction or
committed by the BSEB. These line are considered as part of the initial system for
development of 2018 transmission system for the state of Bihar
The following table provides the substations under construction or committed by the BSEB.
Table 4-25
Name of the substation

Committed 132/33kV Substations


# Transformers

Capacity (MVA)

WAZIRGANJ

20

DIGHA

50

DINARA

20

KUDRA

20

AURANGABAD

10

JAGDISHPUR

20

KARPI

20

HARNUALT

20

NALANDA

20

GOH

20

MASHRAKH

20

DALSINGSARAI

20

RUNNISAIDPUR

20

SONABARSHI

20

KUSHESHWAR

20

KATRA

50

BUXAR

20

TEKARI

20

Developing the PSMP for Bihar

4-29

020328-40RP-0400-00

Final Report
Name of the substation

# Transformers

Capacity (MVA)

EKANGASARAI

20

HULSANGANJ

20

SKMCH

50

RAXAUL

20

Table 4-26

Committed 220/132kV Substations

Name of the substation

# Transformers

SIPARA, PATNA

Capacity (MVA)

150

50

100

50

100

20

HAJIPUR (NEW)

100

PUSAULI (NEW)

2`

150

BEGUSARAI

MADHEPURA

Table 4-27

Committed 400/132kV or 400/220kV Substations

Name of the substation

# Transformers

Capacity (MVA)

BANKA

200

JAMALPUR

200

KISHANGANJ

315

The following table provides the transmission lines under construction or committed by the
BSEB.
Table 4-28

Committed Transmission Lines of BSEB


Committed Transmission Lines

132KV DCSS Line from ARRA to JAGDISHPUR

132KV DCSS Line from BANJARI to SASARAM

132KV S/C Line from DIGHA to KHAGAUL

132KV DCSS Line from DINARA to KUDRA

132KV DCSS Line from DUMRAON to BUXAR

132KV S/C Line from HAJIPUR to DALSINGSARAI

132KV DCSS Line from JAMUI to SHEIKHPURA

132KV DCSS Line from JEHNABAD to KARPI

132KV S/C Line from KHAGAUL to BIHTA

10

132KV S/C Line from LAKHISARAI to SULTANGANJ

11

132KV DCSS Line from MADHEPURA to SONABARSHI

Developing the PSMP for Bihar

4-30

020328-40RP-0400-00

Final Report
Committed Transmission Lines

4.7

12

132KV S/C Line from SAMASTIPUR to BEGUSARAI

13

132KV S/C Line from SKMCH to SITAMAHRI

14

132KV S/C Line from SULTANGANJ to KAHALGAON

15

132KV DCDS Line from SUPAUL to KATIYA

16

132KV S/C Line from SUPAUL to PHULPARAS

17

132KV DCSS Line from TEKARI to GOH

18

132KV S/C Line from BEGUSARAI to BTPS

19

132KV S/C Line from BEGUSARAI to KUSHESWAR

20

220KV DCDS Line from BEGUSARAI to PURNEA

21

220KV DSDS Line from BEGUSARAI to KANTI

22

132KV S/C Line from BIHARSHARIFF to HULASGANJ

23

132KV DCSS Line from BIHARSHARIFF to SHEIKHPURA

24

132KV S/C Line from CHAPRA to HAJIPUR

25

220KV DCDS Line from HAJIPUR to FATUHA

26

132KV S/C Line from KHAGAUL to DIGHA

27

132KV DCSS Line from MTPS to SKMCH

28

132KV S/C Line from SAMASTIPUR to BEGUSARAI

29

132KV S/C Line from SONNENAGAR to AURANGABAD

30

220KV DCDS Line from PURNEA to MADHEPURA

31

132KV DCDS Line from DEHRI-ON-SONE to SONENAGAR

32

132KV S/C Line from GOPALGANJ to BETTIAH

33

132KV S/C Line from BIHARSHARIFF to NAWADA

SYSTEM STUDIES FOR FY 2018

This section presents the results of the system studies carried out to determine the
proposed transmission system for FY 2018. The transmission system studies were carried
out with a purpose to ensure that the power generated from the exisitng and the planned
stations can be evacuated and also to supply the forecast loads for each circle which was
subsequently allocated among the proposed and existing substations.
The system studies were carried out for the following scenarios

Peak Load (to determine the transmission requirements)

Light Load (to determine the reactive compensation requirements)

The system peak load of the system for FY 2018 occurs during October and whereas the
system light loads condition occurs during April. The system peak load and light load
respectively used for the studies were 5,383 MW and 3042 MW. As per the grid code in
various states, a power factor of 0.9 was taken at the interface bus.

Developing the PSMP for Bihar

4-31

020328-40RP-0400-00

Final Report

4.7.1

Integration of New Generating Stations into Network

As a first step, evacuation plans for the new generators coming into the system were taken
into account. This section presents the proposed transmission evacuation scheme for the
new generating station commissioned by FY 2018.
BTPS Extension
BTPS generating station extension comprises of 2x 250 MW units. It is expected to be
commissioned in FY 2014. The generation from these units are evacuated from the 220kV
transmission system with the following transmission reinforcement.

220kV DCDS AAAC line from BTPS to Hazipur (New) apart from the proposed
DCDS line

220kV DCDS AAAC line from BTPS to Begusarai.

MTPS Extension
MTPS extension comprises of 2x 195 MW units. It is expected to be commissioned in FY
2014. The generation from these units are evacuated from the 220kV transmission system
with the following transmission reinforcement.

Connected directly to existing 220kV KANTI SS

Nabinagar Power Generation (JV)


Nabinagar Power Generation is a 50:50 joint venture project of GoB/BSEB and NTPC. It
comprises of 3x 660MW units. It is expected to be commissioned in FY 2014. The
generation from these units is proposed to be evacuated from the 400kV transmission
system with the following transmission reinforcement.

Two DCDS 400kV Quad Moose lines from Nabinagar to Pusauli (Power Grid)

Barh Stage-1 and Stage-2


Barh Stage-1 comprises of 3x660 MW power generation and Stage-2 comprises of 2x660
MW. The total generation from Barh is 3,300 MW. The stage-1 is expected to be
commissioned in June 2011 and stage -2 is expected to be commissioned in FY 2012. The
generation from these units for the study purposes was evacuated from the 400kV
transmission system with the following transmission reinforcement planned by PGCIL.
Transmission Lines reinforcement planned by PGCIL

400kV DCDS Quad Moose line from Barh to Gorakhpur

LILO of 400kV DCDS Quad Moose line from Barh to Balia at Patna

LILO of 400kV DCDS Quad Moose line from Kahalgaon to Balia at Barh

Nabinagar Railway Power Generation


Nabinagar Power Generation is a joint venture project of NTPC and Indian Railways. It
comprises of 4x 250MW. It is expected to be commissioned in FY 2014. BSEB will have
5.8% share from this project. The generation from these units are evacuated from the 400kV
transmission system with the following transmission reinforcement.

One DCDS Quad Moose lines from Nabinagar to Pusauli (Power Grid)

Developing the PSMP for Bihar

4-32

020328-40RP-0400-00

Final Report

Buxar Thermal Power Generation


Buxar Thermal Power Generation comprises of 2x 660 MW located at Chausa in Buxar
district. It is expected to be commissioned in FY 2015. The generation from these units are
evacuated from the 400kV transmission system with the following transmission
reinforcement.

One DCDS 400kV Quad Moose lines from Buxar to Arra 400kV SS.

Lakhisarai Thermal Power Generation


Lakhisarai Thermal Power Generation comprises of 2x 660 MW located at Kajra in
Lakhisarai district. It is expected to be commissioned in FY 2015. The generation from these
units are evacuated from the 400kV transmission system with the following transmission
reinforcement.

Two DCDS 400kV Twin Moose lines from Lakhisarai to Patna 400kV SS.

Pirpainti Thermal Power Generation


Pirpainti Thermal Power Generation comprises of 2x 660 MW located at Pirpainti in
Bhagalpur district. It is expected to be commissioned in FY 2015. The generation from these
units are evacuated from the 400kV transmission system with the following transmission
reinforcement.

One DCDS 400kV Twin Moose lines from Pirpainti to Katihar 400kV SS.

JAS Infrastructure Power Generation


JAS Thermal Power Generation comprises of 4x 660 MW located at Banka in Bhagalpur
district. The generation from these units are evacuated from the 400kV transmission system
with the following transmission reinforcement.

One DCDS 400kV Quad Moose lines from JAS to 400kV Banka SS.

Two DCDS 400kV Quad Moose lines from JAS to 400kV Patna SS

Vikas Infrastructure Power Generation


Vikas Thermal Power Generation comprises of 4x 660 MW located at Begusarai in
Bhagalpur district. The generation from these units are evacuated from the 400kV
transmission system with the following transmission reinforcement.

Two DCDS 220kV Zebra lines from Vikas 220kV to Begusarai 220kV SS.

Gas Turbines located at Buxar


Gas turbines proposed in generation plan comprises of 4x 100 MW located at Buxar in
Buxer district. The generation from these units are evacuated from the 220kV transmission
system with the following transmission reinforcement.

One DCDS and one DCSS 220kV AAAC lines from 220kV generating to proposed
400kV Arrah substation.

Gas Turbines located at Gaya


Gas turbines proposed in generation plan comprises of 4x 100 MW located at Gaya in Gaya
district. The generation from these units are evacuated from the 220kV transmission system
with the following transmission reinforcement.

One DCDS and one DCSS 220kV AAAC lines from 220kV generating to 220kV
Bodhgaya substation.

Developing the PSMP for Bihar

4-33

020328-40RP-0400-00

Final Report

Dagmara Hydro Electric Station


Dagmara hydro electric power station of 126 MW located at Piprahi in Supaul district. The
generation from these units are evacuated from the 220kV transmission system with the
following transmission reinforcement.

4.7.2

One 220kV DCDS line from 220kV generating to proposed 220kV Supaul substation.
System Performance without Additional Reinforcements

The system studies were carried out for FY 2018 peak load study considering the existing
and committed transmission network as an initial network. During this scenario, as expected
overloading of several transmission lines and undervoltage at many buses was observed.
This is mainly due to the fact that the present BSEB transmission system and committed
reinforcements will not be able to meet the peak koad requirements without additional
reinforcements.
The transmission system was modelled in the PSAF program and load flow analysis was
carried out. The Table 29 shown below presents the overloaded lines considering the load
and generation scenario for peak load scenario of FY 2018. In the table below the
percentage of overload along with the list of overloaded lines is also presented.
Table 4-29

List of Overloaded Existing and Committed Network for FY 2018


Peak Load Study

SL
NO.

NAME OF THE LINE

OVERLOAD
(%)

132KV PURNEA to 220KV KATHIHAR

643.8

220KV HAJIPUR to 132KV HAJIPUR

507.8

220KV FATHUA to 132KV GAIGHAT

432.8

220KV MTPS to 132KV SKMCH

345.4

132KV SHITALPUR to 132KV HAJIPUR

302.1

400KV PURNEA to 132KV KISHANGANJ

280.8

220KV ARRA to 132KV DUMRAON

209.2

400KV PUSAULI to 132KV BHABUA

200.1

220KV KHAGAUL to 400KV PATNA

175.5

10

400KV KAHALGAON to 132KV KAHALGAON

172.9

11

132KV FORBESGANJ to 132KV PURNEA

170.9

12

220KV PUSAULI to 400KV PUSAULI

170.2

13

132KV CHAPRA to 132KV SHITALPUR

169.6

14

220KV KHAGAUL to 400KV PATNA

167.6

15

132KV BTPS to 132KV HATHIDAH CKT-1

159.9

16

132KV BTPS to 132KV HATHIDAH CKT-2

159.9

17

132KV PURNEA to 132KV SAHARSA

155.5

18

132KV BEGUSARAI to 132KV BTPS CKT-1

151.8

19

132KV BTPS to 132KV BEGUSARAI CKT-2

151.7

Developing the PSMP for Bihar

4-34

020328-40RP-0400-00

Final Report

SL
NO.

NAME OF THE LINE

OVERLOAD
(%)

20

220KV KANTI to 220KV GOPALGANJ

142.8

21

220KV MTPS to 132KV VAISHALI

141.3

22

220KV KHAGAUL to 132KV DIGHA

141.1

23

220KV KHAGAUL to 132KV BIHTA CKT-1

139.8

24

220KV KHAGAUL to 132KV BIHTA CKT-2

139.8

25

132KV VAISHALI to 132KV SHITALPUR

137.5

26

220KV DEHRI-ON-SONE to 132KV


SONNENAGAR CKT-1

136.1

27

220KV DEHRI-ON-SONE to 132KV


SONNENAGAR CKT-2

136.1

28

132KV SABOUR to 132KV BANKA

132.9

29

220KV JAKKANPUR to 132KV MITHAPUR

130.6

30

132KV SULTANGANJ to 132KV KAHALGAON

128.4

31

132KV SAMASTIPUR to 132KV DHARBHANGA

32

132KV BETTIAH to 132KV MOTIHARI

123.4

33

132KV SAHARSA to 220KV SUPAUL

122.9

34

132KV MOTIHARI to 220KV MTPS

122.5

35

220KV JAKKANPUR to 132KV MITHAPUR

122.4

36

132KV JEHNABAD to 132KV CHANDAUTI

121.9

37

132KV HAJIPUR to 132KV SAMASTIPUR

121.9

38

400KV PURNEA to 132KV PURNEA CKT-1

121.3

39

400KV PURNEA to 132KV PURNEA CKT-2

121.3

40

132KV SAMASTIPUR to 132KV BEGUSARAI


CKT-1

120.5

41

132KV SAMASTIPUR to 132KV BEGUSARAI


CKT-2

120.5

42

220KV DARBHANGA to 132KV DHARBHANGA


CKT-1

118.2

43

220KV DARBHANGA to 132KV DHARBHANGA


CKT-2

118.2

44

132KV GOPALGANJ to 132KV SIWAN

117.9

45

220KV DEHRI-ON-SONE to 132KV BIKRAMGANJ

114.5

46

132KV MITHAPUR to 132KV GAIGHAT

47

132KV BTPS to 132KV SAMASTIPUR

113.7

48

132KV SKMCH to 132KV SITMHARI

108.4

49

132KV WAZIRGANJ to 132KV PAHARPUR

50

400KV PATNA to 220KV FATUHA

Developing the PSMP for Bihar

4-35

124

114

105
102.7

020328-40RP-0400-00

Final Report

In addition to overloading of transmission lines, under voltage and overloading of several


buses and substations was observed.
4.7.3

New Transmission Substation Reinforcements

In order to relieve the overloading of the transmission lines and voltage problems at several
buses the additional reinforcements (new Substation, new Lines and reactive compensation)
were proposed apart from the existing and committed network. All the additional
reinforcements were identified by carrying out the simulations using the load flow program.
The transmission system for 2018 was developed by including the existing network,
committed additions and system reinforcements as identified by the studies.
The following table presents the proposed transmission substations required for meeting the
load for FY 2018 for maintaining the voltages of the 220/132/33kV and 132/33kV.
Table 4-30

Future 220/132kV/33kV and 132/33kV Substation Committed and


Planned
# of T/F

SL
NO.

COMMISSIONING
YEAR (FY)

NAME OF THE SS

10
MVA

20
MVA

50
MVA

2011

132KV AURANGABAD

2011

132KV BUXAR

2011

132KV DALSINGSARAI

2012

132KV DHANHA

2011

132KV DIGHA

2011

132KV DINARA

2011

132KV EKANGASARAI

2012

132KV FATHUA-2

2012

132KV GANGWARA

2011

132KV GOH

2011

132KV HARNAUT

10

2011

132KV HULASGANJ

11

2011

132KV JAGDISHPUR

12

2012

132KV JAKKANPUR-2

13

2011

132KV KARPY

14

2011

132KV KATRA

15

2013

132KV KHAGAUL-2

16

2011

132KV KUDRA

17

2011

132KV KUSHESWAR

18

2011

132KV MADHEPURA

19

2011

132KV MASRAKH

20

2014

132KV MITHAPUR-2

Developing the PSMP for Bihar

4-36

020328-40RP-0400-00

Final Report
# of T/F
SL
NO.

COMMISSIONING
YEAR (FY)

NAME OF THE SS

10
MVA

20
MVA

50
MVA

21

2011

132KV NALANDA

22

2011

132KV RAXAUL

23

2011

132KV RUNI SAIDPUR

24

2011

132KV SHEOHAR

25

2011

132KV SKMCH

26

2011

132KV SONABARSHI

27

2011

132KV TEKARI

28

2011

132KV WAZIRGANJ

29

2010

132KV BEGUSARAI

30

2012

220KV SIPARA

31

2018

132KV PAHARPUR

32

2017

132KV BARIPAHRI-2

33

2018

132KV BIHTA-2

34

2016

132KV CHANDAUTI-2

35

2016

132KV CHAPRA-2

36

2016

132KV GAIGHAT-2

37

2016

132KV KHAGUAL-3

38

2017

132KV MITHAPUR-3

39

2017

132KV MUZAFFARPUR-2

40

2016

132KV PURNEA-2

41

2016

132KV SABOUR-2

42

2016

132KV SAMASTIPUR-2

43

2017

132KV SONNENAGAR-2

TOTAL (Number)

37

49

40

740

2,450

TOTAL (MVA)

The following Table 31 presents the increase in transmission capacity of the transmission
substations for the voltage ratio of 220/132kV and 400/220kV.

Developing the PSMP for Bihar

4-37

020328-40RP-0400-00

Final Report

Table 4-31

Future 220/132kV and 400/220kV Substations Committed and


Planned
NUMBER OF T/F

SL NO.

FY

100

150

200

315

1,500

220/
132 KV

220/
132 KV

220/
132 KV

400/
220 KV

765/
400 KV

NAME OF THE SS

2013

765KV SASARAM

2013

765KV GAYA

2012

400KV KISHANGANJ

2012

400KV JAMALPUR

2012

400KV BANKA

2012

400KV KATHIHAR

2011

220KV SUPAUL

2012

220KV SONENAGAR

2012

220KV SIPARA

10

2012

220KV SHEOHAR

11

2012

220KV KATHIHAR

12

2012

220KV PUSAULI

13

2015

220KV MUZAFFARPUR

14

2011

220KV MADHEPURA

15

2013

220KV KHAGAUL-2

16

2012

220KV JAKKANPUR

17

2011

220KV HAJIPUR

18

2012

220KV GAIGHAT

19

2010

220KV BEGUSARAI

20

2015

400KV ARRAH

21

2015

220KV SAMASTIPUR

22

2015

220KV SABOUR

23

2018

220KV HULSANGANJ

24

2016

220KV FORBESGANJ

25

2015

220KV CHAPRA

26

2017

220KV BIKRAMGANJ

29

12

2,900

1,800

800

2,520

7,500

TOTAL (Number)
TOTAL (MVA)

Developing the PSMP for Bihar

4-38

020328-40RP-0400-00

Final Report

4.7.4

Transmission Substation Augmentation

This section presents the transmission substation augmentation required at various voltage
levels.

Developing the PSMP for Bihar

4-39

020328-40RP-0400-00

Final Report

The following table presents the augmentation of existing 220/132/33kV and 132/kV substations.
Table 4-32

Augmentation of 220/132kV/33kV and 132/33kV Existing Substation


T/F CAPACITY (MVA)

COMMISSIONING YEAR (FY)

NAME OF THE SS
2010

2011

2012

2013

2014

2015

2016

2017

2018

TOTAL

EXISTING

132KV ARRA

50

50

50

150

EXISTING

132KV BANJARI

20

20

EXISTING

132KV BANKA

50

50

50

150

EXISTING

132KV BARHI

100

50

150

EXISTING

132KV BARIPAHRI

50

50

100

EXISTING

132KV BELAGANJ

20

20

40

EXISTING

132KV BETTIAH

50

50

100

EXISTING

132KV BHABUA

50

50

50

150

EXISTING

132KV BIHTA

50

50

EXISTING

132KV BIKRAMGANJ

50

50

50

150

EXISTING

132KV CHANDAUTI

40

40

EXISTING

132KV CHAPRA

100

50

150

EXISTING

132KV DARBHANGA

50

50

100

EXISTING

132KV DHAKA

20

20

40

EXISTING

132KV DUMRAON

100

50

150

EXISTING

132KV FORBESGANJ

50

50

100

EXISTING

132KV GAIGHAT

100

100

EXISTING

132KV GOPALGANJ

100

50

150

EXISTING

132KV HAJIPUR

50

50

50

150

Developing the PSMP for Bihar

4-40

020328-40RP-0400-00

Final Report
T/F CAPACITY (MVA)
COMMISSIONING YEAR (FY)

NAME OF THE SS
2010

2011

2012

2013

2014

2015

2016

2017

2018

TOTAL

EXISTING

132KV HATHIDAH

100

50

150

EXISTING

132KV JAINAGAR

20

20

40

EXISTING

132KV JAMALPUR

50

50

100

EXISTING

132KV JAMUI

50

50

50

150

EXISTING

132KV JEHNABAD

50

100

150

EXISTING

132KV KARMNASA

20

20

20

50

110

EXISTING

132KV KATIHAR

50

50

50

150

EXISTING

132KV KATIYA

100

100

EXISTING

132KV KHAGARIYA

50

50

50

150

EXISTING

132KV KAHALGAON

50

50

100

EXISTING

132KV KISHANGANJ

50

50

50

150

EXISTING

132KV LAKHISARAI

50

50

100

EXISTING

132KV MASURHI

50

50

100

EXISTING

132KV MADHUBANI

50

50

50

150

EXISTING

132KV MITHAPUR

50

50

EXISTING

132KV MOTIHARI

50

50

50

150

EXISTING

132KV MUZAFFARPUR

50

50

EXISTING

132KV NAUGACHHIYA

50

50

100

EXISTING

132KV NAWADA

50

50

50

150

EXISTING

132KV PANDAUL

50

50

50

150

EXISTING

132KV PHULPARAS

20

20

40

Developing the PSMP for Bihar

4-41

020328-40RP-0400-00

Final Report
T/F CAPACITY (MVA)
COMMISSIONING YEAR (FY)

NAME OF THE SS
2010

2011

2012

2013

2014

2015

2016

2017

2018

TOTAL

EXISTING

132KV PURNEA

50

50

100

EXISTING

132KV RAFIGANJ

50

50

100

EXISTING

132KV RAJGIR

50

50

100

EXISTING

132KV RAMNAGAR

50

50

50

150

EXISTING

132KV SABOUR

50

50

100

EXISTING

132KV SAMASTIPUR

50

50

50

150

EXISTING

132KV SASARAM

50

50

50

150

EXISTING

132KV SAHARSA

50

50

50

150

EXISTING

132KV SHEIKHPURA

50

50

50

150

EXISTING

132KV SHITALPUR

50

50

100

EXISTING

132KV SITAMAHRI

50

50

50

150

EXISTING

132KV SIWAN

50

50

50

150

EXISTING

132KV SONNENAGAR

100

100

EXISTING

132KV SULTANGANJ

50

50

50

150

EXISTING

132KV SUPAUL

20

20

50

50

140

EXISTING

132KV VAISHALI

100

50

150

EXISTING

220KV BODHGAYA

50

50

EXISTING

220KV DEHRI-ON-SONE

50

50

100

2011

132KV AURANGABAD

40

40

2011

132KV DALSINGSARAI

50

50

2011

132KV DIGHA

50

50

Developing the PSMP for Bihar

4-42

020328-40RP-0400-00

Final Report
T/F CAPACITY (MVA)
COMMISSIONING YEAR (FY)

Developing the PSMP for Bihar

NAME OF THE SS
2010

2011

2012

2013

2014

2015

2016

2017

2018

TOTAL

2012

132KV FATHUA-2

50

50

2011

132KV HARNAUT

10

10

2011

132KV JAGDISHPUR

20

20

2012

132KV JAKKANPUR-2

50

50

2011

132KV KATRA

50

50

2013

132KV KHAGAUL-2

50

50

2011

132KV SKMCH

50

50

2012

220KV SIPARA

50

50

2016

132KV KHAGUAL-3

50

50

2017

132KV MITHAPUR-3

50

50

TOTAL

2,180

1,360

1,290

880

760

310

290

170

7,240

4-43

020328-40RP-0400-00

Final Report

The following table presents the augmentation of existing 220/132kV and above substations.
Table 4-33

Augmentation of 220/132kV and above Substations


T/F CAPACITY (MVA)

COMMISSIONING YEAR (FY)

NAME OF THE SS
2010

2011

2012

2013

2014

2015

2016

2017

2018

TOTAL

EXISTING

400KV KAHALGAON

100

100

EXISTING

400KV PUSAULI

150

150

EXISTING

400KV PURNEA

315

315

EXISTING

400KV PATNA

1,000

500

1,500

EXISTING

220KV KANTI

300

150

450

EXISTING

220KV KHAGAUL

300

150

450

EXISTING

220KV GOPALGANJ

100

100

EXISTING

220KV FATUHA

100

100

EXISTING

220KV DEHRI-ON-SONE

200

200

2012

220KV SHEOHAR

100

100

2011

220KV MADHEPURA

100

100

2013

220KV KHAGAUL-2

150

150

2012

220KV JAKKANPUR

150

150

2011

220KV HAJIPUR

100

100

2015

220KV SAMASTIPUR

100

100

2015

220KV SABOUR

100

100

2016

220KV FORBESGANJ

100

100

2015

220KV CHAPRA

100

100

Developing the PSMP for Bihar

4-44

020328-40RP-0400-00

Final Report
T/F CAPACITY (MVA)
COMMISSIONING YEAR (FY)

NAME OF THE SS
2010

2017

Developing the PSMP for Bihar

2011

2012

2013

2014

2015

2016

2017

2018

TOTAL

220KV BIKRAMGANJ

100

100

TOTAL

1,000

1,415

150

450

500

300

400

250

4,465

4-45

020328-40RP-0400-00

Final Report

4.7.5

Reactive Compensation

As presented in the earlier section, undervoltage was observed at the various buses during
simulation studies of peak load 2018 conditions. This section presents the reactive
compensation required to ensure the bus voltages within the specified limits under peak load
conditions and maintain the generator MVAr absorption within permitted limits. As a general
understanding, Inductive reactive compensation was planned for 400kV substations under
light load conditions and capacitive compensation at 132kV substations under peak load
conditions.
The power flow in BSEB power system flows is from the south-east region to northern region
and therefore the buses voltages in northern region were lesser than the minimum specified
limits and capacity compensation at 132kV substations in these regions was proposed. The
sizes of reactive compensation used in the study were 10/20/30 MVAr depending on the
requirement at each substation.
The following table shows the bus voltages which were outside the voltage limits (without
reactive compensation for FY 2018 Peak Load Scenario).
Table 4-34

Bus Voltages without Reactive Compensation for Peak Load


Scenario for FY 2018.

Sl. No

VOLTAGE
(KV)

33

132KV SIWAN

0.794

33

132KV DANHA`

0.812

33

132KV GOPALGANJ

0.829

33

132KV NAWADA

0.837

132

132KV DANHA`

0.839

33

132KV MASRAKH

0.839

132

132KV SIWAN

0.839

33

132KV JAKKANPUR

0.842

33

132KV PANDAUL

0.845

10

33

132KV MITHAPUR-3

0.847

11

33

132KV MITHAPUR

0.847

12

33

132KV JAKKANPUR-2

0.850

13

33

132KV CHAPRA

0.851

14

33

132KV KHAGAUL-2

0.851

15

33

132KV KHAGUAL-3

0.851

16

33

132KV BETTIAH

0.852

17

33

132KV MITHAPUR-2

0.852

18

132

132KV MASRAKH

0.854

19

33

132KV MOTIHARI

0.854

20

33

132KV FATHUA-2

0.855

21

33

132KV GAIGHAT

0.855

Developing the PSMP for Bihar

NAME OF THE SS

4-46

Voltage
(p.u)

020328-40RP-0400-00

Final Report

Sl. No

VOLTAGE
(KV)

22

33

132KV RAXAUL

0.855

23

33

132KV DHAKA

0.857

24

33

132KV SAMASTIPUR

0.857

25

33

132KV MUZAFFARPUR

0.860

26

33

132KV CHAPRA-2

0.86

27

33

132KV KATRA

0.86

28

33

132KV DIGHA

0.86

29

33

132KV BIHTA

0.86

30

33

132KV MADHUBANI

0.86

31

33

132KV SITMHARI

0.86

32

33

132KV VAISHALI

0.86

33

33

220KV SIPARA

0.86

34

132

132KV GOPALGANJ

0.86

35

132

220KV GOPALGANJ

0.87

36

33

132KV PAHARPUR

0.87

37

33

132KV GAIGHAT-2

0.87

38

132

132KV RAXAUL

0.87

39

33

132KV GANGWARA

0.87

40

33

132KV DALSINGSARAI

0.87

41

33

132KV JEHNABAD

0.87

42

33

132KV RAMNAGAR

0.87

43

33

220KV FATHUA

0.87

44

132

132KV BETTIAH

0.87

45

132

132KV NAWADA

0.87

46

33

132KV RUNI SAIDPUR

0.87

47

33

132KV SHITALPUR

0.88

48

33

132KV BIHTA-2

0.88

49

33

132KV DHARBHANGA

0.88

50

33

132KV KARPY

0.88

51

132

132KV MOTIHARI

0.87

52

33

132KV SKMCH

0.87

53

33

132KV SHEOHAR

0.87

54

132

132KV DHAKA

0.88

55

33

132KV HAJIPUR

0.88

56

33

132KV MASURHI

0.88

Developing the PSMP for Bihar

NAME OF THE SS

4-47

Voltage
(p.u)

020328-40RP-0400-00

Final Report

Sl. No

VOLTAGE
(KV)

Voltage
(p.u)

57

33

132KV WAZIRGANJ

0.88

58

33

132KV DUMRAON

0.88

59

33

132KV MUZAFFARPUR-2

0.88

60

33

132KV BELAGANJ

0.88

61

33

132KV KHAGAUL

0.88

62

132

132KV MADHUBANI

0.88

63

132

132KV RAMNAGAR

0.88

64

132

132KV PANDAUL

0.88

65

400

400KV MZAFFARPUR

1.05

NAME OF THE SS

The following table shows the reactive compensation required at various locations based on
the peak load condition of FY 2018 and FY 2014 load flow simulation. The in-service dates
of the capacitors based on the load flow simulation for FY 2018 and FY 2014 are also
presented in the following table.
Table 4-35

SL. NO

FY

132kV/33 kV Capacitive Compensation Requirements

VOLTAGE (KV)

NAME OF THE SS
Total

CAPAITY
(MVAr)
1,130

2011

33

132KV BUXAR

20

2011

33

132KV DHAKA

20

2011

33

132KV DUMRAON

30

2012

33

132KV GOPALGANJ

10

2012

33

132KV MOTIHARI

20

2014

33

132KV NAWADA

30

2012

33

132KV RAMNAGAR

20

2012

33

132KV SIWAN

30

2014

33

132KV BETTIAH

30

10

2013

33

132KV BIHTA

20

11

2011

33

132KV CHAPRA

20

12

2011

33

132KV DHANHA

20

13

2011

33

132KV JAMUI

10

14

2011

33

132KV RAXAUL

20

15

2012

33

132KV SHITALPUR

10

16

2014

33

132KV BHABUA

10

17

2012

33

132KV DHARBHANGA

20

Developing the PSMP for Bihar

4-48

020328-40RP-0400-00

Final Report

NAME OF THE SS

CAPAITY
(MVAr)

18

2011

33

132KV FATHUA-2

20

19

2013

33

132KV HAJIPUR

10

20

2013

33

132KV KHAGAUL-3

20

21

2015

33

132KV MASRAKH

10

22

2015

33

132KV MITHAPUR-2

30

23

2015

33

132KV PANDAUL

30

24

2015

33

132KV DUMRAON

10

25

2015

33

132KV FATHUA

10

26

2015

33

132KV GOPALGANJ

10

27

2015

33

132KV MASURHI

10

28

2015

33

132KV MITHAPUR

30

29

2015

33

132KV MUZAFFARPUR

10

30

2015

33

132KV PANDAUL

10

31

2015

33

132KV SITMHARI

10

32

2015

33

132KV VISHALI

10

33

2015

33

132KV DALSINGSARAI

20

34

2015

33

132KV JAKKANPUR

30

35

2015

33

132KV KATRA

10

36

2015

33

132KV KHAGAUL-2

30

37

2016

33

132KV MADHUBANI

20

38

2016

33

132KV KISHANGANJ

10

39

2016

33

132KV GAIGHAT

20

40

2016

33

132KV JAKKANPUR-2

20

41

2016

33

132KV JEHNABAD

20

42

2016

33

132KV KARPY

10

43

2016

33

132KV KHAGAUL

20

44

2016

33

132KV SAMASTIPUR

20

45

2017

132

220KV FATHUA

20

46

2016

33

132KV BODHGAYA

10

47

2016

33

132KV SABOUR

10

48

2016

33

132KV CHANDAUTI-2

10

49

2016

33

132KV DIGHA

20

50

2016

33

132KV JAINAGAR

20

51

2017

33

132KV KHAGARIYA

20

52

2017

33

132KV MITHAPUR-3

30

Developing the PSMP for Bihar

4-49

020328-40RP-0400-00

Final Report

NAME OF THE SS

CAPAITY
(MVAr)

53

2017

33

132KV SASARAM

10

54

2017

33

132KV WAZIRGANJ

30

55

2017

33

132KV LAKHISARAI

10

56

2017

33

132KV BANKA

10

57

2017

33

132KV BARIPAHRI

10

58

2017

33

132KV BIKRAMGANJ

20

59

2018

33

132KV CHANDAUTI

10

60

2017

33

132KV DINARA

10

61

2017

33

132KV GAIGHAT-2

20

62

2018

33

132KV HARNAUT

10

63

2018

33

132KV KATHAR

10

64

2018

33

132KV NAUGACHHIYA

10

65

2018

33

132KV PAHARPUR

10

66

2018

33

132KV SONNENAGAR

10

67

2018

132

220KV KHAGAUL-2

10

Similarly, the inductive compensation was proposed at various 400kV substations under light
load conditions to limit the 400kV bus voltages within specified limits. The bus voltages in the
proposed ARRAH and BANKA 400kV substations apart from the existing 400kV substation
are higher than the bus voltage limits under during light load condition.
The following table shows the inductive compensation required with the proposed in-service
dates at various location.
Table 4-36
FY

OWNER

400kV Inductive Compensation Requirements.

VOLTAGE KV

NAME OF THE SS

CAPAITY
(MVAr)
800

2011

PGCIL

400

400KV MZAFFARPUR

100

2011

PGCIL

400

400KV MZAFFARPUR

100

2012

PGCIL

400

400KV MZAFFARPUR

100

2014

PGCIL

400

765KV SASARAM

200

2015

BSEB

400

400KV ARRAH

100

2017

BSEB

400

400KV JAMALPUR

100

2016

BSEB

400

400KV BANKA

100

Developing the PSMP for Bihar

4-50

020328-40RP-0400-00

Final Report

4.7.6

Peak Load System Condition for FY 2018

The peak load forecast used for studies for FY 2018 was 5,383 MW based on the load
forecast report. The system was simulated and studied to define the transmission system
needed to the above peak load. The system demand was allocated to various substations
which are presented in earlier section in this report. As discussed earlier, a specific
percentage of transmission losses are assumed for deriving the substation loads. These
values of substation loads was used as starting point for system study simulation and the
model was further refined and adjusted to meet the value of the peak load as defined in the
load forecast report.. All loads are assumed to have a power factor 0.9. The generation and
import/export schedules are prepared for the peak load condition. These schedules are
presented earlier in the report.
The single line diagram for 2018 peak load condition is presented in the end of section
(Figure BSEB 2018-1) The SLD presents the bus voltages, line flows (MW and MVAr). The
flows presented are per circuit and number of circuits are marked separately.
4.7.6.1

Load Flow Results

The following table summarises the load flow study results.


Table 4-37

Load Flow Summary Results-2018 Peak Load Condition

Details

MW

Substation Loads

5157

Generation

5504

Losses of PGCIL Network within State

122

Net Generation Utilisation by BSEB

2.2%

5382

Losses
132kV

58

1.08%

220kV

72

1.35%

400kV Losses

94

1.75%

Total Losses

225

4.18%

The system peak demand met was 5,382 MW which is almost equal to the projected system
peak demand of 5,383.
The total BSEB transmission losses of 225 MW represent the 4.18% of BSEB system
requirement. The transmission losses for the 132, 220 and 440 kV were found to be 1.08%,
1.35% and 1.75% respectively in the BSEB system.
All transformers and transmission lines were operating within their permitted load ratings. All
bus voltages were within permissible limits.
The N-1 contingency operation was carried out to test the system for satisfactory operation.
It is observed that during the N-1 contingency operation all branch loadings and bus voltages
were observed to be within limits.
The minimum and maximum voltages observed in the system simulations were 0.95 and
1.052 p.u. The summary of bus voltages as obtained during study are presented in the
following table:

Developing the PSMP for Bihar

4-51

020328-40RP-0400-00

Final Report

Table 4-38

Summary of Voltage Profile- 2018 Peak Load Condition


Number of Buses within Specified Voltages limits (p.u)

Voltage
(KV)

Number
of Buses

0.95 to 1

1.00 to 1.05

1.05 to 1.1

765

0%

100%

0%

400

20

0%

20

100%

0%

220

42

0%

42

100%

0%

132

139

66

47%

73

53%

0%

203

66

Total

137

The circle wise demand, generation and losses are presented in the following table
Table 4-39

Circle wise summary of Load, generation and Losses for FY 2018


Peak Load Condition
Active
Power
(MW)

Reactive
Power
(MVAR)

Total generation

5504

1744

Static Load

5157

2498

Shunt loads

-430

5157

2067

347

-3053

2729

Total losses

347

-324

Mismatches

Active
Power

Reactive
Power

Total generation

-667

662

Static Load

1549

750

Shunt loads

-356

1549

394

Line / cable losses

39

-610

Transformer losses

653

39

42

Summary Data
COMPLETE SUMMARY REPORT

Total load
Line / cable losses
Transformer losses

SUMMARY REPORT FOR CIRCLE: PATNA, PESU(E), PESU(W)

Summary Data

Total load

Total losses

Developing the PSMP for Bihar

4-52

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Active
Power

Reactive
Power

2285

-1378

Static Load

532

258

Shunt loads

-138

532

120

Line / cable losses

18

-502

Transformer losses

476

18

-26

Active
Power

Reactive
Power

1160

206

Static Load

228

110

Shunt loads

-19

228

91

Line / cable losses

10

-65

Transformer losses

130

10

65

Active
Power

Reactive
Power

Total generation

5486

-577

Spinning reserve

842

Static Load

323

157

Shunt loads

79

323

236

Summary Data
SUMMARY REPORT FOR CIRCLE: GAYA

Summary Data

Total generation

Total load

Total losses

SUMMARY REPORT FOR CIRCLE: MUNGER

Summary Data

Total generation

Total load

Total losses

SUMMARY REPORT FOR CIRCLE: BHAGALPUR

Summary Data

Total load

Developing the PSMP for Bihar

4-53

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Line / cable losses

27

-12

Transformer losses

617

27

605

Active
Power

Reactive
Power

Total generation

504

366

Static Load

421

204

Shunt loads

299

421

503

Line / cable losses

20

-562

Transformer losses

132

20

-430

Active
Power

Reactive
Power

Static Load

296

143

Shunt loads

-88

296

55

Line / cable losses

-31

Transformer losses

40

Total losses

Active
Power

Reactive
Power

-14

Summary Data

Total losses

SUMMARY REPORT FOR CIRCLE: MUZAFFARPUR

Summary Data

Total load

Total losses

SUMMARY REPORT FOR CIRCLE: CHAPRA

Summary Data

Total generation

Total load

SUMMARY REPORT FOR CIRCLE: MOTIHARI

Summary Data

Total generation

Developing the PSMP for Bihar

4-54

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Static Load

160

78

Shunt loads

-133

160

-55

Line / cable losses

-27

Transformer losses

Total losses

-19

Active
Power

Reactive
Power

Static Load

243

118

Shunt loads

-97

243

21

Line / cable losses

12

-34

Transformer losses

23

12

-11

Active
Power

Reactive
Power

1036

470

Static Load

253

122

Shunt loads

-39

253

84

Line / cable losses

16

-54

Transformer losses

141

16

88

Summary Data

Total load

SUMMARY REPORT FOR CIRCLE: DARBHANGA

Summary Data

Total generation

Total load

Total losses

SUMMARY REPORT FOR CIRCLE: SAMASTIPUR

Summary Data

Total generation

Total load

Total losses

SUMMARY REPORT FOR CIRCLE: PURNEA

Developing the PSMP for Bihar

4-55

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Active
Power

Reactive
Power

3302

15

Static Load

259

125

Shunt loads

-11

259

114

Line / cable losses

85

-31

Transformer losses

181

85

150

Active
Power

Reactive
Power

58

-76

Static Load

191

92

Shunt loads

-20

191

73

Line / cable losses

-56

Transformer losses

26

Total losses

-30

Active
Power

Reactive
Power

-4693

1424

Static Load

351

170

Shunt loads

70

351

240

Line / cable losses

47

-952

Transformer losses

81

47

-871

Summary Data

Summary Data

Total generation

Total load

Total losses

SUMMARY REPORT FOR CIRCLE: SAHARSA

Summary Data

Total generation

Total load

SUMMARY REPORT FOR CIRCLE: ROHTAS

Summary Data

Total generation

Total load

Total losses

Developing the PSMP for Bihar

4-56

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Active
Power

Reactive
Power

-2821

-238

Static Load

176

85

Shunt loads

42

176

127

Line / cable losses

34

88

Transformer losses

191

34

280

Active
Power

Reactive
Power

-150

884

Static Load

176

85

Shunt loads

-20

176

65

Line / cable losses

24

-205

Transformer losses

30

24

-175

Summary Data
SUMMARY REPORT FOR CIRCLE: BHOJPUR

Summary Data

Total generation

Total load

Total losses

SUMMARY REPORT FOR CIRCLE: NALANDA

Summary Data

Total generation

Total load

Total losses

4.7.6.2

Short Circuit Studies for FY 2018 Peak Load Condition

Three phase short-circuit studies were carried out to compute the short-circuit levels for
various shunt faults (bus faults) across the system for the year FY 2018-Peak load condition.
The sub-transient reactance of generators was used in the study. The tie-lines are modelled
in the short-circuit study considering the fault contribution from one node from each of the
neighbouring system. It was assumed that each of the neighbouring system contributed
around 20KA of fault current.
The short-circuit levels for three phase shunt faults at various buses are presented as below:

Developing the PSMP for Bihar

4-57

020328-40RP-0400-00

Final Report

Table 4-40
SL.
NO

Three Phase Short Circuit Currents- 2018 Peak Load Study

NAME OF THE SS/GENERATING


STATION

BUS VOLTAGE
(KV)

FAULT
CURRENT
(KA)

FAULT
MVA

765KV SASARAM

765

27

36,105

765KV GAYA

765

29

38,211

400KV KAHALGAON*

400

40

27,706

400KV BANKA*

400

39

26,735

400KV PIRPAINTI

400

18

12,670

400KV JAMALPUR

400

20

13,726

400KV JAS INFRA*

400

40

27,431

400KV LAKHISARAI

400

19

13,048

400KV NABINAGAR

400

27

18,782

10

400KV BARH*

400

42

29,215

11

400KV NABINAGAR-RLY

400

19

13,266

12

400KV KATHIHAR

400

21

14,546

13

400KV KISHANGANJ

400

20

13,536

14

400KV MZAFFARPUR

400

18

12,542

15

400KV BIHARSHARIFF*

400

39

26,924

16

400KV PURNEA

400

24

16,483

17

400KV BUXAR

400

20

13,526

18

400KV PATNA*

400

44

30,683

19

400KV PUSAULI*

400

46

31,773

20

765KV SASARAM*

400

46

31,872

21

400KV ARRAH

400

29

19,989

22

765KV GAYA

400

26

18,012

23

400KV KAHALGAON

220

15

5,600

24

220KV GT BUXAR

220

13

5,078

25

220KV VIKAS

220

32

12,137

26

220KV GT-GAYA

220

16

5,938

27

400KV KISHANGANJ

220

18

7,017

28

220KV BTPS*

220

39

14,792

29

220KV BEGUSARAI*

220

39

14,703

30

400KV MUZAFFRPUR

220

18

6,909

31

220KV SAMASTIPUR

220

14

5,203

32

400KV PURNEA

220

21

8,074

33

220KV KANTI

220

29

11,085

34

400KV KATHIHAR

220

26

9,971

Developing the PSMP for Bihar

4-58

020328-40RP-0400-00

Final Report

SL.
NO

NAME OF THE SS/GENERATING


STATION

BUS VOLTAGE
(KV)

FAULT
CURRENT
(KA)

FAULT
MVA

35

220KV KATHIHAR

220

26

10,084

36

220KV DARBHANGA

220

25

9,366

37

220KV BODHGAYA

220

18

6,786

38

220KV SABOUR

220

22

8,498

39

400KV BIHARSHARIFF

220

35

13,472

40

220KV BIHARSHARIFF

220

36

13,587

41

220KV HULSANGANJ

220

15

5,563

42

220KV FORBESGANJ

220

3,000

43

220KV SHEOHAR

220

12

4,472

44

220KV MADHEPURA

220

14

5,407

45

220KV MUZAFFARPUR

220

2,118

46

220KV GOPALGANJ

220

2,481

47

220KV HAJIPUR*

220

44

16,674

48

400KV ARRAH

220

27

10,282

49

220KV ARRA

220

27

10,299

50

220KV FATUHA

220

47

17,863

51

220KV SONENAGAR

220

14

5,203

52

220KV BIKRAMGANJ

220

14

5,192

53

400KV PATNA*

220

49

18,551

54

400KV PUSAULI

220

20

7,538

55

220KV SIPARA*

220

48

18,404

56

220KV PUSAULI

220

20

7,522

57

220KV DEHRI-ON-SONE

220

14

5,219

58

220KV GAIGHAT*

220

45

17,182

59

220KV JAKKANPUR*

220

46

17,396

60

220KV SUPAUL

220

3,229

61

220KV KHAGAUL*

220

41

15,562

62

220KV KHAGAUL-2*

220

38

14,302

63

220KV CHAPRA

220

11

4,024

64

220KV DAGMARA

220

2,331

65

400KV BANKA

132

18

4,174

66

132KV NBANKA

132

18

4,152

67

220KV SAMASTIPUR

132

1,699

68

132KV SAMASTIPUR-2

132

1,639

69

400KV KAHALGAON

132

18

4,175

Developing the PSMP for Bihar

4-59

020328-40RP-0400-00

Final Report

SL.
NO

NAME OF THE SS/GENERATING


STATION

BUS VOLTAGE
(KV)

FAULT
CURRENT
(KA)

FAULT
MVA

70

220KV KATHIHAR

132

17

3,802

71

132KV KATHAR

132

16

3,632

72

132KV KAHALGAON

132

19

4,309

73

220KV SABOUR

132

21

4,829

74

132KV SABOUR

132

21

4,879

75

132KV SABOUR-2

132

19

4,348

76

220KV FORBESGANJ

132

11

2,548

77

400KV JAMALPUR

132

18

4,195

78

132KV FORBESGANJ

132

11

2,549

79

400KV PURNEA

132

18

4,091

80

132KV RAXAUL

132

846

81

132KV JAMALPUR

132

18

4,125

82

132KV PURNEA

132

18

4,122

83

132KV PURNEA-2

132

16

3,700

84

132KV BETTIAH

132

1,357

85

220KV MTPS

132

20

4,599

86

220KV BIHARSHARIFF

132

21

4,792

87

220KV GOPALGANJ

132

1,822

88

220KV SHEOHAR

132

14

3,119

89

132KV GOPALGANJ

132

1,819

90

132KV NAUGACHHIYA

132

1,225

91

132KV SHEOHAR

132

13

3,034

92

220KV MUZAFFARPUR

132

1,857

93

132KV MUZAFFARPUR-2

132

1,869

94

132KV RUNI SAIDPUR

132

13

3,024

95

132KV DHAKA

132

1,200

96

220KV BODHGAYA

132

17

3,786

97

220KV MADHEPURA

132

13

2,948

98

132KV MADHEPURA

132

13

2,958

99

132KV HARNAUT

132

11

2,423

100

132KV KATIYA

132

1,790

101

132KV RAMNAGAR

132

883

102

132KV BARIPAHRI

132

15

3,503

103

132KV BARIPAHRI-2

132

15

3,458

104

132KV KOSHI

132

1,681

Developing the PSMP for Bihar

4-60

020328-40RP-0400-00

Final Report

SL.
NO

NAME OF THE SS/GENERATING


STATION

BUS VOLTAGE
(KV)

FAULT
CURRENT
(KA)

FAULT
MVA

105

132KV SKMCH

132

15

3,446

106

132KV NALANDA

132

1,436

107

132KV SITMHARI

132

12

2,741

108

220KV HULSANGANJ

132

15

3,414

109

132KV DHANHA

132

796

110

132KV HULASGANJ

132

15

3,405

111

132KV SONABARSHI

132

1,232

112

220KV BIKRAMGANJ

132

2,138

113

132KV MUZAFFARPUR

132

14

3,253

114

132KV EKANGASARAI

132

13

3,027

115

132KV MOTIHARI

132

1,849

116

220KV SUPAUL

132

13

3,047

117

132KV SULTANGANJ

132

16

3,708

118

132KV BIKRAMGANJ

132

2,137

119

132KV SUPAUL

132

13

3,073

120

220KV BEGUSARAI

132

21

4,899

121

132KV CHANDAUTI

132

16

3,757

122

132KV PAHARPUR

132

1,913

123

132KV BTPS

132

22

5,084

124

132KV TEKARI

132

12

2,693

125

132KV WAZIRGANJ

132

1,718

126

132KV KUSHESWAR

132

1,017

127

132KV LAKHISARAI

132

16

3,638

128

132KV RAJGIR

132

921

129

132KV KISHANGANJ

132

1,726

130

132KV GOH

132

1,567

131

132KV VAISHALI

132

12

2,748

132

400KV PUSAULI

132

15

3,483

133

132KV PHULPARAS

132

11

2,442

134

132KV SAHARSA

132

10

2,296

135

132KV CHANDAUTI-2

132

1,305

136

132KV MASRAKH

132

1,109

137

132KV SIWAN

132

1,362

138

132KV BELAGANJ

132

1,654

139

132KV HATHIDAH

132

20

4,664

Developing the PSMP for Bihar

4-61

020328-40RP-0400-00

Final Report

SL.
NO

NAME OF THE SS/GENERATING


STATION

BUS VOLTAGE
(KV)

FAULT
CURRENT
(KA)

FAULT
MVA

140

220KV SONENAGAR

132

13

2,894

141

220KV DEHRI-ON-SONE

132

15

3,349

142

132KV JAINAGAR

132

1,385

143

220KV DARBHANGA

132

12

2,696

144

132KV SONNENAGAR

132

13

2,935

145

132KV SONNENAGAR-2

132

12

2,836

146

132KV DHARBHANGA

132

12

2,699

147

132KV AURANGABAD

132

10

2,199

148

220KV HAJIPUR

132

17

3,881

149

220KV PUSAULI

132

15

3,531

150

132KV HAJIPUR

132

17

3,884

151

132KV BARHI

132

12

2,740

152

132KV BHABUA

132

15

3,449

153

132KV SHITALPUR

132

11

2,514

154

220KV ARRA

132

12

2,754

155

132KV UDAKISHANGANJ

132

963

156

132KV NAWADA

132

1,090

157

132KV DINARA

132

1,710

158

220KV CHAPRA

132

12

2,685

159

132KV KHAGARIYA

132

973

160

132KV CHAPRA

132

12

2,687

161

220KV SIPARA

132

24

5,421

162

132KV CHAPRA-2

132

11

2,523

163

220KV FATHUA

132

19

4,418

164

220KV GAIGHAT

132

20

4,532

165

132KV BIHTA-2

132

22

5,093

166

132KV KUDRA

132

14

3,241

167

132KV GAIGHAT-2

132

19

4,323

168

132KV SASARAM

132

11

2,572

169

132KV ARRA

132

12

2,707

170

132KV GAIGHAT

132

20

4,505

171

132KV FATHUA-2

132

18

4,133

172

132KV BANJARI

132

1,270

173

132KV RAFIGANJ

132

1,599

174

132KV MASURHI

132

10

2,333

Developing the PSMP for Bihar

4-62

020328-40RP-0400-00

Final Report

SL.
NO

NAME OF THE SS/GENERATING


STATION

BUS VOLTAGE
(KV)

FAULT
CURRENT
(KA)

FAULT
MVA

175

132KV MITHAPUR-2

132

17

3,969

176

132KV GANGWARA

132

2,070

177

132KV KARPY

132

1,600

178

220KV KHAGAUL

132

16

3,705

179

132KV JEHNABAD

132

13

2,866

180

220KV KHAGAUL-2

132

23

5,352

181

132KV KATRA

132

18

4,041

182

132KV JAGDISHPUR

132

1,413

183

220KV JAKKANPUR

132

21

4,767

184

132KV KHAGAUL

132

16

3,621

185

132KV SAMASTIPUR

132

16

3,690

186

132KV KHAGUAL-3

132

23

5,202

187

132KV KHAGAUL-2

132

23

5,259

188

132KV JAKKANPUR-2

132

20

4,656

189

132KV KARMNASA

132

11

2,603

190

132KV PANDAUL

132

10

2,212

191

132KV DIGHA

132

15

3,316

192

132KV BUXAR

132

1,203

193

132KV BIHTA

132

15

3,433

194

132KV DALSINGSARAI

132

14

3,141

195

132KV JAKKANPUR

132

24

5,532

196

132KV MITHAPUR

132

21

4,723

197

132KV MITHAPUR-3

132

18

4,009

198

132KV DUMRAON

132

1,582

199

132KV MADHUBANI

132

1,602

200

132KV SHEIKHPURA

132

10

2,217

201

132KV JAMUI

132

1,406

*the short-circuit levels for these susbstations are more than 36kA and were found critical and would
need detailed analysis consideriing input feed from other systems.

4.7.7

Light Load System Condition for FY 2018

The light load condition for the BSEB was simulated with about 57% of total substation peak
load for the same year. As discussed earlier, the circles wise substations light load were
calculated using the ratio as defined above. The total substation loads during light load
condition was about 2,969 MW in FY 2018. The generation utilisation by BSEB to meet the
load was 3,042 MW. The load flow simulation was carried out for the above substation load
scenario and results are presented below:

Developing the PSMP for Bihar

4-63

020328-40RP-0400-00

Final Report

4.7.7.1

Load Flow Results

The following table summarises the load flow study results.


Table 4-41

Load Flow Summary Results-2018 Light Load Condition


Details

MW

Substation Loads

2972

Generation

3108

Losses of PGCIL Network within State

42

Net Generation Utilisation by BSEB

1.3%

3066

Losses
132kV

25

0.82%

220kV

27

0.87%

400kV Losses

43

1.39%

Total Losses

94

3.07%

Total connected Inductive Compensation


(MVAr)

800

Total connected Capacitive compensation


(MVAr)

1090

The system demand met by BSEB during light load is 3,066 MW which is about 57% of the
system peak demand.
The total BSEB transmission losses of 94 MW represent 3.07% of BSEB system
requirement. The transmission system losses for 132, 220 and 400 kV were limited to
0.82%, 0.87% and 1.39% respectively in the BSEB system.
All transformers and transmission lines were operating within their permitted load ratings. All
bus voltages were within permissible limits.
The N-1 contingency operation was carried out to test the system for satisfactory operation.
It was observed that during the N-1 contingency operation all branch loadings and bus
voltages were operating satisfactorily.
The minimum and maximum voltages observed in the system were 0.986 and 1.091 p.u.
The summary of bus voltages are presented in the following table:
Table 4-42

Summary of Voltage Profile- 2018 Light Load Condition


Number of Buses within Specified Voltages limits (p.u)

Voltage (KV)

Number of Buses
0.95 to 1

1.00 to 1.05

1.05 to 1.1

765

0%

100%

0%

400

20

5%

19

95%

0%

220

42

0%

39

100%

7%

132

139

5%

121

95%

12

9%

203

Total

Developing the PSMP for Bihar

181

4-64

15

020328-40RP-0400-00

Final Report

The circle wise demand, generation and losses are presented in the following table
Table 4-43

Circle wise summary of Load, generation and Losses for FY 2018


Light Load Condition
Active
Power
(MW)

Reactive
Power
(MVAR)

Total generation

3109

-2879

Static Load

2972

1439

Shunt loads

-301

2972

1138

137

-5348

1331

Total losses

137

-4017

Mismatches

Active
Power

Reactive
Power

-255

355

Static Load

842

408

Shunt loads

-397

842

11

Line / cable losses

19

-864

Transformer losses

302

19

-562

Active
Power

Reactive
Power

2142

-1586

Static Load

311

151

Shunt loads

-150

311

-546

Summary Data
COMPLETE SUMMARY REPORT

Total load
Line / cable losses
Transformer losses

SUMMARY REPORT FOR CIRCLE: PATNA, PESU(E), PESU(W)

Summary Data

Total generation

Total load

Total losses

SUMMARY REPORT FOR CIRCLE: GAYA

Summary Data

Total generation

Total load
Line / cable losses

Developing the PSMP for Bihar

4-65

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Transformer losses

250

Total losses

-296

Active
Power

Reactive
Power

Total generation

580

67

Static Load

133

64

Shunt loads

89

133

153

Line / cable losses

-120

Transformer losses

61

Total losses

-59

Active
Power

Reactive
Power

Total generation

3638

Spinning reserve

671

Static Load

189

92

Shunt loads

78

189

169

Line / cable losses

10

-155

Transformer losses

351

10

196

Active
Power

Reactive
Power

404

-79

Summary Data

SUMMARY REPORT FOR CIRCLE: MUNGER

Summary Data

Total load

SUMMARY REPORT FOR CIRCLE: BHAGALPUR

Summary Data

Total load

Total losses

SUMMARY REPORT FOR CIRCLE: MUZAFFARPUR

Summary Data

Total generation

Developing the PSMP for Bihar

4-66

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Static Load

246

119

Shunt loads

297

246

417

Line / cable losses

-673

Transformer losses

60

Total losses

-613

Active
Power

Reactive
Power

Static Load

161

78

Shunt loads

-102

161

-24

Line / cable losses

-46

Transformer losses

12

Total losses

-34

Active
Power

Reactive
Power

-17

Static Load

92

45

Shunt loads

-127

92

-82

Line / cable losses

-34

Transformer losses

Total losses

-31

Summary Data

Total load

SUMMARY REPORT FOR CIRCLE: CHAPRA

Summary Data

Total generation

Total load

SUMMARY REPORT FOR CIRCLE: MOTIHARI

Summary Data

Total generation

Total load

SUMMARY REPORT FOR CIRCLE: DARBHANGA

Developing the PSMP for Bihar

4-67

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Active
Power

Reactive
Power

Static Load

141

68

Shunt loads

-109

141

-41

Line / cable losses

-70

Transformer losses

Total losses

-64

Active
Power

Reactive
Power

Total generation

716

14

Static Load

197

95

Shunt loads

-42

197

53

Line / cable losses

-101

Transformer losses

79

Total losses

-22

Active
Power

Reactive
Power

1968

-533

Static Load

141

68

Shunt loads

-12

141

57

Line / cable losses

30

-763

Transformer losses

60

30

-703

Summary Data

Summary Data

Total generation

Total load

SUMMARY REPORT FOR CIRCLE: SAMASTIPUR

Summary Data

Total load

SUMMARY REPORT FOR CIRCLE: PURNEA

Summary Data

Total generation

Total load

Total losses

Developing the PSMP for Bihar

4-68

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Active
Power

Reactive
Power

87

-77

Static Load

111

54

Shunt loads

-21

111

32

Line / cable losses

-90

Transformer losses

13

Total losses

-78

Active
Power

Reactive
Power

-3266

772

Static Load

203

99

Shunt loads

180

203

278

Line / cable losses

15

-1412

Transformer losses

46

15

-1366

Active
Power

Reactive
Power

-2454

-837

Static Load

103

50

Shunt loads

36

103

86

17

-125

Summary Data
SUMMARY REPORT FOR CIRCLE: SAHARSA

Summary Data

Total generation

Total load

SUMMARY REPORT FOR CIRCLE: ROHTAS

Summary Data

Total generation

Total load

Total losses

SUMMARY REPORT FOR CIRCLE: BHOJPUR

Summary Data

Total generation

Total load
Line / cable losses

Developing the PSMP for Bihar

4-69

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

80

17

-45

Active
Power

Reactive
Power

-455

-963

Static Load

103

50

Shunt loads

-21

103

28

Line / cable losses

10

-351

Transformer losses

10

10

-341

Summary Data
Transformer losses
Total losses

SUMMARY REPORT FOR CIRCLE: NALANDA

Summary Data

Total generation

Total load

Total losses

4.7.7.2

Short Circuit Studies for FY 2018 Light Load Condition

Three phase short-circuit studies were carried out to compute the short-circuit levels for
various shunt faults (bus faults) across the system for the year FY 2018-Light load condition.
The sub-transient reactance of generators was used in the study to determine the maximum
fault currents. The tie-lines are modelled in the short-circuit study considering the fault
contribution from one node from each of the neighbouring system. It was assumed that
20KA of fault contribution is from each of the neighbouring system.
The short-circuit levels for three phase shunt faults at various buses are presented as below:
Table 4-44
SL. NO

Three Phase Short Circuit Currents- 2018 Light Load Study


NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAG
E (KV)

FAULT
CURRENT
(KA)

FAULT
MVA

765KV SASARAM

765

26

33,893

765KV GAYA

765

27

36,107

400KV PURNEA

400

20

13,576

400KV KATHIHAR

400

17

11,779

400KV KISHANGANJ

400

16

11,396

400KV PIRPAINTI

400

14

9,825

400KV LAKHISARAI

400

15

10,391

400KV KAHALGAON

400

35

24,429

Developing the PSMP for Bihar

4-70

020328-40RP-0400-00

Final Report

SL. NO
9

NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAG
E (KV)

FAULT
CURRENT
(KA)

FAULT
MVA

400KV BANKA

400

34

23,413

10

400KV JAS INFRA

400

34

23,663

11

400KV BIHARSHARIFF

400

36

24,991

12

400KV NABINAGAR-RLY

400

18

12,135

13

400KV NABINAGAR

400

24

16,290

14

400KV JAMALPUR

400

19

13,144

15

400KV MZAFFARPUR

400

17

12,061

16

400KV PATNA

400

37

25,821

17

400KV BUXAR

400

16

10,751

18

400KV PUSAULI

400

42

29,180

19

765KV SASARAM

400

42

29,341

20

400KV BARH

400

36

24,728

21

400KV ARRAH

400

25

17,240

22

765KV GAYA

400

26

17,841

23

400KV KISHANGANJ

220

17

6,551

24

400KV PURNEA

220

20

7,562

25

400KV KATHIHAR

220

24

9,161

26

220KV KATHIHAR

220

24

9,275

27

220KV FORBESGANJ

220

2,991

28

220KV GOPALGANJ

220

2,520

29

220KV MADHEPURA

220

14

5,345

30

220KV SABOUR

220

21

8,049

31

220KV SUPAUL

220

3,280

32

400KV MUZAFFRPUR

220

17

6,643

33

400KV KAHALGAON

220

14

5,459

34

220KV DARBHANGA

220

23

8,800

35

220KV VIKAS

220

28

10,673

36

220KV KANTI

220

27

10,236

37

220KV SAMASTIPUR

220

13

5,027

38

220KV BEGUSARAI

220

34

13,024

39

220KV BTPS

220

35

13,282

40

220KV SHEOHAR

220

12

4,384

41

400KV BIHARSHARIFF

220

33

12,486

42

220KV BIHARSHARIFF

220

33

12,563

43

220KV MUZAFFARPUR

220

2,129

Developing the PSMP for Bihar

4-71

020328-40RP-0400-00

Final Report

SL. NO

NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAG
E (KV)

FAULT
CURRENT
(KA)

FAULT
MVA

44

220KV DAGMARA

220

2,391

45

220KV HULSANGANJ

220

13

5,117

46

220KV CHAPRA

220

11

4,035

47

220KV HAJIPUR

220

40

15,274

48

220KV GT-GAYA

220

12

4,395

49

220KV BODHGAYA

220

14

5,342

50

220KV FATUHA

220

43

16,275

51

220KV GAIGHAT

220

41

15,716

52

220KV JAKKANPUR

220

42

15,865

53

220KV SIPARA

220

44

16,689

54

400KV PATNA

220

44

16,807

55

220KV KHAGAUL-2

220

35

13,314

56

220KV KHAGAUL

220

37

14,265

57

220KV GT -BUXAR

220

3,490

58

220KV BIKRAMGANJ

220

13

5,006

59

220KV ARRA

220

23

8,799

60

400KV ARRAH

220

23

8,754

61

220KV SONENAGAR

220

13

4,874

62

400KV PUSAULI

220

19

7,280

63

220KV PUSAULI

220

19

7,264

64

220KV DEHRI-ON-SONE

220

13

4,922

65

132KV DHANHA

132

844

66

132KV BETTIAH

132

1,435

67

132KV RAMNAGAR

132

940

68

132KV RAXAUL

132

902

69

220KV GOPALGANJ

132

1,896

70

132KV GOPALGANJ

132

1,894

71

132KV SIWAN

132

1,435

72

132KV MASRAKH

132

1,170

73

132KV DHAKA

132

1,247

74

132KV JAINAGAR

132

1,453

75

132KV MOTIHARI

132

1,915

76

220KV MADHEPURA

132

13

3,009

77

132KV MADHEPURA

132

13

3,020

78

220KV SUPAUL

132

14

3,119

Developing the PSMP for Bihar

4-72

020328-40RP-0400-00

Final Report

SL. NO

NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAG
E (KV)

FAULT
CURRENT
(KA)

FAULT
MVA

79

132KV SUPAUL

132

14

3,146

80

220KV KATHIHAR

132

17

3,790

81

132KV PHULPARAS

132

11

2,525

82

220KV FORBESGANJ

132

11

2,585

83

132KV KATHAR

132

16

3,629

84

132KV SONABARSHI

132

1,279

85

132KV FORBESGANJ

132

11

2,587

86

400KV PURNEA

132

18

4,084

87

132KV PURNEA

132

18

4,117

88

132KV PURNEA-2

132

16

3,709

89

132KV MADHUBANI

132

1,682

90

132KV SAHARSA

132

10

2,367

91

132KV KATIYA

132

1,843

92

132KV KOSHI

132

1,733

93

132KV NAUGACHHIYA

132

1,256

94

132KV PANDAUL

132

10

2,300

95

132KV SITMHARI

132

12

2,787

96

220KV SHEOHAR

132

14

3,144

97

132KV SHEOHAR

132

13

3,061

98

132KV UDAKISHANGANJ

132

1,009

99

400KV BANKA

132

18

4,124

100

132KV NBANKA

132

18

4,103

101

132KV RUNI SAIDPUR

132

13

3,055

102

220KV DARBHANGA

132

12

2,763

103

132KV DHARBHANGA

132

12

2,767

104

132KV WAZIRGANJ

132

1,715

105

132KV GANGWARA

132

2,147

106

132KV NAWADA

132

1,113

107

220KV MTPS

132

20

4,569

108

132KV PAHARPUR

132

1,898

109

132KV SKMCH

132

15

3,470

110

220KV SABOUR

132

21

4,802

111

132KV SABOUR

132

21

4,852

112

132KV SABOUR-2

132

19

4,336

113

220KV MUZAFFARPUR

132

1,883

Developing the PSMP for Bihar

4-73

020328-40RP-0400-00

Final Report

SL. NO

NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAG
E (KV)

FAULT
CURRENT
(KA)

FAULT
MVA

114

132KV MUZAFFARPUR-2

132

1,896

115

132KV MUZAFFARPUR

132

14

3,279

116

220KV BODHGAYA

132

16

3,569

117

220KV SAMASTIPUR

132

1,690

118

132KV SAMASTIPUR-2

132

1,631

119

400KV KAHALGAON

132

18

4,153

120

132KV KAHALGAON

132

19

4,289

121

132KV VAISHALI

132

12

2,793

122

400KV JAMALPUR

132

18

4,189

123

132KV JAMALPUR

132

18

4,123

124

132KV KHAGARIYA

132

1,001

125

132KV CHAPRA

132

12

2,754

126

220KV CHAPRA

132

12

2,751

127

132KV CHANDAUTI

132

16

3,607

128

132KV CHAPRA-2

132

11

2,590

129

220KV HULSANGANJ

132

15

3,362

130

132KV HULASGANJ

132

15

3,354

131

132KV TEKARI

132

12

2,663

132

220KV BIHARSHARIFF

132

21

4,741

133

132KV SHITALPUR

132

11

2,575

134

132KV BELAGANJ

132

1,658

135

132KV GOH

132

1,580

136

132KV EKANGASARAI

132

13

3,012

137

132KV HARNAUT

132

11

2,436

138

132KV CHANDAUTI-2

132

1,327

139

132KV BARIPAHRI

132

15

3,496

140

132KV BARIPAHRI-2

132

15

3,452

141

132KV GAIGHAT-2

132

19

4,371

142

220KV GAIGHAT

132

20

4,573

143

220KV FATHUA

132

20

4,462

144

132KV GAIGHAT

132

20

4,548

145

132KV KARPY

132

1,643

146

132KV FATHUA-2

132

18

4,185

147

132KV MITHAPUR-2

132

18

4,027

148

132KV KATRA

132

18

4,099

Developing the PSMP for Bihar

4-74

020328-40RP-0400-00

Final Report

SL. NO

NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAG
E (KV)

FAULT
CURRENT
(KA)

FAULT
MVA

149

220KV JAKKANPUR

132

21

4,801

150

132KV JAKKANPUR-2

132

21

4,695

151

132KV KISHANGANJ

132

1,813

152

220KV KHAGAUL-2

132

23

5,362

153

132KV JEHNABAD

132

13

2,897

154

132KV KUSHESWAR

132

1,027

155

132KV KHAGAUL-2

132

23

5,274

156

132KV KHAGUAL-3

132

23

5,219

157

132KV MITHAPUR-3

132

18

4,066

158

132KV MITHAPUR

132

21

4,764

159

220KV BEGUSARAI

132

20

4,590

160

220KV HAJIPUR

132

17

3,906

161

132KV HAJIPUR

132

17

3,909

162

132KV JAKKANPUR

132

24

5,539

163

132KV BTPS

132

21

4,715

164

132KV MASURHI

132

10

2,378

165

132KV LAKHISARAI

132

16

3,656

166

220KV SIPARA

132

24

5,387

167

132KV SULTANGANJ

132

16

3,743

168

132KV BIHTA-2

132

22

5,075

169

132KV SAMASTIPUR

132

16

3,708

170

132KV HATHIDAH

132

19

4,451

171

132KV BUXAR

132

1,239

172

132KV BARHI

132

12

2,734

173

132KV DALSINGSARAI

132

14

3,178

174

132KV NALANDA

132

1,462

175

220KV KHAGAUL

132

16

3,722

176

132KV KHAGAUL

132

16

3,642

177

132KV DUMRAON

132

1,622

178

132KV DIGHA

132

15

3,347

179

220KV BIKRAMGANJ

132

2,142

180

132KV BIKRAMGANJ

132

2,142

181

132KV BIHTA

132

15

3,459

182

220KV ARRA

132

12

2,749

183

132KV SHEIKHPURA

132

10

2,246

Developing the PSMP for Bihar

4-75

020328-40RP-0400-00

Final Report

SL. NO

4.7.8

NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAG
E (KV)

FAULT
CURRENT
(KA)

FAULT
MVA

184

132KV ARRA

132

12

2,710

185

132KV JAGDISHPUR

132

1,436

186

132KV JAMUI

132

1,450

187

400KV PUSAULI

132

15

3,471

188

132KV DINARA

132

1,736

189

220KV PUSAULI

132

15

3,525

190

132KV BHABUA

132

15

3,448

191

132KV RAJGIR

132

960

192

132KV KUDRA

132

14

3,249

193

132KV KARMNASA

132

11

2,623

194

132KV SASARAM

132

11

2,589

195

220KV DEHRI-ON-SONE

132

15

3,357

196

132KV BANJARI

132

1,284

197

220KV SONENAGAR

132

13

2,924

198

132KV SONNENAGAR

132

13

2,969

199

132KV AURANGABAD

132

10

2,220

200

132KV SONNENAGAR-2

132

13

2,869

201

132KV RAFIGANJ

132

1,618

Summary of FY 2018 system studies

The two main purposes for development of the transmission system for FY 2018 was to
evacuate the base case generation and transmit the power to various 33kV loads centres,
which include existing and proposed 132kV/33 substations.
From the simulation studies it could be observed that the transmission system so developed
was able to meet the requirements of meeting the load demand with the planned generation
without any deviation from the planning criteria under normal and contingency conditions.
4.8

System Studies for FY 2014

This section presents the proposed transmission system for FY 2014 and also presents the
results of system studies that were carried out. The transmission system studies were
carried out to evacuate the planned capacity additions and to supply the forecast loads for
each circle which were subsequently allocated among the proposed and existing
substations.
The system studies for are carried out for the following scenarios in FY 2014.

Peak Load

Light Load

The system peak load of the system for FY 2014 occurs during October and whereas the
system light loads condition occurs during April.

Developing the PSMP for Bihar

4-76

020328-40RP-0400-00

Final Report

The system peak load and light load respectively for the FY 2014 used for the studies were
3,647 MW and 2078 MW. The peak load was based on the load forecast report developed
earlier.
The power grid 400kV Barh bus was taken as slack bus.
The various transmission lines and substation covering all voltages were iteratively removed
from the list proposed for load flow studies in FY 2018. The commissioned schedule of the
various network presented in previous section beyond FY 2014 were removed from load flow
studies conducted for FY 2014.
The most of the network reinforcements planned in FY 2018 are phased in FY 2014 based
on the network requirement
4.8.1

Peak Load System Condition for FY 2014

The peak load forecast for FY 2014 is 3,647 MW. The system was simulated and studied to
meet the above peak. The system demand was allocated to various substations which has
been presented in the earlier section of ihis report. As discussed earlier, a specific
percentage of transmission losses were assumed for deriving the substation loads. These
loads were used as starting point for load simulation and loads for the peak load. Further,
the substation loads were adjusted globally to meet the system peak demand during the
peak load flow base case studies. All loads were assumed to have a power factor 0.9. The
generation and import/export schedules were prepared for the peak load condition. These
schedules are presented earlier in the report.
The single line diagram for 2014 peak load condition is presented in the end of section
(Figure BSEB 2014-1) The SLD presents the bus voltages, line flows (MW and MVAr). The
flows presented are per circuit and number of circuits are marked separately
4.8.1.1

Load Flow Results

The following table summarises the load flow study results.


Table 4-45

Load Flow Summary Results-2014 Peak Load Condition


Details

MW

Substation Loads

3540

Generation

3766

Losses of PGCIL Network within


State
Net Generation Utilisation by
BSEB

119

3.2%

3647

Losses
132kV

35

0.95%

220kV

46

1.27%

400kV Losses

27

0.73%

Total Losses

107

2.94%

The system peak demand met is 3,647 MW which was equal to the projected system peak
demand.
Developing the PSMP for Bihar

4-77

020328-40RP-0400-00

Final Report

The total BSEB transmission losses of 107 MW represent the 2.94% of BSEB system
requirement. The losses comprise of 0.95%, 1.27% and 0.73% respectively for 132, 220 kV
and 400 kV transmission system of BSEB.
All transformers and transmission lines were operating within their permitted load ratings. All
bus voltages were within permissible limits.
The N-1 contingency operation was carried out to test the system for satisfactory operation.
It is observed that during the N-1 contingency operation all branch loadings and bus voltages
are operating satisfactorily.
The minimum and maximum voltages observed in the system were within 0.95 and 1.05 p.u.
for all the 400 kV and above, few buses of 220 kV were at 1.052 which is within the voltage
limits The summary of bus voltages are presented in the following table
Table 4-46

Voltage
(KV)

Summary of Voltage Profile- 2014 Peak Load Condition


Number of Buses within Specified Voltages limits
(p.u)

Number
of Buses

0.95 to 1

1.00 to 1.05

1.05 to 1.1

765

0%

100%

0%

400

15

0%

15

100%

0%

220

32

0%

31

100%

3%

132

120

63

53%

57

48%

0%

169

63

Total

105

The circle wise demand, generation and losses are presented in the following table
Table 4-47

Circle wise summary of Load, generation and Losses for FY 2014


Peak Load Condition
Active
Power
(MW)

Reactive
Power
(MVAR)

Total generation

3767

436

Static Load

3540

1715

Shunt loads

194

3540

1909

226

-3341

1868

Total losses

226

-1472

Mismatches

Summary Data
COMPLETE SUMMARY REPORT

Total load
Line / cable losses
Transformer losses

SUMMARY REPORT FOR CIRCLE: PATNA, PESU(E), PESU(W)

Developing the PSMP for Bihar

4-78

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Active
Power

Reactive
Power

-2117

638

Static Load

1067

517

Shunt loads

-19

1067

497

Line / cable losses

27

-228

Transformer losses

515

27

287

Active
Power

Reactive
Power

Total generation

568

-1002

Static Load

380

184

Shunt loads

-9

380

174

Line / cable losses

14

-490

Transformer losses

428

14

-62

Active
Power

Reactive
Power

Static Load

157

76

Shunt loads

-10

157

66

Line / cable losses

-103

Transformer losses

14

Total losses

-88

Summary Data

Summary Data

Total generation

Total load

Total losses

SUMMARY REPORT FOR CIRCLE: GAYA

Summary Data

Total load

Total losses

SUMMARY REPORT FOR CIRCLE: MUNGER

Summary Data

Total generation

Total load

Developing the PSMP for Bihar

4-79

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Active
Power

Reactive
Power

Total generation

2006

-373

Spinning reserve

365

Static Load

223

108

Shunt loads

223

108

Line / cable losses

-142

Transformer losses

220

Total losses

77

Active
Power

Reactive
Power

Total generation

505

318

Static Load

291

141

Shunt loads

319

291

460

Line / cable losses

13

-634

Transformer losses

110

13

-524

Active
Power

Reactive
Power

204

99

Summary Data

SUMMARY REPORT FOR CIRCLE: BHAGALPUR

Summary Data

Total load

SUMMARY REPORT FOR CIRCLE: MUZAFFARPUR

Summary Data

Total load

Total losses

SUMMARY REPORT FOR CIRCLE: CHAPRA

Summary Data

Total generation
Static Load

Developing the PSMP for Bihar

4-80

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

-67

204

31

Line / cable losses

-31

Transformer losses

25

Total losses

-7

Active
Power

Reactive
Power

-8

Static Load

110

53

Shunt loads

-51

110

Line / cable losses

-29

Transformer losses

Total losses

-25

Active
Power

Reactive
Power

Static Load

168

81

Shunt loads

-51

168

30

Line / cable losses

-50

Transformer losses

13

Total losses

-38

Active
Power

Reactive
Power

Summary Data
Shunt loads
Total load

SUMMARY REPORT FOR CIRCLE: MOTIHARI

Summary Data

Total generation

Total load

SUMMARY REPORT FOR CIRCLE: DARBHANGA

Summary Data

Total generation

Total load

SUMMARY REPORT FOR CIRCLE: SAMASTIPUR

Summary Data

Developing the PSMP for Bihar

4-81

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Total generation

596

316

Static Load

148

72

Shunt loads

148

72

Line / cable losses

-29

Transformer losses

82

Total losses

53

Active
Power

Reactive
Power

2934

-345

Static Load

178

86

Shunt loads

178

86

Line / cable losses

47

-507

Transformer losses

102

47

-405

Active
Power

Reactive
Power

18

-16

Static Load

132

64

Shunt loads

132

64

Line / cable losses

-61

Transformer losses

16

Total losses

-46

Summary Data

Total load

SUMMARY REPORT FOR CIRCLE: PURNEA

Summary Data

Total generation

Total load

Total losses

SUMMARY REPORT FOR CIRCLE: SAHARSA

Summary Data

Total generation

Total load

SUMMARY REPORT FOR CIRCLE: ROHTAS

Developing the PSMP for Bihar

4-82

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Active
Power

Reactive
Power

-3458

1224

Static Load

242

117

Shunt loads

101

242

218

Line / cable losses

59

-790

Transformer losses

244

59

-547

Active
Power

Reactive
Power

Total generation

276

97

Static Load

121

59

Shunt loads

-19

121

40

Line / cable losses

-46

Transformer losses

43

Total losses

-3

Active
Power

Reactive
Power

2433

-413

Static Load

121

59

Shunt loads

121

59

Line / cable losses

22

-199

Transformer losses

53

22

-146

Summary Data

Summary Data

Total generation

Total load

Total losses

SUMMARY REPORT FOR CIRCLE: BHOJPUR

Summary Data

Total load

SUMMARY REPORT FOR CIRCLE: NALANDA

Summary Data

Total generation

Total load

Total losses

Developing the PSMP for Bihar

4-83

020328-40RP-0400-00

Final Report

4.8.1.2

Short Circuit Studies for FY 2014 Peak Load Condition

Three phase short-circuit studies were carried out to compute the short-circuit levels for
various shunt faults (bus faults) across the system for the year FY 2014-Peak load condition.
The sub-transient reactance of generators is used in the study. The tie-lines are modelled in
the short-circuit study considering the fault contribution from a node from each of the
neighbouring system. It was assumed that 20KA of fault contribution is from each of the
neighbouring system.
The short-circuit levels for three phase shunt faults at various buses are presented as below:
Table 4-48
SL. NO

Three Phase Short Circuit Currents- 2014 Peak Load Study


NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAGE
(KV)

FAULT
CURRENT
(KA)

FAULT
MVA

765KV SASARAM

765

12

15,592

765KV GAYA

765

12

15,381

400KV KISHANGANJ

400

15

10,277

400KV PURNEA

400

17

11,635

400KV KATHIHAR

400

13

9,133

400KV KAHALGAON

400

30

20,835

400KV NABINAGAR-RLY

400

17

11,901

400KV BARH

400

33

23,088

400KV PATNA

400

22

15,417

10

400KV NABINAGAR

400

23

16,227

11

400KV BANKA

400

18

12,553

12

400KV JAMALPUR

400

17

11,740

13

400KV MZAFFARPUR

400

16

10,981

14

400KV BIHARSHARIFF

400

29

20,129

15

400KV PUSAULI

400

31

21,269

16

765KV SASARAM

400

30

20,799

17

765KV GAYA

400

20

13,550

18

400KV KISHANGANJ

220

13

4,779

19

400KV KATHIHAR

220

15

5,799

20

220KV KATHIHAR

220

15

5,815

21

400KV PURNEA

220

18

6,793

22

220KV GT -BUXAR

220

10

3,919

23

400KV MUZAFFRPUR

220

16

6,237

24

220KV BTPS

220

28

10,748

25

220KV GT-GAYA

220

14

5,145

26

220KV KANTI

220

24

9,136

27

220KV DARBHANGA

220

21

7,914

Developing the PSMP for Bihar

4-84

020328-40RP-0400-00

Final Report

SL. NO

NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAGE
(KV)

FAULT
CURRENT
(KA)

FAULT
MVA

28

220KV MADHEPURA

220

11

4,198

29

220KV BEGUSARAI

220

27

10,368

30

400KV KAHALGAON

220

13

5,005

31

220KV SUPAUL

220

2,567

32

220KV SHEOHAR

220

11

4,012

33

400KV BIHARSHARIFF

220

30

11,533

34

220KV BODHGAYA

220

17

6,312

35

220KV BIHARSHARIFF

220

30

11,605

36

220KV ARRA

220

16

6,236

37

220KV HAJIPUR

220

33

12,673

38

220KV GOPALGANJ

220

2,323

39

220KV FATUHA

220

34

13,144

40

400KV PATNA

220

34

13,144

41

220KV SIPARA

220

34

13,013

42

220KV GAIGHAT

220

34

12,805

43

220KV JAKKANPUR

220

33

12,752

44

220KV KHAGAUL

220

30

11,574

45

220KV KHAGAUL-2

220

29

10,993

46

220KV PUSAULI

220

18

6,766

47

400KV PUSAULI

220

18

6,779

48

220KV SONENAGAR

220

13

4,806

49

220KV DEHRI-ON-SONE

220

13

4,817

50

220KV KATHIHAR

132

14

3,274

51

132KV KATHAR

132

14

3,148

52

400KV BANKA

132

15

3,427

53

132KV NBANKA

132

15

3,408

54

400KV PURNEA

132

15

3,457

55

220KV MADHEPURA

132

10

2,339

56

132KV MADHEPURA

132

10

2,359

57

132KV PURNEA

132

15

3,472

58

132KV SONABARSHI

132

1,127

59

220KV SUPAUL

132

11

2,516

60

132KV SUPAUL

132

11

2,533

61

132KV SAHARSA

132

1,957

62

132KV NAUGACHHIYA

132

1,189

Developing the PSMP for Bihar

4-85

020328-40RP-0400-00

Final Report

SL. NO

NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAGE
(KV)

FAULT
CURRENT
(KA)

FAULT
MVA

63

400KV JAMALPUR

132

16

3,768

64

132KV JAMALPUR

132

16

3,717

65

132KV PHULPARAS

132

2,148

66

132KV UDAKISHANGANJ

132

910

67

220KV MTPS

132

17

3,965

68

400KV KAHALGAON

132

14

3,247

69

220KV DARBHANGA

132

11

2,542

70

220KV SHEOHAR

132

11

2,452

71

132KV KAHALGAON

132

14

3,286

72

132KV SHEOHAR

132

11

2,403

73

132KV DHARBHANGA

132

11

2,546

74

132KV RUNI SAIDPUR

132

10

2,357

75

132KV JAINAGAR

132

1,057

76

132KV RAXAUL

132

819

77

132KV SKMCH

132

12

2,705

78

132KV DHAKA

132

1,120

79

132KV SITMHARI

132

10

2,268

80

132KV FORBESGANJ

132

1,456

81

132KV GANGWARA

132

1,970

82

220KV BIHARSHARIFF

132

17

3,782

83

132KV PANDAUL

132

2,067

84

132KV KATIYA

132

1,290

85

132KV KOSHI

132

1,235

86

132KV MUZAFFARPUR

132

13

2,885

87

132KV KISHANGANJ

132

1,707

88

132KV SABOUR

132

13

2,967

89

132KV BETTIAH

132

1,290

90

220KV GOPALGANJ

132

1,670

91

132KV MOTIHARI

132

1,688

92

132KV EKANGASARAI

132

1,976

93

132KV HULASGANJ

132

1,623

94

132KV GOPALGANJ

132

1,665

95

132KV MADHUBANI

132

1,494

96

132KV RAMNAGAR

132

856

97

132KV NALANDA

132

1,333

Developing the PSMP for Bihar

4-86

020328-40RP-0400-00

Final Report

SL. NO

NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAGE
(KV)

FAULT
CURRENT
(KA)

FAULT
MVA

98

220KV BEGUSARAI

132

20

4,632

99

132KV BTPS

132

21

4,839

100

220KV BODHGAYA

132

14

3,233

101

132KV BARIPAHRI

132

13

2,955

102

132KV KUSHESWAR

132

1,006

103

132KV HARNAUT

132

2,171

104

400KV PUSAULI

132

14

3,166

105

132KV BARHI

132

11

2,565

106

132KV SULTANGANJ

132

14

3,122

107

132KV LAKHISARAI

132

14

3,169

108

132KV HATHIDAH

132

19

4,383

109

132KV RAJGIR

132

877

110

132KV VAISHALI

132

2,114

111

220KV PUSAULI

132

14

3,141

112

132KV BHABUA

132

13

3,069

113

220KV HAJIPUR

132

13

2,939

114

132KV HAJIPUR

132

13

2,949

115

132KV SAMASTIPUR

132

16

3,556

116

220KV ARRA

132

11

2,471

117

132KV CHANDAUTI

132

13

2,960

118

132KV DHANHA

132

766

119

132KV SIWAN

132

1,203

120

132KV KUDRA

132

12

2,814

121

220KV SONENAGAR

132

11

2,611

122

132KV KHAGARIYA

132

964

123

132KV DALSINGSARAI

132

13

2,972

124

132KV SONNENAGAR

132

12

2,641

125

132KV ARRA

132

11

2,441

126

132KV AURANGABAD

132

2,029

127

220KV DEHRI-ON-SONE

132

13

2,936

128

132KV KARMNASA

132

10

2,362

129

220KV SIPARA

132

28

6,405

130

132KV TEKARI

132

1,470

131

132KV BELAGANJ

132

1,470

132

132KV JAGDISHPUR

132

1,337

Developing the PSMP for Bihar

4-87

020328-40RP-0400-00

Final Report

SL. NO

NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAGE
(KV)

FAULT
CURRENT
(KA)

FAULT
MVA

133

132KV SHEIKHPURA

132

2,105

134

132KV GOH

132

1,052

135

220KV FATHUA

132

24

5,381

136

220KV GAIGHAT

132

30

6,819

137

132KV SASARAM

132

10

2,381

138

220KV JAKKANPUR

132

24

5,426

139

220KV KHAGAUL-2

132

22

5,124

140

132KV FATHUA-2

132

21

4,766

141

132KV GAIGHAT

132

29

6,728

142

132KV JAKKANPUR-2

132

23

5,202

143

132KV MASRAKH

132

808

144

132KV BANJARI

132

1,213

145

132KV KHAGAUL-2

132

22

5,085

146

132KV MITHAPUR

132

29

6,661

147

132KV SHITALPUR

132

1,866

148

132KV MASURHI

132

11

2,402

149

132KV PAHARPUR

132

1,433

150

132KV KATRA

132

22

5,035

151

132KV MITHAPUR-2

132

22

5,086

152

132KV JAKKANPUR

132

24

5,523

153

132KV WAZIRGANJ

132

1,320

154

220KV KHAGAUL

132

15

3,402

155

132KV JAMUI

132

1,348

156

132KV KHAGAUL

132

15

3,327

157

132KV RAFIGANJ

132

1,506

158

132KV BIHTA

132

14

3,163

159

132KV JEHNABAD

132

12

2,853

160

132KV DIGHA

132

13

2,932

161

132KV KARPY

132

1,592

162

132KV NAWADA

132

910

163

132KV CHAPRA

132

1,311

164

132KV DINARA

132

910

165

132KV BIKRAMGANJ

132

1,040

166

132KV BUXAR

132

929

167

132KV DUMRAON

132

1,147

Developing the PSMP for Bihar

4-88

020328-40RP-0400-00

Final Report

4.8.2

Light Load System Condition for FY 2014

The light load condition for the BSEB was simulated is based on about 57% of total
substation peak loads. However, the circle wise substations peak loads considered for light
load conditions was based on the historical data. The total substation loads during light load
condition was about 2,022 MW in FY 2014. The generation utilisation by BSEB to meet the
load was 2,077 MW. The load flow simulation was carried out for the above substation load
scenario.
4.8.2.1

Load Flow Results

The following table summarises the load flow study results.


Table 4-49

Load Flow Summary Results-2014 Light Load Condition


Details

MW

Substation Loads

2022

Generation

2142

Losses of PGCIL Network within State


Net Generation Utilisation by BSEB

65

3.0%

2077

Losses
132kV

14

0.68%

220kV

21

1.02%

400kV Losses

20

0.97%

Total Losses

55

2.67%

Total connected Inductive Compensation


(MVAr)

400

Total connected Capacitive compensation


(MVAr)

250

The system demand met by BSEB during light load is 2,077 MW which is about 57% of the
system peak demand.
The total BSEB transmission losses of 55 MW represent 2.67% of BSEB system
requirement. The losses comprises of 0.68%, 1.02% and 0.97% respectively for 132,220kV
and 400kV transmission system of BSEB.
All transformers and transmission lines were operating within their permitted load ratings. All
bus voltages were within permissible limits.
The N-1 contingency operation was carried out to test the system for satisfactory operation.
It is observed that during the N-1 contingency operation all branch loadings and bus voltages
were operating satisfactorily.
The minimum and maximum voltages observed in the system were 0.987 and 1.058 p.u and
they were within the planning critera as mentione in the earlier sections. The summary of
bus voltages are presented in the following table:

Developing the PSMP for Bihar

4-89

020328-40RP-0400-00

Final Report

Table 4-50

Voltage
(KV)

Summary of Voltage Profile- 2014 Light Load Condition


Number
of
Buses

Number of Buses within Specified


Voltages limits (p.u)
0.95 to 1

1.00 to 1.05

1.05 to 1.1

765

0%

100%

0%

400

15

0%

15

100%

0%

220

32

0%

27

100%

16%

132

120

5%

106

95%

7%

169

Total

150

13

The circle wise demand generation and losses are presented in the following table
Table 4-51

Circle wise summary of Load, generation and Losses for FY 2014


Light Load Condition
Active
Power
(MW)

Reactive
Power
(MVAR)

Total generation

2143

-1823

Static Load

2022

979

Shunt loads

393

2022

1372

120

-4415

1220

Total losses

120

-3196

Mismatches

Active
Power

Reactive
Power

-1745

323

Static Load

572

277

Shunt loads

-21

572

256

Line / cable losses

18

-339

Transformer losses

337

18

-2

Summary Data
COMPLETE SUMMARY REPORT

Total load
Line / cable losses
Transformer losses

SUMMARY REPORT FOR CIRCLE: PATNA, PESU(E), PESU(W)

Summary Data

Total generation

Total load

Total losses

Developing the PSMP for Bihar

4-90

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Active
Power

Reactive
Power

Total generation

289

-1364

Static Load

221

107

Shunt loads

-10

221

97

Line / cable losses

-518

Transformer losses

305

Total losses

-213

Active
Power

Reactive
Power

Static Load

91

44

Shunt loads

-10

91

34

Line / cable losses

-119

Transformer losses

Total losses

-114

Active
Power

Reactive
Power

Total generation

1830

-389

Spinning reserve

341

Static Load

129

63

Shunt loads

110

Summary Data

SUMMARY REPORT FOR CIRCLE: GAYA

Summary Data

Total load

SUMMARY REPORT FOR CIRCLE: MUNGER

Summary Data

Total generation

Total load

SUMMARY REPORT FOR CIRCLE: BHAGALPUR

Summary Data

Developing the PSMP for Bihar

4-91

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

129

173

Line / cable losses

-163

Transformer losses

190

Total losses

27

Active
Power

Reactive
Power

Total generation

415

-35

Static Load

169

82

Shunt loads

319

169

400

Line / cable losses

-672

Transformer losses

54

Total losses

-618

Active
Power

Reactive
Power

Static Load

112

54

Shunt loads

-76

112

-21

Line / cable losses

-44

Transformer losses

Total losses

-37

Active
Power

Reactive
Power

Summary Data
Total load

SUMMARY REPORT FOR CIRCLE: MUZAFFARPUR

Summary Data

Total load

SUMMARY REPORT FOR CIRCLE: CHAPRA

Summary Data

Total generation

Total load

SUMMARY REPORT FOR CIRCLE: MOTIHARI

Summary Data

Developing the PSMP for Bihar

4-92

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

-17

Static Load

64

31

Shunt loads

-55

64

-24

Line / cable losses

-34

Transformer losses

Total losses

-32

Active
Power

Reactive
Power

Static Load

97

47

Shunt loads

-54

97

-8

Line / cable losses

-66

Transformer losses

Total losses

-62

Active
Power

Reactive
Power

Total generation

506

86

Static Load

114

55

Shunt loads

114

55

Line / cable losses

-48

Transformer losses

52

Total losses

Summary Data
Total generation

Total load

SUMMARY REPORT FOR CIRCLE: DARBHANGA

Summary Data

Total generation

Total load

SUMMARY REPORT FOR CIRCLE: SAMASTIPUR

Summary Data

Total load

SUMMARY REPORT FOR CIRCLE: PURNEA

Developing the PSMP for Bihar

4-93

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Active
Power

Reactive
Power

1964

-590

Static Load

97

47

Shunt loads

Total load

97

47

Line / cable losses

23

-794

Transformer losses

41

23

-753

Active
Power

Reactive
Power

Total generation

18

-17

Static Load

76

37

Shunt loads

76

37

Line / cable losses

-80

Transformer losses

Total losses

-74

Active
Power

Reactive
Power

-2235

992

Static Load

139

67

Shunt loads

211

139

278

Line / cable losses

32

-1165

Transformer losses

192

32

-973

Summary Data

Summary Data

Total generation

Total losses

SUMMARY REPORT FOR CIRCLE: SAHARSA

Summary Data

Total load

SUMMARY REPORT FOR CIRCLE: ROHTAS

Summary Data

Total generation

Total load

Total losses

Developing the PSMP for Bihar

4-94

020328-40RP-0400-00

Final Report
Active
Power
(MW)

Reactive
Power
(MVAR)

Active
Power

Reactive
Power

Static Load

70

34

Shunt loads

-20

70

14

Line / cable losses

-72

Transformer losses

Total losses

-68

Active
Power

Reactive
Power

1096

-814

Static Load

70

34

Shunt loads

Total load

70

34

Line / cable losses

13

-302

Transformer losses

23

13

-279

Summary Data
SUMMARY REPORT FOR CIRCLE: BHOJPUR

Summary Data

Total generation

Total load

SUMMARY REPORT FOR CIRCLE: NALANDA

Summary Data

Total generation

Total losses

4.8.2.2

Short Circuit Studies for FY 2014 Light Load Condition

Three phase short-circuit studies were carried out to compute the short-circuit levels for
various shunt faults (bus faults) across the system for the year FY 2014-Light load condition.
The sub-transient reactance of generators was used in the study to detemine the maximum
fault currents. The tie-lines were modelled in the short-circuit study considering the fault
contribution from one node from each of the neighbouring system. It is assumed that 20KA
of fault contribution is from each of the neighbouring system.
The short-circuit levels for three phase shunt faults at various buses are presented as below:

Developing the PSMP for Bihar

4-95

020328-40RP-0400-00

Final Report

Table 4-52
SL. NO

Three Phase Short Circuit Currents- 2014 Light Load Study

NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAGE
(KV)

FAULT
CURRENT (KA)

FAULT
MVA

765KV SASARAM

765

12

16,165

765KV GAYA

765

12

15,994

400KV KATHIHAR

400

12

8,339

400KV KAHALGAON

400

30

20,701

400KV PURNEA

400

15

10,347

400KV JAMALPUR

400

17

11,725

400KV KISHANGANJ

400

13

9,082

400KV BANKA

400

18

12,559

400KV NABINAGAR

400

24

16,551

10

400KV MZAFFARPUR

400

16

10,902

11

400KV BIHARSHARIFF

400

29

20,149

12

400KV NABINAGAR-RLY

400

16

11,121

13

400KV PUSAULI

400

33

22,580

14

765KV SASARAM

400

32

22,077

15

400KV BARH

400

29

20,167

16

400KV PATNA

400

22

15,032

17

765KV GAYA

400

20

13,892

18

220KV MADHEPURA

220

11

4,121

19

220KV SUPAUL

220

2,560

20

400KV KATHIHAR

220

15

5,543

21

220KV KATHIHAR

220

15

5,561

22

400KV KISHANGANJ

220

12

4,527

23

400KV PURNEA

220

17

6,451

24

220KV GOPALGANJ

220

2,334

25

220KV DARBHANGA

220

20

7,495

26

220KV KANTI

220

22

8,554

27

400KV MUZAFFRPUR

220

16

6,026

28

220KV SHEOHAR

220

10

3,921

29

400KV KAHALGAON

220

13

5,015

30

220KV BTPS

220

27

10,227

31

220KV BEGUSARAI

220

26

9,865

32

400KV BIHARSHARIFF

220

28

10,836

33

220KV BIHARSHARIFF

220

29

10,881

34

220KV HAJIPUR

220

31

11,829

Developing the PSMP for Bihar

4-96

020328-40RP-0400-00

Final Report

SL. NO

NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAGE
(KV)

FAULT
CURRENT (KA)

FAULT
MVA

35

220KV GT-GAYA

220

10

3,885

36

220KV BODHGAYA

220

13

5,140

37

220KV FATUHA

220

32

12,189

38

220KV GAIGHAT

220

31

11,871

39

220KV GT -BUXAR

220

2,685

40

400KV PUSAULI

220

17

6,493

41

220KV PUSAULI

220

17

6,478

42

220KV ARRA

220

13

5,137

43

220KV JAKKANPUR

220

31

11,772

44

220KV KHAGAUL-2

220

27

10,240

45

220KV KHAGAUL

220

28

10,612

46

400KV PATNA

220

32

12,135

47

220KV SIPARA

220

32

12,019

48

220KV SONENAGAR

220

12

4,473

49

220KV DEHRI-ON-SONE

220

12

4,507

50

132KV RAXAUL

132

849

51

132KV BETTIAH

132

1,331

52

220KV MADHEPURA

132

10

2,349

53

132KV MADHEPURA

132

10

2,371

54

132KV SONABARSHI

132

1,143

55

220KV SUPAUL

132

11

2,530

56

132KV SUPAUL

132

11

2,547

57

220KV GOPALGANJ

132

1,710

58

132KV GOPALGANJ

132

1,706

59

132KV RAMNAGAR

132

887

60

132KV SAHARSA

132

1,977

61

132KV PHULPARAS

132

10

2,172

62

132KV UDAKISHANGANJ

132

928

63

220KV KATHIHAR

132

14

3,236

64

132KV KATHAR

132

14

3,117

65

132KV SIWAN

132

1,249

66

132KV DHAKA

132

1,147

67

132KV DHANHA

132

797

68

132KV MOTIHARI

132

1,723

69

132KV JAINAGAR

132

1,082

Developing the PSMP for Bihar

4-97

020328-40RP-0400-00

Final Report

SL. NO

NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAGE
(KV)

FAULT
CURRENT (KA)

FAULT
MVA

70

400KV PURNEA

132

15

3,433

71

132KV PURNEA

132

15

3,449

72

132KV PANDAUL

132

2,101

73

220KV DARBHANGA

132

11

2,557

74

132KV MASRAKH

132

845

75

220KV SHEOHAR

132

11

2,459

76

132KV DHARBHANGA

132

11

2,563

77

132KV SHEOHAR

132

11

2,411

78

132KV RUNI SAIDPUR

132

10

2,367

79

132KV MADHUBANI

132

1,528

80

132KV GANGWARA

132

2,000

81

132KV SITMHARI

132

10

2,285

82

400KV BANKA

132

15

3,440

83

132KV NBANKA

132

15

3,422

84

220KV MTPS

132

17

3,924

85

132KV NAUGACHHIYA

132

1,194

86

132KV SKMCH

132

12

2,700

87

132KV KATIYA

132

1,317

88

132KV KOSHI

132

1,262

89

400KV JAMALPUR

132

17

3,790

90

132KV JAMALPUR

132

16

3,740

91

132KV FORBESGANJ

132

1,486

92

132KV MUZAFFARPUR

132

11

2,603

93

400KV KAHALGAON

132

14

3,274

94

132KV KAHALGAON

132

15

3,317

95

132KV VAISHALI

132

2,142

96

132KV KISHANGANJ

132

1,755

97

132KV SABOUR

132

13

3,005

98

132KV CHAPRA

132

1,358

99

132KV SHITALPUR

132

1,903

100

132KV SULTANGANJ

132

14

3,166

101

132KV LAKHISARAI

132

14

3,179

102

132KV KUSHESWAR

132

998

103

132KV SAMASTIPUR

132

15

3,507

104

220KV BEGUSARAI

132

19

4,312

Developing the PSMP for Bihar

4-98

020328-40RP-0400-00

Final Report

SL. NO

NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAGE
(KV)

FAULT
CURRENT (KA)

FAULT
MVA

105

132KV HAJIPUR

132

13

2,943

106

220KV HAJIPUR

132

13

2,932

107

132KV BTPS

132

20

4,459

108

132KV DALSINGSARAI

132

13

2,953

109

132KV KHAGARIYA

132

970

110

132KV HATHIDAH

132

18

4,150

111

132KV JAMUI

132

1,367

112

132KV BARHI

132

11

2,515

113

132KV SHEIKHPURA

132

2,092

114

220KV BIHARSHARIFF

132

17

3,784

115

132KV EKANGASARAI

132

1,956

116

132KV HULASGANJ

132

1,605

117

132KV BARIPAHRI

132

13

2,944

118

132KV HARNAUT

132

2,154

119

400KV PUSAULI

132

14

3,088

120

220KV BODHGAYA

132

13

3,000

121

132KV NALANDA

132

1,323

122

220KV PUSAULI

132

13

3,070

123

132KV BHABUA

132

13

3,004

124

132KV CHANDAUTI

132

12

2,800

125

132KV KARMNASA

132

10

2,322

126

132KV TEKARI

132

1,425

127

132KV KUDRA

132

12

2,758

128

132KV BELAGANJ

132

1,425

129

132KV PAHARPUR

132

1,387

130

132KV GOH

132

1,027

131

220KV FATHUA

132

23

5,213

132

132KV FATHUA-2

132

20

4,632

133

132KV WAZIRGANJ

132

1,282

134

220KV GAIGHAT

132

29

6,553

135

220KV SIPARA

132

27

6,138

136

132KV GAIGHAT

132

28

6,471

137

220KV ARRA

132

10

2,358

138

132KV KATRA

132

21

4,888

139

220KV JAKKANPUR

132

23

5,245

Developing the PSMP for Bihar

4-99

020328-40RP-0400-00

Final Report

4.8.3

SL. NO

NAME OF THE
SS/GENERATING
STATION

BUS
VOLTAGE
(KV)

140

132KV JAKKANPUR-2

132

22

5,036

141

132KV MITHAPUR

132

28

6,406

142

132KV MITHAPUR-2

132

22

4,936

143

220KV KHAGAUL-2

132

22

4,957

144

132KV ARRA

132

10

2,335

145

132KV RAJGIR

132

881

146

132KV MASURHI

132

10

2,347

147

132KV KHAGAUL-2

132

22

4,922

148

132KV JAGDISHPUR

132

1,298

149

132KV JAKKANPUR

132

23

5,341

150

132KV JEHNABAD

132

12

2,776

151

132KV NAWADA

132

897

152

220KV KHAGAUL

132

14

3,288

153

132KV KARPY

132

1,565

154

132KV KHAGAUL

132

14

3,218

155

132KV BIHTA

132

13

3,062

156

132KV DIGHA

132

12

2,846

157

132KV SASARAM

132

10

2,338

158

132KV BANJARI

132

1,193

159

220KV DEHRI-ON-SONE

132

13

2,881

160

220KV SONENAGAR

132

11

2,575

161

132KV SONNENAGAR

132

11

2,607

162

132KV AURANGABAD

132

1,997

163

132KV DINARA

132

904

164

132KV BUXAR

132

929

165

132KV RAFIGANJ

132

1,485

166

132KV DUMRAON

132

1,144

167

132KV BIKRAMGANJ

132

1,035

FAULT
CURRENT (KA)

FAULT
MVA

Summary of FY 2014 system studies

The transmission system was developed to evacuate the base case generation and transmit
the power to various 33kV loads of existing and proposed 132/33 kV substations.
The transmission system operated successfully for a range of steady state operation
condition including the peak load and light load condition.

Developing the PSMP for Bihar

4-100

020328-40RP-0400-00

Final Report

4.9

Investment Costing

This section presents the investment cost required as per the proposed transmission system
during transmission system studies. The cost estimates were carried out for the future
network which includes the proposed substation and lines by BSEB.
The cost estimates are carried out for BSEB network only. The 400kV and above network
planned by PGCIL were not considered in the Investment planning. However, the additional
400kV network identified during the study was taken in the investment planning and it was
assumed these projects will be built by BSEB.
The cost of the transmission line entry bays for the lines of BSEB terminating at 400kV
PGCIL substations was not considered and assumed the line entry bay at PGCIL substation
end will be built by PGCIL.
For all generating stations, it is assumed that BSEB was responsible for cost of the line bay
entries at generating stations end.
4.9.1

Methodology for Investment Costing

This section presents the methodology for estimation of transmission costs for expansion of
400kV, 220kV and 132kV transmission system. The investment required to transfer the load
form generating station to loads within the oprating criteria requires investment under the
following heads:

Investment required for generation evacuation

Investment required for transmission reinforcement for meeting the load growth

The following methodology was used to estimate the cost of the Transmission System
Expansion up to FY 2018.
1. Equipment cost:
The equipment cost data was prepared for each equipment based on the data used
by various utilities in India. Since the latest cost for most of the major equipment was
not readily available, suitable escalation factors were used to fine tune the data to
represent current prices.
2. per-km cost:
The per-km cost of circuit was calculated based on the recent BSEB tenders which
included line cost of 400kV, 220kV, 132kV transmission lines.
3. Substation Cost:
The methodology for estimating the substation cost was based on modular approach
where substation cost was divided into following components

Substation Only (no transformer, reactors, or line entries)

Transformer bay addition

Reactor bay addition

Line entry bay addition

These costs were based on the standard substation design practice in India.
However, it should be noted that the cost data varies over the various substation
designs

Developing the PSMP for Bihar

4-101

020328-40RP-0400-00

Final Report

4. The list of transmission projects was prepared including the associated substation
bays (line, transformer and reactors) and respective commissioning dates are
assigned.
5. The cost for the line entry bays are attached to the associated transmission lines to
give the total cost for the transmission lines and its associated equipment.
For estimating the cost of new substation, the cost of the Substation Only should be
added to the cost of required transformer bays, line bays and reactor bays.
The substation cost of augmentation carried out by considering transformer bay cost.
4.9.2

Equipment Cost Data

The cost data used for estimation of transmission costs are based on the following
equipment data. The data is divided into following modules

Substation Only cost data

Transformer bay data

Reactor Bay Data

Capacitor Bay Data

Line Entry Bay Data

Line Data

The cost data for each module is presented as follows:


(a) Substation Only Module Cost Data
Description

kV

Cost ( Rs.
Lakhs)

400 kV SS with no transformer

400

3702.00

220 kV SS with no transformers

220

2211.00

132 kV SS with no transformers

132

885.00

The above cost data does not include line entry bays.
(b) Transformer Bay Module Cost Data
Description

Capacity

Cost (Rs. Lakhs)

500 MVA 400/220 kV T/F bay

500 MVA

2763

315 MVA 400/220 kV T/F bay

315 MVA

2640

200 MVA 400/132 kV T/F bay

200 MVA

2325

150 MVA 220/132 kV T/F bay

150 MVA

1408

100 MVA 220/132 kV T/F bay

100 MVA

1210

50 MVA 220/132 kV T/F bay

50 MVA

925

50 MVA 132/33 kV T/F bay

50 MVA

471

20 MVA 132/33 kV T/F bay

20 MVA

375

Developing the PSMP for Bihar

4-102

020328-40RP-0400-00

Final Report
Description

Capacity

16 MVA 132/33 kV T/F bay

Cost (Rs. Lakhs)

16 MVA

345

12.5 MVA 132/33 kV T/F bay

12.5 MVA

305

13.5 MVA 132/33 kV T/F bay

13.5 MVA

315

10 MVA

285

10 MVA 132/33 kV T/F bay

(c) Reactor Bay Module Cost Data


Description

Voltage
(kV)

Cost (Rs.
Lakhs)

Capacity

100 MVAr 400 kV Reactor bay

400

100 MVAr

1224

63 MVAr 400 kV Reactor bay

400

63 MVAr

1198

50 MVAr 400 kV Reactor bay

400

50 MVAr

1100

(d) Capacitor Bay Module Cost Data


Description

Voltage
(kV)

Capacity

Cost (Rs.
Lakhs)

30 MVAr 132 kV Capacitor Bank

132

30 MVAr

265

20 MVAr 132 kV Capacitor Bank

132

20 MVAr

245

10 MVAr 132 kV Capacitor Bank

132

10 MVAr

213

10 MVAr 33 kV Capacitor Bank

33

10 MVAr

48

30 MVAr 33 kV Capacitor Bank

33

30 MVAr

125

(e) Line Entry Bay Module Cost Data


Description

kV

Cost (Rs. Lakhs)

400 kV Line entry bay

400

809

220 kV Line entry bay

220

240

132 kV Line entry bay

132

165

(f) Line Cost Data per km


Description

kV

Cost ( Rs. Lakhs)

400 kV Quad Moose DCDS Line

400

290

400 kV Twin Moose DCDS Line

400

160

220 kV AAAC DCDS Line

220

65

220 kV ZEBRA DCDS Line

220

60

220 kV AAAC DCSS Line

220

50

220 kV ZEBRA DCSS Line

220

48

Developing the PSMP for Bihar

4-103

020328-40RP-0400-00

Final Report

Description

4.9.3

kV

Cost ( Rs. Lakhs)

220 kV AAAC 2nd Ckt

220

15

220 kV ZEBRA 2nd Ckt

220

14

132 kV Panther DCDS Line

132

39

132 kV Panther DCSS Line

132

31

132 kV Panther 2nd Ckt

132

Summary of Investment Costs

The summary various transmission expansion costs are presented in the following table. The
details of component wise cost estimates are provided in the subsequent sections.
Table 4-53

Summary of Investment Costs

Type of Transmission Project

Total (Rs. Lakhs)

400kV
Transmission Lines
New Substations

264,661
37,308

Substation Augmentation
Shunt Reactors

0
3,672

Total 400kV Projects

305,641

220kV
Transmission Lines

142,248

New Substations

93,995

Substation Augmentation

27,192

Total 220kV Projects

263,435

132kV
Transmission Lines

174,498

New Substations

77,919

Substation Augmentation

71,937

Shunt Capacitor Banks


Total

329,883

Total Investment

Developing the PSMP for Bihar

5,529

898,959

4-104

020328-40RP-0400-00

Final Report

The total cost of the transmission expansion estimated to about Rs. 8,989 Crores over the
period of ten years starting from FY 2009 to FY 2018. The allocation of total investment into
400kV, 220kV and 132kV voltages are in the ratio of 34%: 29%: 37%.
4.9.4

Investment Planning

This section presents the schedule of investments required to transmit the planned
generation to the forecasted load up to FY 2018. As discussed in the previous section, the
cost of transmission investment is about Rs.8,989 Crores and to be required over the ten
year period. The year wise schedules of commissioning of various transmission projects
were arrived based on the following methodology:

Identify various committed projects with their commissioning dates.

Identification of various transmission substation and lines required over the period
from FY 2010 to FY 2014 based on the load flow studies conducted for FY 2014

Similarly the identification of various transmission lines and substation required over
the period starting from FY 2015 to FY 2018 based on the load flow studies carried
out for FY 2018.

Schedule the commissioning dates of lines and substation planned for the period of
FY 2010 to FY 2014 based on the load growth during the period

Similarly, schedule the commissioning dates of lines and substation planned for the
period of FY 2015 to FY 2018 based on the load growth during the period

Schedule the augmentation of various substation for the period FY 2010 and FY
2014 and for the period FY 2015 to FY 2018 are carried based on the load growth in
the respective periods.

Based on the methodology discussed above, the schedule of in-service dates for various
transmission components were arrived and presented in the subsequent sections.
The annual disbursements required to meet the scheduled in-service dates of various
transmission projects were arrived assuming 24 months of construction period and the
investments are occurring 24 months period prior to the beginning of the year of
commissioning. The disbursement required for first 12 months period is 40% of total
investment and 60% is for the next 12 months period, in case of substation and lines. The
disbursement required for substation augmentation including transformers, capacitor bays
and reactor bays is of 12 months period prior to the beginning of the commissioning year.
The estimation of present worth of total investment is carried out by taking discount rate of
10%. The present worth of annual disbursements at the beginning of FY 2009 is estimated
as Rs. 6,106 Crores.
The schedule of annual investment and annual disbursements required are presented in the
following tables and graphs.

Developing the PSMP for Bihar

4-105

020328-40RP-0400-00

Final Report

Table 4-54

Summary of Annual Investment Costs (Rs. Lakhs)


FINANCIAL YEAR

ITEM
2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

Total

400kV
Transmission Lines

11,768

78,804

77,488

96,601

264,661

New Substations

28,326

8,982

37,308

Substation Augmentation

Shunt Reactors

1,224

1,224

1,224

3,672

Total

40,094

80,028

87,694

1,224

96,601

305,641

Transmission Lines

12,448

22,319

46,415

5,709

11,897

29,668

4,919

3,479

5,395

142,248

New Substations

4,631

13,893

38,027

5,027

19,734

4,631

3,421

4,631

93,995

Substation Augmentation

9,262

1,210

1,408

4,224

3,630

4,840

2,618

27,192

Total

17,079

45,474

85,652

12,144

16,121

49,402

13,180

11,740

12,644

263,435

Transmission Lines

11,353

80,320

38,504

6,508

11,191

2,232

10,312

6,915

7,162

174,498

New Substations

1,827

39,273

9,135

1,827

2,298

12,789

7,308

3,462

77,919

Substation

21,282

13,371

12,525

9,036

7,719

3,111

3,105

1,788

71,937

Shunt Capacitor Banks

807

605

288

394

999

821

730

885

5,529

Total

13,180

141,682

61,615

21,148

22,919

10,950

27,033

18,058

13,297

329,883

30,259

187,156

187,362

33,292

119,068

148,046

41,437

29,798

122,542

898,959

220kV

132kV

Augmentation

Total Investment

Developing the PSMP for Bihar

4-106

020328-40RP-0400-00

Final Report

Figure 4-2

Developing the PSMP for Bihar

Summary of Annual Investment Costs (Rs. Lakhs)

4-107

020328-40RP-0400-00

Final Report

Table 4-55

Schedule of Disbursements to meet In-service Dates (Rs. Lakhs)


FINANCIAL YEAR

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

Total

400kV
Transmission Lines

4,707

7,061

31,522

78,278

46,493

38,640

57,961

264,661

New Substations

11,330

16,996

3,593

5,389

37,308

Substation Augmentation

Shunt Reactors

1,224

1,224

1,224

3,672

Total

16,038

24,056

31,522

83,094

53,106

1,224

38,640

57,961

305,641

Transmission Lines

4,979

16,396

31,198

30,892

8,184

19,005

19,768

4,343

4,245

3,237

142,248

New Substations

1,852

8,336

23,547

24,827

3,016

7,894

13,693

4,147

3,905

2,779

93,995

9,262

1,210

1,408

4,224

3,630

4,840

2,618

27,192

6,831

24,732

64,007

56,929

12,608

31,123

33,461

12,120

12,990

8,634

263,435

2,603

39,427

64,838

25,913

8,381

7,608

5,464

8,953

7,014

4,297

174,498

731

16,805

27,218

6,212

2,015

1,379

5,116

10,597

5,770

2,077

77,919

Substation Augmentation

21,282

13,371

12,525

9,036

7,719

3,111

3,105

1,788

71,937

Shunt Capacitor Banks

807

605

288

394

999

821

730

885

5,529

3,334

56,232

114,145

46,101

23,210

18,416

19,298

23,482

16,618

9,047

329,883

10,165

80,964

194,189

127,086

67,340

132,634

105,864

36,826

68,249

75,642

898,959

220kV

Substation Augmentation
Total

132kV
Transmission Lines
New Substations

Total

Developing the PSMP for Bihar

4-108

020328-40RP-0400-00

Final Report

Figure 4-3

Developing the PSMP for Bihar

Schedule of Disbursements to Meet In-service Dates (Rs. Lakhs)

4-109

020328-40RP-0400-00

Final Report

4.9.5

Cost Estimates for 132kV Substations


Table 4-56
SL
NO.

FY

NAME OF THE SS

Cost Estimates for 132kV Substations (Rs. Lakhs).


T/F CAPACITY (MVA)

Total

#T/F BAYS

SCHEDULE OF
DISBURSEMENTS

COST

10

20

50

10

20

50

(Rs.Lakhs)

YEAR (-2)

YEAR (-1)

40

740

2,450

37

49

77,919

31,168

46,751

20

1455

582

873

2011

132KV AURANGABAD

2011

132KV BUXAR

40

1635

654

981

2011

132KV DALSINGSARAI

100

1827

731

1,096

2011

132KV DIGHA

100

1827

731

1,096

2011

132KV DINARA

40

1635

654

981

2012

132KV DHAHNA

100

1827

731

1,096

2011

132KV EKANGASARAI

40

1635

654

981

2012

132KV FATHUA-2

100

1827

731

1,096

2012

132KV GANGWARA

100

1827

731

1,096

10

2011

132KV GOH

40

1635

654

981

11

2011

132KV HARNAUT

40

1635

654

981

12

2011

132KV HULASGANJ

40

1635

654

981

13

2011

132KV JAGDISHPUR

20

1260

504

756

14

2012

132KV JAKKANPUR-2

100

1827

731

1,096

15

2011

132KV KARPY

40

1635

654

981

16

2011

132KV KATRA

100

1827

731

1,096

17

2013

132KV KHAGAUL-2

100

1827

731

1,096

Developing the PSMP for Bihar

4-110

020328-40RP-0400-00

Final Report
SL
NO.

FY

NAME OF THE SS

T/F CAPACITY (MVA)

#T/F BAYS

SCHEDULE OF
DISBURSEMENTS

COST

10

20

50

10

20

50

(Rs.Lakhs)

YEAR (-2)

YEAR (-1)

18

2011

132KV KUDRA

40

1635

654

981

19

2011

132KV KUSHESWAR

40

1635

654

981

20

2011

132KV MADHEPURA

20

1455

582

873

21

2011

132KV MASRAKH

40

1635

654

981

22

2014

132KV MITHAPUR-2

150

2298

919

1,379

23

2011

132KV NALANDA

40

1635

654

981

24

2011

132KV RAXAUL

40

1635

654

981

25

2011

132KV RUNI SAIDPUR

40

1635

654

981

26

2011

132KV SHEOHAR

40

1635

654

981

27

2011

132KV SKMCH

100

1827

731

1,096

28

2011

132KV SONABARSHI

40

1635

654

981

29

2011

132KV TEKARI

40

1635

654

981

30

2011

132KV WAZIRGANJ

40

1635

654

981

31

2010

132KV BEGUSARAI

100

1827

731

1,096

32

2012

220KV SIPARA

100

1827

731

1,096

33

2018

132KV PAHARPUR

40

1635

654

981

34

2017

132KV BARIPAHRI-2

100

1827

731

1,096

35

2018

132KV BIHTA-2

100

1827

731

1,096

36

2016

132KV CHANDAUTI-2

100

1827

731

1,096

37

2016

132KV CHAPRA-2

100

1827

731

1,096

38

2016

132KV GAIGHAT-2

100

1827

731

1,096

Developing the PSMP for Bihar

4-111

020328-40RP-0400-00

Final Report
SL
NO.

4.9.6

FY

NAME OF THE SS

T/F CAPACITY (MVA)

#T/F BAYS

SCHEDULE OF
DISBURSEMENTS

COST

10

20

50

10

20

50

(Rs.Lakhs)

YEAR (-2)

YEAR (-1)

39

2016

132KV KHAGUAL-3

100

1827

731

1,096

40

2017

132KV MITHAPUR-3

100

1827

731

1,096

41

2017

132KV MUZAFFARPUR-2

100

1827

731

1,096

42

2016

132KV PURNEA-2

100

1827

731

1,096

43

2016

132KV SABOUR-2

100

1827

731

1,096

44

2016

132KV SAMASTIPUR-2

100

1827

731

1,096

45

2017

132KV SONNENAGAR-2

100

1827

731

1,096

Cost Estimates for 220kV and above Substations


Table 4-57
SL
NO.

FY

ASSET

Cost Estimates for 220kV and above Substations (Rs. Lakhs).


NAME OF THE SS

Total
Capacity
(MVA)
Total

SCHEDULE OF
DISBURSEMENTS

COST
(Rs.Lakhs)

YEAR (-2)

YEAR (-1)

131,303

52,521

78,782

2013

PGCIL

765KV SASARAM

765

3,000

2013

PGCIL

765KV GAYA

765

4,500

2012

PGCIL

400KV KISHANGANJ

400

945

2012

BSEB

400KV JAMALPUR

400

400

8352

3,341

5,011

2012

BSEB

400KV BANKA

400

400

8352

3,341

5,011

2012

BSEB

400KV KATHIHAR

400

945

11622

4,649

6,973

Developing the PSMP for Bihar

4-112

020328-40RP-0400-00

Final Report
SL
NO.

FY

ASSET

NAME OF THE SS

Total
Capacity
(MVA)

SCHEDULE OF
DISBURSEMENTS

COST
(Rs.Lakhs)

YEAR (-2)

YEAR (-1)

2011

BSEB

220KV SUPAUL

220

200

4631

1,852

2,779

2012

BSEB

220KV SONENAGAR

220

200

4631

1,852

2,779

2012

BSEB

220KV SIPARA

220

450

6435

2,574

3,861

10

2012

BSEB

220KV SHEOHAR

220

200

4631

1,852

2,779

11

2012

BSEB

220KV KATHIHAR

220

300

5841

2,336

3,505

12

2012

BSEB

220KV PUSAULI

220

300

5027

2,011

3,016

13

2015

BSEB

220KV MUZAFFARPUR

220

300

5841

2,336

3,505

14

2011

BSEB

220KV MADHEPURA

220

200

4631

1,852

2,779

15

2013

BSEB

220KV KHAGAUL-2

220

300

5027

2,011

3,016

16

2012

BSEB

220KV JAKKANPUR

220

300

5027

2,011

3,016

17

2011

BSEB

220KV HAJIPUR

220

200

4631

1,852

2,779

18

2012

BSEB

220KV GAIGHAT

220

450

6435

2,574

3,861

19

2010

BSEB

220KV BEGUSARAI

220

200

4631

1,852

2,779

20

2015

BSEB

400KV ARRAH

400

630

8982

3,593

5,389

21

2015

BSEB

220KV SAMASTIPUR

220

200

4631

1,852

2,779

22

2015

BSEB

220KV SABOUR

220

200

4631

1,852

2,779

23

2018

BSEB

220KV HULSANGANJ

220

200

4631

1,852

2,779

24

2016

BSEB

220KV FORBESGANJ

220

200

4631

1,852

2,779

25

2015

BSEB

220KV CHAPRA

220

200

4631

1,852

2,779

26

2017

BSEB

220KV BIKRAMGANJ

220

100

3421

1,368

2,053

Developing the PSMP for Bihar

4-113

020328-40RP-0400-00

Final Report

4.9.7

Cost Estimates for Augmentation of 132kV Substations


Table 4-58
FY

Cost Estimates for Augmentation of 132kV Substations (Rs. Lakhs).

NAME OF THE SS

T/F BAY
CAP(MVA)

SSCODE

COST
(Rs.lakhs)

SCHEDULE OF
DISBURSEMENTS
YEAR (-1)

Total

7,240

71,937

71,937

2011

132KV ARRA

1ARRA132

50

471

471

2012

132KV ARRA

1ARRA132

50

471

471

2015

132KV ARRA

1ARRA132

50

471

471

2015

132KV AURANGABAD

1AURGBD132

20

375

375

2015

132KV AURANGABAD

1AURGBD132

20

375

375

2014

132KV BANJARI

1BANJR132

20

375

375

2011

132KV BARHI

1BARH132

50

471

471

2011

132KV BARHI

1BARH132

50

471

471

2015

132KV BARHI

1BARH132

50

471

471

2012

132KV BARIPAHRI

1BARIPAH132

50

471

471

2013

132KV BARIPAHRI

1BARIPAH132

50

471

471

2013

132KV BELAGANJ

1BELAGJ132

20

375

375

2014

132KV BELAGANJ

1BELAGJ132

20

375

375

2011

132KV BETTIAH

1BETTH132

50

471

471

2012

132KV BETTIAH

1BETTH132

50

471

471

2011

132KV BHABUA

1BHABUA132

50

471

471

2013

132KV BHABUA

1BHABUA132

50

471

471

Developing the PSMP for Bihar

4-114

020328-40RP-0400-00

Final Report

FY

NAME OF THE SS

T/F BAY
CAP(MVA)

SSCODE

COST
(Rs.lakhs)

SCHEDULE OF
DISBURSEMENTS
YEAR (-1)

2014

132KV BHABUA

1BHABUA132

50

471

471

2013

132KV BIHTA

1BIHTA132

50

471

471

2011

132KV BIKRAMGANJ

1BIKRMGJ132

50

471

471

2013

132KV BIKRAMGANJ

1BIKRMGJ132

50

471

471

2017

132KV BIKRAMGANJ

1BIKRMGJ132

50

471

471

2011

132KV CHANDAUTI

1CHNDAU132

20

375

375

2011

132KV CHANDAUTI

1CHNDAU132

20

375

375

2011

132KV CHAPRA

1CHPRA132

50

471

471

2011

132KV CHAPRA

1CHPRA132

50

471

471

2013

132KV CHAPRA

1CHPRA132

50

471

471

2015

132KV DALSINGSARAI

1DALSING132

50

471

471

2015

132KV DHAKA

1DHAKA132

20

375

375

2017

132KV DHAKA

1DHAKA132

20

375

375

2011

132KV DHARBHANGA

1DARBH132

50

471

471

2012

132KV DHARBHANGA

1DARBH132

50

471

471

2012

132KV DIGHA

1DIGHA132

50

471

471

2011

132KV DUMRAON

1DUMROAN132

50

471

471

2011

132KV DUMRAON

1DUMROAN132

50

471

471

2013

132KV DUMRAON

1DUMROAN132

50

471

471

2015

132KV FATHUA-2

1FATH2-132

50

471

471

2011

132KV FORBESGANJ

1FORBESGJ132

50

471

471

Developing the PSMP for Bihar

4-115

020328-40RP-0400-00

Final Report

FY

NAME OF THE SS

T/F BAY
CAP(MVA)

SSCODE

COST
(Rs.lakhs)

SCHEDULE OF
DISBURSEMENTS
YEAR (-1)

2013

132KV FORBESGANJ

1FORBESGJ132

50

471

471

2011

132KV GAIGHAT

1GAIGHAT132

50

471

471

2011

132KV GAIGHAT

1GAIGHAT132

50

471

471

2011

132KV GOPALGANJ

1GOPLGJ132

50

471

471

2011

132KV GOPALGANJ

1GOPLGJ132

50

471

471

2015

132KV GOPALGANJ

1GOPLGJ132

50

471

471

2012

132KV HAJIPUR

1HAJPUR132

50

471

471

2013

132KV HAJIPUR

1HAJPUR132

50

471

471

2015

132KV HAJIPUR

1HAJPUR132

50

471

471

2016

132KV HARNAUT

1HARNAUT132

10

285

285

2011

132KV HATHIDAH

1HATIDH132

50

471

471

2011

132KV HATHIDAH

1HATIDH132

50

471

471

2015

132KV HATHIDAH

1HATIDH132

50

471

471

2014

132KV JAGDISHPUR

1JAGDSP132

20

375

375

2011

132KV JAINAGAR

1JAINGAR132

20

375

375

2012

132KV JAINAGAR

1JAINGAR132

20

375

375

2013

132KV JAKKANPUR-2

1JAKK2-132

50

471

471

2011

132KV JAMALPUR

1JAMLPUR132

50

471

471

2016

132KV JAMALPUR

1JAMLPUR132

50

471

471

2011

132KV JAMUI

1JAMUY132

50

471

471

2013

132KV JAMUI

1JAMUY132

50

471

471

Developing the PSMP for Bihar

4-116

020328-40RP-0400-00

Final Report

FY

NAME OF THE SS

T/F BAY
CAP(MVA)

SSCODE

COST
(Rs.lakhs)

SCHEDULE OF
DISBURSEMENTS
YEAR (-1)

2017

132KV JAMUI

1JAMUY132

50

471

471

2013

132KV JEHNABAD

1JEHBAD132

50

471

471

2014

132KV JEHNABAD

1JEHBAD132

50

471

471

2014

132KV JEHNABAD

1JEHBAD132

50

471

471

2011

132KV KAHALGAON

1KHLGAON132

50

471

471

2012

132KV KAHALGAON

1KHLGAON132

50

471

471

2012

132KV KARMNASA

1KARMNSA132

20

375

375

2013

132KV KARMNASA

1KARMNSA132

20

375

375

2014

132KV KARMNASA

1KARMNSA132

20

375

375

2016

132KV KARMNASA

1KARMNSA132

50

471

471

2011

132KV KATHAR

1KATHAR132

50

471

471

2014

132KV KATHAR

1KATHAR132

50

471

471

2018

132KV KATHAR

1KATHAR132

50

471

471

2014

132KV KATIYA

1KATIYA132

50

471

471

2014

132KV KATIYA

1KATIYA132

50

471

471

2015

132KV KATRA

1KATRA132

50

471

471

2011

132KV KHAGARIYA

1KHGRIA132

50

471

471

2012

132KV KHAGARIYA

1KHGRIA132

50

471

471

2015

132KV KHAGARIYA

1KHGRIA132

50

471

471

2014

132KV KHAGAUL-2

1KGL2-132

50

471

471

2017

132KV KHAGUAL-3

1KGL3-132

50

471

471

Developing the PSMP for Bihar

4-117

020328-40RP-0400-00

Final Report

FY

NAME OF THE SS

T/F BAY
CAP(MVA)

SSCODE

COST
(Rs.lakhs)

SCHEDULE OF
DISBURSEMENTS
YEAR (-1)

2011

132KV KISHANGANJ

1KISHNGJ132

50

471

471

2013

132KV KISHANGANJ

1KISHNGJ132

50

471

471

2015

132KV KISHANGANJ

1KISHNGJ132

50

471

471

2011

132KV LAKHISARAI

1LAKHSAR132

50

471

471

2012

132KV LAKHISARAI

1LAKHSAR132

50

471

471

2011

132KV MADHUBANI

1MDHUBN132

50

471

471

2013

132KV MADHUBANI

1MDHUBN132

50

471

471

2016

132KV MADHUBANI

1MDHUBN132

50

471

471

2011

132KV MASURHI

1MASURH132

50

471

471

2012

132KV MASURHI

1MASURH132

50

471

471

2011

132KV MITHAPUR

1MITHAPUR132

50

471

471

2018

132KV MITHAPUR-3

1MITH3-132

50

471

471

2011

132KV MOTIHARI

1MOTIHAR132

50

471

471

2012

132KV MOTIHARI

1MOTIHAR132

50

471

471

2016

132KV MOTIHARI

1MOTIHAR132

50

471

471

2011

132KV MUZAFFARPUR

1MZFPUR132

50

471

471

2011

132KV NAUGACHHIYA

1NAUGACH132

50

471

471

2012

132KV NAUGACHHIYA

1NAUGACH132

50

471

471

2012

132KV NAWADA

1NAWAD132

50

471

471

2013

132KV NAWADA

1NAWAD132

50

471

471

2015

132KV NAWADA

1NAWAD132

50

471

471

Developing the PSMP for Bihar

4-118

020328-40RP-0400-00

Final Report

FY

NAME OF THE SS

T/F BAY
CAP(MVA)

SSCODE

COST
(Rs.lakhs)

SCHEDULE OF
DISBURSEMENTS
YEAR (-1)

2011

132KV NBANKA

1BANKA132

50

471

471

2012

132KV NBANKA

1BANKA132

50

471

471

2014

132KV NBANKA

1BANKA132

50

471

471

2011

132KV PANDAUL

1PANDUL132

50

471

471

2013

132KV PANDAUL

1PANDUL132

50

471

471

2014

132KV PANDAUL

1PANDUL132

50

471

471

2017

132KV PHULPARAS

1PHULPRS132

20

375

375

2018

132KV PHULPARAS

1PHULPRS132

20

375

375

2011

132KV PURNEA

1PURNEA132

50

471

471

2012

132KV PURNEA

1PURNEA132

50

471

471

2013

132KV RAFIGANJ

1RAFIGJ132

50

471

471

2014

132KV RAFIGANJ

1RAFIGJ132

50

471

471

2012

132KV RAJGIR

1RAJGIR132

50

471

471

2014

132KV RAJGIR

1RAJGIR132

50

471

471

2013

132KV RAMNAGAR

1RAMNGR132

50

471

471

2014

132KV RAMNAGAR

1RAMNGR132

50

471

471

2017

132KV RAMNAGAR

1RAMNGR132

50

471

471

2012

132KV SABOUR

1SABOUR132

50

471

471

2014

132KV SABOUR

1SABOUR132

50

471

471

2011

132KV SAHARSA

1SHARSA132

50

471

471

2012

132KV SAHARSA

1SHARSA132

50

471

471

Developing the PSMP for Bihar

4-119

020328-40RP-0400-00

Final Report

FY

NAME OF THE SS

T/F BAY
CAP(MVA)

SSCODE

COST
(Rs.lakhs)

SCHEDULE OF
DISBURSEMENTS
YEAR (-1)

2013

132KV SAHARSA

1SHARSA132

50

471

471

2012

132KV SAMASTIPUR

1SAMSTPUR132

50

471

471

2013

132KV SAMASTIPUR

1SAMSTPUR132

50

471

471

2014

132KV SAMASTIPUR

1SAMSTPUR132

50

471

471

2011

132KV SASARAM

1SASARM132

50

471

471

2013

132KV SASARAM

1SASARM132

50

471

471

2015

132KV SASARAM

1SASARM132

50

471

471

2011

132KV SHEIKHPURA

1SHEKPUR132

50

471

471

2013

132KV SHEIKHPURA

1SHEKPUR132

50

471

471

2018

132KV SHEIKHPURA

1SHEKPUR132

50

471

471

2011

132KV SHITALPUR

1SHITLPR132

50

471

471

2012

132KV SHITALPUR

1SHITLPR132

50

471

471

2011

132KV SITMHARI

1SITMHRY132

50

471

471

2012

132KV SITMHARI

1SITMHRY132

50

471

471

2015

132KV SITMHARI

1SITMHRY132

50

471

471

2011

132KV SIWAN

1SIWAN132

50

471

471

2012

132KV SIWAN

1SIWAN132

50

471

471

2014

132KV SIWAN

1SIWAN132

50

471

471

2016

132KV SKMCH

1SKMCH132

50

471

471

2012

132KV SONNENAGAR

1SONNGR132

50

471

471

2012

132KV SONNENAGAR

1SONNGR132

50

471

471

Developing the PSMP for Bihar

4-120

020328-40RP-0400-00

Final Report

FY

NAME OF THE SS

T/F BAY
CAP(MVA)

SSCODE

COST
(Rs.lakhs)

SCHEDULE OF
DISBURSEMENTS
YEAR (-1)

2011

132KV SULTANGANJ

1SULTGJ132

50

471

471

2012

132KV SULTANGANJ

1SULTGJ132

50

471

471

2013

132KV SULTANGANJ

1SULTGJ132

50

471

471

2011

132KV SUPAUL

1SUPAUL132

20

375

375

2012

132KV SUPAUL

1SUPAUL132

20

375

375

2016

132KV SUPAUL

1SUPAUL132

50

471

471

2017

132KV SUPAUL

1SUPAUL132

50

471

471

2013

132KV VAISHALI

1VAISHL132

50

471

471

2013

132KV VAISHALI

1VAISHL132

50

471

471

2014

132KV VAISHALI

1VAISHL132

50

471

471

2015

220KV BODHGAYA

2BDGAYA132

50

471

471

2011

220KV DEHRI-ONSONE

2DEHSON132

50

471

471

2012

220KV DEHRI-ONSONE

2DEHSON132

50

471

471

2013

220KV SIPARA

2SIPARA132

50

471

471

Developing the PSMP for Bihar

4-121

020328-40RP-0400-00

Final Report

4.9.8

Cost estimates for 220kV and above Substation Augmentation


Table 4-59
FY

ASSET

Cost estimates for 220kV and above Substation Augmentation (Rs. Lakhs)
NAME OF THE SS

VOLTAGE

T/F BAY
CAP(MVA)

COST
(Rs.lakhs)

SCHEDULE OF
DISBURSEMENTS
YEAR (-1)

4,465

27,192

27,192

2012

PGCIL

400KV PATNA

400

500

2012

PGCIL

400KV PATNA

400

500

2015

PGCIL

400KV PATNA

400

500

2012

PGCIL

400KV PURNEA

400

315

2011

BSEB

220KV DEHRI-ON-SONE

220

100

1210

1,210

2011

BSEB

220KV DEHRI-ON-SONE

220

100

1210

1,210

2011

BSEB

220KV FATUHA

220

100

1210

1,210

2012

BSEB

220KV GOPALGANJ

220

100

1210

1,210

2011

BSEB

220KV KHAGAUL

220

150

1408

1,408

2011

BSEB

220KV KHAGAUL

220

150

1408

1,408

2014

BSEB

220KV KHAGAUL

220

150

1408

1,408

2014

BSEB

220KV KHAGAUL-2

220

150

1408

1,408

2011

BSEB

220KV KANTI

220

150

1408

1,408

2011

BSEB

220KV KANTI

220

150

1408

1,408

2014

BSEB

220KV KANTI

220

150

1408

1,408

2011

PGCIL

400KV KAHALGAON

220

100

2013

BSEB

400KV PUSAULI

220

150

1408

1,408

Developing the PSMP for Bihar

4-122

020328-40RP-0400-00

Final Report

FY

ASSET

NAME OF THE SS

VOLTAGE

T/F BAY
CAP(MVA)

COST
(Rs.lakhs)

SCHEDULE OF
DISBURSEMENTS
YEAR (-1)

4.9.9

2018

BSEB

220KV BIKRAMGANJ

220

100

1210

1,210

2017

BSEB

220KV CHAPRA

220

100

1210

1,210

2017

BSEB

220KV FORBESGANJ

220

100

1210

1,210

2016

BSEB

220KV HAJIPUR

220

100

1210

1,210

2018

BSEB

220KV JAKKANPUR

220

150

1408

1,408

2016

BSEB

220KV MADHEPURA

220

100

1210

1,210

2016

BSEB

220KV SABOUR

220

100

1210

1,210

2017

BSEB

220KV SAMASTIPUR

220

100

1210

1,210

2017

BSEB

220KV SHEOHAR

220

100

1210

1,210

Cost estimates for 400kV Lines


Table 4-60

FY

OWNER

TRANSMISSION
LINE

Total

Cost estimates for 400kV Lines (Rs. Lakhs)

#CKTS

LENGTH
(R-KM)

40

3,168

CONDUCTOR

2015

BSEB

400KV BUXAR to
400KV ARRAH

63

QUADMOOSE

2015

BSEB

400KV BUXAR to
400KV ARRAH

63

QUADMOOSE

Developing the PSMP for Bihar

TOWER
CONFIGURATION

DCDS

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST (
Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

241,200

47

23,461

264,661

9,135

1,618

10,753

9,135

1,618

10,753

DCDS

4-123

020328-40RP-0400-00

Final Report

FY

2018

2018

2009

2009

2018

2018

2018

2018

OWNER

TRANSMISSION
LINE

BSEB

400KV JASINFRA
GENERATION to
400KV BANKA

BSEB

400KV JASINFRA
GENERATION to
400KV BANKA

PGCIL

400KV
MZAFFARPUR to
400KV
BIHARSHARIFF

PGCIL

400KV
MZAFFARPUR to
400KV
BIHARSHARIFF

BSEB

400KV PATNA to
400KV JASINFRA
GENERATION

BSEB

400KV PATNA to
400KV JASINFRA
GENERATION

BSEB

400KV PATNA to
400KV JASINFRA
GENERATION

BSEB

400KV PATNA to
400KV JASINFRA
GENERATION

Developing the PSMP for Bihar

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST (
Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

DCDS
1

10

QUADMOOSE

1,450

1,618

3,068

1,450

1,618

3,068

21,605

1,618

23,223

21,605

809

22,414

21,605

809

22,414

21,605

809

22,414

DCDS
1

10

QUADMOOSE
DCDS

131

TWINMOOSE
DCDS

131

TWINMOOSE
DCDS

149

QUADMOOSE
DCDS

149

QUADMOOSE
DCDS

149

QUADMOOSE
DCDS

149

QUADMOOSE

4-124

020328-40RP-0400-00

Final Report

OWNER

TRANSMISSION
LINE

2015

BSEB

400KV PATNA to
400KV LAKHISARAI

123

TWINMOOSE

2015

BSEB

400KV PATNA to
400KV LAKHISARAI

123

TWINMOOSE

2015

BSEB

400KV PATNA to
400KV LAKHISARAI

123

TWINMOOSE

2015

BSEB

400KV PATNA to
400KV LAKHISARAI

123

TWINMOOSE

2009

PGCIL

400KV PATNA to
400KV KAHALGAON

257

QUADMOOSE

2009

PGCIL

400KV PATNA to
400KV KAHALGAON

257

QUADMOOSE

2012

BSEB

400KV PURNEA to
400KV KATHIHAR

35

QUADMOOSE

2012

BSEB

400KV PURNEA to
400KV KATHIHAR

35

QUADMOOSE

2014

BSEB

400KV PUSAULI to
400KV NABINAGAR

85

QUADMOOSE

2014

BSEB

400KV PUSAULI to
400KV NABINAGAR

85

QUADMOOSE

2014

BSEB

400KV PUSAULI to
400KV NABINAGAR

85

QUADMOOSE

2014

BSEB

400KV PUSAULI to
400KV NABINAGAR

85

QUADMOOSE

FY

Developing the PSMP for Bihar

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST (
Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

DCDS
9,840

809

10,649

9,840

809

10,649

9,840

809

10,649

9,840

809

10,649

5,075

809

5,884

5,075

809

5,884

12,325

809

13,134

12,325

809

13,134

12,325

809

13,134

12,325

809

13,134

DCDS
DCDS
DCDS
DCDS
DCDS
DCDS
DCDS
DCDS
DCDS
DCDS
DCDS

4-125

020328-40RP-0400-00

Final Report

FY

2014

2014

2009

2009

2015

2015

2012

2012

OWNER

TRANSMISSION
LINE

BSEB

400KV PUSAULI to
400KV NABINAGAR
RAILWAY

BSEB

400KV PUSAULI to
400KV NABINAGAR
RAILWAY

PGCIL

400KV PUSAULI to
400KV
BIHARSHARIFF

PGCIL

400KV PUSAULI to
400KV
BIHARSHARIFF

BSEB

400KV PIRPAINTI
GENERATION to
400KV KATHIHAR

BSEB

400KV PIRPAINTI
GENERATION to
400KV KATHIHAR

PGCIL

LILO OF 1ST DC 1CKT BIAHRSARIFFKAHALGAON LINE


AT BANKA

PGCIL

LILO OF 1ST DC 2ND 1CKT


BIAHRSARIFFKAHALGAON LINE
AT BANKA

Developing the PSMP for Bihar

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST (
Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

DCDS
1

85

QUADMOOSE

12,325

809

13,134

12,325

809

13,134

5,075

1,618

6,693

5,075

1,618

6,693

DCDS
1

85

QUADMOOSE
DCDS

194

TWINMOOSE
DCDS

194

TWINMOOSE
DCDS

35

QUADMOOSE
DCDS

35

QUADMOOSE
DCDS

25

TWINMOOSE
DCDS

25

TWINMOOSE

4-126

020328-40RP-0400-00

Final Report

FY

2012

2012

2015

2015

OWNER

TRANSMISSION
LINE

PGCIL

LILO OF 1ST DC 1CKT BIAHRSARIFFKAHALGAON LINE


AT JAMALPUR

PGCIL

LILO OF 1ST DC 2ND 1CKT


BIAHRSARIFFKAHALGAON LINE
AT JAMALPUR

PGCIL

LILO OF 1ST DC 1CKT PATNA-BALIA


LINE AT JAMALPUR

PGCIL

LILO OF 1ST DC 2ND 1CKT PATNABALIALINE AT


JAMALPUR

Developing the PSMP for Bihar

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST (
Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

DCDS
2

20

TWINMOOSE

DCDS

20

TWINMOOSE
DCDS

15

QUADMOOSE
DCDS

15

QUADMOOSE

4-127

020328-40RP-0400-00

Final Report

4.9.10

Cost estimates for 220 kV Lines


Table 4-61

FY

OWNER

TRANSMISSION
LINE

2010

BSEB

2010

BSEB

2014

BSEB

2014

BSEB

2014

BSEB

2012

BSEB

2012

BSEB

2013

BSEB

Total
220KV
BIHARSHARIFF to
220KV
BEGUSARAI
220KV
BIHARSHARIFF to
220KV
BEGUSARAI
220KV BTPS to
220KV
BEGUSARAI
220KV BTPS to
220KV
BEGUSARAI
220KV BTPS to
220KV
BEGUSARAI
220KV GAIGHAT to
220KV FATUHA
220KV GAIGHAT to
220KV FATUHA
220KV GAYA GT
STATION to 220KV
BODHGAYA

2013

BSEB

220KV GAYA GT
STATION to 220KV

Developing the PSMP for Bihar

Cost estimates for 220kV Lines (Rs. Lakhs)

LINE COST
(Rs. Lakhs)

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

102,970

164

39,278

142,248

#CKTS

LENGTH
(R-KM)

106

3,095

75

ZEBRA

DCDS

2,250

479

2,729

75

ZEBRA

DCDS

2,250

479

2,729

AAAC

DCDS

228

479

707

AAAC

DCDS

228

479

707

AAAC

DCSS

350

479

829

AAAC

DCDS

163

479

642

AAAC

DCDS

163

479

642

15

AAAC

DCDS

488

479

967

15

AAAC

DCDS

488

479

967

CONDUCTOR

4-128

TOWER
CONFIGURATION

NO.OF
LINE
ENTRY
BAYS

020328-40RP-0400-00

Final Report

FY

OWNER

2013

BSEB

2014

BSEB

2014

BSEB

2014

BSEB

2014

BSEB

2015

BSEB

2015

BSEB

2011

BSEB

2011

BSEB

2011

BSEB

2011

BSEB

2012

BSEB

2012

BSEB

2012

BSEB

TRANSMISSION
LINE
BODHGAYA
220KV GAYA GT
STATION to 220KV
BODHGAYA
220KV HAJIPUR to
220KV BTPS
220KV HAJIPUR to
220KV BTPS
220KV HAJIPUR to
220KV BTPS
220KV HAJIPUR to
220KV BTPS
220KV HAJIPUR to
220KV CHAPRA
220KV HAJIPUR to
220KV CHAPRA
220KV HAJIPUR to
220KV FATUHA
220KV HAJIPUR to
220KV FATUHA
220KV HAJIPUR to
220KV FATUHA
220KV HAJIPUR to
220KV FATUHA
220KV HAJIPUR to
220KV GAIGHAT
220KV HAJIPUR to
220KV GAIGHAT
220KV
JAKKANPUR to
220KV FATUHA

Developing the PSMP for Bihar

#CKTS

LENGTH
(R-KM)

LINE COST
(Rs. Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

CONDUCTOR

TOWER
CONFIGURATION

15

AAAC

DCSS

750

479

1,229

42

AAAC

DCDS

1,365

479

1,844

42

AAAC

DCDS

1,365

479

1,844

42

AAAC

DCDS

1,365

479

1,844

42

AAAC

DCDS

1,365

479

1,844

58

ZEBRA

DCDS

1,740

479

2,219

58

ZEBRA

DCDS

1,740

479

2,219

15

AAAC

DCDS

488

479

967

15

AAAC

DCDS

488

479

967

15

AAAC

DCDS

488

479

967

15

AAAC

DCDS

488

479

967

14

AAAC

DCDS

455

479

934

14

AAAC

DCDS

455

479

934

18

AAAC

DCDS

569

479

1,048

4-129

020328-40RP-0400-00

Final Report

FY

OWNER

2012

BSEB

2012

BSEB

2012

BSEB

2012

BSEB

2012

BSEB

2013

BSEB

2013

BSEB

2011

BSEB

2011

BSEB

2012
2012

BSEB
BSEB

TRANSMISSION
LINE
220KV
JAKKANPUR to
220KV FATUHA
220KV
JAKKANPUR to
220KV GAIGHAT
220KV
JAKKANPUR to
220KV GAIGHAT
220KV KHAGAUL
to 220KV
JAKKANPUR
220KV KHAGAUL
to 220KV
JAKKANPUR
220KV KHAGAUL-2
to 220KV
JAKKANPUR
220KV KHAGAUL-2
to 220KV
JAKKANPUR
220KV
MADHEPURA to
220KV
DARBHANGA
220KV
MADHEPURA to
220KV
DARBHANGA
220KV
MADHEPURA to
220KV KATHIHAR
220KV

Developing the PSMP for Bihar

#CKTS

LENGTH
(R-KM)

LINE COST
(Rs. Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

CONDUCTOR

TOWER
CONFIGURATION

18

AAAC

DCDS

569

479

1,048

AAAC

DCDS

163

479

642

AAAC

DCDS

163

479

642

AAAC

DCDS

195

479

674

AAAC

DCDS

195

479

674

AAAC

DCDS

195

479

674

AAAC

DCDS

195

479

674

137

AAAC

DCDS

4,453

479

4,932

137

AAAC

DCDS

4,453

479

4,932

1
1

78.25
78.25

AAAC
AAAC

DCDS
DCDS

2,543
2,543

2
2

479
479

3,022
3,022

4-130

020328-40RP-0400-00

Final Report

FY

OWNER

2012

BSEB

2012

BSEB

2011

BSEB

2011

BSEB

2010

BSEB

2012

BSEB

2012

BSEB

2015

BSEB

2015

BSEB

2015

BSEB

2015

BSEB

TRANSMISSION
LINE
MADHEPURA to
220KV KATHIHAR
220KV
MADHEPURA to
220KV KATHIHAR
220KV KANTI to
220KV
GOPALGANJ
220KV KANTI to
220KV HAJIPUR
220KV KANTI to
220KV HAJIPUR
220KV
MUZAFFARPUR to
220KV
DARBHANGA
220KV PUSAULI to
220KV DEHRI-ONSONE
220KV PUSAULI to
220KV DEHRI-ONSONE
220KV SABOUR to
220KV
BEGUSARAI
220KV SABOUR to
220KV KATHIHAR
220KV SABOUR to
220KV KATHIHAR
220KV
SAMASTIPUR to
220KV
BEGUSARAI

Developing the PSMP for Bihar

#CKTS

LENGTH
(R-KM)

78.25

LINE COST
(Rs. Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

CONDUCTOR

TOWER
CONFIGURATION

AAAC

DCSS

3,913

479

4,392

101.35

ZEBRA

SC-STRINGING

1,419

479

1,898

75

ZEBRA

DCDS

479

479

75

ZEBRA

DCDS

2,250

479

2,729

67

ZEBRA

DCSS

3,216

479

3,695

55

ZEBRA

DCDS

1,650

479

2,129

55

ZEBRA

DCDS

1,650

479

2,129

52

AAAC

DCDS

1,690

479

2,169

22

AAAC

DCDS

715

479

1,194

22

AAAC

DCDS

715

479

1,194

68

ZEBRA

DCDS

2,040

479

2,519

4-131

020328-40RP-0400-00

Final Report

FY

OWNER

2015

BSEB

2012

BSEB

2012

BSEB

2012

BSEB

2012

BSEB

2015

BSEB

2015

BSEB

2011

BSEB

2011

BSEB

2018

BSEB

TRANSMISSION
LINE
220KV
SAMASTIPUR to
220KV
BEGUSARAI
220KV SHEOHAR
to 220KV KANTI
220KV SHEOHAR
to 220KV KANTI
220KV
SONENAGAR to
220KV BODHGAYA
220KV
SONENAGAR to
220KV DEHRI-ONSONE
220KV SUPAUL to
220KV DAGMARA
GENERATION
220KV SUPAUL to
220KV DAGMARA
GENERATION
220KV SUPAUL to
220KV
MADHEPURA
220KV SUPAUL to
220KV
MADHEPURA
220KV VIKAS
GENERATION to
220KV
BEGUSARAI

Developing the PSMP for Bihar

#CKTS

LENGTH
(R-KM)

LINE COST
(Rs. Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

CONDUCTOR

TOWER
CONFIGURATION

68

ZEBRA

DCDS

2,040

479

2,519

41

ZEBRA

DCDS

1,230

479

1,709

41

ZEBRA

DCDS

1,230

479

1,709

84

ZEBRA

DC/SC

4,032

479

4,511

7.25

ZEBRA

DC/SC

348

479

827

42

ZEBRA

DCDS

1,260

479

1,739

42

ZEBRA

DCDS

1,260

479

1,739

56

ZEBRA

DCDS

1,680

479

2,159

56

ZEBRA

DCDS

1,680

479

2,159

10

ZEBRA

DCDS

300

479

779

4-132

020328-40RP-0400-00

Final Report

FY

OWNER

2018

BSEB

2018

BSEB

2018

BSEB

2015

BSEB

2015

BSEB

2015

BSEB

2015

BSEB

2015

BSEB

2015

BSEB

2012

BSEB

2012

BSEB

TRANSMISSION
LINE
220KV VIKAS
GENERATION to
220KV
BEGUSARAI
220KV VIKAS
GENERATION to
220KV
BEGUSARAI
220KV VIKAS
GENERATION to
220KV
BEGUSARAI
400KV ARRAH to
220KV BUXAR GT
STATION
400KV ARRAH to
220KV BUXAR GT
STATION
400KV ARRAH to
220KV BUXAR GT
STATION
400KV ARRAH to
220KV ARRA
400KV ARRAH to
220KV ARRA
400KV ARRAH to
220KV ARRA
400KV KATHIHAR
to 220KV
KATHIHAR
400KV KATHIHAR
to 220KV
KATHIHAR

Developing the PSMP for Bihar

#CKTS

LENGTH
(R-KM)

LINE COST
(Rs. Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

CONDUCTOR

TOWER
CONFIGURATION

10

ZEBRA

DCDS

300

479

779

10

ZEBRA

DCDS

300

479

779

10

ZEBRA

DCDS

300

479

779

63

AAAC

DCDS

2,048

479

2,527

63

AAAC

DCDS

2,048

479

2,527

63

AAAC

DCSS

3,150

479

3,629

ZEBRA

DCDS

30

479

509

ZEBRA

DCDS

30

479

509

ZEBRA

DCSS

48

479

527

AAAC

DCDS

65

479

544

AAAC

DCDS

65

479

544

4-133

020328-40RP-0400-00

Final Report

FY

OWNER

2012

BSEB

2016

BSEB

2016

BSEB

2012

BSEB

2012

BSEB

2012

BSEB

2012

BSEB

2012

BSEB

2012

BSEB

2012

BSEB

2012

BSEB

2013

BSEB

TRANSMISSION
LINE
400KV KATHIHAR
to 220KV
KATHIHAR
400KV
KISHANGANJ to
220KV
FORBESGANJ
400KV
KISHANGANJ to
220KV
FORBESGANJ
400KV
KISHANGANJ to
220KV KATHIHAR
400KV
KISHANGANJ to
220KV KATHIHAR
400KV PATNA to
220KV FATUHA
400KV PATNA to
220KV GAIGHAT
400KV PATNA to
220KV GAIGHAT
400KV PATNA to
220KV
JAKKANPUR
400KV PATNA to
220KV
JAKKANPUR
400KV PATNA to
220KV KHAGAUL
400KV PATNA to
220KV KHAGAUL-2

Developing the PSMP for Bihar

#CKTS

LENGTH
(R-KM)

LINE COST
(Rs. Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

CONDUCTOR

TOWER
CONFIGURATION

AAAC

DCSS

100

479

579

74

ZEBRA

DCDS

2,220

240

2,460

74

ZEBRA

DCDS

2,220

240

2,460

69

AAAC

DCDS

2,243

240

2,482

69

AAAC

DCDS

2,243

240

2,482

12

AAAC

DCSS

600

240

840

13

AAAC

DCDS

423

240

662

13

AAAC

DCDS

423

240

662

AAAC

DCDS

163

240

402

AAAC

DCDS

163

240

402

20

AAAC

DCSS

1,000

240

1,240

12

ZEBRA

DCDS

360

240

600

4-134

020328-40RP-0400-00

Final Report

FY

OWNER

2013

BSEB

2012

BSEB

2012

BSEB

2012

BSEB

2010

BSEB

2015

BSEB

2012

BSEB

2012

BSEB

2012

BSEB

2011

BSEB

2011

BSEB

2018

BSEB

2018

BSEB

TRANSMISSION
LINE
400KV PATNA to
220KV KHAGAUL-2
400KV PATNA to
220KV SIPARA
400KV PATNA to
220KV SIPARA
400KV PATNA to
220KV SIPARA
400KV PURNEA to
220KV
BEGUSARAI
400KV PURNEA to
220KV SABOUR
400KV PUSAULI to
220KV PUSAULI
400KV PUSAULI to
220KV PUSAULI
400KV PUSAULI to
220KV PUSAULI
LILO OF FATHUAKHAGUAL LINE AT
PATNA
LILO OF FATHUAKHAGUAL LINE AT
SIPARA
LILO OF 220KV
BIHARSHARIFF BODHGAYA AT
220KV
HULSANGANJ
LILO OF 220KV
BIHARSHARIFF BODHGAYA AT

Developing the PSMP for Bihar

#CKTS

LENGTH
(R-KM)

12

LINE COST
(Rs. Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

CONDUCTOR

TOWER
CONFIGURATION

ZEBRA

DCDS

360

240

600

0.225

AAAC

DCDS

240

247

0.225

AAAC

DCDS

240

247

0.225

AAAC

DCDS

240

247

94

AAAC

DCDS

3,055

240

3,295

52

AAAC

DCDS

1,690

240

1,930

0.5

ZEBRA

DCDS

15

240

255

0.5

ZEBRA

DCDS

15

240

255

0.5

ZEBRA

DCSS

24

240

264

9.3

ZEBRA

DCDS

558

240

798

0.45

ZEBRA

DCDS

27

240

267

15

ZEBRA

DCDS

900

240

1,140

15

ZEBRA

DCDS

900

240

1,140

4-135

020328-40RP-0400-00

Final Report

FY

OWNER

2014

BSEB

2014

BSEB

2017

BSEB

2017

BSEB

2012

BSEB

2012

BSEB

TRANSMISSION
LINE
220KV
HULSANGANJ
LILO OF 1ST CKT
220KV D/C MTPS BEGUSARAI LINE
AT BTPS
LILO OF 2ND CKT
220KV D/C MTPS BEGUSARAI LINE
AT BTPS
LILO OF 1ST CKT
220KV D/C
PUSAULI -ARRAH
LINE AT
BIKRAMGANJ
LILO OF 2ND CKT
220KV D/C
PUSAULI -ARRAH
LINE AT
BIKRAMGANJ
LILO OF 1ST CKT
220KV D/C
BODHGAYA DEHRI-ON-SONE
LINE AT
SONENAGAR
220KV SS
LILO OF 2ND CKT
220KV D/C
BODHGAYA DEHRI-ON-SONE
LINE AT
SONENAGAR

Developing the PSMP for Bihar

#CKTS

LENGTH
(R-KM)

LINE COST
(Rs. Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

CONDUCTOR

TOWER
CONFIGURATION

15

ZEBRA

DCDS

900

240

1,140

15

ZEBRA

DCDS

900

240

1,140

25

ZEBRA

DCDS

1,500

240

1,740

25

ZEBRA

DCDS

1,500

240

1,740

ZEBRA

DCDS

180

240

420

ZEBRA

DCDS

180

240

420

4-136

020328-40RP-0400-00

Final Report

FY

4.9.11

OWNER

TRANSMISSION
LINE
220KV SS

LENGTH
(R-KM)

#CKTS

LINE COST
(Rs. Lakhs)

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

Cost estimates for 132 kV Lines


Table 4-62

FY

CONDUCTOR

TOWER
CONFIGURATION

NO.OF
LINE
ENTRY
BAYS

OWNER

TRANSMISSION
LINE

#CKTS

Total

Cost estimates for 132kV Lines (Rs. Lakhs)

LENGTH
(R-KM)

259

CONDUCTOR

TOWER
CONFIGURATION

4,292

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

97,938

464

COST
(Rs.
Lakhs)

76,560

Total Cost
(Rs.Lakhs)

174,498

BSEB

132KV
BARIPAHRI-2 to
132KV
BARIPAHRI

PANTHER

DCDS

20

330

350

2017

BSEB

132KV
BARIPAHRI-2 to
132KV
BARIPAHRI

PANTHER

DCDS

20

330

350

2013

BSEB

132KV BIHTA to
132KV ARRA

40

PANTHER

DCDS

780

330

1,110

2013

BSEB

132KV BIHTA to
132KV ARRA

40

PANTHER

DCDS

780

330

1,110

2017

Developing the PSMP for Bihar

4-137

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2011

BSEB

132KV
CHANDAUTI to
132KV BELAGANJ

28

PANTHER

DCDS

553

330

883

2011

BSEB

132KV DUMRAON
to 132KV BUXAR

16

PANTHER

DCDS

315

330

645

2011

BSEB

132KV DUMRAON
to 132KV BUXAR

16

PANTHER

DCDS

315

330

645

2011

BSEB

132KV DUMRAON
to 132KV DINARA

44

PANTHER

SC-STRINGING

352

330

682

2011

BSEB

132KV
GOPALGANJ to
132KV BETTIAH

71

PANTHER

SC

2,191

330

2,521

2010

BSEB

132KV HAJIPUR
to 132KV
CHAPRA

80

PANTHER

SC-STRINGING

640

330

970

2011

BSEB

132KV HAJIPUR
to 132KV
DALSINGSARAI

24

PANTHER

SC-STRINGING

192

330

522

2017

BSEB

132KV HARNAUT
to 132KV
BARIPAHRI-2

10

PANTHER

DCDS

195

330

525

2011

BSEB

132KV
HULASGANJ to
132KV
EKANGASARAI

20

PANTHER

DCDS

390

330

720

2011

BSEB

132KV
HULASGANJ to

20

PANTHER

DCDS

390

330

720

Developing the PSMP for Bihar

4-138

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE
132KV
EKANGASARAI

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2011

BSEB

132KV
JAGDISHPUR to
132KV ARRA

28

PANTHER

DCDS

547

330

877

2011

BSEB

132KV
JAGDISHPUR to
132KV ARRA

28

PANTHER

DCDS

547

330

877

2013

BSEB

132KV
JEHNABAD to
132KV
CHANDAUTI

48

PANTHER

DCSS

1,488

330

1,818

2011

BSEB

132KV KARPY to
132KV
JEHNABAD

23

PANTHER

DCDS

442

330

772

2011

BSEB

132KV KARPY to
132KV
JEHNABAD

23

PANTHER

DCDS

442

330

772

2011

BSEB

132KV KATRA to
132KV GAIGHAT

PANTHER

DCDS

162

330

492

2011

BSEB

132KV KATRA to
132KV GAIGHAT

PANTHER

DCDS

162

330

492

2013

BSEB

132KV KHAGAUL2 to 132KV


JAKKANPUR

PANTHER

DCDS

117

330

447

2013

BSEB

132KV KHAGAUL2 to 132KV

PANTHER

DCDS

117

330

447

Developing the PSMP for Bihar

4-139

020328-40RP-0400-00

Final Report

CONDUCTOR

TOWER
CONFIGURATION

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

TRANSMISSION
LINE
JAKKANPUR

2016

BSEB

132KV KHAGUAL3 to 132KV


JAKKANPUR

PANTHER

DCSS

186

330

516

2010

BSEB

132KV
KHAGARIYA to
132KV BTPS

50

PANTHER

SC-STRINGING

400

330

730

2014

BSEB

132KV KHAGAUL
to 132KV BIHTA

PANTHER

DCDS

137

330

467

2011

BSEB

132KV KHAGAUL
to 132KV DIGHA

PANTHER

SC

124

330

454

2012

BSEB

132KV
KISHANGANJ to
132KV
FORBESGANJ

74

PANTHER

DCSS

2,294

330

2,624

2011

BSEB

132KV KUDRA to
132KV DINARA

32

PANTHER

DCSS

1,002

330

1,332

2010

BSEB

132KV
LAKHISARAI to
132KV
JAMALPUR

45

PANTHER

SC-STRINGING

360

330

690

2010

BSEB

132KV MASURHI
to 132KV
CHANDAUTI

60

PANTHER

SC-STRINGING

480

330

810

2014

BSEB

132KV
MITHAPUR-2 to

PANTHER

DCSS

124

330

454

Developing the PSMP for Bihar

#CKTS

LENGTH
(R-KM)

LINE
COST
(Rs.
Lakhs)

4-140

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE
132KV GAIGHAT2

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2014

BSEB

132KV
MITHAPUR-2 to
132KV GAIGHAT

PANTHER

DCSS

124

330

454

2017

BSEB

132KV
MITHAPUR-3 to
132KV
JAKKANPUR-2

PANTHER

DCSS

155

330

485

2015

BSEB

132KV MITHAPUR
to 132KV
JAKKANPUR-2

PANTHER

DCSS

155

330

485

2011

BSEB

132KV PANDAUL
to 132KV
DHARBHANGA

21

PANTHER

DCSS

651

330

981

2016

BSEB

132KV
PHULPARAS to
132KV JAINAGAR

43

PANTHER

DCSS

1,333

330

1,663

2014

BSEB

132KV
PHULPARAS to
132KV PANDAUL

56

PANTHER

DCDS

1,092

330

1,422

2011

BSEB

132KV
PHULPARAS to
132KV PANDAUL

56

PANTHER

DCDS

1,092

330

1,422

2011

BSEB

132KV PURNEA
to 132KV KATHAR

29

PANTHER

DCSS

899

330

1,229

2016

BSEB

132KV PURNEA-2
to 132KV

PANTHER

DCDS

59

330

389

Developing the PSMP for Bihar

4-141

020328-40RP-0400-00

Final Report

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2016

BSEB

132KV PURNEA-2
to 132KV
PURNEA

PANTHER

DCDS

39

330

369

2011

BSEB

132KV
RAMNAGAR to
132KV BETTIAH

41.5

PANTHER

DCSS

1,287

330

1,617

2011

BSEB

132KV RAXAUL to
132KV BETTIAH

37.19

PANTHER

DCDS

725

330

1,055

2011

BSEB

132KV RAXAUL to
132KV BETTIAH

37.19

PANTHER

DCDS

725

330

1,055

2011

BSEB

132KV SABOUR
to 132KV NBANKA

41.58

PANTHER

DCSS

1,289

330

1,619

2010

BSEB

132KV SABOUR
to 132KV
KAHALGAON

PANTHER

SC-STRINGING

72

330

402

2014

BSEB

132KV
SAMASTIPUR to
132KV BTPS

67.2

PANTHER

DCSS

2,083

330

2,413

BSEB

132KV
SAMASTIPUR to
132KV
DALSINGSARAI

PANTHER

SC-STRINGING

64

330

394

BSEB

132KV
SAMASTIPUR to
132KV
DALSINGSARAI

PANTHER

DCSS

248

330

578

2011

Developing the PSMP for Bihar

CONDUCTOR

TOWER
CONFIGURATION

NO.OF
LINE
ENTRY
BAYS

TRANSMISSION
LINE
PURNEA

2011

#CKTS

LENGTH
(R-KM)

LINE
COST
(Rs.
Lakhs)

4-142

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2011

BSEB

132KV SASARAM
to 132KV
BANJARI

45.86

PANTHER

DCSS

1,422

330

1,752

2011

BSEB

132KV SAHARSA
to 132KV
MADHEPURA

18

PANTHER

DCDS

351

330

681

2011

BSEB

132KV SAHARSA
to 132KV
MADHEPURA

17

PANTHER

DCDS

332

330

662

2011

BSEB

132KV
SHEIKHPURA to
132KV JAMUI

49

PANTHER

DCSS

1,519

330

1,849

2012

BSEB

132KV SITMHARI
to 132KV
MOTIHARI

27

PANTHER

DCSS

837

330

1,167

2011

BSEB

132KV SITMHARI
to 132KV RUNI
SAIDPUR

22

PANTHER

DCDS

429

330

759

2011

BSEB

132KV SITMHARI
to 132KV RUNI
SAIDPUR

22

PANTHER

DCDS

429

330

759

2011

BSEB

132KV SIWAN to
132KV
GOPALGANJ

29.94

PANTHER

DCDS

584

330

914

2011

BSEB

132KV SIWAN to
132KV MASRAKH

58

PANTHER

DCSS

1,798

330

2,128

Developing the PSMP for Bihar

4-143

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2017

BSEB

132KV SKMCH to
132KV
MUZAFFARPUR-2

25

PANTHER

DCSS

775

330

1,105

2011

BSEB

132KV SKMCH to
132KV RUNI
SAIDPUR

22

PANTHER

DCDS

429

330

759

2011

BSEB

132KV SKMCH to
132KV RUNI
SAIDPUR

22

PANTHER

DCDS

429

330

759

2011

BSEB

132KV SKMCH to
132KV SITMHARI

35

PANTHER

SC

1,085

330

1,415

BSEB

132KV
SONABARSHI to
132KV
MADHEPURA

40

PANTHER

DCDS

780

330

1,110

BSEB

132KV
SONABARSHI to
132KV
MADHEPURA

40

PANTHER

DCDS

780

330

1,110

BSEB

132KV
SONNENAGAR to
132KV
SONNENAGAR-2

PANTHER

DCDS

20

330

350

BSEB

132KV
SONNENAGAR to
132KV
SONNENAGAR-2

PANTHER

DCDS

20

330

350

2011

2011

2017

2017

Developing the PSMP for Bihar

4-144

020328-40RP-0400-00

Final Report
NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

BSEB

132KV
SULTANGANJ to
132KV
JAMALPUR

38

PANTHER

SC-STRINGING

304

330

634

BSEB

132KV
SULTANGANJ to
132KV
KAHALGAON

28

PANTHER

SC-STRINGING

224

330

554

BSEB

132KV
SULTANGANJ to
132KV
KAHALGAON

28

PANTHER

DCSS

868

330

1,198

BSEB

132KV
SULTANGANJ to
132KV
LAKHISARAI

40

PANTHER

SC-STRINGING

320

330

650

2012

BSEB

132KV
SULTANGANJ to
132KV
LAKHISARAI

40

PANTHER

DCSS

1,240

330

1,570

2010

BSEB

132KV
SULTANGANJ to
132KV SABOUR

35

PANTHER

SC-STRINGING

280

330

610

2011

BSEB

132KV SUPAUL to
132KV KATIYA

94

PANTHER

DCDS

1,833

330

2,163

2011

BSEB

132KV SUPAUL to
132KV KATIYA

94

PANTHER

DCDS

1,833

330

2,163

2011

BSEB

132KV SUPAUL to

18

PANTHER

DCDS

351

330

681

FY

2010

2011

2012

2011

OWNER

TRANSMISSION
LINE

LINE
COST
(Rs.
Lakhs)

Developing the PSMP for Bihar

4-145

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE
132KV
MADHEPURA

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2011

BSEB

132KV SUPAUL to
132KV
MADHEPURA

15

PANTHER

DCDS

293

330

623

2011

BSEB

132KV SUPAUL to
132KV
PHULPARAS

30

PANTHER

SC

930

330

1,260

2014

BSEB

132KV SUPAUL to
132KV
PHULPARAS

30

PANTHER

DCDS

585

330

915

2014

BSEB

132KV SUPAUL to
132KV
PHULPARAS

30

PANTHER

DCDS

585

330

915

2011

BSEB

132KV TEKARI to
132KV
CHANDAUTI

28.36

PANTHER

DCDS

553

330

883

2011

BSEB

132KV TEKARI to
132KV
CHANDAUTI

28.36

PANTHER

DCDS

553

330

883

2011

BSEB

132KV TEKARI to
132KV GOH

22.3

PANTHER

DCDS

435

330

765

2011

BSEB

132KV TEKARI to
132KV GOH

22.3

PANTHER

DCDS

435

330

765

2011

BSEB

132KV
UDAKISHANGANJ
to 132KV

50.35

PANTHER

DCSS

1,561

330

1,891

Developing the PSMP for Bihar

4-146

020328-40RP-0400-00

Final Report

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2011

BSEB

132KV
WAZIRGANJ to
132KV NAWADA

28.5

PANTHER

DCDS

556

330

886

BSEB

132KV
WAZIRGANJ to
132KV
PAHARPUR

PANTHER

DCDS

98

330

428

2018

BSEB

220KV
BODHGAYA to
132KV
PAHARPUR

33

PANTHER

DCSS

1,023

330

1,353

2010

BSEB

132KV
BEGUSARAI to
132KV BTPS

PANTHER

SC

124

330

454

2010

BSEB

132KV
BEGUSARAI to
132KV BTPS

PANTHER

DCDS

78

330

408

2010

BSEB

132KV
BEGUSARAI to
132KV BTPS

PANTHER

DCDS

78

330

408

2011

BSEB

132KV
BEGUSARAI to
132KV
KUSHESWAR

65.1

PANTHER

SC

2,018

330

2,348

2011

BSEB

132KV
BEGUSARAI to

65.1

PANTHER

DCSS

2,018

330

2,348

Developing the PSMP for Bihar

CONDUCTOR

TOWER
CONFIGURATION

NO.OF
LINE
ENTRY
BAYS

TRANSMISSION
LINE
SAHARSA

2011

#CKTS

LENGTH
(R-KM)

LINE
COST
(Rs.
Lakhs)

4-147

020328-40RP-0400-00

Final Report
NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

BSEB

132KV
BEGUSARAI to
132KV
SAMASTIPUR

67

PANTHER

SC

2,077

330

2,407

2010

BSEB

132KV
BEGUSARAI to
132KV
SAMASTIPUR

67

PANTHER

DCSS

2,077

330

2,407

2012

BSEB

132KV DHANHA
to 220KV
GOPALGANJ

60

PANTHER

DCDS

1,170

330

1,500

2012

BSEB

132KV DHANHA
to 220KV
GOPALGANJ

60

PANTHER

DCDS

1,170

330

1,500

2012

BSEB

132KV
DARBHANGA to
132KV
GANGWARA

10

PANTHER

DCSS

310

330

640

2012

BSEB

132KV PANDAUL
to 132KV
GANGWARA

12

PANTHER

DCSS

372

330

702

BSEB

220KV
BIHARSHARIFF to
132KV
BARIPAHRI-2

10

PANTHER

DCSS

310

330

640

FY

2010

2017

OWNER

TRANSMISSION
LINE
132KV
KUSHESWAR

LINE
COST
(Rs.
Lakhs)

Developing the PSMP for Bihar

4-148

020328-40RP-0400-00

Final Report

FY

2011

2011

2011

2011

2017

2017

2017

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

BSEB

220KV
BIHARSHARIFF to
132KV
EKANGASARAI

26

PANTHER

DCDS

507

330

837

BSEB

220KV
BIHARSHARIFF to
132KV
EKANGASARAI

26

PANTHER

DCDS

507

330

837

BSEB

220KV
BIHARSHARIFF to
132KV
HULASGANJ

44.54

PANTHER

SC

1,381

330

1,711

BSEB

220KV
BIHARSHARIFF to
132KV
SHEIKHPURA

38.6

PANTHER

DCSS

1,197

330

1,527

BSEB

220KV
BIKRAMGANJ to
132KV
BIKRAMGANJ

PANTHER

DCDS

39

330

369

BSEB

220KV
BIKRAMGANJ to
132KV
BIKRAMGANJ

PANTHER

DCDS

39

330

369

BSEB

220KV
BIKRAMGANJ to
132KV
BIKRAMGANJ

PANTHER

DCSS

62

330

392

OWNER

TRANSMISSION
LINE

LINE
COST
(Rs.
Lakhs)

Developing the PSMP for Bihar

4-149

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2016

BSEB

220KV CHAPRA
to 132KV
CHAPRA-2

PANTHER

DCDS

39

330

369

2016

BSEB

220KV CHAPRA
to 132KV
CHAPRA-2

PANTHER

DCDS

39

330

369

2015

BSEB

220KV CHAPRA
to 132KV
CHAPRA

0.7

PANTHER

DCDS

14

330

344

2015

BSEB

220KV CHAPRA
to 132KV
CHAPRA

0.7

PANTHER

DCDS

14

330

344

BSEB

220KV
DARBHANGA to
132KV
DHARBHANGA

PANTHER

DCDS

20

330

350

2011

BSEB

220KV
DARBHANGA to
132KV
DHARBHANGA

PANTHER

DCDS

20

330

350

2011

BSEB

220KV DEHRION-SONE to
132KV DINARA

62

PANTHER

SC-STRINGING

496

330

826

2012

BSEB

220KV FATHUA to
132KV FATHUA-2

PANTHER

DCDS

39

330

369

2012

BSEB

220KV FATHUA to
132KV FATHUA-2

PANTHER

DCDS

39

330

369

2011

Developing the PSMP for Bihar

4-150

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2012

BSEB

220KV FATHUA to
132KV FATHUA-2

PANTHER

DCSS

62

330

392

2011

BSEB

220KV FATHUA to
132KV KATRA

8.3

PANTHER

DCDS

162

330

492

2011

BSEB

220KV FATHUA to
132KV KATRA

8.3

PANTHER

DCDS

162

330

492

BSEB

220KV
FORBESGANJ to
132KV
FORBESGANJ

PANTHER

DCDS

20

330

350

BSEB

220KV
FORBESGANJ to
132KV
FORBESGANJ

PANTHER

DCDS

20

330

350

BSEB

220KV
FORBESGANJ to
132KV
FORBESGANJ

PANTHER

DCDS

20

330

350

2016

BSEB

220KV
FORBESGANJ to
132KV
FORBESGANJ

PANTHER

DCDS

20

330

350

2016

BSEB

220KV
FORBESGANJ to
132KV KATIYA

54

PANTHER

DCSS

1,674

330

2,004

2016

BSEB

220KV GAIGHAT
to 132KV
GAIGHAT-2

PANTHER

DCDS

20

330

350

2016

2016

2016

Developing the PSMP for Bihar

4-151

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2016

BSEB

220KV GAIGHAT
to 132KV
GAIGHAT-2

PANTHER

DCDS

20

330

350

2012

BSEB

220KV GAIGHAT
to 132KV
GAIGHAT

PANTHER

DCDS

20

330

350

2012

BSEB

220KV GAIGHAT
to 132KV
GAIGHAT

PANTHER

DCDS

20

330

350

2012

BSEB

220KV GAIGHAT
to 132KV
GAIGHAT

PANTHER

DCSS

31

330

361

2014

BSEB

220KV GAIGHAT
to 132KV
MITHAPUR-2

PANTHER

DCSS

124

330

454

2011

BSEB

220KV HAJIPUR
to 132KV
HAJIPUR

0.7

PANTHER

DCDS

14

330

344

2011

BSEB

220KV HAJIPUR
to 132KV
HAJIPUR

0.7

PANTHER

DCDS

14

330

344

2011

BSEB

220KV HAJIPUR
to 132KV
HAJIPUR

0.7

PANTHER

DCDS

14

330

344

2011

BSEB

220KV HAJIPUR
to 132KV
HAJIPUR

0.7

PANTHER

DCDS

14

330

344

Developing the PSMP for Bihar

4-152

020328-40RP-0400-00

Final Report
NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

BSEB

220KV
HULSANGAJ to
132KV
CHANDAUTI-2

40

PANTHER

DCDS

780

330

1,110

BSEB

220KV
HULSANGAJ to
132KV
CHANDAUTI-2

40

PANTHER

DCDS

780

330

1,110

BSEB

220KV
HULSANGAJ to
132KV
HULASGANJ

PANTHER

DCDS

20

330

350

BSEB

220KV
HULSANGAJ to
132KV
HULASGANJ

PANTHER

DCDS

20

330

350

2018

BSEB

220KV
HULSANGAJ to
132KV
HULASGANJ

PANTHER

DCSS

31

330

361

2018

BSEB

220KV
HULSANGAJ to
132KV TEKARI

30

PANTHER

DCDS

585

330

915

2018

BSEB

220KV
HULSANGAJ to
132KV TEKARI

30

PANTHER

DCDS

585

330

915

2012

BSEB

220KV
JAKKANPUR to
132KV

PANTHER

DCDS

20

330

350

FY

2018

2018

2018

2018

OWNER

TRANSMISSION
LINE

LINE
COST
(Rs.
Lakhs)

Developing the PSMP for Bihar

4-153

020328-40RP-0400-00

Final Report

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

#CKTS

CONDUCTOR

TOWER
CONFIGURATION

BSEB

220KV
JAKKANPUR to
132KV
JAKKANPUR-2

PANTHER

DCDS

20

330

350

BSEB

220KV
JAKKANPUR to
132KV
JAKKANPUR-2

PANTHER

DCSS

31

330

361

BSEB

220KV
JAKKANPUR to
132KV
MITHAPUR-3

PANTHER

DCDS

98

330

428

2017

BSEB

220KV
JAKKANPUR to
132KV
MITHAPUR-3

PANTHER

DCDS

98

330

428

2012

BSEB

220KV
JAKKANPUR to
132KV MITHAPUR

PANTHER

DCDS

98

330

428

2012

BSEB

220KV
JAKKANPUR to
132KV MITHAPUR

PANTHER

DCDS

98

330

428

2012

BSEB

220KV KATHIHAR
to 132KV KATHAR

PANTHER

DCDS

39

330

369

2012

BSEB

220KV KATHIHAR
to 132KV KATHAR

PANTHER

DCDS

39

330

369

2012

2012

2017

OWNER

NO.OF
LINE
ENTRY
BAYS

LENGTH
(R-KM)

FY

TRANSMISSION
LINE
JAKKANPUR-2

LINE
COST
(Rs.
Lakhs)

Developing the PSMP for Bihar

4-154

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2012

BSEB

220KV KATHIHAR
to 132KV
PURNEA

37

PANTHER

DCDS

722

330

1,052

2012

BSEB

220KV KATHIHAR
to 132KV
PURNEA

37

PANTHER

DCDS

722

330

1,052

2012

BSEB

220KV KATHIHAR
to 132KV
PURNEA

31

PANTHER

DCSS

961

330

1,291

2013

BSEB

220KV KHAGAUL2 to 132KV


JAKKANPUR

PANTHER

DCSS

186

330

516

2013

BSEB

220KV KHAGAUL2 to 132KV


KHAGAUL-2

PANTHER

DCDS

20

330

350

2013

BSEB

220KV KHAGAUL2 to 132KV


KHAGAUL-2

PANTHER

DCDS

20

330

350

2013

BSEB

220KV KHAGAUL2 to 132KV


KHAGAUL-2

PANTHER

DCSS

31

330

361

2016

BSEB

220KV KHAGAUL2 to 132KV


KHAGUAL-3

PANTHER

DCDS

20

330

350

2016

BSEB

220KV KHAGAUL2 to 132KV


KHAGUAL-3

PANTHER

DCDS

20

330

350

Developing the PSMP for Bihar

4-155

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2016

BSEB

220KV KHAGAUL2 to 132KV


KHAGUAL-3

PANTHER

DCSS

31

330

361

2014

BSEB

220KV KHAGAUL
to 132KV BIHTA

PANTHER

DCDS

137

330

467

2011

BSEB

220KV KHAGAUL
to 132KV DIGHA

PANTHER

SC

124

330

454

2011

BSEB

220KV KHAGAUL
to 132KV DIGHA

PANTHER

DCSS

124

330

454

2012

BSEB

220KV KHAGAUL
to 132KV
KHAGAUL

PANTHER

DCSS

31

330

361

BSEB

220KV
MADHEPURA to
132KV
MADHEPURA

PANTHER

DCDS

39

330

369

BSEB

220KV
MADHEPURA to
132KV
MADHEPURA

PANTHER

DCDS

39

330

369

BSEB

220KV
MADHEPURA to
132KV
MADHEPURA

PANTHER

DCDS

39

330

369

BSEB

220KV
MADHEPURA to
132KV
MADHEPURA

PANTHER

DCDS

39

330

369

2011

2011

2011

2011

Developing the PSMP for Bihar

4-156

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2014

BSEB

220KV MTPS to
132KV
MUZAFFARPUR

15.5

PANTHER

DCSS

481

330

811

2011

BSEB

220KV MTPS to
132KV SKMCH

14.136

PANTHER

DCSS

438

330

768

2011

BSEB

220KV MTPS to
132KV VAISHALI

30.1

PANTHER

DCDS

587

330

917

2011

BSEB

220KV MTPS to
132KV VAISHALI

30.1

PANTHER

DCDS

587

330

917

BSEB

220KV
MUZAFFARPUR
to 132KV
MUZAFFARPUR-2

PANTHER

DCDS

59

330

389

2017

BSEB

220KV
MUZAFFARPUR
to 132KV
MUZAFFARPUR-2

PANTHER

DCDS

59

330

389

2010

BSEB

220KV ARRA to
132KV ARRA

PANTHER

SC

93

330

423

2011

BSEB

220KV ARRA to
132KV ARRA

PANTHER

DCSS

93

330

423

2012

BSEB

220KV PUSAULI
to 132KV BHABUA

10

PANTHER

DCDS

195

330

525

2012

BSEB

220KV PUSAULI
to 132KV BHABUA

10

PANTHER

DCDS

195

330

525

2012

BSEB

220KV PUSAULI
to 132KV KUDRA

10

PANTHER

DCDS

195

330

525

2017

Developing the PSMP for Bihar

4-157

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2012

BSEB

220KV PUSAULI
to 132KV KUDRA

10

PANTHER

DCDS

195

330

525

2015

BSEB

220KV SABOUR
to 132KV
SABOUR

PANTHER

DCDS

20

330

350

2015

BSEB

220KV SABOUR
to 132KV
SABOUR

PANTHER

DCDS

20

330

350

2015

BSEB

220KV SABOUR
to 132KV
SABOUR

PANTHER

DCSS

31

330

361

2016

BSEB

220KV SABOUR
to 132KV
SABOUR-2

PANTHER

DCDS

39

330

369

2016

BSEB

220KV SABOUR
to 132KV
SABOUR-2

PANTHER

DCDS

39

330

369

BSEB

220KV
SAMASTIPUR to
132KV
SAMASTIPUR-2

PANTHER

DCDS

39

330

369

2016

BSEB

220KV
SAMASTIPUR to
132KV
SAMASTIPUR-2

PANTHER

DCDS

39

330

369

2012

BSEB

220KV SHEOHAR
to 132KV RUNI
SAIDPUR

PANTHER

DCDS

98

330

428

2016

Developing the PSMP for Bihar

4-158

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2012

BSEB

220KV SHEOHAR
to 132KV RUNI
SAIDPUR

PANTHER

DCDS

98

330

428

2012

BSEB

220KV SHEOHAR
to 132KV
SHEOHAR

PANTHER

DCDS

20

330

350

2012

BSEB

220KV SHEOHAR
to 132KV
SHEOHAR

PANTHER

DCDS

20

330

350

2012

BSEB

220KV SHEOHAR
to 132KV
SITMHARI

17

PANTHER

DCDS

332

330

662

2012

BSEB

220KV SHEOHAR
to 132KV
SITMHARI

17

PANTHER

DCDS

332

330

662

2018

BSEB

220KV SIPARA to
132KV BIHTA-2

PANTHER

DCDS

20

330

350

2018

BSEB

220KV SIPARA to
132KV BIHTA-2

PANTHER

DCDS

20

330

350

2012

BSEB

220KV SIPARA to
132KV
JAKKANPUR

19

PANTHER

DCDS

371

330

701

2012

BSEB

220KV SIPARA to
132KV
JAKKANPUR

19

PANTHER

DCDS

371

330

701

2012

BSEB

220KV SIPARA to
132KV

26

PANTHER

DCDS

507

330

837

Developing the PSMP for Bihar

4-159

020328-40RP-0400-00

Final Report

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2012

BSEB

220KV SIPARA to
132KV
JEHNABAD

26

PANTHER

DCDS

507

330

837

2012

BSEB

220KV SIPARA to
132KV MASURHI

14

PANTHER

DCSS

434

330

764

BSEB

220KV
SONNENAGAR to
132KV
AURANGABAD

9.12

PANTHER

SC

283

330

613

2012

BSEB

220KV
SONNENAGAR to
132KV
AURANGABAD

9.12

PANTHER

DCSS

283

330

613

2012

BSEB

220KV
SONNENAGAR to
132KV RAFIGANJ

23.5

PANTHER

SC-STRINGING

188

330

518

2012

BSEB

220KV
SONNENAGAR to
132KV RAFIGANJ

23.5

PANTHER

DCSS

729

330

1,059

BSEB

220KV
SONNENAGAR to
132KV
SONNENAGAR

PANTHER

DCDS

20

330

350

BSEB

220KV
SONNENAGAR to
132KV
SONNENAGAR

PANTHER

DCDS

20

330

350

2012

2012

Developing the PSMP for Bihar

CONDUCTOR

TOWER
CONFIGURATION

NO.OF
LINE
ENTRY
BAYS

TRANSMISSION
LINE
JEHNABAD

2012

#CKTS

LENGTH
(R-KM)

LINE
COST
(Rs.
Lakhs)

4-160

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2011

BSEB

220KV SUPAUL to
132KV SAHARSA

35

PANTHER

DCSS

1,085

330

1,415

2011

BSEB

220KV SUPAUL to
132KV SUPAUL

PANTHER

DCDS

20

330

350

2011

BSEB

220KV SUPAUL to
132KV SUPAUL

PANTHER

DCDS

20

330

350

2011

BSEB

220KV SUPAUL to
132KV SUPAUL

PANTHER

DCSS

31

330

361

2012

BSEB

400KV BANKA to
132KV NBANKA

0.5

PANTHER

DCDS

10

330

340

2012

BSEB

400KV BANKA to
132KV NBANKA

0.5

PANTHER

DCDS

10

330

340

2012

BSEB

400KV BANKA to
132KV NBANKA

0.5

PANTHER

DCSS

16

330

346

BSEB

400KV
JAMALPUR to
132KV
JAMALPUR

PANTHER

DCDS

20

330

350

BSEB

400KV
JAMALPUR to
132KV
JAMALPUR

PANTHER

DCDS

20

330

350

2012

BSEB

400KV
JAMALPUR to
132KV
JAMALPUR

PANTHER

DCSS

31

330

361

2012

BSEB

400KV

45

PANTHER

DCDS

878

330

1,208

2012

2012

Developing the PSMP for Bihar

4-161

020328-40RP-0400-00

Final Report

TRANSMISSION
LINE
JAMALPUR to
132KV
LAKHISARAI

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

LINE
COST
(Rs.
Lakhs)

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

FY

OWNER

2012

BSEB

400KV
JAMALPUR to
132KV
LAKHISARAI

45

PANTHER

DCDS

878

330

1,208

BSEB

400KV
KAHALGAON to
132KV
KAHALGAON

PANTHER

DCDS

59

330

389

2012

BSEB

400KV
KAHALGAON to
132KV
KAHALGAON

PANTHER

DCDS

59

330

389

2014

BSEB

400KV PURNEA
to 132KV
KISHANGANJ

54.9

PANTHER

DCSS

1,702

330

2,032

2012

BSEB

400KV PUSAULI
to 132KV BHABUA

10

PANTHER

DCDS

195

330

525

2012

BSEB

400KV PUSAULI
to 132KV BHABUA

10

PANTHER

DCDS

195

330

525

BSEB

LILO OF
BARIPAHRIFATHUA 132KV
S/C LINE AT
HARNUAT

11.48

PANTHER

DCDS

448

165

613

2014

2011

Developing the PSMP for Bihar

4-162

020328-40RP-0400-00

Final Report

FY

2011

2011

2011

2011

2011

2011

2011

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

BSEB

LILO OF DEHRIKARMNASA
132KV S/C LINE
AT KUDRA

PANTHER

DCDS

273

165

438

BSEB

LILO OF
CHAPRA-SIWAN
LINE AT
MUSRAKH

PANTHER

DCDS

165

165

BSEB

LILO OF
BARIPAHRIRAJGIR LINE AT
NALANDA

1.5

PANTHER

DCDS

59

165

224

BSEB

LILO OF 132KV
D/C FATHUAGAIGHAT AT
KATRA

3.6

PANTHER

DCDS

140

165

305

BSEB

LILO OF 132KV
S/C GAIGHATMITHAPUR AT
SIPARA

9.81

PANTHER

DCDS

383

165

548

BSEB

LILO OF IST
132KV GAYAJAKKANPUR AT
SIPARA

9.98

PANTHER

DCDS

389

165

554

BSEB

LILO OF 2ND
132KV GAYAJAKKANPUR AT
SIPARA

10.742

PANTHER

DCDS

419

165

584

OWNER

TRANSMISSION
LINE

LINE
COST
(Rs.
Lakhs)

Developing the PSMP for Bihar

4-163

020328-40RP-0400-00

Final Report
NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

BSEB

LILO OF 132KV
D/C SITAMHARIMUZAFFARPUR
AT SKMCH

0.5

PANTHER

DCDS

20

165

185

BSEB

LILO OF 132KV
BARUANIPURNEA AT
NAUGACHIYA

0.85

PANTHER

DCDS

33

165

198

BSEB

LILO OF 132KV
DC BARUANISAMASTIPUR AT
BEGUSARAI

3.85

PANTHER

DCDS

150

165

315

BSEB

LILO OF
HAZIPURSAMASTIPUR
132KV D/C LINE
AT
DALSINGSARAI

1.03

PANTHER

DCDS

40

165

205

BSEB

LILO OF SKMCHSITMHARI 132KV


S/C LINE AT
RUNNI SAIDPUR

PANTHER

DCDS

234

165

399

2011

BSEB

LILO OF DEHRIKARMANASA
132KV S/C AT
KUDRA

PANTHER

DCDS

273

165

438

2011

BSEB

LILO OF
BODHGAYANAWADA 132KV

0.8

PANTHER

DCDS

31

165

196

FY

2011

2011

2011

2011

2011

OWNER

TRANSMISSION
LINE

LINE
COST
(Rs.
Lakhs)

Developing the PSMP for Bihar

4-164

020328-40RP-0400-00

Final Report

FY

2011

2011

2012

NO.OF
LINE
ENTRY
BAYS

COST
(Rs.
Lakhs)

Total Cost
(Rs.Lakhs)

#CKTS

LENGTH
(R-KM)

CONDUCTOR

TOWER
CONFIGURATION

BSEB

LILO OF 2ND CKT


OF DEHRIDUMRAON 132KV
D/C AT DINARA

15

PANTHER

DCDS

585

165

750

BSEB

LILO OF
SAHARSASUPAUL LINE AT
MADHEPURA

1.5

PANTHER

DCDS

59

165

224

BSEB

LILO OF 132KV
S/C LINE
NAUGACHIYA
PURNEA LINE AT
KATIHAR

15

PANTHER

DCDS

585

165

750

OWNER

TRANSMISSION
LINE
S/C LINE AT
WAZIRGANJ

LINE
COST
(Rs.
Lakhs)

Developing the PSMP for Bihar

4-165

020328-40RP-0400-00

Final Report

4.9.12

Cost estimates for Shunt Capacitors


Table 4-63
FY

Cost estimates for Shunt Capacitors (Rs. Lakhs)

VOLTAGE
(KV)

CAPAITY
(MVAR)

NAME OF THE SS
Total

COST
(Rs.lakhs)

1,130

5,529

2011

33

132KV BUXAR

20

96

2011

33

132KV DHAKA

20

96

2011

33

132KV DUMRAON

30

125

2011

33

132KV GOPALGANJ

10

48

2011

33

132KV MOTIHARI

20

96

2011

33

132KV NAWADA

30

125

2011

33

132KV RAMNAGAR

20

96

2011

33

132KV SIWAN

30

125

2012

33

132KV BETTIAH

30

125

2012

33

132KV BIHTA

20

96

2012

33

132KV CHAPRA

20

96

2012

33

132KV DHANHA

20

96

2012

33

132KV JAMUI

10

48

2012

33

132KV RAXAUL

20

96

2012

33

132KV SHITALPUR

10

48

2013

33

132KV BHABUA

10

48

2013

33

132KV DHARBHANGA

20

96

2013

33

132KV FATHUA-2

20

96

2013

33

132KV HAJIPUR

10

48

2014

33

132KV KHAGAUL-3

20

96

2014

33

132KV MASRAKH

10

48

2014

33

132KV MITHAPUR-2

30

125

2014

33

132KV PANDAUL

30

125

2015

33

132KV DUMRAON

10

48

2015

33

132KV FATHUA

10

48

2015

33

132KV GOPALGANJ

10

48

2015

33

132KV MASURHI

10

48

2015

33

132KV MITHAPUR

30

125

2015

33

132KV MUZAFFARPUR

10

48

2015

33

132KV PANDAUL

10

48

2015

33

132KV SITMHARI

10

48

2015

33

132KV VISHALI

10

48

Developing the PSMP for Bihar

4-166

020328-40RP-0400-00

Final Report
VOLTAGE
(KV)

NAME OF THE SS

2015

33

132KV DALSINGSARAI

20

96

2015

33

132KV JAKKANPUR

30

125

2015

33

132KV KATRA

10

48

2015

33

132KV KHAGAUL-2

30

125

2015

33

132KV MADHUBANI

20

96

2016

33

132KV KISHANGANJ

10

48

2016

33

132KV GAIGHAT

20

96

2016

33

132KV JAKKANPUR-2

20

96

2016

33

132KV JEHNABAD

20

96

2016

33

132KV KARPY

10

48

2016

33

132KV KHAGAUL

20

96

2016

33

132KV SAMASTIPUR

20

96

2016

132

220KV FATHUA

20

245

2017

33

132KV BODHGAYA

10

48

2017

33

132KV SABOUR

10

48

2017

33

132KV CHANDAUTI-2

10

48

2017

33

132KV DIGHA

20

96

2017

33

132KV JAINAGAR

20

96

2017

33

132KV KHAGARIYA

20

96

2017

33

132KV MITHAPUR-3

30

125

2017

33

132KV SASARAM

10

48

2017

33

132KV WAZIRGANJ

30

125

2018

33

132KV LAKHISARAI

10

48

2018

33

132KV BANKA

10

48

2018

33

132KV BARIPAHRI

10

48

2018

33

132KV BIKRAMGANJ

20

96

2018

33

132KV CHANDAUTI

10

48

2018

33

132KV DINARA

10

48

2018

33

132KV GAIGHAT-2

20

96

2018

33

132KV HARNAUT

10

48

2018

33

132KV KATHAR

10

48

2018

33

132KV NAUGACHHIYA

10

48

2018

33

132KV PAHARPUR

10

48

2018

33

132KV SONNENAGAR

10

48

2018

132

220KV KHAGAUL-2

10

213

FY

Developing the PSMP for Bihar

4-167

CAPAITY
(MVAR)

COST
(Rs.lakhs)

020328-40RP-0400-00

Final Report

4.9.13

Cost estimates for Shunt Reactors


Table 4-64
FY

4.10

OWNER

Cost estimates for Shunt Reactors (Rs. Lakhs).

VOLTAGE KV

CAPAITY
(MVAr)

COST
(Rs.lakhs)

Total

600

3,672

NAME OF THE SS

2011

PGCIL

400

400KV MZAFFARPUR

100

2011

PGCIL

400

400KV MZAFFARPUR

100

2012

PGCIL

400

400KV MZAFFARPUR

100

2015

BSEB

400

400KV ARRAH

100

1224

2016

BSEB

400

400KV BANKA

100

1224

2014

BSEB

400

400KV JAMALPUR

100

1224

Summary

The present report discussed and presented the key issues, transmission planning basis,
methodology for development of transmission expansion plan for the horizon year (2017-18).
Base case Transmission plan was developed based on the most likely Load Forecast and
Generation plan as presented in the earlier reports. The system studies were carried out, for
the horizon year FY 2018 and also for the intermediate year FY 2014. The load flow
scenarios carried out for each of the above years were as follows:

Peak Load Scenario

Light Load Scenario

During the development of transmission expansion plan various committed transmission


projects of BSEB which are under construction and expected to be commissioned in next
few years are considered.
The network expansion is planned to meet the system peak demand of 5,383 MW in FY
2018. The summary of various transmission capacities required to transfer the power from
generating station to 132kV loads are as follows.
45 No. 132kV substations of total capacity:

3,230 MVA

4 No. 440kV substation of total capacity:

2,375 MVA

19 No. 220kV substation of total capacity:

4,700 MVA

Augmentation of 132kV Substations capacity:

7,240 MVA

Augmentation of 220kV Substations capacity:

2,400 MVA

Addition of 400kV Lines:

1,884 Ckt-km

Addition of 220kV Lines:

3,095 Ckt-km

Addition of 132kV Lines:

4,292 Ckt-km

132/33 kV Shunt Capacitors :

1,130 MVAr

400kV Shunt Reactors:

Developing the PSMP for Bihar

600 MVAr

4-168

020328-40RP-0400-00

Final Report

The load flow studies show satisfactory operation of transmission system with reinforcement
under steady state operation for FY 2018 and FY 2014 with peak load and light load
conditions.
The total annual investment for the above requirement is about Rs. 8,989 Crores.
The present worth of annual disbursements required to meet the in-service dates proposed
at 10% discount rate is estimated as Rs. 6,106 Crores at the beginning of FY 2009.

Developing the PSMP for Bihar

4-169

020328-40RP-0400-00

Final Report

DISTRIBUTION PLANNING

5.1

Overview

This section describes the distribution planning studies that were carried out as part of the
ADB funded Master Plan activities for the state of Bihar. The distribution planning studies
utilised the results of the load forecast and the transmission expansion plan as major inputs
to determine the additional distribution facilities that will be required over the planning period
(2010-2014).
5.2

Objectives and Scope

The ultimate objective of the distribution planning studies is to determine the distribution
expansion plan for the BSEB system over the study period 2010-2014, consistent with the
requirements of the load forecast and the transmission expansion plan. The expansion plan
was divided into two parts the first part comprised of 33 kV network and the second part
was 11 kV network and below. For determining the expansion plan for 33 kV network
detailed simulation studies were carried out to determine the system strengthening required
and based on the result of these studies, the system strengthening required in 11 kV and LT
was worked out.
5.2.1

Basis of the Study

The existing distribution system of BSEB is very weak at many places and needs
strengthening. In addition to system strengthening and as discussed in the earlier generation
expansion scenario report which is also the part of Master Plan for BSEB, the BSEB system
is facing shortage of power in terms of peak and energy demand at present. However over
the next few years it is expected that there will be the increase in availability of power and the
transmission system strengthening will provide the back bone for transmission of the
required power from generating centers to load centers. It is therefore very necessary to
develop a distribution network in place to receive and transfer the power received from the
various generation sources to the ultimate consumer. The distribution network has to be
such that the supply at the consumer end is of good and reliable quality. Another important
factor is to keep the distribution losses to a minimum value as these losses occurring in the
distribution system are loss to the utility in terms of financial and also pollute the
environment. The planning of the distribution network for a system largely depends on the
correctness of the required input data and the tools employed to work out the future
requirement.
According to the assessment made in the load forecast report for most likely scenario and
the transmission planning of BSEB, the peak demand of power by 2014 is expected to
increase by a factor of about 2.33 times of the unrestricted demand of FY 2009. To meet the
load growth, as per the Least Cost Generation Plan report the Net Capacity Additions (MW)
by the year 2014 are expected to increase by 2866 MW. The increase in load growth and
generation necessitates a strong transmission and distribution system, which with maximum
efficiency and reliability is available to evacuate the available power to the load end.
The horizon period for the distribution planning studies and transmission studies is quite
different. In transmission system, because of long lines, right of way, environmental
clearance, bulk power, long gestation period etc, It is necessary to have a horizon of at least
10 years. On the other hand for the distribution system, when compared to the transmission
system the lines are short, with lesser clearances as defined above and also as the ground

Developing the PSMP for Bihar

5-1

020328-40RP-0400-00

Final Report

realities are not going to be likely the same for longer period of time, the planning horizon
period is usually taken as 5 years
For carrying out the distribution planning studies of BSEB, following scenarios were
examined:

Existing distribution network

Proposed reinforced network for the year 2010

Distribution network for 2014

The distribution planning was carried out considering the Peak Load under the average Load
Forecast Scenario as per the load forecast report. Normally distribution systems are radial in
nature and studied for handling the transfer of power to the ultimate consumer in all
situations keeping the quality of supply with in prescribed limits and incurring minimum
losses.
As a first step for planning the distribution system to meet the 2014 load requirements, the
existing 33 kV system was modeled and studied. This study brought out the shortcomings
and reinforcements needed in the existing system. It is very necessary that the existing
system gets strengthened before planning exercise for future years is carried out.
Accordingly existing system was strengthened and reinforcements included in the form of
additional circuits, augmentation of conductor size, transformation capacity and capacitors
required by the present distribution network were identified. The results for this analysis were
presented section 4. The reinforced system was simulated and studied and results are
presented in the section 4.2. The reinforced system was used as base case system for
planning the 2014 distribution network of BSEB. The studies for 2014 system identified
several areas for system strengthening which included new grid and/or distribution
substations, reinforcement of distribution lines, augmentation of conductor, capacitor
installation etc. All the reinforcements constitute the distribution investment plan, however it
should be noted that it gives only guiding figures for investment.
The software study was carried out for each and every 33 kV feeder in the BSEB system.
The 33kV network is the basic and most important link between the transmission network
and the ultimate Distribution network. The planning study identified the requirement of new
substations abased on the load requirements. Actual location of 11 kV lines and the DTRs
can easily be decided as per local requirements once the set up of the 33/11 kV S/S is
finalized. For Investment planning the provision for 11 kV network, the DTRs and the LT lines
has been made along with every new 33/11 kV S/S for each capacity addition / augmentation
at the existing S/S on the basis of certain assumptions, which are stated in another sub head
of this report.
5.2.2

Need for planning of a Distribution System

The BSEB distribution system has evolved over time in the last few years by ad-hoc system
planning. Basically one of the major reasons for this was the severe shortage in availability of
power after division of the State. However, this position is expected to change as BSEB has
put into place for integration of power plants from private and state sector. Therefore it is
necessary, keeping the load growth and generation plan a proper and systematic planning
an Electricity Distribution System in BSEB is set up.
The summary below presents the needs for proper planning at BSEB:

Availability of additional power thus lowering restriction of demand or removal of


restriction

Load Growth or Increase in load due to:

Developing the PSMP for Bihar

5-2

020328-40RP-0400-00

Final Report

Normal Development

Industrial Development

Rise in per capita income resulting in the further rise of the electricity
consumption

Increase in population

Extension of Rural Electrification & other similar beneficial schemes

Improvement in quality of supply

Reduction in low voltage problem

Reduction in outages

Reduction in fluctuations

Reduction of Technical losses in the Distribution system

The following defines the necessary steps for reinforcing the distribution system:

Transformer capacity addition / augmentation at the existing sub stations

Strengthening existing lines appropriately (increase in conductor size for few


sections) to avoid overloading and thus to reduce losses and improve the quality of
supply

Erection of new sub stations at right place (load centre) with appropriate transformer
capacities

Construction of new lines with conductor of appropriate size and capacity

Providing shunt compensation at appropriate places to reduce the losses and


improve the voltage levels on the feeder.

5.3

Distribution Planning Methodology

The following methodology has been adopted for Distribution Planning for the years 2010
and 2014
5.3.1

Planning for the Year 2010

The existing network of lines and sub stations were modeled and studied using the
software Cymdist. All possible reinforcements were identified so that the healthy
network could be prepared and studied.

The necessary additions of transformer capacities , change in size of line conductors


have been identified

The reinforced network in the scenario of demand and availability of power in 2010
has been brought out

5.3.2

Planning for the Year 2014

The load forecast prepared in the load forecast report and also Transmission
Planning study for the year 2014 was the basis for planning,

The projected load for the 2014 assigned to each feeder

Each 33 kV feeder modeled with load as defined above

Developing the PSMP for Bihar

5-3

020328-40RP-0400-00

Final Report

Reinforcement identified to make sure the study results meet the panning criteria

The need for augmentation / addition of transformer capacity at the existing sub
stations and creation of new sub stations identified and proposed

Remodeling of lines and construction of new lines identified and proposed on the basis of
study modeled on Cymdist
The Distribution Planning has been carried out for all the circles of BSEB followed by EHV
S/S wise. All the 33 kV Feeders were modeled separately and the 33/11 kV substation was
modeled as load. Proposals of additions of transformers, augmentation of transformer
capacities, new sub stations, upgrading of line conductors, conversion of lines from S/C to
D/C and construction of new lines was made based on the system study results.
At the start of the process, the new 33/11 kV sub stations and the connecting 33 kV lines
already planned by BSEB were taken into consideration so as to avoid any duplication and
/or confusion.
The block diagrams showing 33 kV feeders emanating from the EHV S/Ss along with the
connected 33/11 kV S/S have been drawn circle wise along with a diagram for the entire
state for two scenarios, viz., 2009 (existing) and 2014 (planned)
Input at 33 kV feeder is equal to the sum of the 33 kV feeder end load and the line loss, i.e.
Input power at 33 kV

Ultimate 33 kV load + 33 kV Line Loss

BSEB Electricity Supply Circles considered for Distribution Planning Study:


Table 5-1

BSEB Distibution Circles

Table 1- BSEB Distibution Circles


Sr.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Developing the PSMP for Bihar

Circle

PESU (E)
PESU (W)
Patna
Nalanda (Bihar Sharif)
Chapra
Motihari
Bhojpur (Ara)
Gaya
Saharsa
Bhagalpur
Munger
Samastipur
Purnea
Sasaram
Muzaffarpur
Darbhanga

5-4

020328-40RP-0400-00

Final Report

It should be noted that the study of Distribution Planning does not provide:

Technical Losses for 11 kV Lines & DTRs and LT lines

Specific geographical location, by name, of the place of installation of new proposed


33/11 kV S/Ss except those already covered under plan. The distribution plan brings
out the approximate location of the substation based on the load forecast as
available. The exact location will depend upon land availability, and any change in
load condition.

Specific geographical route, by name , of the proposed new 33 kV lines except those
already covered under plan

5.3.3

Limitations:

Accuracy of software results and hence the planning largely depends on the correctness of
input data such as

Line Length

Load on feeder at the sending end

Conductor Size

Power Factor

Transformer Capacity and hence the total capacity of each S/S

The manner of connectivity of S/Ss

Complete details of each feeder, etc.

5.3.4

Assumptions and Planning criteria:

The following assumptions have been made while carrying out this study of Distribution
Planning
I. Power factor at the sending end (source EHV S/S) of the 33 kV line has been taken
uniformly as 85%
II. Length of 33 kV line to connect a new 33/11 kV S/S to an existing or new EHV S/S or
an existing 33/11 kV S/S to a new EHV S/S at the same H.Q. has been taken as below

Large Towns

Other District H.Qs.

5 km

Places other than District H.Q.

3 km

10 km

III. Length of 33 kV lines connecting S/S at places other than those of the EHV S/Ss have
been assumed on the basis of the geographical map of Bihar, as far as possible, to
avoid wide deviations from the actual line lengths
IV. 11 kV Lines have been considered as below

From new 33/11 kV sub stations


a) City

b) Rural

3*05 km for each 1*10 MVA Xmer capacity


3*10 km for each 1*5 MVA Xmer capacity

From existing 33/11 kV sub stations


c) City

Developing the PSMP for Bihar

1*05 km for addition of each 5 MVA Xmer capacity


5-5

020328-40RP-0400-00

Final Report

d) Rural -

1*10 km for addition of each 5 MVA Xmer capacity

V. 11/0.4 kV DTRs for each 11 kV line

Large Towns

Other Cities

Rural

630 KVA

2 Nos.

315 KVA

8 Nos.

200 kVA

10 Nos.

315 kVA

2 Nos.

200 kVA

10 Nos.

100 kVA

8 Nos.

200 kVA

5 Nos.

100 kVA

15 Nos.

VI. L T lines per DTR

Cities

0.50 km

Rural

1.00 km

5.3.4.1

Maximum Capacity Criteria Sub Stations and Transformers

The criteria for the maximum transformer capacity for urban, semi-urban and rural area have
been fixed as shown in the section 5.2.4. Also, the usual Xmer capacities considered for the
S/Ss in the urban and rural areas have been shown in the Table 2.
Table 5-2

33/11 kV Sub Station and Transformer Capacity

Total Max.Sub Station Capacity (MVA)

Individual Transformer Capacity (MVA)

Urban

Semi Urban and Rural

Urban

Semi Urban

Rural

40

20

10

10

3.15

3.15**

1.6 / 1.0**

** Capacity only in Old Sub Stations

Developing the PSMP for Bihar

5-6

020328-40RP-0400-00

Final Report

5.3.4.2

Maximum Capacity Criteria DTRs

The maximum capacity of the DTRs in the areas of large towns, other District H.Q.s and the
rural considered is shown in Table 3.
Table 5-3

5.3.4.3

DTR Capacities (kVA)

Large Towns

Other Towns

Rural Area

630

315

200

315

200

100

200

100

Line Loading Limits

The maximum current carrying capacity of the conductors used in the lines for different
voltage classes, 33 kV and below, in BSEB along with the recommended maximum loading
is shown in Table 4.
Table 5-4

Line Loading Limits

Table 4- Line Loading Limits


Current Carrying
Conductor Code
Capacity (A)

5.3.4.4

WOLF

400

DOG

280

RACOON

180

RABBIT

165

WEASEL

110

Voltage Limits

The Normal permissible voltage limits for the system are as shown in the Table 5.
Table 5-5

Voltage Limits

Table 5 - Voltage Limits

[Type

quote

from

the

Voltage Limits

Bus Voltage (Line)


(kV)

(kV)

33

(+/-) 10%

29.6 - 36.3

11

(+/-) 10%

9.8 - 12.2

0.4 (LT)

(+/-) 10%

0.36 - 0.44

Developing the PSMP for Bihar

5-7

020328-40RP-0400-00

Final Report

5.3.4.5

Conductor Details

The circuit formations recommended for use in 33 kV and 11 kV lines are shown in the Table
6.

Table 5-6

33 kV Circuit Formations with Different Conductor


Table 6 - 33 kV Circuit Formations with Different Conductor
Circuit Formations

Voltage Class

5.3.4.6

33 kV

S/C PANTHER ACSR

D/C WOLF ACSR

S/C WOLF ACSR

S/C DOG ACSR

11 kV

D/C DOG

S/C DOG

D/C RACOON

S/C RACOON

Status of 33 kV Lines and 33/11 kV Sub Stations as on 2009

Details of 33 kV lines with total length of each line and the 33/11 kV S/Ss with their capacity
and the number and rating of individual transformer installed at each of the S/Ss connected
to the feeder, as on 2009, in respect of each circle are given in the Tables 7.
Table 5-7

Circle

Feeder
name

1.PESU
(East)

1.Bahadurpu
r-Saidpur

33 kV Lines and 33/11 kV Sub Stations in B S E B - 2009


EHV S/S
from where
feeder
emanating
Mithapur

Total
Feeder
length km)
12

Transformer
- wise
Capacity
(No.MVA)

Total S/S
Capacity
(MVA)

1.
Bahadurpur

4x5

20

2. Saidpur

4x5

20

33/11 kV
S/Ss on
feeder

2. PESU V
(Kankarbag)

Mithapur

1. Kankarbag

5x5

25

3. PESU IV
(R K Nagar)

Mithapur

6.2

1. R K Nagar

2x10

20

3x5

15

1.
Karbaghiya

3x5 + 1x3.15

18.15

2. R. Nagar

3x5

15

3.
Machhuatoli

2x5

10

1. Meena
Bazar

1x5

2. Mangal
Talab

4x5

20

3. Malsalami

2x5

10

2. Ashok
Nagar
4. PESU I &
II

5. City

Mithapur

Gaighat

Developing the PSMP for Bihar

10.75

10

5-8

020328-40RP-0400-00

Final Report

Circle

Feeder
name
6. NMCH Meena Bazar

EHV S/S
from where
feeder
emanating
Gaighat

Total
Feeder
length km)
3.5

Transformer
- wise
Capacity
(No.MVA)

Total S/S
Capacity
(MVA)

1. NMCH

1x10+1x5

15

2. Meena
Bazar

4x5

20

2x5

10

33/11 kV
S/Ss on
feeder

7. Gaighat

Gaighat

0.2

1. Gaighat

8. Pahari

Katra

7.5

1. Pahari

3x5+1x3.15

18.15

2.
Sampatchak

1x5+2x3.15

11.3

3. HTC
9. Katra

Fatuah

15

1. Katra

10.Dina Iron

Fatuah

15

1. Karmali
Chak

1.5
5x5

25

2x10

20

2. HTC (Dina
Iron)

17.14

3. HTC
11.Telecom

Jakkanpur

20.3

1.6

1. S K
Memorial

1x10+2x5

20

2. PMCH

2x5

10

105.45
2.PESU
(West)

1. Khagaul
III & IV

2. Khagaul II

Khagaul

Khagaul

16.8

22.5

347.84
1. Garikhana

3x5

15

2. Pataliputra

4x5

20

3. Rajapur

2x5

10

4. S K Puri

1x10+3x5

25

5. A N
College

4x5

20

1. Phulwari

1x5

1x10+1x5

15

1x5+1x3.15

8.15

4. IGIMS

4x5

20

5. Walmi

2x5

10

1. Bhusaula

1x5+1x3.15

8.15

2. S K Puri

1x10+3x5

25

3. A N
College

4x5

20

1. Digha

2x5

10

2. Excise
3. Veterinary
College

3. Khagaul I

4. Danapur I

Khagaul

Khagaul

Developing the PSMP for Bihar

28.5

22

5-9

020328-40RP-0400-00

Final Report

Circle

Feeder
name

EHV S/S
from where
feeder
emanating

Total
Feeder
length km)

Transformer
- wise
Capacity
(No.MVA)

Total S/S
Capacity
(MVA)

2. R B I

1x5

3. Digha C/S

2x5

10

33/11 kV
S/Ss on
feeder

5. Danapur
II

Khagaul

1. Danapur

4x5

20

6. Vidyut
Bhawan

Jakkanpur

1.Vidyut
Bhawan

2x5

10

2. High Court

2x5

10

1. Sinchai
Bhawan

2x5

10

2. Vikas
Bhawan

2x5

10

3. Board's
Colony

4x5

20

7. Sinchai
Bhawan

Jakkanpur

8. PESU IX

Jakkanpur

5.15

1. Bandar
Bagicha

5x5

25

9. PESU VII

Jakkanpur

1. Sahitya
Sammelan

2x5

10

2. Maurya
Lok

3x5

15

1. Beur

2x5

10

2. Khagaul

2x5

10

1.
Gardanibag

2x5

10

2. Anishabad

2x5

10

1. Jakkanpur

4x5

20

10.PESU VI

11.PESU III

12.Jakkanpu
r

Jakkanpur

Jakkanpur

Jakkanpur

12

0.1
140.05

3.
Patna

416.3

1. GISCO

Bihta

14

1. HTC

2. Bihta I

Bihta

1. Bihta

1x5+3x3.1.5

14.45

3. Bihta II

Bihta

47

1. Pareo

2x3

2. Kanpa

1x3+1x3.15+
1x1.6

7.75

3.
Lalbhasara

1x3+1x3.15

6.15

4. Paliganj

1x5+1x3.15+
1x3

11.15

1. Bihta A/F

1x5+1x1.6

6.6

2x5

10

4. Bihta A/F

Bihta

15.7

2. Maner

Developing the PSMP for Bihar

5-10

14

020328-40RP-0400-00

Final Report

Circle

Feeder
name

EHV S/S
from where
feeder
emanating

Total
Feeder
length km)

33/11 kV
S/Ss on
feeder

Transformer
- wise
Capacity
(No.MVA)

6. Bihta A/F
- Balmukund

Bihta

4.2

1. HTC

12.14

7. Bihta A/F
- HTC Group

Bihta

1. HTC
Group

11.68

8.
Biharibigha

Barh

12

1.
Biharibigha

9. Barh

Barh

23

1. Barh
2.
Bakhtiyarpur

10.NTPC I &
II

Barh

11.Fatuah

Fatuah

12.NeoraNaubatpur

Khagaul

4
26.8

14

2x3.15

6.3

4x5

20

1x5+3x1.5+2
x3.15

15.8

1. HTC

2.67

1. Fatuah

3x5+1x3.15

18.15

2.
Daniyaman

1x3.15+1x1.
6

4.75

3. Khusrupur

2x3.15

6.3

1. Neora

2x3.15

6.3

2. Naubatpur

2x5

10

13.Masaurhi
New

Masaurhi

0.7

1. Masaurhi
New

2x5+1x3

13

14.Masaurhi
Old

Masaurhi

18.6

1. Masaurhi
Old

2x3

2. Dhanaura

2x3.15

6.3

1. Haathidah

4x5

20

2. Mokama

2x5

10

15.HathidahMokama

Hathidah

14.1

209.1
4.
Nalanda

Total S/S
Capacity
(MVA)

1. Parwalpur

1x5+1x3.15

8.15

(Hulasganj of
Gaya Circle

2.
Ekangersarai

2x5

10

not included)

3. Hilsa

2x5+1x3

13

4. Islampur

2x3.15

6.3

5. Khudaganj

2x3.15

6.3

1.
Ramchandra
pur

4x5+2x3

26

4x5+1x3.15+
1x3

26.15

1.
Ekangersarai

Bari Pahari

67

245.49

2.
Ramchandra
pur

Bari Pahari

3. Bari
Pahari

Bari Pahari

0.1

Developing the PSMP for Bihar

5-11

1. Bari
Pahari

020328-40RP-0400-00

Final Report

Circle

Feeder
name
4. Sohasarai

EHV S/S
from where
feeder
emanating
Bari Pahari

Total
Feeder
length km)

33/11 kV
S/Ss on
feeder

Transformer
- wise
Capacity
(No.MVA)

Total S/S
Capacity
(MVA)

15

1. Sohasarai

4x5+1x3

23

1x5+2x3.15

11.3

3x3.15

9.45

1x5+1x3.15

8.15

3. Thertheri

1x3.15

3.15

4. Dhamauli

1x3.15

3.15

5. Harnaut

3x3.15

9.45

2x3.15

6.3

2x5+2x3.15

16.3

2. Raiter

2x5

10

1. Rajgir

3x5

15

2. Rahui
5. Noorsarai

Bari Pahari

48

1. Noorsarai
2. Chandi

6. Silao

Rajgir

1. Silao

7. Nalanda

Rajgir

15

1. Nalanda

8. Rajgir

Rajgir

2.5
158.6

5.
Chapra

1. Fulwaria

2. Gopalganj

3. Barauli

4. Srinagar

Gopalganj

Gopalganj

Gopalganj

Siwan

71

63

40

18

211.15
1. Fulwaria

2x3.15

6.3

2. Hathua

1x3.15

3.15

3. Hussepur

2x5

10

1. Gopalganj

2x5

10

2. Kuchaikot

1x5

3. Jhajhwa

1x1.6

1.6

1. Barauli

2x3.15

6.3

2.
Baikunthpur

2x3.15

6.3

1. Srinagar

2x3.15

6.3

2. Mairwa

2x3.15

6.3

3x5

15

5. Siwan

Siwan

0.2

1. Siwan

6.
Maharajganj

Siwan

40

1.
Maharajganj

1x3.15+1x5

8.15

2. Ekma

1x1.5+1x3

4.5

1. Baniapur

2x3.15

6.3

2. Mashrakh

2x3.15

6.3

2x3.15+1x5

11.3

7. BaniapurMashrakh

Siwan

55

8. Sonepur

Hajipur

1. Sonepur

9.
Prabhunathn
agar

Chapra

25

1.
Prabhunathn
agar

2x5

10

2. Manjhi

1x5

Developing the PSMP for Bihar

5-12

020328-40RP-0400-00

Final Report

Circle

Feeder
name

EHV S/S
from where
feeder
emanating

Total
Feeder
length km)

33/11 kV
S/Ss on
feeder

10.Telpa

Chapra

0.1

1. Telpa

11.Marworah

Chapra

46

1. Marworah
2. Taraiya

12.Sheetalpu
r

Sheetalpur

0.1

1. Sheetalpur

Transformer
- wise
Capacity
(No.MVA)

Total S/S
Capacity
(MVA)

5x5

25

1x3.15+1x5

8.15

1x5

2x3.15

6.3

363.4

6.
Motihari

172.25

1. Valmiki
Nagar

Surajpura,
Nepal

3.5

1. Valmiki
Nagar

1x3.15

3.15

2.
Ramnagar

Ramnagar

54.5

1. Ramnagar

1x5+1x3.15

8.15

2. Bagaha

1x5+1x1.6

6.6

3. Lauria

Ramnagar

23

1. Lauria

1x1.6

1.6

4.
Narkatiaganj

Ramnagar

20

1.
Narkatiaganj

2x3.15

6.3

5. Raxaul

Nepal

19

1. Raxaul

1x5+2x3.15

11.3

2. Adopur

1x3.15

3.15

6. Dhaka

Dhaka

0.1

1. Dhaka

2x5

10

7. Bettiah

Bettiah

2.5

1. Bettiah

3x5

15

2. HTC
8.
MadhopurHarsiddhi

Motihari

46

1. Madhopur

1x3.15

3.15

2. Harsiddhi

1x3.15

3.15

1x3.15+1x1.
6

4.75

9. Areraj

Motihari

33

1. Areraj

10.Motihari

Motihari

0.1

1. Motihari

3x5

15

11.Chakia

Motihari

47

1. Chakia

1x3+2x3.15

9.3

1x3

2. Madhuban
248.7
7.
Bhojpur

1. Buxar

Dumraon

56

105.6
1. Buxar

2x5

10

2. Itarhi

1x3.15

3.15

1x3.15+2x1.
5

6.15

4. Industrial

1x3.15

3.15

3. Chausa

2. Dumraon

Dumraon

1. Dumraon

2x5

10

3.
Nawanagar

Dumraon

30

1.
Nawanagar

2x3.15

6.3

Developing the PSMP for Bihar

5-13

020328-40RP-0400-00

Final Report

Circle

Feeder
name

4. Bramhpur

EHV S/S
from where
feeder
emanating

Dumraon

Total
Feeder
length km)

43

Transformer
- wise
Capacity
(No.MVA)

Total S/S
Capacity
(MVA)

2. Murar

1x1.6

1.6

3. Akarsai

1x3.15

3.15

1.
Krishnapura
m

2x3.15

6.3

2. Brahmpur

1x3.15

3.15

3. Shahpur

2x3.15

6.3

1x5+1x3.15

8.15

1. Garhani

1x3.15

3.15

2. Pero

2x3.15

6.3

2x3.15

6.3

33/11 kV
S/Ss on
feeder

4. Bihian
5. Garhani

Ara

48

6.
Jagdishpur

Ara

30

1.
Jagdishpur

7. Japani
Farm

Ara

20

1. Japani
Farm

3x5

15

2. Serai

2x3.15

6.3

3x5

15

2. Bahirha

2x3.15

6.3

3. Sandes

2x3.15

6.3

4. Agiaon

2x3.15

6.3

1. Koilwar

2x5+1x3.15

13.15

8.
Powerganj

9. Koilwar

Ara

Bihta

63

10

1. Powerganj

303
8. Gaya

1. Kako

2. Ataullah

3. Tehta

4. Ghosi

Irki

Irki

Irki

Irki

Developing the PSMP for Bihar

29

59

27

18

5-14

151.5
1. Kako

1x1.6+1x3.1
5

4.75

2. Charui

1x1.6+1x3.1
5

4.75

1x3+2x1.6

6.2

2. Kurtha

2x3.15

6.3

3. Karpi

1x1.6

1.6

4. Arwal

1x1.6+2x3.1
5

7.9

1. Tehta

1x1.6+1x3.1
5

4.75

2. Makpa

1x3.15

3.15

3.
Makhdumpur

1x5+1x3.15

8.15

1. Ghosi

1x3.15+1x1.

4.75

1. Ataullah

020328-40RP-0400-00

Final Report

Circle

Feeder
name

5. Irki

6. Rafiganj
I&II

EHV S/S
from where
feeder
emanating

Irki

Rafiganj

Total
Feeder
length km)

13.1

21

33/11 kV
S/Ss on
feeder

8. Guraru

9. Tekari

10.Belaganj

Rafiganj

Rafiganj

Tekari

Belaganj

38

55

12.2

36.2

Total S/S
Capacity
(MVA)

2.
Jehanabad

3x5

15

1. Irki

2x5

10

2.
Shakurabad

1x3.15

3.15

1. Rafiganj

1x5+1x3.15

8.15

1x3

1. Uchauli

1x3.15

3.15

2. Madanpur

1x3.15

3.15

1. Guraru

2x3.15

6.3

2. Paraiya

2x3.15

6.3

1. Tekari

1x5

2. Koach

1x3.15

3.15

1. Belaganj

2x3.15

6.3

2. Chakand

2x3.15

6.3

3. Panari

2x3.15

6.3

4. Paibigha

2x5

10

2. Goh
7. Uchauli

Transformer
- wise
Capacity
(No.MVA)
6

11.Chandauti

Chandauti
(Gaya)

0.1

1. Chandauti

5x5

25

12.Dandibag

Chandauti

12

1. Dandibag

3x5

15

13.Gandhi
Maidan

Chandauti

10

1. Gandhi
Maidan

2x5

10

2. pancahiti
Akhara

3x5

15

1. A P
Colony

2x5

10

2. Railway
Maidan

4x5

20

14.A P
Colony

Chandauti

15.Central
Stores

Chandauti

1. Central
Stores

2x3.15

6.3

16.Medical

Chandauti

15

1. Medical

2x5

10

2. Cherki

1x3.15+1x1.
6

4.75

1. Sherghati

1x5+1x3.15

8.15

1x3.15

3.15

17.Sherghati

Bodh Gaya

154

2. Gurua

Developing the PSMP for Bihar

5-15

020328-40RP-0400-00

Final Report

Circle

Feeder
name

EHV S/S
from where
feeder
emanating

Total
Feeder
length km)

Transformer
- wise
Capacity
(No.MVA)

Total S/S
Capacity
(MVA)

3. Amas

2x3.15

6.3

4. Banke
Bazar

2x3.15

6.3

5. Imamganj

1x3.15

3.15

6. Dumaria

2x3.15

6.3

1x3.15+1x1.
6

4.75

8.
Chkrabaria

2x3.15

6.3

9. Dobhi

2x3.15

6.3

3x5+1x3.15

18.15

2. Tankuppa

2x3.15

6.3

3. Paimar

1x1.6

1.6

4. Wazirganj

2x3.15

6.3

5. Fatehpur

1x3.15

3.15

6. Gere

2x3.15

6.3

7. Bhore

DEF

33/11 kV
S/Ss on
feeder

7. Shobh

18.Manpur

Bodh Gaya

107

1. Manpur

19.Industrial
Area

Bodh Garya

1. Ind. Area

20.M U
Campus

Bodh Garya

1. M U
Campus
2. Buddhist
Complex

2x3.15

6.3

3x5+1x3.15

18.15

2x5

10

2x5+1x3.15

13.15

21.Sone
Nagar

Barun

0.1

1. Sone
Nagar

22.Barem

Barun

22

1. Barem

2x3.15

6.3

23.Tengra

Barun

13

1. Tengra

2x3.15

6.3

24.Aurangab
ad

Barun

79

1.
Aurangabad

4x5

20

2. Obra

2x3

3. Daud
Nagar

1x3+1x1.6

4.6

4. Gangti

2x3.15

6.3

1x3+1x1.5

4.5

1x3.15

3.15

5. Deo
25.Sone
Hydel

Barun

HTC

26.Nabi

Barun

64

1. Nabi

Developing the PSMP for Bihar

5-16

020328-40RP-0400-00

Final Report

Circle

Feeder
name

EHV S/S
from where
feeder
emanating

Total
Feeder
length km)

Nagar

27.Hasua

28.Nawada

29.Akbarpur

30.Roh

Transformer
- wise
Capacity
(No.MVA)

Total S/S
Capacity
(MVA)

2. Amba

2x3.15

6.3

1. Hasua

1x5+1x3

2. Nadirganj

2x3

1. Nawada

3x5

15

2.
Bhadhokhara

2x3

3. Nawada
New

2x3

1. Akbarpur

1x3

2. Rajauli

1x5+1x3

3. Sirdala

1x3

1. Roh

1x1.6

1.6

2. Kaukol

1x1.6

1.6

3.
Warsaliganj

2x3

4.
Pakribarwan

1x3

33/11 kV
S/Ss on
feeder
Nagar

Nawada

Nawada

Nawada

Nawada

20

13.5

29

64

31.Hulasganj
from
Islampur

Bari Pahari

12

1. Hulasganj

1x1.6

1.6

32,Atari

Rajgir

50

1. Atari

1x3.15

3.15

2. Khizr
Sarai

2x3.15

6.3

995.2
9.
Saharsa

1. Supaul

Supaul

62.5

545.4
1. Supaul

2x5

10

2. Kishanpur

2x1.6

3.2

3. Pipra

2x3.15

6.3

4. Raghopur

1x3.15+1x1.
6

4.75

1x5+1x3.15

8.15

2x5

10

2. Simri
Bkhtiyarpur

Saharsa

25

1. Simri
Bakhtiyarpur

3. New
Market

Saharsa

2.5

1. New
Market

4. Saharsa

Saharsa

0.1

1. Saharsa

3x5+1x1.6

16.6

5.
Madhepura

Saharsa

62

1.
Madhepura

2x5

10

2. Singhswar

1x5

Developing the PSMP for Bihar

5-17

020328-40RP-0400-00

Final Report

Circle

Feeder
name

6. Khagaria

EHV S/S
from where
feeder
emanating

Khagaria

Total
Feeder
length km)

20.1

33/11 kV
S/Ss on
feeder

Transformer
- wise
Capacity
(No.MVA)

3. Murliganj

1x3.15+1x1.
6

4.75

1. Khagaria

3x5

15

2. Mansi

1x3+1x1.5

4.5

3.
Maheshkunt

1x5+1x3.15

8.15

7. Alam
Nagar

Udakishanga
nj

25

1. Alam
Nagar

1x1.6+1x1.5

3.1

8.
Udakishanga
nj

Udakishanga
nj

0.1

1.
Udakishanga
nj

1x5+1x3.15

8.15

197.3
10.
Bhagalp
ur

Total S/S
Capacity
(MVA)

117.65

1. Bihpur

Naugachhia

15

1. Bihpur

2.
Naugachhia

Naugachhia

3.5

1.
Naugachhia

3. Belhar
from Tarapur

Sultanganj

22

1. Belhar

4. Patwara

Sultanganj

26

1. Patwara

5.
Sultanganj

Sultanganj

0.1

6. Shahkund

Sultanganj

14

7. Barari

Sabour

8. C S
Compund

Sabour

12.3

8.7

2x3.15

6.3

1x5+2x3.15

11.3

1x3.15

3.15

1x3

1. Sultanganj

2x5+1x3.15

13.15

1. Shahkund

1x3.15

3.15

1. Barari

1x5

2. Central
Jail

1x5

3. Mayaganj

2x5

10

1. C S
Compound

2x5

10

2. T T School

2x5

10

1. Sabour

2x3.15

6.3

2x3.15

6.3

9. Sabour

Sabour

5.5

10.Gouradih

Sabour

1. Gouradih

11.Aliganj I

Sabour

27

1. Aliganj

1x5

2.
Jagdishpur

1x5

2x5+1x3.15

13.15

1. Aliganj

2x5

10

2.
Mojahidpur

1x5

3. Nath
Nagar
12.Aliganj II

Sabour

Developing the PSMP for Bihar

13

5-18

020328-40RP-0400-00

Final Report

Circle

Feeder
name

EHV S/S
from where
feeder
emanating

Total
Feeder
length km)

33/11 kV
S/Ss on
feeder

Transformer
- wise
Capacity
(No.MVA)

Total S/S
Capacity
(MVA)

13.Sanhaula

Kahalgaon

29

1. Sanhaula

1x5+1x3.15

8.15

14.Kahalgao
n

Kahalgaon

32

1. Kahalgaon

3x5+1x3.15

18.15

2. Pirpainti

1x1+1x3.15

4.15

2x5

10

1x3.15+1x3

6.15

1x3.15

3.15

1x3+1x1.6

4.6

15.Banka

Banka

49.15

1. Banka
2. Amarpur
3. Rajaun
4. Bousi

264.25
11.Mun
ger

1. Tarapur

Sultanganj

34

185.15
1. Tarapur
2. Kharagpur

2x5

10

1x3+1x5

2x3.15+1x1.
6

7.9

2. Barhaiya

Hathidah

12

1. Barhaiya

3. Ariari

Sheikhpura

57

1. Ariari

1x3.15

3.15

2. Bhalua

1x3.15

3.15

3. Katari

1x1.6

1.6

4. Barkna

1x1.5

1.5

1. Onama

1x1.6

1.6

2. Mirzapur

1x3.15+1x1.
6

4.75

1x1.6

1.6

1x5+1x3.15+
1x1.6

9.75

2x5+1x3.15

13.15

2x3.15

6.3

1x5+1x3.15+
1x.75

8.9

1. Salempur

1x5+1x3.15

8.15

2. Haibatganj

2x3.15

6.3

1. Jamui

3x5+1x3.15

18.15

2. Khaira

2x3.15

6.3

3. Sikandara

2x3.15

6.3

1. Gidhour

1x3.15

3.15

4. Onama

Sheikhpura

20

5.
Hathiyama

Sheikhpura

1. Hathiyama

6.
Sheikhpura

Sheikhpura

0.5

1.
Sheikhpura

7. Purani
Bazar

Lakhisarai

7.3

1. Purani
Bazar
2. Court Area
3. Balaji

8.
SalempurHaibatganj

9. Jamui

10.Gidhour-

Lakhisarai

Mallehpur

Mallehpur

Developing the PSMP for Bihar

28

43

43.5

5-19

020328-40RP-0400-00

Final Report

Circle

Feeder
name

EHV S/S
from where
feeder
emanating

Total
Feeder
length km)

Transformer
- wise
Capacity
(No.MVA)

Total S/S
Capacity
(MVA)

2. Jhajha

1x5+1x3.15

8.15

3. Sono

1x1.6+1x3.1
5+1x5

9.75

33/11 kV
S/Ss on
feeder

Jhajha

11.Dakranala

Jamalpur

1. Dakranala

1x5+1x1.5

6.5

12.Ramchan
drapur

Jamalpur

1.
Ramchandra
pur

1x1.5

1.5

2x3.15+2x5

16.3

1x3.15

3.15

2. Rly.
Workshop
13.Safiabad

Jamalpur

18.2

1. Safiabad
2. Baniyarpur

14.ITC

Jamalpur

HTC

15.Karnchau
ra

Jamalpur

13

1.
Karnchaura

3x5

15

16.Nandlalpu
r

Jamalpur

1. Nandlalpur

2x5

10

17.Bindwara

Jamalpur

2.5

1x5+1x3.15

8.15

1. Bindwara

2.135

309
12.
Samasti
pur

1. Pusa

Mohanpur

32

2. Mohanpur

Mohanpur

30.6

3. Jute Mill

Mohanpur

10

4.
Sarairanjan

Mohanpur

18.5

5. Jitwarpur

Mohanpur

10

6. Railway

Mohanpur

3.75

7.
Dalsingsarai

Mohanpur

52

210.335
1. Pusa

2x3.15

6.3

1. Mohanpur

3x5

15

2.
Warisnagar

1x3.15

3.15

3. Kalyanpur

1x3.15

3.15

HTC
1.
Sarairanjan

1x3.15

3.15

2. Patei

1x3.15

3.15

1x5+1x3.15

8.15

1. Jitwarpur
HTC

2x3.15

6.3

2. Mohadi
Nagar

2x1.6

3.2

1x5+1x1.6

6.6

1x3.15+1x1.
6

4.75

Mohanpur

24

1. Sirsia

9. RoseraBibhutipur

Mohanpur

65

1. Rosera

5-20

2.5

1.
Dalsinghsara
i

8. Sirsia

Developing the PSMP for Bihar

2.5

020328-40RP-0400-00

Final Report

Circle

Feeder
name

10.Bangradih

EHV S/S
from where
feeder
emanating

BTPS

Total
Feeder
length km)

37.8

33/11 kV
S/Ss on
feeder

Transformer
- wise
Capacity
(No.MVA)

Total S/S
Capacity
(MVA)

2. Bibhutipur

1x3.15

3.15

3. Hassanpur

1x1.6

1.6

1. Deona
2. Bangradih

2x5
2x5+2x3.15

3. Jai
Mangala(HT
C)

6.5

4. Jai Matadi
(HTC)

1.5

5. Bachhaura

1x3.15+1x1.
6

11.IOC

BTPS

15

HTC

12.Railway

BTPS

12

HTC

13.Begusarai

BTPS

56

1. Begusarai

5x5

25

2. Manjhaul

1x3.15+1x3

6.15

3. Ganga
Dairy
4. Baliya

1.25
2x3.15

366.65
13.Purn
ea

4.75

6.3
132.1

1. Kursaila

Naugachhia

16.5

1. Kursaila

2x3.15

6.3

2.
Narpatganj

Forbesganj

18

1.
Narpatganj

2x3.15

6.3

3. Raniganj

Forbesganj

28

1. Raniganj

2x3.15

6.3

4.
ForbesganjAraria

Forbesganj

32

1.
Forbesganj

3x5

15

2. Araria

2x5

10

3. Jokihat

2x3.15

6.3

1. Dighal
Bank

2x3.15

6.3

2.
Bahadurganj

2x3.15

6.3

2x3.15

6.3

5. Dighal
Bank

Kishanganj

32

6. Sarai

Kishanganj

22

1. Sarai

7.
Paschimpali

Kishanganj

1.
Paschimpali

2x5+1x3.15

13.15

8. Purabpali

Kishanganj

12

1. Purabpali

2x5

10

9.
Thakurganj

Kishanganj

60

1.
Thakurganj

1x5+1x3.15

8.15

Developing the PSMP for Bihar

5-21

020328-40RP-0400-00

Final Report

Circle

Feeder
name

EHV S/S
from where
feeder
emanating

Total
Feeder
length km)

33/11 kV
S/Ss on
feeder

Transformer
- wise
Capacity
(No.MVA)

Total S/S
Capacity
(MVA)

3x5

15

10.Group
Control

Purnea

0.1

1. Group
Control

11.Banmank
hiMadhubani

Purnea

44

1.
Banmankhi

1x3.15+1x3

6.15

2.
Madhubani

2x5

10

1. Zero Mile

3x5

15

2. City

1x5

1.
Belagachhi

1x5

2. Dalkola

1x1.6

1.6

3. Sonaily

1x3.15

3.15

4. Baloni

1x5

5. Pranpur

1x1.6

1.6

1. Naranga

2x5+1x3.15

13.15

2. Mirganj

2x3.15

6.3

3. Dargaha

1x1.5

1.5

1x5+1x3.15

8.15

3x5

15

2. Gore Beri

2x1.5

3. Falka

1x1.5

1.5

12.Zero Mile

13.Belgachhi

14.Naranga

Purnea

Purnea

Purnea

16

120

71

15.Jalalgarh

Purnea

25

1. Jalalgarh

16.Beri

Katihar

38

1. Beri

17.Industrial
Estate

Katihar

1. Industrial
Estate

2x5+1x3.15

13.15

18.Binodpur

Katihar

1. Binodpur

2x5

10

549.6
14.
Sasara
m

1. Karmnasa

2. DVPL

3. Ramgarh

Karmnasa

Karmnasa

Karmnasa

Developing the PSMP for Bihar

31.1

17

48

5-22

239.65
1. Karmnasa

1x3.15

3.15

2. Durgawati

1x5

3. Chand

3x5

15

1. HTC

1.5

2. Larma

1x3.15

3.15

1. Kalyanpur

1x3.15

3.15

2. Ramgarh

3x5

15

3. Chourasia

1x3.15

3.15

4. Nuaon

2x3.15

6.3

020328-40RP-0400-00

Final Report

Circle

Feeder
name

EHV S/S
from where
feeder
emanating

Total
Feeder
length km)

33/11 kV
S/Ss on
feeder

Transformer
- wise
Capacity
(No.MVA)

Total S/S
Capacity
(MVA)

4. Kakrait

Karmnasa

17

1. Kakrait

2x5

10

5. Dinara

Bikramganj

38

1. Dinara

2x3.15

6.3

2. Kochas

3x3.15

9.45

6. Dawath

Biramganj

1. Dawath

2x3.15

6.3

7. Sunjhauli

Biramganj

22

1. Sanjhauli

2x3.15

6.3

8. Surjapura

Biramganj

0.1

1. Surajpura

2x3.15

6.3

9.
Bikramganj

Biramganj

26

1.
Bikramganj

2x5+1x3.15

13.15

2. Karakat

2x3.15

6.3

10.Parsathua

Mohania

20

1. Parsathua

2x3.15

6.3

11.Chainpur

Mohania

21

1. Chainpur

2x3.15

6.3

12.Kudra Bhabhua
New

Mohania

50

1. Bhabhua
New

2x5

10

2. Kudra

3x5

15

3. Karamchat

1x1.5

1.5

4. Cenari

1x3.15

3.15

1. Mohania

3x5

15

2. Bhabhua

2x5+1x3.15

13.15

3. Adhaura

1x3.15

3.15

4. Bahuara

1x3.15+1x2.
5

5.65

1x5+1x1

13.Mohania

Mohania

93.1

14.Pusauli

PGCIL
Pusauli

0.1

1. Pusauli

15.Beda Takia

Sasaram

23

1. Beda

4x5

20

2. Takia

3x5

15

3. Nokha

1x3.15

3.15

1. Naigaon

1x5+1x3.15

8.15

2. Sheosagar

1x5+1x3.15

8.15

1. BMP Dehri

4x5

20

16.NaigaonSheosagar

17.BMP
Dehri I & II

Sasaram

Dehri-onSone

17

42

2. PHED
(HTC)
3. Basa
Karwanda

Developing the PSMP for Bihar

5-23

1.5
2x3.15

6.3

020328-40RP-0400-00

Final Report

Circle

Feeder
name

EHV S/S
from where
feeder
emanating

Total
Feeder
length km)

33/11 kV
S/Ss on
feeder

Transformer
- wise
Capacity
(No.MVA)

18.JVLO&FL

Dehri-onSone

1. HTC

3.15

19.Akorigola

Dehri-onSone

1. Akorigola

1x5+1x3.15

8.15

20.Nasarigan
j

Dehri-onSone

20

1. Nasariganj

2x3.15

6.3

21.Rajpur

Dehri-onSone

21

1. Rajpur

2x3.15

6.3

22.Nauhatta

Banjari

37

1. Nauhatta

2x3.15

6.3

23.Samhauta

Banjari

0.1

1. Samhauta

3x5

15

24.Indra Puri

Barun

12

1. Indra Puri

2x5+1x3.15+
1x1.5+1x.5

15.15

25.Kripabal

Barun

30

1. Kripabal

2x5+1x3.15

13.15

604.5
15.
Muzaffa
rpur

Total S/S
Capacity
(MVA)

360.45

1. Shivhar

Sitamarhi

30

1. Shivhar

2x3.15

6.3

2. Runi
Saidpur

Sitamarhi

25

1. Runi
Saidpur

1x5+1x3.15

8.15

3. Pupri

Sitamarhi

28

1. Pupri

2x3.15

6.3

4. Dumra

Sitamarhi

1. Dumra

3x5

15

5. Sursand

Sitamarhi

30

1. Sursand

2x3.15

6.3

2x5

10

2. Nepal
6. Mehua

Vaishali

30

1. Mehua

7.
Prataptand

Vaishali

15

1.
Prataptand

2x3.15

6.3

8. Lalganj

Vaishali

10

1. Lalganj

1x5+1x3.15

8.15

9. Sarai

Vaishali

20

1. Sarai

2x3.15

6.3

10.Motipur

Muzaffarpur

35

1. Motipur

1x5+1x3.15

8.15

11.Maripur

Muzaffarpur

1. Maripur

2x5

10

12.Vaishali

Muzaffarpur

1. Vaishali

2x5

10

13.Kurhani

Muzaffarpur

30

1. Kurhani

1x5

14.Dholi

Muzaffarpur

28

1. Dholi

1x5+1x3.15

8.15

15.SKMCH

Muzaffarpur

25

1. SKMCH

2x5

10

1x5+1x3.15

8.5

3. MIT

2x5

10

1. IDPL

2x5+2x10

30

2.
Sikandarpur

16.IDPL

Muzaffarpur

Developing the PSMP for Bihar

3.5

5-24

020328-40RP-0400-00

Final Report

Circle

Feeder
name

EHV S/S
from where
feeder
emanating

Total
Feeder
length km)

33/11 kV
S/Ss on
feeder

Transformer
- wise
Capacity
(No.MVA)

Total S/S
Capacity
(MVA)

17.Khabra

Muzaffarpur

1.5

1. Khabra

1x5

18.Bhikapura

Muzaffarpur

0.1

1.
Bhikanpura

2x5

10

19.Railway

Muzaffarpur

20.Nayatola

Muzaffarpur

9.5

3x5

15

21.Railway

Hajipur

HTC

22.Bidupur

Hajipur

10

1. Bidupur

2x5

10

23.EDIP

Hajipur

10

1. EDIP

2x3

24.Hajipur IE

Hajipur

1. Hajipur IE

3x5

15

25.Konharag
hat

Hajipur

1.
Konharaghat

3x5

15

26.Mehnar

Mohanpur

2x3.15

6.3

7.5

HTC
1. Nayatola

1. Mehnar

2.6

390.1
16.
Darbha
nga

257.5

1. Basopatti

Jaynagar

20

1. Basopatti

2x5

10

2. Jaynagar

Jaynagar

48.5

1. Jaynagar

2x3.15

6.3

2. Khagauli

2x5

10

3. Ladonia

1x3.15

3.15

3. Khutauna

Phulparas

20

1. Khutauna

1x5

4. Phulparas

Phulparas

39

1. Phulparas

2x3.15

6.3

2. Jalpatganj

2x3.15

3.15

3. Nirmali

1x3.15

3.15

1. Benipatti

1x1.6+1x5

6.6

2.
Ahilyasthan

2x5

10

2x3.15

6.3

2.
Madhubani

2x5

10

1. Rajnagar

2x3.15

6.3

2. Babubarhi

1x3.15

3.15

5. Benipatti

6. Rahika

7. Rajnagar

Rahika

Rahika

Pandaul

54

5.1

46

1. Rahika

8. Raiyam

Pandaul

14

1. Raiyam

1x3.15

3.15

9. Pandaul

Pandaul

0.1

1. Pandaul

1x5+1x3.15

8.15

10.Benipur

Pandaul

50

1. Benipur

2x3.15

6.3

2. Biraul

1x1.6+1x3.1
5

4.75

1.

1x1.6+1x3.1

4.75

11.Manigach

Pandaul

Developing the PSMP for Bihar

5-25

020328-40RP-0400-00

Final Report

Feeder
name

Circle

EHV S/S
from where
feeder
emanating

Total
Feeder
length km)

hi

33/11 kV
S/Ss on
feeder
Manigachhi

12.Jhanjharp
ur

13.Donar

Pandaul

Ramnagar

59

13

Total S/S
Capacity
(MVA)

1.
Jhanjharpur

2x3.15

6.3

2. Madhopur

2x1.6

3.2

1x5+1x3.15

8.15

1x3.15+1x5+
1x1.6

9.75

1. Donar
2. Gangwara

14.Bela

Ramnagar

22

1. Bela

2x5

10

15.Pandasari

Ramnagar

9.1

1. Pandsarai

1x5

2. Jail
(Laharia
Sarai)

1x5

3. DMCH

2x5

10

4. Urban

2x5

10

1. Pouria

1x1.6

1.6

1x3.15+1x1.
6

4.75

1x3.15

3.15

16.PouriaAriar

Ramnagar

46

2. Ariar
3. Baheri
453.8

5.4

Transformer
- wise
Capacity
(No.MVA)
5

193.4

Data Collection

The data collection was a very complex exercise. At the start up of the project, meetings
were held with BSEB senior management and the formats for data collection and
requirement of SLDs was explained to the counterpart BSEB head office and field personnel.
The data collection has been a continuation process, during the course of project, several
meetings were held with the BSEB personnel to explain the importance of the data collection
and improve the quality. The data collection was also discussed with the field personnel
during the visit to site. However it was observed that the data in some of the cases submitted
by the BSEB site personnel was inconsistent. Also in some cases the required data was
unavailable for some reasons or faulty housekeeping of data. In such cases, the data was
assessed on reasonable basis scientifically supported principles have been used to project
for the missing data and fill up the data void. Therefore for the study purpose certain
assumptions have been taken into account which is described in the section 5.2 of the report.
5.4.1

Committed Distribution Projects:

Distribution projects which are committed or under progress, with the scheduled in-service
dates, are listed in Table 8 and Table 9. These tables include the data for committed 33 kV

Developing the PSMP for Bihar

5-26

020328-40RP-0400-00

Final Report

substations and 33 kV distribution lines. These projects were included as part of base case
distribution reinforcement studies.

Table 5-8
Circle

Committed 33/11 kV Sub Stations

District

Sub Station

Capacity (MVA)

Nalanda
(Bihar Sharif)

Nalanda

Badi

2x5

Sarbahadi

2x5

Chiksura Bazar

2x5

Tetrawan

2x5

Hernaut (Cheral)

2x5

Kalyan Bigha

2x5

Ghosarwan

2x5

Chainpur

2x5

Malti

2x5

10

Bhindidih

2x5

11

Andawas

2x5

12

Katri Sarai

2x5

13

Akhgaon

2x5

14

Zero Mile Ara

2x5

15

Barhara

2x5

16

Giddha

2x5

17

Chhotka Dhakai Chak

2x5

18

Pandey Patti

2x5

19

Ghogha

2x5

20

Sanhauli

2x5

21

Mananpur

2x5

22

Piei Bazar

2x5

23

Kajra

2x5

Bhojpur
Ara

Buxar

Bhagalpur
Bhagalpur

Munger
Lakhisarai

Developing the PSMP for Bihar

5-27

020328-40RP-0400-00

Final Report

Circle

District
Sheikhpura

Sub Station

Capacity (MVA)

24

Ghuskuri

2x5

25

Lohain

2x5

26

Toygarh

2x5

Gaya

27

Nawgarh

2x5

Aurangabad

28

Dihra

2x5

29

Saikia

2x5

30

Sonwa

2x5

31

Dhongra

2x5

32

Nowaman

2x5

Muzaffarpur

33

Bhagwanpur Chowk

2x5

Samastipur

34

Kuboliram

2x5

35

Karpoorigram

2x5

Purnea

36

Vaisi

2x5

Araria

37

Bahargaon

2x5

38

Kusgaon

2x5

39

Malgaon

2x5

40

Sour Bazar

2x5

41

Balwa Hat

2x5

42

Salkhua

2x5

43

Kumarkhand

2x5

44

Bihariganj

2x5

45

Puraini

2x5

46

Ghailar

2x5

47

Larganj

2x5

48

Parasrama

2x5

Madhubani

49

Rudrapur

2x5

Motihari

50

Chhitwani

2x5

Bettiah

51

Chautarwa

2x5

Gaya

Jehanabad

Muzaffarpur

Samastipur

Purnea

Saharsa
Saharsa

Madhepura

Supaul

Darbhanga

Motihari

Developing the PSMP for Bihar

5-28

020328-40RP-0400-00

Final Report

Circle

District

Sub Station

Capacity (MVA)

PESU (E)
Patna

52

Table 5-9
Circle

District

Deedarganj

2x5

Committed 33 kV Lines
33 kV Line

Sub Stations to
be connected

Line Length
(km)

Nalanda
(Bihar
Sharif)

Nalanda

Tapping from Rajgir-Giriak

Badi

12

From Tetrawan S/S

Sarbahadi

17

Tapping from Masaurhi -Paver


Mor

Chiksura Bazar

10

Tapping from Giriak feeder

Tetrawan

Tapping from Bari Pahari Harnaut

Hernaut (Cheral)

Tapping from Bari Pahari Harnaut

Kalyan Bigha

Tapping from Rajgir feeder

Ghosarwan

10

From Chandi S/S

Chainpur

12

From Asthawan S/S

Malti

0.5

10

From Silao S/S

Bhindidih

11

From Rajgir GSS

Andawas

16

12

From Badi S/S

Katri Sarai

13

Tapping from Ara-Sandes

Akhgaon

0.5

14

From Ara GSS

Zero Mile Ara

0.5

15

From Saraiya S/S+J19

Barhara

14

16

From Koilwar S/S

Giddha

17

Tapping from Dumraon - Simri

Chhotka Dhakai
Chak

18

From Buxar S/S

Pandey Patti

19

From Kahalgaon GSS

Ghogha

12

20

From Naugachhia GSS

Sanhauli

11

2.5

Bhojpur
Ara

Buxar

Bhagalpur
Bhagalpur

Munger

Developing the PSMP for Bihar

5-29

020328-40RP-0400-00

Final Report

Circle

District

33 kV Line

Sub Stations to
be connected

Line Length
(km)

21

Tapping from Lakhisarai Kendy Line

Mananpur

16

22

From Kajra S/S

Piei Bazar

12

23

From Lakhisarai GSS

Kajra

20

24

From Sheikhpura GSS

Ghuskuri

30

25

From Bhalwa S/S

Lohain

26

Tapping from SheikhpuraMirjapur Line

Toygarh

Gaya

27

From Hulasganj GSS

Nawgarh

15

Aurangabad

28

From Sone Nagar GSS

Dihra

10

29

From Phesar S/S

Saikia

30

From Hulasganj GSS

Sonwa

12

31

From Hulasganj GSS

Dhongra

10

32

From Sakurabad S/S

Nowaman

Muzaffarpur

33

From Bhikanpura GSS

Bhagwanpur
Chowk

Samastipur

34

From Sirsia S/S

Kuboliram

35

Tapping from Mohanpur-Sirsia

Karpoorigram

3.5

Purnea

36

From Dalkola S/S

Vaisi

10

Araria

37

From Raniganj S/S

Bahargaon

13

38

From Araria S/S

Kusgaon

39

From Jokihat S/S

Malgaon

10

40

From Saharsa GSS

Sour Bazar

12

41

From Saharsa GSS

Balwa Hat

19

42

From Balwahat S/S

Salkhua

19

43

From Murliganj S/S

Kumarkhand

12

44

From Uda Kishanganj GSS

Bihariganj

10

45

From Uda Kishanganj GSS

Puraini

10

46

From Sinheswar S/S

Ghailar

10

47

Tapping from Pipra-Raghopur


Line

Larganj

Lakhisarai

Sheikhpura

Gaya

Jehanabad

Muzaffarpur
2.5

Samastipur
8

Purnea

Saharsa
Saharsa

Madhepura

Supaul

Developing the PSMP for Bihar

5-30

020328-40RP-0400-00

Final Report

Circle

District

33 kV Line

Sub Stations to
be connected

Line Length
(km)

48

From Supaul S/S (Inside GSS)

Parasrama

16

Madhubani

49

From Phulparas GSS

Rudrapur

30

Motihari

50

From Majuraha GSS

Chhitwani

Bettiah

51

From Ram Nagar GSS

Chautarwa

15

Patna

52

From Karmali Chak S/S

Deedarganj

Darbhanga

Motihari

PESU (E)

5.4.2

Distribution System Software

For the study of the Distribution system loss analysis of BSEB, the state of the art windows
based CYMDIST (Cyme Distribution) Tool was used.
CYMDIST is optimization software for analysis and planning of Distribution system. It has an
edge over similar software in terms of availability of;

Optimization of network

Powerful algorithm for complex distribution system

Reliability analysis

This program was developed by Cyme International T&D Canada and has been continually
improved since its debut.
In Canada, USA, Germany, Sweden and other European countries, the software is being
extensively used by the utilities and consultants for planning and analysis of power systems.
This tool is also extensively used in Indian utilities like Madhya Pradesh, Kerala, West
Bengal etc and many private distribution companies viz., NDPL, Torrent and Reliance energy
Ltd. for planning and monitoring purposes.
5.4.2.1

Salient features

CYMDIST is a planning tool and is used to analyze, plan, optimize and manage the planning
and information system for electrical networks. CYMDIST can perform several types of
analyses on balanced or unbalanced three-phase, two-phase and single-phase systems that
are operated in radial, looped or meshed configurations:

Basic module interactive graphic including symbol editor, data and database
management.

Load allocation.

Voltage drop analysis (Load flow).

Short-circuit current computation.

Load Balancing.

Load growth.

Developing the PSMP for Bihar

5-31

020328-40RP-0400-00

Final Report

Capacitor placement.

Fault Flow.

Harmonic Analysis.

Protective Device Coordination.

Contingency Analysis..

GIS Interface.

5.5

System Planning Studies

5.5.1

Planning for the year 2010

System Study of the existing 2009-2010 network of the 33 kV system using the Cymdist
Software
Based on the data collected which included the SLDs, the line lengths, transformer details
collected from BSEB, individual feeders were modeled on CYMDIST and a study involving
load flow was carried out to determine the loading and voltage on each feeder section length
and transformer of feeder. It was noted that a considerable number of 33 kV lines were found
to be showing very high losses due to the fact that they (the 33 kV Lines) have been wired
with 7/12, 7/14 or 7/16 SWG GI wire as per input data provided for Planning study. Use of GI
wire for transfer of electricity is not recommended anywhere in India and there were
problems of simulating the system using GI wire in its design, because of high resistance of
GI wires, abnormally high drop in voltages were observed at the receiving end of the line.
The simulation results brought out very clearly that for the loading conditions of 2009-10 the
need for augmentation of transformer capacity is not very high up on the list of
reinforcements for many of the distribution circles but it is necessary to replace the line
conductors. This was required to reduce the line loss and improve voltages at the receiving
end of the lines. In some of the cases it was also found that though the conductor used is
standard one but is inadequate to carry the current flowing or power it is carrying through the
major portion of the feeder line. In such cases it was proposed to replace the conductor of
the adequate capacity.
For cases where a need was felt to augment or add the transformer capacity the same was
recommended and included in the planning report.
Capacity augmentation / addition of Transformer capacity
For 2010 condition the proposal has been made, as per the study, to augment the
transformer capacities, to add the transformers and to erect new substation. The circle wise
details in respect of 33/11 kV sub stations are furnished in Table X. The proposals have also
been made to strengthen the 33 kV lines by replacing the conductors and to construct the
new lines. The circle wise details in respect of lines have been brought out in Table 10

Developing the PSMP for Bihar

5-32

020328-40RP-0400-00

Final Report

Table 5-10
Circle

1 PESU (East)

Feeder
BahadurpurSaidpur

33 kV Line Work in 2010

Source EHV
S/S

Work proposed
Conversion of S/C DOG to D/C
WOLF ACSR

Mithapur

Length
(km)

6.0

from Mithapur GSS to Bahadurpur


S/S
Kankarbag

Mithapur

Replacement of DOG with WOLF


ACSR

5.0

R K Nagar

Mithapur

Replacement of DOG with WOLF


from Mithapur

2.5

GSS to Ashoknagar S/S


KarbagahiyaR.Nagar

Replacement of DOG with WOLF


from Mithapur

Mithapur

2.0

to Karbagahiya
City feeder

Replacement of DOG with WOLF


upto

Gaighat

10.0

Malsalami S/S
NMCH

Replacement of DOG with WOLF


ACSR from Gaighat

Gaighat

3.5

GSS to NMCH to Meena Bazar


2. PESU
(West)

Khagaul III and


IV

Replacement of DOG with WOLF


ACSR

Khagaul

from Khagaul to Garikhana


Khagaul II

1. Conversion of S/C DOG to D/C


WOLF ACSR from

Khagaul

Khagaul to Walmi tapping


2. Replacement of DOG with
WOLF from Walmi

to IGIMS
Khagaul I

1. Conversion of S/C DOG to D/C


WOLF ACSR from

Khagaul

Khagaul to Bhusaula
2. Conversion of S/C DOG to D/C
WOLF from

10

Bhusaula to A N College
Danapur I

Replacement of DOG with WOLF


from Danapur

Khagaul

12

to Digha
PESU 9

Developing the PSMP for Bihar

Jakkanpur

5-33

Replacement of DOG with WOLF


ACSR

020328-40RP-0400-00

Final Report

Circle

Feeder

PESU 7

Source EHV
S/S

Jakkanpur

Work proposed
Replacement of DOG with WOLF
ACSR from

Length
(km)

Jakkanpur to Mauryalok tapping


PESU 6

Jakkanpur

Conversion of S/C DOG to D/C


WOLF ACSR

from Jakkanpur to Beur


3. Patna

Pareo-Kanpa

1. Conversion of S/C DOG to D/C


WOLF from

Bihta

26.0

Bihta to Lalbhasara S/S


2. Replacement of GI Wire with
DOG ACSR

2.7

between Bihta and Pareo


3. Replacement of RABBIT & GI
with DOG ACSR

5.3

between Lalbhasara and Paliganj


Bihta A/F

Bihta

Replacement of DOG with WOLF


ACSR (3 ckts.)

2.1

Balmukund HTC

Bihta

Replacement of DOG with WOLF


ACSR from

3.5

Bihta A/F to Balmukund HTC


Fatuah

1. Replacement of GI Wire with


DOG ACSR

Fatuah

12.0

between Fatuah and Daniyaman


S/Ss
2. Replacement of GI Wire with
DOG ACSR

12.0

between Fatuah and Khusrupur


S/Ss
4. Nalanda

Sohasarai

Bari Pahari

Replacement of RABBIT and GI


wire with DOG

11.7

ACSR between Sohasarai and


Rahui S/Ss
Ramchandrapur

Bari Pahari

Replacement of DOG with WOLF


ACSR

2.0

from Bari Pahari GSS to


Ramchandrapur S/S
Ekangersarai

Bari Pahari

1. Replacement of GI Wire with


DOG ACSR

49.0

between Ekangersarai to
Hulasganj and

Developing the PSMP for Bihar

5-34

020328-40RP-0400-00

Final Report

Circle

Feeder

Source EHV
S/S

Work proposed

Length
(km)

Khudaganj S/Ss
2. Replacement of DOG with
WOLF ACSR

30.0

between Bari Pahari GSS and


Ekangersarai S/S
Silao

Replacement of GI wire with DOG


ACSR betweeen

Rajgir

54.5

Rajgir GSS and Silao-Athri-Khizr


Sarai S/Ss
Nalanda

1. Replacement of DOG with


WOLF ACSR

Rajgir

0.5

between Rajgir GSS and next node


2. Replacement of GI Wire with
DOG ACSR

15.3

between Nalanda and Raiter S/Ss


Noor Sarai

Bari Pahari

Replacement of GI wire with DOG


ACSR betweeen

23.0

Bari Pahari and Noor Sarai


5. Chapra
6. Motihari

Bettiah

Replacement of DOG with WOLF


ACSR

Bettiah

1.1

from Bettiah GSS to Bettiah S/S


Lauria

Ram Nagar

Replacement of GI wire with DOG


ACSR

12.5

between Ram Nagar GSS and


Lauria S/S
Ram Nagar

Ram Nagar

Replacement of GI wire with DOG


ACSR

27.0

between Ram Nagar GSS and


Bagaha S/S
Areraj

Replacement of GI wire with DOG


ACSR

Motihari

16.5

between Motihari GSS and Areraj


S/S
MadhopurHarsiddhi

Replacement of GI wire with DOG


ACSR

Motihari

20.5

between Motihari GSS and


Madhopur-Harsiddhi S/Ss
ChakiaMadhuban

Developing the PSMP for Bihar

Replacement of GI wire with DOG


ACSR

Motihari

5-35

6.0

020328-40RP-0400-00

Final Report

Circle

Feeder

Source EHV
S/S

Work proposed

Length
(km)

between Chakia and Madhuban


S/Ss
7. Bhojpur

Japani farmSarai

Replacement of DOG with WOLF


ACSR

Ara

5.0

between Ara GSS and Japani farm


S/S
Powerganj

Replacement of DOG with WOLF


ACSR from

Ara

6.0

Ara GSS to Powerganj S/S


NawanagarMurar

Replacement of GI wire with DOG


ACSR

Dumraon

4.0

between Nawanagar and Murar


S/Ss
Buxar

1. Replacement of DOG with


WOLF ACSR

Dumraon

20.0

from Dumraon GSS to Buxar S/S


2. Replacement of GI Wire with
DOG ACSR

10.0

between Buxar and Chausa S/Ss


8. Gaya

Kako-Charui

Replacement of GI wire with DOG


ACSR

Irki

6.0

between Kako and Charui S/Ss


Tehta-Makpa

Replacement of GI wire with DOG


ACSR

Irki

13.5

Irki GSS and Makhadampur Tehta - Makpa S/Ss


Irki-Shakurabad

Replacement of GI wire with DOG


ACSR

Irki

6.5

between Irki and Shakurabad S/Ss


Rafiganj

Replacement of GI wire with DOG


ACSR

Rafiganj

9.5

between Rafiganj and Goh S/Ss


UchauliMadanpur

1. Replacement of GI wire and


RABBIT with DOG

Rafiganj

6.5

ACSR between Rafiganj and


Uchauli S/Ss
2. Replacement of GI Wire with
DOG ACSR

12.5

between Uchauli and Madanpur


S/Ss

Developing the PSMP for Bihar

5-36

020328-40RP-0400-00

Final Report

Circle

Feeder

Tekari-Konch

Source EHV
S/S

Work proposed
Replacement of GI wire with DOG
ACSR

Tekari

Length
(km)

12.0

between Tekari and Konch S/Ss


Gandhi Maidan

Shergahti

Chandauti

Replacement of DOG with WOLF


ACSR

(Gaya)

from Chandauti and Gandhi


Maidan S/Ss

Bodh Gaya

1. Replacement of DOG with


WOLF ACSR

6.0

20.8

between Bodh Gaya GSS and


Sherghati S/S
2. Replacement of GI Wire with
DOG ACSR

10.0

between Imamganj and Dumaria


S/Ss
3. Replacement of GI wire with
DOG ACSR

5.0

between Sherghati and Gurua


S/Ss
Manpur

Bodh Gaya

Replacement of GI wire with DOG


ACSR

30.0

between Manpur - Paimar Wazirganj S/Ss


MU Campus

Bodh Gaya

Replacement of DOG with WOLF


ACSR

3.0

from Bodh Gaya to MU Campus


Akbarpur

Replacement of GI wire with DOG


ACSR

Nawada

4.0

between Akbarpur and Sirdala


S/Ss
Warsaliganj

1. Replacement of GI Wire with


DOG ACSR

Nawada

10.0

between Warsaliganj and


Pakribarwan S/Ss
2. Replacement of GI Wire with
DOG ACSR

32.0

between Warsaliganj - Roh Kankol S/Ss


Aurangabad

Replacement of DOG with WOLF


ACSR

Barun

22.0

from Barun GSS to Aurangabad


S/S

Developing the PSMP for Bihar

5-37

020328-40RP-0400-00

Final Report

Circle

9. Saharsa

Feeder

Supaul

Source EHV
S/S

Work proposed
Replacement of DOG with WOLF
ACSR

Supaul

Length
(km)

0.5

from Supaul GSS to Supaul S/S


10. Bhagalpur

Sanhaula

Kahalgaon

Replacement of GI wire with DOG


ACSR

9.0

between Kahalgaon and Sanhaula


S/Ss
Banka-Bausi

Replacement of DOG with WOLF


ACSR

Banka

0.1

from Banka GSS to Banka S/S


11. Munger

Jamui

Mallehpur

Replacement of DOG with WOLF


ACSR

8.0

from Mallehpur GSS to Jamui S/S


Purani Bazar

Lakhisarai

Replacement of DOG with WOLF


ACSR

3.0

from Lakhisarai GSS to Lakhisarai


S/S
Onama

Sheikhpura

Replacement of GI wire with DOG


ACSR

4.0

between Sheikhpura GSS and


Onama S/S
Hathiyama

Sheikhpura

Replacemento of GI wire with


DOG ACSR

8.0

between Sheikhpura GSS and


Hathiyama S/S
Ariari

Sheikhpura

Replacement of GI wire with DOG


ACSR

34.0

between Sheikhpura GSS and


Ariari S/S
12. Samastipur

IOC

Replacement of GI wire with DOG


ACSR

BTPS

7.5

between BTPS and IOC S/S


Bangerdih

Conversion of S/C DOG to D/C


WOLF ACSR

BTPS

16.5

between BTPS and Bangerdih


Begusarai

Conversion of S/C DOG to D/C


WOLF ACSR

BTPS

20.0

between BTPS and Begusarai


Manhar

Developing the PSMP for Bihar

Mohanpur

5-38

Replacement of GI wire with DOG


ACSR

15.0

020328-40RP-0400-00

Final Report

Circle

13. Purnea

14. Sasaram

Feeder

Source EHV
S/S

Work proposed

Length
(km)

Dalsingsarai

Mohanpur

Replacement of GI wire with DOG


ACSR

26.0

Rosera

Mohanpur

Replacement of GI wire with DOG


ACSR

23.0

Zero Mile - City

Purnea

Replacement of RABBIT with DOG


ACSR

6.0

Belgachhi

Purnea

Replacement of GI wire with DOG


ACSR

8.0

Beri

Purnea

Replacement of GI wire with DOG


ACSR

20.0

KalyanpurRamgarh

Karmnasa

Replacement of DOG with WOLF


ACSR

30.0

from Karmnasa GSS to Kalyanpur


and from
Kalyanpur to Ramgarh S/S
Kudra

Conversion of S/C DOG to D/C


WOLF ACSR

Mohania

1.0

from Mohania GSS to Kudra node


Mohania

Conversion of S/C DOG to D/C


WOLF ACSR

Mohania

0.1

from Mohania GSS to Mohania S/S


Beda-Takia

Replacement of DOG with WOLF


ACSR

Sasaram

5.0

between Sasaram GSS and Beda Takia S/Ss


15.
Muzaffarpur

Mehua-Patepur

Vaishali

Replacement of GI wire with DOG


ACSR

45.0

Prataptand

Vaishali

Replacement of GI wire with DOG


ACSR

15.0

Konharaghat

Hajipur

Replacement of DOG with WOLF


ACSR

8.0

from Hajipur GSS to Konharaghat


S/S
SKMCH

Developing the PSMP for Bihar

Bhikanpura

5-39

Conversion of S/C DOG to D/C

9.0

020328-40RP-0400-00

Final Report

Circle

Source EHV
S/S

Feeder

Work proposed

Length
(km)

WOLF ACSR
from Bhikanpura GSS to SKMCH
S/S
IDPL

Replacement of DOG with WOLF


ACSR

Bhikanpura

3.5

from Bhikanpura GSS to IDPL S/S


16. Darbhanga

JhanjharpurMadhepura

Pandaul

Replacement of GI wire with DOG


ACSR

10.0

Gangwara-Bela

Ram Nagar

Replacement of DOG with WOLF


ACSR

18.0

from Ram Nagar GSS to


Gangwara S/S
Pouria

Replacement of Weasel and GI


wire with DOG

Ram Nagar

13.0

ACSR between Ram Nagar GSS


and Pouria S/Ss

Table 5-11

33/11 kV Transformers and Erection of New 33/11 kV S/Ss - 2010

Circle

Sub Station

Work

1. PESU(East)

2. PESU(West)

3. Patna

Bihta AF

Addition of 1x5 MVA Xmer

Sheetalpur

Augmentation of 1x3.15 with 1x5 MVA


Xmer

Siwan

Addition of 1x5 MVA Xmer

Valmiki Nagar

Addition of 1x5 MVA Xmer

Bettiah

Augmentation of 2x5 with 2x10 MVA


Xmers

Lauria

Addition of 1x3.15 MVA Xmer

4. Nalanda

5. Chapra

6. Motihari

Developing the PSMP for Bihar

5-40

020328-40RP-0400-00

Final Report

Circle

Sub Station

Work

Motihari

Augmentation of 2x5 with 2x10 MVA


Xmers

Kako

Addition of 3.15 MVA Xmer

Guraru

Addition of 1x5 MVA Xmer

Panari

2x3.15 MVA Xmers to be charged

Central Stores

Addition of 1x5 MVA Xmer

10.Bhagalpur

Shahkund

Addition of 1x5 MVA Xmer

11.Munger

Ramchandrapur

Addition of 1x5 MVA Xmer

Onama

Addition of 1x5 MVA Xmer

Mirjapur

Addition of 1x5 MVA Xmer

Barkana

Addition of 1x5 MVA Xmer

Deona

Addition of 1x5 MVA Xmer

Pusa

Addition of 1x5 MVA Xmer

Jitwarpur

Addition of 1x5 MVA Xmer

13.Purnea

Group Control

Addition of 1x5 MVA Xmer

14.Sasaram

Kalyanpur

Addition of 1x5 MVA Xmer

Dinara

Addition of 1x5 MVA Xmer

Bhabhua New

Addition of 1x5 MVA Xmer

Pusauli

Addition of 1x5 MVA Xmer

Takia

Addition of 1x5 MVA Xmer

Nokha

Addition of 1x5 MVA Xmer

Beda

Addition of 1x5 MVA Xmer

Nahatta

Addition of 1x5 MVA Xmer

Pupri

Addition of 1x5 MVA Xmer

Dumar

Addition of 1x5 MVA Xmer

Lalganj

Addition of 1x5 MVA Xmer

EDIP

Addition of 1x5 MVA Xmer

Hajipur IE

Addition of 1x5 MVA Xmer

Konharaghat

Addition of 1x5 MVA Xmer

7. Bhojpur

8. Gaya

9. Saharsa

12.Samastipur

15.Muzaffarpur

Developing the PSMP for Bihar

5-41

020328-40RP-0400-00

Final Report

Circle

16.Darbhanga

5.5.2

Sub Station

Work

Motipur

Addition of 1x5 MVA Xmer

MIT

Addition of 1x5 MVA Xmer

Sikandarpur

Addition of 1x5 MVA Xmer

SKMCH

Addition of 1x5 MVA Xmer

Khabra

Addition of 1x5 MVA Xmer

Bhikanpura

Addition of 1x5 MVA Xmer

Rajnagar

Addition of 1x5 MVA Xmer

Raiyam

Addition of 1x5 MVA Xmer

Pandaul

Addition of 1x5 MVA Xmer

Planning for the year 2014

System Study of the planned network for 2014 of the 33 kV system using the Cymdist
Software
The network developed for 2010 was used as a base case for developing the network for
2014. Individual feeders were modeled on CYMDIST and a study involving load flow was
carried out to determine the loading and voltage on the each section of the feeder. From the
load flow, the power flow and voltage on the transformers connected to the feeder were also
determined.
As a starting point, the load from 2014 was modeled on the 2010 system and it was noted
that a considerable number of 33 kV lines were found to be showing very high losses and
very low voltage due to the fact that the existing 33kV lines were not capable for transporting
the load requirement of 2014. Moreover at many places as mentioned before in the report GI
wire was used as distribution line and use of GI wire for transfer of electricity is not
recommended, because of high resistance of GI wires. This high resistance would result in
abnormally high voltage drop at the intermediate and receiving end of the line. In some cases
it was observed that although the conductor used was a standard one but was inadequate to
carry the amount of required current or power in major sections of the feeder line. In such
cases it was proposed to replace the conductor of the adequate capacity in the particular
sections.
The simulation results brought out very clearly that with the loading conditions of 2014 the
need for new grid and distribution substation along with additional distribution lines and
augmentation of transformer capacity at the existing distribution substations. The distribution
system simulation study also highlighted the areas where the improvement in losses and
voltage could be achieved by using higher size of conductor for some initial sections of the
line.

Developing the PSMP for Bihar

5-42

020328-40RP-0400-00

Final Report

Table 5-12
Circle

Feeder

Karmali Chak

S.K. Memorial

1.PESU
(East)

2.PESU
(West)

Line Work 33 kV - 2014

Source EHV
S/S
Fatuah

Jakkanpur

Work proposed

Length
(km)

S/C WOLF line from Fatuah GSS to


Karmali Chak

15.6

S/C DOG line from Karmali Chak to


Deedarganj

Conversion of S/C to D/C WOLF line


from Jakkanpur GSS to S K Memorial

14.3

Laying second length cable

4.5

Kankar Bag (2)

Mithapur (2)

D/C WOLF line from Mithapur (2)


(New) GSS to Kankar Bag (2)

10

Saidpur

Mithapur (2)

D/C WOLF line from Mithapur (2)


(New) GSS to Saidpur

10

Bahadurpur

Mithapur (2)

D/C WOLF line from Mithapur (2)


(New) GSS to Bahadurpur

10

R. Nagar

Mithapur (2)

D/C WOLF line from Mithapur (2)


(New) GSS to R Nagar

10.5

Ashok Nagar

Mithapur

D/C WOLF line from Mithapur GSS to


Ashok Nagar

6.1

R.K.Nagar

Mithapur

Laying of 2nd ckt. Cable from Mithapur


GSS to R K Nagar

0.2

Gaighat

Gaighat

Conversion of S/C WOLF to D/C


WOLF from Gaighat GSS to Gaighat

0.2

NMCH

Gaighat

Conversion of S/C WOLF to D/C


WOLF from Gaighat GSS to NMCH

1.5

Katra (2)

Katra

S/C WOLF line from Katra GSS to new


S/S Katra (2)

Pahari

Katra

Conversion of S/C WOLF to D/C


WOLF from Katra GSS to Pahari

7.5

Malsalami

Katra

S/C WOLF line from Katra GSS to


Malsalami

Mangal Talab

Katra

D/C WOLF line from Katra GSS to


Mangal Talab

Meena Bazar (2)

Jakkanpur
(2)

D/C WOLF line from Jakkanpur (2)


(New) GSS to Mina Bazar (2)

PMCH

Mithapur (2)

S/C WOLF line from Mithapur (2)


(New) GSS to PMCH

10

A.N.College

Khagaul (2)

D/C WOLF line from Khagaul (2) (New)


GSS to A N College

10

S.K.Puri

Khagaul (2)

D/C WOLF line from Khagaul (2) (New)


GSS to S K Puri

Garikhana I & II

Khagaul

Conversion of S/C WOLF to D/C


WOLF line from Khagaul GSS to

Developing the PSMP for Bihar

5-43

18

020328-40RP-0400-00

Final Report

Circle

Feeder

Source EHV
S/S

Length
(km)

Work proposed
Garikhana (both lines)
Pataliputra (one line)

and

upto

Danapur

Digha

S/C WOLF line from Digha (New) GSS


to Digha-Danapur tapping

10

Digha

Digha

D/C WOLF line from Digha (New) GSS


to Digha

R.B.I.

Digha

S/C WOLF line from Digha (New) GSS


to Digha-RBI tapping

Danapur (2)

Digha

D/C WOLF line from Digha (New) GSS


to Danapur (2)

10

IGIMS

Sipara

D/C WOLF line from Sipara (New) GSS


to IGIMS

10

Veterinary
College

Sipara

D/C WOLF line from Sipara (New) GSS


to Veterinary College

10

Conversion of S/C WOLF to D/C


WOLF line from Veterinary to Board's
Colony

Conversion of S/C DOG to D/C WOLF


line from Vikas Bhawan to Board's
Colony

Conversion of S/C DOG to D/C WOLF


line from Sahitya Sammelan to Maurya
Lok

D/C WOLF line from Jakkanpur (2)


(New) GSS to Bandar Bagicha

10

Laying 2nd cable length from


Jakkanpur GSS to Sinchai Bhawan

1.5

Laying 2nd cable length from Sinchai


Bhawan to Vikas Bhawan

1.5

Maurya Lok

Sinchai Bhawan

Jakkanpur

Jakkanpur

Anishabad

Jakkanpur

Conversion of S/C DOG to D/C WOLF


from Jakkanpur GSS to Gardanibag

Gardanibag

Jakkanpur

Replacement of DOG with WOLF


ACSR from Anishabad to Gardanibag

Vidyut Bhawan

Jakkanpur

Laying 2nd Cable length from


Jakkanpur GSS to Vidyut Bhawan

3.5

Sahitya
Sammelan

Jakkanpur
(2)

D/C WOLF line from Jakkanpur (2)


(New) GSS to Sahitya Sammelan

10

Bandar Bagicha
(2)

Jakkanpur
(2)

D/C WOLF line from Jakkanpur (2)


(New) GSS to Bandar Bagicha (2)

10

Beur

Jakkanpur
(2)

D/C WOLF line from Jakkanpur (2)


(New) GSS to Beur

10

Replacement of DOG with WOLF


ACSR from Beur to Khagaul S/S

10

Developing the PSMP for Bihar

5-44

020328-40RP-0400-00

Final Report

Circle

3. Patna

Feeder

Source EHV
S/S

Work proposed

Length
(km)

A.F. Bihta

Bihta

S/C WOLF line from Khagaul (2) (New)


GSS to A/F Bihta for HTC Group

10

Pareo

Bihta

D/C WOLF line from Bihta GSS to


Bihta S/S for separate line to Pareo

Replacement of DOG with WOLF from


Pareo to Koilwar (Bhojpur circle)

15

S/C DOG line from Koilwar (Bhojpur) to


Giddha New S/S (Bhojpur)

GISCO

Khagaul (2)

S/C DOG line from Khagaul (2) (New)


GSS to GISCO HTC

10

Maner

Khagaul (2)

S/C WOLF line from Khagaul (2) (New)


GSS to A/F Bihta for Maner

10

Neora

Khagaul

Replacement of DOG with WOLF from


Neora to Naubatpur

10

Fatuah (2)

Fatuah (2)

S/C WOLF line from Fatuah (2) (New)


GSS to Fatuah (2)

Khusrupur

Fatuah (2)

S/C WOLF line from Fatuah (2) (New)


GSS to Fatuah for

Daniyaman + Khusrupur feeders

4. Nalanda

Masaurhi Old

Masaurhi

Replacement of DOG with WOLF from


Masaurhi GSS to Masaurhi Old

Masarhi New

Masaurhi

Replacement of DOG with WOLF from


Masaurhi GSS to Masaurhi New

0.85

Barh

Barh

Conversion of S/C DOG to D/C WOLF


from Barh GSS to Barh

Barh (2)

Barh

S/C DOG line from Barh GSS to Barh


(2)

Replacement of DOG with WOLF from


Hathidah GSS to Mokama

14

Hathidah (2)

Hathidah

S/C WOLF line from Hathidah GSS to


Hathidah (2)

Hilsa

Ekangersarai

Replacement of DOG with WOLF from


Ekangersarai to Hilsa

12

Islampur

Ekangersarai

Replacement of DOG with WOLF from


Ekangersarai to Islampur

12

Ekangersarai

S/C WOLF lines ( 3 nos.) from


Ekangersarai
New
GSS
to
Ekangersarai

15

Ekangersarai

for Ekangersarai, Islampur and Hilsa


Chiksurabazar

Masaurhi

S/C DOG line from Masaurhi-Paver


tapping to Chiksurabazar

10

Dhamauli

Harnaut

S/C WOLF line from Harnaut (New)

Developing the PSMP for Bihar

5-45

020328-40RP-0400-00

Final Report

Circle

Feeder

Source EHV
S/S

Work proposed

Length
(km)

GSS to Dhamauli

Noorsarai

Harnaut

S/C DOG line from Rahui to Dhamauli

S/C WOLF line from Harnaut (New)


GSS to Noorsarai

15

S/C DOG line from Bari Pahari Harnaut tapping to Kalyanbigha

S/C DOG line from Chandi S/S to


Chainpur

12

S/C DOG line from Bari Pahari Harnaut tapping to Cheral

2.5

S/C DOG line from Silao S/S to


Bhindidih

Andawas

Rajgir

S/C DOG line from Rajgir GSS to


Andawas

16

Rajgir

Rajgir

Replacement of DOG with WOLF from


Rajgir GSS to Rajgir S/S

2.5

S/C DOG line from Rajgir GSS - Rajgir


S/S tapping to Ghosarwan

10

S/C DOG line from Rajgir - Giriak


tapping to Tetrawan

S/C DOG line from Tetrawan S/S to


Sarbahadi

17

S/C DOG line


tapping to Badi

12

Giriak

Rajgir

from

Rajgir-Giriak

S/C DOG line from Badi S/S to


Katrisarai

10

Bari Pahari

S/C WOLF line from Bari Pahari to


Ramchandrapur (2)

Bari Pahari

Conversion of S/C WOLF to D/C


WOLF
from
Bari
Pahari
to
Ramchandrapur

S/C DOG line from Asthawan S/S to


Malti

0.5

Bari Pahari

Conversion of S/C DOG to D/C WOLF


from Bari Pahari GSS to Sohasarai

2.5

Gopalganj

Conversion of S/C DOG line to D/C


WOLF from Gopalganj GSS to Hathua
tapping

20

Gopalganj

Gopalganj

Conversion of S/C DOG line to D/C


WOLF from Gopalganj GSS to
Gopalganj S/S

Srinagar

Siwan

Replacement of DOG with WOLF from


Siwan GSS to Srinagar

Ramchandrapur
(2)

Ramchandrapur

Sohasarai
5. Chapra
Fulwaria

Developing the PSMP for Bihar

5-46

020328-40RP-0400-00

Final Report

Circle

6. Motihari

7. Bhojpur

Feeder

Source EHV
S/S

Work proposed

Length
(km)

Maharajganj

Siwan

Replacement of DOG with WOLF from


Siwan GSS to Maharajganj

20

Siwan (2)

Siwan

D/C WOLF line from Siwan GSS to


Siwan (2) S/S

Mashrakh

Mashrakh

S/C WOLF line from Mashrakh (New)


GSS to Mashrakh

Taraiya

Mashrakh

S/C WOLF line from Mashrakh (New)


GSS to Taraiya

11

Baikunthpur

Mashrakh

S/C DOG line from Mashrakh (New)


GSS to Baikunthpur

18

Prabhunath
Nagar

Chapra

Conversion of S/C DOG line with D/C


WOLF from Telpa GSS to Prabhunath
Nagar

Telpa

Chapra

Conversion of S/C DOG line with D/C


WOLF from Telpa GSS to Telpa

0.1

Sheetalpur

Sheetalpur

Replacement of DOG with WOLF from


Sheetalpur GSS to Sheetalpur

0.1

Ramnagar

Ramnagar

Replacement of DOG with WOLF from


Ramnagar GSS to Ramnagar S/S

0.5

Chautarwa

Ramnagar

S/C DOG line from Ramnagar GSS to


Chautarwa

15

Raxaul

Raxaul

S/C WOLF line from Raxaul (New)


GSS to Raxaul

Adopur

Raxaul

S/C DOG line from Raxaul (New) GSS


to Raxaul for Adopur

Bettiah

Bettiah

Conversion of S/C WOLF to D/C


WOLF from Bettiah GSS to Bettiah S/S

Bettiah (2)

Bettiah

S/C WOLF line from Bettiah GSS to


Bettiah (2)

Chakia

Motihari

Replacement of DOG with WOLF from


Motihari GSS to Chakia

35

Chhitwani

Motihari

S/C DOG line from Motihari GSS to


Chhitwani

Chausa

Buxar

S/C WOLF line from Buxar (New) GSS


to Itarhi - Chausa tapping

Buxar

Buxar

D/C WOLF line from Buxar (New) GSS


to Buxar

Pandy Patti

Buxar

S/C DOG line from Buxar (New) GSS


to Pandey Patti

Dumraon (2)

Dumraon

S/C DOG line from Dumraon GSS to


Dumraon (2)

Nawanagar

Dumraon

Developing the PSMP for Bihar

Replacement of S/C DOG with D/C


20
WOLF
from
Dumrao
GSS
to
5-47
020328-40RP-0400-00

Final Report

Circle

Feeder

Source EHV
S/S

Work proposed

Length
(km)

Nawanagar

Garhani

8. Gaya

Jagdishpur

Conversion of S/C DOG to D/C WOLF


from Dumraon GSS to Bramhapur

18

S/C DOG line from Simri to Chhotka


Dhakai Chak

D/C WOLF line from Jagdishpur (New)


GSS to Garhani

25

S/C WOLF line from Garhani to Agiaon

10

Jagdishpur

Jagdishpur

S/C DOG line from Jagdishpur (New)


GSS to Jagdishpur

Japani Farm

Ara

Conversion of S/C WOLF to D/C


WOLF from Ara GSS to Japani Farm

Powerganj

Ara

Conversion of S/C WOLF to D/C


WOLF from Ara GSS to Powerganj

Laying of cable from Powerganj SS to


Power House

S/C DOG line from Serai to Barhara

14

Zero Mile

Ara

S/C DOG line from Ara GSS to Zero


Mile

0.5

Karpi

Karpi

S/C DOG line from Karpi (New) GSS


and Karpi S/S

Goh

Goh

S/C DOG line from Goh (New) GSS to


Goh S/S

Daudnagar

Goh

S/C DOG line from Goh (New) GSS to


Daudnagar

25

Kako

Irki

Replacement of DOG with WOLF


between Irki GSS and Kako

17

Irki

Replacement of DOG with WOLF


between Irki GSS and Tehta

12

Conversion of S/C WOLF to D/C


WOLF from Irki GSS to Jehanabad

Conversion of S/C WOLF to D/C


WOLF from Irki GSS to Irki

0.3

S/C DOG line from Shakurabad to


Nowaman

Rafiganj

Replacement of DOG with WOLF from


Rafiganj GSS to Guraru

25

Belaganj

Conversion of S/C DOG with D/C


WOLF from Belaganj GSS to Belaganj
S/S

0.2

S/C DOG line from Belaganj GSS to

0.2

Tehta

Irki

Guraru

Belaganj

Developing the PSMP for Bihar

Irki

5-48

020328-40RP-0400-00

Final Report

Circle

Feeder

Source EHV
S/S

Work proposed

Length
(km)

Belaganj S/S for Panari


Dhongra

Hulasganj

S/C DOG line from Hulasganj (New)


GSS to Dhongra

10

Sonwa

Hulasganj

S/C DOG line from Hulasganj (New)


GSS to Sonwa

12

Hulasganj

Hulasganj

S/C DOG line from Hulasganj (New)


GSS to Hulasganj S/S

Nawagarh

Hulasganj

S/C DOG line from Hulasganj (New)


GSS to Nawagarh

15

Aurangabad

Aurangabad

S/C WOLF line from Aurangabad


(New) GSS to Aurangabad

Aurangabad

S/C WOLF line from Aurangabad


(New) GSS to Aurangabad for Obra
feeder

Deo

Aurangabad

S/C WOLF line from Aurangabad


(New) GSS to Aurangabad for DeoGangti feeders

Barun (2)

Barun

S/C DOG line from Barun GSS to


Barun (2)

Dihara

Barun

S/C DOG line from Sone Nagar GSS to


Dihara

10

Wazirganj

Wazirganj

S/C WOLF line from Wazirganj (New)


GSS to Wazirganj S/S

Atari

Wazirganj

S/C DOG Line from Wazirganj (New)


GSS to Atari

12

Gurua

Sherghati

S/C DOG line from Sherghati (New)


GSS to Sherghati for Gurua

Amas

Sherghati

S/C DOG line from Sherghati (New)


GSS to Sherghati for Amas

Banke

Sherghati

S/C DOG line from Sherghati (New)


GSS to Sherghati for Banke Bazar

Shergahti

Sherghati

S/C DOG line from Sherghati (New)


GSS to Sherghati

Imamganj

Sherghati

S/C DOG line from Sherghati (New)


GSS to Sherghati for Imamganj

Central Stores

Chandauti

Replacement of DOG with WOLF from


Chandauti to Central Stores

Conversion of S/C DOG to D/C WOLF


from Chandauti to A P Colony Railway Maidan

6.5

Conversion of S/C DOG to D/C WOLF


from Chandauti to Gandhi Maidan

Obra

Gandhi Maidan

Developing the PSMP for Bihar

Chandauti

5-49

020328-40RP-0400-00

Final Report

Circle

Feeder

Length
(km)

Work proposed
Conversion of S/C DOG to D/C WOLF
from
Gandhi Maidan to Panchaiti
Akhara

Dandibag

Chandauti

Conversion of S/C DOG to D/C WOLF


from Chandauti to Dandibag

12

Manpur

Bodh Gaya

Conversion of S/C WOLF to D/C


WOLF from Bodh Gaya to Manpur

18

Bodh Gaya

Conversion of S/C WOLF to D/C


WOLF from Bodh Gaya to M U
Campus

Replacement of DOG with WOLF from


MU Campus to Buddhist Complex

M.U. Campus

9. Saharsa

Source EHV
S/S

Nawada

Nawada

Conversion of S/C WOLF to D/C


WOLF from Nawada GSS to Nawada

Akbarpur

Nawada

Conversion of S/C WOLF to D/C


WOLF from Nawada GSS to Akbarpur

14

Replacement of DOG with WOLF from


Akbarpur to Rajauli

15

Conversion of S/C WOLF to D/C


WOLF from Supaul GSS to Supaul

0.5

S/C DOG line from Supaul GSS to


Parasrama

16

S/C DOG line tapping from Pipra Raghopur to Larganj

Supaul

Supaul

Hulasganj

Saharsa (2)

Saharsa

D/C WOLF line from Saharsa GSS to


Saharsa (2)

Sour Bazar

Saharsa

S/C DOG line from Saharsa GSS to


Sour Bazar

12

Balwahat

Saharsa

S/C DOG line from Saharsa GSS to


Balwahat

19

S/C DOG line from


Salakhua

19

Balwahat

to

Old Saharsa

Saharsa

Conversion of S/C DOG line to D/C


WOLF from Saharsa GSS to Saharsa

0.1

Madhepura

Madhepura

S/C WOLF line from Madhepura (New)


GSS to Madhepura

S/C DOG line from Muraliganj to


Kumarkhand

12

S/C DOG line from Singheshwar to


Ghailar

10

Replacement
of
PANTHER ACSR

0.1

Khagaria

Developing the PSMP for Bihar

Khagaria

5-50

conductor

with

020328-40RP-0400-00

Final Report

Circle

Feeder

Length
(km)

Conversion of S/C DOG line to D/C


WOLF from Khagaria GSS to Mansi

10

Replacement of DOG with WOLF


ACSR from Mansi to Maheshkunt

10

Udakishanga
nj

S/C DOG line from Udakishanganj


GSS to Bihariganj

13

Puraini

Udakishanga
nj

S/C DOG line from Udakishanganj


GSS to Puraini

10

Sanhauli

Naugachhia

S/C DOG line from Naugachhia GSS to


Sanhauli

11

Naugachhia

Naugachhia

Replacement of DOG with WOLF from


Naugachhia GSS to Naugachhia S/S

3.5

Conversion of S/C DOG to D/C WOLF


from Sabour GSS to Central Jail

8.2

Conversion of S/C DOG to D/C WOLF


from Sabour GSS to C S Compound

Replacement of DOG with WOLF


ACSR from CS Compund to TT School

4.7

Sabour

Aliganj I

Sabour

Conversion of S/C DOG to D/C WOLF


line from Sabour GSS to Aliganj

Aliganj II

Sabour

Conversion of S/C DOG to D/C WOLF


line from Sabour GSS to Aliganj

Replacement of DOG with WOLF from


Aliganj to Nath Nagar

Banka (2)

Banka

S/C DOG line from Banka GSS to


Banka (2) S/S

Banka

Banka

Conversion of S/C WOLF to D/C


WOLF from Banka GSS to Banka S/S

0.15

Replacement of DOG with WOLF from


Banka S/S to Rajauna-Bousi tapping

Kahalgaon

S/C DOG line from Kahalgaon GSS to


Ghogha

12

Kahalgaon

Kahalgaon

Conversion of S/C DOG to D/C WOLF


from Kahalgaon GSS to Kahalgaon
S/S

Tarapur

Sultanganj

Conversion of S/C DOG to D/C WOLF


from Sultanganj to Tarapur

20

Ramchandrapur

Jamalpur

Replacement of DOG with WOLF from


Jamalpur GSS to Ramchandrapur

Safiabad

Jamalpur

Replacement of DOG with WOLF from


Jamalpur GSS to Safiabad

0.2

Karnachaura

Jamalpur

Conversion of S/C DOG to D/C WOLF

13

Ghogha

11. Munger

Work proposed

Bihariganj

CS Compound

10.Bhagalpur

Source EHV
S/S

Developing the PSMP for Bihar

5-51

020328-40RP-0400-00

Final Report

Circle

Feeder

Source EHV
S/S

Work proposed

Length
(km)

from Jamalpur GSS to Karnachaura

Balaji

Kajra

Haibatganj

Jamui

Gidhour

Ghuskuri

Onama

Sheikhpura

S/C DOG line from Lakhisarai GSS to


Balaji HTC

7.3

Conversion of S/C DOG to D/C WOLF


from Lakhisarai GSS to Court Area

S/C DOG line from Lakhisarai GSS to


Kajra

20

S/C DOG line from Kajra to Piri Bazar

12

Replacement of DOG with WOLF from


Lakhisarai to Salempur

20

S/C DOG line from Lakhisarai - Kendy


tapping to Mananpur

16

Mallehpur

Conversion of S/C DOG to D/C WOLF


from Mallehpur GSS to Jamui

Mallehpur

Conversion of S/C DOG to D/C WOLF


from Mallehpur GSS to Gidhour
tapping

12

Replacement of DOG with WOLF from


Gidhour tapping and Jhajha

S/C DOG line from Sheikhpura GSS to


Ghuskuri

30

S/C DOG line from Bhalua to Lohain

Replacement of DOG with WOLF


ACSR from Sheikhpura to Mirzapur

12

S/C DOG line tapping from Sheikhpura


- Mirzapur line to Toygarh

Sheikhpura

Replacement of DOG with WOLF from


Sheikhpura GSS to Sheikhpura

Mohanpur

Conversion of S/C DOG line to D/C


WOLF from Mohanpur GSS to
Mohanpur S/S

0.6

Mohanpur

Conversion of S/C DOG line to D/C


WOLF line from Mohanpur GSS to
Jitwarpur

10

S/C WOLF line from Jitwarpur to


Magardahi

S/C DOG line from Sirsia to Kuboliram

S/C DOG line from Mohanpur - Sirsia


line as tapping to Karpoorigram

3.5

S/C WOLF line from Dalsingsarai GSS


to Dalsingsarai S/S

Lakhisarai

Lakhisarai

Lakhisarai

Sheikhpura

Sheikhpura

12.Samastipur
Mohanpur

Jitwarpur

Dalsingsarai

Developing the PSMP for Bihar

Dalsingsarai

5-52

020328-40RP-0400-00

Final Report

Circle

13. Purnea

14. Sasaram

Feeder

Source EHV
S/S

Length
(km)

Work proposed

Pateri

Dalsingsarai

S/C DOG line from Dalsingsarai (New)


GSS to Pateri

25

Bachhwara

Dalsingsarai

S/C DOG line from Dalsingsarai (New)


GSS to Bachhwara

12

Bibhutipur

Dalsingsarai

S/C WOLF line from Dalsingsarai GSS


to Bibhutipur

15

Bangrahdih (2)

BTPS

S/C WOLF line


Bangradih (2)

20

Deona (2)

Zero Mile

S/C WOLF line from Zero


(Begusarai) GSS to Deona (2)

Kankaul

Zero Mile

S/C WOLF line from Zero Mile GSS to


Kankaul

15

Begusarai

Zero Mile

D/C WOLF line from Zero Mile GSS to


Begusarai

12

Raniganj

Forbesganj

S/C DOG line from Raniganj


Bahargaon

13

from

BTPS

to
Mile
12

to

S/C DOG line from Araria to Kusgaon

S/C DOG line from Jokihat to Malgaon

10

Group Control

Purnea

Conversion of S/C DOG to D/C WOLF


line from Purnea GSS to Group Control

0.1

Banmankhi

Purnea

Replacement of RABBIT with WOLF


from Purnea GSS to Banmankhi

40

Zero Mile

Purnea

Replacement of DOG with WOLF from


Purnea GSS to Zero Mile

12

S/C DOG line from Dalkola to Vaisi

10

Naranga

Purnea

Conversion of S/C DOG to D/C WOLF


line from Purnea GSS to Naranga

Jalalgarh

Purnea

Replacement of DOG with WOLF from


Purnea GSS to Jalalgarh

25

Beri

Katihar

Conversion of S/C DOG to D/C WOLF


from Katihar GSS to Beri

Barsoi

Katihar

S/C DOG line from Katihar to Barsoi

50

Pranpur

Katihar

S/C DOG line from Katihar to Pranpur

30

Karmnasa

Karmnasa

Conversion of S/C DOG to D/C WOLF


line from Karmnasa GSS to

0.9

Durgawati S/S tapping point


Replacement of DOG with WOLF from
Durgawati tapping to Chand
Kalyanpur

Developing the PSMP for Bihar

18

Karmnasa

Conversion of S/C WOLF to D/C


30
WOLF from Karmnasa GSS to
5-53
020328-40RP-0400-00

Final Report

Circle

Feeder

Source EHV
S/S

Work proposed

Length
(km)

Ramgarh

15.
Muzaffarpur

Ramgarh (2)

Karmnasa

S/C WOLF line from Karmnasa GSS to


Ramgarh (2)

30

Mohania (2)

Mohania

S/C WOLF line from Mohania GSS to


Mohania (2)

Replacement of DOG with WOLF from


Mohania GSS to Bhabhua Old

15

Dinara

Dinara

S/C WOLF line from Dinara (New) GSS


to Dinara

Bikramganj

Bikramganj

Conversion of S/C DOG to D/C WOLF


from Bikramganj GSS to Bikramganj

Bikramganj (2)

Bikramganj

Conversion of S/C DOG to D/C WOLF


from Bikramganj GSS to Bikramganj
(2)

Kudra

Kudra

D/C WOLF line from Kudra (New) GSS


to Kudra

Karamchat

Kudra

Replacement of DOG with WOLF from


Kudra to Karamchat

20

S/C DOG line from Cenari to Adhaura

38

Sasaram (2)

Sasaram

D/C WOLF line from Sasaram GSS to


Sasaram (2) S/S

Sasaram (3)

Sasaram

S/C WOLF line from Sasaram GSS to


Sasaram (3) S/S

10

BMP Dehri (2)

Dehri-OnSone

D/C WOLF line from Dehri-on-Sone


GSS to BMP Dehri (2)

Samhauta

Banjari

Replacement of DOG with WOLF from


Banjari GSS to Samhauta

0.1

Samhauta (2)

Banjari

S/C WOLF line from Banjari GSS to


Samhauta (2)

Kirpabal (2)

Barun

S/C DOG line from Barun to Kirpabal


(2)

30

Conversion of S/C DOG to D/C WOLF


from Barun GSS to Kirpabal

30
15

Indrapuri

Barun

S/C WOLF line from Barun Sone


Nagar GSS to Indra Puri to

Indrapuri (2)

Barun

Indrapuri (2)

Shivhar

Shivhar

S/C DOG line from Shivhar (New) GSS


to Shivhar S/S

Runi Saidpur

Runi Saidpur

S/C WOLF line from Runi Saidpur


(New) GSS to Runi Saidpur S/S

Pupri

Sitamarhi

Replacement of DOG with WOLF from

28

Developing the PSMP for Bihar

5-54

020328-40RP-0400-00

Final Report

Circle

Feeder

Source EHV
S/S

Work proposed

Length
(km)

Sitamarhi GSS to Pupri


Dumra (2)

Sitamarhi

S/C WOLF line from Sitamarhi GSS to


Dumra (2)

Dumra

Sitamarhi

Replacement of DOG with WOLF from


Sitamarhi GSS to Dumra

Sursand

Sonbarsa

D/C WOLF line from Sonbarsa (New)


GSS to Sursand

20

Sonbarsa

Sonbarsa

S/C DOG line from Sonbarsa (New)


GSS to Sonbarsa S/S

Patepur

Vaishali

Replacement of DOG with WOLF from


Vaishali GSS to Mehua

30

Lalganj

Vaishali

Replacement of RABBIT and DOG with


WOLF from Vaishali GSS to Lalganj

10

Sarai

Vaishali

Replacement of DOG with WOLF from


Vaishali GSS to Sarai

20

Bidupur

Hajipur

Replacement of DOG with WOLF from


Hajipur GSS to Bidupur

10

Hajipur I E

Hajipur

Replacement of DOG with WOLF from


Hajipur GSS to Hajipur I E

10

Konharaghat (2)

Hajipur

S/C WOLF line from Hajipur GSS to


Konharaghat (2)

10

SKMCH (2)

Mohanpur

S/C WOLF line from SKMCH (New)


GSS to SKMCH (2) S/S

MIT

SKMCH

S/C WOLF line from SKMCH (New)


GSS to MIT

10

Sikandarpur (2)

SKMCH

S/C WOLF line from SKMCH (New)


GSS to Sikandarpur (2)

10

SKMCH

SKMCH

D/C WOLF line from SKMCH (New)


GSS to SKMCH S/S

Kurhani

SKMCH

S/C DOG line from SKMCH (New)


GSS to Kurhani

15

Motipur

SKMCH

Replacement of DOG with WOLF from


Bhikanpura GSS to Motipur

35

Motipur (2)

Muzaffarpur

S/C WOLF line from Bhikanpura GSS


to Motipur (2)

20

Dholi

Muzaffarpur

Replacement of DOG with WOLF from


Bhikanpura GSS to Dholi

28

IDPL (2)

Muzaffarpur

S/C WOLF line from Bhikanpura GSS


to IDPL (2)

IDPL

Muzaffarpur

Conversion of S/C WOLF to D/C


WOLF from Bhikanpura to IDPL

3.5

Khabra

Muzaffarpur

Replacement of DOG with WOLF from

1.5

Developing the PSMP for Bihar

5-55

020328-40RP-0400-00

Final Report

Circle

Feeder

Source EHV
S/S

Work proposed

Length
(km)

Bhikanpura GSS to Khabra

16.
Darbhanga

Bhikanpura

Muzaffarpur

Replacement of DOG with WOLF from


Bhikanpura GSS to Bhikanpura S/S

0.1

Bhagwanpur
Chowk

Muzaffarpur

S/C WOLF line from Bhikanpura GSS


to Bhagwanpur Chowk

2.5

Nayatola (2)

Muzaffarpur

S/C WOLF line from Bhikanpura GSS


to Nayatola (2)

10

Hajipur I E (2)

Muzaffarpur

S/C WOLF line from Hajipur GSS to


Hajipur I E (2)

10

Jay Nagar

Jay Nagar

Replacement of DOG with WOLF from


Jay Nagar GSS to Jay Nagar

0.5

Benipatti

Rahika

Replacement of DOG with WOLF from


Rahika GSS to Benipatti

32

Rahika

Rahika

Conversion of S/C DOG to D/C WOLF


from Rahika GSS to Rahika S/S

0.1

Replacement of DOG with WOLF from


Rahika S/S to Madhubani

Bela

Gangwara

D/C WOLF line from Gangwara (New)


GSS to Gangwara for Bela

Gangwara

Gangwara

S/C WOLF line from Gangwara (New)


GSS to Gangwara S/S

Donar

Gangwara

S/C WOLF line from Gangwara (New)


GSS to Gangwara for Donar

Panda Sarai

Ram Nagar
D/C WOLF line from Gangwara (New)
GSS to DMCH

Anar

Kusheshwar

S/C WOLF line from Kusheshwar


(New) GSS to Baheri

30

Biraul

Kusheshwar

S/C WOLF line from Kusheshwar


(New) GSS to Biraul

20

Raj Nagar

Pandaul

Conversion of S/C DOG to D/C WOLF


from Pandaul GSS to Raj Nagar

33

Pandaul

Pandaul

Replacement of DOG with WOLF from


Pandaul GSS to Pandaul

0.1

Jhanjharpur

Pandaul

Replacement of DOG with WOLF fro


Pandaul GSS to Jhanjharpur

39

Rudrapur

Phulparas

S/C WOLF line from Phulparas GSS to


Rudrapur

30

Phulparas

Phulparas

Conversion of S/C DOG to D/C WOLF


from Phulparas GSS to Phulparas S/S

Developing the PSMP for Bihar

5-56

020328-40RP-0400-00

Final Report

Table 5-13

33/11 kV Transformers and Erection of New 33/11 kV S/Ss - (2011-2014)

Circle

Sub Station

Work

Deedarganj

New S/S with 2x5 MVA Xmer capacity

S.K.Memorial

Augmentation of 2x5 with 2x10 MVA Xmers

Kankar Bag (2)

New S/S with 3x10 MVA Xmer Capacity

Saidpur

Augmentation of 4x5 with 4x10 MVA Xmers

Bahadurpur

Augmentation of 4x5 with 4x10 MVA Xmers

R.Nagar

Augmentation of 2x5 with 2x10 MVA Xmers

Machhuatoli

Addition of 1x10 MVA Xmer

Ashok Nagar

Augmentation of 3x5 with 3x10 MVA Xmers


and addition of 1x10 MVA Xmer

R.K.Nagar

Addition of 2x10 MVA Xmers

Karbigahiya

Augmentation of 1x3.15 and 1x5 with


2x10 MVA Xmers

1. PESU (East)
Gaighat

Augmentation of 1x5 with 1x10 MVA Xmer


and addition of 1x10 MVA Xmer

NMCH

Augmentation of 1x5 with 1x10 MVA Xmer


and addition of 1x10 MVA Xmer

Meena Bazar

Augmentation of 2x5 with 2x10 MVA Xmers

Katra (2)

New S/S with 2x10 MVA Xmer capacity

Pahari

Augmentation of 1x3.15 and 2x5 with


3x10 MVA Xmers

2. PESU (West)

Malsalami

Augmentation of 2x5 with 2x10 MVA Xmers

Mangal Talab

Augmentation of 4x5 with 4x10 MVA Xmers

Meena Bazar (2)

New S/S with 3x10 MVA Xmer Capacity

PMCH

Augmentation of 1x5 with 1x10 MVA Xmer

A.N.College

Augmentation of 1x5 with 1x10 MVA Xmer

S.K.Puri

Augmentation of 2x5 with 2x10 MVA Xmer

Garikhana

Augmentation of 3x5 with 3x10 MVA Xmers

Pataliputra

Augmentation of 3x5 with 3x10 MVA Xmers

Rajapur

Augmentation of 2x5 with 2x10 MVA Xmers

Walmi

Augmentation of 1x5 with 1x10 MVA Xmer

Danapur

Augmentation of 1x5 with 1x10 MVA Xmer

Digha

Augmentation of 1x5 with 1x10 MVA Xmer

Digha C/S

Augmentation of 1x5 with 1x10 MVA Xmer

RBI

Augmentation of 1x5 with 1x10 MVA Xmer

Danapur (2)

New S/S with 3x10 MVA Xmers capacity

Developing the PSMP for Bihar

5-57

020328-40RP-0400-00

Final Report
Circle

3. Patna

Sub Station

Work

IGIMS

Augmentation of 2x5 with 2x10 MVA Xmers

Excise

Augmentation of 1x5 with 1x10 MVA Xmer

Vaterinery College

Augmentation of 1x5 with 1x10 MVA Xmer

Board`s Colony

Augmentation of 2x5 with 2x10 MVA Xmers

Jakkanpur

Augmentation of 2x5 with 2x10 MVA Xmers

Maurya Lok

Augmentation of 3x5 with 3x10 MVA Xmers

Bandar Bagicha

Augmentation of 2x5 with 2x10 MVA Xmers

Sinchai Bhawan

Augmentation of 1x5 with 1x10 MVA Xmer

Anishabad

Augmentation of 2x5 with 2x10 MVA Xmers

Gardanibag

Augmentation of 2x5 with 2x10 MVA Xmers

Vidyut Bhawan

Augmentation of 2x5 with 2x10 MVA Xmers

High Court

Augmentation of 2x5 with 2x10 MVA Xmers

Sahitya Sammelan

Augmentation of 2x5 with 2x10 MVA Xmers

Bandar Bagicha (2)

New S/S with 2x10 MVA Xmers capacity

Beur

Augmentation of 2x5 with 2x10 MVA Xmers

Khagaul

Augmentation of 2x5 with 2x10 MVA Xmers

Phulwari

Augmentation of 1x5 with 1x10 MVA Xmer

Vikas Bhawan

Augmentation of 1x5 with 1x10 MVA Xmer

Bhusaula

Augmentation of 1x3.15 with 1x10 MVA


Xmer

A.F.Bihta

Augmentation of 1x1.6 with 1x5 MVA xmer

Pareo

Addition of 2x5 MVA Xmers

Bihta

Augmentation of 3x3.15 with 2x5 and 1x10


MVA Xmers

Kanpa

Augmentation of 1x1.6 with 1x5 MVA xmer

Lalbhasara

Augmentation of 1x3 with 1x5 MVA and


addition of 1x5 MVA Xmers

Paliganj

Augmentation of 1x3 with 1x5 MVA and


addition of 1x5 MVA Xmers

Maner

Addition of 1x10 MVA Xmer

Neora

Augmentation of 2x3.15 with 2x5 MVA and


addition of 1x5 MVA Xmers

Naubatpur

Addition of 2x5 MVA Xmers

Fatuah (2)

New S/S with 2x10 MVA Xmer capacity

Khusrupur

Augmentation of 1x3.15 with 1x5 MVA


and addition of 1x5 MVA Xmers

Developing the PSMP for Bihar

5-58

020328-40RP-0400-00

Final Report
Circle

Sub Station
Daniyaman

Work
Augmentattion of 1x1.6 and 1x3.15 MVA
with 2x5 MVA Xmers

Fatuah

Augmentation of 1x3.15 with 1x5 MVA Xmer

Karnawad Punpun

Augmentation of 1x3 and 1x1.6 MVA Xmers


with 2x5 MVA Xmers (Patna Circle)

Masaurhi Old

Augmentation of 2x3 with 1x5 and 1x10 MVA


Xmers

4. Nalanda

Dhanaura

Addition of 1x5 MVA Xmer

Masaurhi New

Augmentation of 1x3 with 1x10 MVA Xmer

Barh (2)

New S/S with 2x5 MVA Xmer capacity

Biharibigha

Augmentation of 2x3.15 with 2x5 MVA Xmers

Mokama

Addition of 1x10 MVA Xmer

Hathidah (2)

New S/S with 2x5 MVA Xmer capacity

Islampur

Addition of 1x5 MVA Xmer

Khudaganj

Addition of 1x5 MVA Xmer

Ekangersarai

Addition of 2x5 MVA Xmers

Chiksurabazar

New S/S with 2x5 MVA Xmers

Dhamauli

Addition of 1x5 MVA Xmer

Kalyanbigha

New S/S with 2x5 MVA Xmers

Chainpur

New S/S with 2x5 MVA Xmers

Thertheri

Addition of 1x5 MVA Xmer

Cheral (Railways)

New S/S with 2x5 MVA Xmers

Bhindidih

New S/S with 2x5 MVA Xmers

Andawas

New S/S with 2x5 MVA Xmers

Ghosarwan

New S/S with 2x5 MVA Xmers

Tetrawan

New S/S with 2x5 MVA Xmers

Sarbahadi

New S/S with 2x5 MVA Xmers

Badi

New S/S with 2x5 MVA Xmers

Katrisarai

New S/S with 2x5 MVA Xmers

Parwalpur

Augmenttation of 1x3.15 with 1x5 MVA Xmer


and addition of 1x5 MVA Xmer

Ramchandrapur (2)

New S/S with 2x10 MVA Xmers capacity

Ramchandrapur

Augmentation of 4x5 + 2x3 MVA Xmers with


3x10 MVA Xmers

Bari Parhari

Augmentation of 1x3 + 1x3.15 + 4x5 MVA


with 4x10 MVA Xmers

Developing the PSMP for Bihar

5-59

020328-40RP-0400-00

Final Report
Circle

Sub Station

Work

Malti

New S/S with 2x5 MVA Xmers

Sohasarai

Augmentation of 4x5 + 1x3.15 with


3x10 MVA Xmers

5. Chapra

6. Motihari

Fulwaria

Addition of 2x5 MVA Xmers

Hathua

Addition of 1x5 MVA Xmer

Gopalganj

Addition of 2x5 MVA Xmers

Jhajhwa

Addition of 1x5 MVA Xmer

Kuchaikot

Addition of 1x5 MVA Xmer

Srinagar

Addition of 1x5 MVA Xmer

Mairwa

Addition of 1x5 MVA Xmer

Maharajganj

Addition of 1x5 MVA Xmer

Ekma

Addition of 1x5 MVA Xmer

Siwan (2)

New S/S with 3x5 MVA Xmers

Mashrakh

Addition of 1x5 MVA Xmer

Baniapur

Addition of 1x5 MVA Xmer

Taraiya

Addition of 1x5 MVA Xmer

Marworah

Addition of 1x5 MVA Xmer

Prabhunath Nagar

Addition of 1x10 MVA Xmer

Manjhi

Addition of 1x5 MVA Xmer

Telpa

Augmentation of 3x5 with 3x10 MVA Xmers

Sheetalpur

Addition of 2x5 MVA Xmers

Valmiki Nagar

Addition of 1x5 MVA Xmer

Dhanha

New S/S with 2x5 MVA Xmer capacity

Ramnagar

Addition of 2x5 MVA Xmers


Augmentation of 1x3.15 with 1x5 MVA

Chautarwa

New S/S with 2x5 MVA Xmer capacity

Lauria

Addition of 1x3.15 MVA Xmer

Narkatiaganj

Addition of 2x5 MVA Xmers

Raxaul

Augmentation of 1x3.15 MVA with 1x5 MVA


and addition of 1x5 MVA Xmer

Adopur

Addition of 1x5 MVA Xmer

Dhaka

Addition of 2x5 MVA Xmers

Bettiah
Bettiah (2)

New S/S with 2x10 MVA Xmers capacity

Madhopur

Addition of 1x5 MVA Xmer

Harsidhi

Addition of 1x5 MVA Xmer

Developing the PSMP for Bihar

5-60

020328-40RP-0400-00

Final Report
Circle

Sub Station
Areraj

Work
Augmentation of 1x1.6 with 1x5 MVA Xmer
and addition of 1x5 MVA Xmer

Motihari (2)

New S/S with 2x5 MVA Xmer capacity

Motihari

Augmentation of 1x5 with 1x10 MVA Xmer

Chakia

Addition of 1x5 MVA Xmer

Madhuban

Addition of 1x5 MVA Xmer

Chhitwani

New S/S with 2x5 MVA Xmer capacity

Chausa

Augmentation of 1x1.6 wirh 1x5 MVA Xmer

Itarhi

Addition of 1x5 MVA Xmer

Purushottampur

Addition of 1x5 MVA Xmer

Buxar

Augmentation of 2x5 with 2x10 MVA Xmers

Industrial

7. Bhojpur

Augmentation of 1x3.15 with 1x10 MVA


Xmer

Pandey Patti

New S/S with 2x5 MVA Xmer capacity

Dumraon (2)

New S/S with 3x5 MVA Xmer capacity

Nawanagar

Addition of 1x5 MVA Xmer

Murar

Addition of 1x5 MVA Xmer

Akarsai

Addition of 1x5 MVA Xmer

Krishnapuram

Addition of 1x5 MVA Xmer

Bramhapur

Addition of 1x5 MVA Xmer

Giddha (Ara Circle)

New S/S with 2x5 MVA Xmer capacity

Chhotka Dhakai

New S/S with 2x5 MVA Xmer capacity

Garhani

Addition of 1x5 MVA Xmer

Piro

Addition of 1x5 MVA Xmer

Agiaon

Augmentation of 1x3.15 with 1x5 MVA Xmer

Japani Farm

Augmentation of 3x5 with 3x10 MVA Xmers


and addition of 1x10 MVA Xmer

8. Gaya

Powerganj

Augmentation of 3x5 with 2x10 MVA Xmers

Power House

New S/S with 1x10 MVA capacity

Barhara

New S/S with 2x5 MVA Xmer capacity

Zero Mile

New S/S with 2x5 MVA Xmer capacity

Kako

Addition of 1x5 MVA Xmer

Charui

Addition of 1x5 MVA Xmer

Tehta

Augmentation of 1x1.6 with 1x5 MVA Xmer

Makpa

Addition of 1x 3.15 MVA Xmer

Makhdampur

Addition of 1x5 MVA Xmer

Developing the PSMP for Bihar

5-61

020328-40RP-0400-00

Final Report
Circle

Sub Station

Work

Ghosi

Addition of 1x5 MVA Xmer

Jehanabad

Augmentation of 3x5 with 3x10 MVA Xmers

Irki

Addition of 2x5 MVA Xmers

Nowaman

New S/S with 2x5 MVA Xmer capacity

Rafiganj

Addition of 2x5 MVA Xmers

Uchauli

Addition of 1x5 MVA Xmer

Madanpur

Addition of 1x5 MVA Xmer

Guraru

Addition of 1x5 MVA Xmer

Paraiya

Addition of 1x5 MVA Xmer

Tekari

Addition of 1x5 MVA Xmer

Koach

Addition of 1x5 MVA Xmer

Belaganj

Addition of 2x5 MVA Xmers

Panari

Addition of 2x5 MVA Xmers

Chakand

Addition of 2x5 MVA Xmers

Dhongra

New S/S with 2x5 MVA Xmer capacity

Sonwa

New S/S with 2x5 MVA Xmer capacity

Nawagarh

New S/S with 2x5 MVA Xmer capacity

Barun

Addition of 1x5 MVA Xmer

Tengra

Addition of 2x5 MVA Xmers

Nabinagar

Addition of 1x5 MVA Xmer

Amba

Addition of 1x5 MVA Xmer

Barun (2)

New S/S with 2x5 MVA Xmer capacity

Dihara

New S/S with 2x5 MVA Xmer capacity

Chandauti

Augmentation of 2x5 with 2x10 MVA Xmers


and addition of 1x10 MVA Xmer

Central Stores

Augmentation of 1x3.15 with 1x5 MVA Xmer


and addition of 1x10 MVA Xmer

A.P.Coloy

Addition of 1x5 MVA Xmer

Railway Maidan

Augmentation of 2x5 with 2x10 MVA Xmers

Gandhi Maidan

Augmentation of 1x5 with 1x10 MVA Xmer


and addition of 1x10 MVA Xmer

Panchaiti Akhara

Augmentation of 3x5 with 3x10 MVA Xmers

Dandibag

Augmentation of 2x5 with 2x10 MVA Xmers


and addition of 1x10 MVA Xmer

Manpur

Addition of 1x5 MVA Xmer

Tankuppa

Augmentation of 3.15 with 1x5 MVA Xmer

Developing the PSMP for Bihar

5-62

020328-40RP-0400-00

Final Report
Circle

Sub Station
Bhore
M.U.Campus

Work
Replacement of defective Xmer with 1x5
MVA
Augmentation of 1x3.15 + 1x5 MVA with
2x10 MVA Xmers

Buddhist Complex

Addition of 1x10 MVA Xmer

Hasua

Augmentation of 1x3 with 1x5 MVA Xmer

Nadirganj

Augmentation of 1x3 with 1x5 MVA Xmer

Nawada

Augmentation of 3x5 with 3x10 MVA Xmers

Nawada New

Addition of 1x5 MVA Xmer

Bhadhokhara

Addition of 1x5 MVA Xmer

Akbarpur

Addition of 1x5 MVA Xmer

Rajauli

Addition of 1x5 MVA Xmer

Sirdala

Addition of 1x5 MVA Xmer

Roh

Addition of 1x3.15 MVA Xmer

Warsaliganj

Addition of 1x5 MVA Xmer

Pakribarwan

Addition of 1x5 MVA Xmer

Kaukol

Addition of 1x3.15 MVA Xmer

Barem

Addition of 2x5 MVA Xmers

Supaul

Augmentation of 1x5 with 1x10 MVA Xmer


and addition of 1x10 MVA Xmer

9. Saharsa

10.Bhagalpur

Parasrama

New S/S with 2x5 MVA Xmer capacity

Larganj

New S/S with 2x5 MVA Xmer capacity

Sahrsa (2)

New S/S with 3x10 MVA Xmer capacity

Sour Bazar

New S/S with 2x5 MVA Xmer capacity

Balwahat

New S/S with 2x5 MVA Xmer capacity

Salakhua

New S/S with 2x5 MVA Xmer capacity

New Market

Addition of 1x10 MVA Xmer

Madhepura

Addition of 1x5 MVA Xmer

Kumarkhand

New S/S with 2x5 MVA Xmer capacity

Ghailar

New S/S with 2x5 MVA Xmer capacity

Khagaria

Addition of 2x10 MVA Xmers

Mansi

Addition of 1x5 MVA Xmer

Maheshkunt

Addition of 2x5 MVA Xmers

Bihariganj

New S/S with 2x5 MVA Xmer capacity

Puraini

New S/S with 2x5 MVA Xmer capacity

Bihpur

Augmentation of 2x3.15 with 2x5 MVA Xmer

Developing the PSMP for Bihar

5-63

020328-40RP-0400-00

Final Report
Circle

Sub Station
Sanhauli
Sultanganj

Work
New S/S with 2x5 MVA Xmer capacity
Augmentation of 1x3.15 with 1x10 MVA
Xmer
and addition of 1x5 MVA Xmer

Barari

Addition of 1x10 MVA Xmer

Central Jail

Addition of 1x10 MVA Xmer

Mayaganj

Addition of 1x10 MVA Xmer

C S Compound

Addition of 1x10 MVA Xmer

T T School

Addition of 1x10 MVA Xmer

Sabour

Addition of 1x10 MVA Xmer

Aliganj

Addition of 1x10 MVA Xmer

Mojahidpur

Addition of 1x5 MVA Xmer

Aliganj

Addition of 1x10 MVA Xmer

Jagdishpur

Addition of 1x5 MVA Xmer

Nath Nagar
Banka (2)

New S/S with 2x5 MVA Xmer capacity

Banka

Addition of 1x5 MVA Xmer

Rajouna

Addition of 1x5 MVA Xmer

Bousi

Addition of 2x5 MVA Xmers

Sanhoula

Addition of 1x5 MVA Xmer

Ghogha

New S/S with 2x5 MVA Xmer capacity

Kahalgaon
11. Munger

Augmentation of 1x3.15 with 1x10 MVA


Xmer

Augmentation of 1x3.15 with 1x10 MVA


Xmer

Tarapur

Addition of 2x5 MVA Xmers

Kharagpur

Addition of 1x5 MVA Xmer

Dakranala

Addition of 1x5 MVA Xmer

Ramchandrapur

Addition of 1x5 MVA Xmer

Safiabad

Addition of 1x5 MVA Xmer

Baniyarpur

Addition of 1x5 MVA Xmer

Karnchaura

Augmentation of 1x5 with 1x10 MVA Xmer


and addition of 1x10 MVA Xmer

Nandlalpur

Addition of 1x5 MVA Xmer

Bindwara

Addition of 2x5 MVA Xmers

Purani Bazar

Augmentattion of 3.15 with 1x10 MVA Xmer


and addition of 1x10 MVA Xmer

Court Area

Developing the PSMP for Bihar

Addition of 1x10 MVA Xmer

5-64

020328-40RP-0400-00

Final Report
Circle

Sub Station

Work

Kajra

New S/S with 2x5 MVA Xmer capacity

Piri Bazar

New S/S with 2x5 MVA Xmer capacity

Manpur

New S/S with 2x5 MVA Xmer capacity

Jamui

Augmentation of 1x3.15 + 1x5 MVA with


2x10 MVA Xmers

Khaira

Addition of 1x5 MVA Xmer

Sikandara

Addition of 1x5 MVA Xmer

Gidhour

Addition of 1x5 MVA Xmer

Jhajha

Addition of 1x5 MVA Xmer

Sono

Augmentation of 1x1.5 with 1x5 MVA Xmer

Ghuskuri

New S/S with 2x5 MVA Xmer capacity

Lohain

New S/S with 2x5 MVA Xmer capacity

Toygarh

New S/S with 2x5 MVA Xmer capacity

Hathiyama

Addition of 1x3.15 MVA Xmer

Sheikhpura

Augmentattion of 1x1.6 + 1x3.15 MVA Xmers


with 2x10 MVA Xmers

12.Samastipur

Pusa

Addition of 1x5 MVA Xmer

Mohanpur

Augmentation of 3x5 + 1x3.15 MVA with


2x10 MVA Xmers

Warisnagar

Addition of 1x5 MVA Xmer

Kalyanpur

Addition of 1x5 MVA Xmer

Sarairanjan

Addition of 1x5 MVA Xmer

Jitwarpur

Augmentation of 2x5 + 1x3.15 MVA with


2x10 MVA Xmers

Magardahi

New S/S with 2x10 MVA Xmer capacity

Kuboliram

New S/S with 2x5 MVA Xmer capacity

Karpoorigram

New S/S with 2x5 MVA Xmer capacity

Dalsingsarai

Addition of 1x5 MVA Xmer

Mehuddinnagar

Addition of 1x5 MVA Xmer

Pateri

Addition of 1x5 MVA Xmer

Bachchwara

Addition of 1x5 MVA Xmer

Bibhutipur

Addition of 1x5 MVA Xmer

Rosera

Addition of 1x5 MVA Xmer

Hassanpur

Addition of 1x5 MVA Xmer

Bangrahdih (2)

New S/S with 2x10 MVA Xmer capacity

Deona (2)

New S/S with 2x10 MVA Xmer capacity

Developing the PSMP for Bihar

5-65

020328-40RP-0400-00

Final Report
Circle

13. Purnea

14. Sasaram

Sub Station

Work

Kankaul

New S/S with 2x10 MVA Xmer capacity

Begusarai

Augmentation of 5x5 with 3x10 MVA Xmers

Manjhaul

Addition of 2x5 MVA Xmers

Balia

Addition of 1x5 MVA Xmer

Narpatganj

Addition of 1x5 MVA Xmer

Bahargaon

New S/S with 2x5 MVA Xmer capacity

Kusgaon

New S/S with 2x5 MVA Xmer capacity

Malgaon

New S/S with 2x5 MVA Xmer capacity

Sarai

Addition of 1x5 MVA Xmer

Paschimpali

Addition of 1x10 MVA Xmer

Purabpali

Addition of 1x10 MVA Xmer

Group control

Augmentation of 3x5 with 3x10 MVA Xmers

Madhubani

Addition of 1x5 MVA Xmer

Zero Mile

Addition of 1x5 MVA Xmer

City

Addition of 1x5 MVA Xmer

Vaisi

New S/S with 2x5 MVA Xmer capacity

Naranga

Addition of 1x5 MVA Xmer

MLR Ganj

Addition of 1x3.15 MVA Xmer

Jalalgarh

Addition of 2x5 MVA Xmers

Beri

Addition of 1x5 MVA Xmer

Gore Beri

Addition of 1x3.15 MVA Xmer

Falka

Addition of 1x3.15 MVA Xmer

Industrial Estate

Addition of 1x5 MVA Xmer

Binodpur

Addition of 1x5 MVA Xmer

Karmnasa

Addition of 1x5 MVA Xmer

Durgawati

Addition of 1x5 MVA Xmer

Chand

Addition of 1x5 MVA Xmer

Larma

Addition of 1x5 MVA Xmer

Kalyanpur

Addition of 3x5 MVA Xmers

Chourasia

Addition of 1x5 MVA Xmer

Nuaon

Addition of 1x5 MVA Xmer

Kakrait

Addition of 1x5 MVA Xmer

Parsathua

Addition of 1x5 MVA Xmer

Chainpur

Addition of 1x5 MVA Xmer

Mohania (2)

New S/S with 2x10 MVA capacity

Bhabhua Old

Augmentation of 1x3.15 with 1x10 MVA

Developing the PSMP for Bihar

5-66

020328-40RP-0400-00

Final Report
Circle

Sub Station

Work
Xmer

Bahuara

Addition of 1x5 MVA Xmer

Dinara

Addition of 1x5 MVA Xmer

Kochas

Addition of 1x5 MVA Xmer

Sanjhouli

Addition of 1x5 MVA Xmer

Surajpura

Addition of 1x5 MVA Xmer

Kararkat

Addition of 1x5 MVA Xmer

Bikramganj (2)

New S/S with 2x10 MVA capacity

Pusauli

Augmentation of 1x1.0 with 1x10 MVA Xmer

Kudra

Addition of 1x5 MVA Xmer

Bhabhua New

Addition of 2x10 MVA Xmers

Karamchat

Addition of 1x3.15 MVA Xmer

Cenari

Addition of 1x5 MVA Xmer

Adhaura

Addition of 1x5 MVA Xmer

Takia Sasaram

Addition of 1x10 MVA Xmer

Nokha

Addition of 1x5 MVA Xmer

Sasaram (2)

New S/S with 2x10 MVA capacity

Sasaram (3)

New S/S with 2x10 MVA capacity

Naigaon

Addition of 2x5 MVA Xmers

Sheosagar

Addition of 2x5 MVA Xmers

BMP Dehri (2)

New S/S with 3x10 MVA Xmers

Basa Karwandia

Addition of 1x5 MVA Xmer

Akorigola

Addition of 2x5 MVA Xmers

Nasariganj

Addition of 2x5 MVA Xmers

Rajpur

Addition of 1x5 MVA Xmer

Nauhatta

Addition of 2x5 MVA Xmers

Samhauta

Addition of 1x5 MVA Xmer

Samhauta (2)

15. Muzaffarpur

New S/S with 1x10 + 1x5 MVA Xmer


capacity

Kirpabal (2)

New S/S with 2x5 MVA Xmer capacity

Indrapuri (2)

New S/S with 2x10 MVA capacity

Shivhar

Addition of 2x5 MVA Xmers

Runi Saidpur

Addition of 2x5 MVA Xmers

Pupri

Addition of 1x5 MVA Xmer

Dumra (2)

New S/S with 2x10 MVA Xmer capacity

Sursand

Addition of 2x5 MVA Xmers

Developing the PSMP for Bihar

5-67

020328-40RP-0400-00

Final Report
Circle

16. Darbhanga

Sub Station

Work

Sonbarsa

Addition of 2x5 MVA Xmers

Lalganj

Addition of 2x5 MVA Xmers

Sarai

Addition of 2x5 MVA Xmers

Bidupur

Addition of 1x10 MVA Xmer

EDIP

Addition of 1x5 MVA Xmer

Konharaghat

Augmentation of 3x5 with 2x10 MVA Xmers

Konharaghat(2)

New S/S with 2x10 MVA Xmer capacity

SKMCH (2)

New S/S with 2x10 MVA Xmer capacity

MIT

Augmentation of 2x5 with 2x10 MVA Xmers

Sikandarpur (2)

New S/S with 2x10 MVA Xmer capacity

Kurhani

Addition of 1x5 MVA Xmer

Motipur (2)

New S/S with 2x10 MVA Xmer capacity

Maripur

Addition of 1x10 MVA Xmer

Vaishali

Addition of 1x5 MVA Xmer

Dholi

Addition of 1x5 MVA Xmer

IDPL (2)

New S/S with 2x10 MVA Xmer capacity

IDPL

Augmentation of 3x5 with 2x10 MVA Xmers

Khabra

Augmentation of 2x5 with 2x10 MVA Xmers

Bhagwanpur chowk

New S/S with 2x5 MVA Xmer capacity

Nayatola (2)

New S/S with 2x10 MVA Xmer capacity

Hajipur I E (2)

New S/S with 2x10 MVA Xmer capacity

Jay Nagar

Addition of 1x5 MVA Xmer

Khajauli

Addition of 1x5 MVA Xmer

Ladania

Addition of 1x5 MVA Xmer

Benipatti

Addition of 1x5 MVA Xmer

Rahika

Addition of 1x10 MVA Xmer

Madhubani

Augmentation of 2x5 with 2x10 MVA Xmers

Bela

Addition of 1x5 MVA Xmer

Gangwara

Augmentation of 1x1.6 with 1x10 MVA Xmer

Donar

Addition of 1x5 MVA Xmer

Panda Sarai

Addition of 1x5 MVA Xmer

DMCH

Addition of 1x5 MVA Xmer

Urban

Addition of 1x5 MVA Xmer

Pouriya

Addition of 1x3.15 MVA Xmer

Baheri

Addition of 1x5 MVA Xmer

Anar

Addition of 1x5 MVA Xmer

Developing the PSMP for Bihar

5-68

020328-40RP-0400-00

Final Report
Circle

Sub Station
Kusheshwar

New S/S with 2x5 MVA Xmer capacity

Biraul

Addition of 1x5 MVA Xmer

Benipur

Addition of 1x5 MVA Xmer

Raj Nagar

Addition of 1x5 MVA Xmer

Babu Barhi

Addition of 1x5 MVA Xmer


Augmentation of 1x3.15 with 1x10 MVA
Xmer

Pandaul

5.6

Work

Manigachi

Addition of 1x5 MVA Xmer

Jhanjharpur

Addition of 1x5 MVA Xmer

Madhepur

Addition of 1x3.15 MVA Xmer

Rudrapur

New S/S with 2x5 MVA Xmer capacity

Phulparas

Addition of 1x5 MVA Xmer

Nirmali

Addition of 1x5 MVA Xmer

Talpatganj

Addition of 1x5 MVA Xmer

Distribution Network Scenario For 2014:

This section presents the Distribution system for the 33 kV network after incorporation of all
the planned items (2014 scenario). This network has also shown as block diagram for
complete BSEB and is attached as Appendix 8. The block diagrams for each circle have also
been drawn and are attached to the Appendix 8.
The following table gives the details of 33 kV lines and sub stations, cirlce wise, as on 2014
after implementaiton of the Distribution plan.
Table 5-14

Circle

1.PESU
(East)

33 kV Lines and 33/11 kV Sub Stations in B S E B - 2014

Feeder name

EHV S/S
from where
feeder
emanating

33/11 kV S/Ss on
feeder

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

5x5

25

1. Katra

Fatuah

1. Katra

2. Dina Iron

Fatuah

1. HTC

1.6

2. HTC

17.14

3. Karmali Chak

Fatuah

1. Karmali Chak

2x10

20

2. Deedarganj

2x5

10

4. S.K. Memorial

Jakkanpur

1. S.K.Memorial

3x10

30

5. Kankar Bag (2)

Mithapur (2)

1. Kankar Bag (2)

3x10

30

6. Saidpur

Mithapur (2)

1. Saidpur

4x10

40

7. Bahadurpur

Mithapur (2)

1. Bahadurpur

4x10

40

Developing the PSMP for Bihar

5-69

020328-40RP-0400-00

Final Report

Circle

Feeder name

8. R. Nagar

EHV S/S
from where
feeder
emanating
Mithapur (2)

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

1. R.Nagar

2x10+1x5

25

2. Machhuatoli

1x10+2x5

20

33/11 kV S/Ss on
feeder

9. Kankar Bag

Mithapur

1. Kankar Bag

5x5

25

10.Ashok Nagar

Mithapur

1. Ashok Nagar

4x10

40

11.R.K.Nagar

Mithapur

1. R.K.Nagar

4x10

40

12.Karbigahiya

Mithapur

1. Karbigahiya

2x10+2x5

30

13.Gaighat

Gaighat

1. Gaighat

2x10+1x5

25

14.NMCH

Gaighat

1. NMCH

3x10

30

15.Meena Bazar

Gaighat

1. Meena Bazar

2x10+2x5

30

16.Katra (2)

Katra

1. Katra (2)

2x10

20

17.Pahari

Katra

1. Pahari

3x10+1x5

35

1x5+2x3.15

11.3

2. Sampatchak
(Patna)
3. HTC (Patna)

1.5

18.Malsalami

Katra

1. Malsalami

2x10

20

19.Mangal Talab

Katra

1. Mangal Talab

4x10

40

20.Meena Bazar
(2)

Jakkanpur
(2)

1. Meena Bazar
(2)

3x10

30

21.PMCH

Mithapur (2)

1. PMCH

1x10+1x5

15
651.5

2.PESU
(West)

1. A.N.College

Khagaul (2)

1. A.N.College

1x10+3x5

25

2. S.K.Puri

Khagaul (2)

1. S.K.Puri

3x10+1x5

35

3. Garikhana I & II

Khagaul

1. Garikhana

3x10

30

2. Pataliputra

3x10+1x5

35

2x10

20

3. Rajapur
4. Walmi

Khagaul

1. Walmi

1x10+1x5

15

5. Bhusaula-Vikas
B.

Khagaul

1. Bhusaula

1x5+1x10

25

2. Vikas Bhawan

1x5+1x10

25

6. Danapur

Digha

1. Danapur

1x10+3x5

25

7. Digha

Digha

1. Digha

1x10+2x5

20

2. Digha Central
Stores

1x10+1x5

15

1x10

10

8. R.B.I.

Developing the PSMP for Bihar

Digha

1. RBI

5-70

020328-40RP-0400-00

Final Report

Circle

Feeder name

EHV S/S
from where
feeder
emanating

33/11 kV S/Ss on
feeder

Transformer wise Capacity


(No.xMVA)

2. HTC (Group)
9. Danapur (2)

Digha

1. Danapur (2)

10. IGIMS

Sipara

11.Veterinary
College

Sipara

Total Sub
Capacity
MVA
6.9

3x10

30

1. IGIMS

2x10+2x5

30

2. Excise

2x10

20

1x10+1x3.15

13.15

2x10+2x5

30

1. Veterinary
College
2. Board`s Colony

12.Jakkanpur

Jakkanpur

1. Jakkanpur

2x10

20

13.Maurya Lok

Jakkanpur

1. Maurya Lok

3x10

30

2. Bandar
Bagicha

2x10+3x5

35

14.Karnawad
Punpun

Jakkanpur

1. Karnawad
Punpun

1x3+2x5

13

15.Sinchai Bhawan

Jakkanpur

1. Sinchai
Bhawan

1x10+1x5

15

16.Anishabad

Jakkanpur

1. Anishabad

2x10

20

2. Gardanibag

2x10

20

1. Vidyut Bhawan

2x10

20

2. High Court

2x10

20

17.Vidyut Bhawan

Jakkanpur

18.Sahitya
Sammelan

Jakkanpur
(2)

1. Sahitya
Sammelan

2x10

20

19.Bandar Bagicha
(2)

Jakkanpur
(2)

1. Bandar
Bagicha (2)

2x10

20

20.Beur

Jakkanpur
(2)

1. Beur

2x10

20

2. Khagaul

2x10

20

3. HTC

7.2

4. HTC

5. Phulwari

1x10

10
701.3

3. Patna

1. A.F. Bihta

Bihta

1. A.F.Bihta

2. Pareo

Bihta

1. Pareo

Developing the PSMP for Bihar

3x5

15

2x5+2x3

16

2. Koilwar (Ara
Circle)

2x5+1x3.15

13.15

3. Giddha (Ara
Circle)

2x5

10

5-71

020328-40RP-0400-00

Final Report

Circle

Feeder name

3. Bihta I & II

EHV S/S
from where
feeder
emanating
Bihta

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

1. Bihta

1x10+3x5

25

2. Kanpa

1x3+1x3.15+1x5

11.15

3. Lalbhasara

2x5+1x3.15

13.15

4. Paliganj

3x5+1x3.15

18.15

33/11 kV S/Ss on
feeder

4. GISCO

Khagaul (2)

HTC

14

5. Balmukund

Khagaul (2)

HTC group

6. Maner

Khagaul (2)

1. Maner

1x10+2x5

20

7. Neora

Khagaul

1. Neora

3x5

15

2. Naubatpur

4x5

20

23.82

8. Fatuah (2)

Fatuah (2)

1. Fatuah (2)

2x10

20

9. Khusrupur

Fatuah (2)

1. Khusrupur

2x5+1x3.15

13.15

2. Daniyaman

2x5

10

4x5

20

10.Fatuah

Fatuah

1. Fatuah

11.Dina Iron

Fatuah

1. HTC

17.14

2. HTC

1.6

12.Masaurhi Old

Masaurhi

1. Masaurhi Old
2. Dhanaura

13.Masarhi New

Masaurhi

1. Masaurhi New

14.NTPC I & II

Barh

HTC

15.Barh

Barh

1. Barh
2. Bakhtiyarpur

1x10+1x5

15

1x5+2x3.15

11.3

2x5+1x10

20
2.67

4x5

20

1x5+3x1.5+2x3.
15

15.8

16.Barh (2)

Barh

1. Barh (2)

2x5

10

17.Biharibigha

Barh

1. Biharibigha

2x5

10

18.Hathidah

Hathidah

1. Hathidah

4x5

20

2. Mokama

1x10+1x5

15

2x5

10

19.Hathidah (2)

Hathidah

1. Hathidah (2)

446.1
4.
Nalanda

1. Hilsa

2. Islampur

3. Ekangersarai

Developing the PSMP for Bihar

Ekangersarai

Ekangersarai

Ekangersarai

1. Hilsa

2x5+1x3

13

2. Hilsa (2)

2x5

10

1. Islampur

1x5+2x3.15

11.3

2. Khudaganj

1x5+2x3.15

11.3

4x5

20

1. Ekangersarai

5-72

020328-40RP-0400-00

Final Report

Circle

Feeder name

EHV S/S
from where
feeder
emanating

33/11 kV S/Ss on
feeder

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

2x5

10

4. Chiksurabazar

Masaurhi

1. Chiksurabazar

5. Dhamauli

Harnaut

1. Dhamauli

1x5+1x3.15

8.15

2. Rahui

1x5+2x3.15

11.3

1. Noorsarai

1x5+3x3.15

14.45

2x5

10

1x5+1x3.15

8.15

4. Chainpur

2x5

10

5. Thertheri

1x5+1x3.15

8.15

1. Harnaut

3x3.15

9.45

2. Cheral
(Railways)

2x5

10

2x3.15

6.3

2. Bhindidih

2x5

10

6. Noorsarai

Harnaut

2. Kalyanbigha
3. Chandi

7. Harnaut

8. Silao

Harnaut

Rajgir

1. Silao

9. Andawas

Rajgir

1. Andawas

2x5

10

10.Rajgir

Rajgir

1. Rajgir

3x5

15

2. Ghosarwan

2x5

10

1. Tetrawan

2x5

10

2. Sarbahadi

2x5

10

2x3.15

6.3

4. Badi

2x5

10

5. Katrisarai

2x5

10

2x5+2x10

30

11.Giriak

Rajgir

3. Giriak

12.Nalanda

Nalanda

1. Nalanda

13.Raiter

Nalanda

1. Bihar Sharif

2. Raiter

3x5

15

14.Parwalpur

Bari Pahari

1. Parwalpur

3x5

15

15.Ramchandrapur
(2)

Bari Pahari

1.
Ramchandrapur
(2)

2x10

20

16.Ramchandrapur

Bari Pahari

1.
Ramchandrapur

3x10

30

17.Bari Pahari

Bari Pahari

1. Bari Parhari

4x10

40

18.Asthawan

Bari Pahari

1. Asthawan

2x3.15

6.3

2. Malti

2x5

10

1. Sohasarai

3x10

30

19.Sohasarai

Developing the PSMP for Bihar

Bari Pahari

5-73

020328-40RP-0400-00

Final Report

Circle

Feeder name

EHV S/S
from where
feeder
emanating

33/11 kV S/Ss on
feeder

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA
460.2

1. Fulwaria

2. Gopalganj

Gopalganj

Gopalganj

1. Fulwaria

2x5+2x3.15

16.3

2. Hathua

1x5+1x3.15

8.15

3. Hussepur

3x5

15

1. Gopalganj

2x10+2x5

30

2. Jhajhwa

1x5+1x1.6

6.6

2x5

10

1. Srinagar

1x5+2x3.15

11.3

2. Mairwa

1x5+2x3.15

11.3

4x5

20

1x3.15+2x5

13.15

1x5+1x1.5+1x3

9.5

3. Kuchaikot
3. Srinagar

Siwan

4. Siwan

Siwan

1. Siwan

5. Maharajganj

Siwan

1. Maharajganj
2. Ekma

5.
Chapra

6. Siwan (2)

Siwan

1. Siwan (2)

3x10

30

7. Mashrakh

Mashrakh

1. Mashrakh

1x5+2x3.15

11.3

2. Baniapur

1x5+2x3.15

11.3

2x5

10

1x3.15+2x5

13.15

1. Baikunthpur

2x3.15

6.3

2. Barouli

2x3.15

6.3

1x10+2x5

20

2. Manjhi

2x5

10

3x10+2x5

40

8. Taraiya

Mashrakh

1. Taraiya
2. Marworah

9. Baikunthpur

10.Prabhunath
Nagar

Mashrakh

Chapra

1. Prabhunath
Nagar

11.Telpa

Chapra

1. Telpa

12.Sheetalpur

Sheetalpur

1. Sheetalpur

3x5+1x3.15

18.15

13.Sonepur

Hajipur

1. Sonepur

2x3.15+1x5

11.3
339.1

6.
Motihari

1. Valmiki Nagar

Nepal

1. Valmiki Nagar

1x3.15+2x5

13.15

2. Dhanha

Dhanha

1. Dhanha

2x5

10

3. Ramnagar

Ramnagar

1. Ramnagar

4x5

20

1x5+1x1.6

6.6

2x5

10

2x3.15+1x1.6

7.9

2x5+2x3.15

16.3

2. Bagha
4. Chautarwa

Ramnagar

1. Chautarwa

5. Lauria

Ramnagar

1. Lauria

6. Narkatiaganj

Ramnagar

1. Narkatiaganj

Developing the PSMP for Bihar

5-74

020328-40RP-0400-00

Final Report

Circle

Feeder name

EHV S/S
from where
feeder
emanating

33/11 kV S/Ss on
feeder

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

7. Raxaul

Raxaul

1. Raxaul

3x5+1x3.15

18.15

8. Adopur

Raxaul

1. Adopur

1x3.15+1x5

8.5

9. Dhaka

Dhaka

1. Dhaka

4x5

20

10.Bettiah

Bettiah

1. Bettiah

2x10

20

11.Bettiah (2)

Bettiah

1. Bettiah (2)

2x10

20

12.Madhopur

Motihari

1. Madhopur

1x5+1x3.15

8.15

2. Harsidhi

1x5+1x3.15

8.15

1x3.15+2x5

13.15

13.Areraj

Motihari

1. Areraj

14.Motihari (2)

Motihari

1. Motihari (2)

2x5

10

15.Motihari

Motihari

1. Motihari

2x10

20

16.Chakia

Motihari

1. Chakia

1x5+1x3+2x3.15

14.3

2. Madhuban

1x5+1x3

1. Chhitwani

2x5

10

17.Chhitwani

Motihari

262.4
7.
Bhojpur

1. Chausa

Buxar

1. Chausa

1x5+1x3.15+1x1
.5

9.65

1x5+1x3.15

8.15

3.
Purushottampur

1x5

1. Buxar

2x10

20

2. Industrial

1x10

10

2. Itarhi

2. Buxar

Buxar

3. Pandy Patti

Buxar

1. Pandey Patti

2x5

10

4. Dumraon

Dumraon

1. Dumraon

2x5

10

5. Dumraon (2)

Dumraon

1. Dumraon (2)

3x5

15

6. Nawanagar

Dumraon

1. Nawanagar

1x5+2x3.15

11.3

1x3.15+1x1.6

4.75

3. Akarsai

1x5+1x3.15

8.15

1. Krishnapuram

1x5+2x3.15

11.3

2. Bramhapur

1x5+1x3.15

8.15

3. Sahpur

2x3.15

6.3

4. Bihian

1x5+1x3.15

8.15

1. Simri

2x3.15

6.3

2x5

10

2. Murar

7. Bramhpur

8. Simri

Dumraon

Dumraon

2. Chhotka
Dhakai Chak

Developing the PSMP for Bihar

5-75

020328-40RP-0400-00

Final Report

Circle

Feeder name

9. Garhani

EHV S/S
from where
feeder
emanating
Jagdishpur

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

1. Garhani

1x5+1x3.15

8.15

2. Piro

1x5+2x3.15

11.3

3. Agiaon

2x5

10

4. Sandes

2x3.15

6.3

1x5+2x3.15

11.3

3x10

30

2x3.15

6.3

1. Powerganj

2x10

20

2. Power House

1x10

10

3. Barhara

2x5

10

1. Zero Mile

2x5

10

33/11 kV S/Ss on
feeder

10.Jagdishpur

Jagdishpur

1. Jagdishpur

11.Japani Farm

Ara

1. Japani Farm
2. Serai

12.Powerganj

13.Zero Mile

Ara

Ara

295.6
8. Gaya

1. Karpi

Karpi

1. Karpi

1x1.6

1.6

1x3+2x1.6

6.2

3. Kurtha

2x3.15

6.3

2. Ataullah

2. Arwal

Karpi

1. Arwal

1x1.6+2x3.15

7.9

3. Goh

Goh

1. Goh

1x3

4. Daudnagar

Goh

1. Daudnagar

1x3+1x1.6

4.6

2x5

10

1. Kako

1x5+1x1.6+1x3.
15

9.75

2. Charui

1x5+1x1.6+1x3.
15

9.75

1. Tehta

1x5+1x3.15

8.15

2. Makpa

2x3.15

6.3

2x5+1x3.15

13.15

1x5+1x1.6+1x3.
15

9.75

2. Jehanabad

3x10

30

1. Irki

4x5

20

2. Sakurabad

1x3.15

3.15

3. Nowaman

2x5

10

2. Haspura
5. Kako

6. Tehta

Irki

Irki

3. Makhdampur
7. Ghosi

8. Irki

Irki

Irki

1. Ghosi

9. Rafiganj I & II

Rafiganj

1. Rafiganj

3x5+1x3.15

18.15

10.Uchauli

Rafiganj

1. Uchauli

1x5+1x3.15

8.15

Developing the PSMP for Bihar

5-76

020328-40RP-0400-00

Final Report

Circle

Feeder name

11.Guraru

12.Tekari

13.Belaganj

EHV S/S
from where
feeder
emanating

Rafiganj

Tekari

Belaganj

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

2. Madanpur

1x5+1x3.15

8.15

1. Guraru

2x5+2x3.15

16.3

2. Paraiya

1x5+2x3.15

11.3

1.Tekari

2x5

10

2. Koach

1x5+1x3.15

8.15

1. Belaganj

2x5+2x3.15

16.3

2. Panari

2x5+2x3.15

16.3

3. Paibigha

2x5

10

33/11 kV S/Ss on
feeder

14.Chakand

Belaganj

1. Chakand

2x5+2x3.15

16.3

15.Dhongra

Hulasganj

1. Dhongra

2x5

10

16.Sonwa

Hulasganj

1. Sonwa

2x5

10

17.Hulasganj

Hulasganj

1. Hulasganj

2x5

10

18.Nawagarh

Hulasganj

1. Nawagarh

2x5

10

19.Aurangabad

Aurangabad

1. Aurangabad

4x5

20

20.Obra

Aurangabad

1. Obra

2x3

2. Phesar

2x3.15

6.3

3. Sokhea

2x5

10

1x3+1x1.5

4.5

2. Gangti

2x3.15

6.3

21.Deo

Aurangabad

1. Deo

22.Sone Nagar

Barun

1. Barun

3x5+1x3.15

18.15

23.Barem

Barun

1. Barem

2x3.15+2x5

16.3

24.Tengra

Barun

1. Tengra

2x5+2x3.15

16.3

25.Sone Hydel

Barun

HTC

26.Nabinagar

Barun

1. Nabinagar

1x5+1x3.15

8.15

2. Amba

1x5+2x3.15

11.3

27.Barun (2)

Barun

1. Barun (2)

2x5

10

28.Dihara

Barun

1. Dihara

2x5

10

29.Wazirganj

Wazirganj

1. Wazirganj

2x3.15

6.3

2. Fatehpur

1x3.15

3.15

3. Paimer

1x1.6

1.6

1. Atari

1x3.15

3.15

2. Khizr Sarai

2x3.15

6.3

1. Gurua

1x3.15

3.15

30.Atari

31.Gurua

Developing the PSMP for Bihar

Wazirganj

Sherghati

5-77

020328-40RP-0400-00

Final Report

Circle

Feeder name

EHV S/S
from where
feeder
emanating

33/11 kV S/Ss on
feeder

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

32.Amas

Sherghati

1. Amas

2x3.15

6.3

33.Banke

Sherghati

1. Banke

2x3.15

6.3

34.Shergahti

Sherghati

1. Sherghati

1x5+1x3.15

8.15

2. Dobhi

2x3.15

6.3

1. Imamganj

1x3.15

3.15

2. Dumaria

2x3.15

6.3

3x10+1x5

35

35.Imamganj

Sherghati

36.Chandauti

Chandauti

1. Chandauti

37.Medical

Chandauti

1. Medical

2x5

10

2. Cherki

1x1.6+1x3.15

4.75

2x5+1x10+1x3.1
5

23.15

3x5

15

2. Railway
Maidan

2x10+2x5

30

1. Gandhi Maidan

2x10+1x5

25

2. Panchaiti
Akhara

3x10

30

3x10+1x5

35

1x3.15+1x1.6

4.75

2x3.15

6.3

1. Manpur

4x5+1x3.15

23.15

2. Tankuppa

1x5+1x3.15

8.15

3. Gere

2x3.15

6.3

4. Bhore

1x5

2x3.15

6.3

38.Central Stores

Chandauti

1. Central Stores

39.A.P.Colony

Chandauti

1. A.P.Coloy

40.Gandhi Maidan

Chandauti

41.Dandibag

Chandauti

1. Dandibag

42.Shobh

Bodh Gaya

1. Shobh
2. Charkbria

43.Manpur

Bodh Gaya

44.Industrial Area

Bodh Gaya

1. Industrial Area

45.M.U. Campus

Bodh Gaya

1. M.U.Campus

2x10+2x5

30

2. Buddhist
Complex

1x10+2x5

20

2x5

10

1x5+1x3

3x10

30

2. Nawada New

1x5+2x3

11

3. Bhadhokhara

1x5+2x3.

11

1. Akbarpur

1x5+1x3

11

46.Hasua

Nawada

1. Hasua
2. Nadirganj

47.Nawada

48.Akbarpur

Developing the PSMP for Bihar

Nawada

Nawada

1. Nawada

5-78

020328-40RP-0400-00

Final Report

Circle

Feeder name

49.Roh

EHV S/S
from where
feeder
emanating

Nawada

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

2. Rajauli

2x5+1x3

13

3. Sirdala

1x5+1x3

11

1x3.15+1x1.6

4.75

2. Warsaliganj

1x5+2x3.

11

3. Pakribarwan

1x5+1x3

11

1x3.15+1x1.6

4.75

33/11 kV S/Ss on
feeder

1. Roh

4. Kaukol

996.5
9.
Saharsa

1. Supaul

Supaul

1. Supaul

2x10+1x5

25

2. Parasrama

2x5

10

3. Kishanpur

2x1.6

3.2

2x.3.15

6.3

1x3.15+1x1.6

4.75

6. Larganj

2x5

10

4. Pipra
5. Raghopur

2. Saharsa (2)

Saharsa

1. Sahrsa (2)

3x10

30

3. Sour Bazar

Saharsa

1. Sour Bazar

2x5

10

4. Balwahat

Saharsa

1. Balwahat

2x5

10

2. Salakhua

2x5

10

1x5+1x3.15

8.15

5. Simri
Bakhtiyarpur

Saharsa

1. Simri
Bakhtiyarpur

6. New Market

Saharsa

1. New Market

1x10+2x5

20

7. Old Saharsa

Saharsa

1. Old Saharsa

3x5+1x1.6

16.6

8. Madhepura

Madhepura

1. Madhepura

3x5

15

2. Muraliganj

1x3.15+1x1.6

4.75

3. Kumarkhand

2x5

10

1. Singheswar

1x5

2. Ghailar

2x5

10

2x10+3x5

35

1x5+1x3+1x1.5

9.5

3x5+1x3.15

18.15

2x5

10

1x5+1x3.15

8.15

9. Singheswar

10.Khagaria

Madhepura

Khagaria

1. Khagaria
2. Mansi
3. Maheshkunt

11.Bihariganj

Udakishanga
nj

1. Bihariganj

12.Udakishanganj

Udakishanga
nj

1. Udakishanganj

Developing the PSMP for Bihar

5-79

020328-40RP-0400-00

Final Report

Circle

Feeder name

EHV S/S
from where
feeder
emanating

33/11 kV S/Ss on
feeder

13.Puraini

Udakishanga
nj

1. Puraini

14.Alamnagar

Udakishanga
nj

1. Alamnagar

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

2x5

10

1x1.6+1x1.5

3.1
302.7

1. Bihpur

Naugachhia

1. Bihpur

2x5

10

2. Sanhauli

Naugachhia

1. Sanhauli

2x5

10

3. Naugachhia

Naugachhia

1. Naugachhia

1x5+2x3.15

11.3

4. Patwara

Sultanganj

1. Patwara

1x3

5. Sultanganj

Sultanganj

1. Sultanganj

3x5+1x10

25

6. Shahkund

Sultanganj

1. Shahkund

1x5+1x3.15

8.15

7. Barari

Sabour

1. Barari

1x10+1x5

15

2. Central Jail

1x10+1x5

15

3. Mayaganj

1x10+1x5

15

1. C S Compound

1x10+2x5

20

2. T T School

1x10+2x5

20

1x10+2x3.15

16.3

2x3.15

6.3

1x10+2x5

20

2x5

10

1x10+1x5

15

2. Jagdishpur

2x5

10

3. Nath Nagar

2x5+1x10

20

8. CS Compound

10.
Bhagalpu
r

Sabour

9. Sabour

Sabour

1. Sabour

10.Gouradih

Sabour

1. Gouradih

11.Aliganj I

Sabour

1. Aliganj
2. Mojahidpur

12.Aliganj II

Sabour

1. Aliganj

13.Banka (2)

Banka

1. Banka (2)

2x5

10

14.Banka

Banka

1. Banka

3x5

15

2. Amarpur

1x3.15+1x3

6.15

3. Rajouna

1x5+1x3.15

8.15

2x5+1x3+1x1.6

14.6

2x5+1x3.15

13.15

2x5

10

3x5+1x10

25

1x1+1x3.15

4.15

4. Bousi
15.Sanhoula

Kahalgaon

1. Sanhoula

16.Ghogha

Kahalgaon

1. Ghogha

17.Kahalgaon

Kahalgaon

1. Kahalgaon
2. Pirpainti

356.3

Developing the PSMP for Bihar

5-80

020328-40RP-0400-00

Final Report

Circle

11.
Munger

Feeder name

1. Tarapur

EHV S/S
from where
feeder
emanating
Sultanganj

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

4x5

20

2. Kharagpur

1x3+2x5

13

33/11 kV S/Ss on
feeder

1. Tarapur

2. Dakranala

Jamalpur

1. Dakranala

2x5+1x1.5

11.5

3. Ramchandrapur

Jamalpur

1.
Ramchandrapur

2x5+1x1.5

11.5

1. Safiabad

2x3.15+3x5

21.3

2. Baniyarpur

1x5+1x3.15

8.15

2. Railways (HTC)
4. Safiabad

Jamalpur

5. ITC

Jamalpur

1. ITC (HTC)

6. Karnachaura

Jamalpur

1. Karnchaura

2x10+2x5

30

7. Nandlalpur

Jamalpur

1. Nandlalpur

3x5

15

8. Bindwara

Jamalpur

1. Bindwara

3x5+1x3.15

18.15

9. Balaji

Lakhisarai

1. Balaji

1x5+1x3.15+1x.
75

8.9

10.Purani Bazar

Lakhisarai

1. Purani Bazar

2x5+2x10

30

1x10+2x3.15

16.3

1. Kajra

2x5

10

2. Piri Bazar

2x5

10

1. Salempur

1x5+1x3.15

8.15

2x5

10

2x3.15

6.3

1. Jamui

2x5+2x10

30

2. Khaira

1x5+2x3.15

11.3

3. Sikandara

1x5+2x3.15

11.3

1. Gidhour

1x5+1x3.15

8.15

2. Jhajha

2x5+1x3.15

13.15

3. Sono

2x5+1x3.15

13.15

2x5

10

2. Court Area
11.Kajra

12.Haibatganj

Lakhisarai

Lakhisarai

2. Manpur
3. Haibatganj
13.Jamui

14.Gidhour

Mallehpur

Mallehpur

15.Ghuskuri

Sheikhpura

1. Ghuskuri

16.Ariari

Sheikhpura

1. Ariari

1x3.15

3.15

2. Bhalua

1x1.6

1.6

3. Lohain

2x5

10

4. Katari

1x1.6

1.6

5. Barkna

1x5+1x1.6

6.6

Developing the PSMP for Bihar

5-81

020328-40RP-0400-00

Final Report

Circle

Feeder name

17.Onama

EHV S/S
from where
feeder
emanating
Sheikhpura

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

1. Onama

1x5+1x1.6

6.6

2. Mirzapur

1x5+1x3.15+1x1
.6

9.75

3. Toygarh

2x5

10

33/11 kV S/Ss on
feeder

18.Hathiyama

Sheikhpura

1. Hathiyama

1x3.15+1x1.6

4.75

19.Sheikhpura

Sheikhpura

1. Sheikhpura

1x5+2x10

25
427.4

12.
Samastip
ur

1. Pusa

Mohanpur

1. Pusa

2x5+2x3.15

16.3

2. Mohanpur

Mohanpur

1. Mohanpur

2x10

20

2. Warisnagar

1x5+1x3.15

8.15

3. Kalyanpur

1x5+1x3.15

8.15

3. Jute Mill

Mohanpur

HTC

4. Sarairanjan

Mohanpur

1. Sarairanjan

5. Jitwarpur

Mohanpur

1x5+1x3.15

8.15

1. Jitwarpur

2x10

20

2. Magardahi

2x10

20

6. Rly.Samastipur

Mohanpur

HTC

7. Sirsia

Mohanpur

1. Sirsia

8. Dalsingsarai

Dalsingsarai

6.6

2. Kuboliram

2x5

10

3. Karpoorigram

2x5

10

1. Dalsingsarai

1x5+2x3.15

11.3

2. Mohadinnagar

1x5+2x1.6

8.2

1x5+1x3.15

8.15

1x5+1x3.15+1x1
.6

9.75

1x5+1x3.15

8.15

1x5+1x3.15+1x1
.6

9.75

1x5+1x1.6

6.6

3x5

15

2x5+2x3.15

16.3

Dalsingsarai

1. Pateri

10.Bachchwara

Dalsingsarai

1. Bachchwara

11.Bibhutipur

Dalsingsarai

1. Bibhutipur
2. Rosera
3. Hassanpur

BTPS

1. Deona
2. Bangrahdih

Developing the PSMP for Bihar

2.5
1x5+1x1.6

9. Pateri

12.Deona

2.5

3. Jai Mangla
(HTC)

6.5

4. Jai Mata Di
(HTC)

1.5

5-82

020328-40RP-0400-00

Final Report

Circle

Feeder name

EHV S/S
from where
feeder
emanating

33/11 kV S/Ss on
feeder

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

2x10

20

13.Bangrahdih (2)

BTPS

1. Bangrahdih (2)

14.IOC

BTPS

HTC

15.Railways

BTPS

HTC

16.Deona (2)

Zero Mile

1. Deona (2)

2x10

20

17.Kankaul

Zero Mile

1. Kankaul

2x10

20

18.Begusarai

Zero Mile

1. Begusarai

3x10

30

2. Manjhaul

2x5+1x3.15+1x3

16.15

3. Ganga Dairy
(HTC)
4. Balia

1.25
1x5+2x3.15

11.3
360.3

13.
Purnea

1. Narpatganj

Forbesganj

1. Narpatganj

2. Raniganj

Forbesganj

1. Raniganj

3. Forbesganj

Forbesganj

1x5+2x3.15

11.3

2x3.15

6.3

2. Bahargaon

2x5

10

1. Forbesganj

3x5

15

2. Araria

2x5

10

3. Kusgaon

2x5

10

2x3.15

6.3

2x5

10

1. Bahadurganj

2x3.15

6.3

2. Dighal Bank

2x3.15

6.3

1x5+2x3.15

11.3

1x10+2x5+1x3.1
5

23.15

1x10+2x5

20

4. Jokihat
5. Malgaon
4. Bahadurganj

Kishanganj

5. Sarai

Kishanganj

1. Sarai

6. Paschimpali

Kishanganj

1. Paschimpali

7. Purabpali

Kishanganj

1. Purabpali

8. Thakurganj

Kishanganj

1. Chhatargarh

2x3.15

6.3

2. Thakurganj

1x5+1x3.15

8.15

1x5+3x10

35

9. Group Control

Purnea

1. Group control

10.Banmankhi

Purnea

1. Banmankhi

1x3.15+1x3

6.15

2. Madhubani

3x5

15

1. Zero Mile

4x5

20

2. City

2x5

10

1. Belgachhi

1x5

11.Zero Mile

12.Belgachhi

Developing the PSMP for Bihar

Purnea

Purnea

5-83

020328-40RP-0400-00

Final Report

Circle

Feeder name

EHV S/S
from where
feeder
emanating

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

1x3.15

3.15

2x5

10

1. Naranga

3x5+1x3.15

18.15

2. MLR Ganj

1x5+2x3.15

11.3

3. Dargaha

1x1.5

1.5

3x5+1x3.15

18.15

4x5

20

2. Gore Beri

1x3.15+2x1.5

6.15

3. Falka

1x3.15+1x1.5

4.65

4. Sonaily

1x3.15

3.15

1x5

33/11 kV S/Ss on
feeder

2. Dalkola
3. Vaisi
13.Naranga

Purnea

14.Jalalgarh

Purnea

1. Jalalgarh

15.Beri

Katihar

1. Beri

16.Barsoi

Katihar

1. Barsoi

17.Pranpur

Katihar

1. Pranpur

1x1.6

1.6

18.Industrial Estate

Katihar

1. Industrial
Estate

2x5+1x3.15

13.15

19.Binodpur

Katihar

1. Binodpur

3x5

15

20.Kursaila

Naugachhia

1. Kursaila

2x3.15

6.3
388.8

14.
Sasaram

1. Karmnasa

2. Larma

Karmnasa

Karmnasa

1. Karmnasa

1x5+1x3.15

8.15

2. Durgawati

2x5

10

3. Chand

4x5

20

1. Larma

1x5+1x3.15

8.15

2. DVPL (HTC)
3. Kalyanpur

Karmnasa

1.5

1. Kalyanpur

3x5+1x3.15

18.15

2. Ramgarh

3x5

15

3. Chourasia

1x5+1x3.15

8.15

4. Nuaon

1x5+2x3.15

11.3

4. Ramgarh (2)

Karmnasa

1. Ramgarh (2)

2x5

10

5. Kakrait

Karmnasa

1. Kakrait

3x5

15

6. Parsathua

Mohania

1. Parsathua

1x5+2x3.15

11.3

7. Chainpur

Mohania

1. Chainpur

1x5+2x3.15

11.3

8. Mohania (2)

Mohania

1. Mohania (2)

2x10

20

9. Mohania

Mohania

1. Mohania

3x5

15

2x5+1x10

20

2. Bhabhua Old

Developing the PSMP for Bihar

5-84

020328-40RP-0400-00

Final Report

Circle

Feeder name

EHV S/S
from where
feeder
emanating

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

1x5+1x2.5+1x3.
15

10.65

1. Dinara

2x5+2x3.15

16.3

2. Kochas

1x5+2x3.15

11.3

3. Dawath

2x3.15

6.3

33/11 kV S/Ss on
feeder

3. Bahuara
10.Dinara

Dinara

11.Sanjhouli

Bikramganj

1. Sanjhouli

1x5+2x3.15

11.3

12.Surajpura

Bikramganj

1. Surajpura

1x5+2x3.15

11.3

13.Bikramganj

Bikramganj

1. Bikramganj

2x5+1x3.15

13.15

2. Kararkat

1x5+2x3.15

11.3

2x10

20

14.Bikramganj (2)

Bikramganj

1. Bikramganj (2)

15.Pusauli

PGCIL
Pusauli

1. Pusauli

2x5+1x10

20

16.Kudra

Kudra

1. Kudra

4x5

20

2x10+3x5

35

1x3.15+1x1.5

4.65

2. Cenari

1x5+1x3.15

8.15

3. Adhaura

1x5+1x3.15

8.15

1. Beda Sasaram

5x5

25

2. Takia Sasaram

1x10+3x5

25

2x5+1x3.15

13.15

2. Bhabhua New
17.Karamchat

18.Beda Sasaram

Kudra

Sasaram

1. Karamchat

3. Nokha
19.Sasaram (2)

Sasaram

1. Sasaram (2)

2x10

20

20.Sasaram (3)

Sasaram

1. Sasaram (3)

2x10

20

21.Naigaon

Sasaram

1. Naigaon

3x5+1x3.15

18.15

2. Sheosagar

3x5+1x3.15

18.15

22.BMP Dehri (2)

Dehri-OnSone

1. BMP Dehri (2)

2x10

20

23.BMP Dehri I & II

Dehri-OnSone

1. BMP Dehri

4x5

20

1x5+2x3.15

11.3

2. Basa
Karwandia
3. PHED (HTC)
24.JVLO&FL
Pahleja

Dehri-OnSone

1. HTC

25.Akorigola

Dehri-OnSone

1. Akorigola

Developing the PSMP for Bihar

5-85

1.5
3.15
3x5+1x3.15

18.15

020328-40RP-0400-00

Final Report

Circle

Feeder name

EHV S/S
from where
feeder
emanating

33/11 kV S/Ss on
feeder

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

26.Nasariganj

Dehri-OnSone

1. Nasariganj

2x5+2x3.15

16.3

27.Rajpur

Dehri-OnSone

1. Rajpur

1x5+2x3.15

11.3

28.Nauhatta

Banjari

1. Nauhatta

2x5+2x3.15

16.3

29.Samhauta

Banjari

1. Samhauta

4x5

20

30.Samhauta (2)

Banjari

1. Samhauta (2)

1x10+1x5

15

31.Kirpabal (2)

Barun

1. Kirpabal (2)

2x5

10

2. Kirpabal

2x5+1x3.15

13.15

2x5+1x3.15+1x1
.5+1x0.5

15.15

2x10

20

32.Indrapuri

Barun

1. Indrapuri

33.Indrapuri (2)

Barun

1. Indrapuri (2)

761.3
15.
Muzaffar
pur

1. Shivhar

Shivhar

1. Shivhar

2x5 + 2x3.15

16.3

2. Runi Saidpur

Runi Saidpur

1. Runi Saidpur

3x5+1x3.15

18.15

3. Pupri

Sitamarhi

1. Pupri

2x5+2x3.15

16.3

4. Dumra (2)

Sitamarhi

1. Dumra (2)

2x10

20

5. Dumra

Sitamarhi

1. Dumra

4x5

20

6. Sursand

Sonbarsa

1. Sursand

2x5+2x3.15

16.3

7. Sonbarsa

Sonbarsa

1. Sonbarsa

2x5

10

8. Nepal

Sonbarsa

1. Nepal

9. Patepur

Vaishali

1. Mehua

2x5

10

2. Patepur

2x3.15

6.3

2x3.15

6.3

10.Prataptand

Vaishali

1. Prataptand

11.Lalganj

Vaishali

1. Lalganj

4x5+1x3.15

23.15

12.Sarai

Vaishali

1. Sarai

2x5+2x3.15

16.3

13.Railway (HTC)

Hajipur

2.6

2.6

14.Bidupur

Hajipur

1. Bidupur

1x10+2.5

12.5

15.EDIP

Hajipur

1. EDIP

2x5+2x3

16

16.Hajipur I E

Hajipur

1. Hajipur I E

4x5

20

17.Hajipur I E (2)

Hajipur

1. Hajipur I E (2)

2x10

20

18.Konharaghat

Hajipur

1. Konharaghat

2x10

20

19.Konharaghat (2)

Hajipur

1. Konharaghat

2x10

20

20.Mehnar

Mohanpur

1. Mehnar

1x5+2x3.15

11.3

Developing the PSMP for Bihar

5-86

020328-40RP-0400-00

Final Report

Circle

Feeder name

EHV S/S
from where
feeder
emanating

33/11 kV S/Ss on
feeder

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

2x10

20

1x5+2x10

25

21.SKMCH (2)

SKMCH

1. SKMCH (2)

22.MIT

SKMCH

1. MIT

23.Sikandarpur (2)

SKMCH

1. Sikandarpur (2)

2x10

20

24.SKMCH

SKMCH

1. SKMCH

3x5

15

2x5+1x3.15

13.15

2. Sikandarpur
25.Kurhani

SKMCH

1. Kurhani

2x5

10

26.Motipur

Muzaffarpur

1. Motipur

2x5+1x3.15

13.15

27.Motipur (2)

Muzaffarpur

1. Motipur (2)

2x10

20

28.Maripur

Muzaffarpur

1. Maripur

1x10+2x5

20

29.Vaishali

Muzaffarpur

1. Vaishali

2x5

10

30.Dholi

Muzaffarpur

1. Dholi

2x5+1x1.5

11.5

31.IDPL (2)

Muzaffarpur

1. IDPL (2)

2x10

20

32.IDPL

Muzaffarpur

1. IDPL

2x5+2x10

30

33.Khabra

Muzaffarpur

1. Khabra

2x10

20

34.Bhikanpura

Muzaffarpur

1. Bhikanpura

2x5

10

35.Bhagwanpur
Chowk

Muzaffarpur

1. Bhagwanpur
chowk

2x5

10

36.Railway (HTC)

Muzaffarpur

37.Nayatola (2)

Muzaffarpur

1. Nayatola (2)

2x10

20

38.Nayatola

Muzaffarpur

1. Nayatola

3x5

15
604.3

16.
Darbhang
a

1. Basopatti

Jay Nagar

1. Basopatti

2x5

10

2. Jay Nagar

Jay Nagar

1. Jay Nagar

1x5+2x3.15

11.3

2. Khajauli

3x5

15

3. Ladania

1x5+1x3.15

8.15

1. Benipatti

1x1.6+2x5

11.6

2x5

10

1x10+2x3.15

16.3

2. Madhubani

2x10

20

3x5

15

1x3.15+1x5+1x1
0

18.15

2x5+1x3.15

13.15

3. Benipatti

Rahika

2. Ahilyasthan
4. Rahika

Rahika

1. Rahika

5. Bela

Gangwara

1. Bela

6. Gangwara

Gangwara

1. Gangwara

7. Donar

Gangwara

1. Donar

Developing the PSMP for Bihar

5-87

020328-40RP-0400-00

Final Report

Circle

Feeder name

8. Panda Sarai

EHV S/S
from where
feeder
emanating
Ram Nagar

Transformer wise Capacity


(No.xMVA)

Total Sub
Capacity
MVA

1. Panda Sarai

2x5

10

2. Laheria Sarai
(Jail)

2x5

10

3. DMCH

3x5

15

4. Urban

3x5

15

33/11 kV S/Ss on
feeder

9. Pouriya

Ram Nagar

1. Pouriya

1x3.15+1x1.6

4.75

10.Anar

Kusheshwar

1. Baheri

1x5+1x3.15

8.15

1x5+1x3.15+1x1
.6

9.75

2x5

10

1x5+1x1.6+1x3.
15

9.75

2. Benipur

1x5+2x3.15

11.3

1. Raj Nagar

2x5+2x3.15

16.3

2. Babu Barhi

1x5+1x3.15

8.15

2. Anar
11.Kusheshwar

Kusheshwar

1. Kusheshwar

12.Biraul

Kusheshwar

1. Biraul

13.Raj Nagar

Pandaul

14.Raiyam

Pandaul

1. Raiyam

1x5+1x3.15

8.15

15.Pandaul

Pandaul

1. Pandaul

2x5+1x10

20

16.Manigachi

Pandaul

1. Manigachi

1x5+1x1.6+1x3.
15

9.75

17.Jhanjharpur

Pandaul

1. Jhanjharpur

1x5+2x3.15

11.3

2. Madhepur

1x3.15+2x1.6

6.35

18.Khatauna

Phulparas

1. Khatauna

1x5

19.Rudrapur

Phulparas

1. Rudrapur

2x5

10

20.Phulparas

Phulparas

1. Phulparas

1x5+2x3.15

11.3

2. Nirmali

1x5+1x3.15

8.15

3. Tulpatganj

1x5+2x3.15

11.3
378.1

Developing the PSMP for Bihar

5-88

020328-40RP-0400-00

Final Report

5.7

Capital Investment Requirement

5.7.1

Methodology

This section discusses the scheduling for the Distribution Investment Plan to year 2014, to
transmit the planned power available from grid substations to the forecast loads.
The studies and resulting recommendations for the distribution system were based on the
data available as July 2010.
The substation loads were based on the Load Forecast up to year 2014, and also from the
data available from transmission planning report as discussed in section 2
The generation schedules were determined from the Based Generation Plan as discussed in
Section 2
The Distribution Expansion Plan necessary to transmit the power available at the grid
substation to the forecast load is discussed in Section 5.4.
The equipment cost estimates, summarized in Section 5.2 and detailed in Appendix 6, were
based on recent (2009-10) DPRs for the BSEB.
The investment estimates do not include land requirements for the distribution system.
It was assumed that 33 kV transmission and substation projects could be commissioned
within 12 months of project go-ahead being issued and for this reason Interest During
Construction (IDC) is not included.
Contingencies are included.
Operation and Maintenance Budgets are not included.
The project cost estimates are given in Rs. Lakhs.
5.7.2

Schedule of Investments

The estimated investment in the Distribution system (33 kV lines, substations and additional
bays, 11kV lines and additional Bays, DTRs and LT lines) are Rs. 368,058 Lakhs. This
investment includes the investment required for year 2010 to bring the existing network to
meet the load requirements of 2010 with reasonable quality.
Table 5-15

Summary of Investment Cost for Distribution (2010-2014)

Table 5.2-1 Summary of Investment Cost for Distribution (2010 - 2014)


(Amount in Rs.Lakh)
33 kV
11 kV
Shunt
33 kV
33 kV
11 kV
Year
Additional
Additional
DTRs
LT Lines Compens
Total
Lines
S/Ss
Lines
Bays
bays
ation (11

2010
2011
2012
2013
2014
Total
BSEB
(2010-

5,296

4,775

2,442

575

3,669

2,727

19,483

3,205
4,807
8,012
16,023

8,368
12,552
20,920
41,840

398
597
996
1,992

5,563
8,345
13,909
27,817

1,361
2,042
3,403
6,807

9,167
13,750
22,916
45,833

6,455
9,682
16,137
32,274

341
511
851
1,703

34,857
52,286
87,144
174,287

37,342

88,455

3,983

58,076

14,189

95,334

67,274

3,405

368,058

Developing the PSMP for Bihar

5-89

020328-40RP-0400-00

Final Report

5.7.3

Estimated Cash Flow for Distribution

The estimated cash flows for every year for the distribution expansion are given in Table 5.31 below.
The Table 5.3-1 presents the Investment amount in Rs Lakhs (for 33 kV Lines, Substations,
additional Bays and 11 kV lines, additional Bays and DTRs, LT lines and finally shunt
compensation on the 11 kV side)
Table 5-16
Circle

Summary of Investment Cost for Distribution for 2010

Table 5.3-1 Summary of Investment Cost for Distribution for 2010 (Amount in Rs Lakhs)
33 kV
11 kV
Shunt
33 kV Lines 33 kV S/Ss
Additional
11 kV Lines Additional
DTRs
LT Lines
Compensatio
Bays
bays
n (11 kV)

Total

PESU (E)
202

202

426

426

441

109

72

14

97

81

814

801

801

195

108

27

194

81

606

PESU (W)
Patna
Nalanda
Chapra
Motihari
333

692

251

55

357

244

1,933

240

240

932

293

144

41

260

203

1,873

36

109

72

14

81

81

393

248

436

251

55

341

285

1,616

677

327

180

41

260

203

1,688

135

109

36

14

97

41

431

220

872

503

110

682

488

2,875

403

1,307

610

164

1,055

773

4,314

198

327

215

41

244

244

1,270

5,296

4,775

2,442

575

3,669

2,727

19,483

Bhojpur
Gaya
Saharsa
Bhagalpur
Munger
Samastipur
Purnea
Sasaram
Muzaffarpur
Darbhanga
Total BSEB

Developing the PSMP for Bihar

5-90

020328-40RP-0400-00

Final Report

Table 5-17

Summary of Investment Cost for Distribution for 2011

Table 5.3-1 Summary of Investment Cost for Distribution for 2011 (Amount in Rs Lakhs)
33 kV
11 kV
Circle
33 kV Lines 33 kV S/Ss
Additional
11 kV Lines Additional
DTRs
Bays
bays
PESU (E)
242
666
30
259
99
974
PESU (W)
285
709
30
223
85
839
Patna
130
430
20
291
62
366
Nalanda
220
630
33
603
122
739
Chapra
86
292
10
162
38
247
Motihari
65
364
13
287
60
374
Bhojpur
178
425
25
251
63
403
Gaya
283
952
53
664
153
971
Saharsa
155
455
28
481
101
621
Bhagalpur
82
358
8
230
60
381
Munger
180
479
18
420
88
533
Samastipur
210
464
28
291
74
474
Purnea
172
337
15
287
60
382
Sasaram
322
778
28
472
129
823
Muzaffarpur
342
668
41
370
111
698
Darbhanga
254
362
18
273
55
343
Total BSEB

3,205

8,368

Developing the PSMP for Bihar

398

5,563

1,361

5-91

9,167

LT Lines

Shunt
Compensatio
n (11 kV)

Total

293

2,563

252

2,424

366

17

1,681

684

10

3,040

179

22

1,035

317

14

1,495

301

22

1,668

741

51

3,868

545

14

2,401

265

1,390

476

43

2,237

334

19

1,894

326

39

1,617

566

46

3,163

509

19

2,758

301

17

1,623

6,455

341

34,857

020328-40RP-0400-00

Final Report

Table 5-18
Circle

Summary of Investment Cost for Distribution for 2012

Table 5.3-1 Summary of Investment Cost for Distribution for 2012 (Amount in Rs Lakhs)
33 kV
11 kV
Shunt
33 kV Lines 33 kV S/Ss
Additional
11 kV Lines Additional
DTRs
LT Lines
Compensati
Bays
bays
on (11 kV)

Total

PESU (E)
362

999

46

388

148

1,462

440

3,844

428

1,064

46

334

127

1,259

378

3,635

195

644

30

436

92

549

549

25

2,522

330

944

49

905

183

1,109

1,026

14

4,561

129

438

15

242

58

370

269

33

1,553

97

547

19

431

90

560

476

22

2,242

267

638

38

377

95

604

452

33

2,502

425

1,428

80

996

230

1,456

1,111

76

5,802

233

683

42

722

152

931

818

22

3,602

123

536

11

345

90

572

397

11

2,085

270

719

27

630

133

799

714

65

3,356

314

697

42

436

112

711

501

29

2,841

258

505

23

431

90

573

488

58

2,426

483

1,167

42

708

193

1,235

849

69

4,744

513

1,003

61

555

166

1,047

763

29

4,137

382

543

27

409

83

514

452

25

2,434

4,807

12,552

597

8,345

2,042

13,750

9,682

511

52,286

PESU (W)
Patna
Nalanda
Chapra
Motihari
Bhojpur
Gaya
Saharsa
Bhagalpur
Munger
Samastipur
Purnea
Sasaram
Muzaffarpur
Darbhanga

Total BSEB

Developing the PSMP for Bihar

5-92

020328-40RP-0400-00

Final Report

Table 5-19
Circle

Summary of Investment Cost for Distribution for 2013

Table 5.3-1 Summary of Investment Cost for Distribution for 2013 (amount in Rs. Lakhs)
33 kV
11 kV
Shunt
33 kV Lines 33 kV S/Ss
Additional
11 kV Lines Additional
DTRs
LT Lines Compensatio
Bays
bays
n (11 kV)

Total

PESU (E)
604

1,665

76

646

247

2,436

733

6,406

713

1,773

76

557

212

2,098

631

6,059

324

1,074

51

727

154

914

916

42

4,203

550

1,574

82

1,508

305

1,848

1,709

24

7,601

215

729

25

404

96

617

448

54

2,588

161

911

32

718

151

934

794

36

3,737

445

1,063

63

628

158

1,006

753

54

4,171

708

2,379

133

1,661

384

2,427

1,852

127

9,670

388

1,138

70

1,203

253

1,551

1,363

36

6,003

205

894

19

575

150

953

661

18

3,476

449

1,198

44

1,050

221

1,332

1,190

109

5,594

524

1,161

70

727

186

1,185

834

48

4,735

431

841

38

718

150

954

814

97

4,043

805

1,944

70

1,180

321

2,058

1,414

115

7,906

855

1,671

101

925

277

1,745

1,272

48

6,895

636

904

44

682

138

857

753

42

4,057

8,012

20,920

996

13,909

3,403

22,916

16,137

851

87,144

PESU (W)
Patna
Nalanda
Chapra
Motihari
Bhojpur
Gaya
Saharsa
Bhagalpur
Munger
Samastipur
Purnea
Sasaram
Muzaffarpur
Darbhanga

Total BSEB

Developing the PSMP for Bihar

5-93

020328-40RP-0400-00

Final Report

Table 5-20
Circle

33 kV Lines

Summary of Investment Cost for Distribution for 2014

Tabl2 5.3-1 Summary of Investment Cost for Distribution for 2014


33 kV
11 kV
33 kV S/Ss
Additional
11 kV Lines
Additional
DTRs
LT Lines
Bays
bays

Shunt
Compensatio
n (11 kV)

Total

PESU (E)
1,208

3,330

152

1,293

493

4,872

1,465

12,813

1,425

3,546

152

1,113

425

4,195

1,262

12,118

PESU (W)
Patna
649

2,148

101

1,454

308

1,829

1,831

85

8,405

1,099

3,148

165

3,016

610

3,696

3,419

48

15,202

429

1,459

51

808

192

1,234

895

109

5,176

323

1,822

63

1,436

301

1,868

1,587

72

7,473

Nalanda
Chapra
Motihari
Bhojpur
890

2,126

127

1,257

315

2,013

1,506

109

8,341

1,416

4,759

266

3,321

767

4,854

3,704

254

19,341

776

2,275

140

2,406

507

3,103

2,727

72

12,006

410

1,788

38

1,149

300

1,907

1,323

36

6,951

899

2,395

89

2,101

442

2,664

2,381

217

11,187

1,048

2,322

140

1,454

372

2,370

1,669

97

9,471

861

1,683

76

1,436

301

1,908

1,628

193

8,087

1,610

3,888

140

2,359

643

4,116

2,829

229

15,813

1,709

3,342

203

1,849

555

3,491

2,544

97

13,789

1,272

1,809

89

1,364

276

1,714

1,506

85

8,115

16,023

41,840

1,992

27,817

6,807

45,833

32,274

1,703

174,287

Gaya
Saharsa
Bhagalpur
Munger
Samastipur
Purnea
Sasaram
Muzaffarpur
Darbhanga
Total BSEB

Developing the PSMP for Bihar

5-94

020328-40RP-0400-00

Final Report

PROJECT FORMULATION

The objective of project formulation is to prepare the generation, transmission and


distribution expansion capital works program for a five-year period from 2010 to 2014. The
investment cost data for each plan are a combination of output from SYPCO for the
generation component and from the Transmission and Distribution costing. The detailed
work of investment costing and project formulation has been done in separated studies for
generation, transmission and distribution expansion programs. The projects for the period
are also proposed and tabulated in the sections for generation, transmission and distribution
planning. This section only provides a summary of the investment requirements of the capital
works programs for the five-year period from 2010 to 2014.
6.1

Generation Expansion Capital Works Program for 5 Years

Generation Investment Costing


The generation investment costing is carried out based on the generation expansion plan,
the cashflow pattern and the number of years of construction given in the database to
produce a cashflow profile for all investments. Any special investments entered are also
treated in the same way. All investments are assumed to be made at mid-year and the
beginning of the first year operation is assumed to be at the end of the construction period.
The annual constant investments are estimated based on the proportion of cash flows during
construction and the capital cost of the plant. These yearly investments are treated as
middle of the year for each year of the cash flow. These investments do not include Interest
During Construction (IDC) and escalation in costs. These investments indicate the level
investments requirement at each year of the construction period.
However, the annual investments during construction period are getting capitalised at the
beginning of the year of commissioning of the projects. The capitalised investment for a
project is the sum of the total cash flow during the construction period plus the interest paid
during construction period.
The following table presents the annual constant investments for the least scenario
(Scenario-2: Coal+Hydro+Imports) under average load forecast scenario. The total annual
investment for the entire horizon period is Rs. 20,246 Crores.
Table 6-1

Financial
Year

Annual Investment (Constant Rs.Crores) : Coal+ Hydro + Import


Scenario-Average LF Scenario

BTPS
Expansion

MTPS
Expansion

Nabinagar

Pirpainti

Gas
Turbines

Hydro

Total

2008

163

163

2009

172

172

2010

364

323

327

230

1243

2011

1061

942

1280

600

230

4113

2012

1213

1077

2042

1020

268

5619

Developing the PSMP for Bihar

6-1

020328-40RP-0400-00

Final Report

Financial
Year

BTPS
Expansion

MTPS
Expansion

Nabinagar

Pirpainti

Gas
Turbines

Hydro

Total

2013

394

350

1770

180

176

2870

2014

1307

305

176

1788

2015

1089

889

1978

2016

354

1016

240

1610

2017

330

360

690

2018

Note: The constant rupees are cash flows during construction period and do not include interest
during construction (IDC).

The capitalised investment for Scenario-2 under average load forecast scenario is presented
in the following table. The total investment for the entire horizon period is Rs. 24,335 Crores.
Table 6-2

Financial
Year

Annual Capitalised Investment (Rs.Crores) : Coal+ Hydro + Import


Scenario-Average LF Scenario
BTPS
Expansion

MTPS
Expansion

Nabinagar

Pirpainti

Gas
Turbines

Hydro

Total

2010

59

59

2011

2012

37

37

2013

1636

598

2234

2014

3667

3256

3293

327

10542

2015

3293

1149

4442

2016

2017

3293

3293

2018

3073

654

3728

Note: The capitalized investment is the total cash flow during construction plus the interest during
construction.

Similarly, the annual constant investments for the least scenario (Scenario-2:
Coal+Hydro+Imports) under average load forecast scenario is presented in the following
table. The total annual investment for the entire horizon period is Rs. 33,852 Crores.

Developing the PSMP for Bihar

6-2

020328-40RP-0400-00

Final Report

Table 6-3

Annual Investment (Constant Rs.Crores) : Coal+ Hydro + Import


Scenario-Optimistic LF Scenario

BTPS
Expansi
on

MTPS
Expansi
on

Nabinag
ar

Pirpain
ti

Lakhisar
ai

Buxa
r

Gas
Turbine
s

Hydr
o

Tot
al

2008

163

163

2009

172

172

2010

364

323

980

230

189
6

2011

1061

942

2859

305

720

230

611
7

2012

1213

1077

3267

1194

1080

268

809
9

2013

394

350

1062

1906

610

120

176

461
8

2014

1347

1779

610

420

176

433
2

2015

330

2033

1779

480

462
2

2016

661

2033

300

299
3

2017

661

180

840

2018

Financi
al Year

Note: The constant rupees are cash flows during construction period and do not include interest
during construction (IDC).

The capitalised investment for Scenario-2 under optimistic load forecast scenario is
presented in the following table. The total investment for the entire horizon period is Rs.
40,682 Crores.
Table 6-4

Annual Capitalised Investment (Rs.Crores) : Coal+ Hydro + Import


Scenario-Optimistic LF Scenario

BTPS
Expansi
on

MTPS
Expansi
on

Nabinag
ar

Pirpain
ti

Lakhisar
ai

Bux
ar

Gas
Turbin
es

Hydr
o

Total

2010

59

59

2011

2012

37

37

2013

1963

598

2561

2014

3667

3256

9879

1680
0

Financi
al Year

Developing the PSMP for Bihar

6-3

020328-40RP-0400-00

Final Report

BTPS
Expansi
on

MTPS
Expansi
on

Nabinag
ar

Pirpain
ti

Lakhisar
ai

Bux
ar

Gas
Turbin
es

Hydr
o

Total

2015

3073

327

1149

4549

2016

3073

654

3728

2017

6147

327

6474

2018

6147

327

6474

Financi
al Year

Note: The capitalized investment is the total cash flow during construction plus the interest
during construction.
The following table presents the summary of annul constant and capitalised investments for
Scenario-2 for both Average and Optimistic Load Forecast Scenario.
Table 6-5

Comparison of Annual Investments (Rs.Crores) for Scenario-2( Coal+


Hydro + Import Scenario)
Average Load Forecast Scenario

Optimistic Load Forecast Scenario

Financial Year

Constant
Rupees
(Rs.Crores)

Capitalized
Investment
(Rs.Crores)

Constant
Rupees
(Rs.Crores)

Capitalized
Investment
(Rs.Crores)

2008

163

163

2009

172

172

2010

1243

59

1896

59

2011

4113

6117

2012

5619

37

8099

37

2013

2870

2234

4618

2561

2014

1788

10542

4332

16800

2015

1978

4442

4622

4549

2016

1610

2993

3728

2017

690

3293

840

6474

2018

3728

6474

Note: The constant rupees are cash flows during construction period and do not include interest
during construction (IDC) whereas capitalized investment includes IDC.

6.2

Transmission Expansion Capital Works Program for 5 Years

The transmission expansion capital works program was developed as per the proposed
transmission system during transmission system studies and the cost estimates for the
future network which includes the proposed substation and lines by BSEB.
As discussed in Section 4.9, the cost estimates are carried out for BSEB network only. The
400kV and above network planned by PGCIL were not considered in the capital works

Developing the PSMP for Bihar

6-4

020328-40RP-0400-00

Final Report

program. However, the additional 400kV network identified during the study was taken in the
investment planning and it was assumed these projects will be built by BSEB.
The cost of the transmission line entry bays for the lines of BSEB terminating at 400kV
PGCIL substations was not considered and assumed the line entry bay at PGCIL substation
end will be built by PGCIL. For all generating stations, it is assumed that BSEB was
responsible for cost of the line bay entries at generating stations end.
The total investment of the transmission expansion capital works program for the five-year
period from 2010 to 2014 are provided in the table below.

Table 6-6

Summary of Investment Costs of Capital Works Program for


Transmission from 2010 to 2014 (Rs. Lakhs)

Financial Year
ITEM

2010

2011

2012

2013

2014

Total

400kV
Transmission Lines

11,768

78,804

90,572

New Substations

28,326

28,326

Substation Augmentation

Shunt Reactors

1,224

1,224

Sub-Total

40,094

80,028

120,122
0

220kV

Transmission Lines
New Substations
Substation Augmentation
Sub-Total

12,448

22,319

46,415

5,709

11,897

98,788

4,631

13,893

38,027

5,027

61,578

9,262

1,210

1,408

4,224

16,104

17,079

45,474

85,652

12,144

16,121

176,470
0

132kV

Transmission Lines

11,353

80,320

38,504

6,508

11,191

147,876

1,827

39,273

9,135

1,827

2,298

54,360

21,282

13,371

12,525

9,036

56,214

807

605

288

394

2,094

Sub-Total

13,180

141,682

61,615

21,148

22,919

260,544

Total Investment

30,259

187,156

187,362

33,292

119,068

557,137

New Substations
Substation

Augmentation

Shunt Capacitor Banks

The schedules of disbursements to meet in-service dates and the details of the capital works

Developing the PSMP for Bihar

6-5

020328-40RP-0400-00

Final Report

program for the five-year period from 2010 to 2014 are provided in the Table 55 to Table 64
in Section 4.
6.3

Distribution Expansion Capital Works Program for 5 Years

The distribution expansion capital works program was developed as per the proposed
Distribution Expansion Plan necessary to transmit the power available at the grid substation
to the forecast load and the equipment cost estimates based on recent (2009-10) DPRs for
the BSEB.
As discussed in Section 5.6, the investment estimates do not include land requirements for
the distribution system; it was assumed that 33 kV transmission and substation projects
could be commissioned within 12 months of project go-ahead being issued and for this
reason Interest During Construction (IDC) was not included; contingencies were included;
operation and Maintenance Budgets were not included.
The total investment of the distribution expansion capital works program for the five-year
period from 2010 to 2014 are provided in the table below.
Table 6-7

Summary of Investment Costs of Capital Works Program for Distribution


from 2010 to 2014 (Rs. Lakhs)

Year

33 kV
Lines

33 kV
S/Ss

33 kV
Additional
Bays

11 kV
Lines

11 kV
Additional
Bays

DTRs

LT
Lines

Shunt
Compensation
(11 kV)

Total

2010

5,296

4,775

2,442

575

3,669

2,727

19,483

2011

3,205

8,368

398

5,563

1,361

9,167

6,455

341

34,857

2012

4,807

12,552

597

8,345

2,042

13,750

9,682

511

52,286

2013

8,012

20,920

996

13,909

3,403

22,916

16,137

851

87,144

2014

16,023

41,840

1,992

27,817

6,807

45,833

32,274

1,703

174,287

Total BSEB
(2010-14)

37,342

88,455

3,983

58,076

14,189

95,334

67,274

3,405

368,058

The details of the capital works program for the five-year period from 2010 to 2014 are
provided in the Table 5.3-1 in Section 5.

Developing the PSMP for Bihar

6-6

020328-40RP-0400-00

Final Report

CAPACITY BUILDING

As is stated in the Terms of Reference, one of the objectives of this work is training and
capacity building. The work has carried out with the counterpart staff participating in all
components of the work: data collection, data validation, analyses, and preparing the text
and conclusions of the various reports and technical memoranda. The training program for
the counterpart staff has been designed keeping in mind the requirements and availability of
BSEB staff.
The capacity building activities had included the identification and procurement of planning
software that BSEB planning unit need for ongoing generation, transmission and distribution
planning work and hands-on training in the use of this software. The master plan studies
require considerable use of computer models in all analyses leading to the PSMP, therefore
considerable effort has been put into ensuring that BSEB counterparts fully understand the
capabilities, operating requirements and results that these models represent. Workshops,
seminars and consultation meetings have been organized and held with BSEB management
and counterpart staff as well as the stakeholders to receive feedback on policy.
The training program has covered the following topics: load forecasting; power system
expansion planning fundamentals and modeling techniques; hydro-thermal systems;
transmission planning and distribution planning. The audience of these sessions has
included the assigned counterparts, as well as other individuals assigned from BSEB.
Structured training materials including the manuals for the planning software have been
provided in hard copy to seminar participants, to aid in their long-term learning.
The training workshops on the technical topics are listed below:
Table 7-1
No.

Training Workshops on Technical Topics

Workshop

Topics

Date

Power System
Planning and Load
Forecasting

Overview of power system planning, load


forecasting methodologies and results of
Load Forecast

June 4 -10, 2009

Generation Planning

SYPCO Model, Operation and Results

September 14-18, 2009

Transmission
Planning

PSAF Modeling Techniques & Transmission


Planning

December 27-28, 2010

Distribution Planning

CYME Dist Modeling Techniques &


Distribution Planning

December 28-29, 2010

The presentations for the four training workshops are provided in Appendix 11 14:
Appendix 11 Presentation for the Workshop on Load Forecast
Appendix 12 Presentation for the Workshop on Generation Planning
Appendix 13 Presentation for the Workshop on Transmission Planning
Appendix 14 Presentation for the Workshop on Distribution Planning

Developing the PSMP for Bihar

7-1

020328-40RP-0400-00

Final Report

COMPUETR MODELS AND TRANSFER OF PLANNING MODELS AND


DATABASE

8.1

Planning Models

The following power system planning software as specified in the proposal have been
purchased for the study and training. The Consultant has been using all the proposed
software in numerous similar master plan studies in India and other countries. The software
proved to be efficient and effective in facilitating the formulation of power system
development plans. The purchased software is listed as follows:
The Advanced Power System Planning and Production Costing (SYPCO)
Power Systems Analysis Framework (PSAF)
Distribution System Analysis (CYMDIST)

SYPCO is provided by SNC-Lavalin. PSAF and CYMDIST are provided by CYME


INTERNATIONAL. For the purposes of use the software, computers with Pentium IV
capabilities is sufficient. Five laptop computers with Pentium IV were purchased for the
BSEB counterparts covering generation, transmission and distribution functions.
Training on the use of the software has been provided to the BSEB counterparts by the
consultant during the course of execution of the project. Software training workshops have
been scheduled on the completion of the work for the relevant activities including generation,
transmission and distribution planning.
The programs for generation planning, transmission planning and system analysis for the
BSEB PSMP study are listed below:

SYPCO Generation Production Costing and Planning - 1 copy

Power Flow PSAF-FLOW (Cyme International)(+) 1 copy

Short-Circuit Analysis PSAF-FAULT (Cyme International)(+) 1 copy

CYMDIST Distribution Load Flow and Calculation analysis 1 copy

All the programs purchased for the study have been transferred to BSEB free of charge.
8.2

Generation Planning Model SYPCO

SYPCO program is used to compare alternative methods for meeting a given load over a
selected period of time. The program can also be used to develop a generation scenario
based on a given set of criteria. A feature in the program enables peaking plants to be
added to compensate for a given loss of load probability.

Developing the PSMP for Bihar

8-1

020328-40RP-0400-00

Final Report

Once the generation plan has been developed, the production costs are determined by
estimating the energy produced by each unit either on a probabilistic basic or by using a
simplified method. The investment costs are determined by using either the UAP, or SLD, or
Capital Cost methods. The sensitivity of the results to different discount rates is
automatically determined.
This computer program consists of several interrelated modules. The program is very
flexible and the level of detail and the options used can be tailored to the problem at hand.
SYPCO operates on the IBM-PC or compatible computer using Microsoft Windows NT 4.0,
Windows 2003, Windows XP or Windows 2007.
The users manual of SYPCO (hard copy and CD copy) and the database used for the
preparation of the generation plans have been provided to BSEB.
8.3

Transmission Planning Model PSAF

PSAF is an integrated power systems analysis software package that includes the Graphic
User Interface, Data Base Manager, and Electrical Equipment Parameter Estimation for
creating the Network one-line diagram and associated database.
PSAF is directly applicable to both utility-type and industrial three-phase electric power
systems.
A wide selection of network equipment and controllers is supported by a built-in database
that contains industry standard equipment characteristics. Every type of equipment features
more than one modelling possibility depending on the purpose and extent of the simulation
to be conducted.
PSAF offers both graphical and tabular data entry modes, user-preferred single-line diagram
drawing options (including exporting to AutoCADTM) and sophisticated facilities for
reporting, plotting and customizing the simulation reports.
PSAF for Windows requires an IBM PC or compatible computer using Microsoft Windows
NT 4.0, Windows 2003, Windows XP or Windows 2007.
The users manual of PSAF (hard copy and CD copy) and the database used for the
preparation of the generation plans have been provided to BSEB.
8.4

Distribution Planning Model CYMEDIST

CYMDIST can perform several types of analysis on balanced or unbalanced three-phase,


two-phase and single-phase systems that are operated in radial, looped or meshed
configurations. The base module includes per-phase voltage drop and power flow analysis,
fault calculations (fault flows and fault voltages), protective device coordination (by
interfacing with CYMTCC), optimal capacitor placement and sizing, load balancing and load
allocation/estimation. CYMDIST is also equipped with add-on modules to perform more
specialized analyses such as predictive and historical reliability analysis, contingency
analysis, harmonic analysis, switching (tie-points) optimization, and more, as described
below.

Developing the PSMP for Bihar

8-2

020328-40RP-0400-00

Final Report

CYMDIST is a powerful tool to assist planners in creating "what-if" studies and performing
simulations to evaluate the impact of modifications to your network, actual or future.
With the newly added Network Forecaster function planners can view/modify/create timedependent projects in the selected period, that consist of any modifications such as the
addition of any load at a given date (year, month or day), change/ replacement of power
transformers within the substation, rephasing/reconductoring project, network switching or
reconfiguration, etc.
CYMDIST requires an IBM PC or compatible computer using Windows 2003, XP or Server
2007.
The users manual of CYMDIST (hard copy and CD copy) and the database used for the
preparation of the generation plans have been provided to BSEB.
8.5

Transfer of Planning Models and Database

The Consultant has supervised the installation, start-up and initial operation of the planning
model(s) at BSEBs office, and supply all computer applications, planning model(s) users
manuals (hard copy and CD copy), and the database used for the preparation of the power
sector master plan to BSEB.

Developing the PSMP for Bihar

8-3

020328-40RP-0400-00

Final Report

CONCLUSIONS,
STARTEGY

9.1

Stakeholder issues

RECOMMENDATIONS

AND

IMPLEMENTATION

The 1st and 2nd Power System Master Plan for Bihar were presented to a group of
stakeholders in Patna during the course of the study. These stakeholders included:

BSEB;
Energy Department, Government of Bihar;

Subsequent to the presentations, the stakeholders comments were duly taken account of
and incorporated in the report.
9.2

Conclusions

Load Forecasting

Bihar has been suffering from constraints in the energy availability since last eight
years. There is a high level of suppressed demand in the Bihar;

According to the Tariff order for year 2006-07, BSEB had total connections of
1,730,904 as on 1st May 2006, out of which around 48% (833,033 Nos.) connections
were unmetered;

Owing to obvious errors in the assessment of unmetered/defective meter sale,


current T&D losses cannot be termed as reliable. Further, there is no break-up
available of the T&D losses in terms of consumer category wise Technical and
Commercial losses;

The peak demand in for 2009 is about 2,000 MW and this is forecast to increase to
between 5,383 MW (Average Load Forecast Scenario) and 8,243 MW (Optimistic
Load Forecast Scenario) in 2018.

Generation Supply Options


The capacity additions committed and/planned by the state of Bihar is very huge and it will
be more than sufficient for the present horizon period. Therefore the generation expansion
plan for the state of Bihar is rather limited to selection of optimum generation to meet the
state needs. However, the state has planned huge base load stations mostly coal based
plants and the size of the units is higher in terms of their proportion of system peak demand
handled by the system. Therefore there is a need for various supply sources for meeting the
peak load. The supply options available to the state are limited to Gas Turbine by assuming
that the National Gas Grid is available by FY2012.
The committed and planned new plants have been prioritised based on their status and
nature of project. The following priority order was used to select the projects based on the
requirement and their ranking according to the economic analysis.

Developing the PSMP for Bihar

9-1

020328-40RP-0400-00

Final Report

Table 9-1

Priority of the Projects by Type of Project


Type of Project

Priority Order

Small Hydro Power Projects under Bihar


Hydro Power Corporation (BHPC)

Bihar State Electricity Board (BSEB)


Extension and JV of BSEB and NTPC Projects

Imports available before FY 2014

Share from Ultra Mega Power Project (UMPP)

Imports from CGS and Others

Projects under tariff based competitive bidding


route

Projects under IPP through MOU

Other projects under pipe line and approved


by SIPB

Generation Requirements
Four generation scenarios were formulated for each load forecast scenario and considered
for selection of least cost plan:

Scenario-1:Coal+Hydro

Scenario-2: Coal+ Hydro+ Import

Scenario-3: Coal+ Hydro+ CCGT

Scenario-4: Coal+ Hydro+ Import+ Pump Hydro

Generation plan for each scenario was developed to meet the reliability requirements.
Results of each scenario were analysed in detail. The Scenario-2 was found to be least cost
option comparing with other scenario for both the load forecast scenario.
The net capacity additions under Scenario-2 are estimated to be 4,373 for the Average Load
Forecast Scenario and 7,068 MW for the Optimistic Load Forecast Scenario.
Transmission Requirements
The network expansion is planned to meet the system peak demand of 5,383 MW (Average
Load Forecast Scenario) in FY 2018. The summary of various transmission capacities
required to transfer the power from generating station to 132kV loads are as follows.

45 No. 132kV substations of total capacity:

3,230 MVA

4 No. 440kV substation of total capacity:

2,375 MVA

19 No. 220kV substation of total capacity:

4,700 MVA

Augmentation of 132kV Substations capacity:

7,240 MVA

Augmentation of 220kV Substations capacity:

2,400 MVA

Addition of 400kV Lines:

1,884 Ckt-km

Developing the PSMP for Bihar

9-2

020328-40RP-0400-00

Final Report

Addition of 220kV Lines:

3,095 Ckt-km

Addition of 132kV Lines:

4,292 Ckt-km

132/33 kV Shunt Capacitors :

1,130 MVAr

400kV Shunt Reactors:

600 MVAr

The load flow studies show satisfactory operation of transmission system with reinforcement
under steady state operation for FY 2018 and FY 2014 with peak load and light load
conditions.
Distribution Requirements
The studies and resulting recommendations for the distribution system were based on the
data available as July 2010.
The substation loads were based on the Load Forecast up to year 2014, and also from the
data available from transmission planning report The generation schedules were determined
from the Based Generation Plan
The Distribution Expansion Plan necessary to transmit the power available at the grid
substation was developed based on the inputs
The estimated investment in the Distribution system (33 kV lines, substations and additional
bays, 11kV lines and additional Bays, DTRs and LT lines) Rs. 368,058 Lakhs. This
investment includes the investment required for year 2010 to bring the existing network to
meet the load requirements of 2010 with reasonable quality
Investment Requirements
The total capitalised generation investment under Scenario-2 for the study period of 2010
2018 is estimated to be Rs. 24,336 Crores for the Average Load Forecast Scenario and Rs.
40,684 Crores for the Optimistic Load Forecast Scenario.
The total annual investment for the transmission is about Rs. 8,989 Crores for the study
periof of 2010 - 2018. The present worth of annual disbursements required to meet the inservice dates proposed at 10% discount rate is estimated as Rs. 6,106 Crores at the
beginning of FY 2009.
An investment of about Rs. 368,058 Lakhs is required to expand and reinforce the
distribution system by the year 2014.
9.3

Recommendations and Implementation Strategy

Generation Expansion
Based on the study it is recommended that:

The BSEB should immediately take necessary steps to bridge the demand supply
gas exist before FY 2014. The alternatives for the first five year for the horizon period
are as follows:
o

Medium-Term power procurement through IPPs outside the state

Medium-Term power procurement through power trading companies

Developing the PSMP for Bihar

9-3

020328-40RP-0400-00

Final Report

Negotiate with Central Generating Sector Plants for procuring additional


power for this period.

Many projects are expected to be commissioned in FY 2014 and if all the projects are
materialised BSEB will have comfortable position in meeting the demand. However, if
any delay of these projects may further extend the deficit period beyond FY 2013.
Therefore, BSEB should closely monitor these projects and if required a separate
Project Monitoring Cell (PMC) to be created to closely monitor these projects.

The BSEB should take immediate steps to obtain the necessary approvals from
concerned departments for R&M works of existing plants and immediately start R&M
works of one unit of BTPS and one unit of MTPS. BSEB should also closely monitor
the R&M works of these plants and make sure these units are available before the
planned R&M period which will improve the power supply position to certain extent

As of now BSEB has not planned any peak load plants. The alternatives proposed for
peaking capacity in this report are Gas Turbines and Pumped Storage Hydro. The
gas is expected to be available to the state after FY 2012. Therefore, BSEB should
look at the possibility of setting up these plants through JV/IPP/ any other mode in
the state. The Bihar Hydro Corporation has plans to build many pumped storage in
the state. Since Bihar state will have enough base load capacity after FY 2014,
pumped storage hydro could be an alternative for peaking capacity if the capital cost
of the plant is lower enough to compete with gas turbines.

The reserve requirement for the state of Bihar is about 14% and 7% respectively for
Average Load Forecast Scenario and Optimistic Load Forecast Scenario and the
installed net capacity additions requirement under two load forecast scenarios are
only in between 4,400 MW to 7,500 MW. Therefore, if all the projects are
materialised as per the BSEB plan the state will experience huge surplus and need to
examine the possibility of exporting such surplus power to other states in the country.

BSEB should take up detail generation planning studies before entering into the any
long-term contracts with Independent Power Producers (IPPs) or power purchase
from other sources or deciding upon the new project

BSEB should plan future capacity additions based on the system requirements and
not on their availability in the market place. Such system requirements should be
arrived through long-term generation planning studies.

BSEB should carry out detailed financial analysis before finalizing PPAs or contracts
with other parties.
Transmission Expansion

The observations and recommendation for transmission expansion are as follows:

The existing transmission system cannot meet the current unrestricted demand
within the specified operating criteria and requires substantial investment even if it is
assumed there is no load growth and generation expansion.

It is expected that the transmission expansion in the near future will at least avoid or
reduce the present load shedding caused due to transmission capacity constraints
and ease power supply position to important commercial and industrial consumers.
Therefore, BSEB should extensively plan transmission system and ensure
transmission system in pace with generation capacity addition plan to avoid any
further load shedding.

BSEB should closely monitor the construction of existing substation and lines and
bring them as per the schedule date of commissioning.

Developing the PSMP for Bihar

9-4

020328-40RP-0400-00

Final Report

Since most of the 132/33kV substations are planned early period of the planning and
therefore a close vigil on these projects is required.

Similarly in case of augmentation of existing 220/132kV and 132/33kV substations


BSEB should ensure the commissioning dates of augmentation.

The total number of substations and lines scheduled for the commissioned in the ten
year period and associated transmission investment is a quite considerable.

Distribution Network
This previous recent history of shortages of power and energy has had negative
environmental and social impacts, including the use of small and inefficient generators and
alternative fossil fuels during power outages. Also, the lack of a reliable electrical supply has
had a negative social impact throughout Bihar since it has restricted the growth in economic
activity. the provision of reliable electric power should help to alleviate the environmental
pollution from alternative sources of power that are necessary because the BSEB was not
able to satisfy the suppressed load demand from the industrial, commercial and private
sectors
It is therefore can be considered that the proposed distribution system, coupled with the
commissioning of new generation and improvements in the transmission system will have
positive environmental and social impacts
The existing BSEB distribution system cannot meet the current demands within the specified
operating criteria, and would require substantial investment, even if there were to be no
increase in load, and no generation expansion.
Without the extensive transmission and distribution system expansion, the new generation
cannot be evacuated and there can be no increase in the supplied consumer load. The
increase in consumer load demand would just add to the already significant suppressed
demand, resulting in more load-shedding in BSEB.
Therefore, the recommended expenditures in distribution systems are essential for the new
generation to be evacuated to satisfy the projected growth in load.
The proposed schedules for commissioning new distribution lines and substations are very
tight, and will require significant commitments of BSEB senior management.

Developing the PSMP for Bihar

9-5

020328-40RP-0400-00

Final Report

Appendix 1
Bihar State Electricity Board- Brief Profile and Future Sector Development
Programme
The Bihar State Electricity Board (referred to as BSEB or Board hereinafter) was
constituted under section 5 of Electricity (Supply) Act, 1948 on 1st April 1958. It is a
deemed licensee in terms of Section 14 of the Electricity Act, 2003. It is engaged in the
business of generation, transmission and distribution of electricity in the State of Bihar.
In the year 2000 the State of Bihar was bifurcated into two successor States of Bihar and
Jharkhand and the; Bihar State Electricity Board was bifurcated into two separate
Boards with effect from 1st April, 2001. Since its inception BSEB has filed two tariff
petitions to the Bihar State Electricity Regulatory Commission (BERC)- first for year
2006-07 and second for year 2008-09. Tariff orders have been notified for both the tariff
petitions. Brief overview of current capacity in generation, transmission and distribution
is summarized below.
A.1.1 Consumer Profile
Sales to different consumer segments as reported by BSEB for FY 2009 are mentioned
in Figure A-1 below.
Figure A-1

Consumption Profile of BSEB (as on 31st March 2008)

Clearly, the sales are dominated by the Domestic Category followed by Industrial HT
sales. Irrigation also forms very large part of the entire sales pie.
A.1.2 Current Status
Generation
At present, Bihar has two thermal generating plants located at Muzaffarpur and Barauni
whose total installed capacity is 540MW. The only Hydel generating plant at Kosi has
been transferred to Bihar State Hydro Power Corporation. The present status of the
thermal plants is given below:
-1-

Final Report

Table A-1

Name

Generation Capacity Status as on 31/03/2005

Unit Capacity
(MW)

Date of
Present status
Commissioning

(i) Barauni T.P.S 320 MW


Unit 1,2,3,

Have
retired

been

Have been retired

Unit 4

50 MW

09/11/1969

Shut down since 24-04-96

Unit 5

50 MW

01/12/1971

Shut down since15-03-95

Unit 6

110 MW

01/12/1984

Running under deteriorated


Condition

Unit 7

110 MW

31.03.1985

Running under deteriorated


Condition

One unit is running under


deteriorated condition and other
unit is under R&M

(ii) Muzaffarpur T.P.S 220 MW


Unit 1

110 MW

31/03/1985

Unit 2

110 MW

17/03/1986

Total

540 MW

No new generating station or additional unit at existing generating station is under


execution. Hence, practically entire power requirement of Bihar is met by Central
generating plants share allocated to Bihar. This position is not likely to change in next
two years.
Transmission
Bihar has a transmission network of 220 kV & 132 kV transmission lines and is tabulated
below:
Table A-2

Transmission Network (As on 31/03/2005)

Voltage

Transmission
lines
( Ckt-km)

No. of
substations

Total sub
station
capacity
(MVA)

Number of
Transformers

*440 kV

75.00

220 kV

957.02

1300

11

132 kV

3648.71

44

2077.90

93

* Charged at 220 kV
-2-

Final Report

The existing transmission system is capable to meet a demand of about 1,100 MW.
Distribution
Table A-3

Distribution Network

Voltage

Sub
transmission/Distribution No. of substations
lines (Ckt-kM)

Transformer
capacity (MVA)

33 kV

5761.80

362

2544.46

11 kV

35053.77

35746*

2,982,915

LT lines

65859.81

*Distribution transformers
Except for a few locations, the major drawal of power from Central Sector is on 220 KV.
Hence, against 1300 MVA transformer capacity at 220 KV level, about 1100 MW power
can be drawn. This provides marginal extra capacity to meet any emergency in
operations. Utilization of power to meet consumers load above 33 KV is less than 10%.
Thus, about 900 MW power is being distributed through 33KV, 11KV and L.T. system.
A1.3

Generation, Transmission and Distribution System Development Plan

A1.3.1 Generation
Existing installed capacity
The existing installed capacity of BSEB is 585 MW. There are two thermal power plants
in Bihar owned by BSEB namely Barauni Thermal Power Station (BTPS) (3x15 + 2x50 +
2x110 MW) and Muzaffarpur Thermal Power Station (MTPS) (2x110 MW). At present,
these stations are not in operation due to various reasons. The unit wise details of the
capacity and broad reason for shut down are presented as below.
Table A-4

Name of the
Plant/Unit

Existing Installed Capacity

Installed
Capacity (MW)

Status of
Operation

Remarks

a)

3x15 MW

Obsolete

Process of Sale initiated

b)

2x50 MW

Shutdown
DPR for R&M Prepared by NTPC.
Since March CEA opinioned in Oct08 R&M is
95 /Apr96
not techno-economically viable

c)

2x110 MW

R&M
/LE Defects in MP rotor bearing and
Proposed
others are attended by BHEL

BTPS

MTPS

-3-

Final Report

Name of the
Plant/Unit

Installed
Capacity (MW)

Status of
Operation

a)

2x110 MW

One unit is
running under
deteriorated
condition and
other unit is
under R&M

Remarks

Renovation and modernization works (R&M) of existing power stations


The renovation and modernization works are being carried out for BTPS and MTPS to
improve the PLF/ Generation. The details of R&M works of various units are presented
in the following sections:
R&M works of UNIT No 6&7 (2x110 MW) at BTPS:
-

The commercial offer of Rs. 601. 185 Crores was submitted by BHEL in jan08 excluding
civil works and taxes & duties for Unit No. 6&7 of BTPS

BSEB requested CEA on 12.03.08 for price settlement. CEA opinioned that scheme is
non-viable on the basis of MOP ceiling price of Rs. 1.25 crores/MW on 30-07-08.

The matter was raised by BSEB before Dr. S.C.Jha, Chairman, Special task Force on
Bihar in Planning Commission on 16-10-08

BHEL submitted revised offer of Rs. 476 crores. The price was negotiated and settled at
Rs. 428 Crores excluding restoration, consultancy and taxes etc. But CEA still did not
agree.

The meeting on 27-11-08 convened by Dr. Jha in Planning Commission, New Delhi.
CEA agreed to review the decision treating it as a special case.

CEA team visited BTPS on 17th Dec08

The meeting on 31-12-08 in Planning Commission, New Delhi was convened by


Chairman, Special task Force. BHEL and BESB agreed in principle to CEAs suggestion
for firm offer and waiver of entry tax respectively. Final decision from BHEL is expected

R&M works of UNIT No 1&2 (2x110 MW) at MTPS:


-

R&M works of Unit No 1&2 is being done by KBUNL

The BTG offer submitted by BHEL was examined by KBUNL. The issues of price were
deliberated between CMD-NTPC & CMD-BHEL on 11-09-2008. The final agreed price
by BHEL for R&M of MTPS is Rs. 212.792 Crores.

R&M of BOP packages will be carried out by KBUNL at the estimated cost of Rs. 170
Crores.

The total expenditure of R&M of Unit No. 1&2 including restoration, consultancy, taxes &
duties at the name plate rating comes to Rs. 471.8 Crores

-4-

Final Report

CEA team visited MTPS on 16th Dec08

The meeting convened by Dr. S.C.Jha, Chairman, Special task Force on Bihar on 31-1208 to follow up progress of R&M schemes of MTPS

Existing allocation of power from central generating stations


BESB has allocation of capacity as on 30-12-2008 from various power stations of
Central Generating Stations (CGS) of about 1,667 MW. Therefore, at present BSEB is
largely dependent on power from central sector stations. The details of allocation of
power from various power stations are presented as below.
Table A-5

Existing Allocation of Power from Central Generating Stations

Sl.
No

Power Station

Tala HEP

Capacity (MW)

% Allocation

Allocation
(MW)

1,020

25.5%

260.10

Chuka HEP

270

29.63%

80.00

Ranjeet HEP

60

35.0%

21.00

Teesta HEP

510

21.26%

108.43

Farakka STPS

1,600

24.62%

393.92

Kahalgaon STPS-I

840

30.21%

253.76

Kahalgaon STPS-II*

1,000

6.66%

66.70

Talcher STPS

1,000

37.0%

370.00

Total

1,553.81

*The share from Kahalgaon Stage-II of 96MW is expected to be added in March-09.


Capacity addition program
The total capacity addition under various modes is about 21,370 MW. The capacity
addition from various modes is tabulated as below.
Table A-6

Capacity Addition Program

Sl.
No

Details

Capacity
(MW)

Under Public Sector

2,980

Under tariff based Bidding through JVC of IL&FS & BSEB

3,960

Approved by SIPB under IPP (MOU signed)

6,140

-5-

Final Report

Sl.
No

Details

Capacity
(MW)

Approved by SIPB

8,290

Total

21,370

The detail of capacity addition from various power plants and their status sectors is
tabulated as below.
Table A-7

Name of the Plant/Unit

Details of Capacity Addition

Capacity Remarks
(MW)

Under Public Sector


Extension of BTPS

2x250

DPR submitted to BHEL, one unit


in 30 months

Extension MTPS

2x250

Being executed by JVC. DPR


prepared

of 3x660

Preparation of feasibility report,


EIA study data collection is being
done by NPGCL

Nabinagar Power Plant


GOB/BEB & NTPC)

(JV

Under tariff based Bidding through JVC of IL&FS & BSEB


Buxar Thermal Power Station

2x660

Survey Completed

Lakhisarai Thermal Power Station

2x660

Geo-Technical
progress

Pirpainti Thermal Power Station

2x660

EIA-report prepared

Study

under

TOR-approved by MOEF
AAI clearance approved
Coal linkages fees deposited
Approved by SIPB under IPP (MOU signed)
M/s JAS Infrastructure Capital Pvt. 4x660
Ltd. at Banka, Bhagalpur

Land identified
Coal block allotted
Water clearances obtained

M/s Nalanda Power Company Ltd., 2,000


at Pirpainti, Bhagalpur
-6-

New site identification is under


progress

Final Report

Name of the Plant/Unit

Capacity Remarks
(MW)
Water clearances obtained

Ms/s Adhunik Power and Natural 1,000


Resources
Ltd.
at
Pirpainti/
Lakhisarai

Land identified

M/s Vikas Metal and Power Ltd. at 500


Begusarai

Land not yet identified

Approved by SIPB
M/s Subas Projects & Marketing 1,200
Ltd., at Lakhisarai
M/s IL&FS, at Motipur, Muzaffarpur

Land identified

500

M/s India Power Corporation Ltd., 1,650


place not identified
M/s
Triton
Energy
Nabinagar, Aurangabad

Ltd.,

at 1,320

Land identified

M/s Krishak Bharti Co-operative Ltd. 1,320


place not identified
M/s
Cement
Manufacturing 500
Company Ltd., Place not identified

Land identified
Application for coal block submitted

Essar Power Ltd., Ranchi

1,800

Apart from the state capacity, the state has an allocation of 500 MW power from Tilaiya
UMPP (4000 MW). The power purchase agreement was executed on 10-09-08.
A1.3.2 Transmission System Development in Bihar
A comprehensive sub transmission and distribution system strengthening scheme for
Bihar has been formulated under Rashtriya Sam Vikas Yojna (RSVY)1 in consultation
with the BSEB. The total scheme is funded through central assistance under special
plan for Bihar. The total scheme is envisaged to be implemented in the following
phases2.

Sub-Transmission Scheme Phase-I

Source: The report of the special task force on Bihar on Road Map for Development of Power Sector
in Bihar, July-2007.
2
Source: The presentation made by BSEB before Honble Chief Minister of Bihar on 14-12-2008
-7-

Final Report

Sub-Transmission Scheme Phase-II, Part-1

Sub-Transmission Scheme Phase-II, Part-2

The total evacuation capacity after strengthening of the transmission and distribution
system under this scheme is presented in the following tables.
Table A-8

Transmission System

Sl.
No

Particulars

Present grid capacity at 132/33 kV level

3,096

Capacity addition under execution

2,080

Total capacity by 2009-10

5,176

Table A-9

Capacity (MVA)

Distribution Power Sub-Stations 33/11 kV Level

Sl.
No

Particulars

Capacity (MVA)

Existing

3,294

Under execution

2,656

RGGVY

318

State sector
Total

6,268

The details of the each phase are discussed in the subsequent sections.
Sub-Transmission Scheme Phase-I
The total amount released by Planning Commission under Phase-I is Rs. 552.4 Crores.
The expenditure under Phase-I as on 31-11-08 is 453.59 and the Planning Commission
permitted to transfer the balance available fund of Rs. 98.91 Crores to Phase-II. The
implementation of scheme is being done by PGCIL on behalf of BESB. The construction
of 18 No. new grid substations, 1 No. 33/11 kV substation and 876 km of associated
transmission lines is already completed and taken over under this scheme. The details
of the scheme are as follows:

New 132/33kV Grid Substations-16 No., 600MVA

Banka, Barh, Forbesganj, Udakishanganj, Bihta, Bikramganj, Gopalganj, Bhabhua,


Sasaram, Madhubani, Phulparas, Dhaka, Supaul, Sheetalpur, Vaishali and Jainagar

New 220/132kV Grid-Substation- 2No., 400 MVA

Gopalganj and Darbhanga


-8-

Final Report

New 33/11kV Power Sub-station- 1 No., 6MVA

Baniapur

Associated Transmission Line- 876 km.

Sub-Transmission Scheme Phase-II, Part-1


The total sanctioned amount under this scheme is Rs. 1,005.62 Crores and the amount
already released is Rs. 240 Crores. The expenditure already incurred under this phase
is Rs. 396 Crores. The scheme involves the construction of 10 Nos.grid substations and
523km transmission lines. The details of the scheme are as follows:

New 220/132kV Grid-Substation- 2No., 500 MVA

Sampatchak, Begusarai

New 132/33kV Grid Substations-8No., 540 MVA

Katra, Tekari, Naugachiya, Hulasganj, Raxaul, Ekangarsarai, SKMCH (Muz) and Buxar

Associated Transmission Lines 523 km

Capacity augmentation of grid substations- 19Nos, 1050 MVA

Purnea, Darbhanga, Khagaria, Samastipur, Chapra, Jakkanpur, Kanti, Fatuha,


Chandauti, Sabour, Jehanabad, Rajgir, Jamalpur, Bettiah, Sultanganj, Motihar,
Bodhgaya, Biharsharif and Sheikhpura

R&M of Grids- 8 Nos.

Biharsharif, Baripahari, Bodhgaya, Dehri, Fatuha, Jakkanpur, Barauni and Samastipur

Re-Conductoring of old lines 362 km

The progress of various works under the scheme is as follows

Construction of GSS at Raxaul, SKMCH, Naugachiya, Hulasgang, Tekari, Katra & Buxar
with associated transmission lines are under progress and expected to be completed by
June 2009, except SKMCH and Naugachiya.

Land for Ekangarsarai is expected to be transferred and the land is not yet transferred to
Sampatchak

Begusarai 220/132/33 kV GSS (2x100 MVA) work is under progress and to be


completed by August-2009

R&M of Bodhgaya work is under progress expected to be completed by June-2009

Reconductoring of 132 kV double circuit Patna-Gaya line is completed

90% of reconductoring of Barauni-Smastipur 132 kV line is completed

-9-

Final Report

R&M of Dehri, Fatuha, Jakkanpur, Barauni and Samastipur is likely to be completed by


March-2010

Augmentation of transformation capacity of 540 MVA is already completed.

Augmentation of transformation capacity of 490 MVA is under progress.

Sub-Transmission Scheme Phase-II, Part-2


The total sanctioned amount under this scheme is Rs. 1240 Crores and the amount
already released is Rs. 169.66 Crores. The expenditure already incurred under this
phase is Rs. 73.28 Crores. The scheme involves the construction of 17 No. grid
substations, augmentation of 12 No. substations, associated transmission lines of 1513
km and reconductoring of 180 km old 132kV transmission lines. The details of the
scheme are as follows:

New 220/132kV Grid-Substation- 2No., 400 MVA

Madhepura, Hajipur

New 132/33kV Grid Substations-15 No., 700 MVA

Mashrakh, Wazirganj, Dalsingsarai, Runnisaidpur, Digha, Dinara, Kudra, Aurangabad,


Jagdishpur, Karpi, Harnaut, Nalanda, Sonebarsa, Goh and Kusheshwarsthan

Augmentation of transformation capacity of 12 No substation of capacity 540 MVA

Associated transmission lines

220 kV: 136 km


132 kV: 1037 km
33 kV: 180 km

Reconductoring of old 132 kV lines 180 km

The progress of the works under this scheme is as follows:

Land is available at Dalsinghsarai, Wazairganj, Hajipur, Goh, Jagdishpur and many other
places the land has been identified.

The work has been awarded by PGCIL between Dec-07 to July-08

Supply of materials has already been commenced for Madhepura, Jagdishpur, Goh,
Wazirganj, Nalanda, Harnaut, Dalsinghsarai GSS

A1.3.3 Rural Electrification and Distribution


Physical progress of village electrification

The physical progress of village electrification as per definition of RGGVY/AREP in the


state of Bihar up to Sep-08 is presented in the following table. At present the existing

- 10 -

Final Report

power substations are overloaded and many cases the burnt out of transformers were
observed.
Table A-10

Physical Progress of Village Electrification

Sl. Implementing Total No.


No Agency
of villages
to
be
electrified

No.
of
villages
where
infrastructure
developed
(no.)

No.
of
villages
electrified not
as
per
RGGVY (no.)

No.
of
villages
electrified as
per RGGVY
(no.)

No. of
Villages
taken
over

PGCIL

18,054

12,281

4,708

1,932

2,354

NHPC

6,008

1,475

16

261

277

BSEB

4,988

Total

29,050

Tender received, under process


13,756

4,724

2,193

2,631

The amount sanctioned and fund released under rural electrification program is
presented below.
Table A-11

Sanctioned Amount and Funds Released under Rural Electrification


Program

Sl. Implementing
No Agency

Sanctioned
Amount

Villages to be Amount
electrified
released
(No.)
(Rs.
Crores)

(Rs. Crores)
1

PGCIL (24
districts)

1,973.22 (AREP)

18,054

119.64 (MNP)

(AREP+MNP)

Expenditure
up to Sep08
(Rs. Crores)

1,412.74
(AREP)

1,356.64
(AREP)

102.3
(MNP)

78.57 (MNP)

NHPC (6 districts)

500.98
(AREP+RGGVY)

6,008

224.15

201.73

BSEB (8 districts)

616.52

4,988

The proposal of revised DPR under RGGVY Rs. 1,827.47 Crores is yet to be sanctioned
by REC/MOP, GOI. Two districts namely Muzaffarpur and Vaishali had been taken
under MNP initially and now sanctioned under RGGVY in 11th Plan.
The various constraints in implementing of RGGVY observed are as follows:

DPRs prepared originally were subject to change with revised benchmark for all
categories of villages

- 11 -

Final Report

Revised benchmark fixed by Ministry of Power, Govt. of India in February 2008 (i.e. Rs.
13 lakhs per un-electrified villages and Rs. 4 lakhs per electrified villages) is not
adequate to meet the demands of rural consumers

Logistic of villages in Bihar is far more different from the villages of other states. The
villages of Bihar are densely populated and bigger in size in comparison to other states.
As such uniform benchmarks applicable for all states are not justifiable.

The existing infrastructure of villages of developed states covers almost 80% of the
villages, whereas existing infrastructure in the villages of Bihar is much lesser than those
of developed states.

PGCIL has submitted estimated cost of Rs.4095 Crores for additional 3-phase
infrastructure in villages of all 38 districts.

Proposed power substations under various schemes


The number of power substations 33/11kV (PSS) proposed under various rural
electrification schemes in the state is presented below:
Table A-12

Sanctioned

Proposed Power Substations (No.)

Sl.
No

Scheme

Achievement In advance stage

RE

24

12

12

ACA

40

---

LOI issued and likely to be


completed by June 2010

RGGVY

171

47

36

Status of distribution franchise


BSEB has planned to franchisee few distribution segments namely Gaya, Bhagalpur,
Muzaffarpur, and Patna towns. The status of various distribution franchisees is as below:
Bid documents for Gaya Town finalized in consultation with BPIC (A JVC of BSEB and
IL & FS) based on Bhiwandi model.
Bid documents for Bhagalpur, Muzaffarpur, and Patna Towns finalized in consultation
with ADB.
Board has approved the proposal for aforesaid franchisee model and requested to. State
Govt. for permission.
The selection procedure of franchisee is as tabulated below.
Table A-13

Sl.
No

Slab of Monthly Targets


Existing

Selection Procedure of Franchisee

Estimated rate of commission (in % of


actual monthly collection

Revised

- 12 -

Final Report

Sl.
No

Slab of Monthly Targets


Existing

Estimated rate of commission (in % of


actual monthly collection

Revised

0% to 35%

65% to 70%

8%

36% to 50%

Above 70% to
80%

10%

51% 75%

Above 80% to
90%

12%

76% to 100%

Above 90% to
100%

14%

A sum of Rs. 75 is to be paid for every new service connection. An additional incentive
for installing new service connection in large number is ranging from Rs. 50 to Rs. 70
per connection. Apart from this, a sum of Rs.1.0 per consumer per month on the
collection of minimum 50% of the total monthly collection targets is provided. The
performance of the franchisee is reviewed every three months. In case of the franchisee
failing to collect the average minimum monthly collection targets i.e. 35%/65% of
monthly targets, a penalty of 2% of the average shortfall assessed for every three
months is levied.
Status of APDRP program in Bihar
As part of APDRP program the total amount of Rs. 1066.58 Crores was sanctioned. The
source of funds received under this scheme is from GOI, PFC and GOB. The
expenditure under this scheme as of now is 645.68 Crores. The status of work in 12
circles (PESU(E), PESU (W), Patna, Muzaffarpur, Gaya, Rohtas, Darbhanga, Chapra,
Bhagalpur, Purnea, Saharsa & Munger) is presented as below.
Table A-14

Status of APDRP Program in Bihar

Name of the Package

Total Qty. to
executed (No.)

be Total
Qty.
executed (No.)

New Power Sub-Stations (PSS)

40

34

R&M of PSS

212

203

972 Km

762.8 Km

4,119 Km

3,749 Km

New DTs

2,226 Nos.

2,189 Nos.

R&M of DTs

6,728 Nos

5,944 Nos.

2,62,571 Nos

1,85,333 Nos

New 33 &11 kV line


Re-conductoring of 33 &11 kV line

Consumer Meter: 3-Phase &1-Phase


(PGCIL)

- 13 -

Final Report

Name of the Package

Total Qty. to
executed (No.)

Consumer Meter: 3-Phase &1-Phase


(BSEB)

be Total
Qty.
executed (No.)

3,05,000 Nos

2,37,807 Nos

143 Nos

39 Nos

DT Meter (PGCIL)

4,228

2,910

11kV Feeder Meter

705

682

33kV Feeder Meter

201

176

HT Consumer Meter (PGCIL)


System Meter:

The number of PSS for which land handed over to PGCIL is 38.
Status of metering in distribution system
The thrust on proper metering of consumers, distribution transformer (DTs), 11 kV and
33kV feeders is on in many circles in BSEB. The system metering work is entrusted to
M/s Secure Meters along with maintenance contract for five years including meter
reading with data analysis for two years. The metering at various levels in distribution
system is tabulated below.
Table A-15

Status of Metering in Distribution System

Particulars

Total No.

Meter Installed
(No)

Feeder Meter/DT Meter


By BSEB (4 circles)
33 kV Feeder

176

123

11 kV Feeder

277

257

6,902

6,737

33 kV Feeder

201

176

11 kV Feeder

705

682

4,228

2,910

DT Meter
By PGCIL (8 circles)

DT Meter
Consumer Meter
By BSEB (4 circles)

- 14 -

Final Report

Particulars

Total No.

Meter Installed
(No)

1-Phase

2,46,300

2,23,458

3-Phase

58,700

14,349

1-Phase

2,53,206

1,83,347

3-Phase

9,365

1,986

By PGCIL (8 circles)

The metering for remaining 4 circles not covered under APDRP is covered under ADB
funding. This includes the metering of 57 No. 33 kV feeders, 96 No. 11kV feeders, 4 No
33kV consumers, 42 No. 11kV consumers and 1,01,176 No. LT consumer meters (1Phase & 3-Phase). NIT was issued for 4 lakhs consumer meters out of total 9Lakhs
consumers unmetered. The balance 5Lakhs consumers will be metered in the next
phase. The work order for supply and installation of 40,057 No. 3-phase consumers (i.e.
State Tube Wells, Lift Irrigation, Water Supply, Agriculture and other consumers) has
already been issued.
Anti-theft initiatives
BSEB has taken many initiatives to control power theft in the distribution system. As part
of the theft control measures a Special Task Force (STF) was created at Board head
quarters in November 2007. All filed offices were equipped with Anti Power Theft (APT)
squads for conducting regular checks /raids. STF is headed by an officer in the rank of
Electrical Superintending Engineer (Energy Accounting). STF consists of 22 officers in
the rank of EEE/AEE. STF is fully equipped with measuring equipments and testing
equipments with full mobility. STF is also supported by 1:4 district armed force with
magistrate. The total number of premises inspected in FY 2009 (up to Oct08) was 1464.
The total number of cases in which FIR lodged was 297. The persons arrested in the
period were 58. The total amount realized was Rs. 713.28 Lakhs.

- 15 -

Final Report

Appendix 2
Historical GDP for the State of Bihar
(All figures are in Indian Rupee)
GDP at 1999-2000 Prices

Sector

1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08

Agriculture

1,520,245

2,086,135

1,628,760

2,066,604

1,689,948

1,941,748

1,698,380

2,172,949

1,908,325

Forestry & logging

91,061

96,295

98,771

102,316

106,604

111,676

116,602

121,603

126,756

Fishing

69,666

76,924

98,479

106,927

109,147

109,534

114,470

106,906

114,874

1,680,972

2,259,354

1,826,010

2,275,847

1,905,699

2,162,958

1,929,452

2,401,458

2,149,955

9,444

13,342

24,254

6,795

5,570

4,382

7,476

6,419

6,400

1,690,415

2,272,696

1,850,265

2,282,642

1,911,269

2,167,340

1,936,927

2,407,876

2,156,355

361,400

338,989

314,355

338,616

331,723

352,658

378,947

400,246

418,302

-6.2%

-7.3%

7.7%

-2.0%

6.3%

7.5%

5.6%

4.5%

Agri & Allied


4

Mining & quarrying

Sub Total of Primary

Manufacturing

5.1 Manu-Registered

115,065

78,584

67,724

84,163

62,181

79,040

87,155

96,361

106,133

5.2 Manu-Unregistered

246,335

260,405

246,632

254,453

269,541

273,618

291,792

303,885

312,168

Construction

192,919

195,250

215,939

257,473

251,752

310,399

569,833

741,919

775,018

Electricity, gas and Water supply

71,852

77,800

60,214

61,571

63,170

65,444

72,782

77,198

82,152

Sub Total of Secondary

626,172

612,039

590,508

657,660

646,645

728,500

1,021,562

1,219,363

1,275,471

-1-

Final Report

GDP at 1999-2000 Prices

Sector

1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08

Industry

635,615

625,381

614,763

664,455

652,215

732,882

1,029,037

1,225,782

1,281,872

Transport, storage & communication

372,396

405,384

405,059

435,725

407,067

439,091

489,087

539,672

542,528

8.1 Railways

156,375

175,517

180,244

183,662

138,312

148,520

161,319

175,855

175,855

8.2 Transport by other means (including


storage)

139,261

150,387

149,788

157,546

158,205

165,599

167,454

177,825

180,681

8.4 Communication

76,760

79,480

75,027

94,517

110,550

124,972

160,314

185,992

185,992

Trade, hotels and restaurants

754,085

870,094

952,999

1,135,742

1,141,966

1,388,069

1,357,104

1,741,314

1,960,068

10

Banking & Insurance

181,914

201,432

247,359

236,669

229,532

242,491

260,262

319,976

319,976

11

Real estate, ownership of dwellings


and business services

209,709

220,979

230,439

239,966

250,855

263,763

278,237

294,723

312,882

12

Public administration

379,361

412,939

446,152

384,602

436,253

458,763

443,199

521,040

509,162

13

Other services

805,941

829,506

826,758

832,877

866,359

868,354

953,042

1,061,398

1,022,945

c.

Sub Total of Tertiary

2,703,406

2,940,334

3,108,766

3,265,581

3,332,031

3,660,530

3,780,930

4,478,123

4,667,561

14

State domestic product (Rs. lacs)

5,019,993

5,825,069

5,549,539

6,205,883

5,889,945

6,556,371

6,739,419

8,105,362

8,099,388

8.3 Storage

-2-

Final Report

Appendix 3
TECHNICAL AND COST CHARACTERISITCS
Existing BSEB Plants
Description

Plant-1

Plant-2

Name of the Unit

BTPS

MTPS

Source

14%

Thermal
Performance
Report 2006-07,
CEA

33.12%

21.3%

Thermal
Performance
Report 2006-07,
CEA

Total Fuel Cost(Rs/MT)

1799

1799

Gross Calorific Value


(kCal/kWh)

4520

4520

Unit Heat Rate


(kCal/kWh)

4768

3600

Variable O&M (Rs/kWh)

0.06

0.076

Fixed O&M
(Rs/kW/Year)

1959

1959

Auxiliary Consumption
(%)

Forced Outage Rate (%)

Unit Maintenance
(Weeks)

17.64%

-1-

Assumption
BSEB
BSEB
BSEB
Assumption
Assumption

Final Report

Existing Imports
Thermal
Description
Name of the Unit
Transmission
Losses (%)

Plant-1
Farakka
STPS
3.42%

Station Service (%)

Forced Outage Rate


(%)

6.53%

Plant-2
Plant-3
Kahalgaon Kahalgaon
STPS-I
STPS-II
3.42%

8.74%

3.42%

7.5%

Plant-4

Remarks

Talcher
3.42%

RLDC

5.67%

Thermal
Performance
Report 200607, CEA
Thermal
Performance
Report 200607, CEA

5.75%

1.24%

2%

3.04%

Variable Tariff
(Rs/kWh)

1.02

1.12

1.12

0.42

BSEB

Fixed Tariff
(Rs/KW/Month)

708

504

504

729.6

BSEB

2450.16

1090

90% of
PLF

2653

BSEB

Description

Plant-1

Plant-2

Plant-3

Plant-4

Name of the Unit

Teesta
HEP

Tala HEP

Chuka
HEP

Ranjeet
HEP

Transmission
Losses (%)

3.42%

7.38%

3.42%

3.42%

Station Service (%)

0.5%

0.5%

0.5%

0.5%

Forced Outage Rate


(%)

2%

2%

2%

2%

Variable
(Rs/kWh)

1.77

1.12

0.71

BSEB

624

782

489.6

BSEB

391.3

973.8

554.03

115.10

BSEB

Annual Gross
Energy Availability
(MU)
Hydro

Tariff

Fixed
Tariff
(Rs/KW/Month)
Annual
Energy
(MU)

Gross
Availability

-2-

Remarks

RLDC
Assumption
Assumption

Final Report

Appendix 4
RESTRICTED LOAD DURATION CURVES
Restricted Load Duration Curve Profiles

-1-

Final Report

-2-

Final Report

Unrestricted Load Duration Curve Profiles

-3-

Final Report

-4-

Final Report

-5-

Final Report

Appendix 5
DESCRIPTION OF SYPCO (ADVANCED POWER SYSTEM PLANNING AND
PRODUCTION COSTING SOFTWARE)
This annexure presents a description of the computer programs utilized to develop the
generation expansion plans. Details are provided for SYPCO.
SYPCO
This section describes the computer program SYPCO (Advanced Power System
Planning and Production Costing), a tool for costing power system generation plans. The
program can be used to examine a generation expansion scheme based on a given set
of criteria by comparing the cost of alternative generation scenarios to serve a given load
over a selected period of time. The criteria normally would consist of a load forecast,
existing generation capability, future generation facilities, fuel, operation and
maintenance (O & M) costs and the target reliability with which the load is to be served.
SYPCO has the capability of evaluating thermal and hydro generation, as well as
interconnection ties with neighbouring systems.
Using SYPCO, peak load units can be added to satisfy a given loss of load probability
criterion.
Once the generation expansion plan has been developed, there are a number of options
available to determine the cost of operating the system. The production costs are
determined by simulating the operation of the system for a given method. Investment
costs for the selected generation plan can be determined by using a number of costing
methods. The production and investment costs are then combined to calculate the total
annual costs along with the cumulative present worth.
The information required to determine the sensitivity to varying discount rates, escalation
in fuel prices, capital costs, and operation and maintenance costs is readily available by
selecting appropriate options. Thus, alternative generation scenarios can be evaluated
rapidly and the sensitivity of the results to critical economic parameters can be
assessed.
SYPCO consists of several interrelated modules as shown in the following figure.

-1-

Final Report

The program is very flexible and the level of detail and the options selected can be
tailored to the problem at hand. The basic options, which may be selected, are as
follows:
- Generation Expansion - Automatic addition of peak load units.
- Loss of Load Probability Analysis (LOLP) - Analysis based on either monthly (12
intervals per year) or the annual load duration curves.
- Production Costing - Interval or annual based on either the simplified or the
Probabilistic method.
- Investment Costing - Based on either the uniform annual payment method, the
straight-line depreciation method, or the capital cost method.
Any combination of these options may be selected for a given study. The following
subsections provide an indication of the level of detail possible and briefly describe the
various modules.
Load Model
This module uses the input load data and converts it into a form that is usable by the
other program modules. Depending on the level of detail desired the availability of data,
either the interval load duration curves (ILDC), or the Annual Load Duration Curve

-2-

Final Report

(ALDC). For each case, the annual peak load (in MW) and annual energy (in GWh) as
well as other characteristic information is required.
Hydro Scheduler
This module schedules the hydro units and determines the load, which has to be served
by thermal units.
It is possible to model two types of hydro units.

Base hydro

Peak hydro

Base hydro units have no storage capability and are assumed to operate all the time that
water is available. They are stacked at the bottom of the load duration curve. Peak
hydro units on the other hand, have storage capability and are scheduled using the
insertion technique; see the following figures (for LOLP purposes either the firm energy
or average energy may be used).

In this way peak hydro units serve in essentially a peak shaving mode. The level at
which they are stacked is determined in such a way that all their available energy is
utilized, if possible.
Hydro scheduling can be done, depending on the load model used, on one of the
following basis:

Scheduling under the Annual Load Duration Curve

Scheduling under the Interval Duration curves

For scheduling under the Annual Load Duration Curve, the capacity and energy (energy
for peak hydro only) of the unit is required. However, for scheduling under the Interval
Load Duration Curves the distribution of the hydro capacity for both base and peak
hydro and the distribution of hydro energy for peak hydro units for each of the intervals is
required. Typically the following is the input hydro data:
-3-

Final Report

Base Hydro Units

Hydro capacity

Forced outage rate

Ratio of interval capacity to rated capacity

Peak Hydro Units

Hydro capacity

Forced outage rate

Firm energy

Average energy

Ratio of interval firm energy to annual firm energy

Ratio of interval average energy to annual average energy

The interval capacity and energy data for hydro units may be specified in any consistent
units.
For stacking base hydro units and peak hydro units the capacity is derated by the forced
outage rate of the unit. This results in a reduction in energy output from the base hydro
units. For peak hydro units the energy is recoverable.
After scheduling the hydro units and determining the stackable peak hydro capacity the
load left over i.e. the load to be served by thermal units, is determined. The output from
the hydro scheduler consists of one of the following:

Stackable capacity of peak hydro units

Annual thermal load duration curves

Loss of Load Probability (LOLP) Analysis and Addition of Peaking Units


This module uses the load duration curves to calculate the risk associated with having
insufficient generation to meet the load. The risk is calculated as a Loss of Load
Expectancy (LOLP) in days per year or hours per year. As an option, peaking plants are
added automatically in such a way that the system reliability is at least equal to a given
reliability index.
The LOLP analysis is generally done using the interval load duration curves. The
maintenance of the hydro units is done deterministically and the maintenance of the
thermal units may be scheduled either manually or automatically. To schedule
maintenance automatically, the program starts by scheduling the units in descending
order of size and locating maintenance in the interval having the highest reserve. If the
unit requires more than one interval of maintenance then consecutive intervals with the
highest reserve are located in order to schedule unit maintenance.
Starting with the original load duration curve, each unit is convolved with the load
duration curve using the following recursive formula (Eq-1):

-4-

Final Report

ELDC i (x ) = p i . ELDC ( i-1 ) (x ) + q i . ELDC ( i-1 ) (x - C i )


Where:
qi

= Forced outage rate (FOR) of the ith unit

pi

= 1 - qi, the availability rate of the ith unit

ELDCi(x) = Equivalent LDC after convolution of the ith unit


Ci

= Capacity of the ith unit

The loss of load probability for a system having n units and a total installed capacity, C,
is:
LOLP = ELDCn(C)

(2)

If LOLP is greater than the system design criteria, then peaking units are added until the
desired reliability is achieved. When the annual LDC is used, an approximation is made
for the maintenance of units. For calculating LOLP, the firm capability of the hydro is
usually used, but the other capabilities can be examined if desired.
Production Costing
The objective of this module is to simulate the operation of the power system and to
determine the cost of energy production. The energy produced by each unit can be
computed for two distinct levels of detail: interval basis using the ILDC, or annual basis
using the ALDC.
For production costing, the costs associated with the production, generally fixed per
year, are computed. The load model prepares the appropriate load data and produces
the thermal load duration curves. Once the interval load duration curve has been
determined, the thermal units are stacked in order of priority. The unit with the lowest
variable cost (fuel and variable O & M) is stacked first after the must run units.
The energy produced by the thermal units can be calculated by either one of two ways:
Simplified Method - This method is illustrated in the following figure. The energy
produced by a unit is the area under the duration curve. The unit capacity is derated by
the unit forced outage rate and to account for unit maintenance, the unit capability is also
generally derated by the planned outage rate. The derated capacity (Di) is given by:

-5-

Final Report

Di = Ci {1 - (PORi + FORi)}

(3)

Where:
Ci

= unit net capacity

PORi = planned outage rate


FORi = forced outage rate
Probabilistic Method - The method takes the outage rate of the unit into account
probabilistically as illustrated in the following figure. As in the LOLP analysis, each unit is
successively convolved with the load duration curve using the recursive formula given in
equation (1). When a unit is stacked, the load level increases by the unit size for a
duration proportional to the forced outage rate of the unit and to the time the unit is used
in that load state.

The energy produced by unit i (Ei) is the area under the load duration curve multiplied by
the unit availability.
Qi

Ei= pi

ELDC ( i -1 ) ( x ) dx

Q ( i-1 )

Where Qi and Qi-1 are the load levels at which the unit is stacked.
On a probabilistic basis, there will always be some unserviced energy. After stacking
the n available thermal units having a total capacity of C, the expected unserviced
energy (UE) is:
PL+C

UE =

ELDC i ( x ) dx

-6-

Final Report

Where :

PL = Peak Load

Unit maintenance is treated either automatically or manually as described in the LOLP


analysis:
Once the interval energy produced by each unit has been determined, a simple
summation of the energy produced by each unit in each interval gives the annual energy
produced. The production costs (fuel, fixed and variable O & M) can then be easily
computed for each of the generation units and hence for the entire system. These costs
can include escalation in fuel prices, capital costs, and operation and maintenance
costs.
The method used for annual production costing is an approximation to that described
above for interval production costing. The primary difference is that unit maintenance is
approximated and the annual load duration curve is used instead of the interval load
duration curve.
Pumped Storage Modeling in SYPCO
Pumped storage units are used to improve system reliability and decrease generation
costs by storing cheap off-peak energy, which is later released during high-cost peak
hours. These units operate in cyclical manner consisting of pumping and generating
usually on a daily or weekly basis. Pumping is performed in low-cost periods of thermal
operation where the unit operates like a motor to pump water into a reservoir. The stored
water in the reservoir is then used to generate electricity during peak-load, high-cost
periods. The operation of the pumped-storage unit is limited by its physical
characteristics and optimized to maximize the economics of its operation.
Physical characteristics
The pumped-storage units physical characteristics are represented by:
-

E : storage volume (GWh)

Pp : pumping capacity (MW)

p : pumping efficiency (%)

Pg : restoration or generation capacity (MW)

g : generating efficiency (%)

The energy required to pump the water into the storage reservoir is:

Ep

E
p

and the energy generated from the water stored in the reservoir is:

Eg E g
The roundtrip or overall efficiency of the pumping/generation cycle is:

p g
-7-

Final Report

SYPCO uses monthly load duration curves (LDC) to represent the system load, where
the load is represented by a non-chronological format. Therefore the results obtained in
SYPCO only provide the overall monthly operation.
The operation of a pumped storage unit is shown in the following figure where the
pumped energy is added to the LDC and the generated energy is removed from the
peak of the curve.

-8-

Final Report

S YP CO LDC curves

7000

6000

5000
Restored energy

Difference in cost between pumped and restored energy

Load (MW)

4000

Pumped energy

3000

2000

1000

0
0

10

20

30

40

50

60

70

80

90

100

Num ber o f po in ts
O riginal LD C

T hermal (-H YDR O )

Pum ped Storage

Economics
The economics of operating a pumped storage unit is based on the difference between
the cost between the cost of storing the energy and the avoided cost of not producing
the energy provided by the pumped storage unit. This difference is determined by the
overall efficiency of the pumping/generation cycle as well as the thermal units affected
by the pumped storage unit - shown in the following formulae:
The cost of pumping the energy is :

C p E p UPC p
and the avoided cost of generating with the stored water is:
-9-

Final Report

C g E g UPC g
Where UPC p is the variable cost of the thermal unit pumping the water and UPC g is the
avoided cost of not having to generate that energy had the pumped storage unit not run.
These costs are expressed in mills/kWh.
Therefore, to operate economically:

Cg C p
Substituting,

E g UPC g E p UPC p
Or

UPC g UPC p
To operate economically, the avoided cost of the generation UPC g reduced by the
overall efficiency must be greater than the cost of pumping the water UPC p . As the
storage unit may span more than one thermal unit, UPC may be made up of several
thermal units costs. The operating cost savings can be expressed as:

Csavings E (UPC g g UPC p p )


It should be noted that E and UPC are coupled so that when E increases, the price
difference between UPC g and UPC p decreases. There are also many other
considerations and interrelationships that come into play when a pumped storage unit is
added. Among them are:

The load and load shape

Maintenance schedules

Energy limited thermals units

Interconnection usage

New unit additions

Reliability - LOLP

Unit |forced outage rates

Types of generating units

Cost of expected unserviced energy (EUE)

To properly model the effect of pumped storage units on all of these phenomena, an
iterative annual optimization is necessary.
Investment Costing
The investment-costing module uses the generation expansion plan, the cashflow
pattern and the number of years of construction given in the database to produce a
cashflow profile for all investments. Any special investments entered are also treated in
- 10 -

Final Report

the same way. Then based on the method of calculation used, the annual costs are
calculated. Three methods of calculation are available: uniform annual payments (UAP),
straight-line depreciation (SLD), and capital cost.
The uniform annual payments method calculates the annual capital costs using a
uniform charge to cover both interest and depreciation. The full cost is paid back over
the life of the plant. These costs appear for each year of the plant life starting in the
commissioning year along with other charges such as interim replacement and
insurance.
The straight-line depreciation method calculates the annual capital costs using straightline depreciation, with interest calculated on the diminishing balance. As with the UAP
method, the full cost is paid back over the life of the plant and the costs appear for each
year of the plant life starting in the commissioning year along with the other charges
such as interim replacement and insurance.
The capital cost method assumes that the entire capitalized investment is assumed to be
spent in the commissioning year. The investment costs for future years of the life of the
plant include charges for items such as interim replacement and insurance.
Economic Analysis
The economic analysis is carried out by simulating the operation of the system for a
period of time long enough to absorb the project under study. This is called the
simulation period. In order to measure the effect of the project(s) on long term operating
costs, the operation simulated in the last year of the simulation period is held constant
for a period long enough to measure these effects. The overall period of comparison is
called the evaluation period. For hydro plants, this evaluation period is usually 50 years.
The following figure shows the relationship between evaluation period, simulation period,
reference year for discounting and reference year for cost data.

The present worth analysis consists of obtaining the present worth of all costs, both
production and investment costs, for a basic discount rate and for up to five additional
discount rates. When investment costs are determined for these additional discount
rates, the interest during construction is automatically recalculated to reflect the discount
rate being used.

- 11 -

Final Report

An evaluation of a given scenario beyond the simulation period is obtained by assuming


that the annual costs during the evaluation period remain constant and equal to the
annual cost during the last year of the simulation period.
This provides a
computationally efficient means of extending the economic analysis of the system into
years beyond the simulation period.
SYPCO permits the use of up to five different escalation rates for fuel costs, capital costs
and O & M costs. The cost data is supplied in terms of reference year costs, i.e. the
costs are valid for the beginning of the specified reference year. To determine the actual
costs in any given simulation year, the costs are multiplied by an escalation factor.
Summary Reports
The following is a sample list of summary reports that are available at the completion of
a SYPCO simulation:

Annual and/or Interval LOLP

Annual and/or Interval Unit Energy Production

Annual Production and/or Investment Costs

Annual and/or Interval Hydro Utilization

Annual and/or Interval Energy and Capacity Balances

Maintenance Schedule

Generation Expansion Program by Unit Type

Energy Production Mix by Fuel Type

Summary of Surplus Hydro

Summary of Annual LOLP

Summary of Annual Costs and Present Worth

Sensitivity to Discount Rates

Input Data Processing


An editor, SYPEDIT was specifically developed for editing SYPCO data input. It was
designed to simplify the data entry procedure and is also able to detect some anomalies
in the data that may be entered erroneously.

- 12 -

APPENDIX 6
EQUIPMENT UNIT COST

TABLES:

A-1 to A-17

Appendix A-1

Estimated Cost of Replacement of Old Xmer with 1 x 10 MVA , 33/11 kV Xmer


SL

PARTICULARS

AUGMENTATION OF TRANSFORMER WITH HIGHER CAPACITY


33/11kV Transformer along with oil and all accessories, complete
33kV Equipments
11kV Equipments
AC/DC Supply
Sub Station Auxiliaries
Insulators and Hardware
Spares
Civil Works (other than foundations) (w/o land cost, if any)
Civil Foundations
Erection and Dismantling Charges
Cable Laying and associated work
Stringing and Jumpering
Testing, Commissioning and misc. works
Transport, Insurance, Service charges, Contingencies, etc.
Total
Prices are 2010-11 (1st quarter) based
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Amount in
Rs. Lakh
74.48
9.33
5.15
0.22
4.37
0.52
1.85
0.12
2.62
4.98
0.17
0.46
0.46
22.31
127.01

Appendix A-2

Estimated Cost of Replacement of Old Xmer with 1 x 5 MVA , 33/11 kV Xmer


SL

PARTICULARS

AUGMENTATION OF TRANSFORMER WITH HIGHER CAPACITY


33/11kV Transformer along with oil and all accessories, complete
33kV Equipments
11kV Equipments
AC/DC Supply
Sub Station Auxiliaries
Insulators and Hardware
Spares
Civil Works (other than foundations) (w/o land cost, if any)
Civil Foundations
Erection and Dismantling Charges
Cable Laying and associated work
Stringing and Jumpering
Testing, Commissioning and misc. works
Transport, Insurance, Service charges, Contingencies, etc.
Total
Prices are 2010-11 (1st quarter) based
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Amount in
Rs. Lakh
39.16
9.33
5.15
0.22
4.37
0.52
1.85
0.12
2.62
4.98
0.17
0.46
0.46
16.48
85.86

Appendix A-3

Estimated Cost of Installation of New 33/11 kV Sub Station with


1x10 MVA Transformer, 1x33 kV and 3x11 kV Bays
SL

PARTICULARS

NEW 33/11kV OUT DOOR SUB STATION


33/11kV Transformer along with oil and all accessories, complete
11/0.4 kV 100 kVA Station Transformer including oil
33kV Equipments
11kV Equipments
AC/DC Supply
Sub Station Auxiliaries
Structures
Insulators and Hardwares
Sub Station Lighting
Fire Fighting Equipments
Safety Equipments
Spares
Tools & Plants
Civil Works (other than foundations) (w/o land cost, if any)
Civil Foundations
Erection Charges
Cable Laying and associated work
Stringing and Jumpering
Testing, Commissioning and misc. works
Transport, Insurance, Service charges, Contingencies, etc.
Total
Prices are 2010-11 (1st quarter) based
Cost does not include charges towards land compensation, etc., if any
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Amount in
Rs. Lakh
74.48
1.52
19.19
24.73
1.92
10.39
17.60
0.88
1.18
0.18
0.16
15.19
0.43
16.35
13.19
5.68
1.08
0.91
1.18
42.66
248.91

Appendix A-4

Estimated Cost of Installation of additional 33/11 kV 1x10 MVA Transformer


with protective switchgear
SL

PARTICULARS

INSTATLLATION OF ADDITIONAL 33/11 kV TRANSFORMER


33/11kV Transformer along with oil and all accessories, complete
33kV Equipments
11kV Equipments
AC/DC Supply
Sub Station Auxiliaries
Structures
Insulators and Hardwares
Sub Station Lighting
Fire Fighting Equipments
Spares
Civil Works (other than foundations) (w/o land cost, if any)
Civil Foundations
Erection Charges
Cable Laying and associated work
Stringing and Jumpering
Testing, Commissioning and misc. works
Transport, Insurance, Service charges, Contingencies, etc.
Total
Prices are 2010-11 (1st quarter) based
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Amount in
Rs. Lakh
74.48
9.98
5.38
0.22
4.21
6.34
0.52
0.30
0.09
13.63
0.68
5.83
2.34
0.46
0.34
0.48
25.66
150.94

Appendix A-5

Estimated Cost of Installation of new 33/11 kV Sub Station with


1x5 MVA Transformer, 1x33 kV and 3x11 kV Bays
SL

PARTICULARS

NEW 33/11kV OUT DOOR SUB STATION


33/11kV Transformer along with oil and all accessories complete
11/0.4 kV 100 kVA Station Transformer including oil.
33kV Equipments
11kV Equipments
AC/DC Supply
Sub Station Auxiliaries
Structures
Insulators and Hardwares
Sub Station Lighting
Fire Fighting Equipments
Safety Equipments
Spares
Tools & Plants
Civil Works (other than foundations) (w/o land cost, if any)
Civil Foundations
Erection Charges
Cable Laying and associated work
Stringing and Jumpering
Testing, Commissioning and misc. works
Transport, Insurance, Service charges, Contingencies, etc.
Total
Prices are 2010-11 (1st quarter) based
Cost does not include charges towards land compensation, etc., if any
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Amount in
Rs. Lakh
39.16
1.52
19.19
24.73
1.92
10.39
17.60
0.88
1.18
0.18
0.16
15.19
0.43
16.35
13.19
5.68
1.08
0.91
1.18
34.96
205.88

Appendix A-6

Estimated Cost of Installation of Additional 33/11 kV 1x 5 MVA Transformer


with Protective Switchgear
SL

PARTICULARS

INSTALLATION OF ADDITIONAL 33/11 kV TRANSFORMER


33/11kV Transformer along with oil and all accessories complete
33kV Equipments
11kV Equipments
AC/DC Supply
Sub Station Auxiliaries
Structures
Insulators and Hardwares
Sub Station Lighting
Fire Fighting Equipments
Spares
Civil Works (other than foundations) (w/o land cost, if any)
Civil Foundations
Erection Charges
Cable Laying and associated work
Stringing and Jumpering
Testing, Commissioning and misc. works
Transport, Insurance, Service charges, Contingencies, etc.
Total
Prices are 2010-11 (1st quarter) based
1
3
4
5
6
7
8
9
10
12
14
15
16
17
18
19
20

Amount in
Rs. Lakh
39.16
9.98
5.38
0.22
4.21
6.34
0.52
0.30
0.09
13.63
0.68
5.83
2.34
0.46
0.34
0.48
19.00
108.96

Appendix A-7

Estimated per km Cost of New 33 kV D/C Line with WOLF ACSR


SL

PARTICULARS
1
2
3
4
5
6
7
8
9

Rail Pole
Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Erection / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based
Cost does not include charges towards land compensation, etc., if any

Amount in
Rs. Lakh
8.43
4.36
1.49
1.26
1.20
0.19
1.58
1.85
2.13
22.49

Appendix A-8

Estimated per km Cost of New 33 kV S/C Line with WOLF ACSR


SL

PARTICULARS
1
2
3
4
5
6
7
8
9

Rail Pole
Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Erection / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based
Cost does not include charges towards land compensation, etc., if any

Amount in
Rs. Lakh
7.73
2.18
0.63
0.63
1.20
0.10
1.32
1.38
1.58
16.74

Appendix A-9

Estimated per km Cost of New 33 kV S/C Line with DOG ACSR (50 m span)
SL

PARTICULARS
1
2
3
4
5
6
7
8
9

Rail Pole
Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Erection / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based
Cost does not include charges towards land compensation, etc., if any

Amount in
Rs. Lakh
7.73
1.51
0.63
0.63
1.20
0.10
1.32
1.31
1.51
15.92

Appendix A-10

Estimated per km Cost of New 33 kV S/C Line with DOG ACSR (100 m span)
SL

PARTICULARS
1
2
3
4
5
6
7
8
9

Rail Pole
Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Erection / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based
Cost does not include charges towards land compensation, etc., if any

Amount in
Rs. Lakh
3.87
1.51
0.44
0.42
1.20
0.07
0.79
0.83
0.95
10.08

Appendix A-11

Estimated per km Cost of Replacement of 33 kV S/C Line Cond. with DOG ACSR (with 100
metre span)
SL

PARTICULARS
1
2
3
4
5
6
7
8

Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Dismantling / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based

Amount in
Rs. Lakh
1.51
0.34
0.42
0.33
0.02
0.45
0.54
0.35
3.96

Appendix A-12

Estimated per km Cost of Replacement of 33 kV S/C Line Cond. with DOG ACSR
(with 50 metre span)
SL

PARTICULARS
1
2
3
4
5
6
7
8

Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Dismantling / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based

Amount in
Rs. Lakh
1.51
0.68
0.63
0.33
0.03
0.76
0.69
0.45
5.09

Appendix A-13

Estimated per km Cost of Replacement of 33 kV S/C Line Cond. with WOLF ACSR
SL

PARTICULARS
1
2
3
4
5
6
7
8

Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Dismantling / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based

Amount in
Rs. Lakh
2.18
0.68
0.63
0.33
0.03
0.76
0.81
0.53
5.95

Appendix A-14

Estimated per km Cost of Conversion of 33 kV S/C Line to D/C line with WOLF ACSR
SL

PARTICULARS
1
2
3
4
5
6
7
8

Conductor
Fabricated items including Cross-arms, Pin, Clamps, etc
Insulators with Hardware
Guarding and Lacing
Nuts and Bolts
Misc. items including Stay support, Earthing, Paints, etc.
Dismantling / Stringing
Transport, Insurance, Service Charges, Contingencies,etc.
Total
Prices are 2010-11 (1st quarter) based

Amount in
Rs. Lakh
4.36
1.59
1.26
0.33
0.07
0.76
1.46
0.96
10.80

Appendix A-15

Estimated per km Cost of 33 kV Underground Cabling Work


SL

PARTICULARS

LAYING OF 33 kV XLPE CABLE


33 kV, 3-Core, 400 sq.mm.XLPE Cable
End Termination Kits
Straight through Jointing Kits
Pipe for laying cable on the Terminal Structures
Cable Laying and associated work
Transport, Insurance, Service charges, Contingencies, etc.
Total
Prices are 2010-11 (1st quarter) based
1
2
3
4
5
6

Amount in
Rs. Lakh
32.21
0.67
1.68
0.16
3.47
3.99
42.19

Appendix A-16

Estimated Cost of Construction of New 33 kV Bay


SL

PARTICULARS

ERECTION OF 33 kV BAY
33kV Equipments
AC/DC Supply
Sub Station Auxiliaries
Structures
Insulators and Hardwares
Sub Station Lighting
Spares
Civil Works (other than foundations) (w/o land cost, if any)
Civil Foundations
Erection Charges
Cable Laying and associated work
Stringing and Jumpering
Testing, Commissioning and misc. works
Transport, Insurance, Service charges, Contingencies, etc.
Total
Prices are 2010-11 (1st quarter) based
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Amount in
Rs. Lakh
8.85
0.05
1.48
2.69
0.29
0.12
1.12
0.30
2.14
1.09
0.18
0.23
0.19
6.64
25.37

Appendix A-17

Estimated Cost of Construction of New 11 kV Bay


SL

PARTICULARS
1
2
3
4
5
6
7
8
9
10

Cost of 11 kV Equipments
Auxiliaries (Cables & Conductors)
Structures
Insulators & Hardwares
Civil Works (Other than Foundations)
Civil Foundations
Erection Charges
Cable Laying & Associated Work
Stringing & Jumpering
Testing,Commissioning and Associated Work
Total
Contingencies @5%
Grand Total
Add 10%
Total

Amount in
Rs. Lakh
5.38
1.40
3.25
0.09
0.19
0.70
0.41
0.23
0.17
0.04
11.86
0.59
12.45
1.25
13.70

APPENDIX 7
TOTAL COST

TABLES:

B-1 to B-7

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

Feeder

Source
EHV S/S

Work proposed

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

Circle Total
Cost
(Rs. Lakh)

2010

1. PESU (East)

1. Bahadurpur-Saidpur

Mithapur

2. Kankarbag
3. R K Nagar

Mithapur
Mithapur

4. Karbagahiya-R.Nagar Mithapur
5. City feeder

Gaighat

6. NMCH

Gaighat

1. Khagaul III and IV

Khagaul

2. Khagaul II

Khagaul

3. Khagaul I

Khagaul

2. PESU (West)

3. Patna

4. Danapur I

Khagaul

5. PESU 9
6. PESU 7

Jakkanpur
Jakkanpur

7. PESU 6

Jakkanppur

1. Pareo-Kanpa

Bihta

Conversion of S/C DOG to D/C WOLF ACSR


from Mithapur GSS to Bahadurpur S/S
Replacement of DOG with WOLF ACSR
Replacement of DOG with WOLF from Mithapur
GSS to Ashoknagar S/S

6.0

10.80

64.80

5.0
2.5

5.95
5.95

29.75
14.88

Replacement of DOG with WOLF from Mithapur


to Karbagahiya
Replacement of DOG with WOLF upto
Malsalami S/S
Replacement of DOG with WOLF ACSR from Gaighat
GSS to NMCH to Meena Bazar

2.0

5.95

11.90

10.0

5.95

59.50

3.5

5.95

20.83

Replacement of DOG with WOLF ACSR


from Khagaul to Garikhana
1. Conversion of S/C DOG to D/C WOLF ACSR from
Khagaul to Walmi tapping
2. Replacement of DOG with WOLF from Walmi
to IGIMS
1. Conversion of S/C DOG to D/C WOLF ACSR from
Khagaul to Bhusaula
2. Conversion of S/C DOG to D/C WOLF from
Bhusaula to A N College
Replacement of DOG with WOLF from Danapur
to Digha
Replacement of DOG with WOLF ACSR
Replacement of DOG with WOLF ACSR from
Jakkanpur to Mauryalok tapping
Conversion of S/C DOG to D/C WOLF ACSR
from Jakkanpur to Beur
1. Conversion of S/C DOG to D/C WOLF from
Bihta to Lalbhasara S/S
2. Replacement of GI Wire with DOG ACSR
between Bihta and Pareo
3. Replacement of RABBIT & GI with DOG ACSR

201.65
8

5.95

47.60

10.80

10.80

5.95

53.55

10.80

64.80

10

10.80

108.00

12

5.95

71.40

5
5

5.95
5.95

29.75
29.75

10.80

10.80

26.0

10.80

280.80

2.7

3.96

10.56

5.3

3.96

21.12

426.45

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

3. Patna

Feeder

Source
EHV S/S

2. Bihta A/F
3. Balmukund HTC

Bihta
Bihta

4. Fatuah

Fatuah

1. Sohasarai

Bari Pahari

2. Ramchandrapur

Bari Pahari

3. Ekangersarai

Bari Pahari

4. Nalanda
4. Silao

Rajgir

5. Nalanda

Rajgir

6. Noor Sarai

Bari Pahari

Work proposed
between Lalbhasara and Paliganj
Replacement of DOG with WOLF ACSR (3 ckts.)
Replacement of DOG with WOLF ACSR from
Bihta A/F to Balmukund HTC
1. Replacement of GI Wire with DOG ACSR
between Fatuah and Daniyaman S/Ss
2. Replacement of GI Wire with DOG ACSR
between Fatuah and Khusrupur S/Ss
Replacement of RABBIT and GI wire with DOG
ACSR between Sohasarai and Rahui S/Ss
Replacement of DOG with WOLF ACSR
from Bari Pahari GSS to Ramchandrapur S/S
1. Replacement of GI Wire with DOG ACSR
between Ekangersarai to Hulasganj and
Khudaganj S/Ss
2. Replacement of DOG with WOLF ACSR
between Bari Pahari GSS and Ekangersarai S/S
Replacement of GI wire with DOG ACSR betweeen
Rajgir GSS and Silao-Athri-Khizr Sarai S/Ss
1. Replacement of DOG with WOLF ACSR
between Rajgir GSS and next node
2. Replacement of GI Wire with DOG ACSR
between Nalanda and Raiter S/Ss
Replacement of GI wire with DOG ACSR betweeen
Bari Pahari and Noor Sarai

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

2.1
3.5

5.95
5.95

12.50
20.83

12.0

3.96

47.52

12.0

3.96

47.52

11.7

3.96

46.33

2.0

5.95

11.90

49.0

3.96

194.04

30.0

5.95

178.50

54.5

3.96

215.82

0.5

5.95

2.98

15.3

3.96

60.59

23.0

3.96

91.08

Circle Total
Cost
(Rs. Lakh)

440.84

801.24

5. Chapra

6. Motihari

1. Bettiah

Bettiah

2. Lauria

Ram Nagar

3. Ram Nagar

Ram Nagar

4. Areraj

Motihari

5. Madhopur-Harsiddhi

Motihari

6. Chakia-Madhuban

Motihari

Replacement of DOG with WOLF ACSR


from Bettiah GSS to Bettiah S/S
Replacement of GI wire with DOG ACSR
between Ram Nagar GSS and Lauria S/S
Replacement of GI wire with DOG ACSR
between Ram Nagar GSS and Bagaha S/S
Replacement of GI wire with DOG ACSR
between Motihari GSS and Areraj S/S
Replacement of GI wire with DOG ACSR
between Motihari GSS and Madhopur-Harsiddhi S/Ss
Replacement of GI wire with DOG ACSR
between Chakia and Madhuban S/Ss

1.1

5.95

6.55

12.5

3.96

49.50

27.0

3.96

106.92

16.5

3.96

65.34

20.5

3.96

81.18

6.0

3.96

23.76
333.25

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

7. Bhojpur

Source
EHV S/S

Feeder
1. Japani farm-Sarai

Ara

2. Powerganj

Ara

3. Nawanagar-Murar

Dumraon

4. Buxar

Dumraon

1. Kako-Charui

Irki

2. Tehta-Makpa

Irki

3. Irki-Shakurabad

Irki

4. Rafiganj

Rafiganj

5. Uchauli-Madanpur

Rafiganj

8. Gaya
6. Tekari-Konch

Tekari

7. Gandhi Maidan

Chandauti
(Gaya)
Bodh Gaya

8. Shergahti

9. Manpur

Bodh Gaya

Work proposed
Replacement of DOG with WOLF ACSR
between Ara GSS and Japani farm S/S
Replacement of DOG with WOLF ACSR from
Ara GSS to Powerganj S/S
Replacement of GI wire with DOG ACSR
between Nawanagar and Murar S/Ss
1. Replacement of DOG with WOLF ACSR
from Dumraon GSS to Buxar S/S
2. Replacement of GI Wire with DOG ACSR
between Buxar and Chausa S/Ss
Replacement of GI wire with DOG ACSR
between Kako and Charui S/Ss
Replacement of GI wire with DOG ACSR
Irki GSS and Makhadampur - Tehta - Makpa S/Ss
Replacement of GI wire with DOG ACSR
between Irki and Shakurabad S/Ss
Replacement of GI wire with DOG ACSR
between Rafiganj and Goh S/Ss
1. Replacement of GI wire and RABBIT with DOG
ACSR between Rafiganj and Uchauli S/Ss
2. Replacement of GI Wire with DOG ACSR
between Uchauli and Madanpur S/Ss
Replacement of GI wire with DOG ACSR
between Tekari and Konch S/Ss
Replacement of DOG with WOLF ACSR
from Chandauti and Gandhi Maidan S/Ss
1. Replacement of DOG with WOLF ACSR
between Bodh Gaya GSS and Sherghati S/S
2. Replacement of GI Wire with DOG ACSR
between Imamganj and Dumaria S/Ss
3. Replacement of GI wire with DOG ACSR
between Sherghati and Gurua S/Ss
Replacement of GI wire with DOG ACSR

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

5.0

5.95

29.75

6.0

5.95

35.70

4.0

3.96

15.84

20.0

5.95

119.00

10.0

3.96

39.60

6.0

3.96

23.76

13.5

3.96

53.46

6.5

3.96

25.74

9.5

3.96

37.62

6.5

3.96

25.74

12.5

3.96

49.50

12.0

3.96

47.52

6.0

5.95

35.70

20.8

5.95

123.76

10.0

3.96

39.60

5.0

3.96

19.80

30.0

3.96

118.80

Circle Total
Cost
(Rs. Lakh)

239.89

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

8. Gaya

9. Saharsa

10.Bhagalpur

11.Munger

12.Samastipur

Feeder

Source
EHV S/S

10.MU Campus

Bodh Gaya

11.Akbarpur

Nawada

12.Warsaliganj

Nawada

13.Aurangabad

Barun

1. Supaul

Supaul

1. Sanhaula

Kahalgaon

2. Banka-Bausi

Banka

1. Jamui

Mallehpur

2. Purani Bazar

Lakhisarai

3. Onama

Sheikhpura

4. Hathiyama

Sheikhpura

5. Ariari

Sheikhpura

1. IOC

BTPS

2. Bangerdih

BTPS

3. Begusarai

BTPS

4. Manhar
5. Dalsingsarai
6. Rosera

Mohanpur
Mohanpur
Mohanpur

Work proposed
between Manpur - Paimar - Wazirganj S/Ss
Replacement of DOG with WOLF ACSR
from Bodh Gaya to MU Campus
Replacement of GI wire with DOG ACSR
between Akbarpur and Sirdala S/Ss
1. Replacement of GI Wire with DOG ACSR
between Warsaliganj and Pakribarwan S/Ss
2. Replacement of GI Wire with DOG ACSR
between Warsaliganj - Roh - Kankol S/Ss
Replacement of DOG with WOLF ACSR
from Barun GSS to Aurangabad S/S
Replacement of DOG with WOLF ACSR
from Supaul GSS to Supaul S/S
Replacement of GI wire with DOG ACSR
between Kahalgaon and Sanhaula S/Ss
Replacement of DOG with WOLF ACSR
from Banka GSS to Banka S/S
Replacement of DOG with WOLF ACSR
from Mallehpur GSS to Jamui S/S
Replacement of DOG with WOLF ACSR
from Lakhisarai GSS to Lakhisarai S/S
Replacement of GI wire with DOG ACSR
between Sheikhpura GSS and Onama S/S
Replacemento of GI wire with DOG ACSR
between Sheikhpura GSS and Hathiyama S/S
Replacement of GI wire with DOG ACSR
between Sheikhpura GSS and Ariari S/S
Replacement of GI wire with DOG ACSR
between BTPS and IOC S/S
Conversion of S/C DOG to D/C WOLF ACSR
between BTPS and Bangerdih
Conversion of S/C DOG to D/C WOLF ACSR
between BTPS and Begusarai
Replacement of GI wire with DOG ACSR
Replacement of GI wire with DOG ACSR
Replacement of GI wire with DOG ACSR

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

3.0

5.95

17.85

4.0

3.96

15.84

10.0

3.96

39.60

32.0

3.96

126.72

22.0

5.95

130.90

0.5

5.95

2.98

9.0

3.96

35.64

0.1

5.95

0.60

8.0

5.95

47.60

3.0

5.95

17.85

4.0

3.96

15.84

8.0

3.96

31.68

34.0

3.96

134.64

7.5

3.96

29.70

16.5

10.80

178.20

20.0

10.80

216.00

15.0
26.0
23.0

3.96
3.96
3.96

59.40
102.96
91.08

Circle Total
Cost
(Rs. Lakh)

931.91
2.98

36.24

247.61

677.34

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

13.Purnea

Feeder

Source
EHV S/S

Work proposed

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

1. Zero Mile - City


2. Belgachhi
3. Beri

Purnea
Purnea
Purnea

Replacement of RABBIT with DOG ACSR


Replacement of GI wire with DOG ACSR
Replacement of GI wire with DOG ACSR

6.0
8.0
20.0

3.96
3.96
3.96

23.76
31.68
79.20

1. Kalyanpur-Ramgarh

Karmnasa

30.0

5.95

178.50

2. Kudra

Mohania

1.0

10.80

10.80

3. Mohania

Mohania

0.1

10.80

1.08

4. Beda-Takia

Sasaram

5.0

5.95

29.75

1. Mehua-Patepur
2. Prataptand
3. Konharaghat

Vaishali
Vaishali
Hajipur

45.0
15.0
8.0

3.96
3.96
5.95

178.20
59.40
47.60

4. SKMCH

Bhikanpura

9.0

10.80

97.20

5. IDPL

Bhikanpura

Replacement of DOG with WOLF ACSR


from Karmnasa GSS to Kalyanpur and from
Kalyanpur to Ramgarh S/S
Conversion of S/C DOG to D/C WOLF ACSR
from Mohania GSS to Kudra node
Conversion of S/C DOG to D/C WOLF ACSR
from Mohania GSS to Mohania S/S
Replacement of DOG with WOLF ACSR
between Sasaram GSS and Beda - Takia S/Ss
Replacement of GI wire with DOG ACSR
Replacement of GI wire with DOG ACSR
Replacement of DOG with WOLF ACSR
from Hajipur GSS to Konharaghat S/S
Conversion of S/C DOG to D/C WOLF ACSR
from Bhikanpura GSS to SKMCH S/S
Replacement of DOG with WOLF ACSR
from Bhikanpura GSS to IDPL S/S

3.5

5.95

20.83

Replacement of GI wire with DOG ACSR


Replacement of DOG with WOLF ACSR
from Ram Nagar GSS to Gangwara S/S
Replacement of Weasel and GI wire with DOG
ACSR between Ram Nagar GSS and Pouria S/Ss

10.0
18.0

3.96
5.95

39.60
107.10

13.0

3.96

51.48

Circle Total
Cost
(Rs. Lakh)

134.64

14.Sasaram

15.Muzaffarpur

1. JhanjharpurMadhepura
2. Gangwara-Bela

Pandaul
Ram Nagar

3. Pouria

Ram Nagar

16.Darbhanga

220.13

403.23

198.18
5295.56

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

Feeder

Source
EHV S/S

Work proposed

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

Circle Total
Cost
(Rs. Lakh)

2011-2014
1. Katra
2. Dina Iron
3. Karmali Chak

Fatuah
Fatuah
Fatuah

4. S.K. Memorial

Jakkanpur

5.
6.
7.
8.

15.6
6

16.74
15.92

261.14
95.52

Mithapur (2)
Mithapur (2)
Mithapur (2)
Mithapur (2)

S/C WOLF line from Fatuah GSS to Karmali Chak


S/C DOG line from Karmali Chak to Deedarganj
Conversion of S/C to D/C WOLF line from Jakkanpur GSS to S K
Memorial
Laying second length cable
D/C WOLF line from Mithapur (2) (New) GSS to Kankar Bag (2)
D/C WOLF line from Mithapur (2) (New) GSS to Saidpur
D/C WOLF line from Mithapur (2) (New) GSS to Bahadurpur
D/C WOLF line from Mithapur (2) (New) GSS to R Nagar

14.3
4.5
10
10
10
10.5

10.8
42.19
22.49
22.49
22.49
22.49

154.44
189.86
224.90
224.90
224.90
236.15

Mithapur
Mithapur

D/C WOLF line from Mithapur GSS to Ashok Nagar

6.1

22.49

137.19

Mithapur
Mithapur

Laying of 2nd ckt. Cable from Mithapur GSS to R K Nagar

0.2

42.19

8.44

13.Gaighat

Gaighat

Conversion of S/C WOLF to D/C WOLF from Gaighat GSS to Gaighat

0.2

10.8

2.16

14.NMCH
15.Meena Bazar
16.Katra (2)
17.Pahari
18.Malsalami
19.Mangal Talab
20.Meena Bazar (2)
21.PMCH

Gaighat
Gaighat
Katra
Katra
Katra
Katra
Jakkanpur (2)
Mithapur (2)

Conversion of S/C WOLF to D/C WOLF from Gaighat GSS to NMCH

1.5

10.8

16.20

S/C WOLF line from Katra GSS to new S/S Katra (2)
Conversion of S/C WOLF to D/C WOLF from Katra GSS to Pahari
S/C WOLF line from Katra GSS to Malsalami
D/C WOLF line from Katra GSS to Mangal Talab
D/C WOLF line from Jakkanpur (2) (New) GSS to Mina Bazar (2)
S/C WOLF line from Mithapur (2) (New) GSS to PMCH

5
7.5
5
5
5
10

16.74
10.8
16.74
22.49
22.49
16.74

83.70
81.00
83.70
112.45
112.45
167.40

Kankar Bag (2)


Saidpur
Bahadurpur
R. Nagar

9. Kankar Bag
10.Ashok Nagar
1. PESU (East) 11.R.K.Nagar
12.Karbigahiya

2416.491
2. PESU (West)

1. A.N.College
2. S.K.Puri
3. Garikhana I & II

Khagaul (2)
Khagaul (2)
Khagaul

D/C WOLF line from Khagaul (2) (New) GSS to A N College


D/C WOLF line from Khagaul (2) (New) GSS to S K Puri
Conversion of S/C WOLF to D/C WOLF line from Khagaul GSS to

10
18

22.49
22.49
10.8

224.90
0.00
194.40

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

Feeder

Source
EHV S/S

Work proposed

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

Circle Total
Cost
(Rs. Lakh)

Garikhana (both lines) and upto Pataliputra (one line)

2. PESU (West)

4. Walmi
5. Danapur
6. Digha

Khagaul
Digha
Digha

S/C WOLF line from Digha (New) GSS to Digha-Danapur tapping


D/C WOLF line from Digha (New) GSS to Digha

10
5

16.74
22.49

167.40
112.45

7. R.B.I.

Digha

S/C WOLF line from Digha (New) GSS to Digha-RBI tapping

16.74

83.70

8. Danapur (2)
9. IGIMS

Digha
Sipara

D/C WOLF line from Digha (New) GSS to Danapur (2)


D/C WOLF line from Sipara (New) GSS to IGIMS

10
10

22.49
22.49

224.90
224.90

10.Veterinary College

Sipara

D/C WOLF line from Sipara (New) GSS to Veterinary College


Conversion of S/C WOLF to D/C WOLF line from Veterinary to Board's
Colony
Conversion of S/C DOG to D/C WOLF line from Vikas Bhawan to
Board's Colony

10

22.49

224.90

10.8

32.40

10.8

32.40

2
10

10.8
22.49

21.60
224.90

1.5
1.5

42.19
42.19

63.29
63.29

10.8

43.20

11.Jakkanpur

Jakkanpur

12.Maurya Lok

Jakkanpur

13.Karnawad Punpun

Jakkanpur

14.Sinchai Bhawan

Jakkanpur

15.Anishabad

Jakkanpur

Laying 2nd cable length from Jakkanpur GSS to Sinchai Bhawan


Laying 2nd cable length from Sinchai Bhawan to Vikas Bhawan
Conversion of S/C DOG to D/C WOLF from Jakkanpur GSS to
Gardanibag

16.Gardanibag
17.Vidyut Bhawan

Jakkanpur
Jakkanpur

Replacement of DOG with WOLF ACSR from Anishabad to Gardanibag


Laying 2nd Cable length from Jakkanpur GSS to Vidyut Bhawan

5
3.5

5.95
42.19

29.75
147.67

18.Sahitya Sammelan

Jakkanpur (2)

D/C WOLF line from Jakkanpur (2) (New) GSS to Sahitya Sammelan

10

22.49

224.90

19.Bandar Bagicha (2)


20.Beur

Jakkanpur (2)
Jakkanpur (2)

D/C WOLF line from Jakkanpur (2) (New) GSS to Bandar Bagicha (2)
D/C WOLF line from Jakkanpur (2) (New) GSS to Beur
Replacement of DOG with WOLF ACSR from Beur to Khagaul S/S

10
10
10

22.49
22.49
5.95

224.90
224.90
59.50

Conversion of S/C DOG to D/C WOLF line from Sahitya Sammelan to


Maurya Lok
D/C WOLF line from Jakkanpur (2) (New) GSS to Bandar Bagicha

2850.24

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

Feeder

Work proposed

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

1. A.F. Bihta

Bihta

S/C WOLF line from Khagaul (2) (New) GSS to A/F Bihta for HTC
Group

10

16.74

167.40

2. Pareo

Bihta

D/C WOLF line from Bihta GSS to Bihta S/S for separate line to Pareo

22.49

134.94

Replacement of DOG with WOLF from Pareo to Koilwar (Bhojpur circle)


S/C DOG line from Koilwar (Bhojpur) to Giddha New S/S (Bhojpur)

15
5

5.95
15.92

89.25
79.60

S/C DOG line from Khagaul (2) (New) GSS to GISCO HTC

10

15.92

159.20

S/C WOLF line from Khagaul (2) (New) GSS to A/F Bihta for Maner
Replacement of DOG with WOLF from Neora to Naubatpur

10
10

16.74
5.95

167.40
59.50

S/C WOLF line from Fatuah (2) (New) GSS to Fatuah (2)
S/C WOLF line from Fatuah (2) (New) GSS to Fatuah for Daniyaman +
Khusrupur feeders

16.74

83.70

16.74

83.70

3.
4.
5.
6.
7.

3. Patna

Source
EHV S/S

Bihta I & II
GISCO
Balmukund
Maner
Neora

Bihta
Khagaul (2)
Khagaul (2)
Khagaul (2)
Khagaul

8. Fatuah (2)

Fatuah (2)

9. Khusrupur
10.Fatuah
11.Dina Iron

Fatuah (2)
Fatuah
Fatuah

12.Masaurhi Old

Masaurhi

Replacement of DOG with WOLF from Masaurhi GSS to Masaurhi Old

5.95

29.75

13.Masarhi New
14.NTPC I & II
15.Barh

Masaurhi
Barh
Barh

Replacement of DOG with WOLF from Masaurhi GSS to Masaurhi New

0.85

5.95

5.06

Conversion of S/C DOG to D/C WOLF from Barh GSS to Barh

10.8

75.60

16.Barh (2)
17.Biharibigha
18.Hathidah

Barh
Barh
Hathidah

S/C DOG line from Barh GSS to Barh (2)

15.92

79.60

5.95
16.74

83.30

Hathidah

Replacement of DOG with WOLF from Hathidah GSS to Mokama


S/C WOLF line from Hathidah GSS to Hathidah (2)

14

19.Hathidah (2)
1. Hilsa
2. Islampur

Ekangersarai
Ekangersarai

Replacement of DOG with WOLF from Ekangersarai to Hilsa


Replacement of DOG with WOLF from Ekangersarai to Islampur

12
12

5.95
5.95

71.40
71.40

3. Ekangersarai

Ekangersarai

S/C WOLF lines ( 3 nos.) from Ekangersarai New GSS to Ekangersarai

15

16.74

251.10

Circle Total
Cost
(Rs. Lakh)

1298.00

4. Nalanda

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

4. Nalanda

Feeder

Source
EHV S/S

4. Chiksurabazar
5. Dhamauli

Masaurhi
Harnaut

6. Noorsarai

Harnaut

7. Harnaut

Harnaut

8. Silao

Rajgir

9. Andawas
10.Rajgir

Rajgir
Rajgir

11.Giriak

Rajgir

12.Parwalpur
13.Ramchandrapur (2)

Bari Pahari
Bari Pahari

14.Ramchandrapur
15.Bari Pahari
16.Asthawan

Bari Pahari
Bari Pahari
Bari Pahari

17.Sohasarai

Bari Pahari

1. Fulwaria

Gopalganj

Work proposed

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

for Ekangersarai, Islampur and Hilsa


S/C DOG line from Masaurhi-Paver tapping to Chiksurabazar
S/C WOLF line from Harnaut (New) GSS to Dhamauli
S/C DOG line from Rahui to Dhamauli
S/C WOLF line from Harnaut (New) GSS to Noorsarai
S/C DOG line from Bari Pahari - Harnaut tapping to Kalyanbigha
S/C DOG line from Chandi S/S to Chainpur

10
5
5
15
3
12

10.08
16.74
10.08
16.74
15.92
10.08

100.80
83.70
50.40
251.10
47.76
120.96

S/C DOG line from Bari Pahari - Harnaut tapping to Cheral

2.5

15.92

39.80

S/C DOG line from Silao S/S to Bhindidih


S/C DOG line from Rajgir GSS to Andawas
Replacement of DOG with WOLF from Rajgir GSS to Rajgir S/S
S/C DOG line from Rajgir GSS - Rajgir S/S tapping to Ghosarwan
S/C DOG line from Rajgir - Giriak tapping to Tetrawan
S/C DOG line from Tetrawan S/S to Sarbahadi

8
16
2.5
10
7
17

10.08
15.92
5.95
15.92
10.08
10.08

80.64
254.72
14.88
159.20
70.56
171.36

S/C DOG line from Rajgir-Giriak tapping to Badi


S/C DOG line from Badi S/S to Katrisarai

12
10

10.08
10.08

120.96
100.80

S/C WOLF line from Bari Pahari to Ramchandrapur (2)


Conversion of S/C WOLF to D/C WOLF from Bari Pahari to
Ramchandrapur

16.74

83.70

10.8

21.60

0.5

10.08

5.04

2.5

10.8

27.00

S/C DOG line from Asthawan S/S to Malti


Conversion of S/C DOG to D/C WOLF from Bari Pahari GSS to
Sohasarai

Circle Total
Cost
(Rs. Lakh)

2198.88

5. Chapra

2.
3.
4.
5.
6.

Gopalganj
Srinagar
Siwan
Maharajganj
Siwan (2)

Gopalganj
Siwan
Siwan
Siwan
Siwan

Conversion of S/C DOG line to D/C WOLF from Gopalganj GSS to


Hathua tapping
Conversion of S/C DOG line to D/C WOLF from Gopalganj GSS to
Gopalganj S/S
Replacement of DOG with WOLF from Siwan GSS to Srinagar
Replacement of DOG with WOLF from Siwan GSS to Maharajganj
D/C WOLF line from Siwan GSS to Siwan (2) S/S

20

10.8

216.00

2
3

10.8
5.95

21.60
17.85

20
2

5.95
22.49

119.00
44.98

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

5. Chapra

Feeder

Source
EHV S/S

7. Mashrakh
8. Taraiya
9. Baikunthpur

Mashrakh
Mashrakh
Mashrakh

10.Prabhunath Nagar

Work proposed

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

3
11
18

16.74
16.74
10.08

50.22
184.14
181.44

Chapra

S/C WOLF line from Mashrakh (New) GSS to Mashrakh


S/C WOLF line from Mashrakh (New) GSS to Taraiya
S/C DOG line from Mashrakh (New) GSS to Baikunthpur
Conversion of S/C DOG line with D/C WOLF from Telpa GSS to
Prabhunath Nagar

10.8

21.60

11.Telpa

Chapra

Conversion of S/C DOG line with D/C WOLF from Telpa GSS to Telpa

0.1

10.8

1.08

12.Sheetalpur

Sheetalpur

Replacement of DOG with WOLF from Sheetalpur GSS to Sheetalpur

0.1

5.95

0.60

1. Valmiki Nagar
2. Dhanha

Nepal
Dhanha

3.
4.
5.
6.
7.
8.
9.

Ramnagar
Ramnagar
Ramnagar
Ramnagar
Raxaul
Raxaul
Dhaka

Circle Total
Cost
(Rs. Lakh)

858.51

Ramnagar
Chautarwa
Lauria
Narkatiaganj
Raxaul
Adopur
Dhaka

6. Motihari
10.Bettiah
11.Bettiah (2)
12.Madhopur
13.Areraj

Bettiah
Bettiah
Motihari
Motihari

14.Motihari (2)
15.Motihari
16.Chakia
17.Chhitwani

Motihari
Motihari
Motihari
Motihari

1.
2.
3.
4.
5.

Buxar
Buxar
Buxar
Dumraon
Dumraon

Replacement of DOG with WOLF from Ramnagar GSS to Ramnagar


S/S
S/C DOG line from Ramnagar GSS to Chautarwa

0.5
15

5.95
10.08

2.98
151.20

S/C WOLF line from Raxaul (New) GSS to Raxaul


S/C DOG line from Raxaul (New) GSS to Raxaul for Adopur

3
3

16.74
15.92

50.22
47.76

Conversion of S/C WOLF to D/C WOLF from Bettiah GSS to Bettiah


S/S
S/C WOLF line from Bettiah GSS to Bettiah (2)

2
5

10.8
16.74

21.60
83.70

Replacement of DOG with WOLF from Motihari GSS to Chakia


S/C DOG line from Motihari GSS to Chhitwani

35
5

5.95
15.92

208.25
79.60

S/C WOLF line from Buxar (New) GSS to Itarhi - Chausa tapping
D/C WOLF line from Buxar (New) GSS to Buxar
S/C DOG line from Buxar (New) GSS to Pandey Patti

5
5
5

16.74
22.49
15.92

83.70
112.45
79.60

S/C DOG line from Dumraon GSS to Dumraon (2)


Replacement of S/C DOG with D/C WOLF from Dumrao GSS to
Nawanagar

15.92

79.60

20

5.95

119.00

645.31

7. Bhojpur

Chausa
Buxar
Pandy Patti
Dumraon
Dumraon (2)

6. Nawanagar

Dumraon

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

7. Bramhapur

7. Bhojpur

Source
EHV S/S

Feeder

Work proposed

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

Circle Total
Cost
(Rs. Lakh)

Dumraon
Conversion of S/C DOG to D/C WOLF from Dumraon GSS to
Bramhapur

18

10.8

194.40

5
25
10
2

10.08
22.49
16.74
10.08

50.40
562.25
167.40
20.16

10.8

54.00

6
1
14
0.5

10.8
42.19
10.08
15.92

64.80
42.19
141.12
7.96

8. Simri

Dumraon

9. Garhani

Jagdishpur

10.Jagdishpur

Jagdishpur

S/C DOG line from Simri to Chhotka Dhakai Chak


D/C WOLF line from Jagdishpur (New) GSS to Garhani
S/C WOLF line from Garhani to Agiaon
S/C DOG line from Jagdishpur (New) GSS to Jagdishpur

11.Japani Farm

Ara

Conversion of S/C WOLF to D/C WOLF from Ara GSS to Japani Farm

12.Powerganj

Ara

13.Zero Mile

Ara

Conversion of S/C WOLF to D/C WOLF from Ara GSS to Powerganj


Laying of cable from Powerganj SS to Power House
S/C DOG line from Serai to Barhara
S/C DOG line from Ara GSS to Zero Mile

1.
2.
3.
4.
5.

Karpi
Karpi
Goh
Goh
Irki

S/C DOG line from Karpi (New) GSS and Karpi S/S

10.08

30.24

S/C DOG line from Goh (New) GSS to Goh S/S


S/C DOG line from Goh (New) GSS to Daudnagar
Replacement of DOG with WOLF between Irki GSS and Kako

3
25
17

10.08
10.08
5.95

30.24
252.00
101.15

6. Tehta
7. Ghosi

Irki
Irki

Replacement of DOG with WOLF between Irki GSS and Tehta

12

5.95

71.40

8. Irki

Irki

Conversion of S/C WOLF to D/C WOLF from Irki GSS to Jehanabad


Conversion of S/C WOLF to D/C WOLF from Irki GSS to Irki
S/C DOG line from Shakurabad to Nowaman

7
0.3
4

10.8
10.8
10.08

75.60
3.24
40.32

9. Rafiganj I & II
10.Uchauli
11.Guraru
12.Tekari

Rafiganj
Rafiganj
Rafiganj
Tekari

Replacement of DOG with WOLF from Rafiganj GSS to Guraru

25

5.95

148.75

13.Belaganj

Belaganj

Conversion of S/C DOG with D/C WOLF from Belaganj GSS to


Belaganj S/S
S/C DOG line from Belaganj GSS to Belaganj S/S for Panari

0.2
0.2

10.8

2.16

14.Chakand
15.Dhongra
16.Sonwa

Belaganj
Hulasganj
Hulasganj

S/C DOG line from Hulasganj (New) GSS to Dhongra


S/C DOG line from Hulasganj (New) GSS to Sonwa

10
12

10.08
10.08

100.80
120.96

1779.03

8. Gaya

Karpi
Arwal
Goh
Daudnagar
Kako

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

8. Gaya

Feeder

Source
EHV S/S

17.Hulasganj
18.Nawagarh
19.Aurangabad

Hulasganj
Hulasganj
Aurangabad

20.Obra

Aurangabad

21.Deo
22.Barun
23.Barem
24.Tengra
25.Sone Hydel
26.Nabinagar
27.Barun (2)
28.Dihara
29.Wazirganj
30.Atari
31.Gurua
32.Amas

Aurangabad
Barun
Barun
Barun
Barun
Barun
Barun
Barun
Wazirganj
Wazirganj
Sherghati
Sherghati

33.Banke
34.Shergahti
35.Imamganj
36.Chandauti
37.Medical
38.Central Stores
39.A.P.Colony

Sherghati
Sherghati
Sherghati
Chandauti
Chandauti
Chandauti
Chandauti

40.Gandhi Maidan

Chandauti

41.Dandibag
42.Shobh
43.Manpur
44.Industrial Area

Chandauti
Bodh Gaya
Bodh Gaya
Bodh Gaya

45.M.U. Campus

Bodh Gaya

Length
(km)

Work proposed

Cost per Total Cost


km
(Rs. Lakh)

S/C DOG line from Hulasganj (New) GSS to Hulasganj S/S


S/C DOG line from Hulasganj (New) GSS to Nawagarh
S/C WOLF line from Aurangabad (New) GSS to Aurangabad
S/C WOLF line from Aurangabad (New) GSS to Aurangabad for Obra
feeder
S/C WOLF line from Aurangabad (New) GSS to Aurangabad for DeoGangti feeders

3
15
5

10.08
10.08
16.74

30.24
151.20
83.70

16.74

83.70

16.74

83.70

S/C DOG line from Barun GSS to Barun (2)


S/C DOG line from Sone Nagar GSS to Dihara
S/C WOLF line from Wazirganj (New) GSS to Wazirganj S/S
S/C DOG Line from Wazirganj (New) GSS to Atari
S/C DOG line from Sherghati (New) GSS to Sherghati for Gurua
S/C DOG line from Sherghati (New) GSS to Sherghati for Amas

5
10
3
12
3
3

15.92
10.08
16.74
10.08
15.92
15.92

79.60
100.80
50.22
120.96
47.76
47.76

S/C DOG line from Sherghati (New) GSS to Sherghati for Banke Bazar
S/C DOG line from Sherghati (New) GSS to Sherghati
S/C DOG line from Sherghati (New) GSS to Sherghati for Imamganj

3
3
3

15.92
15.92
15.92

47.76
47.76
47.76

Replacement of DOG with WOLF from Chandauti to Central Stores

5.95

11.90

6.5

10.8

70.20

10.8

64.80

Chandauti to Dandibag

4
12

10.8
10.8

43.20
129.60

Conversion of S/C WOLF to D/C WOLF from Bodh Gaya to Manpur

18

10.8

194.40

Conversion of S/C WOLF to D/C WOLF from Bodh Gaya to M U


Campus

10.8

32.40

Conversion of S/C DOG to D/C WOLF from


Railway Maidan
Conversion of S/C DOG to D/C WOLF from
Maidan
Conversion of S/C DOG to D/C WOLF from
Panchaiti Akhara
Conversion of S/C DOG to D/C WOLF from

Chandauti to A P Colony Chandauti to Gandhi


Gandhi Maidan to

Circle Total
Cost
(Rs. Lakh)

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

8. Gaya

Feeder

Source
EHV S/S

Work proposed

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

Replacement of DOG with WOLF from MU Campus to Buddhist


Complex

5.95

11.90

46.Hasua

Nawada

47.Nawada

Nawada

Conversion of S/C WOLF to D/C WOLF from Nawada GSS to Nawada

10.8

32.40

48.Akbarpur

Nawada

Conversion of S/C WOLF to D/C WOLF from Nawada GSS to Akbarpur


Replacement of DOG with WOLF from Akbarpur to Rajauli

14
15

10.8
5.95

151.20
89.25

49.Roh

Nawada

Circle Total
Cost
(Rs. Lakh)

2831.03

9. Saharsa

1. Supaul

Supaul

Conversion of S/C WOLF to D/C WOLF from Supaul GSS to Supaul


S/C DOG line from Supaul GSS to Parasrama
S/C DOG line tapping from Pipra - Raghopur to Larganj
D/C WOLF line from Saharsa GSS to Saharsa (2)

0.5
16
6
5

10.8
10.08
10.08
22.49

5.40
161.28
60.48
112.45

2. Saharsa (2)

Saharsa

3. Sour Bazar
4. Balwahat

Saharsa
Saharsa

S/C DOG line from Saharsa GSS to Sour Bazar


S/C DOG line from Saharsa GSS to Balwahat
S/C DOG line from Balwahat to Salakhua

12
19
19

10.08
10.08
10.08

120.96
191.52
191.52

5. Simri Bakhtiyarpur
6. New Market

Saharsa
Saharsa

7. Old Saharsa
8. Madhepura

Saharsa
Madhepura

Conversion of S/C DOG line to D/C WOLF from Saharsa GSS to


Saharsa
S/C WOLF line from Madhepura (New) GSS to Madhepura
S/C DOG line from Muraliganj to Kumarkhand

0.1
5
12

10.8
16.74
10.08

1.08
83.70
120.96

9. Singheswar

Madhepura

10.Khagaria

Khagaria

S/C DOG line from Singheshwar to Ghailar


Replacement of conductor with PANTHER ACSR

10
0.1

10.08
25

100.80
2.50

11.Bihariganj
12.Udakishanganj
13.Puraini
14.Alamnagar

Conversion of S/C DOG line to D/C WOLF from Khagaria GSS to Mansi
Replacement of DOG with WOLF ACSR from Mansi to Maheshkunt
Udakishanganj S/C DOG line from Udakishanganj GSS to Bihariganj
Udakishanganj
Udakishanganj S/C DOG line from Udakishanganj GSS to Puraini
Udakishanganj

10
10
13

10.8
5.95
10.08

108.00
59.50
131.04

10

10.08

100.80

1. Bihpur
2. Sanhauli

Naugachhia
Naugachhia

1551.99
10.Bhagalpur

S/C DOG line from Naugachhia GSS to Sanhauli

11

10.08

110.88

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

Feeder

3. Naugachhia
4. Patwara
5. Sultanganj
6. Shahkund
7. Barari

10.Bhagalpur

Source
EHV S/S
Naugachhia
Sultanganj
Sultanganj
Sultanganj
Sabour

Work proposed
Replacement of DOG with WOLF from Naugachhia GSS to Naugachhia
S/S

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

3.5

5.95

20.83

Conversion of S/C DOG to D/C WOLF from Sabour GSS to Central Jail
Conversion of S/C DOG to D/C WOLF from Sabour GSS to C S
Compound

8.2

10.8

88.56

10.8

43.20

8. CS Compound
9. Sabour
10.Gouradih

Sabour
Sabour
Sabour

11.Aliganj I

Sabour

Conversion of S/C DOG to D/C WOLF line from Sabour GSS to Aliganj

10.8

75.60

12.Aliganj II

Sabour

13.Banka (2)

Banka

Conversion of S/C DOG to D/C WOLF line from Sabour GSS to Aliganj
Replacement of DOG with WOLF from Aliganj to Nath Nagar
S/C DOG line from Banka GSS to Banka (2) S/S

7
7
5

10.8
5.95
15.92

75.60
41.65
79.60

14.Banka

Banka

Conversion of S/C WOLF to D/C WOLF from Banka GSS to Banka S/S
Replacement of DOG with WOLF from Banka S/S to Rajauna-Bousi
tapping

0.15

10.8

1.62

5.95

35.70

15.Sanhoula
16.Ghogha

Kahalgaon
Kahalgaon

12

10.08

120.96

17.Kahalgaon

Kahalgaon

S/C DOG line from Kahalgaon GSS to Ghogha


Conversion of S/C DOG to D/C WOLF from Kahalgaon GSS to
Kahalgaon S/S

10.8

97.20

1. Tarapur

Sultanganj

Conversion of S/C DOG to D/C WOLF from Sultanganj to Tarapur

20

10.8

216.00

2. Dakranala

Jamalpur

3. Ramchandrapur

Jamalpur

Replacement of DOG with WOLF from Jamalpur GSS to


Ramchandrapur

5.95

23.80

4. Safiabad

Jamalpur

Replacement of DOG with WOLF from Jamalpur GSS to Safiabad

0.2

5.95

1.19

5. ITC

Jamalpur

6. Karnachaura

Jamalpur

Conversion of S/C DOG to D/C WOLF from Jamalpur GSS to


Karnachaura

13

10.8

140.40

Circle Total
Cost
(Rs. Lakh)

791.40

11. Munger

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

Feeder
7. Nandlalpur
8. Bindwara
9. Balaji
10.Purani Bazar

11. Munger

Source
EHV S/S
Jamalpur
Jamalpur
Lakhisarai
Lakhisarai

11.Kajra

Lakhisarai

12.Haibatganj

Lakhisarai

13.Jamui

Mallehpur

14.Gidhour

Mallehpur

15.Ghuskuri
16.Ariari

Sheikhpura
Sheikhpura

17.Onama

Sheikhpura

18.Hathiyama

Sheikhpura

19.Sheikhpura

Sheikhpura

1. Pusa

Mohanpur

2. Mohanpur
3. Jute Mill
4. Sarairanjan

Mohanpur
Mohanpur
Mohanpur

5. Jitwarpur

Mohanpur

6. Rly.Samastipur
7. Sirsia

Mohanpur
Mohanpur

Work proposed

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

S/C DOG line from Lakhisarai GSS to Balaji HTC

7.3

15.92

116.22

Conversion of S/C DOG to D/C WOLF from Lakhisarai GSS to Court


Area
S/C DOG line from Lakhisarai GSS to Kajra
S/C DOG line from Kajra to Piri Bazar
Replacement of DOG with WOLF from Lakhisarai to Salempur
S/C DOG line from Lakhisarai - Kendy tapping to Mananpur

7
20
12
20
16

10.8
10.08
10.08

75.60
201.60
120.96

10.08

161.28

Conversion of S/C DOG to D/C WOLF from Mallehpur GSS to Jamui


Conversion of S/C DOG to D/C WOLF from Mallehpur GSS to Gidhour
tapping
Replacement of DOG with WOLF from Gidhour tapping and Jhajha
S/C DOG line from Sheikhpura GSS to Ghuskuri

10.8

86.40

12
2
30

10.8
5.95
10.08

129.60
11.90
302.40

S/C DOG line from Bhalua to Lohain

10.08

40.32

Replacement of DOG with WOLF ACSR from Sheikhpura to Mirzapur

12

5.95

71.40

S/C DOG line tapping from Sheikhpura - Mirzapur line to Toygarh

10.08

50.40

Replacement of DOG with WOLF from Sheikhpura GSS to Sheikhpura

5.95

47.60

Circle Total
Cost
(Rs. Lakh)

1797.07

12.Samastipur

Conversion of S/C DOG line to D/C WOLF from Mohanpur GSS to


Mohanpur S/S

0.6

10.8

6.48

Conversion of S/C DOG line to D/C WOLF line from Mohanpur GSS to
Jitwarpur
S/C WOLF line from Jitwarpur to Magardahi

10
6

10.8
16.74

108.00
100.44

S/C DOG line from Sirsia to Kuboliram

10.08

80.64

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

12.Samastipur

Feeder

Source
EHV S/S

8. Dalsingsarai

Dalsingsarai

9. Pateri
10.Bachhwara
11.Bibhutipur
12.Deona
13.Bangrahdih (2)
14.IOC
15.Railways
16.Deona (2)
17.Kankaul
18.Begusarai

Dalsingsarai
Dalsingsarai
Dalsingsarai
BTPS
BTPS
BTPS
BTPS
Zero Mile
Zero Mile
Zero Mile

1. Narpatganj
2. Raniganj

Forbesganj
Forbesganj

3. Forbesganj

Forbesganj

Work proposed

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

S/C DOG line from Mohanpur - Sirsia line as tapping to Karpoorigram


S/C WOLF line from Dalsingsarai GSS to Dalsingsarai S/S

3.5
5

10.08
16.74

35.28
83.70

S/C DOG line from Dalsingsarai (New) GSS to Pateri


S/C DOG line from Dalsingsarai (New) GSS to Bachhwara
S/C WOLF line from Dalsingsarai GSS to Bibhutipur

25
12
15

10.08
10.08
16.74

252.00
120.96
251.10

S/C WOLF line from BTPS to Bangradih (2)

20

16.74

334.80

S/C WOLF line from Zero Mile (Begusarai) GSS to Deona (2)
S/C WOLF line from Zero Mile GSS to Kankaul
D/C WOLF line from Zero Mile GSS to Begusarai

12
15
12

16.74
16.74
22.49

200.88
251.10
269.88

Circle Total
Cost
(Rs. Lakh)

2095.26

4.
5.
6.
7.
8.

Bahadurganj
Sarai
Paschimpali
Purabpali
Thakurganj

S/C DOG line from Raniganj to Bahargaon

13

10.08

131.04

S/C DOG line from Araria to Kusgaon


S/C DOG line from Jokihat to Malgaon

7
10

10.08
10.08

70.56
100.80

Kishan ganj
Kishanganj
Kishanganj
Kishanganj
Kishanganj

13. Purnea
9. Group Control

Purnea

Conversion of S/C DOG to D/C WOLF line from Purnea GSS to Group
Control

0.1

10.8

1.08

10.Banmankhi

Purnea

Replacement of RABBIT with WOLF from Purnea GSS to Banmankhi

40

5.95

238.00

11.Zero Mile
12.Belgachhi

Purnea
Purnea

Replacement of DOG with WOLF from Purnea GSS to Zero Mile

12

5.95

71.40

S/C DOG line from Dalkola to Vaisi


Conversion of S/C DOG to D/C WOLF line from Purnea GSS to
Naranga
Replacement of DOG with WOLF from Purnea GSS to Jalalgarh
Conversion of S/C DOG to D/C WOLF from Katihar GSS to Beri

10

10.08

100.80

1
25
4

10.8
5.95
10.8

10.80
148.75
43.20

13.Naranga
14.Jalalgarh
15.Beri

Purnea
Purnea
Katihar

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

13. Purnea

Feeder

Source
EHV S/S

Work proposed

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

16.Barsoi
17.Pranpur
18.Industrial Estate
19.Binodpur
20.Kursaila

Katihar
Katihar
Katihar
Katihar
Naugachhia

S/C DOG line from Katihar to Barsoi


S/C DOG line from Katihar to Pranpur

50
30

10.08
10.08

504.00
302.40

1. Karmnasa

Karmnasa

Conversion of S/C DOG to D/C WOLF line from Karmnasa GSS to


Durgawati S/S tapping point
Replacement of DOG with WOLF from Durgawati tapping to Chand

0.9

10.8

9.72

18

5.95

107.10

2. Larma
3. Kalyanpur

Karmnasa
Karmnasa
Conversion of S/C WOLF to D/C WOLF from Karmnasa GSS to
Ramgarh
S/C WOLF line from Karmnasa GSS to Ramgarh (2)

30
30

10.8
16.74

324.00
502.20

S/C WOLF line from Mohania GSS to Mohania (2)

16.74

83.70

Replacement of DOG with WOLF from Mohania GSS to Bhabhua Old


S/C WOLF line from Dinara (New) GSS to Dinara

15
5

5.95
16.74

89.25
83.70

10.8

64.80

10.8

64.80

3
20
38

22.49
5.95
10.08

67.47
119.00
383.04

5
10

22.49
16.74

112.45
167.40

22.49

112.45

Circle Total
Cost
(Rs. Lakh)

1722.83

4.
5.
6.
7.
8.
9.

14. Sasaram

Ramgarh (2)
Kakrait
Parsathua
Chainpur
Mohania (2)
Mohania

Karmnasa
Karmnasa
Mohania
Mohania
Mohania
Mohania

10.Dinara
11.Sanjhouli
12.Surajpura

Dinara
Bikramganj
Bikramganj

13.Bikramganj

Bikramganj

14.Bikramganj (2)
15.Pusauli
16.Kudra
17.Karamchat

Bikramganj
PGCIL Pusauli
Kudra
D/C WOLF line from Kudra (New) GSS to Kudra
Kudra
Replacement of DOG with WOLF from Kudra to Karamchat
S/C DOG line from Cenari to Adhaura
Sasaram
Sasaram
D/C WOLF line from Sasaram GSS to Sasaram (2) S/S
Sasaram
S/C WOLF line from Sasaram GSS to Sasaram (3) S/S
Sasaram
Dehri-On-Sone D/C WOLF line from Dehri-on-Sone GSS to BMP Dehri (2)
Dehri-On-Sone

18.Beda Sasaram
19.Sasaram (2)
20.Sasaram (3)
21.Naigaon
22.BMP Dehri (2)
23.BMP Dehri I & II

Conversion of S/C DOG to D/C WOLF from Bikramganj GSS to


Bikramganj
Conversion of S/C DOG to D/C WOLF from Bikramganj GSS to
Bikramganj (2)

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

14. Sasaram

Feeder
24.JVLO&FL Pahleja
25.Nasariganj
26.Rajpur
27.Nauhatta
28.Samhauta
29.Samhauta (2)
30.Kirpabal (2)

Source
EHV S/S

Work proposed

31.Indrapuri
32.Indrapuri (2)

Dehri-On-Sone
Dehri-On-Sone
Dehri-On-Sone
Banjari
Banjari
Replacement of DOG with WOLF from Banjari GSS to Samhauta
Banjari
S/C WOLF line from Banjari GSS to Samhauta (2)
Barun
S/C DOG line from Barun to Kirpabal (2)
Conversion of S/C DOG to D/C WOLF from Barun GSS to Kirpabal
Barun
S/C WOLF line from Barun Sone Nagar GSS to Indra Puri to
Barun
Indrapuri (2)

1. Shivhar
2. Runi Saidpur
3. Pupri
4. Dumra (2)
5. Dumra
6. Sursand
7. Sonbarsa
8. Nepal
9. Patepur
10.Prataptand

Shivhar
Runi Saidpur
Sitamarhi
Sitamarhi
Sitamarhi
Sonbarsa
Sonbarsa
Sonbarsa
Vaishali
Vaishali

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

0.1
3
30
30
15

5.95
16.74
10.08
10.8
16.74

0.60
50.22
302.40
324.00
251.10

S/C DOG line from Shivhar (New) GSS to Shivhar S/S


S/C WOLF line from Runi Saidpur (New) GSS to Runi Saidpur S/S
Replacement of DOG with WOLF from Sitamarhi GSS to Pupri
S/C WOLF line from Sitamarhi GSS to Dumra (2)
Replacement of DOG with WOLF from Sitamarhi GSS to Dumra
D/C WOLF line from Sonbarsa (New) GSS to Sursand
S/C DOG line from Sonbarsa (New) GSS to Sonbarsa S/S

3
3
28
5
5
20
3

15.92
16.74
5.95
16.74
5.95
22.49
15.92

47.76
50.22
166.60
83.70
29.75
449.80
47.76

Replacement of DOG with WOLF from Vaishali GSS to Mehua

30

5.95

178.50

Replacement of RABBIT and DOG with WOLF from Vaishali GSS to


Lalganj
Replacement of DOG with WOLF from Vaishali GSS to Sarai

10
20

5.95
5.95

59.50
119.00

Replacement of DOG with WOLF from Hajipur GSS to Bidupur

10

5.95

59.50

Replacement of DOG with WOLF from Hajipur GSS to Hajipur I E

10

5.95

59.50

S/C WOLF line from Hajipur GSS to Konharaghat (2)

10

16.74

167.40

S/C WOLF line from SKMCH (New) GSS to SKMCH (2) S/S
S/C WOLF line from SKMCH (New) GSS to MIT
S/C WOLF line from SKMCH (New) GSS to Sikandarpur (2)
D/C WOLF line from SKMCH (New) GSS to SKMCH S/S
S/C DOG line from SKMCH (New) GSS to Kurhani
Replacement of DOG with WOLF from Bhikanpura GSS to Motipur
S/C WOLF line from Bhikanpura GSS to Motipur (2)

5
10
10
5
15
35
20

16.74
16.74
16.74
22.49
10.08
5.95
16.74

83.70
167.40
167.40
112.45
151.20
208.25
334.80

Circle Total
Cost
(Rs. Lakh)

3219.40

11.Lalganj
12.Sarai
15. Muzaffarpur 13.Railway (HTC)
14.Bidupur
15.EDIP
16.Hajipur I E
17.Konharaghat
18.Konharaghat (2)
19.Manhar
20.SKMCH (2)
21.MIT
22.Sikandarpur (2)
23.SKMCH
24.Kurhani
25.Motipur
26.Motipur (2)

Vaishali
Vaishali
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Mohanpur
SKMCH
SKMCH
SKMCH
SKMCH
SKMCH
Muzaffarpur

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

15. Muzaffarpur

Feeder

Source
EHV S/S

Work proposed

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

27.Maripur
28.Vaishali
29.Dholi
30.IDPL (2)
31.IDPL
32.Khabra

Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur

33.Bhikanpura
34.Bhagwanpur Chowk
35.Railway (HTC)
36.Nayatola (2)
37.Nayatola
38.Hajipur I E (2)

Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur

1. Basopatti

Jay Nagar

2. Jay Nagar
3. Benipatti

Jay Nagar
Rahika

Replacement of DOG with WOLF from Jay Nagar GSS to Jay Nagar
Replacement of DOG with WOLF from Rahika GSS to Benipatti

0.5
32

5.95
5.95

2.98
190.40

4. Rahika

Rahika

5.
6.
7.
8.

Gangwara
Gangwara
Gangwara
Ram Nagar

Conversion of S/C DOG to D/C WOLF from Rahika GSS to Rahika S/S
Replacement of DOG with WOLF from Rahika S/S to Madhubani
D/C WOLF line from Gangwara (New) GSS to Gangwara for Bela
S/C WOLF line from Gangwara (New) GSS to Gangwara S/S
S/C WOLF line from Gangwara (New) GSS to Gangwara for Donar

0.1
5
4
3
3

10.8
5.95
22.49
16.74
16.74

1.08
29.75
89.96
50.22
50.22

D/C WOLF line from Gangwara (New) GSS to DMCH

22.49

179.92

S/C WOLF line from Kusheshwar (New) GSS to Baheri

30

16.74

502.20

S/C WOLF line from Kusheshwar (New) GSS to Biraul

20

16.74

334.80

Conversion of S/C DOG to D/C WOLF from Pandaul GSS to Raj Nagar

33

10.8

356.40

Replacement of DOG with WOLF from Pandaul GSS to Pandaul

0.1

5.95

0.60

Replacement of DOG with WOLF fro Pandaul GSS to Jhanjharpur

39

5.95

232.05

Replacement of DOG with WOLF from Bhikanpura GSS to Dholi


S/C WOLF line from Bhikanpura GSS to IDPL (2)
Conversion of S/C WOLF to D/C WOLF from Bhikanpura to IDPL
Replacement of DOG with WOLF from Bhikanpura GSS to Khabra
Replacement of DOG with WOLF from Bhikanpura GSS to Bhikanpura
S/S
S/C WOLF line from Bhikanpura GSS to Bhagwanpur Chowk

28
5
3.5
1.5

5.95
16.74
10.8
5.95

166.60
83.70
37.80
8.93

0.1
2.5

5.95
16.74

0.60
41.85

S/C WOLF line from Bhikanpura GSS to Nayatola (2)

10

16.74

167.40

S/C WOLF line from Hajipur GSS to Hajipur I E (2)

10

16.74

167.40

Circle Total
Cost
(Rs. Lakh)

3418.46

16. Darbhanga

Bela
Gangwara
Donar
Panda Sarai

9. Pouriya
10.Anar
11.Kusheshwar
12.Biraul

Ram Nagar
Kusheshwar
Kusheshwar
Kusheshwar

13.Raj Nagar
14.Raiyam
15.Pandaul
16.Manigachi
17.Jhanjharpur
18.Khatauna

Pandaul
Pandaul
Pandaul
Pandaul
Pandaul
Phulparas

APPENDIX B-1

Cost Estimation 33kV Lines


Circle

16. Darbhanga

Feeder

Source
EHV S/S

19.Rudrapur

Phulparas

20.Phulparas

Phulparas

Work proposed
S/C WOLF line from Phulparas GSS to Rudrapur
Conversion of S/C DOG to D/C WOLF from Phulparas GSS to
Phulparas S/S

Length
(km)

Cost per Total Cost


km
(Rs. Lakh)

30

16.74

502.20

10.8

21.60

Circle Total
Cost
(Rs. Lakh)

2544.37

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

Year

1. PESU(East)
2. PESU(West)

2010
2010
2010

3. Patna
4. Nalanda

Sub Station

Bihta AF

Work

Total Cost
(Rs. Lakh)

Addition of 1*5 MVA Xmer

0
0
108.96
108.96

2010
2010
2010

Sheetalpur
Siwan

Augmentation of 1*3.15 with 1*5 MVA Xmer


Addition of 1*5 MVA Xmer

0
85.86
108.96

2010
2010
2010
2010

Valmiki Nagar
Bettiah
Lauria
Motihari

Addition of 1*5 MVA Xmer


Augmentation of 2*5 with 2*10 MVA Xmers
Addition of 1*3.15 MVA Xmer
Augmentation of 2*5 with 2*10 MVA Xmers

108.96
254.02
75.00
254.02

Addition of 3.15 MVA Xmer


Addition of 1*5 MVA Xmer
2*3.15 MVA Xmers to be charged
Addition of 1*5 MVA Xmer

0
75.00
108.96
0
108.96

5. Chapra

6. Motihari
7. Bhojpur

8. Gaya

Circle Total
Cost
(Rs. Lakh)

194.82

692.00
2010
2010
2010
2010
2010

Kako
Guraru
Panari
Central Stores

292.92
9. Saharsa
10.Bhagalpur

11.Munger

2010
2010

Shahkund

Addition of 1*5 MVA Xmer

0
108.96

2010
2010
2010
2010

Ramchandrapur
Onama
Mirjapur
Barkana

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

108.96
108.96
108.96
108.96

2010
2010
2010

Deona
Pusa
Jitwarpur

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

108.96
108.96
108.96

2010

Group Control

Addition of 1*5 MVA Xmer

108.96

2010
2010

Kalyanpur
Dinara

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer

108.96
108.96

108.96

435.83
12.Samastipur

326.87
13.Purnea
14.Sasaram

108.96

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

14.Sasaram

Year

Sub Station

Work

Total Cost
(Rs. Lakh)

2010
2010
2010
2010
2010
2010

Bhabhua New
Pusauli
Takia
Nokha
Beda
Nahatta

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

108.96
108.96
108.96
108.96
108.96
108.96

2010
2010
2010
2010
2010
2010
2010
2010
2010
2010
2010
2010

Pupri
Dumar
Lalganj
EDIP
Hajipur IE
Konharaghat
Motipur
MIT
Sikandarpur
SKMCH
Khabra
Bhikanpura

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

108.96
108.96
108.96
108.96
108.96
108.96
108.96
108.96
108.96
108.96
108.96
108.96

2010
2010
2010

Rajnagar
Raiyam
Pandaul

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

108.96
108.96
108.96

Circle Total
Cost
(Rs. Lakh)

871.67

15.Muzaffarpur

1307.50
16.Darbhanga

326.87
4775.36

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

Year

Sub Station
1. Katra
1. HTC
2. HTC
1. Karmali Chak
2. Deedarganj
1. S.K.Memorial
1. Kankar Bag (2)
1. Saidpur
1. Bahadurpur
1. R.Nagar
2. Machhuatoli
1. Kankar Bag
1. Ashok Nagar

1. PESU (East)

2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

1. R.K.Nagar
1. Karbigahiya
1. Gaighat
1. NMCH
1. Meena Bazar
1. Katra (2)
1. Pahari
2. Sampatchak (Patna)
3. HTC (Patna)
1. Malsalami
1. Mangal Talab
2. Meena Bazar (2)
1. PMCH

Work

Total Cost
(Rs. Lakh)

New S/S with 2*5 MVA Xmer capacity


Augmentation of 2*5 with 2*10 MVA Xmers
New S/S with 3*10 MVA Xmer Capacity
Augmentation of 4*5 with 4*10 MVA Xmers
Augmentation of 4*5 with 4*10 MVA Xmers
Augmentation of 2*5 with 2*10 MVA Xmers
Addition of 1*10 MVA Xmer

314.84
254.02
550.79
508.04
508.04
254.02
150.94

Augmentation of 3*5 with 3*10 MVA Xmers


and addition of 1*10 MVA Xmer
Addition of 2*10 MVA Xmers
Augmentation of 1*3.15 and 1*5 with
2*10 MVA Xmers
Augmentation of 1*5 with 1*10 MVA Xmer
and addition of 1*10 MVA Xmer
Augmentation of 1*5 with 1*10 MVA Xmer
and addition of 1*10 MVA Xmer
Augmentation of 2*5 with 2*10 MVA Xmers
New S/S with 2*10 MVA Xmer capacity
Augmentation of 1*3.15 and 2*5 with
3*10 MVA Xmers

381.03
150.94
301.88
254.02

Augmentation of 2*5 with 2*10 MVA Xmers


Augmentation of 4*5 with 4*10 MVA Xmers
New S/S with 3*10 MVA Xmer Capacity
Augmentation of 1*5 with 1*10 MVA Xmer

254.02
508.04
550.79
127.01

Circle Total
Cost
(Rs. Lakh)

127.01
150.94
127.01
150.94
254.02
399.85
381.03

6659.21

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

2. PESU (West)

Year
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

2014

Sub Station
1. A.N.College
1. S.K.Puri
1. Garikhana
2. Pataliputra
3. Rajapur
1. Walmi
1. Danapur
1. Digha
2. Digha C/S
1. RBI
2. HTC (Group)
1. Danapur (2)
1. IGIMS
2. Excise
1. Vaterinery College
2. Board`s Colony
1. Jakkanpur
1. Maurya Lok
2. Bandar Bagicha
1. Karnawad Punpun

Work
Augmentation of 1*5 with 1*10 MVA Xmer
Augmentation of 2*5 with 2*10 MVA Xmer
Augmentation of 3*5 with 3*10 MVA Xmers
Augmentation of 3*5 with 3*10 MVA Xmers
Augmentation of 2*5 with 2*10 MVA Xmers
Augmentation of 1*5 with 1*10 MVA Xmer
Augmentation of 1*5 with 1*10 MVA Xmer
Augmentation of 1*5 with 1*10 MVA Xmer
Augmentation of 1*5 with 1*10 MVA Xmer
Augmentation of 1*5 with 1*10 MVA Xmer

New S/S with 3*10 MVA Xmers capacity


Augmentation of 2*5 with 2*10 MVA Xmers
Augmentation of 1*5 with 1*10 MVA Xmer
Augmentation of 1*5 with 1*10 MVA Xmer
Augmentation of 2*5 with 2*10 MVA Xmers
Augmentation of 2*5 with 2*10 MVA Xmers
Augmentation of 3*5 with 3*10 MVA Xmers
Augmentation of 2*5 with 2*10 MVA Xmers
Augmentation of 1*3 and 1*1.6 MVA Xmers
with 2*5 MVA Xmers (Patna Circle)
1. Sinchai Bhawan
Augmentation of 1*5 with 1*10 MVA Xmer
1. Anishabad
Augmentation of 2*5 with 2*10 MVA Xmers
1. Gardanibag
Augmentation of 2*5 with 2*10 MVA Xmers
1. Vidyut Bhawan
Augmentation of 2*5 with 2*10 MVA Xmers
2. High Court
Augmentation of 2*5 with 2*10 MVA Xmers
1. Sahitya Sammelan Augmentation of 2*5 with 2*10 MVA Xmers
1. Bandar Bagicha (2) New S/S with 2*10 MVA Xmers capacity
1. Beur
Augmentation of 2*5 with 2*10 MVA Xmers
2. Khagaul
Augmentation of 2*5 with 2*10 MVA Xmers
3. HTC
4. HTC
5. Phulwari
Augmentation of 1*5 with 1*10 MVA Xmer
1. Vikas Bhawan
Augmentation of 1*5 with 1*10 MVA Xmer
2. Bhusaula
Augmentation of 1*3.15 with 1*10 MVA Xmer

Total Cost
(Rs. Lakh)

Circle Total
Cost
(Rs. Lakh)

127.01
254.02
381.03
381.03
254.02
127.01
127.01
127.01
127.01
127.01
550.79
254.02
127.01
127.01
254.02
254.02
381.03
254.02
171.73
127.01
254.02
254.02
254.02
254.02
254.02
399.85
254.02
254.02

127.01
127.01
127.01
7091.81

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

Year

Sub Station
1. A.F.Bihta
1. Pareo
2. Koilwar (Ara Circle)
3. Giddha (Ara Circle)
1. Bihta

3. Patna

2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

2. Kanpa
3. Lalbhasara
4. Paliganj
HTC
HTC group
1. Maner
1. Neora
2. Naubatpur
1. Fatuah (2)
1. Khusrupur
2. Daniyaman
1. Fatuah
1. HTC
2. HTC
1. Masaurhi Old
2. Dhanaura
1. Masaurhi New
HTC
1. Barh
2. Bakhtiyarpur
1. Barh (2)
1. Biharibigha
1. Hathidah
2. Mokama
1. Hathidah (2)

Work

Total Cost
(Rs. Lakh)

Augmentation of 1*1.6 with 1*5 MVA xmer


Addition of 2*5 MVA Xmers

85.86
217.92

New S/S with 2*5 MVA Xmer capacity


Augmentation of 3*3.15 with 2*5 and 1*10
MVA Xmers
Augmentation of 1*1.6 with 1*5 MVA xmer
Augmentation of 1*3 with 1*5 MVA and
addition of 1*5 MVA Xmers
Augmentation of 1*3 with 1*5 MVA and
addition of 1*5 MVA Xmers

314.84
298.74

Circle Total
Cost
(Rs. Lakh)

85.86
85.86
108.96
85.86
108.96

Addition of 1*10 MVA Xmer


Augmentation of 2*3.15 with 2*5 MVA and
addition of 1*5 MVA Xmers
Addition of 2*5 MVA Xmers
New S/S with 2*10 MVA Xmer capacity
Augmentation of 1*3.15 with 1*5 MVA
and addition of 1*5 MVA Xmers
Augmentattion of 1*1.6 and 1*3.15 MVA
with 2*5 MVA Xmers
Augmentation of 1*3.15 with 1*5 MVA Xmer

150.94
171.73
108.96
217.92
399.85
85.86
108.96
171.73

Augmentation of 2*3 with 1*5 and 1*10 MVA


Xmers
Addition of 1*5 MVA Xmer
Augmentation of 1*3 with 1*10 MVA Xmer

212.87

New S/S with 2*5 MVA Xmer capacity


Augmentation of 2*3.15 with 2*5 MVA Xmers

314.84
171.73

Addition of 1*10 MVA Xmer


New S/S with 2*5 MVA Xmer capacity

150.94
314.84

85.86

108.96
127.01

4295.86

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

Year

4. Nalanda

2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

Sub Station
1. Hilsa
2. Hilsa (2)
1. Islampur
2. Khudaganj
1. Ekangersarai
1. Chiksurabazar
1. Dhamauli
2. Rahui
1. Noorsarai
2. Kalyanbigha
3. Chandi
4. Chainpur
5. Thertheri
1. Harnaut
2. Cheral (Railways)
1. Silao
2. Bhindidih
1. Andawas
1. Rajgir
2. Ghosarwan
1. Tetrawan
2. Sarbahadi
3. Giriak
4. Badi
5. Katrisarai
1. Parwalpur

Work

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 2*5 MVA Xmers
New S/S with 2*5 MVA Xmers
Addition of 1*5 MVA Xmer

108.96
108.96
217.92
314.84
108.96

New S/S with 2*5 MVA Xmers

314.84

New S/S with 2*5 MVA Xmers


Addition of 1*5 MVA Xmer

314.84
108.96

New S/S with 2*5 MVA Xmers

314.84

New S/S with 2*5 MVA Xmers


New S/S with 2*5 MVA Xmers

314.84
314.84

New S/S with 2*5 MVA Xmers


New S/S with 2*5 MVA Xmers
New S/S with 2*5 MVA Xmers

314.84
314.84
314.84

New S/S with 2*5 MVA Xmers


New S/S with 2*5 MVA Xmers
Augmenttation of 1*3.15 with 1*5 MVA Xmer
and addition of 1*5 MVA Xmer
1. Ramchandrapur (2) New S/S with 2*10 MVA Xmers capacity
1. Ramchandrapur
Augmentation of 4*5 + 2*3 MVA Xmers with
3*10 MVA Xmers
1. Bari Parhari
Augmentation of 1*3 + 1*3.15 + 4*5 MVA
with 4*10 MVA Xmers
1. Asthawan
2. Malti
1. Sohasarai

Total Cost
(Rs. Lakh)

New S/S with 2*5 MVA Xmers


Augmentation of 4*5 + 1*3.15 with
3*10 MVA Xmers

Circle Total
Cost
(Rs. Lakh)

314.84
314.84
85.86
108.96
399.85
381.03
508.04

314.84
381.03
6296.62

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

5. Chapra

6. Motihari

Year

Sub Station

2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

1. Fulwaria
2. Hathua
1. Gopalganj
2. Jhajhwa
3. Kuchaikot
1. Srinagar
2. Mairwa
1. Siwan
1. Maharajganj
2. Ekma
1. Siwan (2)
1. Mashrakh
2. Baniapur
1. Taraiya
2. Marworah
1. Baikunthpur
2. Barouli
1. Prabhunath Nagar
2. Manjhi
1. Telpa
1. Sheetalpur

2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

2. Bagha
1. Chautarwa
1. Lauria
1. Narkatiaganj
1. Raxaul

Work

Total Cost
(Rs. Lakh)

Addition of 2*5 MVA Xmers


Addition of 1*5 MVA Xmer
Addition of 2*5 MVA Xmers
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

217.92
108.96
217.92
108.96
108.96
108.96
108.96

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
New S/S with 3*5 MVA Xmers
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

108.96
108.96
423.80
108.96
108.96
108.96
108.96

Addition of 1*10 MVA Xmer


Addition of 1*5 MVA Xmer
Augmentation of 3*5 with 3*10 MVA Xmers
Addition of 2*5 MVA Xmers

150.94
108.96
381.03
217.92

Addition of 1*5 MVA Xmer


New S/S with 2*5 MVA Xmer capacity
Addition of 2*5 MVA Xmers
Augmentation of 1*3.15 with 1*5 MVA

108.96
314.84
217.92
85.86

New S/S with 2*5 MVA Xmer capacity


Addition of 1*3.15 MVA Xmer
Addition of 2*5 MVA Xmers
Augmentation of 1*3.15 MVA with 1*5 MVA
and addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 2*5 MVA Xmers

314.84
75.00
217.92
85.86
108.96
108.96
217.92

New S/S with 2*10 MVA Xmers capacity


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

399.85
108.96
108.96

Circle Total
Cost
(Rs. Lakh)

2917.02
1. Valmiki Nagar
1. Dhanha
1. Ramnagar

1. Adopur
1. Dhaka
1. Bettiah
1. Bettiah (2)
1. Madhopur
2. Harsidhi

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

6. Motihari

7. Bhojpur

Year
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

Sub Station
1. Areraj
1. Motihari (2)
1. Motihari
1. Chakia
2. Madhuban
1. Chhitwani

Work

Total Cost
(Rs. Lakh)

Augmentation of 1*1.6 with 1*5 MVA Xmer


and addition of 1*5 MVA Xmer
New S/S with 2*5 MVA Xmer capacity
Augmentation of 1*5 with 1*10 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
New S/S with 2*5 MVA Xmer capacity

85.86
108.96
314.84
127.01
108.96
108.96
314.84

Augmentation of 1*1.6 wirh 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Augmentation of 2*5 with 2*10 MVA Xmers
Augmentation of 1*3.15 with 1*10 MVA Xmer
New S/S with 2*5 MVA Xmer capacity

85.86
108.96
108.96
254.02
127.01
314.84

New S/S with 3*5 MVA Xmer capacity


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

423.80
108.96
108.96
108.96
108.96
108.96

New S/S with 2*5 MVA Xmer capacity


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Augmentation of 1*3.15 with 1*5 MVA Xmer

314.84
108.96
108.96
85.86

Augmentation of 3*5 with 3*10 MVA Xmers


and addition of 1*10 MVA Xmer

381.03
150.94

Augmentation of 3*5 with 2*10 MVA Xmers


New S/S with 1*10 MVA capacity
New S/S with 2*5 MVA Xmer capacity
New S/S with 2*5 MVA Xmer capacity

254.02
248.91
314.84
314.84

Circle Total
Cost
(Rs. Lakh)

3644.23
1. Chausa
2. Itarhi
3. Purushottampur
1. Buxar
2. Industrial
1. Pandey Patti
1. Dumraon
1. Dumraon (2)
1. Nawanagar
2. Murar
3. Akarsai
1. Krishnapuram
2. Bramhapur
3. Sahpur
4. Bihian
1. Simri
2. Chhotka Dhakai
1. Garhani
2. Piro
3. Agiaon
4. Sandes
1. Jagdishpur
1. Japani Farm
2. Serai
1. Powerganj
2. Power House
3. Barhara
1. Zero Mile

4251.45

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

Year

8. Gaya

2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

Sub Station
1. Karpi
2. Ataullah
3. Kurtha
1. Arwal
1. Goh
1. Daudnagar
2. Haspura
1. Kako
2. Charui
1. Tehta
2. Makpa
3. Makhdampur
1. Ghosi
2. Jehanabad
1. Irki
2. Sakurabad
3. Nowaman
1. Rafiganj
1. Uchauli
2. Madanpur
1. Guraru
2. Paraiya
1.Tekari
2. Koach
1. Belaganj
2. Panari
3. Paibigha
1. Chakand
1. Dhongra
1. Sonwa
1. Hulasganj
1. Nawagarh
1. Aurangabad
1. Obra
2. Phesar
3. Sokhea
1. Deo
2. Gangti

Work

Total Cost
(Rs. Lakh)

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
Augmentation of 1*1.6 with 1*5 MVA Xmer
Addition of 1* 3.15 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Augmentation of 3*5 with 3*10 MVA Xmers
Addition of 2*5 MVA Xmers

108.96
108.96
85.86
75.00
108.96
108.96
381.03
217.92

New S/S with 2*5 MVA Xmer capacity


Addition of 2*5 MVA Xmers
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 2*5 MVA Xmers
Addition of 2*5 MVA Xmers

314.84
217.92
108.96
108.96
108.96
108.96
108.96
108.96
217.92
217.92

Addition of 2*5 MVA Xmers


New S/S with 2*5 MVA Xmer capacity
New S/S with 2*5 MVA Xmer capacity

217.92
314.84
314.84

New S/S with 2*5 MVA Xmer capacity

314.84

Circle Total
Cost
(Rs. Lakh)

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

Year

8. Gaya

2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

Sub Station
1. Barun
1. Barem
1. Tengra
HTC
1. Nabinagar
2. Amba
1. Barun (2)
1. Dihara
1. Wazirganj
2. Fatehpur
3. Paimer
1. Atari
2. Khizr Sarai
1. Gurua
1. Amas
1. Banke
1. Sherghati
2. Dobhi
1. Imamganj
2. Dumaria
1. Chandauti
1. Medical
2. Cherki
1. Central Stores
1. A.P.Coloy
2. Railway Maidan
1. Gandhi Maidan
2. Panchaiti Akhara
1. Dandibag
1. Shobh
2. Charkbria
1. Manpur
2. Tankuppa
3. Gere

Work

Total Cost
(Rs. Lakh)

Addition of 1*5 MVA Xmer

108.96

Addition of 2*5 MVA Xmers

217.92

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
New S/S with 2*5 MVA Xmer capacity
New S/S with 2*5 MVA Xmer capacity

108.96
108.96
314.84
314.84

Augmentation of 2*5 with 2*10 MVA Xmers


and addition of 1*10 MVA Xmer

254.02
150.94

Augmentation of 1*3.15 with 1*5 MVA Xmer


and addition of 1*10 MVA Xmer
Addition of 1*5 MVA Xmer
Augmentation of 2*5 with 2*10 MVA Xmers
Augmentation of 1*5 with 1*10 MVA Xmer
and addition of 1*10 MVA Xmer
Augmentation of 3*5 with 3*10 MVA Xmers
Augmentation of 2*5 with 2*10 MVA Xmers
and addition of 1*10 MVA Xmer

85.86
150.94
108.96
254.02
127.01
150.94
381.03
254.02
150.94

Addition of 1*5 MVA Xmer


Augmentation of 3.15 with 1*5 MVA Xmer

108.96
85.86

Circle Total
Cost
(Rs. Lakh)

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

8. Gaya

9. Saharsa

Year
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

Sub Station
4. Bhore
1. Industrial Area
1. M.U.Campus
2. Buddhist Complex
1. Hasua
2. Nadirganj
1. Nawada
2. Nawada New
3. Bhadhokhara
1. Akbarpur
2. Rajauli
3. Sirdala
1. Roh
2. Warsaliganj
3. Pakribarwan
4. Kaukol
1. Barem

Work

Total Cost
(Rs. Lakh)

Replacement of defective Xmer with 1*5 MVA

85.86

Augmentation of 1*3.15 + 1*5 MVA with


2*10 MVA Xmers
Addition of 1*10 MVA Xmer
Augmentation of 1*3 with 1*5 MVA Xmer
Augmentation of 1*3 with 1*5 MVA Xmer
Augmentation of 3*5 with 3*10 MVA Xmers
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*3.15 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*3.15 MVA Xmer
Addition of 2*5 MVA Xmers

254.02

Circle Total
Cost
(Rs. Lakh)

150.94
85.86
85.86
381.03
108.96
108.96
108.96
108.96
108.96
75.00
108.96
108.96
217.92
9517.61

1. Supaul
2. Parasrama
3. Kishanpur
4. Pipra
5. Raghopur
6. Larganj
1. Sahrsa (2)
1. Sour Bazar
1. Balwahat
2. Salakhua
1. Simri Bakhtiyarpur
1. New Market
1. Old Saharsa
1. Madhepura
2. Muraliganj
3. Kumarkhand
1. Singheswar

Augmentation of 1*5 with 1*10 MVA Xmer


and addition of 1*10 MVA Xmer
New S/S with 2*5 MVA Xmer capacity

127.01
150.94
314.84

New S/S with 2*5 MVA Xmer capacity


New S/S with 3*10 MVA Xmer capacity

314.84
550.79

New S/S with 2*5 MVA Xmer capacity


New S/S with 2*5 MVA Xmer capacity
New S/S with 2*5 MVA Xmer capacity

314.84
314.84
314.84

Addition of 1*10 MVA Xmer

150.94

Addition of 1*5 MVA Xmer

108.96

New S/S with 2*5 MVA Xmer capacity

314.84

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

9. Saharsa

10.Bhagalpur

Work

Total Cost
(Rs. Lakh)

Year

Sub Station

2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

2. Ghailar
1. Khagaria
2. Mansi
3. Maheshkunt
1. Bihariganj
1. Udakishanganj
1. Puraini
1. Alamnagar

New S/S with 2*5 MVA Xmer capacity


Addition of 2*10 MVA Xmers
Addition of 1*5 MVA Xmer
Addition of 2*5 MVA Xmers
New S/S with 2*5 MVA Xmer capacity

314.84
301.88
108.96
217.92
314.84

New S/S with 2*5 MVA Xmer capacity

314.84

1. Bihpur
1. Sanhauli
1. Naugachhia
1. Patwara
1. Sultanganj

Augmentation of 2*3.15 with 2*5 MVA Xmer


New S/S with 2*5 MVA Xmer capacity

171.72
314.84

Augmentation of 1*3.15 with 1*10 MVA Xmer


and addition of 1*5 MVA Xmer

127.01
108.96

Addition of 1*10 MVA Xmer


Addition of 1*10 MVA Xmer
Addition of 1*10 MVA Xmer
Addition of 1*10 MVA Xmer
Addition of 1*10 MVA Xmer
Addition of 1*10 MVA Xmer

150.94
150.94
150.94
150.94
150.94
150.94

Addition of 1*10 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 1*10 MVA Xmer
Addition of 1*5 MVA Xmer
Augmentation of 1*3.15 with 1*10 MVA Xmer
New S/S with 2*5 MVA Xmer capacity
Addition of 1*5 MVA Xmer

150.94
108.96
150.94
108.96
127.01
314.84
108.96

Addition of 1*5 MVA Xmer


Addition of 2*5 MVA Xmers
Addition of 1*5 MVA Xmer
New S/S with 2*5 MVA Xmer capacity
Augmentation of 1*3.15 with 1*10 MVA Xmer

108.96
217.92
108.96
314.84
127.01

Circle Total
Cost
(Rs. Lakh)

4550.98

1. Shahkund
1. Barari
2. Central Jail
3. Mayaganj
1. C S Compound
2. T T School
1. Sabour
1. Gouradih
1. Aliganj
2. Mojahidpur
1. Aliganj
2. Jagdishpur
3. Nath Nagar
1. Banka (2)
1. Banka
2. Amarpur
3. Rajouna
4. Bousi
1. Sanhoula
1. Ghogha
1. Kahalgaon
2. Pirpainti

3576.48

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

Year

11. Munger

2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

Sub Station
1. Tarapur
2. Kharagpur
1. Dakranala
1. Ramchandrapur
2. Railways (HTC)
1. Safiabad
2. Baniyarpur
1. ITC (HTC)
1. Karnchaura
1. Nandlalpur
1. Bindwara
1. Balaji
1. Purani Bazar
2. Court Area
1. Kajra
2. Piri Bazar
1. Salempur
2. Manpur
3. Haibatganj
1. Jamui
2. Khaira
3. Sikandara
1. Gidhour
2. Jhajha
3. Sono
1. Ghuskuri
1. Ariari
2. Bhalua
3. Lohain
4. Katari
5. Barkna
1. Onama
2. Mirzapur
3. Toygarh
1. Hathiyama

Work

Total Cost
(Rs. Lakh)

Addition of 2*5 MVA Xmers


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

217.92
108.96
108.96
108.96

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer

108.96
108.96

Augmentation of 1*5 with 1*10 MVA Xmer


and addition of 1*10 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 2*5 MVA Xmers

127.01
150.94
108.96
217.92

Augmentattion of 3.15 with 1*10 MVA Xmer


and addition of 1*10 MVA Xmer
Addition of 1*10 MVA Xmer
New S/S with 2*5 MVA Xmer capacity
New S/S with 2*5 MVA Xmer capacity

127.01
150.94
150.94
314.84
314.84

New S/S with 2*5 MVA Xmer capacity

314.84

Augmentation of 1*3.15 + 1*5 MVA with


2*10 MVA Xmers
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Augmentation of 1*1.5 with 1*5 MVA Xmer
New S/S with 2*5 MVA Xmer capacity

254.02
108.96
108.96
108.96
108.96
85.86
314.84

New S/S with 2*5 MVA Xmer capacity

314.84

New S/S with 2*5 MVA Xmer capacity


Addition of 1*3.15 MVA Xmer

314.84
75.00

Circle Total
Cost
(Rs. Lakh)

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle
11. Munger

12.Samastipur

Year
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

Sub Station
1. Sheikhpura
1. Pusa
1. Mohanpur
2. Warisnagar
3. Kalyanpur
HTC
1. Sarairanjan
1. Jitwarpur
2. Magardahi
HTC
1. Sirsia
2. Kuboliram
3. Karpoorigram
1. Dalsingsarai
2. Mehuddinnagar
1. Pateri
1. Bachchwara
1. Bibhutipur
2. Rosera
3. Hassanpur
1. Deona
2. Bangrahdih
3. Jai Mangla (HTC)
4. Jai Mata Di (HTC)
1. Bangrahdih (2)
HTC
HTC
1. Deona (2)
1. Kankaul
1. Begusarai
2. Manjhaul
3. Ganga Dairy (HTC)
4. Balia

Work
Augmentattion of 1*1.6 + 1*3.15 MVA Xmers
with 2*10 MVA Xmers
Addition of 1*5 MVA Xmer
Augmentation of 3*5 + 1*3.15 MVA with
2*10 MVA Xmers
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

Total Cost
(Rs. Lakh)

Circle Total
Cost
(Rs. Lakh)

254.02
4790.22
108.96
254.02
108.96
108.96

Addition of 1*5 MVA Xmer


Augmentation of 2*5 + 1*3.15 MVA with
2*10 MVA Xmers
New S/S with 2*10 MVA Xmer capacity

108.96
254.02
399.85

New S/S with 2*5 MVA Xmer capacity


New S/S with 2*5 MVA Xmer capacity
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

314.84
314.84
108.96
108.96
108.96
108.96
108.96
108.96
108.96

New S/S with 2*10 MVA Xmer capacity

399.85

New S/S with 2*10 MVA Xmer capacity


New S/S with 2*10 MVA Xmer capacity
Augmentation of 5*5 with 3*10 MVA Xmers
Addition of 2*5 MVA Xmers

399.85
399.85
381.03
217.92

Addition of 1*5 MVA Xmer

108.96
4643.56

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

Year

13. Purnea

2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

Sub Station
1. Narpatganj
1. Raniganj
2. Bahargaon
1. Forbesganj
2. Araria
3. Kusgaon
4. Jokihat
5. Malgaon
1. Bahadurganj
2. Dighal Bank
1. Sarai
1. Paschimpali
1. Purabpali
1. Chhatargarh
2. Thakurganj
1. Group control
1. Banmankhi
2. Madhubani
1. Zero Mile
2. City
1. Belgachhi
2. Dalkola
3. Vaisi
1. Naranga
2. MLR Ganj
3. Dargaha
1. Jalalgarh
1. Beri
2. Gore Beri
3. Falka
4. Sonaily
5. Barsoi
6. Pranpur
1. Industrial Estate
1. Binodpur
1. Kursaila

Work

Total Cost
(Rs. Lakh)

Addition of 1*5 MVA Xmer

108.96

New S/S with 2*5 MVA Xmer capacity

314.84

New S/S with 2*5 MVA Xmer capacity

314.84

New S/S with 2*5 MVA Xmer capacity

314.84

Addition of 1*5 MVA Xmer


Addition of 1*10 MVA Xmer
Addition of 1*10 MVA Xmer

108.96
150.94
150.94

Augmentation of 3*5 with 3*10 MVA Xmers

381.03

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

108.96
108.96
108.96

New S/S with 2*5 MVA Xmer capacity


Addition of 1*5 MVA Xmer
Addition of 1*3.15 MVA Xmer

314.84
108.96
75.00

Addition of 2*5 MVA Xmers


Addition of 1*5 MVA Xmer
Addition of 1*3.15 MVA Xmer
Addition of 1*3.15 MVA Xmer

217.92
108.96
75.00
75.00

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer

108.96
108.96

Circle Total
Cost
(Rs. Lakh)

3365.82

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

Year

Sub Station

14. Sasaram

2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

1. Karmnasa
2. Durgawati
3. Chand
1. Larma
2. DVPL (HTC)
1. Kalyanpur
2. Ramgarh
3. Chourasia
4. Nuaon
1. Ramgarh (2)
1. Kakrait
1. Parsathua
1. Chainpur
1. Mohania (2)
1. Mohania
2. Bhabhua Old
3. Bahuara
1. Dinara
2. Kochas
3. Dawath
1. Sanjhouli
1. Surajpura
1. Bikramganj
2. Kararkat
1. Bikramganj (2)
1. Pusauli
1. Kudra
2. Bhabhua New
1. Karamchat
2. Cenari
3. Adhaura
1. Beda Sasaram
2. Takia Sasaram
3. Nokha
1. Sasaram (2)
1. Sasaram (3)
1. Naigaon
2. Sheosagar

Work

Total Cost
(Rs. Lakh)

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

108.96
108.96
108.96
108.96

Addition of 3*5 MVA Xmers

326.87

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer

108.96
108.96

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
New S/S with 2*10 MVA capacity

108.96
108.96
108.96
399.85

Augmentation of 1*3.15 with 1*10 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

127.01
108.96
108.96
108.96

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer

108.96
108.96

Addition of 1*5 MVA Xmer


New S/S with 2*10 MVA capacity
Augmentation of 1*1.0 with 1*10 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 2*10 MVA Xmers
Addition of 1*3.15 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

108.96
399.85
85.86
108.96
301.88
75.00
108.96
108.96

Addition of 1*10 MVA Xmer


Addition of 1*5 MVA Xmer
New S/S with 2*10 MVA capacity
New S/S with 2*10 MVA capacity
Addition of 2*5 MVA Xmers
Addition of 2*5 MVA Xmers

150.94
108.96
399.85
399.85
217.92
217.92

Circle Total
Cost
(Rs. Lakh)

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

14. Sasaram

15. Muzaffarpur

Year
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

Sub Station
1. BMP Dehri (2)
1. BMP Dehri
2. Basa Karwandia
3. PHED (HTC)
1. HTC
1. Akorigola
1. Nasariganj
1. Rajpur
1. Nauhatta
1. Samhauta
1. Samhauta (2)
1. Kirpabal (2)
2. Kirpabal
1. Indrapuri
1. Indrapuri (2)

Work

Total Cost
(Rs. Lakh)

New S/S with 3*10 MVA Xmers

550.79

Addition of 1*5 MVA Xmer

108.96

Addition of 2*5 MVA Xmers


Addition of 2*5 MVA Xmers
Addition of 1*5 MVA Xmer
Addition of 2*5 MVA Xmers
Addition of 1*5 MVA Xmer
New S/S with 1*10 + 1*5 MVA Xmer capacity
New S/S with 2*5 MVA Xmer capacity

217.92
217.92
108.96
217.92
108.96
357.86
314.84

New S/S with 2*10 MVA capacity

399.85

Addition of 2*5 MVA Xmers


Addition of 2*5 MVA Xmers
Addition of 1*5 MVA Xmer
New S/S with 2*10 MVA Xmer capacity

217.92
217.92
108.96
399.85

Addition of 2*5 MVA Xmers


Addition of 2*5 MVA Xmers

217.92
217.92

Addition of 2*5 MVA Xmers


Addition of 2*5 MVA Xmers

217.92
217.92

Addition of 1*10 MVA Xmer


Addition of 1*5 MVA Xmer

150.94
108.96

Augmentation of 3*5 with 2*10 MVA Xmers


New S/S with 2*10 MVA Xmer capacity

254.02
399.85

New S/S with 2*10 MVA Xmer capacity


Augmentation of 2*5 with 2*10 MVA Xmers

399.85
254.02

Circle Total
Cost
(Rs. Lakh)

7776.98
1. Shivhar
1. Runi Saidpur
1. Pupri
1. Dumra (2)
1. Dumra
1. Sursand
1. Sonbarsa
1. Nepal
1. Mehua
2. Patepur
1. Prataptand
1. Lalganj
1. Sarai
HTC
1. Bidupur
1. EDIP
1. Hajipur
1. Konharaghat
1. Konharaghat(2)
1. Manhar @
1. SKMCH (2)
1. MIT

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

15. Muzaffarpur

16. Darbhanga

Year

Sub Station

2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

1. Sikandarpur (2)
1. SKMCH
1. Kurhani
1. Motipur
1. Motipur (2)
1. Maripur
1. Vaishali
1. Dholi
1. IDPL (2)
1. IDPL
1. Khabra
1. Bhikanpura
1. Bhagwanpur chowk
HTC
1. Nayatola (2)
1. Nayatola
1. Hajipur I E (2)

2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

Work

Total Cost
(Rs. Lakh)

New S/S with 2*10 MVA Xmer capacity

399.85

Addition of 1*5 MVA Xmer

108.96

New S/S with 2*10 MVA Xmer capacity


Addition of 1*10 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
New S/S with 2*10 MVA Xmer capacity
Augmentation of 3*5 with 2*10 MVA Xmers
Augmentation of 2*5 with 2*10 MVA Xmers

399.85
150.94
108.96
108.96
399.85
254.02
254.02

New S/S with 2*5 MVA Xmer capacity

314.84

New S/S with 2*10 MVA Xmer capacity

399.85

New S/S with 2*10 MVA Xmer capacity

Circle Total
Cost
(Rs. Lakh)

399.85
6683.88

1. Basopatti
1. Jay Nagar
2. Khajauli
3. Ladania
1. Benipatti
2. Ahilyasthan
1. Rahika
2. Madhubani
1. Bela
1. Gangwara
1. Donar
1. Panda Sarai
2. Laheria Sarai (Jail)
3. DMCH
4. Urban
1. Pouriya
1. Baheri
2. Anar
1. Kusheshwar
1. Biraul

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

108.96
108.96
108.96
108.96

Addition of 1*10 MVA Xmer


Augmentation of 2*5 with 2*10 MVA Xmers
Addition of 1*5 MVA Xmer
Augmentation of 1*1.6 with 1*10 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

150.94
254.02
108.96
127.01
108.96
108.96

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 1*3.15 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
New S/S with 2*5 MVA Xmer capacity
Addition of 1*5 MVA Xmer

108.96
108.96
75.00
108.96
108.96
314.84
108.96

APPENDIX B-2

Cost Estimate for Addition / Augmentation or 33/11 kV Transformers and Erection of New 33/11 kV S/Ss
Circle

16. Darbhanga

Year
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014

Sub Station
2. Benipur
1. Raj Nagar
2. Babu Barhi
1. Raiyam
1. Pandaul
1. Manigachi
1. Jhanjharpur
2. Madhepur
1. Khatauna
1. Rudrapur
1. Phulparas
2. Nirmali
3. Talpatganj

Work

Total Cost
(Rs. Lakh)

Addition of 1*5 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

108.96
108.96
108.96

Augmentation of 1*3.15 with 1*10 MVA Xmer


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*3.15 MVA Xmer

127.01
108.96
108.96
75.00

New S/S with 2*5 MVA Xmer capacity


Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer
Addition of 1*5 MVA Xmer

314.84
108.96
108.96
108.96

Circle Total
Cost
(Rs. Lakh)

3617.83

APPENDIX B-3

Cost Estimate of Additional 33 kV Bays for 33 kV Feeders


Circle

1. PESU (East)

1. Katra
2. Dina Iron
3. Karmali Chak

Source
EHV S/S
Fatuah
Fatuah
Fatuah

4. S.K. Memorial

Jakkanpur

5. Kankar Bag (2)


6. Saidpur
7. Bahadurpur
8. R. Nagar
9. Kankar Bag
10.Ashok Nagar
11.R.K.Nagar
12.Karbigahiya
13.Gaighat
14.NMCH
15.Meena Bazar
16.Katra (2)
17.Pahari
18.Malsalami
19.Mangal Talab
20.Meena Bazar (2)
21.PMCH

Mithapur (2)
Mithapur (2)
Mithapur (2)
Mithapur (2)
Mithapur
Mithapur
Mithapur
Mithapur
Gaighat
Gaighat
Gaighat
Katra
Katra
Katra
Katra
Jakkanpur (2)
Mithapur (2)

1. A.N.College
2. S.K.Puri
3. Garikhana I & II

Khagaul (2)
Khagaul (2)
Khagaul

Name of 33 kV

4. Walmi
5. Danapur
6. Digha
7. R.B.I.
8. Danapur (2)
2. PESU (West) 9. IGIMS
10.Veterinary College

Khagaul
Digha
Digha
Digha
Digha
Sipara
Sipara

11.Jakkanpur
12.Maurya Lok

Jakkanpur
Jakkanpur

13.Karnawad Punpun
14.Sinchai Bhawan

Jakkanpur
Jakkanpur

33 kV Bay
(No.)

Total Cost
(Rs. Lakh)

S/C WOLF line from Fatuah GSS to Karmali Chak


S/C DOG line from Karmali Chak to Deedarganj
Conversion of S/C to D/C WOLF line from Jakkanpur GSS to S K Memorial
Laying second length cable
D/C WOLF line from Mithapur (2) (New) GSS to Kankar Bag (2)
D/C WOLF line from Mithapur (2) (New) GSS to Saidpur
D/C WOLF line from Mithapur (2) (New) GSS to Bahadurpur
D/C WOLF line from Mithapur (2) (New) GSS to R Nagar

1
1
0

25.37
25.37
0

1
1
1
1

25.37
25.37
25.37
25.37

D/C WOLF line from Mithapur GSS to Ashok Nagar


Laying of 2nd ckt. Cable from Mithapur GSS to R K Nagar

1
0

25.37
0

Conversion of S/C WOLF to D/C WOLF from Gaighat GSS to Gaighat


Conversion of S/C WOLF to D/C WOLF from Gaighat GSS to NMCH

0
0

0
0

S/C WOLF line from Katra GSS to new S/S Katra (2)
Conversion of S/C WOLF to D/C WOLF from Katra GSS to Pahari
S/C WOLF line from Katra GSS to Malsalami
D/C WOLF line from Katra GSS to Mangal Talab
D/C WOLF line from Jakkanpur (2) (New) GSS to Mina Bazar (2)
S/C WOLF line from Mithapur (2) (New) GSS to PMCH

1
0
1
1
1
1

D/C WOLF line from Khagaul (2) (New) GSS to A N College


D/C WOLF line from Khagaul (2) (New) GSS to S K Puri
Conversion of S/C WOLF to D/C WOLF line from Khagaul GSS to
Garikhana (both lines) and upto Pataliputra (one line)

1
1
0

25.37
0
25.37
25.37
25.37
25.37
304.44
25.37
25.37
0

S/C WOLF line from Digha (New) GSS to Digha-Danapur tapping


D/C WOLF line from Digha (New) GSS to Digha
S/C WOLF line from Digha (New) GSS to Digha-RBI tapping
D/C WOLF line from Digha (New) GSS to Danapur (2)
D/C WOLF line from Sipara (New) GSS to IGIMS
D/C WOLF line from Sipara (New) GSS to Veterinary College
Conversion of S/C WOLF to D/C WOLF line from Veterinary to Board's Colony
Conversion of S/C DOG to D/C WOLF line from Vikas Bhawan to Board's Colony

1
1
1
1
1
1
0
0

25.37
25.37
25.37
25.37
25.37
25.37
0
0

Conversion of S/C DOG to D/C WOLF line from Sahitya Sammelan to Maurya Lok
D/C WOLF line from Jakkanpur (2) (New) GSS to Bandar Bagicha

0
1

0
25.37

Laying 2nd cable length from Jakkanpur GSS to Sinchai Bhawan


Laying 2nd cable length from Sinchai Bhawan to Vikas Bhawan

0
0

0
0

Work proposed

APPENDIX B-3

Cost Estimate of Additional 33 kV Bays for 33 kV Feeders


Circle

Name of 33 kV

15.Anishabad
16.Gardanibag
17.Vidyut Bhawan
18.Sahitya Sammelan
2. PESU (West)
19.Bandar Bagicha (2)
20.Beur

3. Patna

4. Nalanda

Source
EHV S/S
Jakkanpur
Jakkanpur
Jakkanpur
Jakkanpur (2)
Jakkanpur (2)
Jakkanpur (2)

1. A.F. Bihta
2. Pareo

Bihta
Bihta

3.
4.
5.
6.
7.
8.
9.

Bihta
Khagaul (2)
Khagaul (2)
Khagaul (2)
Khagaul
Fatuah (2)
Fatuah (2)

Bihta I & II
GISCO
Balmukund
Maner
Neora
Fatuah (2)
Khusrupur

S/C WOLF line from Khagaul (2) (New) GSS to A/F Bihta for HTC Group
D/C WOLF line from Bihta GSS to Bihta S/S for separate line to Pareo
Replacement of DOG with WOLF from Pareo to Koilwar (Bhojpur circle)
S/C DOG line from Koilwar (Bhojpur) to Giddha New S/S (Bhojpur)

1
1
0
1

Total Cost
(Rs. Lakh)
0
0
0
25.37
25.37
25.37
0
304.44
25.37
25.37
0
25.37

S/C DOG line from Khagaul (2) (New) GSS to GISCO HTC

25.37

S/C WOLF line from Khagaul (2) (New) GSS to A/F Bihta for Maner
Replacement of DOG with WOLF from Neora to Naubatpur
S/C WOLF line from Fatuah (2) (New) GSS to Fatuah (2)
S/C WOLF line from Fatuah (2) (New) GSS to Fatuah for
Daniyaman + Khusrupur feeders

1
0
1
1

25.37
0
25.37
25.37

Replacement of DOG with WOLF from Masaurhi GSS to Masaurhi Old


Replacement of DOG with WOLF from Masaurhi GSS to Masaurhi New

0
0

0
0

Conversion of S/C DOG to D/C WOLF from Barh GSS to Barh


S/C DOG line from Barh GSS to Barh (2)

Work proposed
Conversion of S/C DOG to D/C WOLF from Jakkanpur GSS to Gardanibag
Replacement of DOG with WOLF ACSR from Anishabad to Gardanibag
Laying 2nd Cable length from Jakkanpur GSS to Vidyut Bhawan
D/C WOLF line from Jakkanpur (2) (New) GSS to Sahitya Sammelan
D/C WOLF line from Jakkanpur (2) (New) GSS to Bandar Bagicha (2)
D/C WOLF line from Jakkanpur (2) (New) GSS to Beur
Replacement of DOG with WOLF ACSR from Beur to Khagaul S/S

33 kV Bay
(No.)
0
0
0
1
1
1
0

10.Fatuah
11.Dina Iron
12.Masaurhi Old
13.Masarhi New
14.NTPC I & II
15.Barh
16.Barh (2)
17.Biharibigha
18.Hathidah

Fatuah
Fatuah
Masaurhi
Masaurhi
Barh
Barh
Barh
Barh
Hathidah

19.Hathidah (2)

Hathidah

Replacement of DOG with WOLF from Hathidah GSS to Mokama


S/C WOLF line from Hathidah GSS to Hathidah (2)

0
1

1. Hilsa

Ekangersarai

Replacement of DOG with WOLF from Ekangersarai to Hilsa

0
25.37
202.96
0

2. Islampur
3. Ekangersarai

Ekangersarai
Ekangersarai

0
3

0
76.11

4. Chiksurabazar
5. Dhamauli

Masaurhi
Harnaut

6. Noorsarai

Harnaut

Replacement of DOG with WOLF from Ekangersarai to Islampur


S/C WOLF lines ( 3 nos.) from Ekangersarai New GSS to Ekangersarai
for Ekangersarai, Islampur and Hilsa
S/C DOG line from Masaurhi-Paver tapping to Chiksurabazar
S/C WOLF line from Harnaut (New) GSS to Dhamauli
S/C DOG line from Rahui to Dhamauli
S/C WOLF line from Harnaut (New) GSS to Noorsarai
S/C DOG line from Bari Pahari - Harnaut tapping to Kalyanbigha
S/C DOG line from Chandi S/S to Chainpur

0
1
1
1
0
1

0
25.37
25.37
25.37
0
25.37

APPENDIX B-3

Cost Estimate of Additional 33 kV Bays for 33 kV Feeders


Circle

Name of 33 kV
7. Harnaut

Source
EHV S/S
Harnaut

8. Silao

Rajgir

9. Andawas
10.Rajgir

Rajgir
Rajgir

11.Giriak

Rajgir

12.Parwalpur
13.Ramchandrapur (2)
14.Ramchandrapur
15.Bari Pahari
16.Asthawan

Bari Pahari
Bari Pahari
Bari Pahari
Bari Pahari
Bari Pahari

17.Sohasarai

Bari Pahari

1. Fulwaria

Gopalganj

2. Gopalganj
3. Srinagar
4. Siwan
5. Maharajganj
6. Siwan (2)
7. Mashrakh
8. Taraiya
9. Baikunthpur
10.Prabhunath Nagar
11.Telpa
12.Sheetalpur

Gopalganj
Siwan
Siwan
Siwan
Siwan
Mashrakh
Mashrakh
Mashrakh
Chapra
Chapra
Sheetalpur

1. Valmiki Nagar
2. Dhanha
3. Ramnagar
4. Chautarwa
5. Lauria
6. Narkatiaganj
7. Raxaul
8. Adopur
9. Dhaka
10.Bettiah

Nepal
Dhanha
Ramnagar
Ramnagar
Ramnagar
Ramnagar
Raxaul
Raxaul
Dhaka
Bettiah

4. Nalanda

5. Chapra

6. Motihari

33 kV Bay
(No.)

Total Cost
(Rs. Lakh)

S/C DOG line from Bari Pahari - Harnaut tapping to Cheral

S/C DOG line from Silao S/S to Bhindidih


S/C DOG line from Rajgir GSS to Andawas
Replacement of DOG with WOLF from Rajgir GSS to Rajgir S/S
S/C DOG line from Rajgir GSS - Rajgir S/S tapping to Ghosarwan
S/C DOG line from Rajgir - Giriak tapping to Tetrawan
S/C DOG line from Tetrawan S/S to Sarbahadi
S/C DOG line from Rajgir-Giriak tapping to Badi
S/C DOG line from Badi S/S to Katrisarai

1
1
0
0
0
1
0
1

25.37
25.37
0
0
0
25.37
0
25.37

S/C WOLF line from Bari Pahari to Ramchandrapur (2)


Conversion of S/C WOLF to D/C WOLF from Bari Pahari to Ramchandrapur

1
0

25.37
0

S/C DOG line from Asthawan S/S to Malti


Conversion of S/C DOG to D/C WOLF from Bari Pahari GSS to Sohasarai

1
0

25.37
0
329.81

Conversion of S/C DOG line to D/C WOLF from Gopalganj GSS to Hathua tapping
Conversion of S/C DOG line to D/C WOLF from Gopalganj GSS to Gopalganj S/S
Replacement of DOG with WOLF from Siwan GSS to Srinagar

0
0
0

0
0
0

Replacement of DOG with WOLF from Siwan GSS to Maharajganj


D/C WOLF line from Siwan GSS to Siwan (2) S/S
S/C WOLF line from Mashrakh (New) GSS to Mashrakh
S/C WOLF line from Mashrakh (New) GSS to Taraiya
S/C DOG line from Mashrakh (New) GSS to Baikunthpur
Conversion of S/C DOG line with D/C WOLF from Telpa GSS to Prabhunath Nagar
Conversion of S/C DOG line with D/C WOLF from Telpa GSS to Telpa
Replacement of DOG with WOLF from Sheetalpur GSS to Sheetalpur

0
1
1
1
1
0
0
0

0
25.37
25.37
25.37
25.37
0
0
0
101.48

Replacement of DOG with WOLF from Ramnagar GSS to Ramnagar S/S


S/C DOG line from Ramnagar GSS to Chautarwa

0
1

0
25.37

S/C WOLF line from Raxaul (New) GSS to Raxaul


S/C DOG line from Raxaul (New) GSS to Raxaul for Adopur

1
1

25.37
25.37

Conversion of S/C WOLF to D/C WOLF from Bettiah GSS to Bettiah S/S

Work proposed

APPENDIX B-3

Cost Estimate of Additional 33 kV Bays for 33 kV Feeders

11.Bettiah (2)
12.Madhopur
13.Areraj
14.Motihari (2)
15.Motihari
16.Chakia
17.Chhitwani

Source
EHV S/S
Bettiah
Motihari
Motihari
Motihari
Motihari
Motihari
Motihari

1.
2.
3.
4.
5.
6.
7.

Buxar
Buxar
Buxar
Dumraon
Dumraon
Dumraon
Dumraon

Circle

6. Motihari

Name of 33 kV

Chausa
Buxar
Pandy Patti
Dumraon
Dumraon (2)
Nawanagar
Bramhapur

8. Simri

Dumraon

9. Garhani

Jagdishpur

10.Jagdishpur
11.Japani Farm
12.Powerganj

Jagdishpur
Ara
Ara

13.Zero Mile

Ara

1.
2.
3.
4.
5.
6.
7.

Karpi
Karpi
Goh
Goh
Irki
Irki
Irki

7. Bhojpur

8. Gaya

Karpi
Arwal
Goh
Daudnagar
Kako
Tehta
Ghosi

33 kV Bay
(No.)
1

Total Cost
(Rs. Lakh)
25.37

Replacement of DOG with WOLF from Motihari GSS to Chakia


S/C DOG line from Motihari GSS to Chhitwani

0
1

S/C WOLF line from Buxar (New) GSS to Itarhi - Chausa tapping
D/C WOLF line from Buxar (New) GSS to Buxar
S/C DOG line from Buxar (New) GSS to Pandey Patti

1
1
1

0
25.37
126.85
25.37
25.37
25.37

S/C DOG line from Dumraon GSS to Dumraon (2)


Replacement of S/C DOG with D/C WOLF from Dumrao GSS to Nawanagar

1
0

25.37
0

Conversion of S/C DOG to D/C WOLF from Dumraon GSS to Bramhapur

S/C DOG line from Simri to Chhotka Dhakai Chak


D/C WOLF line from Jagdishpur (New) GSS to Garhani
S/C WOLF line from Garhani to Agiaon
S/C DOG line from Jagdishpur (New) GSS to Jagdishpur
Conversion of S/C WOLF to D/C WOLF from Ara GSS to Japani Farm
Conversion of S/C WOLF to D/C WOLF from Ara GSS to Powerganj
Laying of cable from Powerganj SS to Power House
S/C DOG line from Serai to Barhara
S/C DOG line from Ara GSS to Zero Mile

1
1
1
1
0
0
0
1
1

S/C DOG line from Karpi (New) GSS and Karpi S/S

25.37
25.37
25.37
25.37
0
0
0
25.37
25.37
253.7
25.37

S/C DOG line from Goh (New) GSS to Goh S/S


S/C DOG line from Goh (New) GSS to Daudnagar
Replacement of DOG with WOLF between Irki GSS and Kako
Replacement of DOG with WOLF between Irki GSS and Tehta

1
1
0
0

25.37
25.37
0
0

0
0
1

0
0
25.37

Work proposed
S/C WOLF line from Bettiah GSS to Bettiah (2)

8. Irki

Irki

Conversion of S/C WOLF to D/C WOLF from Irki GSS to Jehanabad


Conversion of S/C WOLF to D/C WOLF from Irki GSS to Irki
S/C DOG line from Shakurabad to Nowaman

9. Rafiganj I & II
10.Uchauli
11.Guraru
12.Tekari
13.Belaganj

Rafiganj
Rafiganj
Rafiganj
Tekari
Belaganj

Replacement of DOG with WOLF from Rafiganj GSS to Guraru

Conversion of S/C DOG with D/C WOLF from Belaganj GSS to Belaganj S/S
S/C DOG line from Belaganj GSS to Belaganj S/S for Panari

0
1

0
25.37

APPENDIX B-3

Cost Estimate of Additional 33 kV Bays for 33 kV Feeders


Circle

8. Gaya

Name of 33 kV
14.Chakand
15.Dhongra
16.Sonwa
17.Hulasganj
18.Nawagarh
19.Aurangabad
20.Obra
21.Deo
22.Barun
23.Barem
24.Tengra
25.Sone Hydel
26.Nabinagar
27.Barun (2)
28.Dihara
29.Wazirganj
30.Atari
31.Gurua
32.Amas
33.Banke
34.Shergahti
35.Imamganj
36.Chandauti
37.Medical
38.Central Stores
39.A.P.Colony

Source
EHV S/S
Belaganj
Hulasganj
Hulasganj
Hulasganj
Hulasganj
Aurangabad
Aurangabad
Aurangabad
Barun
Barun
Barun
Barun
Barun
Barun
Barun
Wazirganj
Wazirganj
Sherghati
Sherghati
Sherghati
Sherghati
Sherghati
Chandauti
Chandauti
Chandauti
Chandauti

40.Gandhi Maidan

Chandauti

41.Dandibag
42.Shobh
43.Manpur
44.Industrial Area
45.M.U. Campus

Chandauti
Bodh Gaya
Bodh Gaya
Bodh Gaya
Bodh Gaya

46.Hasua
47.Nawada
48.Akbarpur

Nawada
Nawada
Nawada

49.Roh

Nawada

33 kV Bay
(No.)

Total Cost
(Rs. Lakh)

S/C DOG line from Hulasganj (New) GSS to Dhongra


S/C DOG line from Hulasganj (New) GSS to Sonwa
S/C DOG line from Hulasganj (New) GSS to Hulasganj S/S
S/C DOG line from Hulasganj (New) GSS to Nawagarh
S/C WOLF line from Aurangabad (New) GSS to Aurangabad
S/C WOLF line from Aurangabad (New) GSS to Aurangabad for Obra feeder
S/C WOLF line from Aurangabad (New) GSS to Aurangabad for Deo-Gangti feeders

1
1
1
1
1
1
1

25.37
25.37
25.37
25.37
25.37
25.37
25.37

S/C DOG line from Barun GSS to Barun (2)


S/C DOG line from Sone Nagar GSS to Dihara
S/C WOLF line from Wazirganj (New) GSS to Wazirganj S/S
S/C DOG Line from Wazirganj (New) GSS to Atari
S/C DOG line from Sherghati (New) GSS to Sherghati for Gurua
S/C DOG line from Sherghati (New) GSS to Sherghati for Amas
S/C DOG line from Sherghati (New) GSS to Sherghati for Banke Bazar
S/C DOG line from Sherghati (New) GSS to Sherghati
S/C DOG line from Sherghati (New) GSS to Sherghati for Imamganj

1
1
1
1
1
1
1
1
1

25.37
25.37
25.37
25.37
25.37
25.37
25.37
25.37
25.37

Replacement of DOG with WOLF from Chandauti to Central Stores

Conversion of S/C DOG to D/C WOLF from Chandauti to A P Colony - Railway Maidan
Conversion of S/C DOG to D/C WOLF from Chandauti to Gandhi Maidan
Conversion of S/C DOG to D/C WOLF from Gandhi Maidan to Panchaiti Akhara
Conversion of S/C DOG to D/C WOLF from Chandauti to Dandibag

0
0
0
0

0
0
0
0

Conversion of S/C WOLF to D/C WOLF from Bodh Gaya to Manpur

Conversion of S/C WOLF to D/C WOLF from Bodh Gaya to M U Campus


Replacement of DOG with WOLF from MU Campus to Buddhist Complex

0
0

0
0

Conversion of S/C WOLF to D/C WOLF from Nawada GSS to Nawada


Conversion of S/C WOLF to D/C WOLF from Nawada GSS to Akbarpur
Replacement of DOG with WOLF from Akbarpur to Rajauli

0
0
0

0
0
0

Work proposed

532.77

APPENDIX B-3

Cost Estimate of Additional 33 kV Bays for 33 kV Feeders

1. Supaul

Source
EHV S/S
Supaul

2. Saharsa (2)
3. Sour Bazar
4. Balwahat

Saharsa
Saharsa
Saharsa

5.
6.
7.
8.

Saharsa
Saharsa
Saharsa
Madhepura

Circle

9. Saharsa

Name of 33 kV

Simri Bakhtiyarpur
New Market
Old Saharsa
Madhepura

9. Singheswar

Madhepura

10.Khagaria

Khagaria

Work proposed
Conversion of S/C WOLF to D/C WOLF from Supaul GSS to Supaul
S/C DOG line from Supaul GSS to Parasrama
S/C DOG line tapping from Pipra - Raghopur to Larganj
D/C WOLF line from Saharsa GSS to Saharsa (2)
S/C DOG line from Saharsa GSS to Sour Bazar
S/C DOG line from Saharsa GSS to Balwahat
S/C DOG line from Balwahat to Salakhua

Conversion of S/C DOG line to D/C WOLF from Saharsa GSS to Saharsa
S/C WOLF line from Madhepura (New) GSS to Madhepura
S/C DOG line from Muraliganj to Kumarkhand

11.Bihariganj
12.Udakishanganj
13.Puraini
14.Alamnagar

S/C DOG line from Singheshwar to Ghailar


Replacement of conductor with PANTHER ACSR
Conversion of S/C DOG line to D/C WOLF from Khagaria GSS to Mansi
Replacement of DOG with WOLF ACSR from Mansi to Maheshkunt
Udakishanganj S/C DOG line from Udakishanganj GSS to Bihariganj
Udakishanganj
Udakishanganj S/C DOG line from Udakishanganj GSS to Puraini
Udakishanganj

1. Bihpur
2. Sanhauli
3. Naugachhia
4. Patwara
5. Sultanganj
6. Shahkund
7. Barari

Naugachhia
Naugachhia
Naugachhia
Sultanganj
Sultanganj
Sultanganj
Sabour

8. CS Compound

Sabour

9. Sabour
10.Gouradih
11.Aliganj I
12.Aliganj II

Sabour
Sabour
Sabour
Sabour

13.Banka (2)
14.Banka

Banka
Banka

15.Sanhoula
16.Ghogha
17.Kahalgaon

Kahalgaon
Kahalgaon
Kahalgaon

33 kV Bay
(No.)
0
1
1
1
1
1
1

Total Cost
(Rs. Lakh)
0
25.37
25.37
25.37
25.37
25.37
25.37

0
1
1

0
25.37
25.37

1
0
0
0
1

25.37
0
0
0
25.37

25.37
279.07

10.Bhagalpur

S/C DOG line from Naugachhia GSS to Sanhauli


Replacement of DOG with WOLF from Naugachhia GSS to Naugachhia S/S

1
0

25.37
0

Conversion of S/C DOG to D/C WOLF from Sabour GSS to Central Jail
Conversion of S/C DOG to D/C WOLF from Sabour GSS to C S Compound
Replacement of DOG with WOLF ACSR from CS Compund to TT School

0
0
0

0
0
0

Conversion of S/C DOG to D/C WOLF line from Sabour GSS to Aliganj
Conversion of S/C DOG to D/C WOLF line from Sabour GSS to Aliganj
Replacement of DOG with WOLF from Aliganj to Nath Nagar
S/C DOG line from Banka GSS to Banka (2) S/S
Conversion of S/C WOLF to D/C WOLF from Banka GSS to Banka S/S
Replacement of DOG with WOLF from Banka S/S to Rajauna-Bousi tapping

0
0
0
1
0
0

0
0
0
25.37
0
0

S/C DOG line from Kahalgaon GSS to Ghogha


Conversion of S/C DOG to D/C WOLF from Kahalgaon GSS to Kahalgaon S/S

1
0

25.37
0
76.11

APPENDIX B-3

Cost Estimate of Additional 33 kV Bays for 33 kV Feeders

1. Tarapur
2. Dakranala
3. Ramchandrapur
4. Safiabad
5. ITC
6. Karnachaura
7. Nandlalpur
8. Bindwara
9. Balaji
10.Purani Bazar

Source
EHV S/S
Sultanganj
Jamalpur
Jamalpur
Jamalpur
Jamalpur
Jamalpur
Jamalpur
Jamalpur
Lakhisarai
Lakhisarai

11.Kajra

Lakhisarai

12.Haibatganj

Lakhisarai

13.Jamui
14.Gidhour

Mallehpur
Mallehpur

15.Ghuskuri
16.Ariari

Sheikhpura
Sheikhpura

17.Onama

Sheikhpura

18.Hathiyama
19.Sheikhpura

Sheikhpura
Sheikhpura

1.
2.
3.
4.
5.

Pusa
Mohanpur
Jute Mill
Sarairanjan
Jitwarpur

Mohanpur
Mohanpur
Mohanpur
Mohanpur
Mohanpur

6. Rly.Samastipur
7. Sirsia

Mohanpur
Mohanpur

Circle

11. Munger

Name of 33 kV

12.Samastipur
8. Dalsingsarai
9. Pateri
10.Bachhwara
11.Bibhutipur
12.Deona
13.Bangrahdih (2)
14.IOC
15.Railways

Dalsingsarai
Dalsingsarai
Dalsingsarai
Dalsingsarai
BTPS
BTPS
BTPS
BTPS

33 kV Bay
(No.)
0

Total Cost
(Rs. Lakh)
0

Replacement of DOG with WOLF from Jamalpur GSS to Ramchandrapur


Replacement of DOG with WOLF from Jamalpur GSS to Safiabad

0
0

0
0

Conversion of S/C DOG to D/C WOLF from Jamalpur GSS to Karnachaura

S/C DOG line from Lakhisarai GSS to Balaji HTC

25.37

Conversion of S/C DOG to D/C WOLF from Lakhisarai GSS to Court Area
S/C DOG line from Lakhisarai GSS to Kajra
S/C DOG line from Kajra to Piri Bazar
Replacement of DOG with WOLF from Lakhisarai to Salempur
S/C DOG line from Lakhisarai - Kendy tapping to Mananpur
Conversion of S/C DOG to D/C WOLF from Mallehpur GSS to Jamui
Conversion of S/C DOG to D/C WOLF from Mallehpur GSS to Gidhour tapping
Replacement of DOG with WOLF from Gidhour tapping and Jhajha
S/C DOG line from Sheikhpura GSS to Ghuskuri

0
1
1
0
1
0
0
0
1

0
25.37
25.37
0
25.37
0
0
0
25.37

S/C DOG line from Bhalua to Lohain


Replacement of DOG with WOLF ACSR from Sheikhpura to Mirzapur
S/C DOG line tapping from Sheikhpura - Mirzapur line to Toygarh

1
0
1

25.37
0
25.37

Replacement of DOG with WOLF from Sheikhpura GSS to Sheikhpura

0
177.59

Conversion of S/C DOG line to D/C WOLF from Mohanpur GSS to Mohanpur S/S

Conversion of S/C DOG line to D/C WOLF line from Mohanpur GSS to Jitwarpur
S/C WOLF line from Jitwarpur to Magardahi

0
1

0
25.37

S/C DOG line from Sirsia to Kuboliram


S/C DOG line from Mohanpur - Sirsia line as tapping to Karpoorigram
S/C WOLF line from Dalsingsarai GSS to Dalsingsarai S/S
S/C DOG line from Dalsingsarai (New) GSS to Pateri
S/C DOG line from Dalsingsarai (New) GSS to Bachhwara
S/C WOLF line from Dalsingsarai GSS to Bibhutipur

1
1
1
1
1
1

25.37
25.37
25.37
25.37
25.37
25.37

S/C WOLF line from BTPS to Bangradih (2)

25.37

Work proposed
Conversion of S/C DOG to D/C WOLF from Sultanganj to Tarapur

APPENDIX B-3

Cost Estimate of Additional 33 kV Bays for 33 kV Feeders

16.Deona (2)
17.Kankaul
18.Begusarai

Source
EHV S/S
Zero Mile
Zero Mile
Zero Mile

1. Narpatganj
2. Raniganj

Forbesganj
Forbesganj

3. Forbesganj

Forbesganj

Circle

12.Samastipur

13. Purnea

14. Sasaram

Name of 33 kV

4. Bahadurganj
5. Sarai
6. Paschimpali
7. Purabpali
8. Thakurganj
9. Group Control
10.Banmankhi
11.Zero Mile
12.Belgachhi

Kishan ganj
Kishanganj
Kishanganj
Kishanganj
Kishanganj
Purnea
Purnea
Purnea
Purnea

13.Naranga
14.Jalalgarh
15.Beri
16.Barsoi
17.Pranpur
18.Industrial Estate
19.Binodpur
20.Kursaila

Purnea
Purnea
Katihar
Katihar
Katihar
Katihar
Katihar
Naugachhia

1. Karmnasa

Karmnasa

2. Larma
3. Kalyanpur

Karmnasa
Karmnasa

4.
5.
6.
7.
8.
9.

Ramgarh (2)
Kakrait
Parsathua
Chainpur
Mohania (2)
Mohania

10.Dinara
11.Sanjhouli

Karmnasa
Karmnasa
Mohania
Mohania
Mohania
Mohania
Dinara
Bikramganj

33 kV Bay
(No.)
1
1
1

Total Cost
(Rs. Lakh)
25.37
25.37
25.37
279.07

S/C DOG line from Raniganj to Bahargaon

25.37

S/C DOG line from Araria to Kusgaon


S/C DOG line from Jokihat to Malgaon

1
1

25.37
25.37

Conversion of S/C DOG to D/C WOLF line from Purnea GSS to Group Control
Replacement of RABBIT with WOLF from Purnea GSS to Banmankhi
Replacement of DOG with WOLF from Purnea GSS to Zero Mile

0
0
0

0
0
0

S/C DOG line from Dalkola to Vaisi


Conversion of S/C DOG to D/C WOLF line from Purnea GSS to Naranga
Replacement of DOG with WOLF from Purnea GSS to Jalalgarh
Conversion of S/C DOG to D/C WOLF from Katihar GSS to Beri
S/C DOG line from Katihar to Barsoi
S/C DOG line from Katihar to Pranpur

1
0
0
0
1
1

25.37
0
0
0
25.37
25.37

Conversion of S/C DOG to D/C WOLF line from Karmnasa GSS to


Durgawati S/S tapping point
Replacement of DOG with WOLF from Durgawati tapping to Chand

152.22
0

Conversion of S/C WOLF to D/C WOLF from Karmnasa GSS to Ramgarh


S/C WOLF line from Karmnasa GSS to Ramgarh (2)

0
1

0
25.37

S/C WOLF line from Mohania GSS to Mohania (2)

25.37

Replacement of DOG with WOLF from Mohania GSS to Bhabhua Old


S/C WOLF line from Dinara (New) GSS to Dinara

0
1

0
25.37

Work proposed
S/C WOLF line from Zero Mile (Begusarai) GSS to Deona (2)
S/C WOLF line from Zero Mile GSS to Kankaul
D/C WOLF line from Zero Mile GSS to Begusarai

APPENDIX B-3

Cost Estimate of Additional 33 kV Bays for 33 kV Feeders


Circle

14. Sasaram

15. Muzaffarpur

12.Surajpura
13.Bikramganj
14.Bikramganj (2)
15.Pusauli
16.Kudra
17.Karamchat

Source
EHV S/S
Bikramganj
Bikramganj
Bikramganj
PGCIL Pusauli
Kudra
Kudra

18.Beda Sasaram
19.Sasaram (2)
20.Sasaram (3)
21.Naigaon
22.BMP Dehri (2)
23.BMP Dehri I & II
24.JVLO&FL Pahleja
25.Nasariganj
26.Rajpur
27.Nauhatta
28.Samhauta
29.Samhauta (2)
30.Kirpabal (2)

Sasaram
Sasaram
Sasaram
Sasaram
Dehri-On-Sone
Dehri-On-Sone
Dehri-On-Sone
Dehri-On-Sone
Dehri-On-Sone
Banjari
Banjari
Banjari
Barun

31.Indrapuri
32.Indrapuri (2)

Barun
Barun

1. Shivhar
2. Runi Saidpur
3. Pupri
4. Dumra (2)
5. Dumra
6. Sursand
7. Sonbarsa
8. Nepal
9. Patepur
10.Prataptand
11.Lalganj
12.Sarai
13.Railway (HTC)
14.Bidupur
15.EDIP
16.Hajipur I E
17.Konharaghat
18.Konharaghat (2)
19.Manhar
20.SKMCH (2)

Shivhar
Runi Saidpur
Sitamarhi
Sitamarhi
Sitamarhi
Sonbarsa
Sonbarsa
Sonbarsa
Vaishali
Vaishali
Vaishali
Vaishali
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Mohanpur

Name of 33 kV

33 kV Bay
(No.)

Total Cost
(Rs. Lakh)

Conversion of S/C DOG to D/C WOLF from Bikramganj GSS to Bikramganj


Conversion of S/C DOG to D/C WOLF from Bikramganj GSS to Bikramganj (2)

0
0

0
0

D/C WOLF line from Kudra (New) GSS to Kudra


Replacement of DOG with WOLF from Kudra to Karamchat
S/C DOG line from Cenari to Adhaura

1
0
1

25.37
0
25.37

D/C WOLF line from Sasaram GSS to Sasaram (2) S/S


S/C WOLF line from Sasaram GSS to Sasaram (3) S/S

1
1

25.37
25.37

D/C WOLF line from Dehri-on-Sone GSS to BMP Dehri (2)

25.37

Replacement of DOG with WOLF from Banjari GSS to Samhauta


S/C WOLF line from Banjari GSS to Samhauta (2)
S/C DOG line from Barun to Kirpabal (2)
Conversion of S/C DOG to D/C WOLF from Barun GSS to Kirpabal
S/C WOLF line from Barun Sone Nagar GSS to Indra Puri to
Indrapuri (2)

0
1
1
0
1

0
25.37
25.37
0
25.37

S/C DOG line from Shivhar (New) GSS to Shivhar S/S


S/C WOLF line from Runi Saidpur (New) GSS to Runi Saidpur S/S
Replacement of DOG with WOLF from Sitamarhi GSS to Pupri
S/C WOLF line from Sitamarhi GSS to Dumra (2)
Replacement of DOG with WOLF from Sitamarhi GSS to Dumra
D/C WOLF line from Sonbarsa (New) GSS to Sursand
S/C DOG line from Sonbarsa (New) GSS to Sonbarsa S/S

1
1
0
1
0
1
1

279.07
25.37
25.37
0
25.37
0
25.37
25.37

Replacement of DOG with WOLF from Vaishali GSS to Mehua

Replacement of RABBIT and DOG with WOLF from Vaishali GSS to Lalganj
Replacement of DOG with WOLF from Vaishali GSS to Sarai

0
0

0
0

Replacement of DOG with WOLF from Hajipur GSS to Bidupur

Replacement of DOG with WOLF from Hajipur GSS to Hajipur I E

S/C WOLF line from Hajipur GSS to Konharaghat (2)

25.37

S/C WOLF line from SKMCH (New) GSS to SKMCH (2) S/S

25.37

Work proposed

APPENDIX B-3

Cost Estimate of Additional 33 kV Bays for 33 kV Feeders

21.MIT
22.Sikandarpur (2)
23.SKMCH
24.Kurhani
25.Motipur
26.Motipur (2)
27.Maripur
28.Vaishali
29.Dholi
30.IDPL (2)
31.IDPL
32.Khabra
33.Bhikanpura
34.Bhagwanpur Chowk
35.Railway (HTC)
36.Nayatola (2)
37.Nayatola
38.Hajipur I E (2)

Source
EHV S/S
SKMCH
SKMCH
SKMCH
SKMCH
SKMCH
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur

1.
2.
3.
4.

Basopatti
Jay Nagar
Benipatti
Rahika

Jay Nagar
Jay Nagar
Rahika
Rahika

5.
6.
7.
8.

Bela
Gangwara
Donar
Panda Sarai

Gangwara
Gangwara
Gangwara
Ram Nagar

Circle

15. Muzaffarpur

16. Darbhanga

Name of 33 kV

9. Pouriya
10.Anar
11.Kusheshwar
12.Biraul

Ram Nagar
Kusheshwar
Kusheshwar
Kusheshwar

13.Raj Nagar

Pandaul

14.Raiyam
15.Pandaul
16.Manigachi
17.Jhanjharpur

Pandaul
Pandaul
Pandaul
Pandaul

18.Khatauna
19.Rudrapur
20.Phulparas

Phulparas
Phulparas
Phulparas

33 kV Bay
(No.)
1
1
1
1
0
1

Total Cost
(Rs. Lakh)
25.37
25.37
25.37
25.37
0
25.37

Replacement of DOG with WOLF from Bhikanpura GSS to Dholi


S/C WOLF line from Bhikanpura GSS to IDPL (2)
Conversion of S/C WOLF to D/C WOLF from Bhikanpura to IDPL
Replacement of DOG with WOLF from Bhikanpura GSS to Khabra
Replacement of DOG with WOLF from Bhikanpura GSS to Bhikanpura S/S
S/C WOLF line from Bhikanpura GSS to Bhagwanpur Chowk

0
1
0
0
0
1

0
25.37
0
0
0
25.37

S/C WOLF line from Bhikanpura GSS to Nayatola (2)

25.37

S/C WOLF line from Hajipur GSS to Hajipur I E (2)

25.37
405.92

Replacement of DOG with WOLF from Jay Nagar GSS to Jay Nagar
Replacement of DOG with WOLF from Rahika GSS to Benipatti
Conversion of S/C DOG to D/C WOLF from Rahika GSS to Rahika S/S
Replacement of DOG with WOLF from Rahika S/S to Madhubani
D/C WOLF line from Gangwara (New) GSS to Gangwara for Bela
S/C WOLF line from Gangwara (New) GSS to Gangwara S/S
S/C WOLF line from Gangwara (New) GSS to Gangwara for Donar

0
0
0
0
1
1
1

0
0
0
0
25.37
25.37
25.37

D/C WOLF line from Gangwara (New) GSS to DMCH

25.37

S/C WOLF line from Kusheshwar (New) GSS to Baheri

25.37

S/C WOLF line from Kusheshwar (New) GSS to Biraul

25.37

Conversion of S/C DOG to D/C WOLF from Pandaul GSS to Raj Nagar

Replacement of DOG with WOLF from Pandaul GSS to Pandaul

Replacement of DOG with WOLF fro Pandaul GSS to Jhanjharpur

S/C WOLF line from Phulparas GSS to Rudrapur


Conversion of S/C DOG to D/C WOLF from Phulparas GSS to Phulparas S/S

1
0

25.37
0
3983.09

Work proposed
S/C WOLF line from SKMCH (New) GSS to MIT
S/C WOLF line from SKMCH (New) GSS to Sikandarpur (2)
D/C WOLF line from SKMCH (New) GSS to SKMCH S/S
S/C DOG line from SKMCH (New) GSS to Kurhani
Replacement of DOG with WOLF from Bhikanpura GSS to Motipur
S/C WOLF line from Bhikanpura GSS to Motipur (2)

APPENDIX B-4

11 kV Lines and feeder bays


11 kV Line
Circle

33 kV feeder

11 kV bays

33/11 kV Sub Station


No.

km

Cost
(Rs.Lakh)

No.

Cost
(Rs.Lakh)

2010
1. PESU(East)
2. PESU(West)
3. Patna

1. Bihta AF

Bihta AF

10

1. Sheetalpur
2. Siwan

Sheetalpur
Siwan

1
1

10
5

1.
2.
3.
4.

Valmiki Nagar
Bettiah
Lauria
Motihari

Valmiki Nagar
Bettiah
Lauria
Motihari

1
1
1
1

10
10
5
10

1.
2.
3.
4.

Kako-Charui
Guraru-Paraiya
Belaganj
Central Stores

Kako
Guraru
Panari
Central Stores

1
1

5
10

1. Shahkund

Shahkund

10

1. Railway W/S
2. Onama

Ramchandrapur
Onama
Mirjapur
Barkana

1
1
1
1

5
10
10
10

Deona
Pusa
Jitwarpur

1
1
1

10
10
5

1. Group Control

Group Control

1.
2.
3.
4.
5.

Kalyanpur
Dinara
Bhabhua New
Pusauli
Takia
Nokha
Beda
Nauhatta

1
1
1
1
1
1
1
1

10
10
10
10
5
10
5
10

Pupri
Dumra
Lalganj
EDIP
Hajipur IE
Konharaghat
Motipur
MIT
Sikandarpur
SKMCH
Khabra
Bhikanpura

1
1
1
1
1
1
1
1
1
1
1
1

10
5
5
5
5
10
10
5
10
5
10
5

4. Nalanda
5. Chapra

6. Motihari

7. Bhojpur

8. Gaya

9. Saharsa
10.Bhagalpur

11.Munger
3. Ariari
1. Bangardih
2. Pusa
12.Samastipur
3. Jitwarpur
13.Purnea

14.Sasaram

Kalyanpur
Dinara
Kudra
Pusauli
Beda-Takia

6. Nauhatta
1.
2.
3.
4.
5.
6.
15.Muzaffarpur 7.
8.

Pupri
Dumra
Lalganj
EDIP
Hajipur IE
Konharaghat
Motipur
SKMCH

9. Khabra
1.Bhikanpura

71.81
71.81
0.00
71.81
35.91
107.72
71.81
71.81
35.91
71.81
251.35
0.00
35.91
71.81
35.91
143.63
0.00
71.81
71.81
35.91
71.81
71.81
71.81
251.35
71.81
71.81
35.91
179.54
35.91
35.91
71.81
71.81
71.81
71.81
35.91
71.81
35.91
71.81
502.70
71.81
35.91
35.91
35.91
35.91
71.81
71.81
35.91
71.81
35.91
71.81
35.91
610.42

1
1
1
1
1
1

1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

13.70
13.70
0.00
13.70
13.70
27.40
13.70
13.70
13.70
13.70
54.80
0.00
13.70
13.70
13.70
41.10
0.00
13.70
13.70
13.70
13.70
13.70
13.70
54.80
13.70
13.70
13.70
41.10
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
109.60
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
13.70
164.40

APPENDIX B-4

11 kV Lines and feeder bays


11 kV Line
Circle

33 kV feeder

1. Rajnagar
2. Raiyam
16.Darbhanga 3. Pandaul

11 kV bays

33/11 kV Sub Station

Rajnagar
Raiyam
Pandaul

No.

km

1
1
1

10
10
10

Cost
(Rs.Lakh)
71.81
71.81
71.81
215.44
2441.70

No.
1
1
1

Cost
(Rs.Lakh)
13.70
13.70
13.70
41.10
575.40

APPENDIX B-4

11 kV Lines and feeder bays


11 kV Line
Circle

33 kV feeder

11 kV bays

33/11 kV Sub Station


km

Cost
(Rs.Lakh)

No.

Cost
(Rs.Lakh)

3
2
9
4
4
2
2

15
10
45
20
20
10
10

107.72
71.81
323.17
143.63
143.63
71.81
71.81

3
2
9
4
4
2
2

41.10
27.40
123.30
54.80
54.80
27.40
27.40

5
4
2
3

25
20
10
15

179.54
143.63
71.81
107.72

5
4
2
3

68.50
54.80
27.40
41.10

No.

2011-2014
1. Katra
2. Dina Iron
3. Karmali Chak
4.
5.
6.
7.
8.

S.K. Memorial
Kankar Bag (2)
Saidpur
Bahadurpur
R. Nagar

9. Kankar Bag
1.Ashok Nagar
11.R.K.Nagar
1. PESU (East) 12.Karbigahiya
13.Gaighat

1. Katra
1. HTC
2. HTC
1. Karmali Chak
2. Deedarganj
1. S.K.Memorial
1. Kankar Bag (2)
1. Saidpur
1. Bahadurpur
1. R.Nagar
2. Machhuatoli
1. Kankar Bag
1. Ashok Nagar
1. R.K.Nagar
1. Karbigahiya
1. Gaighat

14.NMCH

1. NMCH

15

107.72

41.10

15.Meena Bazar
16.Katra (2)
17.Pahari

1. Meena Bazar
1. Katra (2)
1. Pahari
2. Sampatchak (Patna)
3. HTC (Patna)
1. Malsalami
1. Mangal Talab
2. Meena Bazar (2)
1. PMCH

2
6
4

10
30
20

71.81
215.44
143.63

2
6
4

27.40
82.20
54.80

2
4
9
2

10
20
45
10

2
4
9
2

1. A.N.College
1. S.K.Puri
1. Garikhana
2. Pataliputra
3. Rajapur
4. Walmi
1. Walmi
5. Danapur
1. Danapur
6. Digha
1. Digha
2. Digha Central Stores
7. R.B.I.
1. RBI
2. HTC (Group)
8. Danapur (2)
1. Danapur (2)
9. IGIMS
1. IGIMS
2. Excise
1.Vaterinery College 1. Vaterinery College
2. Board`s Colony
2. PESU (West)
11.Jakkanpur
1. Jakkanpur
12.Maurya Lok
1. Maurya Lok
2. Bandar Bagicha
13.Karnawad Punpun 1. Karnawad Punpun
14.Sinchai Bhawan
1. Sinchai Bhawan
15.Anishabad
1. Anishabad
16.Gardanibag
1. Gardanibag
17.Vidyut Bhawan
1. Vidyut Bhawan
2. High Court
18.Sahitya Sammelan 1. Sahitya Sammelan
19.Bandar Bagicha (2)1. Bandar Bagicha (2)
2.Beur
1. Beur
2. Khagaul
3. HTC
4. HTC
5. Phulwari

1
1
3
3
2
1
1
1
1
1

5
5
15
15
10
5
5
5
5
5

71.81
143.63
323.17
71.81
2585.33
35.91
35.91
107.72
107.72
71.81
35.91
35.91
35.91
35.91
35.91

1
1
3
3
2
1
1
1
1
1

27.40
54.80
123.30
27.40
986.40
13.70
13.70
41.10
41.10
27.40
13.70
13.70
13.70
13.70
13.70

9
2
1
1
2
2
3
2
1
1
2
2
2
2
2
6
2
2

45
10
5
5
10
10
15
10
5
5
10
10
10
10
10
30
10
10

323.17
71.81
35.91
35.91
71.81
71.81
107.72
71.81
35.91
35.91
71.81
71.81
71.81
71.81
71.81
215.44
71.81
71.81

9
2
1
1
2
2
3
2
1
1
2
2
2
2
2
6
2
2

123.30
27.40
13.70
13.70
27.40
27.40
41.10
27.40
13.70
13.70
27.40
27.40
27.40
27.40
27.40
82.20
27.40
27.40

35.91

13.70

18.Malsalami
19.Mangal Talab
2.Meena Bazar (2)
21.PMCH
1. A.N.College
2. S.K.Puri
3. Garikhana I & II

APPENDIX B-4

11 kV Lines and feeder bays


11 kV Line
Circle

33 kV feeder

11 kV bays

33/11 kV Sub Station

21.Vikas Bhawan

1. Bhusaula
2. Vikas Bhawan

1
1

5
5

1. A.F. Bihta
2. Pareo

1. A.F.Bihta
1. Pareo
2. Koilwar (Ara Circle)
3. Giddha (Ara Circle)
1. Bihta
2. Kanpa
3. Lalbhasara
4. Paliganj
HTC
HTC group
1. Maner
1. Neora
2. Naubatpur
1. Fatuah (2)
1. Khusrupur
2. Daniyaman
1. Fatuah
1. HTC
2. HTC
1. Masaurhi Old
2. Dhanaura
1. Masaurhi New
HTC
1. Barh
2. Bakhtiyarpur
1. Barh (2)
1. Biharibigha
1. Hathidah
2. Mokama
1. Hathidah (2)

1
2

5
10

Cost
(Rs.Lakh)
35.91
35.91
2226.25
35.91
71.81

60

1
1
1

2. PESU (West)

3. Bihta I & II

4.
5.
6.
7.

GISCO
Balmukund
Maner
Neora

8. Fatuah (2)
9. Khusrupur
3. Patna
1.Fatuah
11.Dina Iron
12.Masaurhi Old
13.Masarhi New
14.NTPC I & II
15.Barh
16.Barh (2)
17.Biharibigha
18.Hathidah
19.Hathidah (2)

430.89

82.20

10
10
10

71.81
71.81
71.81

1
1
1

13.70
13.70
13.70

2
2
2
6
1
1

20
20
20
30
10
10

143.63
143.63
143.63
215.44
71.81
71.81

2
2
2
6
1
1

27.40
27.40
27.40
82.20
13.70
13.70

2
1
1

20
10
10

143.63
71.81
71.81

2
1
1

27.40
13.70
13.70

6
1

60
10

430.89
71.81

6
1

82.20
13.70

2
6

20
60

143.63
430.89
2908.49

2
6

27.40
82.20
616.50

1
1
2
6
1

10
10
20
60
10

71.81
71.81
143.63
430.89
71.81

1
1
2
6
1

13.70
13.70
27.40
82.20
13.70

60

430.89

82.20

6
1

60
10

430.89
71.81

6
1

82.20
13.70

60

430.89

82.20

6
6

60
60

430.89
430.89

6
6

82.20
82.20

6
6
6

60
60
60

430.89
430.89
430.89

6
6
6

82.20
82.20
82.20

6
6
1
6
1
2

60
60
10
30
5
10

430.89
430.89
71.81
215.44
35.91
71.81

6
6
1
6
1
2

82.20
82.20
13.70
82.20
13.70
27.40

km

No.
1
1

1. Hilsa

4. Nalanda

1. Hilsa
2. Hilsa (2)
2. Islampur
1. Islampur
2. Khudaganj
3. Ekangersarai
1. Ekangersarai
4. Chiksurabazar
1. Chiksurabazar
5. Dhamauli
1. Dhamauli
2. Rahui
6. Noorsarai
1. Noorsarai
2. Kalyanbigha
3. Chandi
4. Chainpur
5. Thertheri
7. Harnaut
1. Harnaut
2. Cheral (Railways)
8. Silao
1. Silao
2. Bhindidih
9. Andawas
1. Andawas
1.Rajgir
1. Rajgir
2. Ghosarwan
11.Giriak
1. Tetrawan
2. Sarbahadi
3. Giriak
4. Badi
5. Katrisarai
12.Parwalpur
1. Parwalpur
13.Ramchandrapur (2)1. Ramchandrapur (2)
14.Ramchandrapur 1. Ramchandrapur
15.Bari Pahari
1. Bari Parhari

1
2

Cost
(Rs.Lakh)
13.70
13.70
849.40
13.70
27.40

No.

APPENDIX B-4

11 kV Lines and feeder bays


11 kV Line
Circle

33 kV feeder

16.Asthawan
4. Nalanda

17.Sohasarai
1. Fulwaria
2. Gopalganj

3. Srinagar
4. Siwan
5. Maharajganj
5. Chapra

6. Siwan (2)
7. Mashrakh
8. Taraiya
9. Baikunthpur
1.Prabhunath Nagar
11.Telpa
12.Sheetalpur
1. Valmiki Nagar
2. Dhanha
3. Ramnagar

6. Motihari

4. Chautarwa
5. Lauria
6. Narkatiaganj
7. Raxaul
8. Adopur
9. Dhaka
1.Bettiah
11.Bettiah (2)
12.Madhopur
13.Areraj
14.Motihari (2)
15.Motihari
16.Chakia
17.Chhitwani
1. Chausa

2. Buxar

7. Bhojpur

3.
4.
5.
6.

Pandy Patti
Dumraon
Dumraon (2)
Nawanagar

7. Bramhpur

8. Simri

11 kV bays

33/11 kV Sub Station


No.

km

6
1

60
5

1. Fulwaria
2. Hathua
1. Gopalganj
2. Jhajhwa
3. Kuchaikot
1. Srinagar
2. Mairwa
1. Siwan
1. Maharajganj
2. Ekma
1. Siwan (2)
1. Mashrakh
2. Baniapur
1. Taraiya
2. Marworah
1. Baikunthpur
2. Barouli
1. Prabhunath Nagar
2. Manjhi
1. Telpa
1. Sheetalpur

2
1
2
1
1
1
1

1. Valmiki Nagar
1. Dhanha
1. Ramnagar
2. Bagha
1. Chautarwa
1. Lauria
1. Narkatiaganj
1. Raxaul
1. Adopur
1. Dhaka
1. Bettiah
1. Bettiah (2)
1. Madhopur
2. Harsidhi
1. Areraj
1. Motihari (2)
1. Motihari
1. Chakia
2. Madhuban
1. Chhitwani

1. Asthawan
2. Malti
1. Sohasarai

1. Chausa
2. Itarhi
3. Purushottampur
1. Buxar
2. Industrial
1. Pandey Patti
1. Dumraon
1. Dumraon (2)
1. Nawanagar
2. Murar
3. Akarsai
1. Krishnapuram
2. Bramhapur
3. Sahpur
4. Bihian
1. Simri

Cost
(Rs.Lakh)

No.
6
1

Cost
(Rs.Lakh)

20
10
10
10
10
10
10

430.89
35.91
6032.43
143.63
71.81
71.81
71.81
71.81
71.81
71.81

2
1
2
1
1
1
1

82.20
13.70
1219.30
27.40
13.70
27.40
13.70
13.70
13.70
13.70

1
1
5
1
1
1
1

10
10
30
10
10
10
10

71.81
71.81
215.44
71.81
71.81
71.81
71.81

1
1
5
1
1
1
1

13.70
13.70
68.50
13.70
13.70
13.70
13.70

2
1
3
2

20
10
15
10

2
1
3
2

1
6
2

10
60
20

143.63
71.81
107.72
71.81
1615.83
71.81
430.89
143.63

1
6
2

27.40
13.70
41.10
27.40
383.60
13.70
82.20
27.40

6
1
2
1
1
2

60
10
20
5
10
20

430.89
71.81
143.63
35.91
71.81
143.63

6
1
2
1
1
2

82.20
13.70
27.40
13.70
13.70
27.40

6
1
1
2
3
1
1
1
6

30
10
10
20
30
5
10
10
60

6
1
1
2
3
1
1
1
6

2
1
1
2
1
3

20
10
10
10
5
15

215.44
71.81
71.81
143.63
215.44
35.91
71.81
71.81
430.89
2872.58
143.63
71.81
71.81
71.81
35.91
107.72

2
1
1
2
1
3

82.20
13.70
13.70
27.40
41.10
13.70
13.70
13.70
82.20
602.80
27.40
13.70
13.70
27.40
13.70
41.10

5
1
1
1
1
1

30
10
10
10
10
10

215.44
71.81
71.81
71.81
71.81
71.81

5
1
1
1
1
1

68.50
13.70
13.70
13.70
13.70
13.70

APPENDIX B-4

11 kV Lines and feeder bays


11 kV Line
Circle

33 kV feeder

9. Garhani

7. Bhojpur

1.Jagdishpur
11.Japani Farm
12.Powerganj

13.Zero Mile
1. Karpi

2. Arwal
3. Goh
4. Daudnagar
5. Kako
6. Tehta

7. Ghosi
8. Irki

9. Rafiganj I & II
1.Uchauli
11.Guraru
12.Tekari
8. Gaya

13.Belaganj

14.Chakand
15.Dhongra
16.Sonwa
17.Hulasganj
18.Nawagarh
19.Aurangabad
2.Obra

21.Deo
22.Barun
23.Barem
24.Tengra
25.Sone Hydel
26.Nabinagar
27.Barun (2)
28.Dihara
29.Wazirganj

30.Atari

11 kV bays

33/11 kV Sub Station

2. Chhotka Dhakai
1. Garhani
2. Piro
3. Agiaon
4. Sandes
1. Jagdishpur
1. Japani Farm
2. Serai
1. Powerganj
2. Power House
3. Barhara
1. Zero Mile
1. Karpi
2. Ataullah
3. Kurtha
1. Arwal
1. Goh
1. Daudnagar
2. Haspura
1. Kako
2. Charui
1. Tehta
2. Makpa
3. Makhdampur
1. Ghosi
2. Jehanabad
1. Irki
2. Sakurabad
3. Nowaman
1. Rafiganj
1. Uchauli
2. Madanpur
1. Guraru
2. Paraiya
1.Tekari
2. Koach
1. Belaganj
2. Panari
3. Paibigha
1. Chakand
1. Dhongra
1. Sonwa
1. Hulasganj
1. Nawagarh
1. Aurangabad
1. Obra
2. Phesar
3. Sokhea
1. Deo
2. Gangti
1. Barun
1. Barem
1. Tengra
HTC
1. Nabinagar
2. Amba
1. Barun (2)
1. Dihara
1. Wazirganj
2. Fatehpur
3. Paimer
1. Atari

No.

km

6
1
1

60
10
10

Cost
(Rs.Lakh)
430.89
71.81
71.81

6
1
1

Cost
(Rs.Lakh)
82.20
13.70
13.70

25

179.54

68.50

1
3
6
3

5
15
60
15

35.91
107.72
430.89
107.72
2513.51

1
3
6
3

13.70
41.10
82.20
41.10
630.20

1
1
1
1
1
1
3
2

10
10
10
10
10
10
15
10

71.81
71.81
71.81
71.81
71.81
71.81
107.72
71.81

1
1
1
1
1
1
3
2

13.70
13.70
13.70
13.70
13.70
13.70
41.10
27.40

6
2
1
1
1
1
1
1
2
2

60
10
10
10
10
10
10
10
20
20

430.89
71.81
71.81
71.81
71.81
71.81
71.81
71.81
143.63
143.63

6
2
1
1
1
1
1
1
2
2

82.20
27.40
13.70
13.70
13.70
13.70
13.70
13.70
27.40
27.40

2
6
6

20
60
60

143.63
430.89
430.89

2
6
6

27.40
82.20
82.20

60

430.89

82.20

35.91

13.70

20

143.63

27.40

1
1
3
6

10
10
15
60

71.81
71.81
107.72
430.89

1
1
3
6

13.70
13.70
41.10
82.20

0.00

13.70

No.

APPENDIX B-4

11 kV Lines and feeder bays


11 kV Line
Circle

33 kV feeder

31.Gurua
32.Amas
33.Banke
34.Shergahti
35.Imamganj
36.Chandauti
37.Medical
38.Central Stores
39.A.P.Colony
4.Gandhi Maidan
41.Dandibag
42.Shobh
8. Gaya

43.Manpur

44.Industrial Area
45.M.U. Campus
46.Hasua
47.Nawada

48.Akbarpur

49.Roh

11 kV bays

33/11 kV Sub Station

2. Khizr Sarai
1. Gurua
1. Amas
1. Banke
1. Sherghati
2. Dobhi
1. Imamganj
2. Dumaria
1. Chandauti
1. Medical
2. Cherki
1. Central Stores
1. A.P.Coloy
2. Railway Maidan
1. Gandhi Maidan
2. Panchaiti Akhara
1. Dandibag
1. Shobh
2. Charkbria
1. Manpur
2. Tankuppa
3. Gere
4. Bhore
1. Industrial Area
1. M.U.Campus
2. Buddhist Complex
1. Hasua
2. Nadirganj
1. Nawada
2. Nawada New
3. Bhadhokhara
1. Akbarpur
2. Rajauli
3. Sirdala
1. Roh
2. Warsaliganj
3. Pakribarwan
4. Kaukol

No.

Cost
(Rs.Lakh)

20

0.00
143.63

1
4

13.70
54.80

km

1
4

2
0
1
2
3
3
4

10

71.81

32.47

5
10
15
15
20

35.91
71.81
107.72
107.72
143.63

1
2
3
3
4

13.70
27.40
41.10
41.10
54.80

10

71.81

13.70

10

71.81

13.70

2
2
4
4
3
1
1
1
1
1
1
1
1
1
2

10
10
40
40
30
5
10
10
10
10
10
10
10
10
20

71.81
71.81
287.26
287.26
215.44
35.91
71.81
71.81
71.81
71.81
71.81
71.81
71.81
71.81
143.63
6642.85

2
2
4
4
3
1
1
1
1
1
1
1
1
1
2

32.47
27.40
54.80
54.80
41.10
13.70
13.70
13.70
13.70
13.70
8.63
13.70
13.70
8.63
27.40
1534.40

30

215.44

41.10

60

430.89

82.20

6
9
6
6
6

60
45
60
60
60

430.89
323.17
430.89
430.89
430.89

6
9
6
6
6

82.20
123.30
82.20
82.20
82.20

10

71.81

27.40

35.91

13.70

60

430.89

82.20

6
2
1
2

60
10
10
20

430.89
71.81
71.81
143.63

6
2
1
2

82.20
27.40
13.70
27.40

1. Supaul

9. Saharsa

1. Supaul
2. Parasrama
3. Kishanpur
4. Pipra
5. Raghopur
6. Larganj
2. Saharsa (2)
1. Sahrsa (2)
3. Sour Bazar
1. Sour Bazar
4. Balwahat
1. Balwahat
2. Salakhua
5. Simri Bakhtiyarpur 1. Simri Bakhtiyarpur
6. New Market
1. New Market
7. Old Saharsa
1. Old Saharsa
8. Madhepura
1. Madhepura
2. Muraliganj
3. Kumarkhand
9. Singheswar
1. Singheswar
2. Ghailar
1.Khagaria
1. Khagaria
2. Mansi
3. Maheshkunt

Cost
(Rs.Lakh)

No.

APPENDIX B-4

11 kV Lines and feeder bays


11 kV Line
Circle

9. Saharsa

33 kV feeder

11.Bihariganj
12.Udakishanganj
13.Puraini
14.Alamnagar

1. Bihariganj
1. Udakishanganj
1. Puraini
1. Alamnagar

60

Cost
(Rs.Lakh)
430.89

60

1. Bihpur
2. Sanhauli
3. Naugachhia
4. Patwara
5. Sultanganj
6. Shahkund
7. Barari

1. Bihpur
1. Sanhauli
1. Naugachhia
1. Patwara
1. Sultanganj
1. Shahkund
1. Barari
2. Central Jail
3. Mayaganj
1. C S Compound
2. T T School
1. Sabour
1. Gouradih
1. Aliganj
2. Mojahidpur
1. Aliganj
2. Jagdishpur
3. Nath Nagar
1. Banka (2)
1. Banka
2. Amarpur
3. Rajouna
4. Bousi
1. Sanhoula
1. Ghogha
1. Kahalgaon
2. Pirpainti

1
6

8. CS Compound

1.Bhagalpur

9. Sabour
1.Gouradih
11.Aliganj I
12.Aliganj II

13.Banka (2)
14.Banka

15.Sanhoula
16.Ghogha
17.Kahalgaon

1. Tarapur
2. Dakranala
3. Ramchandrapur
4. Safiabad
5. ITC
6. Karnachaura
7. Nandlalpur
8. Bindwara
9. Balaji
1.Purani Bazar
11. Munger

11 kV bays

33/11 kV Sub Station

11.Kajra
12.Haibatganj

13.Jamui

14.Gidhour

15.Ghuskuri
16.Ariari

1. Tarapur
2. Kharagpur
1. Dakranala
1. Ramchandrapur
2. Railways (HTC)
1. Safiabad
2. Baniyarpur
1. ITC (HTC)
1. Karnchaura
1. Nandlalpur
1. Bindwara
1. Balaji
1. Purani Bazar
2. Court Area
1. Kajra
2. Piri Bazar
1. Salempur
2. Manpur
3. Haibatganj
1. Jamui
2. Khaira
3. Sikandara
1. Gidhour
2. Jhajha
3. Sono
1. Ghuskuri
1. Ariari
2. Bhalua
3. Lohain
4. Katari

Cost
(Rs.Lakh)
82.20

430.89

82.20

10
60

4811.58
71.81
430.89

1
6

1013.80
10.14
82.20

10

71.81

32.47

2
2
2
2
2
2

10
10
10
10
10
10

71.81
71.81
71.81
71.81
71.81
71.81

2
2
2
2
2
2

27.40
27.40
27.40
27.40
27.40
27.40

2
1
2
1
1
3
1

10
10
10
10
10
15
5

71.81
71.81
71.81
71.81
71.81
107.72
35.91

2
1
2
1
1
3
1

27.40
13.70
27.40
13.70
18.77
41.10
13.70

1
2
1
6
1

10
20
10
60
10

71.81
143.63
71.81
430.89
71.81

1
2
1
6
1

13.70
27.40
13.70
82.20
18.77

2
1
1
1

20
10
10
10

2298.07
143.63
71.81
71.81
71.81

2
1
1
1

600.75
27.40
13.70
13.70
13.70

1
1

10
10

71.81
71.81

1
1

13.70
13.70

3
1
2

30
10
20

215.44
71.81
143.63

3
1
2

41.10
13.70
27.40

3
2
6
6

15
10
60
60

107.72
71.81
430.89
430.89

3
2
6
6

46.17
27.40
82.20
82.20

60

430.89

82.20

2
1
1
1
1
1
6

10
10
10
10
5
10
60

71.81
71.81
71.81
71.81
35.91
71.81
430.89

2
1
1
1
1
1
6

32.47
13.70
13.70
13.70
13.70
9.59
82.20

60

430.89

82.20

No.

km

No.

APPENDIX B-4

11 kV Lines and feeder bays


11 kV Line
Circle

33 kV feeder

17.Onama
11. Munger
18.Hathiyama
19.Sheikhpura
1. Pusa
2. Mohanpur

3. Jute Mill
4. Sarairanjan
5. Jitwarpur
6. Rly.Samastipur
7. Sirsia

8. Dalsingsarai
9. Pateri
1.Bachchwara
12.Samastipur 11.Bibhutipur

12.Deona

13.Bangrahdih (2)
14.IOC
15.Railways
16.Deona (2)
17.Kankaul
18.Begusarai

1. Narpatganj
2. Raniganj
3. Forbesganj

4. Bahadurganj

13. Purnea

5.
6.
7.
8.

Sarai
Paschimpali
Purabpali
Thakurganj

9. Group Control
1.Banmankhi
11.Zero Mile
12.Belgachhi

11 kV bays

33/11 kV Sub Station


No.

km

Cost
(Rs.Lakh)

No.

Cost
(Rs.Lakh)

60

430.89

82.20

15

1. Pusa
1. Mohanpur
2. Warisnagar
3. Kalyanpur
HTC
1. Sarairanjan
1. Jitwarpur
2. Magardahi
HTC
1. Sirsia
2. Kuboliram
3. Karpoorigram
1. Dalsingsarai
2. Mehuddinnagar
1. Pateri
1. Bachchwara
1. Bibhutipur
2. Rosera
3. Hassanpur
1. Deona
2. Bangrahdih
3. Jai Mangla (HTC)
4. Jai Mata Di (HTC)
1. Bangrahdih (2)
HTC
HTC
1. Deona (2)
1. Kankaul
1. Begusarai
2. Manjhaul
3. Ganga Dairy (HTC)
4. Balia

1
2
1
1

10
10
10
10

107.72
4201.15
71.81
71.81
71.81
71.81

1
2
1
1

41.79
883.51
13.70
27.40
13.70
13.70

1
1
6

10
10
30

71.81
71.81
215.44

1
1
6

13.70
18.77
82.20

6
6
1
1
1
1
1
1
1

60
60
10
10
10
10
10
10
10

430.89
430.89
71.81
71.81
71.81
71.81
71.81
71.81
71.81

6
6
1
1
1
1
1
1
1

82.20
82.20
13.70
13.70
13.70
13.70
13.70
13.70
13.70

30

215.44

82.20

6
6
1
2

30
30
5
20

215.44
215.44
35.91
143.63

6
6
1
2

82.20
82.20
13.70
27.40

10

1. Narpatganj
1. Raniganj
2. Bahargaon
1. Forbesganj
2. Araria
3. Kusgaon
4. Jokihat
5. Malgaon
1. Bahadurganj
2. Dighal Bank
1. Sarai
1. Paschimpali
1. Purabpali
1. Chhatargarh
2. Thakurganj
1. Group control
1. Banmankhi
2. Madhubani
1. Zero Mile
2. City
1. Belgachhi
2. Dalkola
3. Vaisi

10

71.81
2908.49
71.81

13.70
744.87
13.70

60

430.89

82.20

60

430.89

82.20

60

430.89

82.20

1
2
2

10
10
10

71.81
71.81
71.81

1
2
2

13.70
27.40
27.40

15

107.72

41.10

1
1
1

10
5
5

71.81
35.91
35.91

1
1
1

13.70
13.70
13.70

60

430.89

82.20

5. Barkna
1. Onama
2. Mirzapur
3. Toygarh
1. Hathiyama
1. Sheikhpura

APPENDIX B-4

11 kV Lines and feeder bays


11 kV Line
Circle

33 kV feeder

13.Naranga

14.Jalalgarh
15.Beri
13. Purnea

16.Industrial Estate
17.Binodpur
18.Kursaila
1. Karmnasa

14. Sasaram

11 kV bays

33/11 kV Sub Station

1. Naranga
2. MLR Ganj
3. Dargaha
1. Jalalgarh
1. Beri
2. Gore Beri
3. Falka
4. Sonaily
5. Barsoi
6. Pranpur
1. Industrial Estate
1. Binodpur
1. Kursaila

1. Karmnasa
2. Durgawati
3. Chand
2. Larma
1. Larma
2. DVPL (HTC)
3. Kalyanpur
1. Kalyanpur
2. Ramgarh
3. Chourasia
4. Nuaon
4. Ramgarh (2)
1. Ramgarh (2)
5. Kakrait
1. Kakrait
6. Parsathua
1. Parsathua
7. Chainpur
1. Chainpur
8. Mohania (2)
1. Mohania (2)
9. Mohania
1. Mohania
2. Bhabhua Old
3. Bahuara
1.Dinara
1. Dinara
2. Kochas
3. Dawath
11.Sanjhouli
1. Sanjhouli
12.Surajpura
1. Surajpura
13.Bikramganj
1. Bikramganj
2. Kararkat
14.Bikramganj (2)
1. Bikramganj (2)
15.Pusauli
1. Pusauli
16.Kudra
1. Kudra
2. Bhabhua New
17.Karamchat
1. Karamchat
2. Cenari
3. Adhaura
18.Beda Sasaram
1. Beda Sasaram
2. Takia Sasaram
3. Nokha
19.Sasaram (2)
1. Sasaram (2)
2.Sasaram (3)
1. Sasaram (3)
21.Naigaon
1. Naigaon
2. Sheosagar
22.BMP Dehri (2)
1. BMP Dehri (2)
23.BMP Dehri I & II
1. BMP Dehri
2. Basa Karwandia
3. PHED (HTC)
24.JVLO&FL Pahleja 1. HTC
1. Akorigola
25.Nasariganj
1. Nasariganj
26.Rajpur
1. Rajpur
27.Nauhatta
1. Nauhatta
28.Samhauta
1. Samhauta
29.Samhauta (2)
1. Samhauta (2)

No.

km

1
1

10
10

Cost
(Rs.Lakh)
71.81
71.81

1
1

Cost
(Rs.Lakh)
13.70
8.63

2
1
1
1

20
10
10
10

143.63
71.81
71.81
71.81

2
1
1
1

27.40
13.70
8.63
8.63

1
1

5
10

35.91
71.81

1
1

13.70
13.70

1
1
1
1

10
10
10
10

2872.58
71.81
71.81
71.81
71.81

1
1
1
1

601.29
13.70
13.70
13.70
13.70

30

215.44

41.10

1
1

10
10

71.81
71.81

1
1

13.70
13.70

1
1
1
6

10
10
10
30

71.81
71.81
71.81
215.44

1
1
1
6

13.70
13.70
13.70
82.20

1
1
1
1

5
10
10
10

35.91
71.81
71.81
71.81

1
1
1
1

18.77
13.70
13.70
13.70

1
1

10
10

71.81
71.81

1
1

13.70
13.70

1
6
2
1
4
1
1

10
30
10
5
20
10
10

71.81
215.44
71.81
35.91
143.63
71.81
71.81

1
6
2
1
4
1
1

13.70
82.20
24.66
13.70
54.80
8.63
13.70

2
1
6
6
2
2
9

10
10
30
30
20
20
45

71.81
71.81
215.44
215.44
143.63
143.63
323.17

2
1
6
6
2
2
9

27.40
13.70
82.20
82.20
27.40
27.40
123.30

10

71.81

13.70

2
2
1
2
1
5

20
20
10
10
10
22

143.63
143.63
71.81
71.81
71.81
157.99

2
2
1
2
1
5

27.40
27.40
13.70
27.40
13.70
68.50

No.

APPENDIX B-4

11 kV Lines and feeder bays


11 kV Line
Circle

33 kV feeder

30.Kirpabal (2)
14. Sasaram

31.Indrapuri
32.Indrapuri (2)
1.
2.
3.
4.
5.
6.
7.
8.
9.

1. Kirpabal (2)
2. Kirpabal
1. Indrapuri
1. Indrapuri (2)

Shivhar
Runi Saidpur
Pupri
Dumra (2)
Dumra
Sursand
Sonbarsa
Nepal
Patepur

1. Shivhar
1. Runi Saidpur
1. Pupri
1. Dumra (2)
1. Dumra
1. Sursand
1. Sonbarsa
1. Nepal
1. Mehua
2. Patepur
1.Prataptand
1. Prataptand
11.Lalganj
1. Lalganj
12.Sarai
1. Sarai
13.Railway (HTC)
HTC
14.Bidupur
1. Bidupur
15.EDIP
1. EDIP
16.Hajipur I E
1. Hajipur I E
17.Konharaghat
1. Konharaghat
18.Konharaghat (2) 1. Konharaghat(2)
19.Manhar
1. Manhar @
15. Muzaffarpur
2.SKMCH (2)
1. SKMCH (2)
21.MIT
1. MIT
22.Sikandarpur (2)
1. Sikandarpur (2)
23.SKMCH
1. SKMCH
24.Kurhani
1. Kurhani
25.Motipur
1. Motipur
26.Motipur (2)
1. Motipur (2)
27.Maripur
1. Maripur
28.Vaishali
1. Vaishali
29.Dholi
1. Dholi
3.IDPL (2)
1. IDPL (2)
31.IDPL
1. IDPL
32.Khabra
1. Khabra
33.Bhikanpura
1. Bhikanpura
34.Bhagwanpur Chowk1. Bhagwanpur chowk
35.Railway (HTC)
HTC
36.Nayatola (2)
1. Nayatola (2)
37.Nayatola
1. Nayatola
38.Hajipur I E (2)
1. Hajipur I E (2)
1. Basopatti
2. Jay Nagar

3. Benipatti
4. Rahika
16. Darbhanga

5.
6.
7.
8.

Bela
Gangwara
Donar
Panda Sarai

9. Pouriya
1.Anar

11 kV bays

33/11 kV Sub Station

1. Basopatti
1. Jay Nagar
2. Khajauli
3. Ladania
1. Benipatti
2. Ahilyasthan
1. Rahika
2. Madhubani
1. Bela
1. Gangwara
1. Donar
1. Panda Sarai
2. Laheria Sarai (Jail)
3. DMCH
4. Urban
1. Pouriya
1. Baheri
2. Anar

No.

km

60

30

2
2
1
6

Cost
(Rs.Lakh)
430.89

No.
6

Cost
(Rs.Lakh)
82.20

10
10
10
30

215.44
4718.22
71.81
71.81
71.81
215.44

2
2
1
6

82.20
1285.06
27.40
27.40
13.70
82.20

2
2

20
20

143.63
143.63

2
2

27.40
27.40

2
2

20
20

143.63
143.63

2
2

27.40
27.40

2
1

20
5

143.63
35.91

2
1

27.40
13.70

1
6

5
30

35.91
215.44

1
6

13.70
82.20

6
2
6

30
10
30

215.44
71.81
215.44

6
2
6

82.20
27.40
82.20

35.91

13.70

6
2
1
1
6
1
2

30
20
5
10
30
5
20

215.44
143.63
35.91
71.81
215.44
35.91
143.63

6
2
1
1
6
1
2

82.20
27.40
13.70
13.70
82.20
13.70
27.40

60

430.89

82.20

30

215.44

82.20

30

215.44
3698.45

82.20
1109.70

1
1
1
1

10
10
10
10

71.81
71.81
71.81
71.81

1
1
1
1

13.70
13.70
13.70
13.70

2
2
1
2
1
1

10
10
10
20
10
10

71.81
71.81
71.81
143.63
71.81
71.81

2
2
1
2
1
1

27.40
27.40
13.70
23.02
13.70
13.70

1
1
1
1
1

5
5
10
10
10

35.91
35.91
71.81
71.81
71.81

1
1
1
1
1

13.70
13.70
8.63
13.70
13.70

APPENDIX B-4

11 kV Lines and feeder bays


11 kV Line
Circle

33 kV feeder

11.Kusheshwar
12.Biraul
13.Raj Nagar
14.Raiyam
15.Pandaul
16.Manigachi
16. Darbhanga
17.Jhanjharpur
18.Khatauna
19.Rudrapur
2.Phulparas

11 kV bays

33/11 kV Sub Station

1. Kusheshwar
1. Biraul
2. Benipur
1. Raj Nagar
2. Babu Barhi
1. Raiyam
1. Pandaul
1. Manigachi
1. Jhanjharpur
2. Madhepur
1. Khatauna
1. Rudrapur
1. Phulparas
2. Nirmali
3. Talpatganj

No.

km

6
1
1
1
1

60
10
10
10
10

Cost
(Rs.Lakh)
430.89
71.81
71.81
71.81
71.81

6
1
1
1
1

Cost
(Rs.Lakh)
82.20
13.70
13.70
13.70
13.70

1
1
1
1

10
10
10
10

71.81
71.81
71.81
71.81

1
1
1
1

18.77
13.70
13.70
8.63

6
1
1
1

60
10
10
10

430.89
71.81
71.81
71.81
2728.95

6
1
1
1

82.20
13.70
13.70
13.70
552.25

No.

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

1. PESU(East)
2. PESU(West)
3. Patna

1. Bihta AF

Bihta AF

20

6. Motihari

11.Munger

0.00

Sheetalpur
Siwan

20
20

0.00
0.00

1.
2.
3.
4.

Valmiki Nagar
Bettiah
Lauria
Motihari

20
20
20
20

0.00
0.00
0.00
0.00

Valmiki Nagar
Bettiah
Lauria
Motihari

1.
2.
3.
4.

Kako-Charui
Guraru-Paraiya
Belaganj
Central Stores

Kako
Guraru
Panari
Central Stores

20
20
20

9. Saharsa
10.Bhagalpur

1. Sheetalpur
2. Siwan

7. Bhojpur

8. Gaya

0.00

4. Nalanda
5. Chapra

2010
0

14.96

10

0.00
2
2

2
2

0.00

29.19
0.00

14.96
14.96

10
10

53.08
53.08

8
8

29.19
29.19

0.00
14.96
0.00
14.96

5
10
5
10

26.54
53.08
26.54
53.08

15
8
15
8

54.73
29.19
54.73
29.19

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
14.96

53.08

0.00
5
5
10

26.54
26.54
0.00
53.08

0.00
15
15
8

0.00

0.00
0.00

26.54

15

54.73

14.96
0.00
0.00

10
5
5

53.08
26.54
26.54

8
15
15

29.19
54.73
54.73

1. Shahkund

Shahkund

20

0.00

1. Railway W/S
2. Onama

Ramchandrapur
Onama
Mirjapur

20
20
20

0.00
0.00
0.00

0.00

54.73
54.73
0.00
29.19
0.00

0
0
0
0
97.23
97.23
0.00
0.00
97.23
97.23
194.45
81.27
97.23
81.27
97.23
356.99
0.00
0.00
81.27
81.27
0.00
97.23
259.76
0.00
0.00
81.27
81.27
97.23
81.27
81.27

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

3. Ariari

Barkana

20

0.00

0.00

26.54

15

54.73

1. Bangardih
2. Pusa
3. Jitwarpur

Deona
Pusa
Jitwarpur

20
20
20

0.00
0.00
0.00

0.00
0.00
14.96

5
5
10

26.54
26.54
53.08

15
15
8

54.73
54.73
29.19

1. Group Control

Group Control

20

0.00

14.96

10

53.08

29.19

1.
2.
3.
4.
5.

Kalyanpur
Dinara
Bhabhua New
Pusauli
Takia
Nokha
Beda
Nahatta

20
20
20
20
20
20
20
20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
14.96
0.00
14.96
0.00

5
5
5
5
10
5
10
5

26.54
26.54
26.54
26.54
53.08
26.54
53.08
26.54

15
15
15
15
8
15
8
15

54.73
54.73
54.73
54.73
29.19
54.73
29.19
54.73

Pupri
Dumar
Lalganj
EDIP
Hajipur IE
Konharaghat
Motipur
MIT
Sikandarpur
SKMCH
Khabra
Bhikanpura

20
20
20
20
20
20
20
20
20
20
20
20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
14.96
14.96
0.00
0.00
14.96
0.00
14.96
0.00
14.96

5
5
5
10
10
5
5
10
5
10
5
10

26.54
26.54
26.54
53.08
53.08
26.54
26.54
53.08
26.54
53.08
26.54
53.08

15
15
15
8
8
15
15
8
15
8
15
8

54.73
54.73
54.73
29.19
29.19
54.73
54.73
29.19
54.73
29.19
54.73
29.19

Rajnagar
Raiyam
Pandaul

20
20
20

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

5
5
5

26.54
26.54
26.54
0.00

15
15
15

54.73
54.73
54.73
0.00

11.Munger
12.Samastipur

13.Purnea

14.Sasaram

Kalyanpur from
Dinara
Kudra
Pusauli
Beda-Takia

6. Nauhatta
1.
2.
3.
4.
5.
6.
15.Muzaffarpur 7.
8.

Pupri
Dumra
Lalganj
EDIP
Hajipur IE
Konharaghat
Motipur
SKMCH

9. Khabra
10.Bhikanpura
1. Rajnagar
2. Raiyam
16.Darbhanga 3. Pandaul

2
2

2
2

2
2
2

81.27
341.03
81.27
81.27
97.23
259.76
97.23
97.23
81.27
81.27
81.27
81.27
97.23
81.27
97.23
81.27
682.07
81.27
81.27
81.27
97.23
97.23
81.27
81.27
97.23
81.27
97.23
81.27
97.23
1055.01
81.27
81.27
81.27
243.81
3668.61

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

1. Katra
2. Dina Iron

1. PESU (East)

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

1. Katra
1. HTC
2. HTC
3. Karmali Chak
1. Karmali Chak
2. Deedarganj
4. S.K. Memorial 1. S.K.Memorial
5. Kankar Bag (2) 1. Kankar Bag (2)
6. Saidpur
1. Saidpur
7. Bahadurpur
1. Bahadurpur
8. R. Nagar
1. R.Nagar
2. Machhuatoli
9. Kankar Bag
1. Kankar Bag
10.Ashok Nagar
1. Ashok Nagar

0
0
0
0
60
40
180
80
80
40
40

11.R.K.Nagar
12.Karbigahiya

1. R.K.Nagar
1. Karbigahiya

80
40

13.Gaighat

1. Gaighat

60

14.NMCH

1. NMCH

60

15.Meena Bazar
16.Katra (2)
17.Pahari

1. Meena Bazar
1. Katra (2)
1. Pahari

40
120
80

100

2. Sampatchak (Patna)
3. HTC (Patna)
18.Malsalami
1. Malsalami
40
19.Mangal Talab
1. Mangal Talab
80
20.Meena Bazar (2) 2. Meena Bazar (2) 180
21.PMCH
1. PMCH
40

0
0
0
0
6
4
18
8
8
4
4
0
10
0
8
4
0
6
0
6
0
4
12
8
0
0
0
4
8
18
4

2011-2014
0.00
0.00
0.00
0.00
67.26
44.84
201.78
89.68
89.68
44.84
44.84
0.00
112.10
0.00
89.68
44.84
0.00
67.26
0.00
67.26
0.00
44.84
134.52
89.68
0.00
0.00
0.00
44.84
89.68
201.78
44.84

0
0
0
0
24
16
72
32
32
16
16
0
40
0
32
16
0
24
0
24
0
16
48
32
0
0
0
16
32
72
16

0.00
0.00
0.00
0.00
179.49
119.66
538.48
239.32
239.32
119.66
119.66
0.00
299.15
0.00
239.32
119.66
0.00
179.49
0.00
179.49
0.00
119.66
358.98
239.32
0.00
0.00
0.00
119.66
239.32
538.48
119.66

0
0
0
0
30
20
90
40
40
20
20
0
50
0
40
20
0
30
0
30
0
20
60
40
0
0
0
20
40
90
20

0.00
0.00
0.00
0.00
159.24
106.16
477.71
212.31
212.31
106.16
106.16
0.00
265.39
0.00
212.31
106.16
0.00
159.24
0.00
159.24
0.00
106.16
318.47
212.31
0.00
0.00
0.00
106.16
212.31
477.71
106.16

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
405.99
270.66
1217.96
541.32
541.32
270.66
270.66
0.00
676.64
0.00
541.32
270.66
0.00
405.99
0.00
405.99
0.00
270.66
811.97
541.32
0.00
0.00
0.00
270.66
541.32
1217.96
270.66
9743.68

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

1. A.N.College
1. A.N.College
20
2. S.K.Puri
1. S.K.Puri
20
3. Garikhana I & II 1. Garikhana
60
2. Pataliputra
60
3. Rajapur
40
4. Walmi
1. Walmi
20
5. Danapur
1. Danapur
20
6. Digha
1. Digha
20
2. Digha Central Stores
20
7. R.B.I.
1. RBI
20
2. HTC (Group)
8. Danapur (2)
1. Danapur (2)
180
9. IGIMS
1. IGIMS
40
2. Excise
20
10.Vaterinery College1. Vaterinery College 20
2. Board`s Colony 40
11.Jakkanpur
1. Jakkanpur
40
12.Maurya Lok
1. Maurya Lok
60
2. PESU (West)
2. Bandar Bagicha 40
13.Karnawad Punpun1. Karnawad Punpun 20
14.Sinchai Bhawan
15.Anishabad
16.Gardanibag
17.Vidyut Bhawan

1. Sinchai Bhawan 20
1. Anishabad
40
1. Gardanibag
40
1. Vidyut Bhawan
40
2. High Court
40
18.Sahitya Sammelan
1. Sahitya Sammelan40
19.Bandar Bagicha (2)
1. Bandar Bagicha (2)
120
20.Beur
1. Beur
40
2. Khagaul
40
3. HTC
4. HTC
5. Phulwari
20
21.Vikas Bhawan 1. Bhusaula
20
2. Vikas Bhawan
20

2
2
6
6
4
2
2
2
2
2
0
18
4
2
2
4
4
6
4
2
0
2
4
4
4
4
4
12
4
4
0
0
2
2
2

22.42
22.42
67.26
67.26
44.84
22.42
22.42
22.42
22.42
22.42
0.00
201.78
44.84
22.42
22.42
44.84
44.84
67.26
44.84
22.42
0.00
22.42
44.84
44.84
44.84
44.84
44.84
134.52
44.84
44.84
0.00
0.00
22.42
22.42
22.42

8
8
24
24
16
8
8
8
8
8
0
72
16
8
8
16
16
24
16
8
0
8
16
16
16
16
16
48
16
16
0
0
8
8
8

59.83
59.83
179.49
179.49
119.66
59.83
59.83
59.83
59.83
59.83
0.00
538.48
119.66
59.83
59.83
119.66
119.66
179.49
119.66
59.83
0.00
59.83
119.66
119.66
119.66
119.66
119.66
358.98
119.66
119.66
0.00
0.00
59.83
59.83
59.83

10
10
30
30
20
10
10
10
10
10
0
90
20
10
10
20
20
30
20
10
0
10
20
20
20
20
20
60
20
20
0
0
10
10
10

53.08
53.08
159.24
159.24
106.16
53.08
53.08
53.08
53.08
53.08
0.00
477.71
106.16
53.08
53.08
106.16
106.16
159.24
106.16
53.08
0.00
53.08
106.16
106.16
106.16
106.16
106.16
318.47
106.16
106.16
0.00
0.00
53.08
53.08
53.08

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

135.33
135.33
405.99
405.99
270.66
135.33
135.33
135.33
135.33
135.33
0.00
1217.96
270.66
135.33
135.33
270.66
270.66
405.99
270.66
135.33
0.00
135.33
270.66
270.66
270.66
270.66
270.66
811.97
270.66
270.66
0.00
0.00
135.33
135.33
135.33
8390.39

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

1. A.F. Bihta
2. Pareo

3. Bihta I & II

4.
5.
6.
7.

3. Patna

GISCO
Balmukund
Maner
Neora

8. Fatuah (2)
9. Khusrupur

10.Fatuah
11.Dina Iron
12.Masaurhi Old

13.Masarhi New
14.NTPC I & II
15.Barh
16.Barh (2)
17.Biharibigha
18.Hathidah
19.Hathidah (2)

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

1. A.F.Bihta
20
1. Pareo
40
2. Koilwar (Ara Circle)
3. Giddha (Ara Circle)
120
1. Bihta
2. Kanpa
3. Lalbhasara

20
20

4. Paliganj

20

HTC
HTC group
1. Maner
1. Neora

40
40

2. Naubatpur
1. Fatuah (2)
1. Khusrupur

40
120
20

2. Daniyaman

20

1. Fatuah
1. HTC
2. HTC
1. Masaurhi Old

40

2. Dhanaura
1. Masaurhi New
HTC
1. Barh
2. Bakhtiyarpur
1. Barh (2)
1. Biharibigha
1. Hathidah
2. Mokama
1. Hathidah (2)

20
20

120
20
40
120

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5
10
0
30
0
0
5
5
0
5
0
0
0
10
10
0
10
30
5
0
5
0
0
0
0
10
0
5
5
0
0
0
30
5
0
10
30

26.54
53.08
0.00
159.24
0.00
0.00
26.54
26.54
0.00
26.54
0.00
0.00
0.00
53.08
53.08
0.00
53.08
159.24
26.54
0.00
26.54
0.00
0.00
0.00
0.00
53.08
0.00
26.54
26.54
0.00
0.00
0.00
159.24
26.54
0.00
53.08
159.24

15
30
0
90
0
0
15
15
0
15
0
0
0
30
30
0
30
90
15
0
15
0
0
0
0
30
0
15
15
0
0
0
90
15
0
30
90

54.73
109.46
0.00
328.38
0.00
0.00
54.73
54.73
0.00
54.73
0.00
0.00
0.00
109.46
109.46
0.00
109.46
328.38
54.73
0.00
54.73
0.00
0.00
0.00
0.00
109.46
0.00
54.73
54.73
0.00
0.00
0.00
328.38
54.73
0.00
109.46
328.38

81.27
162.54
0.00
487.62
0.00
0.00
81.27
81.27
0.00
81.27
0.00
0.00
0.00
162.54
162.54
0.00
162.54
487.62
81.27
0.00
81.27
0.00
0.00
0.00
0.00
162.54
0.00
81.27
81.27
0.00
0.00
0.00
487.62
81.27
0.00
162.54
487.62
3657.11

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

1. Hilsa
2. Islampur
3. Ekangersarai
4. Chiksurabazar
5. Dhamauli
6. Noorsarai

7. Harnaut
8. Silao

4. Nalanda

9. Andawas
10.Rajgir
11.Giriak

12.Parwalpur

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

1. Hilsa
2. Hilsa (2)
1. Islampur
20
2. Khudaganj
20
1. Ekangersarai
40
1. Chiksurabazar
120
1. Dhamauli
20
2. Rahui
1. Noorsarai
2. Kalyanbigha
120
3. Chandi
4. Chainpur
120
5. Thertheri
20
1. Harnaut
2. Cheral (Railways) 120
1. Silao
2. Bhindidih
120
1. Andawas
120
1. Rajgir
2. Ghosarwan
120
1. Tetrawan
120
2. Sarbahadi
120
3. Giriak
4. Badi
120
5. Katrisarai
120
1. Parwalpur
20

13.Ramchandrapur (2)
1. Ramchandrapur (2)
120
14.Ramchandrapur 1. Ramchandrapur 20
15.Bari Pahari

1. Bari Parhari

40

16.Asthawan

1. Asthawan
2. Malti
1. Sohasarai

120
20

17.Sohasarai

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

12
2
4

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
89.75
14.96
0.00
29.92
0.00
0.00
0.00
0.00
14.96
0.00

0
0
5
5
10
30
5
0
0
30
0
30
5
0
30
0
30
30
0
30
30
30
0
30
30
5
0
60
10
0
20
0
0
0
30
10
0

0.00
0.00
26.54
26.54
53.08
159.24
26.54
0.00
0.00
159.24
0.00
159.24
26.54
0.00
159.24
0.00
159.24
159.24
0.00
159.24
159.24
159.24
0.00
159.24
159.24
26.54
0.00
318.47
53.08
0.00
106.16
0.00
0.00
0.00
159.24
53.08
0.00

0
0
15
15
30
90
15
0
0
90
0
90
15
0
90
0
90
90
0
90
90
90
0
90
90
15
0
48
8
0
16
0
0
0
90
8
0

0.00
0.00
54.73
54.73
109.46
328.38
54.73
0.00
0.00
328.38
0.00
328.38
54.73
0.00
328.38
0.00
328.38
328.38
0.00
328.38
328.38
328.38
0.00
328.38
328.38
54.73
0.00
175.14
29.19
0.00
58.38
0.00
0.00
0.00
328.38
29.19
0.00

0.00
0.00
81.27
81.27
162.54
487.62
81.27
0.00
0.00
487.62
0.00
487.62
81.27
0.00
487.62
0.00
487.62
487.62
0.00
487.62
487.62
487.62
0.00
487.62
487.62
81.27
0.00
583.35
97.23
0.00
194.45
0.00
0.00
0.00
487.62
97.23
0.00
7392.52

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

1. Fulwaria

5. Chapra

6. Motihari

1. Fulwaria
40
2. Hathua
20
2. Gopalganj
1. Gopalganj
40
2. Jhajhwa
20
3. Kuchaikot
20
3. Srinagar
1. Srinagar
20
2. Mairwa
20
4. Siwan
1. Siwan
5. Maharajganj
1. Maharajganj
20
2. Ekma
20
6. Siwan (2)
1. Siwan (2)
100
7. Mashrakh
1. Mashrakh
20
2. Baniapur
20
8. Taraiya
1. Taraiya
20
2. Marworah
20
9. Baikunthpur
1. Baikunthpur
2. Barouli
10.Prabhunath Nagar1. Prabhunath Nagar 40
2. Manjhi
20
11.Telpa
1. Telpa
60
12.Sheetalpur
1. Sheetalpur
40

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1. Valmiki Nagar
2. Dhanha
3. Ramnagar

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4.
5.
6.
7.

Chautarwa
Lauria
Narkatiaganj
Raxaul

8. Adopur
9. Dhaka
10.Bettiah
11.Bettiah (2)
12.Madhopur
13.Areraj

1. Valmiki Nagar
1. Dhanha
1. Ramnagar
2. Bagha
1. Chautarwa
1. Lauria
1. Narkatiaganj
1. Raxaul
1. Adopur
1. Dhaka
1. Bettiah
1. Bettiah (2)
1. Madhopur
2. Harsidhi
1. Areraj

20
120
40
120
20
40
20
20
40
120
20
20
40

10

6
4

0
12

0.00
0.00
29.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
74.79
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44.87
29.92

10
5
20
5
5
5
5
0
5
5
50
5
5
5
5
0
0
10
5
30
20

53.08
26.54
106.16
26.54
26.54
26.54
26.54
0.00
26.54
26.54
265.39
26.54
26.54
26.54
26.54
0.00
0.00
53.08
26.54
159.24
106.16

30
15
16
15
15
15
15
0
15
15
40
15
15
15
15
0
0
30
15
24
16

109.46
54.73
58.38
54.73
54.73
54.73
54.73
0.00
54.73
54.73
145.95
54.73
54.73
54.73
54.73
0.00
0.00
109.46
54.73
87.57
58.38

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
89.75
0.00
0.00
0.00

5
30
10
0
30
5
10
5
0
5
10
0
60
5
5
10

26.54
159.24
53.08
0.00
159.24
26.54
53.08
26.54
0.00
26.54
53.08
0.00
318.47
26.54
26.54
53.08

15
90
30
0
90
15
30
15
0
15
30
0
48
15
15
30

54.73
328.38
109.46
0.00
328.38
54.73
109.46
54.73
0.00
54.73
109.46
0.00
175.14
54.73
54.73
109.46

162.54
81.27
194.45
81.27
81.27
81.27
81.27
0.00
81.27
81.27
486.13
81.27
81.27
81.27
81.27
0.00
0.00
162.54
81.27
291.68
194.45
2467.01
81.27
487.62
162.54
0.00
487.62
81.27
162.54
81.27
0.00
81.27
162.54
0.00
583.35
81.27
81.27
162.54

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

6. Motihari

33 kV feeder

14.Motihari (2)
15.Motihari
16.Chakia
17.Chhitwani
1. Chausa

2. Buxar
3.
4.
5.
6.

Pandy Patti
Dumraon
Dumraon (2)
Nawanagar

7. Bramhpur

7. Bhojpur

8. Simri
9. Garhani

10.Jagdishpur
11.Japani Farm

12.Powerganj

13.Zero Mile

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

1. Motihari (2)
1. Motihari
1. Chakia
2. Madhuban
1. Chhitwani

60
20
20
20
120

1. Chausa
40
2. Itarhi
20
3. Purushottampur 20
1. Buxar
40
2. Industrial
20
1. Pandey Patti
60
1. Dumraon
1. Dumraon (2)
100
1. Nawanagar
20
2. Murar
20
3. Akarsai
20
1. Krishnapuram
20
2. Bramhapur
20
3. Sahpur
4. Bihian
1. Simri
2. Chhotka Dhakai 120
1. Garhani
20
2. Piro
20
3. Agiaon
4. Sandes
1. Jagdishpur
1. Japani Farm
100
2. Serai
1. Powerganj
2. Power House
3. Barhara
1. Zero Mile

20
60
120
60

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

6
2

4
2
6

10

2
6
6

0.00
44.87
14.96
0.00
0.00
0.00

0
30
10
5
5
30

0.00
159.24
53.08
26.54
26.54
159.24

0
24
8
15
15
90

0.00
87.57
29.19
54.73
54.73
328.38

0.00
0.00
0.00
29.92
14.96
44.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
74.79
0.00
0.00
14.96
44.87
0.00
44.87

10
5
5
20
10
30
0
25
5
5
5
5
5
0
0
0
30
5
5
0
0
0
50
0
0
10
30
30
30

53.08
26.54
26.54
106.16
53.08
159.24
0.00
132.70
26.54
26.54
26.54
26.54
26.54
0.00
0.00
0.00
159.24
26.54
26.54
0.00
0.00
0.00
265.39
0.00
0.00
53.08
159.24
159.24
159.24

30
15
15
16
8
24
0
75
15
15
15
15
15
0
0
0
90
15
15
0
0
0
40
0
0
8
24
90
24

109.46
54.73
54.73
58.38
29.19
87.57
0.00
273.65
54.73
54.73
54.73
54.73
54.73
0.00
0.00
0.00
328.38
54.73
54.73
0.00
0.00
0.00
145.95
0.00
0.00
29.19
87.57
328.38
87.57

0.00
291.68
97.23
81.27
81.27
487.62
3735.41
162.54
81.27
81.27
194.45
97.23
291.68
0.00
406.35
81.27
81.27
81.27
81.27
81.27
0.00
0.00
0.00
487.62
81.27
81.27
0.00
0.00
0.00
486.13
0.00
0.00
97.23
291.68
487.62
291.68
4025.59

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

1. Karpi

2. Arwal
3. Goh
4. Daudnagar
5. Kako
6. Tehta

7. Ghosi
8. Irki

8. Gaya

9. Rafiganj I & II
10.Uchauli
11.Guraru
12.Tekari
13.Belaganj

14.Chakand
15.Dhongra
16.Sonwa
17.Hulasganj
18.Nawagarh
19.Aurangabad
20.Obra

21.Deo

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

1. Karpi
2. Ataullah
3. Kurtha
1. Arwal
1. Goh
1. Daudnagar
2. Haspura
1. Kako
2. Charui
1. Tehta
2. Makpa
3. Makhdampur
1. Ghosi
2. Jehanabad
1. Irki
2. Sakurabad
3. Nowaman
1. Rafiganj
1. Uchauli
2. Madanpur
1. Guraru
2. Paraiya
1.Tekari
2. Koach
1. Belaganj
2. Panari
3. Paibigha
1. Chakand
1. Dhongra
1. Sonwa
1. Hulasganj
1. Nawagarh
1. Aurangabad
1. Obra
2. Phesar
3. Sokhea
1. Deo
2. Gangti

20
20
20
20
20
20
60
40
120
40
20
20
20
20
20
20
40
40
40
120
120
120

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

6
4

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44.87
29.92
0.00
0.00
29.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
5
5
5
5
5
5
30
20
0
30
20
5
5
5
5
5
5
10
10
0
10
30
30
0
30
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.54
26.54
26.54
26.54
26.54
26.54
159.24
106.16
0.00
159.24
106.16
26.54
26.54
26.54
26.54
26.54
26.54
53.08
53.08
0.00
53.08
159.24
159.24
0.00
159.24
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
15
15
15
15
15
15
24
16
0
90
16
15
15
15
15
15
15
30
30
0
30
90
90
0
90
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.73
54.73
54.73
54.73
54.73
54.73
87.57
58.38
0.00
328.38
58.38
54.73
54.73
54.73
54.73
54.73
54.73
109.46
109.46
0.00
109.46
328.38
328.38
0.00
328.38
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
81.27
81.27
81.27
81.27
81.27
81.27
291.68
194.45
0.00
487.62
194.45
81.27
81.27
81.27
81.27
81.27
81.27
162.54
162.54
0.00
162.54
487.62
487.62
0.00
487.62
0.00
0.00
0.00
0.00
0.00
0.00

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

22.Barun
23.Barem
24.Tengra
25.Sone Hydel
26.Nabinagar
27.Barun (2)
28.Dihara
29.Wazirganj

30.Atari
31.Gurua
32.Amas
33.Banke
34.Shergahti
8. Gaya

35.Imamganj
36.Chandauti
37.Medical
38.Central Stores

1. Barun
1. Barem
1. Tengra
HTC
1. Nabinagar
2. Amba
1. Barun (2)
1. Dihara
1. Wazirganj
2. Fatehpur
3. Paimer
1. Atari
2. Khizr Sarai
1. Gurua
1. Amas
1. Banke
1. Sherghati
2. Dobhi
1. Imamganj
2. Dumaria
1. Chandauti
1. Medical
2. Cherki
1. Central Stores

39.A.P.Colony

1. A.P.Coloy
2. Railway Maidan
40.Gandhi Maidan 1. Gandhi Maidan

41.Dandibag
42.Shobh
43.Manpur

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

20
40
20
20
60
120
20

20
80

40
20
40
60

2. Panchaiti Akhara 60
1. Dandibag
80
1. Shobh
2. Charkbria
1. Manpur
2. Tankuppa
3. Gere

20

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

8
0
0
4
2
4
6
6
8

14.96
0.00
0.00
0.00
0.00
0.00
44.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59.83
0.00
0.00
0.00
29.92
0.00
14.96
29.92
44.87
0.00
44.87
59.83
0.00
0.00
0.00
0.00
0.00
0.00

10
0
10
0
5
5
30
30
0
5
0
0
0
0
0
0
0
0
0
5
40
0
0
20
0
10
20
30
0
30
40
0
0
0
5
0
0

53.08
0.00
53.08
0.00
26.54
26.54
159.24
159.24
0.00
26.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.54
212.31
0.00
0.00
0.00
106.16
0.00
53.08
106.16
159.24
0.00
159.24
212.31
0.00
0.00
0.00
26.54
0.00
0.00

8
0
30
0
15
15
24
90
0
15
0
0
0
0
0
0
0
0
0
15
32
0
0
16
0
8
16
24
0
24
32
0
0
0
15
0
0

29.19
0.00
109.46
0.00
54.73
54.73
87.57
328.38
0.00
54.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.73
116.76
0.00
0.00
0.00
58.38
0.00
29.19
58.38
87.57
0.00
87.57
116.76
0.00
0.00
0.00
54.73
0.00
0.00

97.23
0.00
162.54
0.00
81.27
81.27
291.68
487.62
0.00
81.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
81.27
388.90
0.00
0.00
0.00
194.45
0.00
97.23
194.45
291.68
0.00
291.68
388.90
0.00
0.00
0.00
81.27
0.00
0.00

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

44.Industrial Area
45.M.U. Campus

46.Hasua
47.Nawada
8. Gaya
48.Akbarpur

49.Roh

9. Saharsa

4. Bhore
1. Industrial Area
1. M.U.Campus

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

20
40

2. Buddhist Complex 40
1. Hasua
80
2. Nadirganj
80
1. Nawada
60
2. Nawada New
20
3. Bhadhokhara
20
1. Akbarpur
20
2. Rajauli
20
3. Sirdala
20
1. Roh
20
2. Warsaliganj
20
3. Pakribarwan
20
4. Kaukol
20
40

1. Supaul

1. Supaul

2. Saharsa (2)

2. Parasrama
3. Kishanpur
4. Pipra
5. Raghopur
6. Larganj
1. Sahrsa (2)

3. Sour Bazar
4. Balwahat

DTRs
33/11 kV Sub
Station

60
120
120
180

1. Sour Bazar
120
1. Balwahat
120
2. Salakhua
120
5. Simri Bakhtiyarpur1. Simri Bakhtiyarpur
6. New Market
1. New Market
40
7. Old Saharsa
1. Old Saharsa
8. Madhepura
1. Madhepura
20
2. Muraliganj
3. Kumarkhand
120
9. Singheswar
1. Singheswar

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
4
4

6
2

18

4
0
2

0.00
0.00
29.92
0.00
29.92
0.00
0.00
44.87
14.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5
0
20
0
20
20
20
30
10
5
5
5
5
5
5
5
5
10

26.54
0.00
106.16
0.00
106.16
106.16
106.16
159.24
53.08
26.54
26.54
26.54
26.54
26.54
26.54
26.54
26.54
53.08

15
0
16
0
16
60
60
24
8
15
15
15
15
15
15
15
15
30

54.73
0.00
58.38
0.00
58.38
218.92
218.92
87.57
29.19
54.73
54.73
54.73
54.73
54.73
54.73
54.73
54.73
109.46

0.00
0.00
0.00
0.00
0.00
0.00
0.00
134.62
0.00
0.00
0.00
0.00
0.00
29.92
0.00
14.96
0.00
0.00
0.00

0
0
15
0
30
0
30
90
0
30
30
30
0
20
0
10
0
30
0

0.00
0.00
79.62
0.00
159.24
0.00
159.24
477.71
0.00
159.24
159.24
159.24
0.00
106.16
0.00
53.08
0.00
159.24
0.00

0
0
45
0
90
0
90
72
0
90
90
90
0
16
0
8
0
90
0

0.00
0.00
164.19
0.00
328.38
0.00
328.38
262.70
0.00
328.38
328.38
328.38
0.00
58.38
0.00
29.19
0.00
328.38
0.00

81.27
0.00
194.45
0.00
194.45
325.08
325.08
291.68
97.23
81.27
81.27
81.27
81.27
81.27
81.27
81.27
81.27
162.54
9708.49
0.00
0.00
243.81
0.00
487.62
0.00
487.62
875.03
0.00
487.62
487.62
487.62
0.00
194.45
0.00
97.23
0.00
487.62
0.00

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

11.Bihariganj
12.Udakishanganj
13.Puraini
14.Alamnagar

120
40
20
40
120

1.
2.
3.
4.
5.

1. Bihpur
1. Sanhauli
1. Naugachhia
1. Patwara
1. Sultanganj

20
120

Bihpur
Sanhauli
Naugachhia
Patwara
Sultanganj

6. Shahkund
7. Barari

8. CS Compound

10.Bhagalpur

Distribution Transformers (DTR) with Installation

2. Ghailar
1. Khagaria
2. Mansi
3. Maheshkunt
1. Bihariganj
1. Udakishanganj
1. Puraini
1. Alamnagar

10.Khagaria

9. Saharsa

DTRs
33/11 kV Sub
Station

9. Sabour
10.Gouradih
11.Aliganj I
12.Aliganj II

13.Banka (2)
14.Banka

15.Sanhoula
16.Ghogha
17.Kahalgaon

1. Shahkund
1. Barari
2. Central Jail
3. Mayaganj
1. C S Compound
2. T T School
1. Sabour
1. Gouradih
1. Aliganj
2. Mojahidpur
1. Aliganj
2. Jagdishpur
3. Nath Nagar
1. Banka (2)
1. Banka
2. Amarpur
3. Rajouna
4. Bousi
1. Sanhoula
1. Ghogha
1. Kahalgaon
2. Pirpainti

120

40

40
40
40
40
40
40
40
20
40
20
20
60
20
20
40
20
120
20

0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

30
10
5
10
30
0
30
0

159.24
53.08
26.54
53.08
159.24
0.00
159.24
0.00

90
30
15
30
90
0
90
0

328.38
109.46
54.73
109.46
328.38
0.00
328.38
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
29.92
0.00
0.00
0.00
29.92
29.92
29.92
29.92
29.92
0.00
29.92
0.00
29.92
0.00
0.00
44.87
14.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5
30
0
0
20
0
0
10
20
20
20
20
20
0
20
5
20
5
5
30
10
0
5
10
5
30
5
0

26.54
159.24
0.00
0.00
106.16
0.00
0.00
53.08
106.16
106.16
106.16
106.16
106.16
0.00
106.16
26.54
106.16
26.54
26.54
159.24
53.08
0.00
26.54
53.08
26.54
159.24
26.54
0.00

15
90
0
0
16
0
0
30
16
16
16
16
16
0
16
15
16
15
15
24
8
0
15
30
15
90
15
0

54.73
328.38
0.00
0.00
58.38
0.00
0.00
109.46
58.38
58.38
58.38
58.38
58.38
0.00
58.38
54.73
58.38
54.73
54.73
87.57
29.19
0.00
54.73
109.46
54.73
328.38
54.73
0.00

4
4
4
4
4
4
4

6
2

487.62
162.54
81.27
162.54
487.62
0.00
487.62
0.00
6205.40
81.27
487.62
0.00
0.00
194.45
0.00
0.00
162.54
194.45
194.45
194.45
194.45
194.45
0.00
194.45
81.27
194.45
81.27
81.27
291.68
97.23
0.00
81.27
162.54
81.27
487.62
81.27
0.00
3813.70

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

1. Tarapur

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

1. Tarapur
2. Kharagpur
2. Dakranala
1. Dakranala
3. Ramchandrapur 1. Ramchandrapur
2. Railways (HTC)
4. Safiabad
1. Safiabad
2. Baniyarpur
5. ITC
1. ITC (HTC)
6. Karnachaura
1. Karnchaura

40
20
20
20

7. Nandlalpur
8. Bindwara
9. Balaji
10.Purani Bazar

1. Nandlalpur
1. Bindwara
1. Balaji
1. Purani Bazar

20
40

2. Court Area
1. Kajra
2. Piri Bazar
1. Salempur
2. Manpur
3. Haibatganj
1. Jamui

40
120
120

2. Khaira
3. Sikandara
1. Gidhour
2. Jhajha
3. Sono
1. Ghuskuri
1. Ariari
2. Bhalua
3. Lohain
4. Katari
5. Barkna
1. Onama
2. Mirzapur
3. Toygarh
1. Hathiyama

20
20
20
20
20
120

11.Kajra
11. Munger

DTRs
33/11 kV Sub
Station

12.Haibatganj

13.Jamui

14.Gidhour

15.Ghuskuri
16.Ariari

17.Onama

18.Hathiyama

20
20
60

60

120
40

120

120

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
29.92
0.00
0.00
0.00
0.00
0.00
29.92
0.00
0.00
0.00
0.00
14.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10
5
5
5
0
5
5
0
15
0
5
10
0
15
0
20
30
30
0
30
0
20
0
5
5
5
10
5
30
0
0
30
0
0
0
0
30
0

53.08
26.54
26.54
26.54
0.00
26.54
26.54
0.00
79.62
0.00
26.54
53.08
0.00
79.62
0.00
106.16
159.24
159.24
0.00
159.24
0.00
106.16
0.00
26.54
26.54
26.54
53.08
26.54
159.24
0.00
0.00
159.24
0.00
0.00
0.00
0.00
159.24
0.00

30
15
15
15
0
15
15
0
45
0
15
30
0
45
0
16
90
90
0
90
0
16
0
15
15
15
8
15
90
0
0
90
0
0
0
0
90
0

109.46
54.73
54.73
54.73
0.00
54.73
54.73
0.00
164.19
0.00
54.73
109.46
0.00
164.19
0.00
58.38
328.38
328.38
0.00
328.38
0.00
58.38
0.00
54.73
54.73
54.73
29.19
54.73
328.38
0.00
0.00
328.38
0.00
0.00
0.00
0.00
328.38
0.00

162.54
81.27
81.27
81.27
0.00
81.27
81.27
0.00
243.81
0.00
81.27
162.54
0.00
243.81
0.00
194.45
487.62
487.62
0.00
487.62
0.00
194.45
0.00
81.27
81.27
81.27
97.23
81.27
487.62
0.00
0.00
487.62
0.00
0.00
0.00
0.00
487.62
0.00

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

19.Sheikhpura

1. Sheikhpura

60

0
0

0.00
0.00

1. Pusa
2. Mohanpur

1. Pusa
1. Mohanpur

20
40
20
20

3. Jute Mill
4. Sarairanjan
5. Jitwarpur

2. Warisnagar
3. Kalyanpur
HTC
1. Sarairanjan
1. Jitwarpur

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

11. Munger

20
20

2. Magardahi
120
6. Rly.Samastipur HTC
7. Sirsia
1. Sirsia
2. Kuboliram
120
3. Karpoorigram
120
8. Dalsingsarai
1. Dalsingsarai
20
2. Mehuddinnagar 20
9. Pateri
1. Pateri
20
12.Samastipur 10.Bachchwara
1. Bachchwara
20
11.Bibhutipur
1. Bibhutipur
20
2. Rosera
20
3. Hassanpur
20
12.Deona
1. Deona
2. Bangrahdih
3. Jai Mangla (HTC)
4. Jai Mata Di (HTC)
13.Bangrahdih (2) 1. Bangrahdih (2) 120
14.IOC
HTC
15.Railways
HTC
16.Deona (2)
1. Deona (2)
120
17.Kankaul
1. Kankaul
120
18.Begusarai
1. Begusarai
20
2. Manjhaul
40
3. Ganga Dairy (HTC)
4. Balia
20

2
12

12

12
2

44.87
0.00

30
0

159.24
0.00

24
0

87.57
0.00

0.00
29.92
0.00
0.00
0.00
0.00
0.00
14.96
0.00
89.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
89.75
0.00
0.00
0.00
89.75
14.96
0.00
0.00
0.00

5
20
0
5
5
0
5
10
0
60
0
0
30
30
5
5
5
5
5
5
5
0
0
0
0
60
0
0
30
60
10
10
0
5

26.54
106.16
0.00
26.54
26.54
0.00
26.54
53.08
0.00
318.47
0.00
0.00
159.24
159.24
26.54
26.54
26.54
26.54
26.54
26.54
26.54
0.00
0.00
0.00
0.00
318.47
0.00
0.00
159.24
318.47
53.08
53.08
0.00
26.54

15
16
0
15
15
0
15
8
0
48
0
0
90
90
15
15
15
15
15
15
15
0
0
0
0
48
0
0
90
48
8
30
0
15

54.73
58.38
0.00
54.73
54.73
0.00
54.73
29.19
0.00
175.14
0.00
0.00
328.38
328.38
54.73
54.73
54.73
54.73
54.73
54.73
54.73
0.00
0.00
0.00
0.00
175.14
0.00
0.00
328.38
175.14
29.19
109.46
0.00
54.73

291.68
0.00
5328.88
81.27
194.45
0.00
81.27
81.27
0.00
81.27
97.23
0.00
583.35
0.00
0.00
487.62
487.62
81.27
81.27
81.27
81.27
81.27
81.27
81.27
0.00
0.00
0.00
0.00
583.35
0.00
0.00
487.62
583.35
97.23
162.54
0.00
81.27
4739.57

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

1. Narpatganj
2. Raniganj

13. Purnea

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

1. Narpatganj
1. Raniganj
2. Bahargaon
3. Forbesganj
1. Forbesganj
2. Araria
3. Kusgaon
4. Jokihat
5. Malgaon
4. Bahadurganj
1. Bahadurganj
2. Dighal Bank
5. Sarai
1. Sarai
6. Paschimpali
1. Paschimpali
7. Purabpali
1. Purabpali
8. Thakurganj
1. Chhatargarh
2. Thakurganj
9. Group Control 1. Group control
10.Banmankhi
1. Banmankhi
2. Madhubani
11.Zero Mile
1. Zero Mile
2. City
12.Belgachhi
1. Belgachhi
2. Dalkola
3. Vaisi
13.Naranga
1. Naranga
2. MLR Ganj
3. Dargaha
14.Jalalgarh
1. Jalalgarh
15.Beri
1. Beri
2. Gore Beri
3. Falka
4. Sonaily
5. Barsoi
6. Pranpur
16.Industrial Estate 1. Industrial Estate
17.Binodpur
1. Binodpur
18.Kursaila
1. Kursaila

20
120

120
120

20
40
40

60
20
20
20

120
20
20
40
20
20
20

20
20

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4
4

2
2

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
29.92
29.92
0.00
0.00
44.87
0.00
0.00
14.96
14.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.96
0.00
0.00

5
0
30
0
0
30
0
30
0
0
5
20
20
0
0
30
0
5
10
10
0
0
30
5
5
0
10
5
5
5
0
0
0
10
5
0

26.54
0.00
159.24
0.00
0.00
159.24
0.00
159.24
0.00
0.00
26.54
106.16
106.16
0.00
0.00
159.24
0.00
26.54
53.08
53.08
0.00
0.00
159.24
26.54
26.54
0.00
53.08
26.54
26.54
26.54
0.00
0.00
0.00
53.08
26.54
0.00

15
0
90
0
0
90
0
90
0
0
15
16
16
0
0
24
0
15
8
8
0
0
90
15
15
0
30
15
15
15
0
0
0
8
15
0

54.73
0.00
328.38
0.00
0.00
328.38
0.00
328.38
0.00
0.00
54.73
58.38
58.38
0.00
0.00
87.57
0.00
54.73
29.19
29.19
0.00
0.00
328.38
54.73
54.73
0.00
109.46
54.73
54.73
54.73
0.00
0.00
0.00
29.19
54.73
0.00

81.27
0.00
487.62
0.00
0.00
487.62
0.00
487.62
0.00
0.00
81.27
194.45
194.45
0.00
0.00
291.68
0.00
81.27
97.23
97.23
0.00
0.00
487.62
81.27
81.27
0.00
162.54
81.27
81.27
81.27
0.00
0.00
0.00
97.23
81.27
0.00
3816.68

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

1. Karmnasa

2. Larma
3. Kalyanpur

4.
5.
6.
7.
8.
9.

Ramgarh (2)
Kakrait
Parsathua
Chainpur
Mohania (2)
Mohania

10.Dinara
14. Sasaram
11.Sanjhouli
12.Surajpura
13.Bikramganj
14.Bikramganj (2)
15.Pusauli
16.Kudra
17.Karamchat

18.Beda Sasaram

19.Sasaram (2)
20.Sasaram (3)
21.Naigaon

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

1. Karmnasa
2. Durgawati
3. Chand
1. Larma
2. DVPL (HTC)
1. Kalyanpur
2. Ramgarh
3. Chourasia
4. Nuaon
1. Ramgarh (2)
1. Kakrait
1. Parsathua
1. Chainpur
1. Mohania (2)
1. Mohania
2. Bhabhua Old
3. Bahuara
1. Dinara
2. Kochas
3. Dawath
1. Sanjhouli
1. Surajpura
1. Bikramganj
2. Kararkat
1. Bikramganj (2)
1. Pusauli
1. Kudra
2. Bhabhua New
1. Karamchat
2. Cenari
3. Adhaura
1. Beda Sasaram
2. Takia Sasaram
3. Nokha
1. Sasaram (2)
1. Sasaram (3)
1. Naigaon
2. Sheosagar

20
20
20
20
60
20
20
20
20
20
120
20
20
20
20
20
20
20
120
36
20
80
12.6
20

40
20
120
120
40
40

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

12
0
2

0
4
12
12

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
89.75
0.00
14.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59.83
0.00
0.00
0.00
0.00
29.92
0.00
89.75
89.75
0.00
0.00

5
5
5
5
0
15
0
5
5
0
5
5
5
60
0
10
5
5
5
0
5
5
0
5
30
9
5
40
3.15
5
0
0
20
5
60
60
10
10

26.54
26.54
26.54
26.54
0.00
79.62
0.00
26.54
26.54
0.00
26.54
26.54
26.54
318.47
0.00
53.08
26.54
26.54
26.54
0.00
26.54
26.54
0.00
26.54
159.24
47.77
26.54
212.31
16.72
26.54
0.00
0.00
106.16
26.54
318.47
318.47
53.08
53.08

15
15
15
15
0
45
0
15
15
0
15
15
15
48
0
8
15
15
15
0
15
15
0
15
90
27
15
32
9.45
15
0
0
16
15
48
48
30
30

54.73
54.73
54.73
54.73
0.00
164.19
0.00
54.73
54.73
0.00
54.73
54.73
54.73
175.14
0.00
29.19
54.73
54.73
54.73
0.00
54.73
54.73
0.00
54.73
328.38
98.51
54.73
116.76
34.48
54.73
0.00
0.00
58.38
54.73
175.14
175.14
109.46
109.46

81.27
81.27
81.27
81.27
0.00
243.81
0.00
81.27
81.27
0.00
81.27
81.27
81.27
583.35
0.00
97.23
81.27
81.27
81.27
0.00
81.27
81.27
0.00
81.27
487.62
146.28
81.27
388.90
51.20
81.27
0.00
0.00
194.45
81.27
583.35
583.35
162.54
162.54

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

14. Sasaram

33 kV feeder

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

22.BMP Dehri (2) 1. BMP Dehri (2)


23.BMP Dehri I & II 1. BMP Dehri
2. Basa Karwandia
3. PHED (HTC)
24.JVLO&FL Pahleja1. HTC
1. Akorigola
25.Nasariganj
1. Nasariganj
26.Rajpur
1. Rajpur
27.Nauhatta
1. Nauhatta
28.Samhauta
1. Samhauta
29.Samhauta (2)
1. Samhauta (2)
30.Kirpabal (2)
1. Kirpabal (2)
2. Kirpabal
31.Indrapuri
1. Indrapuri
32.Indrapuri (2)
1. Indrapuri (2)

180

1.
2.
3.
4.
5.
6.
7.
8.
9.

40
40
20
120

Shivhar
Runi Saidpur
Pupri
Dumra (2)
Dumra
Sursand
Sonbarsa
Nepal
Patepur

1. Shivhar
1. Runi Saidpur
1. Pupri
1. Dumra (2)
1. Dumra
1. Sursand
1. Sonbarsa
1. Nepal
1. Mehua
2. Patepur
10.Prataptand
1. Prataptand
15. Muzaffarpur
11.Lalganj
1. Lalganj
12.Sarai
1. Sarai
13.Railway (HTC) HTC
14.Bidupur
1. Bidupur
15.EDIP
1. EDIP
16.Hajipur I E
1. Hajipur I E
17.Konharaghat
1. Konharaghat
18.Konharaghat (2) 1. Konharaghat(2)
19.Manhar
1. Manhar @
20.SKMCH (2)
1. SKMCH (2)
21.MIT
1. MIT

20

40
40
20
40
20
100
120

120

40
40

40
40
40
20
20
120
120
40

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

18
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2
10

2
0

12
4

134.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.96
74.79
0.00
0.00
0.00
0.00

90
0
5
0
0
10
10
5
10
10
50
30
0
0
30

477.71
0.00
26.54
0.00
0.00
53.08
53.08
26.54
53.08
53.08
265.39
159.24
0.00
0.00
159.24

72
0
15
0
0
30
30
15
30
8
40
90
0
0
90

262.70
0.00
54.73
0.00
0.00
109.46
109.46
54.73
109.46
29.19
145.95
328.38
0.00
0.00
328.38

29.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.96
0.00
0.00
0.00
0.00
89.75
29.92

20
10
5
30
0
10
10
0
0
0
0
10
10
0
10
10
0
5
30
0
60
20

106.16
53.08
26.54
159.24
0.00
53.08
53.08
0.00
0.00
0.00
0.00
53.08
53.08
0.00
53.08
53.08
0.00
26.54
159.24
0.00
318.47
106.16

16
30
15
90
0
30
30
0
0
0
0
30
30
0
30
8
0
15
90
0
48
16

58.38
109.46
54.73
328.38
0.00
109.46
109.46
0.00
0.00
0.00
0.00
109.46
109.46
0.00
109.46
29.19
0.00
54.73
328.38
0.00
175.14
58.38

875.03
0.00
81.27
0.00
0.00
162.54
162.54
81.27
162.54
97.23
486.13
487.62
0.00
0.00
487.62
8231.23
194.45
162.54
81.27
487.62
0.00
162.54
162.54
0.00
0.00
0.00
0.00
162.54
162.54
0.00
162.54
97.23
0.00
81.27
487.62
0.00
583.35
194.45

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

22.Sikandarpur (2) 1. Sikandarpur (2) 120


23.SKMCH
1. SKMCH
24.Kurhani
1. Kurhani
20
25.Motipur
1. Motipur
26.Motipur (2)
1. Motipur (2)
120
27.Maripur
1. Maripur
40
28.Vaishali
1. Vaishali
20
29.Dholi
1. Dholi
20
30.IDPL (2)
1. IDPL (2)
120
15. Muzaffarpur
31.IDPL
1. IDPL
20
32.Khabra
1. Khabra
40
33.Bhikanpura
1. Bhikanpura
34.Bhagwanpur Chowk
1. Bhagwanpur chowk
120
35.Railway (HTC) HTC
36.Nayatola (2)
1. Nayatola (2)
120
37.Nayatola
1. Nayatola
38.Hajipur I E (2)
1. Hajipur I E (2)
120
1. Basopatti
2. Jay Nagar

3. Benipatti
4. Rahika
5.
6.
16. Darbhanga
7.
8.

Bela
Gangwara
Donar
Panda Sarai

9. Pouriya
10.Anar
11.Kusheshwar
12.Biraul

1. Basopatti
1. Jay Nagar
20
2. Khajauli
20
3. Ladania
20
1. Benipatti
20
2. Ahilyasthan
1. Rahika
40
2. Madhubani
40
1. Bela
20
1. Gangwara
40
1. Donar
20
1. Panda Sarai
20
2. Laheria Sarai (Jail)
3. DMCH
20
4. Urban
20
1. Pouriya
20
1. Baheri
20
2. Anar
20
1. Kusheshwar
120
1. Biraul
20

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2
12
2
0

12

4
4

2
2

0.00
0.00
0.00
0.00
0.00
0.00
14.96
0.00
89.75
14.96
0.00
0.00
0.00
0.00
0.00
0.00
89.75

30
0
5
0
30
10
10
5
60
10
10
0
30
0
30
0
60

159.24
0.00
26.54
0.00
159.24
53.08
53.08
26.54
318.47
53.08
53.08
0.00
159.24
0.00
159.24
0.00
318.47

90
0
15
0
90
30
8
15
48
8
30
0
90
0
90
0
48

328.38
0.00
54.73
0.00
328.38
109.46
29.19
54.73
175.14
29.19
109.46
0.00
328.38
0.00
328.38
0.00
175.14

0.00
0.00
0.00
0.00
0.00
0.00
29.92
29.92
0.00
0.00
0.00
0.00
0.00
14.96
14.96
0.00
0.00
0.00
0.00
0.00

0
5
5
5
5
0
20
20
5
10
5
5
0
10
10
5
5
5
30
5

0.00
26.54
26.54
26.54
26.54
0.00
106.16
106.16
26.54
53.08
26.54
26.54
0.00
53.08
53.08
26.54
26.54
26.54
159.24
26.54

0
15
15
15
15
0
16
16
15
30
15
15
0
8
8
15
15
15
90
15

0.00
54.73
54.73
54.73
54.73
0.00
58.38
58.38
54.73
109.46
54.73
54.73
0.00
29.19
29.19
54.73
54.73
54.73
328.38
54.73

487.62
0.00
81.27
0.00
487.62
162.54
97.23
81.27
583.35
97.23
162.54
0.00
487.62
0.00
487.62
0.00
583.35
6981.71
0.00
81.27
81.27
81.27
81.27
0.00
194.45
194.45
81.27
162.54
81.27
81.27
0.00
97.23
97.23
81.27
81.27
81.27
487.62
81.27

APPENDIX B-5

Estimated Cost for Distribution Transformers

Cirlcle

33 kV feeder

13.Raj Nagar

16. Darbhanga

14.Raiyam
15.Pandaul
16.Manigachi
17.Jhanjharpur
18.Khatauna
19.Rudrapur
20.Phulparas

DTRs

Distribution Transformers (DTR) with Installation

Nos.

630 kVA
Cost
315 kVA
Cost
200 kVA
Cost
100 kVA
Cost
Total Cost
(Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Nos.) (Rs.Lakh) (Rs.Lakh)

33/11 kV Sub
Station

2. Benipur
1. Raj Nagar
2. Babu Barhi
1. Raiyam
1. Pandaul
1. Manigachi
1. Jhanjharpur
2. Madhepur
1. Khatauna
1. Rudrapur
1. Phulparas
2. Nirmali
3. Talpatganj

20
20
20
20
20
20
20
120
20
20
20

0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5
5
5
0
5
5
5
5
0
30
5
5
5

26.54
26.54
26.54
0.00
26.54
26.54
26.54
26.54
0.00
159.24
26.54
26.54
26.54

15
15
15
0
15
15
15
15
0
90
15
15
15

54.73
54.73
54.73
0.00
54.73
54.73
54.73
54.73
0.00
328.38
54.73
54.73
54.73

81.27
81.27
81.27
0.00
81.27
81.27
81.27
81.27
0.00
487.62
81.27
81.27
81.27
3427.77

APPENDIX B-6

Estimated Cost for L T Lines


L T Line
Circle

33 kV feeder

33/11 kV Sub Station

Length
(km)

Cost
(Rs.Lakh)

2010
1. PESU(East)
2. PESU(West)
3. Patna

1. Bihta AF

Bihta AF

20

1. Sheetalpur
2. Siwan

Sheetalpur
Siwan

10
10

1.
2.
3.
4.

Valmiki Nagar
Bettiah
Lauria
Motihari

Valmiki Nagar
Bettiah
Lauria
Motihari

20
10
20
10

1.
2.
3.
4.

Kako-Charui
Guraru-Paraiya
Belaganj
Central Stores

Kako
Guraru
Panari
Central Stores

20
20

1. Shahkund

Shahkund

20

1. Railway W/S
2. Onama
3. Ariari

Ramchandrapur
Onama
Mirjapur
Barkana

10
20
20
20

1. Bangardih
2. Pusa
3. Jitwarpur

Deona
Pusa
Jitwarpur

20
20
10

1. Group Control

Group Control

10

1.
2.
3.
4.
5.

Kalyanpur
Dinara
Bhabhua New
Pusauli
Takia
Nokha
Beda
Nahatta

20
20
10
10
10
20
10
20

Pupri
Dumar
Lalganj
EDIP
Hajipur IE
Konharaghat

20
20
20
10
10
20

4. Nalanda
5. Chapra

6. Motihari

7. Bhojpur

8. Gaya

10

9. Saharsa
10.Bhagalpur

11.Munger

12.Samastipur

13.Purnea

14.Sasaram

Kalyanpur from
Dinara
Kudra
Pusauli
Beda-Takia

6. Nauhatta
1.
2.
3.
15.Muzaffarpur
4.
5.
6.

Pupri
Dumra
Lalganj
EDIP
Hajipur IE
Konharaghat

0
0
0
0
81.40
81.40
0.00
0.00
40.70
40.70
81.40
81.40
40.70
81.40
40.70
244.19
0.00
81.40
81.40
40.70
203.49
0.00
81.40
81.40
40.70
81.40
81.40
81.40
284.89
81.40
81.40
40.70
203.49
40.70
40.70
81.40
81.40
40.70
40.70
40.70
81.40
40.70
81.40
488.38
81.40
81.40
81.40
40.70
40.70
81.40

APPENDIX B-6

Estimated Cost for L T Lines


L T Line
Circle

33 kV feeder
7. Motipur
8. SKMCH

9. Khabra
10.Bhikanpura

Motipur
MIT
Sikandarpur
SKMCH
Khabra
Bhikanpura

1. Rajnagar
2. Raiyam
3. Pandaul

Rajnagar
Raiyam
Pandaul

15.Muzaffarpur

16.Darbhanga

33/11 kV Sub Station

Length
(km)
20
10
20
10
20
10
20
20
20

Cost
(Rs.Lakh)
81.40
40.70
81.40
40.70
81.40
40.70
773.26
81.40
81.40
81.40
244.19
2726.77

APPENDIX B-6

Estimated Cost for L T Lines


L T Line
Circle

33 kV feeder

Length
(km)

Cost
(Rs.Lakh)

30
20
90
40
40
20
20

122.09
81.40
366.28
162.79
162.79
81.40
81.40

50

203.49

9. Kankar Bag
10.Ashok Nagar

2011-2014
1. Katra
1. HTC
2. HTC
1. Karmali Chak
2. Deedarganj
1. S.K.Memorial
1. Kankar Bag (2)
1. Saidpur
1. Bahadurpur
1. R.Nagar
2. Machhuatoli
1. Kankar Bag
1. Ashok Nagar

11.R.K.Nagar
12.Karbigahiya

1. R.K.Nagar
1. Karbigahiya

40
20

162.79
81.40

13.Gaighat

1. Gaighat

30

122.09

14.NMCH

1. NMCH

30

122.09

15.Meena Bazar
16.Katra (2)
17.Pahari

1. Meena Bazar
1. Katra (2)
1. Pahari

20
60
40

81.40
244.19
162.79

18.Malsalami
19.Mangal Talab
20.Meena Bazar (2)
21.PMCH

2. Sampatchak (Patna)
3. HTC (Patna)
1. Malsalami
1. Mangal Talab
2. Meena Bazar (2)
1. PMCH

20
40
90
20

1. Katra
2. Dina Iron
3. Karmali Chak
4.
5.
6.
7.
8.

1. PESU (East)

33/11 kV Sub Station

S.K. Memorial
Kankar Bag (2)
Saidpur
Bahadurpur
R. Nagar

1. A.N.College
2. S.K.Puri
3. Garikhana I & II

4. Walmi
5. Danapur
6. Digha
7. R.B.I.
8. Danapur (2)
9. IGIMS
2. PESU (West)
10.Vaterinery College
11.Jakkanpur
12.Maurya Lok
13.Karnawad Punpun
14.Sinchai Bhawan
15.Anishabad
16.Gardanibag
17.Vidyut Bhawan
18.Sahitya Sammelan

1. A.N.College
1. S.K.Puri
1. Garikhana
2. Pataliputra
3. Rajapur
1. Walmi
1. Danapur
1. Digha
2. Digha Central Stores
1. RBI
2. HTC (Group)
1. Danapur (2)
1. IGIMS
2. Excise
1. Vaterinery College
2. Board`s Colony
1. Jakkanpur
1. Maurya Lok
2. Bandar Bagicha
1. Karnawad Punpun

10
10
30
30
20
10
10
10
10
10

81.40
162.79
366.28
81.40
2930.26
40.70
40.70
122.09
122.09
81.40
40.70
40.70
40.70
40.70
40.70

90
20
10
10
20
20
30
20
10

366.28
81.40
40.70
40.70
81.40
81.40
122.09
81.40
40.70

1. Sinchai Bhawan
1. Anishabad
1. Gardanibag
1. Vidyut Bhawan
2. High Court
1. Sahitya Sammelan

10
20
20
20
20
20

40.70
81.40
81.40
81.40
81.40
81.40

APPENDIX B-6

Estimated Cost for L T Lines


L T Line
Circle

33 kV feeder
19.Bandar Bagicha (2)
20.Beur

2. PESU (West)
21.Vikas Bhawan

1. A.F. Bihta
2. Pareo

3. Bihta I & II

4.
5.
6.
7.

GISCO
Balmukund
Maner
Neora

8. Fatuah (2)
9. Khusrupur

33/11 kV Sub Station

Length
(km)
60
20
20

Cost
(Rs.Lakh)
244.19
81.40
81.40

10
10
10
20
40

40.70
40.70
40.70
2523.28
81.40
162.79

120

488.38

2. Kanpa
3. Lalbhasara

20
20

81.40
81.40

4. Paliganj

20

81.40

HTC
HTC group
1. Maner
1. Neora
2. Naubatpur
1. Fatuah (2)
1. Khusrupur

40
40
40
120
20

162.79
162.79
162.79
488.38
81.40

2. Daniyaman

20

81.40

1. Fatuah
1. HTC
2. HTC
1. Masaurhi Old

40

162.79

20
20

81.40
81.40

120
20

488.38
81.40

40
120

162.79
488.38
3662.82

1. Bandar Bagicha (2)


1. Beur
2. Khagaul
3. HTC
4. HTC
5. Phulwari
1. Bhusaula
2. Vikas Bhawan
1. A.F.Bihta
1. Pareo
2. Koilwar (Ara Circle)
3. Giddha (Ara Circle)
1. Bihta

3. Patna

10.Fatuah
11.Dina Iron
12.Masaurhi Old

13.Masarhi New
14.NTPC I & II
15.Barh
16.Barh (2)
17.Biharibigha
18.Hathidah
19.Hathidah (2)

2. Dhanaura
1. Masaurhi New
HTC
1. Barh
2. Bakhtiyarpur
1. Barh (2)
1. Biharibigha
1. Hathidah
2. Mokama
1. Hathidah (2)

APPENDIX B-6

Estimated Cost for L T Lines


L T Line
Circle

33 kV feeder
1. Hilsa

Cost
(Rs.Lakh)

20
20
40
120
20

81.40
81.40
162.79
488.38
81.40

120

488.38

120
20

488.38
81.40

120

488.38

120
120

488.38
488.38

120
120
120

488.38
488.38
488.38

120
120
20

488.38
488.38
81.40

12.Parwalpur
13.Ramchandrapur (2)
14.Ramchandrapur

1. Ramchandrapur (2)
1. Ramchandrapur

60
10

244.19
40.70

15.Bari Pahari
16.Asthawan

1. Bari Parhari
1. Asthawan
2. Malti
1. Sohasarai

20

81.40

120
10

488.38
40.70

40
20
20
20
20
20
20

6837.27
162.79
81.40
81.40
81.40
81.40
81.40
81.40

20
20
50
20
20
20
20

81.40
81.40
203.49
81.40
81.40
81.40
81.40

40
20
30
20

162.79
81.40
122.09
81.40
1790.71

3. Ekangersarai
4. Chiksurabazar
5. Dhamauli
6. Noorsarai

7. Harnaut
8. Silao
9. Andawas
10.Rajgir
11.Giriak

17.Sohasarai

1. Fulwaria
2. Gopalganj

3. Srinagar
4. Siwan
5. Maharajganj
5. Chapra

Length
(km)

1. Hilsa
2. Hilsa (2)
1. Islampur
2. Khudaganj
1. Ekangersarai
1. Chiksurabazar
1. Dhamauli
2. Rahui
1. Noorsarai
2. Kalyanbigha
3. Chandi
4. Chainpur
5. Thertheri
1. Harnaut
2. Cheral (Railways)
1. Silao
2. Bhindidih
1. Andawas
1. Rajgir
2. Ghosarwan
1. Tetrawan
2. Sarbahadi
3. Giriak
4. Badi
5. Katrisarai
1. Parwalpur

2. Islampur

4. Nalanda

33/11 kV Sub Station

6. Siwan (2)
7. Mashrakh
8. Taraiya
9. Baikunthpur
10.Prabhunath Nagar
11.Telpa
12.Sheetalpur

1. Fulwaria
2. Hathua
1. Gopalganj
2. Jhajhwa
3. Kuchaikot
1. Srinagar
2. Mairwa
1. Siwan
1. Maharajganj
2. Ekma
1. Siwan (2)
1. Mashrakh
2. Baniapur
1. Taraiya
2. Marworah
1. Baikunthpur
2. Barouli
1. Prabhunath Nagar
2. Manjhi
1. Telpa
1. Sheetalpur

APPENDIX B-6

Estimated Cost for L T Lines


L T Line
Circle

33 kV feeder
1. Valmiki Nagar
2. Dhanha
3. Ramnagar
4.
5.
6.
7.

6. Motihari

Chautarwa
Lauria
Narkatiaganj
Raxaul

8. Adopur
9. Dhaka
10.Bettiah
11.Bettiah (2)
12.Madhopur
13.Areraj
14.Motihari (2)
15.Motihari
16.Chakia
17.Chhitwani
1. Chausa

2. Buxar
3.
4.
5.
6.

Pandy Patti
Dumraon
Dumraon (2)
Nawanagar

7. Bramhpur

7. Bhojpur

8. Simri
9. Garhani

10.Jagdishpur
11.Japani Farm

12.Powerganj

13.Zero Mile
1. Karpi

8. Gaya

2. Arwal
3. Goh
4. Daudnagar
5. Kako

33/11 kV Sub Station

Length
(km)
20
120
40

Cost
(Rs.Lakh)
81.40
488.38
162.79

120
20
40
20

488.38
81.40
162.79
81.40

20
40

81.40
162.79

60
20
20
40
30
10
20
20
120
40
20
20
20
10
30

244.19
81.40
81.40
162.79
122.09
40.70
81.40
81.40
488.38
3174.45
162.79
81.40
81.40
81.40
40.70
122.09

100
20
20
20
20
20

406.98
81.40
81.40
81.40
81.40
81.40

120
20
20

488.38
81.40
81.40

50

203.49

2. Serai
1. Powerganj
2. Power House
3. Barhara
1. Zero Mile

10
30
120
30

40.70
122.09
488.38
122.09
3011.65

1. Karpi
2. Ataullah
3. Kurtha
1. Arwal
1. Goh
1. Daudnagar
2. Haspura
1. Kako

20

81.40

1. Valmiki Nagar
1. Dhanha
1. Ramnagar
2. Bagha
1. Chautarwa
1. Lauria
1. Narkatiaganj
1. Raxaul
1. Adopur
1. Dhaka
1. Bettiah
1. Bettiah (2)
1. Madhopur
2. Harsidhi
1. Areraj
1. Motihari (2)
1. Motihari
1. Chakia
2. Madhuban
1. Chhitwani
1. Chausa
2. Itarhi
3. Purushottampur
1. Buxar
2. Industrial
1. Pandey Patti
1. Dumraon
1. Dumraon (2)
1. Nawanagar
2. Murar
3. Akarsai
1. Krishnapuram
2. Bramhapur
3. Sahpur
4. Bihian
1. Simri
2. Chhotka Dhakai
1. Garhani
2. Piro
3. Agiaon
4. Sandes
1. Jagdishpur
1. Japani Farm

APPENDIX B-6

Estimated Cost for L T Lines


L T Line
Circle

33 kV feeder

6. Tehta

7. Ghosi
8. Irki

9. Rafiganj I & II
10.Uchauli
11.Guraru
12.Tekari
13.Belaganj

14.Chakand
15.Dhongra
16.Sonwa
17.Hulasganj
18.Nawagarh
19.Aurangabad
20.Obra

21.Deo
8. Gaya

22.Barun
23.Barem
24.Tengra
25.Sone Hydel
26.Nabinagar
27.Barun (2)
28.Dihara
29.Wazirganj

30.Atari
31.Gurua
32.Amas
33.Banke
34.Shergahti
35.Imamganj
36.Chandauti
37.Medical
38.Central Stores
39.A.P.Colony
40.Gandhi Maidan

33/11 kV Sub Station

Length
(km)
20
20
20
20
20
30
20

Cost
(Rs.Lakh)
81.40
81.40
81.40
81.40
81.40
122.09
81.40

120
20
20
20
20
20
20
20
40
40

488.38
81.40
81.40
81.40
81.40
81.40
81.40
81.40
162.79
162.79

40
120
120

162.79
488.38
488.38

120

488.38

10

40.70

40

162.79

20
20
30
120

81.40
81.40
122.09
488.38

20

81.40

20
40

81.40
162.79

1. Medical
2. Cherki
1. Central Stores

20

81.40

1. A.P.Coloy
2. Railway Maidan
1. Gandhi Maidan

10
20
30

40.70
81.40
122.09

2. Charui
1. Tehta
2. Makpa
3. Makhdampur
1. Ghosi
2. Jehanabad
1. Irki
2. Sakurabad
3. Nowaman
1. Rafiganj
1. Uchauli
2. Madanpur
1. Guraru
2. Paraiya
1.Tekari
2. Koach
1. Belaganj
2. Panari
3. Paibigha
1. Chakand
1. Dhongra
1. Sonwa
1. Hulasganj
1. Nawagarh
1. Aurangabad
1. Obra
2. Phesar
3. Sokhea
1. Deo
2. Gangti
1. Barun
1. Barem
1. Tengra
HTC
1. Nabinagar
2. Amba
1. Barun (2)
1. Dihara
1. Wazirganj
2. Fatehpur
3. Paimer
1. Atari
2. Khizr Sarai
1. Gurua
1. Amas
1. Banke
1. Sherghati
2. Dobhi
1. Imamganj
2. Dumaria
1. Chandauti

APPENDIX B-6

Estimated Cost for L T Lines


L T Line
Circle

33 kV feeder

Length
(km)
30
40

Cost
(Rs.Lakh)
122.09
162.79

20

81.40

20

81.40

20

81.40

20
80
80
30
10
20
20
20
20
20
20
20
20

81.40
325.58
325.58
122.09
40.70
81.40
81.40
81.40
81.40
81.40
81.40
81.40
81.40
0.00
7407.04

60

244.19

120

488.38

120
90

488.38
366.28

120
120
120

488.38
488.38
488.38

20

81.40

10

40.70

120

488.38

11.Bihariganj
12.Udakishanganj
13.Puraini
14.Alamnagar

1. Sour Bazar
1. Balwahat
2. Salakhua
1. Simri Bakhtiyarpur
1. New Market
1. Old Saharsa
1. Madhepura
2. Muraliganj
3. Kumarkhand
1. Singheswar
2. Ghailar
1. Khagaria
2. Mansi
3. Maheshkunt
1. Bihariganj
1. Udakishanganj
1. Puraini
1. Alamnagar

120
20
20
40
120

488.38
81.40
81.40
162.79
488.38

120

488.38

1.
2.
3.
4.
5.

1. Bihpur
1. Sanhauli
1. Naugachhia
1. Patwara
1. Sultanganj

20
120

5453.53
81.40
488.38

20

81.40

41.Dandibag
42.Shobh
43.Manpur

44.Industrial Area
45.M.U. Campus

8. Gaya

46.Hasua
47.Nawada

48.Akbarpur

49.Roh

1. Shobh
2. Charkbria
1. Manpur
2. Tankuppa
3. Gere
4. Bhore
1. Industrial Area
1. M.U.Campus
2. Buddhist Complex
1. Hasua
2. Nadirganj
1. Nawada
2. Nawada New
3. Bhadhokhara
1. Akbarpur
2. Rajauli
3. Sirdala
1. Roh
2. Warsaliganj
3. Pakribarwan
4. Kaukol

1. Supaul

2. Saharsa (2)

2. Parasrama
3. Kishanpur
4. Pipra
5. Raghopur
6. Larganj
1. Sahrsa (2)

5.
6.
7.
8.

Simri Bakhtiyarpur
New Market
Old Saharsa
Madhepura

9. Singheswar
10.Khagaria

10.Bhagalpur

2. Panchaiti Akhara
1. Dandibag

1. Supaul

3. Sour Bazar
4. Balwahat

9. Saharsa

33/11 kV Sub Station

Bihpur
Sanhauli
Naugachhia
Patwara
Sultanganj

APPENDIX B-6

Estimated Cost for L T Lines


L T Line
Circle

33 kV feeder

Length
(km)

Cost
(Rs.Lakh)

40
20
20
20
20
20

162.79
81.40
81.40
81.40
81.40
81.40

20
20
20
20
20
30

81.40
81.40
81.40
81.40
81.40
122.09
0.00

20
40
20
120
20

81.40
162.79
81.40
488.38
81.40

40
20
20
20

2645.37
162.79
81.40
81.40
81.40

20
20

81.40
81.40

5. ITC
6. Karnachaura

1. Tarapur
2. Kharagpur
1. Dakranala
1. Ramchandrapur
2. Railways (HTC)
1. Safiabad
2. Baniyarpur
1. ITC (HTC)
1. Karnchaura

60

244.19

7. Nandlalpur
8. Bindwara
9. Balaji
10.Purani Bazar

1. Nandlalpur
1. Bindwara
1. Balaji
1. Purani Bazar

20
40

81.40
162.79

30

122.09

2. Court Area
1. Kajra
2. Piri Bazar
1. Salempur
2. Manpur
3. Haibatganj
1. Jamui

20
120
120

81.40
488.38
488.38

120

488.38

20

81.40

2. Khaira
3. Sikandara
1. Gidhour
2. Jhajha
3. Sono
1. Ghuskuri
1. Ariari
2. Bhalua
3. Lohain
4. Katari
5. Barkna
1. Onama
2. Mirzapur

20
20
20
10
20
120

81.40
81.40
81.40
40.70
81.40
488.38

120

488.38

6. Shahkund
7. Barari

8. CS Compound
9. Sabour
10.Gouradih
11.Aliganj I
10.Bhagalpur

12.Aliganj II

13.Banka (2)
14.Banka

15.Sanhoula
16.Ghogha
17.Kahalgaon

1. Tarapur
2. Dakranala
3. Ramchandrapur
4. Safiabad

11.Kajra
11. Munger

33/11 kV Sub Station

12.Haibatganj

13.Jamui

14.Gidhour

15.Ghuskuri
16.Ariari

17.Onama

1. Shahkund
1. Barari
2. Central Jail
3. Mayaganj
1. C S Compound
2. T T School
1. Sabour
1. Gouradih
1. Aliganj
2. Mojahidpur
1. Aliganj
2. Jagdishpur
3. Nath Nagar
1. Banka (2)
1. Banka
2. Amarpur
3. Rajouna
4. Bousi
1. Sanhoula
1. Ghogha
1. Kahalgaon
2. Pirpainti

APPENDIX B-6

Estimated Cost for L T Lines


L T Line
Circle

11. Munger

33 kV feeder

Cost
(Rs.Lakh)
488.38

30

122.09

3. Toygarh
1. Hathiyama
1. Sheikhpura

1. Pusa
2. Mohanpur

1. Pusa
1. Mohanpur

20
20

4761.67
81.40
81.40

20
20

81.40
81.40

3. Jute Mill
4. Sarairanjan
5. Jitwarpur

2. Warisnagar
3. Kalyanpur
HTC
1. Sarairanjan
1. Jitwarpur

20
10

81.40
40.70

60

244.19

120
120
10
10
10
10
20
20
20

488.38
488.38
40.70
40.70
40.70
40.70
81.40
81.40
81.40

60

244.19

120
60
10
40

488.38
244.19
40.70
162.79

20
20

81.40
3337.24
81.40

120

488.38

120

488.38

120

488.38

20
20
20

81.40
81.40
81.40

30

122.09

20
10
10

81.40
40.70
40.70

8. Dalsingsarai
9. Pateri
10.Bachchwara
11.Bibhutipur

12.Deona

13.Bangrahdih (2)
14.IOC
15.Railways
16.Deona (2)
17.Kankaul
18.Begusarai

1. Narpatganj
2. Raniganj
3. Forbesganj

4. Bahadurganj
13. Purnea

Length
(km)
120

18.Hathiyama
19.Sheikhpura

6. Rly.Samastipur
7. Sirsia

12.Samastipur

33/11 kV Sub Station

5.
6.
7.
8.

Sarai
Paschimpali
Purabpali
Thakurganj

9. Group Control
10.Banmankhi
11.Zero Mile

2. Magardahi
HTC
1. Sirsia
2. Kuboliram
3. Karpoorigram
1. Dalsingsarai
2. Mehuddinnagar
1. Pateri
1. Bachchwara
1. Bibhutipur
2. Rosera
3. Hassanpur
1. Deona
2. Bangrahdih
3. Jai Mangla (HTC)
4. Jai Mata Di (HTC)
1. Bangrahdih (2)
HTC
HTC
1. Deona (2)
1. Kankaul
1. Begusarai
2. Manjhaul
3. Ganga Dairy (HTC)
4. Balia
1. Narpatganj
1. Raniganj
2. Bahargaon
1. Forbesganj
2. Araria
3. Kusgaon
4. Jokihat
5. Malgaon
1. Bahadurganj
2. Dighal Bank
1. Sarai
1. Paschimpali
1. Purabpali
1. Chhatargarh
2. Thakurganj
1. Group control
1. Banmankhi
2. Madhubani
1. Zero Mile
2. City

APPENDIX B-6

Estimated Cost for L T Lines


L T Line
Circle

33 kV feeder
12.Belgachhi

13.Naranga

14.Jalalgarh
15.Beri
13. Purnea

16.Industrial Estate
17.Binodpur
18.Kursaila
1. Karmnasa

2. Larma
3. Kalyanpur

4.
5.
6.
7.
8.
9.

Ramgarh (2)
Kakrait
Parsathua
Chainpur
Mohania (2)
Mohania

10.Dinara

14. Sasaram

11.Sanjhouli
12.Surajpura
13.Bikramganj
14.Bikramganj (2)
15.Pusauli
16.Kudra
17.Karamchat

18.Beda Sasaram

19.Sasaram (2)
20.Sasaram (3)
21.Naigaon
22.BMP Dehri (2)
23.BMP Dehri I & II

24.JVLO&FL Pahleja

33/11 kV Sub Station


1. Belgachhi
2. Dalkola
3. Vaisi
1. Naranga
2. MLR Ganj
3. Dargaha
1. Jalalgarh
1. Beri
2. Gore Beri
3. Falka
4. Sonaily
5. Barsoi
6. Pranpur
1. Industrial Estate
1. Binodpur
1. Kursaila
1. Karmnasa
2. Durgawati
3. Chand
1. Larma
2. DVPL (HTC)
1. Kalyanpur
2. Ramgarh
3. Chourasia
4. Nuaon
1. Ramgarh (2)
1. Kakrait
1. Parsathua
1. Chainpur
1. Mohania (2)
1. Mohania
2. Bhabhua Old
3. Bahuara
1. Dinara
2. Kochas
3. Dawath
1. Sanjhouli
1. Surajpura
1. Bikramganj
2. Kararkat
1. Bikramganj (2)
1. Pusauli
1. Kudra
2. Bhabhua New
1. Karamchat
2. Cenari
3. Adhaura
1. Beda Sasaram
2. Takia Sasaram
3. Nokha
1. Sasaram (2)
1. Sasaram (3)
1. Naigaon
2. Sheosagar
1. BMP Dehri (2)
1. BMP Dehri
2. Basa Karwandia
3. PHED (HTC)
1. HTC

Length
(km)

Cost
(Rs.Lakh)

120
20
20

488.38
81.40
81.40

40
20
20
20

162.79
81.40
81.40
81.40

10
20

40.70
81.40

20
20
20
20

3255.84
81.40
81.40
81.40
81.40

60

244.19

20
20

81.40
81.40

20
20
20
60

81.40
81.40
81.40
244.19

10
20
20
20

40.70
81.40
81.40
81.40

20
20

81.40
81.40

20
60
20
20
40
10
20

81.40
244.19
81.40
81.40
162.79
40.70
81.40

20
20
60
60
40
40
90

81.40
81.40
244.19
244.19
162.79
162.79
366.28

20

81.40

APPENDIX B-6

Estimated Cost for L T Lines


L T Line
Circle

14. Sasaram

33 kV feeder

25.Nasariganj
26.Rajpur
27.Nauhatta
28.Samhauta
29.Samhauta (2)
30.Kirpabal (2)
31.Indrapuri
32.Indrapuri (2)
1.
2.
3.
4.
5.
6.
7.
8.
9.

Shivhar
Runi Saidpur
Pupri
Dumra (2)
Dumra
Sursand
Sonbarsa
Nepal
Patepur

10.Prataptand
11.Lalganj
12.Sarai
13.Railway (HTC)
14.Bidupur
15.EDIP
16.Hajipur I E
17.Konharaghat
18.Konharaghat (2)
19.Manhar
15. Muzaffarpur
20.SKMCH (2)
21.MIT
22.Sikandarpur (2)
23.SKMCH
24.Kurhani
25.Motipur
26.Motipur (2)
27.Maripur
28.Vaishali
29.Dholi
30.IDPL (2)
31.IDPL
32.Khabra
33.Bhikanpura
34.Bhagwanpur Chowk
35.Railway (HTC)
36.Nayatola (2)
37.Nayatola
38.Hajipur I E (2)
1. Basopatti
2. Jay Nagar

16. Darbhanga 3. Benipatti


4. Rahika
5. Bela

33/11 kV Sub Station


1. Akorigola
1. Nasariganj
1. Rajpur
1. Nauhatta
1. Samhauta
1. Samhauta (2)
1. Kirpabal (2)
2. Kirpabal
1. Indrapuri
1. Indrapuri (2)
1. Shivhar
1. Runi Saidpur
1. Pupri
1. Dumra (2)
1. Dumra
1. Sursand
1. Sonbarsa
1. Nepal
1. Mehua
2. Patepur
1. Prataptand
1. Lalganj
1. Sarai
HTC
1. Bidupur
1. EDIP
1. Hajipur I E
1. Konharaghat
1. Konharaghat(2)
1. Manhar @
1. SKMCH (2)
1. MIT
1. Sikandarpur (2)
1. SKMCH
1. Kurhani
1. Motipur
1. Motipur (2)
1. Maripur
1. Vaishali
1. Dholi
1. IDPL (2)
1. IDPL
1. Khabra
1. Bhikanpura
1. Bhagwanpur chowk
HTC
1. Nayatola (2)
1. Nayatola
1. Hajipur I E (2)
1. Basopatti
1. Jay Nagar
2. Khajauli
3. Ladania
1. Benipatti
2. Ahilyasthan
1. Rahika
2. Madhubani
1. Bela

Length
(km)
40
40
20
40
10
50
120

Cost
(Rs.Lakh)
162.79
162.79
81.40
162.79
40.70
203.49
488.38

120
20
40
20
60

488.38
5657.02
81.40
162.79
81.40
244.19

40
40

162.79
162.79

40
40

162.79
162.79

40
10

162.79
40.70

20
120

81.40
488.38

60
20
120

244.19
81.40
488.38

20

81.40

120
40
10
20
60
10
40

488.38
162.79
40.70
81.40
244.19
40.70
162.79

60

244.19

120

488.38

60

244.19
5087.25

20
20
20
20

81.40
81.40
81.40
81.40

20
20
20

81.40
81.40
81.40

APPENDIX B-6

Estimated Cost for L T Lines


L T Line
Circle

33 kV feeder
6. Gangwara
7. Donar
8. Panda Sarai

9. Pouriya
10.Anar
11.Kusheshwar
12.Biraul
16. Darbhanga 13.Raj Nagar
14.Raiyam
15.Pandaul
16.Manigachi
17.Jhanjharpur
18.Khatauna
19.Rudrapur
20.Phulparas

33/11 kV Sub Station


1. Gangwara
1. Donar
1. Panda Sarai
2. Laheria Sarai (Jail)
3. DMCH
4. Urban
1. Pouriya
1. Baheri
2. Anar
1. Kusheshwar
1. Biraul
2. Benipur
1. Raj Nagar
2. Babu Barhi
1. Raiyam
1. Pandaul
1. Manigachi
1. Jhanjharpur
2. Madhepur
1. Khatauna
1. Rudrapur
1. Phulparas
2. Nirmali
3. Talpatganj

Length
(km)
20
20
20

Cost
(Rs.Lakh)
81.40
81.40
81.40

10
10
20
20
20
120
20
20
20
20

40.70
40.70
81.40
81.40
81.40
488.38
81.40
81.40
81.40
81.40

20
20
20
20

81.40
81.40
81.40
81.40

120
20
20
20

488.38
81.40
81.40
81.40
3011.65

APPENDIX B-7

Cost of 11 kV Shunt Compensation at 33/11 kV Sub Stations (2014 - Planned)


Circle

1. PESU (East)

Feeder name

EHV S/S from where


feeder emanating

1. Katra
2. Dina Iron

Fatuah
Fatuah

3. Karmali Chak

Fatuah

4.
5.
6.
7.
8.

Jakkanpur
Mithapur (2)
Mithapur (2)
Mithapur (2)
Mithapur (2)

S.K. Memorial
Kankar Bag (2)
Saidpur
Bahadurpur
R. Nagar

9. Kankar Bag
10.Ashok Nagar
11.R.K.Nagar
12.Karbigahiya
13.Gaighat
14.NMCH
15.Meena Bazar
16.Katra (2)
17.Pahari

Mithapur
Mithapur
Mithapur
Mithapur
Gaighat
Gaighat
Gaighat
Katra
Katra

18.Malsalami
19.Mangal Talab
20.Meena Bazar (2)
21.PMCH

Katra
Katra
Jakkanpur (2)
Mithapur (2)

1. A.N.College
2. S.K.Puri
3. Garikhana I & II

Khagaul (2)
Khagaul (2)
Khagaul

4. Walmi
5. Bhusaula-Vikas B.

Khagaul
Khagaul

6. Danapur
7. Digha

Digha
Digha

8. R.B.I.

Digha

33/11 kV S/Ss on
feeder

11 kV Shunt
Compensatio
n (MVAr)

No. of
Banks

Cost
(Rs. Lakh)

1. Katra
1. HTC
2. HTC
1. Karmali Chak
2. Deedarganj
1. S.K.Memorial
1. Kankar Bag (2)
1. Saidpur
1. Bahadurpur
1. R.Nagar
2. Machhuatoli
1. Kankar Bag
1. Ashok Nagar
1. R.K.Nagar
1. Karbigahiya
1. Gaighat
1. NMCH
1. Meena Bazar
1. Katra (2)
1. Pahari
2. Sampatchak (Patna)
3. HTC (Patna)
1. Malsalami
1. Mangal Talab
1. Meena Bazar (2)
1. PMCH

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1. A.N.College
1. S.K.Puri
1. Garikhana
2. Pataliputra
3. Rajapur
1. Walmi
1. Bhusaula
2. Vikas Bhawan
1. Danapur
1. Digha
2. Digha Central Stores
1. RBI
2. HTC (Group)
1. Danapur (2)
1. IGIMS
2. Excise
1. Veterinary College
2. Board`s Colony
1. Jakkanpur
1. Maurya Lok
2. Bandar Bagicha
1. Karnawad Punpun
1. Sinchai Bhawan
1. Anishabad
2. Gardanibag
1. Vidyut Bhawan
2. High Court
1. Sahitya Sammelan
1. Bandar Bagicha (2)

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

9. Danapur (2)
2. PESU (West) 10. IGIMS

Digha
Sipara

11.Veterinary College

Sipara

12.Jakkanpur
13.Maurya Lok

Jakkanpur
Jakkanpur

14.Karnawad Punpun
15.Sinchai Bhawan
16.Anishabad

Jakkanpur
Jakkanpur
Jakkanpur

17.Vidyut Bhawan

Jakkanpur

18.Sahitya Sammelan
19.Bandar Bagicha (2)

Jakkanpur (2)
Jakkanpur (2)

APPENDIX B-7

Cost of 11 kV Shunt Compensation at 33/11 kV Sub Stations (2014 - Planned)


Circle

Feeder name

EHV S/S from where


feeder emanating

33/11 kV S/Ss on
feeder

20.Beur

Jakkanpur (2)

1. Beur
2. Khagaul
3. HTC
4. HTC
5. Phulwari

1. A.F. Bihta
2. Pareo

Bihta
Bihta

3. Bihta I & II

Bihta

1. A.F.Bihta
1. Pareo
2. Koilwar (Ara Circle)
3. Giddha (Ara Circle)
1. Bihta
2. Kanpa
3. Lalbhasara
4. Paliganj
HTC
HTC group
1. Maner
1. Neora
2. Naubatpur
1. Fatuah (2)
1. Khusrupur
2. Daniyaman
1. Fatuah
1. HTC
2. HTC
1. Masaurhi Old
2. Dhanaura
1. Masaurhi New
HTC
1. Barh
2. Bakhtiyarpur
1. Barh (2)
1. Biharibigha
1. Hathidah
2. Mokama
1. Hathidah (2)

2. PESU (West)

11 kV Shunt
Compensatio
n (MVAr)

No. of
Banks

Cost
(Rs. Lakh)
0
0
0
0
0

4.
5.
6.
7.

GISCO
Balmukund
Maner
Neora

Khagaul (2)
Khagaul (2)
Khagaul (2)
Khagaul

8. Fatuah (2)
9. Khusrupur

Fatuah (2)
Fatuah (2)

10.Fatuah
11.Dina Iron

Fatuah
Fatuah

12.Masaurhi Old

Masaurhi

13.Masarhi New
14.NTPC I & II
15.Barh

Masaurhi
Barh
Barh

16.Barh (2)
17.Biharibigha
18.Hathidah

Barh
Barh
Hathidah

19.Hathidah (2)

Hathidah

1. Hilsa

Ekangersarai

2. Islampur

Ekangersarai

3. Ekangersarai
4. Chiksurabazar
5. Dhamauli

Ekangersarai
Masaurhi
Harnaut

6. Noorsarai

Harnaut

7. Harnaut

Harnaut

8. Silao

Rajgir

9. Andawas
10.Rajgir

Rajgir
Rajgir

3. Patna

1.2
1.2
1.2

2
2
2

24.15
24.15
24.15

1.2

24.15

1.2

24.15

1.2

24.15

1.2

24.15

1.2

24.15

1.2

24.15

1.2

24.15

169.05

4. Nalanda

1. Hilsa
2. Hilsa (2)
1. Islampur
2. Khudaganj
1. Ekangersarai
1. Chiksurabazar
1. Dhamauli
2. Rahui
1. Noorsarai
2. Kalyanbigha
3. Chandi
4. Chainpur
5. Thertheri
1. Harnaut
2. Cheral (Railways)
1. Silao
2. Bhindidih
1. Andawas
1. Rajgir

APPENDIX B-7

Cost of 11 kV Shunt Compensation at 33/11 kV Sub Stations (2014 - Planned)


Circle

Feeder name

EHV S/S from where


feeder emanating

11.Giriak

Rajgir

12.Nalanda
13.Raiter

Nalanda
Nalanda

14.Parwalpur
15.Ramchandrapur (2)
16.Ramchandrapur
17.Bari Pahari
18.Asthawan

Bari Pahari
Bari Pahari
Bari Pahari
Bari Pahari
Bari Pahari

19.Sohasarai

Bari Pahari

1. Fulwaria

Gopalganj

2. Gopalganj

Gopalganj

3. Srinagar

Siwan

4. Siwan
5. Maharajganj

Siwan
Siwan

6. Siwan (2)
7. Mashrakh

Siwan
Mashrakh

8. Taraiya

Mashrakh

9. Baikunthpur

Mashrakh

10.Prabhunath Nagar

Chapra

11.Telpa
12.Sheetalpur
13.Sonepur

Chapra
Sheetalpur
Hajipur

1. Valmiki Nagar
2. Dhanha
3. Ramnagar

Nepal
Dhanha
Ramnagar

4. Chautarwa
5. Lauria
6. Narkatiaganj
7. Raxaul
8. Adopur
9. Dhaka
10.Bettiah
11.Bettiah (2)
12.Madhopur

Ramnagar
Ramnagar
Ramnagar
Raxaul
Raxaul
Dhaka
Bettiah
Bettiah
Motihari

13.Areraj

Motihari

4. Nalanda

33/11 kV S/Ss on
feeder
2. Ghosarwan
1. Tetrawan
2. Sarbahadi
3. Giriak
4. Badi
5. Katrisarai
1. Nalanda
1. Bihar Sharif
2. Raiter
1. Parwalpur
1. Ramchandrapur (2)
1. Ramchandrapur
1. Bari Parhari
1. Asthawan
2. Malti
1. Sohasarai

11 kV Shunt
Compensatio
n (MVAr)

No. of
Banks

Cost
(Rs. Lakh)

1.2

24.15

1.2
1.2

2
2

24.15
24.15

1.2
1.2

2
2

24.15
24.15

1.2

24.15

1.2

24.15

1.2

24.15

1.2

24.15

1.2

24.15

1.2

24.15

1.2

24.15

1.2

24.15

1.2

24.15

96.60

5. Chapra

1. Fulwaria
2. Hathua
3. Hussepur
1. Gopalganj
2. Jhajhwa
3. Kuchaikot
1. Srinagar
2. Mairwa
1. Siwan
1. Maharajganj
2. Ekma
1. Siwan (2)
1. Mashrakh
2. Baniapur
1. Taraiya
2. Marworah
1. Baikunthpur
2. Barouli
1. Prabhunath Nagar
2. Manjhi
1. Telpa
1. Sheetalpur
1. Sonepur

217.35

6. Motihari

1. Valmiki Nagar
1. Dhanha
1. Ramnagar
2. Bagha
1. Chautarwa
1. Lauria
1. Narkatiaganj
1. Raxaul
1. Adopur
1. Dhaka
1. Bettiah
1. Bettiah (2)
1. Madhopur
2. Harsidhi
1. Areraj

APPENDIX B-7

Cost of 11 kV Shunt Compensation at 33/11 kV Sub Stations (2014 - Planned)


Circle

6. Motihari

Feeder name

EHV S/S from where


feeder emanating

14.Motihari (2)
15.Motihari
16.Chakia

Motihari
Motihari
Motihari

17.Chhitwani

Motihari

1. Chausa

Buxar

2. Buxar

Buxar

3.
4.
5.
6.

Buxar
Dumraon
Dumraon
Dumraon

33/11 kV S/Ss on
feeder
1. Motihari (2)
1. Motihari
1. Chakia
2. Madhuban
1. Chhitwani

11 kV Shunt
Compensatio
n (MVAr)

No. of
Banks

Cost
(Rs. Lakh)

1.2
1.2

2
2

24.15
24.15

144.90

Pandy Patti
Dumraon
Dumraon (2)
Nawanagar

7. Bramhpur

Dumraon

7. Bhojpur
8. Simri

Dumraon

9. Garhani

Jagdishpur

10.Jagdishpur
11.Japani Farm

Jagdishpur
Ara

12.Powerganj

Ara

13.Zero Mile

Ara

1. Karpi

Karpi

1. Chausa
2. Itarhi
3. Purushottampur
1. Buxar
2. Industrial
1. Pandey Patti
1. Dumraon
1. Dumraon (2)
1. Nawanagar
2. Murar
3. Akarsai
1. Krishnapuram
2. Bramhapur
3. Sahpur
4. Bihian
1. Simri
2. Chhotka Dhakai Chak
1. Garhani
2. Piro
3. Agiaon
4. Sandes
1. Jagdishpur
1. Japani Farm
2. Serai
1. Powerganj
2. Power House
3. Barhara
1. Zero Mile

1.2

24.15

1.2
1.2

2
2

24.15
24.15

1.2

24.15

1.2

24.15

1.2
1.2
1.2

2
2
2

24.15
24.15
24.15

1.2

24.15

217.35

2. Arwal
3. Goh
4. Daudnagar

Karpi
Goh
Goh

5. Kako

Irki

6. Tehta

Irki

7. Ghosi

Irki

8. Irki

Irki

9. Rafiganj I & II
10.Uchauli

Rafiganj
Rafiganj

11.Guraru

Rafiganj

8. Gaya

1. Karpi
2. Ataullah
3. Kurtha
1. Arwal
1. Goh
1. Daudnagar
2. Haspura
1. Kako
2. Charui
1. Tehta
2. Makpa
3. Makhdampur
1. Ghosi
2. Jehanabad
1. Irki
2. Sakurabad
3. Nowaman
1. Rafiganj
1. Uchauli
2. Madanpur
1. Guraru

1.2

24.15

1.2
1.2
1.2

2
2
2

24.15
24.15
24.15

1.2

24.15

1.2

24.15

APPENDIX B-7

Cost of 11 kV Shunt Compensation at 33/11 kV Sub Stations (2014 - Planned)


Circle

8. Gaya

Feeder name

EHV S/S from where


feeder emanating

12.Tekari

Tekari

13.Belaganj

Belaganj

14.Chakand
15.Dhongra
16.Sonwa
17.Hulasganj
18.Nawagarh
19.Aurangabad
20.Obra

Belaganj
Hulasganj
Hulasganj
Hulasganj
Hulasganj
Aurangabad
Aurangabad

21.Deo

Aurangabad

22.Sone Nagar
23.Barem
24.Tengra
25.Sone Hydel
26.Nabinagar

Barun
Barun
Barun
Barun
Barun

27.Barun (2)
28.Dihara
29.Wazirganj

Barun
Barun
Wazirganj

30.Atari

Wazirganj

31.Gurua
32.Amas
33.Banke
34.Shergahti

Sherghati
Sherghati
Sherghati
Sherghati

35.Imamganj

Sherghati

36.Chandauti
37.Medical

Chandauti
Chandauti

38.Central Stores
39.A.P.Colony

Chandauti
Chandauti

40.Gandhi Maidan

Chandauti

41.Dandibag
42.Shobh

Chandauti
Bodh Gaya

43.Manpur

Bodh Gaya

44.Industrial Area
45.M.U. Campus

Bodh Gaya
Bodh Gaya

46.Hasua

Nawada

33/11 kV S/Ss on
feeder
2. Paraiya
1.Tekari
2. Koach
1. Belaganj
2. Panari
3. Paibigha
1. Chakand
1. Dhongra
1. Sonwa
1. Hulasganj
1. Nawagarh
1. Aurangabad
1. Obra
2. Phesar
3. Sokhea
1. Deo
2. Gangti
1. Barun
1. Barem
1. Tengra
HTC
1. Nabinagar
2. Amba
1. Barun (2)
1. Dihara
1. Wazirganj
2. Fatehpur
3. Paimer
1. Atari
2. Khizr Sarai
1. Gurua
1. Amas
1. Banke
1. Sherghati
2. Dobhi
1. Imamganj
2. Dumaria
1. Chandauti
1. Medical
2. Cherki
1. Central Stores
1. A.P.Coloy
2. Railway Maidan
1. Gandhi Maidan
2. Panchaiti Akhara
1. Dandibag
1. Shobh
2. Charkbria
1. Manpur
2. Tankuppa
3. Gere
4. Bhore
1. Industrial Area
1. M.U.Campus
2. Buddhist Complex
1. Hasua

11 kV Shunt
Compensatio
n (MVAr)
1.2

No. of
Banks

Cost
(Rs. Lakh)

24.15

1.2
1.2
1.2

2
2
2

24.15
24.15
24.15

1.2

24.15

1.2
1.2

2
2

24.15
24.15

1.2
1.2

2
2

24.15
24.15

1.2

24.15

APPENDIX B-7

Cost of 11 kV Shunt Compensation at 33/11 kV Sub Stations (2014 - Planned)


Circle

Feeder name

EHV S/S from where


feeder emanating

47.Nawada

Nawada

48.Akbarpur

Nawada

49.Roh

Nawada

1. Supaul

Supaul

8. Gaya

33/11 kV S/Ss on
feeder
2. Nadirganj
1. Nawada
2. Nawada New
3. Bhadhokhara
1. Akbarpur
2. Rajauli
3. Sirdala
1. Roh
2. Warsaliganj
3. Pakribarwan
4. Kaukol

11 kV Shunt
Compensatio
n (MVAr)

No. of
Banks

Cost
(Rs. Lakh)

1.2
1.2
1.2
1.2
1.2

2
2
2
2
2

24.15
24.15
24.15
24.15
24.15

507.15

9. Saharsa

2. Saharsa (2)

Saharsa

3. Sour Bazar
4. Balwahat

Saharsa
Saharsa

5.
6.
7.
8.

Saharsa
Saharsa
Saharsa
Madhepura

Simri Bakhtiyarpur
New Market
Old Saharsa
Madhepura

9. Singheswar

Madhepura

10.Khagaria

Khagaria

11.Bihariganj
12.Udakishanganj
13.Puraini
14.Alamnagar

Udakishanganj
Udakishanganj
Udakishanganj
Udakishanganj

1. Bihpur
2. Sanhauli
3. Naugachhia
4. Patwara
5. Sultanganj
6. Shahkund
7. Barari

Naugachhia
Naugachhia
Naugachhia
Sultanganj
Sultanganj
Sultanganj
Sabour

8. CS Compound

Sabour

9. Sabour
10.Gouradih
11.Aliganj I

Sabour
Sabour
Sabour

12.Aliganj II

Sabour

1. Supaul
2. Parasrama
3. Kishanpur
4. Pipra
5. Raghopur
6. Larganj
1. Sahrsa (2)
1. Sour Bazar
1. Balwahat
2. Salakhua
1. Simri Bakhtiyarpur
1. New Market
1. Old Saharsa
1. Madhepura
2. Muraliganj
3. Kumarkhand
1. Singheswar
2. Ghailar
1. Khagaria
2. Mansi
3. Maheshkunt
1. Bihariganj
1. Udakishanganj
1. Puraini
1. Alamnagar

1.2
1.2
1.2

2
2
2

24.15
24.15
24.15

1.2
1.2

2
2

24.15
24.15

1.2

24.15

144.90

10. Bhagalpur

1. Bihpur
1. Sanhauli
1. Naugachhia
1. Patwara
1. Sultanganj
1. Shahkund
1. Barari
2. Central Jail
3. Mayaganj
1. C S Compound
2. T T School
1. Sabour
1. Gouradih
1. Aliganj
2. Mojahidpur
1. Aliganj
2. Jagdishpur

1.2

24.15

APPENDIX B-7

Cost of 11 kV Shunt Compensation at 33/11 kV Sub Stations (2014 - Planned)


Circle

Feeder name

EHV S/S from where


feeder emanating

13.Banka (2)
14.Banka

Banka
Banka

15.Sanhoula
16.Ghogha
17.Kahalgaon

Kahalgaon
Kahalgaon
Kahalgaon

10. Bhagalpur

33/11 kV S/Ss on
feeder
3. Nath Nagar
1. Banka (2)
1. Banka
2. Amarpur
3. Rajouna
4. Bousi
1. Sanhoula
1. Ghogha
1. Kahalgaon
2. Pirpainti

11 kV Shunt
Compensatio
n (MVAr)

No. of
Banks

Cost
(Rs. Lakh)

1.2

24.15

1.2

24.15

72.45
1. Tarapur

Sultanganj

2. Dakranala
3. Ramchandrapur

Jamalpur
Jamalpur

4. Safiabad

Jamalpur

5. ITC
6. Karnachaura
7. Nandlalpur
8. Bindwara
9. Balaji
10.Purani Bazar

Jamalpur
Jamalpur
Jamalpur
Jamalpur
Lakhisarai
Lakhisarai

11.Kajra

Lakhisarai

12.Haibatganj

Lakhisarai

13.Jamui

Mallehpur

14.Gidhour

Mallehpur

11. Munger

15.Ghuskuri
16.Ariari

Sheikhpura
Sheikhpura

17.Onama

Sheikhpura

18.Hathiyama
19.Sheikhpura

Sheikhpura
Sheikhpura

1. Pusa
2. Mohanpur

Mohanpur
Mohanpur

1. Tarapur
2. Kharagpur
1. Dakranala
1. Ramchandrapur
2. Railways (HTC)
1. Safiabad
2. Baniyarpur
1. ITC (HTC)
1. Karnchaura
1. Nandlalpur
1. Bindwara
1. Balaji
1. Purani Bazar
2. Court Area
1. Kajra
2. Piri Bazar
1. Salempur
2. Manpur
3. Haibatganj
1. Jamui
2. Khaira
3. Sikandara
1. Gidhour
2. Jhajha
3. Sono
1. Ghuskuri
1. Ariari
2. Bhalua
3. Lohain
4. Katari
5. Barkna
1. Onama
2. Mirzapur
3. Toygarh
1. Hathiyama
1. Sheikhpura

1.2
1.2

2
2

24.15
24.15

1.2
1.2
1.2
1.2
1.2
1.2

2
2
2
2
2
2

24.15
24.15
24.15
24.15
24.15
24.15

1.2
1.2
1.2
1.2
1.2
1.2

2
2
2
2
2
2

24.15
24.15
24.15
24.15
24.15
24.15

1.2
1.2
1.2
1.2

2
2
2
2

24.15
24.15
24.15
24.15

1. Pusa
1. Mohanpur
2. Warisnagar
3. Kalyanpur
HTC
1. Sarairanjan
1. Jitwarpur
2. Magardahi

1.2

24.15

1.2
1.2

2
2

24.15
24.15

434.70

12. Samastipur

3. Jute Mill
4. Sarairanjan
5. Jitwarpur

Mohanpur
Mohanpur
Mohanpur

APPENDIX B-7

Cost of 11 kV Shunt Compensation at 33/11 kV Sub Stations (2014 - Planned)


Circle

Feeder name

EHV S/S from where


feeder emanating

6. Rly.Samastipur
7. Sirsia

Mohanpur
Mohanpur

8. Dalsingsarai

Dalsingsarai

9. Pateri
10.Bachchwara
11.Bibhutipur

Dalsingsarai
Dalsingsarai
Dalsingsarai

12.Deona

BTPS

13.Bangrahdih (2)
14.IOC
15.Railways
16.Deona (2)
17.Kankaul
18.Begusarai

BTPS
BTPS
BTPS
Zero Mile
Zero Mile
Zero Mile

1. Narpatganj
2. Raniganj

Forbesganj
Forbesganj

3. Forbesganj

Forbesganj

12. Samastipur

33/11 kV S/Ss on
feeder
HTC
1. Sirsia
2. Kuboliram
3. Karpoorigram
1. Dalsingsarai
2. Mohadinnagar
1. Pateri
1. Bachchwara
1. Bibhutipur
2. Rosera
3. Hassanpur
1. Deona
2. Bangrahdih
3. Jai Mangla (HTC)
4. Jai Mata Di (HTC)
1. Bangrahdih (2)
HTC
HTC
1. Deona (2)
1. Kankaul
1. Begusarai
2. Manjhaul
3. Ganga Dairy (HTC)
4. Balia

11 kV Shunt
Compensatio
n (MVAr)

No. of
Banks

Cost
(Rs. Lakh)

1.2
1.2

2
2

24.15
24.15

1.2

24.15

1.2
1.2

2
2

24.15
24.15

193.20

13. Purnea

4. Bahadurganj

Kishanganj

5.
6.
7.
8.

Kishanganj
Kishanganj
Kishanganj
Kishanganj

Sarai
Paschimpali
Purabpali
Thakurganj

9. Group Control
10.Banmankhi

Purnea
Purnea

11.Zero Mile

Purnea

12.Belgachhi

Purnea

13.Naranga

Purnea

14.Jalalgarh
15.Beri

Purnea
Katihar

1. Narpatganj
1. Raniganj
2. Bahargaon
1. Forbesganj
2. Araria
3. Kusgaon
4. Jokihat
5. Malgaon
1. Bahadurganj
2. Dighal Bank
1. Sarai
1. Paschimpali
1. Purabpali
1. Chhatargarh
2. Thakurganj
1. Group control
1. Banmankhi
2. Madhubani
1. Zero Mile
2. City
1. Belgachhi
2. Dalkola
3. Vaisi
1. Naranga
2. Mirganj
3. Dargaha
1. Jalalgarh
1. Beri
2. Gore Beri
3. Falka
4. Sonaily

1.2

24.15

1.2
1.2
1.2
1.2

2
2
2
2

24.15
24.15
24.15
24.15

1.2
1.2

2
2

24.15
24.15

1.2
1.2
1.2

2
2
2

24.15
24.15
24.15

1.2
1.2
1.2

2
2
2

24.15
24.15
24.15

1.2
1.2

2
2

24.15
24.15

APPENDIX B-7

Cost of 11 kV Shunt Compensation at 33/11 kV Sub Stations (2014 - Planned)


Circle

13. Purnea

Feeder name

EHV S/S from where


feeder emanating

33/11 kV S/Ss on
feeder

16.Barsoi
17.Pranpur
18.Industrial Estate
19.Binodpur
20.Kursaila

Katihar
Katihar
Katihar
Katihar
Naugachhia

1. Barsoi
1. Pranpur
1. Industrial Estate
1. Binodpur
1. Kursaila

1. Karmnasa

Karmnasa

2. Larma

Karmnasa

3. Kalyanpur

Karmnasa

1. Karmnasa
2. Durgawati
3. Chand
1. Larma
2. DVPL (HTC)
1. Kalyanpur
2. Ramgarh
3. Chourasia
4. Nuaon
1. Ramgarh (2)
1. Kakrait
1. Parsathua
1. Chainpur
1. Mohania (2)
1. Mohania
2. Bhabhua Old
3. Bahuara
1. Dinara
2. Kochas
3. Dawath
1. Sanjhouli
1. Surajpura
1. Bikramganj
2. Kararkat
1. Bikramganj (2)
1. Pusauli
1. Kudra
2. Bhabhua New
1. Karamchat
2. Cenari
3. Adhaura
1. Beda Sasaram
2. Takia Sasaram
3. Nokha
1. Sasaram (2)
1. Sasaram (3)
1. Naigaon
2. Sheonagar
1. BMP Dehri (2)
1. BMP Dehri
2. Basa Karwandia
3. PHED (HTC)
1. HTC
1. Akorigola
1. Nasariganj
1. Rajpur
1. Nauhatta
1. Samhauta
1. Samhauta (2)
1. Kirpabal (2)

11 kV Shunt
Compensatio
n (MVAr)
1.2

No. of
Banks

Cost
(Rs. Lakh)

24.15

386.40

4.
5.
6.
7.
8.
9.

Ramgarh (2)
Kakrait
Parsathua
Chainpur
Mohania (2)
Mohania

10.Dinara

14. Sasaram

Karmnasa
Karmnasa
Mohania
Mohania
Mohania
Mohania

Dinara

11.Sanjhouli
12.Surajpura
13.Bikramganj

Bikramganj
Bikramganj
Bikramganj

14.Bikramganj (2)
15.Pusauli
16.Kudra

Bikramganj
PGCIL Pusauli
Kudra

17.Karamchat

Kudra

18.Beda Sasaram

Sasaram

19.Sasaram (2)
20.Sasaram (3)
21.Naigaon

Sasaram
Sasaram
Sasaram

22.BMP Dehri (2)


23.BMP Dehri I & II

Dehri-On-Sone
Dehri-On-Sone

24.JVLO&FL Pahleja
25.Akorigola
26.Nasariganj
27.Rajpur
28.Nauhatta
29.Samhauta
30.Samhauta (2)
31.Kirpabal (2)

Dehri-On-Sone
Dehri-On-Sone
Dehri-On-Sone
Dehri-On-Sone
Banjari
Banjari
Banjari
Barun

1.2

24.15

1.2
1.2
1.2
1.2

2
2
2
2

24.15
24.15
24.15
24.15

1.2

24.15

1.2

24.15

1.2

24.15

1.2
1.2

2
2

24.15
24.15

1.2

24.15

1.2

24.15

1.2

24.15

1.2

24.15

1.2

24.15

1.2

24.15

APPENDIX B-7

Cost of 11 kV Shunt Compensation at 33/11 kV Sub Stations (2014 - Planned)


Circle

14. Sasaram

Feeder name

EHV S/S from where


feeder emanating

32.Indrapuri
33.Indrapuri (2)

Barun
Barun

1.
2.
3.
4.
5.
6.
7.
8.
9.

Shivhar
Runi Saidpur
Sitamarhi
Sitamarhi
Sitamarhi
Sonbarsa
Sonbarsa
Sonbarsa
Vaishali

33/11 kV S/Ss on
feeder
2. Kirpabal
1. Indrapuri
1. Indrapuri (2)

11 kV Shunt
Compensatio
n (MVAr)
1.2
1.2
1.2

No. of
Banks

Cost
(Rs. Lakh)

2
2
2

24.15
24.15
24.15

458.85

15. Muzaffarpur

Shivhar
Runi Saidpur
Pupri
Dumra (2)
Dumra
Sursand
Sonbarsa
Nepal
Patepur

10.Prataptand
11.Lalganj
12.Sarai
13.Railway (HTC)
14.Bidupur
15.EDIP
16.Hajipur I E
17.Hajipur I E (2)
18.Konharaghat
19.Konharaghat (2)
20.Mehnar
21.SKMCH (2)
22.MIT
23.Sikandarpur (2)
24.SKMCH

Vaishali
Vaishali
Vaishali
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Hajipur
Mohanpur
SKMCH
SKMCH
SKMCH
SKMCH

25.Kurhani
26.Motipur
27.Motipur (2)
28.Maripur
29.Vaishali
30.Dholi
31.IDPL (2)
32.IDPL
33.Khabra
34.Bhikanpura
35.Bhagwanpur Chowk
36.Railway (HTC)
37.Nayatola (2)
38.Nayatola

SKMCH
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur
Muzaffarpur

1. Basopatti
2. Jay Nagar

Jay Nagar
Jay Nagar

3. Benipatti

Rahika

4. Rahika

Rahika

5. Bela
6. Gangwara
7. Donar

Gangwara
Gangwara
Gangwara

1. Shivhar
1. Runi Saidpur
1. Pupri
1. Dumra (2)
1. Dumra
1. Sursand
1. Sonbarsa
1. Nepal
1. Mehua
2. Patepur
1. Prataptand
1. Lalganj
1. Sarai
1. Bidupur
1. EDIP
1. Hajipur I E
1. Hajipur I E (2)
1. Konharaghat
1. Konharaghat
1. Mehnar
1. SKMCH (2)
1. MIT
1. Sikandarpur (2)
1. SKMCH
2. Sikandarpur
1. Kurhani
1. Motipur
1. Motipur (2)
1. Maripur
1. Vaishali
1. Dholi
1. IDPL (2)
1. IDPL
1. Khabra
1. Bhikanpura
1. Bhagwanpur chowk

1.2

24.15

1.2

24.15

1.2
1.2

2
2

24.15
24.15

1.2

24.15

1.2
1.2

2
2

24.15
24.15

1.2

24.15

1. Nayatola (2)
1. Nayatola

193.20

16. Darbhanga

1. Basopatti
1. Jay Nagar
2. Khajauli
3. Ladania
1. Benipatti
2. Ahilyasthan
1. Rahika
2. Madhubani
1. Bela
1. Gangwara
1. Donar

1.2

24.15

1.2
1.2

2
2

24.15
24.15

APPENDIX B-7

Cost of 11 kV Shunt Compensation at 33/11 kV Sub Stations (2014 - Planned)


Circle

Feeder name

EHV S/S from where


feeder emanating

8. Panda Sarai

Ram Nagar

9. Pouriya
10.Anar

Ram Nagar
Kusheshwar

11.Kusheshwar
12.Biraul

Kusheshwar
Kusheshwar

13.Raj Nagar

Pandaul

14.Raiyam
15.Pandaul
16.Manigachi
17.Jhanjharpur

Pandaul
Pandaul
Pandaul
Pandaul

18.Khatauna
19.Rudrapur
20.Phulparas

Phulparas
Phulparas
Phulparas

16. Darbhanga

33/11 kV S/Ss on
feeder
1. Panda Sarai
2. Laheria Sarai (Jail)
3. DMCH
4. Urban
1. Pouriya
1. Baheri
2. Anar
1. Kusheshwar
1. Biraul
2. Benipur
1. Raj Nagar
2. Babu Barhi
1. Raiyam
1. Pandaul
1. Manigachi
1. Jhanjharpur
2. Madhepur
1. Khatauna
1. Rudrapur
1. Phulparas
2. Nirmali
3. Tulpatganj

11 kV Shunt
Compensatio
n (MVAr)

No. of
Banks

Cost
(Rs. Lakh)

1.2

24.15

1.2

24.15

1.2
1.2

2
2

24.15
24.15

169.05

Potrebbero piacerti anche