Sei sulla pagina 1di 2

Astungkara God Blessed Me

Good afternoon sir and mam. First I want to say thank you sir and mam for this
opportunity to me to be here and be interviewed by all of you. First let me
introduce myself, my name is I Made Bian Dananjaya, you can call me Bian. I am
23 years old. I come from Denpasar Bali. I am the first son and I have two little
brothers. I like playing chess, guitar and doing some sport activity like fitness,
futsal and tennis table.
I graduated from bachelor degree of civil engineering in Institut Technology
Sepuluh Nopember Surabaya. During my years in the university, I participated in
several organisations and taking different roles in each of them. In doing so I
have learnt how to position myself and to be both, as follower as well as leader. I
have developed those skills during that time, which I believe will be useful in the
work place. Being independent but can function well in a team is one of the
things that I learnt in organizations. The focus of my study in university is about
transportation, due to the fact that iam personally very interested in learning
that particular subject. My thesis is directed about feasibility study of toll road.
I sincerely believe that my knowledge, experience sand skill will be my
advantage in order to join your company. I will be very glad if I am the one who
selected to work for this company. If you are looking for someone who is very
smart and has already tons of experience, I may not be the person. But if you are
looking for someone who always work hard and never cease to learn in order to
improve and achieve the required standard, I am the right person for the job.
My motivation to apply this job is to have a good career in a good construction
company. I have interest in infrastructure transportation especially in toll road
construction. So hopefully with PT.PP I could do my best that not only to learn
and work to give an advantages to PT. PP, but also contribute as a form of my
services to this country.

Mojokerto Kertosono highway road is one of the most crowded road in East
Java, because of economical growth increase every years in East Java. Therefore
writer

undertake

feasibility

study

of

Mojokerto

Kertosono

highway

construction. The parameters are reviewed to assed the feasibility of Mojokerto


Kertosono highway is Benefit Cost Ratio (BCR ), Nett Present Value (NPV), and
Internal Rate of Return (IRR). The Value of Benefit in this toll road is saving BOK
and Time Value. To Calculate Both of them writer using Jasa Marga method. In
this final project economic analysis results obtained calculation value is 19.55
BCR> 1, the value of NPV is Rp. 42.258.795.689.796,- > 0, so that economic
analysis Mojokerto toll road construction - Kertosono declared eligible. In financial
analysis obtained by 3.21 BCR> 1, NPV Rp. 5.052.376.029.745,-> 0, and
obtained payback period in the year to -12 from 35-year plan, so that the
financial analysis Mojokerto toll road construction - Kertosono be feasible