Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
radius
(m)
Rate of
melting
of radius
(m/day)
Subtract
Multiply
Reductio
n in
radius
for
melting
(m)
Radius
of towed
iceberg
(m)
Distance
(km)
Table 3
Volume
(m^3)
Table 1
Speed
(km/hr)
Division
(1 day =
24 hrs)
Towing
Days
(days)
Rent of
towing
vessel
per day
(/day)
Melting
constt =
0.85
pi*(r^3)*4/3
Volume
of towed
iceberg
(m^3)
Multiply
Multiply
Division
Sum
Multiply
Water in
towed
iceberg
(m^3)
Fuel Cost
()
Fuel Cost
per km
(/km)
Renting
Cost ()
Desalination
cost = 0.1
Total
Cost ()
/m^3
Cost of
water
from
Iceberg
(/m^3)
Desalination
cost = 0.1
/m^3
Comparison
Go
Go with
with Iceberg:
Iceberg:
Yes
Yes or
or No
No or
or
Indifferent
Indifferent