Site Observation
from Owner/O&M
Reference
AOP-EPC-ER-xxxx
Project Name
Observation
Date
Discipline
HHI &I&C
Item Name
GAS COMPRESSOR
Raised By
ASHWIN
NARAYAN
Item Location
O&M Reference
Summary of Finding
Photo Description
OIL TEMPERATURE
1/3
14/11/2015
LV
Description
On 13/11/2015 06:16 hours GT-13 changed over from natural gas to liquid fuel due to gas supply pressure
low at 27.3 bar. This happened due to excess time taken in adjustment of flow and slow rate of loading of
gas compressors due to which discharge header pressure dropped to 28.3 bar at Gas Compressor side
resulting low pressure at Gas Turbine suction side.
Required action/Proposed solution.
of
2/3
Photo Description
Corrected by EPC
Approved by Owner
Name
Name
Date
Date
Signature
Signature
3/3