Sei sulla pagina 1di 4

S.

No

Description of the work & Contract No


1MW Solar system, materials, accessories, Erection,
commissioning with performance warranty Civil,
Mechanical, Erection, Testing & Commissioning

LIST OF PURCHASE ORDER


CAPACITY

Contract awarded by

STATUS

1 MW Grid Tie

NanoPV Solar Inc, USA

COMMISSIONED

Purchase Order to install 25.76kWp Solar off grid


Power plant with 6 hours battery backup

25.76kWp Off Grid

Abhinav Hi-Tech College of


Engineering,Hyderabad

COMMISSIONED

TNPCB-Administartion-Supply,Erection and
Installation of 2KVA solar photo voltaic power plant
in the proposed TNPCV pavilion at 41st India Tourist
and industrial fair in the island ground,chennai
along with2KVA solar power plant available at
croporate office and reinstallation of 4KVAsolar
power plant in the TNPCB Corporate office

2KVA & 4KVA Grid Tie

TamilNadu Pollution Control Board,Chennai600032

COMMISSIONED

Provision of Solar Rooftop Photo voltaic Power


Plant 5kw(on grid)-3Nos in ICF

3X5kWp Grid Tie

Integral coach Factory,chennai-600038

COMMISSIONED

EQPT SPY,Plant,5KW Off Grid Solar invrtr

5kWp Off Grid

JSW STEEL LTD, SALEM .

COMMISSIONED

Design,Supply,installation and Commissioning of


20KWp SPV power plant Grid connected system at
IMSC,Chennai-113

20KWp Grid Tie

Institute of Mathematical Science,Chennai

COMMISSIONED

Purchase order for 1.5kW Rooftop Solar Power


System

1.5kWp Off Grid

Techright Engineering Solutions Pvt.


Ltd.Tirunelveli.

COMMISSIONED

Supply and Istallation order for 10kWp Grid


Connected Solar Power Generating System

10kWp Grid Tie

D.A.V Public School , 19,Sitaram Nagar,


Velachery,Chennai-42

COMMISSIONED

Supply and installaiton of 2X5 kWp Grid connected


Solar power plant Arulmigu Kabaleeswarar Temple

2X5 kWp Grid Tie

Arulmigu Kabaleeswarar Temple

COMMISSIONED

10

Purchase order to install 5 kWp On Grid Solar Roof


Top power plant without Battery Back up at
Arulmigu Muthumariamman ,Temple,Konnaiyur
622401.Pudukkottai District.

5 kWp Grid Tie

Arulmigu Muthumariamman
,Temple,Konnaiyur 622401.Pudukkottai
District.

COMMISSIONED

11

Supply and installaiton of 5 kWp Grid connected


Solar power plant at Arulmigu
Subramaniyaswamy, Temple,Vayalur

5 kWp Grid Tie

Arulmigu Subramaniyaswamy,
Temple,Vayalur

COMMISSIONED

12

Supply and installaiton of 5 kWp Grid connected


Solar power plant at Arulmigu
vanabadrakaliamman temple

5 kWp Grid Tie

Arulmigu vanabadrakaliamman
temple,Coimbatore

COMMISSIONED

13

Supply,Installaiton,testing and commissioning of 1


X5 kWp Grid Connected Rooftop Solar PV Power
Generating System at BHEL,Trichy

1 X5 kWp Grid Tie

BHEL ,Trichy

COMMISSIONED

14

Design ,supply,Installation Testing and


Commissioning of "3kWp Off-Grid Roof Top Solar
Power Plant and 3 Nos of 100W LED Focus Light
Fitting Rail Vikas Nigam Ltd

3kWp Off Grid

Rail Vikas Nigam Ltd, Villupuram

COMMISSIONED

15

Supply ,Installation and Commissioning order for


10kWp Grid Connected Solar Power Generating
System

10kWp Grid Tie

Vivekananda Matric Hr Sec School,Arakonam

COMMISSIONED

16

Purchase order to install Grid Tied Roof Top Power


Plant wothout Battery Backup at Various Zones in
Corporation of Chennai.

73kWp Grid Tie

Corporation of Chennai

COMMISSIONED

17

Supply ,Installation of Grid Tie 10kWp Solar Power


Plant at Arulmigu Masniamman Temple

10kWp Grid Tie

Arulmigu Masniamman Temple ,Pollachi

COMMISSIONED

18

Supply ,Installation of Grid Tie 10kWp Solar Power


Plant at Arulmigu Vinayagar Temple,Echanari.

10kWp Grid Tie

Arulmigu Vinayagar
Temple,Echanari.Coimbatore

COMMISSIONED

19

Purchase order to install 10kWp On Grid Roof Top


Power Plant at Arulmigu Adaikalam Katha Iyyanar &
Bathrakaliamman Thirukovil
,Madapuram,Thiruppuvanam Taluk.Sivagangai

10kWp Grid Tie

Arulmigu Adaikalam Katha Iyyanar &


Bathrakaliamman Thirukovil
,Madapuram,Sivagangai

COMMISSIONED

20

Installation and Commissioning OFF Grid Solar PV


Project in Five different Tribal Colonies in
Palakkad(Dist)-Group-II

47kWp Off Grid

Kerala State Electricity Board

On Going

21

10kWp grid interactive Solar Power generation


system with required interface to existing power
distribution system at Electrical building.

10kWp Grid Tie

BHAVINI,Kalpakkam

COMMISSIONED

22

5kW grid interactive Solar Power generation system


with required interface to existing power
distribution system at Electrical building.

5kWp Grid Tie

BHAVINI,Kalpakkam

COMMISSIONED

23

3kW grid Standalone Solar Power generation


system with required interface to existing power
distribution system at Control building .

3kWp OFF Grid

BHAVINI,Kalpakkam

COMMISSIONED

24

ANERT 27 kWp Off Grid Solar Power Plant at 6


various Grama Panchayat

27 kWp Off Grid

Agency for Non-Conventional Energy & Rural


Technology

COMMISSIONED

25

Design , Fabrication,Supply,Installaiton,Testing and


Commissioning of onr no.50kWp Grid Connected
Solar Photovoltaic Power Plant with five years
warranty and operation and maintenance for ten
years Period Andaman & Nicobar Administration

50kWp Grid Tie

Andaman & Nicobar Administration

On Going

26

Southern Railway - PGT Supply at site ,erection ,


testing and commissioning of Grid connected solar
power generating system 20kWp(2X10 kWp)
capacity

2X10 kWp Grid Tie

Southern Railway,Palakad.

On Going

27

Purchase order to install 27kWp Grid Tied Solar


Roof Top Power Plant at D.A.V School, Chennai.

27kWP

D.A.V School, Chennai.

COMMISSIONED

28

Purchase order to install 10kWp Grid Tied Solar


Roof Top Power Plant at ICF School, Chennai.

10kWp

ICF School, Chennai.

COMMISSIONED