Sei sulla pagina 1di 2

Varianta nr.

1
870.00

Cantitati totale calculate mai jos


25.00

25.00

300.00

25.00

150.00 740.40
25.00
Spatiu tehnic
=2.85 mp

Dormitor =10.5 mp

300.00

Dormitor =10.5 mp

90

180

90

350.00

180

350.00

90

25.00

180

25.00

125.00 Baie =3.75 mp

Beton C12/15
24.65 mc
Beton C20/25
25.10 mc
Armatura (PC52,0B37) 1743 kg
Caramida GVP
26.84 mc
Mortar de zidarie
4187 kg

25.00

795.00

Hol intrare
=8.22 mp
Dormitor =10.5 mp

25.00

350.00
Bucatarie=6.0 mp

90
150.00

180

90
25.00

180

200.00

25.00

Fundatii
1) Conturul exterior
Perimetrul=7.25x2+8.50x2=31.5 ml

H=minim 0.9 depinde de zona unde este localitatea,se determina in functie de adancimea de inghet
B=0.5 m (minim pt. conditii tehnologice)
H=1.0 m (luam aproximativ)
H.s=0.4 m
B.s=0.35 m (caramida de 0.25m + 5 cm de fiecare parte pe langa caramida)
Cantitate beton fundatii
Q.b.simplu=1.0x0.5x31.5=15.75mc
Q.b.armat=0.4x0.35x31.5=4.28 mc

C12/15
C20/25

Cantitate de armatura din fundatii


Q.armatura=4.28*0.20%*7850kg/mc x 2 fete =135 kg
2) Conturul interior
Perimetrul=7.25x2+3x3=23.50 ml

B=0.25m+0.05m+0.05m=0.35m (minim cat este grosimea peretelui+ cate 5 cm intr-o parte si alta)
H=nimim 0.9 (alegem 1.0 m)
se alege in functie de tg de unghiu alfa,aici sunt mai multe detalii dar deja ii prea mult sa iti explic
Q.beton=0.35x1.0x23.50 ml=8.9 mc C12/15
Placa peste sol
H.placa =minim 12 cm
A.placa=10.5mpx3+6mp+8.22mp+3.75mp+2.85mp=52.32 mp
Cantitate beton placa
Q.beton=52.32mp x 0.12 m = 6.3 mc C20/25
Cantitate armatura placa
Q.armatura=6.3mc x 0.8% x 7850 kg/mc =395 kg

Stalpisori la colturi
A.stalpisori=0.25 x 0.25 = 0.0625 mp
Cantitate beton in stalpisori
Q.beton stalpisori=0.0625mpx2.80m (inaltime nivel) x 12 buc = 2.1 mc de beton C20/25
Cantitate armatura in stalpisori
Q.armatura.stalpisor=0.175mc/buc x 1% x 7850 kg/mc x12 buc=165 kg armatura longitudinala
Q.etriri=28 buc x 0.198kg/buc x 12 stalpisori =67 kg
Q.stalpisori =232 kg
Centuri
A.centura=0.25mx0.4m =0.1 mp
Cantitate beton in centuri
Q.beton centura=0.1mp x (29 ml/centuri exterioare + 16ml/centuri interioare) =4.5 mc C20/25
Cantitate armatura in centuri
Q.armatura.centura=4.5 mc x 1% x 7850 kg/mc = 354 kg armatura longitudinala
Q.etrieri centura = 300 buc (45 ml centura din 15 in 15 cm etrieri) x0.4345 kg/buc =130.5 kg
Q.centura = 485 kg

Caramida
Arie geamuri =1.5mx1.5m x 4 buc + 0.5 m x 0.5 m =9.25 mp
Arie usi = 0.9mx1.8m x 5 buc + 1.5mx1.8m = 10.8 mp
A.caramida exteriora=[ (3m+1.5m+3m)x2 + (3.5m+3.5 m) x 2 ] x (2.80m (inaltime nivel )- 0.35 m (inaltime centura))=71.05 mp
A.caramida interioara = [(3.5 m +3.5 m )x2 buc + 3 m x3 buc]x (2.80 m- 0.35 m) =56.35 mp
A.caramida=71.05 mp + 56.35 mp - 9.25 mp -10.8 mp =107.35 mp caramida
Q.CARAMIDA= 107.35 mp x 0.25 m = 26.84 mc
Consum mortar
Sa zicem 156 kg / mc de zidarie => 26.84 mc x 156 kg/mc = 4187 kg de mortar pentru zidarie

Placa peste parter


Arie placa = 8.5m x 7.75 m = 65.88 mp
Grosime placa= minim 12 cm (conditii de rigiditate si rezistenta la foc)
Cantitate beton placa peste parter
Q.beton.placa = 65.88 mp x 0.12 m =7.91 mc C20/25
Cantitate armatura placa peste parter
Q.armatura.placa= 7.91 mc x 0.8% x 7850 kg/mc = 496 kg