Sei sulla pagina 1di 1

GGS-H1

Installation & General Inspection

Details

Date
Huawei Representative
TNL Representative
Site ID-GIS Code
Site Type (Shelter (Indoor/ Outdoor,Nano),
Civil, Mobility Shared)
Site Type (AC/Non-AC)

9/8/16
Mohd Zaid
Ravinder Thapa
GGS

Site on SDH,CEN
(ALU,Cisco,Hauwei,ZTE),MW,SDH L2 POI
Node Name
Vendor & Model
MSAN Uplink Port Details
MSAN Uplink Connectivity Type (Ethernet/
Fiber)
Software
Source A in VDc
Source B in VDc
Earthing Value in Ohm
Amps Rating of MCB's

Sr No
0
1
2
3
4
5
6
7
8
9
10
11
12
Physical Verification

CIVIL
AC
CEN - ALU
H1
Huawei MA5603T
0/6/0- & 0/7/0
Fiber
MA5600V800R016C00
53.9
54.0
1.3 ohm
63A

Item
H80DCCPE
H80DCCPE
H80DCCPE
H80DCCPE
H80DCCPE
H80DCCPE
H802SCUN
H802SCUN

H806VPEA

Slot
0
1
2
3
4
5
6
7
8
9
10
11
12

Serial Numbers

Description

Status

Remarks

Pass/Fail

Applicable for NEW RACk


only

Pass

023ANUDMG3605602
023ANUDMG3601946
023ANUDMG2600480
023ANUDMG3600990

021VDEDMG3601076
021VDEDMG3601842

021YHY10G3000294

Criteria
H/W installed shall be verified from NOC thru EMS
H/W installed shall be verified from NOC thru EMS
H/W installed shall be verified from NOC thru EMS
H/W installed shall be verified from NOC thru EMS
H/W installed shall be verified from NOC thru EMS
H/W installed shall be verified from NOC thru EMS
H/W installed shall be verified from NOC thru EMS
H/W installed shall be verified from NOC thru EMS
H/W installed shall be verified from NOC thru EMS
H/W installed shall be verified from NOC thru EMS
H/W installed shall be verified from NOC thru EMS
H/W installed shall be verified from NOC thru EMS
H/W installed shall be verified from NOC thru EMS

Pass/Fail
Pass
Pass
Pass
Pass

Pass
Pass

Pass

19

Proper Installation/Mounting of Rack

OK

20

Proper Installation/Mounting of MSAN


Shelf

OK

21

Sufficient Space for Air Circulation

OK

22

No Physical Damage to MSAN


Shelf/Cards

OK

Pass

23

No Physical Damage to MSAN Cards

OK

Pass

24

Proper laying of Power Cables


Terminating of power cables to Dual
Power Supply
Earth Cable is properly Grounded
Proper Laying of Fiber/ Ethernet
Cables

OK

Pass

28
29

25
26
27

30
31
32

OK

Pass
Applicable for New Rack
only and if Space

Air-flow from bottom to TOP for MA5600T and from


Left to right for MA5603T

Cabinet to DCDB only

Pass

Pass

OK

Pass

OK

Pass

Proper Laying of Subscribers Cables

OK

Pass

All Cards are screw tight


Check the Labelling of Shelf, Power
Cables, Grounding Cables & Uplink
Connectivity Cables
All Alarms LEDs/ Lamps are in
healthy condition.
Unused Slots are close with Blank
pannel

OK

Pass

OK

Pass

OK

Should be Green

OK

Pass
Pass

Optical Power Level of Uplinking


Fiber Patch Cord

Uplink Port

Tx (db)

Rx(db)

Limit (db)

Pass/Fail

33

0/9/0

1/1/5

-6.110112

-6.187043

should be greater than -19

Pass

34

0/10/0

2/1/5

-5.800442

-5.412111

should be greater than -19

Pass

Mohd Zaid
Huawei Representative Signature

Ravinder Thapa
TNL Field Representative Signature